Loading...
HomeMy WebLinkAboutCOW 2010-11-22 Item 4D - Contract Supplement #11 - Tukwila Urban Center Access (Klickitat) Design with HNTB for $107,764 COUNCIL AGENDA SYNOPSIS W ILA l ,t QSy Initials �l L'1Vf NO Meetin Date Prepared by_ Mayor eu �ounczl review I 11/22/10 1 BG r t�.• y. 2 I 12/06/10 1 BG I 1 f I s.- I l 90 I 1 V� ITEM INFORMATION CAS NUMBER. 10-135 I ORIGINAL AGENDA DATE: NOVEMBER 22, 2010 AGENDA ITEM TITLE Tukwila Urban Center Access (Klickitat) Project Design Supplement No. 11 with HNTB CATEGORY Discusston Motion 1 1 Resolution U Ordinance n BzdAward n Public Hearing 1 1 Other Mtg Date 11/22/10 Mtg Date 12/06/10 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date I SPONSOR 1 1 Council Mayor I 1 Adm Svcs 1 1 DCD 1 'Finance n Fire 1 'Legal P&R LI Police PlV SPONSOR'S The design of the Tukwila Urban Center Access (Klickitat) Project has a number of SUMMARY outstanding issues requiring this additional Supplement No. 11 with HNTB. This supplement will design WSDOT's requirement of a monotube sign bridge on Southcenter Parkway and design of a PSE and Qwest utility duct bank to avoid major utility conflicts. Council is being asked to approve Supplement No. 11 for $107,764.00 with HNTB. REVIEWED BY n COW Mtg. n CA &P Cmte 1 1 F &S Cmte Transportation Cmte 1 1 Utilities Cmte 1 Arts Comm. 1 1 Parks Comm. 1 Planning Comm. DATE: 11/15/10 RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST, IMP FUND S EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $107,764.00 $19,763,000.00 Fund Source: 104 ARTERIAL STREETS (PAGE 15, 2011 PROPOSED CIP) Comments MTG. DA I RECORD OF COUNCIL. ACTION 11/22/10 12/06/10 MTG. DATE ATTACHMENTS 11/22/10 Informational Memorandum dated 11/8/10 Project Schedule HNTB Supplement No. 11 Minutes from the Transportation Committee meeting of 11/15/10 12/06/10 69 70 City of Tukwila b Jim Haggerton, Mayor 906 INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Public Works Director 1 Ari DATE: November 8, 2010 SUBJECT: Tukwila Urban Center Access (Klickitat) Proiect Project No. 84 -RW19, Contract No. 05 -071 Supplemental Agreement No. 11 ISSUE Approve HNTB Supplement No. 11 for additional design scope in order to meet WSDOT requirements and minor utility design adjustments for the Tukwila Urban Center Access (Klickitat) Project. BACKGROUND The design of the Tukwila Urban Center Access Project halted at the 100% shelf -ready design in May of 2007. At the time it was shelved, there were a number of outstanding issues requiring resolution before the project design efforts could resume. Those issues included: WSDOT approvals, design of the buttonhook ramp, right of way (ROW) acquisition, property coordination and associated design efforts, construction phasing and formation of the Local Improvement District. Supplemental Agreements #8 and #9 were developed to complete the design based on the new WSDOT and Federal Highways Administration (FHWA) requirements. Supplemental Agreement #10 was a simple time extension. Even after execution of Supplemental Agreement #9, WSDOT continued to place new requirements on this project beyond the scope of work developed. After extensive negotiations, WSDOT and FHWA have given the necessary approvals and permits allowing the project to go to ad, but with the understanding that two late- emerging requirements would be completed concurrent with the ad period and early construction. The two requirements are to design and construct a monotube sign bridge on Southcenter Parkway between the Nordstrom signal and Klickitat Drive and provide Public Interest Findings (PIF) for the project file for materials which are either sole source or have less than 3 brand names identified. Puget Sound Energy (PSE) and Qwest have a major shared utility duct bank on the east side of Southcenter Parkway, south of Strander Boulevard, which is encased in concrete. Early coordination with PSE and Qwest was somewhat successful but as the project neared the ad date of September 30, 2010, details on the utility duct bank were not provided to the design team in a timely manner. The Plans, Specifications and Estimate (PS &E) documents for the project identified the potential major utility conflicts. Unfortunately there was insufficient time to modify them prior to the September 30 ad date DISCUSSION Supplemental Agreement #11 includes design for the sign bridge on Southcenter Parkway and re- design for the storm drainage to avoid the duct bank. Scope and budget is also included for the PIF's. WSDOT will need to review and approve the sign bridge design but will not be reviewing or approving the rest of the work. The budget reflects the anticipated level of WSDOT coordination. Funding for Supplemental Agreement #11 will come from the federal construction funds recently obligated The work will be issued as a change order to the contractor Minimal impacts to the construction cost are anticipated Phase Estimated Low Bidder 1 Fund Source Available Supplemental Agreement #11 Design 107,764 107,764 Federal Grants 3,250,000 Construction (Engineer's Estimate) 15,365,000 10,880,180 TIB Grant 1 3,398,716 Contingency (10 %/20 Incentive ($250k) 1,786,500 2,426,036 1 City Funds 31,000 Construction Management (15 %120 2,304,750 1 2,176,036 j LID f 8,910,300 Total $19,564,014 $15,590,016 1 Total 1 $15,590,016 RECOMMENDATION Approve Supplemental Agreement #11 with HNTB for final design and PS &E work in the amount of $107,764.00 and consider this item at the November 22, 2010 Committee of the Whole meeting and subsequent December 6, 2010 Regular Meeting. Attachments: Project Schedule HNTB Supplemental Agreement #11 71 IPW Eng1PROJECTSIA- RW RS Projects TUC Access (Klickitat)1INFORMATION MEMO Supplement #11 Sign Bridge, Utility Conflicts, PIFs 11- 8- 10.doc W Tukwila Urban Center Access (Klickitat) Project Schedule Done Date Description 5/7/07 Environmental Approval: ECS Accepted by FHWA 5/24/07 Design Substantial Completion: 100% Shelf -Ready Plans completed 7/16/09 Right -of -Way: Possession and Use Agreement from Legacy Partners 8/17/09 Transportation Committee: LID schedule and steps 8/24/09 Committee of the Whole: LID Schedule and Process 8/25/09 WSDOT ROW certification, limited access revision, channelization plans 8/28/09 Open House: For property owners, businesses and tenants 9/3/09 Open House: For property owners, businesses and tenants 9/4/09 Notification to Property Owners For Public Hearing on Resolution to Form LID 9/8/09 Transportation Committee: Resolution of Intent to Form LID 1 9/14/09 Committee of the Whole: Resolution of Intent to Form LID 9/21/09 Regular Council. Public Hearing Adoption of Resolution of Intent to Form LID 1 1 10/2/09 Notification to Property Owners For Public Hearing on Ordinance to Form LID I 10/5/09 Transportation Committee: Revised Resolution of Intent to Form LID COW Regular Council. Public Hearing Adoption of Resolution of Intent to 10/26/09 Form LID (revised) 11/2/09 Transportation Committee: Revised Ordinance to Form LID 11/9/09 Committee of the Whole: Ordinance to Form LID 11/16/09 Regular Council: Public Hearing Adoption of Ordinance Forming LID #33 2/12/10 WSDOT: Submit for Channelization Plan approval 2/22/10 Right -of -Way: Recorded acquisition and easements from Doubletree Legacy 3/5/10 WSDOT: Comments on Channelization Plan 9/22/10 Finalize PS &E Documents 8/6/10 WSDOT: ROW Certification Process (Partially complete 7/8/10) 9/10/10 WSDOT: Channelization Plan Approval 9/13/10 WSDOT: Project Analysis (deviations) Approval Process 8/4/10 WSDOT: Updated Storm Water Report Approval Process (pending any design changes made to gain Chan Plan approval) 9/22/10 WSDOT: 100% PS &E Approval Process 9/30/10 10/26/10 Advertise for Construction Bid: 3 week time period (required by federal funds) I I 11/4/10 Bids Due with Bid Opening 11/15/10- 11/22/10 Transportation Committee, City Council (C.O.W. and Regular): Award of Contract j 11/23/10 or later Notice to Proceed to successful bidder Nov. -Dec. 2010 Pre construction work of project (no substantial roadway work included) January 2011 Construction of project begins November 2011 Completion of construction, roadway open to traffic 72 W' \PW Eng \Old P drive \Cyndy \Klickitat \Project Schedule Council Packet.doc Adak Igr7/ Washington State 21 Department of Transportation Organization and Address Phone Supplemental Agreement City of Tukwila Number 11 Public Works Department 6300 Southcenter Blvd., Suite #100 Original Agreement Number Tukwila, WA 98188 05 -071 206 431 -3665 Project Number Execution Date Completion Date 84 -RW19 March 31, 2011 Project Title New Maximum Amount Payable Klickitat/Southcenter Parkway Access $4,067,978 Improvement Project Description of Work Change Order Design Services The Local Agency of Tukwila desires to supplement the agreement entered into with HNTB Corporation and executed on April 6, 2005 and identified as Agreement No 05 -071 All provisions in the Agreement remain in effect except as expressly modified by this supplement. The changes to the Agreement are described as follows Section 11, SCOPE OF WORK, shall be amended as follows. The scope of work for this project is supplemented as detailed in the attached Exhibit A, and by this reference made part of the Agreement. 11 Section IV, TIME FOR BEGINNING AND COMPLETION, shall be amended as follows All work under this Agreement shall be completed by the date shown in the heading of this Supplemental Agreement Number 11 under Completion Date. 111 Section V, PAYMENT, shall be amended as follows: Compensation due to Consultant for work performed or services rendered for this project is supplemented as detailed in the attached Exhibit B, and by this reference made part of this Agreement. Contract Document Amount Management Maximum Amount Authorized Reserve Fund Payable Original Agreement $1,168,322 $50,000 $1,218,322 Supplement No. 1 $1,956,680 $0 $3,175,002 Supplement No. 2 $17,200 $0 $3,192,202 Supplement No. 3 $0 $0 $3,192,202 Supplement No. 4 $14,759 $0 $3,206,961 Supplement No. 5 $63,350 $0 $3,270,311 Supplement No. 6 $4,500 $0 $3,274,811 Supplement No. 7 $4,200 $0 $3,279,011 Supplement No. 8 $147,387 $0 $3,426,398 Supplement No. 9 $533,816 $0 $3,960,214 Supplement No. 11 $107,764 $0 $4,067,978 TOTAL $4,017,978 $50,000 $4,067,978 Page 1 of 2 73 If you concur with this Supplemental Agreement Number 11 and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By HNTB Corporation By: City of Tukwila Daniel H. Dixon, Vice President Approving Authority Signature Date Date DOT Form 140 -063 EF Revised 9/2005 Page 2 of 2 74 Exhibit A Scope of Work Contract 05071 Klickitat /Southcenter Parkway Urban Access Improvement Project Supplemental Agreement No. 11 Change Order Design /Proprietary Item Memorandums September 2010 CrINTB 75 Tukwila Urban Access Improvement Project 05 -071, Supplement No. 11 Page i TABLE OF CONTENTS I. INTRODUCTION 1 II. PROJECT SCHEDULE 1 III. WORK TASKS 1 TASK 22 SIGN BRIDGE 1 Task 22.1 Project Administration 1 Task 22.2 Illumination PS &E Revisions 2 Task 22.3 Sign Bridge PS &E 2 Task 22.4 Ductbank Preservation PS &E Revisions 3 Task 22.5 Miscellaneous PS &E Revisions 4 Task 22.6 Supplemental Geotechnical Memorandum 4 TASK 23 PROPRIETARY ITEM MEMOS 5 c' \docume- 1 \cyndy -1.tuk \locals -1 \temp\ <pgrpwise\ exhibit_ a _scope_of_work_supp_11_v13.docx CRINTB Printed 11/10/2010 76 Tukwila Urban Access Improvement Project 05 -071, Supplement No. 11 Page 1 1 INTRODUCTION This supplemental agreement includes the following services 1) determination of type, size and location of a new sign bridge on Southcenter Parkway at the north button hook off ramp, 2) redesign elements of the project to avoid conflict with the existing PSE and Qwest duct banks, 3) preparation of revised drawings and specifications to the PS &E suitable for use as a change order for the new sign bridge and duct bank redesign, and 4) preparation of Public Interest Findings/ Proprietary Item memos for Sole Source Items. II. PROJECT SCHEDULE The Project is on Advertisement as of September 30, 2010. Consultant shall begin services included in this supplemental agreement upon notice -to- proceed from Agency. Consultant shall submit the draft deliverables identified in tasks 22.2, 22.3, 22.4, 22.5, and 22.6 within three (3) weeks after the notice to proceed is issued. It is anticipated that all services shall be complete by January 10, 2010. If the schedule is extended due to reasons beyond the Consultant's control (such as WSDOT reviews), it shall be considered Extra Work. III. WORK TASKS TASK 22 SIGN BRIDGE Task 22.1 Project Administration Subconsultant Management Consultant shall prepare and execute subconsultant supplemental agreements. Consultant shall provide direction to Subconsultants, including conducting project coordination meetings as required with appropriate task leaders. Budget Management Invoicing Consultant shall actively manage, update, and control budget. Consultant shall complete monthly Job Progress Input reports. Consultant shall produce monthly invoices. Communicate Progress Consultant shall conduct ongoing, proactive, and responsive communications with Agency staff involved in the direction and execution of the Project. Consultant shall produce a monthly progress report to be submitted with the monthly invoices. Quality Management Consultant shall conduct monthly quality assurance review meetings "Project Review Meetings which shall include a review of the project status with the pnncipal -in- charge, project manager, project administrator, and other key staff as required. Consultant shall be responsible for checking and coordinating all design revisions and computations, specifications, estimates, and other deliverables identified in this Scope of Work. c: \docume -1 \cyndy -1.tuk \locals -1 temp\ xpgrpwise\ exhibit_a_scope_of_work_supp_1 _v13.docx NNTB Printed 11/10/2010 77 Tukwila Urban Access Improvement Project 05 -071, Supplement No. 11 Page 2 Task 22.2 Illumination PS &E Revisions Consultant shall revise the illumination PS &E to accommodate a new sign bridge at the north button hook ramp. This task will include the following: Relocate Pole 30. Relocate power for lighting, sign lighting and ITS elements. Coordination with Puget Sound Energy for revised loads if necessary. Review lighting calculations with the AGI32 program to determine if continuous lighting is maintained after modifying location of Pole 30. Review and revise voltage drop and load calculations as required. Design will be prepared to meet WSDOT standards as modified by the City of Tukwila, NEC, IES standards. Deliverables: Revised Illumination Plans, Specifications and Estimate (electronic .pdf file format and one (1) original stamped/signed 11" x 17" hard copy). Task 22.3 Sign Bridge PS &E Consultant shall prepare the PS &E for a new sign bridge that crosses over Southcenter Parkway at approximate Station 19 +50. At 90% design completion, Consultant shall submit the plans, specifications and structural calculations to the Agency and WSDOT for review. Consultant shall address and incorporate the review comments into the final Sign Bridge package. Consultant shall conduct one site visit and identify potential utility conflicts and notify the Agency of findings. The following new plan sheets will be nrenared: Sign Bridge Layout (Elevation, Camber Diagram, General Notes) Sign Bridge Details 1 (Structural steel) Sign Bridge Details 2 (Structural steel) Sign Bridge Foundation Details 1(Shaft) Sign Bridge Foundations Details 2 (Miscellaneous shaft and details) Assumptions: The new sign bridge will span the entire width of southbound Southcenter Parkway and will have two foundations, on the west side of Southcenter Parkway and another in the proposed median of Southcenter Parkway. The sign bridge will be mounted on a separate foundation and will not be mounted on barrier. Sign bridge foundations will be drilled shafts "behind" traffic barriers and guardrail such that integral foundation and traffic barrier details are not used No additional field investigation shall be required The sign bndge will be a WSDOT standard structural steel monotube sign structure c: \docume -1 \cyndy- 1.tuk\ locals- 1\ templxpgrpwise \exhibit_a_scope_of work_supp_11_v13.docx IN'B Printed 11/10/2010 78 p Tukwila Urban Access Improvement Project 05 -071, Supplement No 11 Page 3 o Sign bridge posts will be less than 30 feet tall One round of review comments on 90% plans, specifications, and structural calculations will be addressed to complete the final Change Order package o The sign bridge will be designed per the WSDOT Bridge Design Manual (March 2010), which uses the AASHTO Standard Specifications for the Design of Structural Supports for Highway Signs, Luminaires and Traffic Signals. Fourth Edition dated 2001, with Interims through 2006. Construction will be in accordance with the WSDOT Standard Specifications for Road, Bridge and Municipal Construction (2010) and associated WSDOT Special Provisions. Deliverables: 90% Sign Bridge Plans, Specifications, and Estimate (electronic .pdf file format) Breakdown of Lump Sum Quantities for sign structure (electronic .pdf file format) o Sign structural calculations (electronic .pdf file format) o Final Sign Bridge Plans, Specifications, and Estimate (electronic .pdf file format and one (1) original stamped /signed 11" x 17" hard copy) Task 22.4 Ductbank Preservation PS &E Revisions Consultant shall revise the PS &E to avoid conflict with the PSE and Qwest duct banks and the City -owned fiber optic line on Southcenter Parkway (Sta. 5 +00 to 8 +00). The Consultant shall revise the PS &E to avoid the PSE duct bank at Strander Boulevard (Sta. 31 +90 to 33 +00) This includes coordinating with the private utility companies, potholing and surveying at conflict locations, updating the basemap, identifying the feasibility of redesigning elements to avoid conflict with the duct banks, and revising the following design elements• drainage, roadway grading, retaining wall, and associated specifications and estimate. Once pothole data has been collected and analyzed, the Consultant shall analyze the PS &E revisions assumed below for feasibility and cost effectiveness. Should the assumed PS &E revisions not adequately address the utility conflicts, not be feasible or cost effective, work on this scope item (22.4) will be stopped until the matter can be further discussed with the Agency. Assumvtions: Potholing and survey at up to five (5) areas. The base map survey will be revised to show the actual PSE and Qwest duct bank width. The feasibility analysis is limited to identifying the most cost effective approach to avoid conflict with the PSE duct banks and make recommendations to the City. Coordination will continue with PSE and Qwest. Design revisions are limited to the following: o Roadway grading revise roadway profile of Doubletree entrance to relocate low point of curb returns to allow for moving drainage structures 38 and 39a. o Drainage move drainage. structures 38 and 39a, add shallow inlets at structures 35 and 35a and relocate the CB Types 2's, move underdrain from Wall 4, move structures 86, 87, 88 (stormwater vault), and 89. c: \docume- 1\cyndy -1.tuk \locals -1 \temp\xpgrpwise\ exhibit_a_scope ofwork_supp_11 _v13.docx NNTB Printed 11/10/2010 79 Tukwila Urban Access Improvement Project 05 -071, Supplement No. 11 Page 4 o Retaining Wall 6 review and modify shoring specifications, if needed, for construction of Wall 6 adjacent to the proposed stormwater vault and existing PSE duct bank. o Retaining Wall 5c footing will be revised to avoid conflict with the Qwest duct bank. Deliverables: Drainage, Roadway Grading, and Wall Revised Plans, Specifications, and Estimate (electronic .pdf file format and one (1) original stamped/signed 11" x 17" hard copy) Task 22.5 Miscellaneous PS &E Revisions Consultant shall revise the associated PS &E as needed to accommodate the effects of the illumination and sign bridge design changes. This includes revising the following design elements: realignment of median curb, roadway sections, signal conduit, drainage, temporary erosion and sediment control, site preparation, landscaping, architectural treatments, and associated specifications and estimate. Assumptions: Design revisions outside of the construction limits of the new sign bridge and associated revised illumination is not included in this scope of work. Deliverables: Sign Bridge Miscellaneous Revised Plans, Specifications, and Estimate (electronic .pdf file format and one (1) original stamped/signed 11" x 17" hard copy) Task 22.6 Supplemental Geotechnical Memorandum Consultant shall review the project geotechnical data and report, and prepare geotechnical recommendations for the design of the new sign bridge foundations. This scope of work includes the following tasks: Review boring logs previously completed near the new sign bndge foundation locations (GeoEngineers borings B -9 and B -10). Based on the existing data, evaluate subsurface conditions and develop soil design parameters for the sign bridge foundations. Present recommendations in a supplemental memorandum. Assumptions: Geotechnical recommendations will be in accordance with Chapter 17 of the WSDOT Geotechnical Design Manual (GDM issued January 2010) Deliverables: Supplemental Geotechnical Memorandum (electronic .pdf file format) c: \docume -1 \cyndy- 1.tuk\locals -1\ temp \xpgrpwise \exhibil_a_scope_of work_supp_11_v13.docx MINIM Printed 11/10/2010 80 Tukwila Urban Access Improvement Project 05 -071, Supplement No. 11 Page 5 TASK 23 PROPRIETARY ITEM MEMOS CONSULTANT shall prepare up to ten (10) Proprietary Item Memos to address the Public Interest Finding (PIF) as required in the WSDOT Local City Guidelines (LAG) Manual Section 44.55. Consultant shall prepare Proprietary Item Memos for the items listed below; any additional memos will be considered extra work and shall require a supplemental agreement. Propnetary Item Memos will be prepared to address the following items: o Clow Medallion hydrants o Sherwin Williams Chrome Yellow Paint o Electronic Ball Markers o Bio- Barrier by Fiberweb o PROSPECT Tree grates by Urban Accessones o EAS -60 two part epoxy o Pelco Spectra IV Television Cameras o liens Video Detection System o RZ -4 Advanced Video Detection Cameras o Vantage LAM (Lens Adjustment Module) Assumptions: The Proprietary Item Memos will not require review and/or approval by WSDOT. The Proprietary Item Memos will require one review by the Agency. Consultant shall address one (1) round of consolidated review comments and shall submit a final memo for inclusion in the Agency's Project file Each Proprietary Item Memo will be hmited to two pages in length. Deliverables: One (1) draft and one (1) final Proprietary Item Memo for each of the following items (electronic MS Word format): o Clow Medallion hydrants o Sherwin Williams Chrome Yellow Paint o Electronic Ball Markers o Bio Barrier by Fiberweb o PROSPECT Tree grates by Urban Accessories o EAS -60 two part epoxy o Pelco Spectra IV Television Cameras o Iteris Video Detection System o RZ -4 Advanced Video Detection Cameras o Vantage LAM (Lens Adjustment Module) c: \docume -1 \cyndy -1.tuk \locals -1\ temp xpgrpwise\ exhibit_a_scope_of_work_supp_11 _v13.docx Printed 11/10/2010 y 81 HNTB Corporation Consultant Fee Determination Summary Sheet (Lump Sum) Tukwila Urban Center Access Project: Klickitat/Southcenter Parkway Supplement No. 11 Change Order Design /Proprietary Item Memos LABOR COSTS Staff Classification Hours Rate Total Cost Principal 2 $277.52 $555 Project Manager 40 $226.36 $9,054 Sr. Structural Engineer 2 $191.79 $384 Sr. Architectural Manager 2 $183.38 $367 Senior Project Engineer 100 $170 60 $17,060 Project Engineer 28 $137.63 $3,854 Design Engineer /Traffic Engineer 110 $101.62 $11,178 Landscape Architect 4 $108.86 $435 Jr. Engineer /Jr. Landscape Architect 0 $73.54 $0 Sr. CAD Technician 2 $116.93 $234 CAD Technician 42 $101 85 $4,278 Sr Project Administrator 38 $119 37 $4,536 Sr. Administrative Assistant 9 $70.55 $635 Total Hours 379 i TOTAL LABOR COSTS $52,569! REIMBURSEABLE COSTS Local Travel (Mileage /Parking): $50 Reproduction: $200 Courier /Express Mail: $50 Other: $50 TOTAL REIMBURSEABLE COSTS $350 SUBCONSULTANT COSTS 1 HDR Engineering, Inc. $31,388! 1 PACE Engineers, Inc. $21,215! 1 GeoEngineers, Inc. $2,242! 1 TOTAL FEE $107,764! 05 -071, Supplement No. 11 HNTB Corporation C_ \DOCUME-- 1 \CYNDY-1.TU K\ LOCALS -1\ Temp \XPgrpwise \Supp_11_Fee_Est_v8 Page 1 of 2 82 WIEA y City of Tukwila u j? 2 Transportation Committee TRANSPORTATION COMMITTEE Meeting Minutes November 15, 2010 5:00 p.m. Conference Room 1 PRESENT Councilmembers. Verna Seal, Committee Chair Chair; Joan Hernandez and De'Sean Quinn Staff: Bob Giberson, Frank Iriarte, Robin Tischmack, Gail Labanara, Pat Brodin, Cyndy Knighton, Shawn Hunstock, Jack Pace, Steve Lancaster and Kimberly Matej Guests: Brent Carson, Gordon Derr, LLP; and Shelia Malbrain, resident CALL TO ORDER: The meeting was called to order at 4:58 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Tukwila Urban Center Access Klickitat) Proiect Bid Award Staff is seeking Council approval to award a bid to Atkinson Construction in the amount of $10,880,180 for the Tukwila Urban Center Access (Klickitat) Project. The intent of this project is to improve traffic flow by constructing an underpass for the southbound lane on Southcenter Parkway. Out of seven submitted bids, Atkinson Construction has been identified as the lowest responsible bidder. Both the Transportation Improvement Board (TIB) and Washington State Department of Transportation (WSDOT) have reviewed the bid tabulation and have authorized the City to proceed with the bid award. A favorable bidding climate has resulted in a bid below the engineer's estimate, and as such, staff recommends increasing the project contingency as well as estimated construction management costs. Even with implementation of these staff recommendations, the bid award still totals almost $4 million less than the engineer's estimate Any project cost savings will be reflected in the final costs of the LID as determined and calculated after project completion and closeout. However, the favorable bidding climate also affects the amount of the TIB grant funds received by the City. These awarded funds are not fixed monies and will be reduced in relation to the low bid award; conversely, in the event of overruns, TIB grant funds will be adjusted and /or increased as necessary. Additionally, the City will be implementing an incentive clause in the construction contract which awards a payment not to exceed $250,000 total for project completion in advance of the holiday moratorium which is November 15, 2011 There will also be penalty assessments if the project is not complete within the specified time period. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 22 COW FOR DISCUSSION AND SPECIAL MEETING IMMEDIATELY FOLLOWING FOR APPROVAL AS APPROPRIATE. B. Tukwila Urban Center Access (Klickitatl. Supplement No. 11 with HNTB Staff is seeking Council approval for Supplement No 11 with HNTB in the amount of $107,764. This supplement will cover additional design changes required by WSDOT beyond the scope of work developed. Specifically, this supplement addresses design for a sign bridge and re- design of a stoini drain to avoid utility conflicts with a PSE utility duct bank and Qwest fiber optic lines. Funds for the supplement will be taken from obligated federal construction funds. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 22 COW FOR DISCUSSION 83 84