HomeMy WebLinkAboutCOW 2010-11-22 Item 4C - Bid Award - Tukwila Urban Center Access (Klickitat) with Atkinson Construction for $10,880,180 COUNCIL ACHNDA SYNOPSIS
-1161 2 Inztzali ITEM NO.
P 11 i 0 Meeting Date by
<c: Meetin Date Prepared b MaYo vzezv oun review J
in in/
1 11/22/10 BG k
t 11/22/10 1 BG 1-
ITEM INFORMATION
CAS NUMBER: 10-134 1 ORIGINAL AGENDA DA 1 E: NOVEMBER 22, 2010
AGENDA ITEM TITLE Bid Award for Tukwila Urban Center Access (Klickitat) Project
CATEGORY Discussion I Motion Resolution Ordinance Bid Award Public Hearing n Other
Mtg Date 11/22/10 Mg Date Mtg Date Mtg Date Mtg Date 11/22/10 Mtg Date Mtg Date:
'SPONSOR I Council Ma J Adm Svcs DCD n Fznance Fzre Legal Pe,'R Police PW
SPONSOR'S This project will provide roadway improvements on Southcenter Parkway, Klickitat
SUMMARY Drive, and Strander Boulevard by constructing an underpass for the southbound lane
on Southcenter Parkway. The project was advertised on September 30, October 7 and
14, 2010, and seven bids were opened on November 4, 2010. The low bid of
$10,880,180.00 was from Guy F. Atkinson Construction, LLC, who has completed
many large construction projects for WSDOT.
REVIEWED BY L) COW Mtg. 1 1 CA &P Cmte 1 I F &S Cmte Transportation Cmte
Lf Utilities Cmte Arts Comm. Li Parks Comm. Planning Comm.
DATE: 11/15/10
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE Unanimous approval, forward to Committee of the Whole Special
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$10,880,180.00 $19,763,000.00
Fund Source: 104 Arterial Street Fund (page 15, 2011 Proposed CIP)
Comments:
MTG. DATE RECORD OF COUNCIL. ACTION
11/22/10
11/22/10
MTG. DATE ATTACHMENTS
11/22/10 Informational Memo dated November 8, 2010 (revised after 11/15 TC)
Bid Tabulation
CIP Sheet, page 15 2011 Proposed CIP
Transportation Committee Meeting Minutes from November 15, 2010
11/22/10
61
62
,01411:.4- 9�y
City of Tukwila
Jim Haggerton, Mayor
90 INFORMATIONAL MEMORANDUM
TO. Mayor Haggerton
Transportation Committe
FROM: Public Works Director
DATE: November 8, 2010
SUBJECT: Tukwila Urban Center Access (Klickitat) Proiect (revised after 11/15 TC)
Project No. 98410419
Bid Award
ISSUE
Award the construction contract to Guy F. Atkinson Construction, LLC for the Tukwila Urban Center Access Project.
BACKGROUND
A call for bids was advertised on September 30, October 7, and October 14, 2010 Nine addenda were issued addressing clarifications in the bid
documents as well as extending the closing date to November 4, 2010. Seven bids were received and opened and an eighth bid was turned
away as it arrived after the 9:00 am deadline. The lowest responsible bidder is Guy F. Atkinson Construction, LLC
ANALYSIS
The construction bids were reviewed and no mathematical errors were found on Atkinson's bid. Atkinson's bid also included the required 15%
Disadvantaged Business Enterprise (DBE) goal and Washington State Department of Transportation (WSDOT) has confirmed the bid has met
this federal requirement. The Transportation Improvement Board (TIB) has reviewed the bid tab along with WSDOT and both agencies have
given Tukwila authorization to proceed with bid award. Guy F. Atkinson Construction is a large construction company with the resources to
construct the Klickitat project. The proposed bid, along with The remaining known and estimated expenditures, is within the project budget.
Phase Estimated Low Bidder Fund Source 2011 CIF Available
Supplement #11 Design $107,764 $107,764 Federal Grants $3, 250,000 $3,250,000
Construction (Engineer's Estimate) $15,365,000 $10,880,180 TIB Grant $5,000,000 $3,398,716
1 Contingency (10 %/20 1 $1,536,500 $2,176,036 1 City /TIF Funds $(32,000) $31,000
Incentive Pay $250,000 $250,000 1 LID $11,545,000 $8,910,300
Construction Management (15 %/20 j $2,304,750 $2,176,036
1 Total $19,564,014 $15,590,016 Total $19,763,000 $15,590,016
With such a competitive bidding climate, the two low bids came in substantially lower than the engineer's estimate. While this is extremely good
for Tukwila and the property owners participating in the LID, staff is recommending a larger than typical 10% construction contingency. A 20%
contingency is recommended. There is also the potential for the contractor to receive some incentive pay should they be able to complete the
project well in advance of the holiday moratorium. This is the first project Tukwila has undertaken with an incentive pay clause. Additionally, staff
recommends estimating Construction Management costs at 20 rather than the typical 15
Unfortunately the low bid comes with a reduction in the TIB grant. The TIB does not award fixed grant amounts like our other grant sources. The
savings in construction costs must be shared with the TIB, just as any overruns can also be shared with TIB. The approximately $1 6 million
reduction in the grant reflects this savings at project close out. The final amount, reimbursable by TIB, will be adjusted to reflect the actual
project cost.
The LID and the Impact Fee contributions are also adjustable based on the final project cost. New impact fees may be collected next year and
the final number of the LID will be determined after the project is closed out and all costs are known.
RECOMMENDATION
Award the Tukwila Urban Center Access Project's construction contract to Guy F Atkinson Construction, LLC in the amount of $10,880,180.00
and consider this item at the November 22, 2010 Committee of the Whole meeting followed by a Special Meeting on that same night.
Attachments: Bid Tabulation
CIP Sheet
W' \PW Eng \PROJECTS\A- RW RS Projects \84RW19 TUC Access (Klickitat) \INFO MEMO Bid Award 11 -15 -10 gl.doc 6 3
rn
.p
CITY OF TUKINILA TUKWILA URBAN ACCESS IMPROVEMENT PROJECT (KLICKITAT)
CERTIFIED BID TABULATION
November 5, 2010
Engineer's Estimate I I Guy F. Atkinson Construction, LLCI Northwest Construction, Inc. I ICON Materials I J.R. Hayes Sons, Inc. I
Bid Schedule A Public Roadway Improvements I
Item No.I Item Description Quantity Unit Unit Price 1 Cost Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost
Al Roadway Improvements, Complete 1 LS 5,780,716.00 4,400,000.00 4,400,000.00 4,750,956.00 4,750,956.00 5 4, 6,0
4,643,697.00 6,294,000.00 6,294,000.00
A2 Bridge, Complete
nd 9, Comp 1 LS 7 1,338,S 56 .00 ___2 235,000.00 8 04,000.00 604,000.00 619,000.00 619,000.00 1,026,000.00 1,0200.00
A3 Walls 5A,0 alete 1 LS 35,154,00 5 21,000.00 .,000.00 18,430.00 2 1 18,430.00 19,430.00 51,000.00 51,000.00 5 53,000700 53,000.00
r
A4 Walls 5B,5C and 7, Complete 1 LS 373, 359.00 SOO,W0.0o �DD,OD0.00 _554,450.0 0 05 ;1,456700 574,000.00 574,000.00 -5 __410,000.00 410,000.00
A5 Wall 6, Complete W 1 LS 1,665,909.00 1,68 t 1.680,06 676 0 1,285,000 _1,285,000.00_ 1,449 __,000.00 1,449,000.00 937,000.00_ 937,000.00
AS alls 1,2,3 and 4, Complete 1 1.9 2,756,194.00 5 2,120,000.00 _2,120,000.00 5 9 1,8 2,670,000.00 2,670,000.00 1,780,000.00 1
A7 Temporary Erosion and Sediment Control (TESC) 1 LS 5 480,641.00 75,000.00 75,000.00 5 70,464.00 70,464.00 5 260,300.00 260,300.00 106,000.00 106,000.00
AB Training 1000 HR 3,000.00 10.00 10,000.00 2.00 2,000.00 0.05 50.00 f 4700 47,000.00
AS Shoring or Extra Excavation Class B 1 LS 11,545,00 5,500.00 5,500.00 1.00 1.00 2100.00 2,100,00 1.00 1.00
A10 Potholing for Utilities as Marked ___7 EA E___ 7,000.00 1,000.00 7,000.00 1,300.00 9,100.00 500.00 3,500.00 E_ 1,200.00 8,400.00
All Type B Project Schedule (Mn i. Bid 370,000) 1 LS _70,000.00 5 70,000.00 70,000.00 70,000.00 5 7000000 7000000 7 70,006 7
M2 Trench Safety System 1 LS 4,320.00 5,500.00 5,500.00 1.00 1.00 3,100.00 3,100.00 E 1,00 1.00
it C ndCountermeasures P t 1 ----0
A73 Spill Control, Prevention and (SPCC) Plan 1 LS 5,400.00 2,500.00 S 2_500.00 S 1.00 S 1.00 5 SOD.00 S 500.00 E 1_500.00 1,500.00
A14 Project Temporary Traffic Control 1 LS 1,223,587.00 1 1$0.000.00 150,000.00 221,000.00 221,000.00 115.200.00 115,200.00 191,000.00 191.000.00
Total Bid Schedule A 13,763,401.00 9,281,500.00 9,624,403.00 01 10,461,447.00 910,923,902.00
Bid Schedule B City of Tukwila Water Line and System Improvements
Item No.I Item Description 1 Quantity I Unit 1 Unit Price I Cost I Unit Price 1 Cost 1 Unit Price 1 Cost I Unit Price 1 Cost I Unit Price 1 Cost 1
131 1Cily of Tukwila Water Line and System, Complete 1_5 I 4 63,907.00 $75,000.00 5 575,000.00 5 367,750.00_ 367,7 j 586,000.00 _431,900.00 431,900.00
82 Trench Safely 1 LS 4,320.00 1,000.00 1,000.00 1.00 1.00 1 1$ 3,200.00 1.00 I 5 1.00
Subtotal 5 468,227.00 576,000.00 367,751.00 5 589,200.00 431,901.00
Sales Tax 9.5% 44,452.00 54,720.00 34,936.35 55,974.00 41,030.60
Total Bid Schedule B 512,709.00 630,720.00 402,687.35 645,174.00 472,931.60
Bid Schedule C Metro Sanitary Sewer Improvements
1 Item No.1 Item Description 1 Quantity 1 Unit I Unit Price 1 Cost I Unit Price 1 Cost 1 Unit Price 1 Cost 1 Unit Price 1 Cost 1 Unit Price I Cost I
I C1 1Melro Sanitary Sewer Manhole Modification I 1 I LS I I 10,000.00 1 8,000.00 1 8.000 00 1 1 5,500.00 1 1 14,500.00 1 7,500.00 1 7,500.00 1
Total Bid Schedule C 10,000.00 0,000.00 5,500.00 14,500.00 7,500.00
Sales Tax 9.5% 950.00 760.00 522.50 1,377.50 712.50
Total Bid Schedule C 10,950.00 8,750.00 6,022,50' 15,877.50 6,212.50
Bid Schedule D Owner Directed Work
Item No. Item Description Quantity 1 Unit Unit Price Cost Unit Price I Cost Unit Price 1 Cost Unit Price Cost Unit Price Cost
D1 Minor Changes 60,000 I EST 1.00 60,000.00 1.00 60,000.00 1.00 60,000.00 1.00 60,000.00 S 1.00 60,000.00
D2 Resolution of Ulilily Coni icts 100,000 EST too E 100,000.00 1.00 _1 too 9 100,000.00 7 1:66 766 ,560.00 ___1Ao _S 100,000.00
03 Property Re 00,000 EST 1.00 S ____80,000.00 S 1.00 80 ,000.00 1.00 60,000.00 100 80,000.00 1 oo 80,000.00
D4 Unsuitable Excavation and B ackrill Incl. Hau 2,000 CY 40,000.00 35.00 76,000.00 21,00 42000.00 6 _30.00 60,000.00 6 14.13_ 28,260.00
05 Explorative Excavation As Di 25,00_
rected 0_ EST 1.00 25.000.009 1.00 I 0 5 12.44 25,000.00 1,00 25,000.00 1.00 5 2 1.00 00
25,000.00
D 0
5 Gravel Borrow 1,000 TON 1 4,000.00 15.00 1 5 ,0 00.00 16.00 16,000.00 26.00 5 26,000.00 12,440.
D7 PolholinQ -As Directed _2 EST 1.00 20,000.00 f 1_00 20,000.00 1.00 5 20,000.00 S 20,000.00 E 1.00 f 2000000
D 8 Asphalt Cosl Price Adjustment 1 CA LC_ 63,20 63,200.00 63,200.00 63,200.00 63,200,00 63,200.00 63,200.00 6 63,200.00 $__6 63,200.00
D9 Monument Sign Relocation 30000 EST 1.00 6 30,000.00 1.00 30,000.00 5 1.00 30,000.00 1.00 E 30,000.00 1.00 30,060.00
D10 Quarry Spans 2,000 T 5
s O N 40,000.00 25.00 5 50,000.00 21.00 42,000,00 25.00 50,000.00 16.01 5 32,020.00
011 Soulhcenter Parkway Sign B ridge __140,000 EST 0 1.00 1 1.00 140,000.00 1.00 5 140,000.00 1_00 140,000.00 .5 1.00 8 140,000.00
012 Preparation and Approval of Traffic Control Plans 5 0,000 EST 1.00 50,000_00 1 00 19 50,000.00 1.00 S 50,000.00 1.00 502000.00 S 1.00 5 $0,000.00
013 Removing Shaft Obstructions 2 50,000 EST 1.00 250,000.00 1.00 1 250,000.00 1.00 250.000700 1.00 2 50,000.00 1.00 250,000.00
Total Bid Schedule D 912,200.00 959,200.00 918,200.00 954,200.00 890,920.00
Schedule A brought forward 13.763,481.00 9,281.500.00 9,624,403.00 10,461,447.00 510,923,902.00
Schedule B brought forward 512,709.00 630,720.00 402.687.35 645,174.00 472,931.60
Schedule C brought forward 10,950.00 8,760.00 6,022.50 15,877.50 8,212.50
Schedule D brought forward 912,200.00 959,200.00 918,200.00 954,200.00 890,920.00
TOTAL BASE BID PRICE 15,199,340.00 10,880,180.00 5 10,951,312.85 1 12,076,698.50 612,295,966.10
Disadvantaged Business Enterprise
Miscalculations in Contractor Bid Proposals 15% Goal 1$ 1,632,027.001 15% Goal 1 1,642,696.93 1 15% Goal 1 1,811,504.78 1 15% Goal 1,844,394.91
(1) 93 Error in sum for Total Bid Schedule A, total base bid matches proposal ,Proposed A E 1_712,180_00 Proposed _1 1,660,300.00 _Proposed $_2,105,573.00__Proposed 1,909,873.21
(2) 56,000 Error in summation of item A10 unit price listed, not total, total base bid matches proposal Met Goal? YES Met Goal? YES I MetGoal? I YES 1 Mel Goal? YES
(3) All costs in Engineer's Estimate are rounded to nearest whole dollar
Certified bur Date
Cyndy Knighton. Senior Engineer
W.1PW Eng\eld P drlvetCyndyWidtilaltaid Tab Page 1 of 2
Corry OF TUKVVILA TIJKWILA URBAN ACCESS IMPROVEMENT PROJECT (KLICKITAT)
CERTIFIED BID TABULATION
November 5, 2.010
I Engineer's Estimate Gary merlin° Construction Co. 1
Inc. Mowat Construction Company I C.A. Carey Corporation
Bid Schedule A Public Roadway Improvements
Item No.1 Item Description Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost
Al Roadway Improvements, Complete 1 LS 5,780,716.00 5,520,000.00 5,520,000.00 6,500,000.00 6,500,000.00 6,570,000.00 6,570,000.00
A2 Bridge, Complete 1 LS
'I538,656.0o 9 Th46.606706 840,006:66 1,000,e06:bp 1,000,000.00 900,000.00 $90000.b0
r
A3 Walls 5A,8 and 9, Complete 1 LS 35,154.00 36,000.00 36,000.00 6,000.00 8,000.00 39,000.00 39,000.00
A4 Walls 513,5C and 7, Complete_ 1 LS 373,359.00 640,000.00 640,000.00 500,000.00 500,000.00 705,000.00 705,000:00
A5 Wall 6, C cniplele 1 LS 1,665,909D0 1,500.00000 1,50,000.00 600,00000 600,000.00 2,000,000.00 2,000,00000
AG Walls 1,2.3 and 4, Complete 1 LS 2,756,194.00 2,306;000.60 2,300,000.00 2,300,000.00 2,300,000.00 2,100,000.00 2,100,000.00
A7 Temporary Erosion aild Sediment Control (1 ESC) 1 LS 488,6 235,000.00 2•$6,000.00 .600,000.6 i 6 50,060.00 204,000.00 204,0b0.06
AEI training 1000 HR 3,000D0 45.00 45,000.00 1.00 1,000.00 5.00 5
A9 Shoring or Extra Excavation aiss B 1 LS 11 545.bo 76,000.00 10 ONT.00 •70 000.0d 70 Ti 3 O00.00 11,000.00
A10 Potholing for Utilities as Marked 7 EA 7,000.00 600.00 4,200.00 700.00 4,900.06 1,000.00 7,000.00 12
All type 0 Project $cheatile (Min. Bid $70,000) 1 LS 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00
Al2 Trench Safely System 1 LS 4,320.00 10,000.00 10,000.00 25,000.00 25,00000 7,000.00 7,000,00
A15 13ift Control, Prevention aWi Plan 1 LS 5.400.00 500.00 500.00 1,000.00 1,000.00 1,000.00 .1:000.00
A14 ProiegiteMporary traffic Control 1 LS 9 430,000.00 430,000.00 2$0.0 5230.000.00 1,006,000.06
Total Bid Schedule A 13,763,481.00 911,648,700.00 $11,909,900.00 913,619,000.00
Bid Schedule 0 City of Tukwila Water Line and System Improvements
Item No. Item Description I Quantity 1 Unit I Unit Price I Cost I Unit Price 1 Cost I Unit Price I Cost I Unit Price Cost
I B1 City of Tukwilaytfater Line and System, Complete I 1 I LISS. I 1 463,907.00 I 493,000.00 I 493,000.00 I 475,000.00 1 475,000.00 1 614,000.00 .614,000.00
1
I B2 Trench Safety 4,320.00 I 3.000.00 I 3,000.00 I 500.00 I 500.00 I 1.70005 1.700.00
Subtotal 468,2.27.00 496,000.00 475,500.00 615,700.00
Sales Tax 9.5% 44,482.00 47,120.00 45,172.50 58,491.50
Total Bid Schedule 0 512,709.00 543,120.00 520,672.50 674,191.50
Bid Schedule C Metro Sanitary Sewer Improvements
!Item No.I Item Description I Quantity I Unit 1 Unit Price I Cost I Unit Price I Cost I Unit Price I Cost I Unit Price I Cost
Cl I Metro Sanitary Sewer Manhole Modification I 1 1 LS I I 10,000.00 I 10.000.00 1 10,000.00 I 10,000.00 I 10,000.00 I 7.80000 I 7,800.00
Total Bid Schedule C 10,000.00 10,000.00 10,000.00 7,800.00
Sales Tax 9.5% 950.00 950.00 950.00 741.00
Total Bid Schedule C 10,950.00 10,950.00 10,950.00 0,541.00
Bid Schedule D Owner Work
Item No. Item Description Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost
01 Minor Changes 60,000 EST 1.00 60,000.00 1.00 60,000.00 1.00 60,000.00 1.00 60,000.00
D2 Resolution of Utility Conflicts 100,000 EST 1.00 100,000.00 1.00 100,000.00 1.00 100,000.00 1.00 100,000.00
D3 Properly Restoration 00,000 EST 1.00 80,000.00 1.00 00,000.00 1.00 00,000.00 1.00 80,000.00
j
54 Unsuitable Excavation and bacitlill Incl.Flaut 2,000 CY 40,000.00 35.00 70,000.00 39.00 78,000.00 39.00 78,000.00
D5 Explorative Excavarin Directed 25,000 E 1.00 25.000.00 1.00 25,000.00 1.00 25,000.00 1.00 ,T26,060.6 6
D6 Gravel borrow 1.000 TON 14,000.00 18.00 18,000.00 12.25 12,250,00 18.00 16,000.00
07 Potholing As Directed 20,000 EST 1.00 520,000.00 1.00 20,000.00 1.00 20,000.00 1.00 20,000.00
DO Asphalt Cost Pride Adjustment 1 CALC 63,200.00 63,200.00 63 63,200.00 63,200.00 63,200.00 63,200.00 63,200.0o
09 Monument
ent Sign Relocation 30,000 EST 1.00 30,000.00 1.00 30,000.00 1.00 30,000.00 1.00 30.000.00
b16 Quarry $palls 2,000 TON 40,000.00 14.00 26,000.00 19.00 38,000.00 31.00 62,000.00
011 Soulhcenter Parkway Sign Bridge 140,000 EST 1.00 140,000.00 1.00 140,000.00 1.00 ,9_9000 1.00
1-467)6 Co 0
•if>1 Preparation and Approval of Traffic Control Plans 50,000 EST 1.00 50,000 00 1.00 50,000.00 1.00 50,000.00 1.00 50,000.6E
D13 Removing Shaft Obstructions 250.000 EST 1.00 250,000.00 1.00 250,000.00 1.00 250,000.00 9 1.00 is 0;006m
Total 1301 Schedule D 912,2(10.00 934,200.00 946,450.00 976,200.00
Schedule A brought forward 13,763,481.00 $11,648,700.00 $11,909,900.00 $13,619,000.00
Schedule 13 brought forward 512,709.00 543,120.00 520,672.50 674,191.50
Schedule C brought forward 10,950.00 10,950.00 10,950.00 8,541.00
Schedule D brought forward 912,200.00 934,200.00 946,450.00 976,200.00
TOTAL BASE BID PRICE 15,199,340.00 13,136,970.00 1 $13,387,972.50 915,277,932.50
Disadvantaged Business Enterprise
Miscalculations in Contractor Bid Proposals 15% Goal 1,970,545.50 1 15% Goal 1 2,008,195.88 1 15% Goal 1 2,291,609.801
(1) $3 Error in sum for Total Bid Schedule A, total base bid matches proposal _Proposed 2 Proposed _I .2,025 I I 5
m m
(2) $6,000 Error in summation of ite A10 unit m
it price listed, not total, total base bid matches proposal Met Goal? YES I Met Goal'? I YES I Met Goal?
(3) All costs in Engineer's Estimate are rounded to nearest whole dollar
Certified by Date
Cyndy Knighton, Senior Engineer
W. PW Eng101d P drive 1 Cyndy1Klickilal1Bid Tab Page 2 of 2
CO
01
tT
tT
Disadvantaged Business Enterprise
Guy F. Atkinson Construction, LLC I Northwest Construction, Inc. I ICON Materials I J.R. Hayes Sons, Inc.
Amount to Amount to Amount to Amount to
Nance of DBE be Applied Name of DBE be Applied Name of DBE be Applied Name of DBE be Applied
Certificate Number Towards Goal Certificate Number Towards Goal Certificate Number Towards Goal Certificate Number Towards Goal
Garrison Creek Landscaping Inc WE Coates Surveying DDE Electric DBE Electric
D3M0719019 $245,269.00 D3M8019952 I $70,000.00 D2F1021272 $1,026,328.00 D2F1021272 $1,028,328.00
DDE Electric John Wayne Construction Co. Inc. John Wayne Construction Co. Inc. KODO Construction
D2F1021272 $1,028,328.00 D5M0107037 I $644,200.00 D5M0107037 $652,245.00 D4M801988 $393,149.21
KODO Construction Gloria Jeane Hauling 8, Highway Rehab I_n Rebar International AAA Contractors Inc.
D4M801908 $438,583.00 D1F5011386 $37.700.00 D $425.000.00 D4M9B21009 $488,396.00
Sea Tac Sweeping Service
D3M6015063 I $52,500.00
American Pride Corp.
D4M8019836 I $275,000.00
Leajak Concrete Construction Inc_
D3M5310714 I $310,000.00
Oneill Environmental Services LLC
D3M5310714 1 $25,000.00
Green City_ Inc
D4M9 1336 $245,900.00
2
I Totall $1,712,180.001 Totall $1,660,300.001 Totall $2,105,573.001 Totall $1,909,873.211
Gary Merlino Construction Co. Inc. I Mowat Construction Company I C.A. Carey Corporation
Amount to Amount to Amount to
Name of DBE be Applied Name of DBE be Applied Name of DBE be Applied
Certificate Number Towards Goal Certificate Number Towards Goal Certificate Number Towards Goal
John Wayne Construction Co. Inc. John Wayne Construction Co. Inc. John Wayne C onstruction Co. Inc.
D5M0107037 $645,000.00 D5M0107037 I $730,000.00 D5M0107037 $644,2.45.00 I
Rebar International Grady Excavation, Inc Rebar International
D2F2606440 $461,000.00 D2F9320267 $355,000.00 D2F2606440 $437,881.00
DBE Electric DBE Electric KODO Construction
D2F1021272 $1,029,000.00 D2F1021272 $940,000.00 D4M801988 $441,234.00
I Contracting Co Inc
D2F8718503 I $540,000.00
American Coating Supply
D3M0614843 1 $36,500.00
Garison Greek Landscaping
D3N8719019 I $205,000.00
I
I Totall $2,135,000.001 Totall $2,025,000.001 Totall $2,304,860.001
Certified by Date
Cyndy Knighton, Senior Engineer
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2011 to 2016
PROJECT: Tukwila Urban Center Access (Klickitat SIC Pkwy) Project No 98410419
DESCRIPTION: Improve traffic flow on Southcenter Parkway, Klickitat Drive and Strander Boulevard by constructing an
underpass for the southbound lane on Southcenter Pkwy Coordinate with WSDOT on 1 -5 on- ramps.
JUSTIFICATION: Provide needed future traffic capacity, safety improvements and reduce accidents.
STATUS: Design Report completed in 2005, design in 2006 2007, and LID formation in 2009 Proposed Southcenter
Pkwy Klickitat road closure for duration of construction will save a significant amount of costs.
MAINT. IMPACT: Overlay on a 10 -20 year cycle.
Project is on Impact Fee List under Zone 1. Federal design funds for $3.25m. Westfield Mall mitigation $579k cash
COMMENT: and $846k ROW, Boeing (Longacres) mitigation is $65k, ACME Bowling $112k. Construction grants, State TIB
$5m, Federal STP $3m and $250k. Local Improvement District (LID) is a range from $6.5 to $10.5 million.
FINANCIAL Through Estimated
(in $000's) 2009 2010 2011 2012 2013 2014 2015 2016 BEYOND TOTAL
EXPENSES
Design 3,341 670 4,011
LID Expenses 197 10 500 707
Land (RAN) 2,408 7
2,415
Const. Mgmt. 2,513 2,513
Construction 16,750 16,750
TOTAL EXPENSES 5,946 687 19,763 0 0 0 0 0 0 26,396
FUND SOURCES
Awarded Fed Grant 974 3,250 4,224
Earmark future) 1,840 435 2,275
Awarded State Grant 5,000 5,000
LID 11,545 11,545
ROW Donation 846 845
Mitigation Actual 759 759
Impact Fees 336 471 807
City Oper Revenue 1,191 (219) (32) 0 0 0 0 0 0 940
TOTAL SOURCES 5,946 687 19,763 0 0 0 0 0 0 26,396
le Project Location ns, j
-n, 1
e�.o kv T i 1
i
tj e
2011- 2016 Capital Improvement Program 15
67
�ItLA
Q. ,u. City of Tukwila Q Gy
7
Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes
November 15, 2010 5:00 p.m. Conference Room I
PRESENT
Councilmembers: Verna Seal, Committee Chair Chair; Joan Hernandez and De'Sean Quinn
Staff: Bob Giberson, Frank Iriarte, Robin Tischmack, Gail Labanara, Pat Brodin, Cyndy Knighton,
Shawn Hunstock, Jack Pace, Steve Lancaster and Kimberly Mate
Guests: Brent Carson, Gordon Derr, LLP; and Shelia Malbrain, resident
CALL TO ORDER: The meeting was called to order at 4:58 p.m.
I. PRESENTATIONS
No presentations
II. BUSINESS AGENDA
A. Tukwila Urban Center Access (Klickitat) Proiect Bid Award
Staff is seeking Council approval to award a bid to Atkinson Construction in the amount of $10,880,180 for
the Tukwila Urban Center Access (Khckitat) Project. The intent of this project is to improve traffic flow by
constructing an underpass for the southbound lane on Southcenter Parkway. Out of seven submitted bids,
Atkinson Construction has been identified as the lowest responsible bidder. Both the Transportation
Improvement Board (TIB) and Washington State Department of Transportation (WSDOT) have reviewed
the bid tabulation and have authorized the City to proceed with the bid award.
A favorable bidding climate has resulted in a bid below the engineer's estimate, and as such, staff
recommends increasing the project contingency as well as estimated construction management costs. Even
with implementation of these staff recommendations, the bid award still totals almost $4 million less than
the engineer's estimate. Any project cost savings will be reflected in the final costs of the LID as determined
and calculated after project completion and closeout. However, the favorable bidding climate also affects
the amount of the TIB grant funds received by the City. These awarded funds are not fixed monies and will
be reduced in relation to the low bid award; conversely, in the event of overruns, TIB grant funds will be
adjusted and /or increased as necessary.
Additionally, the City will be implementing an incentive clause in the construction contract which awards a
payment not to exceed $250,000 total for project completion in advance of the holiday moratorium which is
November 15, 2011. There will also be penalty assessments if the project is not complete within the
specified time period. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 22 COW FOR
DISCUSSION AND SPECIAL MEETING IMMEDIATELY FOLLOWING FOR APPROVAL AS
APPROPRIATE.
B. Tukwila Urban Center Access (Khckitatl. Supplement No. 11 with HNTB
Staff is seeking Council approval for Supplement No. 11 with HNTB in the amount of $107,764. This
supplement will cover additional design changes required by WSDOT beyond the scope of work developed.
Specifically, this supplement addresses design for a sign bridge and re- design of a storm drain to avoid
utility conflicts with a PSE utility duct bank and Qwest fiber optic lines. Funds for the supplement will be
taken from obligated federal construction funds. UNANIMOUS APPROVAL. FORWARD TO
NOVEMBER 22 COW FOR DISCUSSION
68