Loading...
HomeMy WebLinkAboutPermit D04-165 - NORDSTROM - ROOFNORDSTROM WAREHOUSE 1000 ANDOVER PK W D04-165 9 • • • • 11. z 1- z w 0 0 CIRJ wcD uj I 0 LI 0 = r: J- O City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049118 Address: 1000 ANDOVER PK W TUKW Suite No: DEVELOPMENT PERMIT Permit Number: D04 -165 Issue Date: 05/19/2004 Permit Expires On: 11/15/2004 Tenant: Name: NORDSTROM Address: 1000 ANDOVERPK W, TUKWILA WA Owner: Name: ANDOVER WEST LLC % POWELL D G'∎ Qyi���e�. Address: PO BOX 97070, KIRKLAND WA �veS� \t19 Contact Person: FMS \O Name: DAVE LINK Address: 1911 SW CAMPUS DR, #451, FEDERAL WAY, WA Contractor: Name: LYNX ENTERPRISES INC Address: 1911 SW CAMPUS DR 451, FEDERAL WAY WA Contractor License No: LYNXEI *0773H Phone: 206 550 -8918 Phone: 206 550 -8918 Expiration Date:05 /01/2005 DESCRIPTION OF WORK: PRIME ROOF AND INSTALL MAITENANCE CAP SHEET, FIRE RATE POLY 4 -5 GRAINULATED CAPSHEET. Value of Construction: $152,250.00 Fees Collected: $2,133.91 Type of Fire Protection: Uniform Building Code Edition: 1997 Type of Construction: Occupancy per UBC: 0025 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: N N N N Number: 0 Size (Inches): 0 Start Time: End Time: Volumes: Cut 0 c.y. Fill 0 c.y. Start Time: End Time: Private: Profit: Private: ** Continued Next Page ** Public: Non - Profit: Public: doc: Devperm 004 -165 Printed: 05 -19 -2004 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Permit Center Authorized Signature: v Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit doe: pr; sume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or e •: ma ce of work. I am authorized to sign and obtain this development permit. Signature: Print Name: A"\/� Date: i 9jo 4- This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: Devperm D04 -165 Printed: 05 -19 -2004 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049118 Address: 1000 ANDOVER PK W TUKW Suite No: Tenant: NORDSTROM PERMIT CONDITIONS Permit Number: D04 -165 Status: ISSUED Applied Date: 05/19/2004 Issue Date: 05/19/2004 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 4: A statement from the roofing contractor verifying fire retardant class of roof will be required prior to final inspection (see attached procedure). 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). z cc 2 ~ w. O 0 u) J = H U) 11_, w ° 2 J u_ =d Fw z= 1- O w ~ • w 0 O N 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be v construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any tL o other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this - code shall be valid. v co O z * *continued on next page ** doc: Conditions D04 -165 Printed: 05 -19 -2004 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any regulating construction or the performance of work. Signature: Print Name: of law and ordinances other work or local laws Date: f (/t) 4 doc: Conditions D04 -165 Printed: 05 -19 -2004 CITY OF TUKW/LAr -- Community Developmen, .epartment Public Works Department Permit Center 11 6300 Southcenter Blvd., Suite 100 Tukwila, WA := 98.188. • Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION : Site Address: 1049 —1040 i NZ,o (c 0112-i (A) Tenant Name: %JOiL• 5r'gv'rvt. . Property Owners Name: Ito • DA-p...)( z. 304 6 . geo ert.wpry ,fit . 400 L-05 A-t4 et- C 9 tfao r 3— state Zip Mailing Address: King Co Assessor's Tax No.: Suite Number: New Tenant: Floor: .... Yes R1,..No CONTACT PERSON City Name: VAr1/E L.c cc, Mailing Address: (q t ( .50 E -Mail Address: D Lc JIGcS�H��� GENERAL CONTRACTOR INFORMATION Day Telephone: (C, C) -sq is Dez W t u014 48 613 City Fax Number: State Zip s 3) 9>- — S■1 Company Name: 1—(46,--) Mailing Address: f ( Sev Oftv.A. Fos e_ 4i 5 Contact Person: �l W . L(&) � 1 E -Mail Address: 0316 $ f i-f - CaytA Contractor Registration Number: L-1 00)e- EI o —17 tJ 1+ * *An original or notarized copy of current Washington State Contractor w q802,3 City State Zip Day Telephone: &.\)5-.50 — gQ t 8 Fax Number: (y'. 3-) 9>� = 15T 24 Expiration Date: 5 11-00 5 License must be presented at the time of permit issuance ** ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: (ii LT A10 0 I T5 Soc- A TtE` S Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be wet stamped by Engineer of Record Company Name: e0N5J 'rtiel /(i)ere -/e2 t't- oc.-t. '4 oc T>c s Mailing Address: o . a., 8 tG V,r - 0 Loa- Rt80 83- 0 8 Contact Person: <I 0 614 OA ti E -Mail Address: Fax Number: Cel• -�j) $ 27-- - -75-Ct City State Zip Day Telephone:fO.) ?,Oo — \applicationslpermit application (3.2003) 3/2003 Page 1 BUILDING PERMIT INFORMA Valuation of Project (contractor's bid pric Scope of Work (please provide detailed info: .�. R ar. a — s ne-L fit. Ra ON - 206 -431 -3670 Existing Building Valuation: $ Will there be new rack storage? 0 ..Yes .. No If "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 ....Yes 0 ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑..Sprinklers D..Automatic Fire Alarm [..None . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ .. Yes ❑ ..No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and ivfalerial Safety Data Sheets. \applications \permit application (3.2003) 3/2003 Page 2 Existing Interior : Remodel Addition to ' Existing Structure New Type of - Construction per UBC Type of Occupancy per UBC 1'i Floor 2 "d Floor '. 3rd Floor Floors : thru Basement Accessory Structure* Attached Garage Garage. Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 ....Yes 0 ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑..Sprinklers D..Automatic Fire Alarm [..None . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ .. Yes ❑ ..No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and ivfalerial Safety Data Sheets. \applications \permit application (3.2003) 3/2003 Page 2 PUBLIC WORKS PERMIT I RMATION — 206.- 433 -0179 Scope of Work (please provide detailed information): 4YryJ 1 ; C Call before you Dig: 1-800-424-5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila ❑... Water District #125 ❑ ...Water Availability Provided ❑ ,• l- Iighline ❑ ...Renton Sewer District ❑ ...Tukwila ❑... ValVue ❑ .. Renton ❑ ...Seattle ❑ ...Sewer Use Certificate 0... Sewer Availability Provided ❑ .. Approved Septic Plans Provided ❑ ...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .• Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction /Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑ ,. Geotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) ❑...Hold Harmless ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ ,. Right -of -way Use — Potential Disturbance ❑ •. Work in Flood Zone ❑ .. Storm Drainage ❑ ..:Sanitary Side Sewer ❑ .. Abandon Septic Tank ❑ ...Cap or Remove Utilities ❑ .. Curb Cut ❑ ...Frontage Improvements ❑ .. Pavement Cut ❑ ...Traffic Control ❑ .. Looped Fire Line ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... 71 ❑ ...Temporary Water Meter Size.. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public WO# WO# WO# Private Private ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size " FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ ... Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to: Name: Mailing Address: Day Telephone: Water Meter Refund /Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip \applications\permit application (3.2003) 3/2003 Page 3 MECHANICAL PERMIT, INFOP `CATION 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: E -Mail Address: City Statc Zip Day Telephone: Fax Number: Contractor Registration Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New ....❑ Commercial: New .... ❑ Replacement .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas ....El Other: indicate type of mechanical work being installed and the quantity below: Unit Type: Qty Unit Type: Qty Unit Type:. Qty . .Boiler /Compressor: Qty furnace <100K BTU Air Handling Unit >= 10,000 CFM Other Mechanical Equipment 0 -3 HP /I00,000 BTU Furnace >100K BTU Evaporator Cooler 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan 15 -30 HP /1,000,000 BTU Suspended /Wall /Floor lvtounted Heater Ventilation System 30 -50 HP /1,750,000 BTU Appliance Vent Hood 50+ HP //,750,000 BTU Heat/Refrig /Cooling System Incinerator - Domestic Air Handling Unit <= 10,000 CFM Incinerator — Comm /Ind PERMIT APPLICATION NOTES — 'Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AU Signature: / Print Name: �.1 ' ED GENT: Mailing Address: (q t c Scu S G4'sl Date: Day Telephone: 1(:31G) City t. State Zip Date Application Accepted: Date Application Expires: Staff Initials: \applications \permit application (3.2003) 3/2003 Page 4 City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: Address: Suite No: Applicant: 2623049118 1000 ANDOVER PK W TUKW NORDSTROM RECEIPT Permit Number: Status: Applied Date: Issue Date: D04 -165 PENDING 05/19/2004 Receipt No.: Initials: User ID: R04 -00598 SKS 1165 Payment Amount: 2,133.91 Payment Date: 05/19/2004 08:52 AM Balance: $0.00 Payee: LYNX ENTERPRISES I TRANSACTION LIST: Type Method Description Amount Payment Check 1194 ACCOUNT ITEM LIST: Description Account Code 2,133.91 Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000/322.100 000/345.830 000/386.904 1,290.55 838.86 4.50 Total: 2,133.91 094 05/20 9710 TOTAL 2133.91 doc: Receipt Printed: 05 -19 -2004 Z 're w. UO NO • Lu J • • L w 0 • u_ =d _ O Z I— W uj 2p O -. O wW I- — • O • Z W C.) u3. H � O Z 2-- INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit (206)4 1 -3670 Proj ct: (A)).1 �', 4 Type of Ins ection: P /IVA / • Address: It 9(� i'Td`C3«I/ 4 / l (Ai Date Called: // / . /try Special Instructions: Date Wanted: // /5 /V-/ a.m. p.m. Requester: ' Liiii Phone No: —.0(. — 4-5'"o — c°,5' i fc' Approved per applicable codes. Corrections required prior to approval. COMMENTS: 7-1) ;2 •vim /J Inspa•r: ck Date: 4 47.00 REINSPECT! FEE REQUID. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila; WA 98188 (206)431 -3670 Pr j t: L . Type of I speQction: 6 Address: f� ,,.�,r -100D .6 Date Cal ed: f (o /I ructions:,"t e., v fie Wanted: f L Jim m Requester: J I /4-1&AA._ 1,-1- ilk Phone Uoj; . W)19 J I Q r < < 175 1521Approved per applicable codes. El Corrections required prior to approval. COMMENTS: 0pot � KT) \ \ '1 c o Qq . 1 Date: ""z REINSPECTION EE REQUIRED. Prior to inspection, fee must be at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. Receipt No.: Date: Nordstrom reroof s hoto re s ort -Pro' ect June 2004 Project install by Lynx Enterprises Allied Building Products furnished roofing material for the project. Pallets of material were spaced over glu -lam connecters. RECEIVED DEVELOPMENT A smooth Poly 4-13" strip was installed at cant area of roof. Full width and length rolls were stag _ered and installed to roof area. r• . Nordstrom-Pate 3 7-, 'ry-,--- Material ir-a rmi . ...., b / 0 . '''., ,, eil I . i . ..,Q rw ift, r. ' .4 4.■ .'. ... vna..I,r., t'k."..‘ '...-'■-•., i 't 1 • 'a ', t V. • . .., ..- ...7-:- N-`,K 44,4 0 . .. . ,..„----t- A, , , ei* . ... v6.--i. ' •,,Z ti ) • . 0 , I -a ; —; . was delivered by truck a . . roximately 440 roll . er truck. ''-' -A t• -r-:,..4 ,..-„:-"7"t,c Ilnig P • _.: -- - ----___ .-re...- , . , --. giA kt h■L'...t.,..r. ., ,i:,...„..„,_,_ ki =1?-,-ttRtz-ff,- •_ - ' .,:- ;:•—• ' • :4s.',P"...-'-'---- ' . - - ''''' '''':91" ''.:•*r: N.e4.''' .4P.,; . -.4-...,- - ' - ;II,. - PP . lab , ,„...., • ., ' 4.5 ,iimi... nu 1. -...-,A,- •••••_1.L.._....„ L. .,_ ..-:-.-: .. _ --.- •---.,: , • ___ --_ , -,..."''' ' '...7 ''' ......'• 4 ' ■ ,, ,, nt . ' ':." -.' _ •,f ' . - •.'er''` r•-• 11.-1 41. •••' 1 ":-...z__.',..."'Z.-...r.;" L...........,r,. 1. . 7 , z. .. Fire retardant modified materials were installed z < . z re w 2 0 00 (i) 0 W -J 1— w o < cn I ZI- w z w D :) C3 0, 0 -- C) uj w 2: 0 17: -- 0 2E u) c) o 1— z Nordstrom project —Page 4 A. "; Y`'�,' s�t << Ptt': M � �a• y,ygl,t.'.? 5 a 7S f 1; {`t { .' ,� :�',Y �� sr � �4' ` �•m�` t ^t> : J. � 3' . f '.. t,.:ia ! tt..li+� .r: Lot # of materials. :' , s;; Ys, a'A .■%, tkfi ` {. ;.%� it ,q- V �1 f F "" '4 . ! ". fa'� .."r .{I YYL. M1"" UbF i1� sa1sn F t P 41 $a fir � ,n ■ki t � ,' .I. d j G F4 l .61' ,�• r. $53S' -:. '+.tf . Liy 3� r� }'� ".,1 , , c . ,r r F4 f tqi i v,,,Q rP if 4"" x,iY� �ul,�'� q�y�G'ai y Tty 1' $' k.'na ,t,j �;;t),y '���'!!r'yTJF.� Y' «. CR'!�^.� '?�.i...:; 'gin,`• 5. >rmd_8 ....,, ;. AV!' w n` Y'. f .. l y' ..} `` yt3 9 ° ,,, .,..4 F::� `i' yd's to U': 4 t , i..o.t,''tr;. k t� f FrY tk .1n'S l' Vii, � ..,-, ,e f tP:s'TY+ZliYW .. 5:;yx — — _ -71Yw —.` _ West facin I side of roof during installation. .. .r ; 1'4 y 1. rY WiletlYTAMIMMATZ5nv.,0,S-N-tn,:^..t ..-r.,.. .-....::-.4...17. • , r..--^'.,.. - '"r,..1-.Z,1".. ''r-.--"",-,..",...' ...,, .... -.....- : '.. ,- -... ` ': 1 immiarartm,Part^,:-- "..• .................1770:1.M.. '-"-=' ' . ....::::......,. ....:_ " -:::-,..r, ......7 ...-41., ' 1 V.■,,&‘;'',..?lialf-.. -L.- . --- ' -' 4 . (1 PaliW 1 .w. Final ca tie in across eak of roof. ^ Cap metal coping was installed over a continuous cleat adhered with Performance double-sided tape and then fastened with power-actuated • usin • 1-V2 inch nails and 1-inch washers. Caulk used between metal. All metal notched. Three-inch end over lap, open side of metal hand clamped shown in to. photo. Nordstrom reroof -Pa_e 9 iS ?N `• S Yy r +,q�5:.�'i, ,,,; #1 f F t �•. r 1, f. 1:Aii -i.''i r.'' J'wltil r R �i +.y;tf W't1 7) •'f• tr ,� i !1•{ iY rt.t• ' `"�yF, if'S'k 'ridf W}♦ -,4 � ♦..i.J M tea xy y� C S PhtrY'i 4f`FF'i cNlry r , f ; x j $ :•x,'.. } '^i„s'I sE^ nl tf ;1�r ♦ try,:`;,• - -' ,:u:`,- ti:;a.�.,. . t. ,Iii ., ' -. • i, "t 'afr ;ill y { rr rY7frtGQ 7bq'[ f �Z ,f C ))ffF"�ti�>f FI' t1 W �N,S.iw (�..ni. f 'i S j tx Ti7''1ttn~5 it x h fr i''L^' .t:r 14zi c"�f is1F; tyli { ! +¢•7 ' iT ♦ 7 J,,+j••ff t i 17yfy��. i Y l.' \�il -C A' WXttv''� vi ,}., } firt 1 'f `— .-.-yw (i.-i ' a L) .'rf, f411} +�, h } ;'Yj'jh '• =mac.. t .: 1� J♦'�zixA�t dttYii9'k4�fit♦ a 7 ."Y -. f `. 1. .. I. ..4 " .. ' �^�h'i.i.•'ti.\: L�:' f xA f 7 �4 - .+ S 1 t .,y. �F 1 Y R k ) .. 'f , Z `} `5aH ^1 .4• ....: Y J L4i�'t,Lfv di ."�{, } .♦ '..{ fii""'it,y 4i St; y { .. r .,h"a• f, � �"` i 1"f ' '.,,,. •. to :h :r` ��ti r ♦•�Z y"de ?tttf.. f td '. La Yfii'CF• y1. C. 7x a F•n .'v f • F r" +iw . T ) 1 ' .Y x {i �r, i'My4 {a1 sSs a "+ -may+ t itJn {7z L • Z \ J L 3.5i+it}il N� `i �.: A ) �h j '(f r. iftr S 4 W .^V�6aMj''i,4 `\pV4 • i F j7'f7 -,[' i5.t'+fl'j<`^ ^ {iv .5. rf� '.'� �� ��ry l•�, f j ..i•••t�+^l•�„ T�Ii! �x y YR YJ a'ff 4x LSef = ft•'.�`In'} i� 5 �ff:}� Tt� `•L 'l i} irf •L }d> )°^N d ie•c' S'l M {•i''''rt ,'t , p' {{ • •: ±�y}- �'t1 o1s5u ss�rY,',�arT ,>, �ernS77':7s, in..: 2,.,. �j`': ('•:'y/" f } :L e; „�. 'r q f:` Xt, n'i ` b• ;M„;,. �.' T4 , • f" • t3., k.t:;� ,?�{,a >a K }4 .y.,, s t >ri.Lrr4,'lY,rstt r. 3 +Lff jsS'' t"i �h1 XSir St 4' t uc eQ ' 'a." °" 9.y�4r'" .v � it . C `rr •a,<�'. ' ° '0 Y • ,. k •1�. '. ..Y' L yy x � /''''' ,p '� , ,� C 'Y" v^f t 1. ra°''d ,� R, It ��.. ),r.,)t•.K r1' (y1 .J`• k 51 f :tad' irrk:• S+�y ''{iC •'•r; • •- ■ '4 � KLTS�+;i�F..r�7' It Yrb'••,Y yi � M t, 0 7... S '4` f J ti^ iLS �.. ?ii± • 01. gip,.... :Fi-i '�txit t{ qL•a ,! l ¢� I f .,r• kt ,,,y iT / • ∎ -& ' • *,." x` '' k'4A. +.ii:_.. ...... >, •.1r �:atf;l.vk. s- `£t!.f."•f:'i". ,:� a .Sf1Y 1�! ... v New Performance roofing install 6- inches under existing skirt metal. �� Dr;a ' S S t)f11 l»\ k v41 ii r ' ! t 3s,` 'e♦ (fi-'i' tr p.•w1• '�ier,f,,{fly+ , r N F ,. ro- : t .4 1 S•' { iF ; lf) fer��`SF }r? , n tirtiy:lri� .' �` �Y F .. 7 t•K J t .� �fi4rt - (Yi4r. 4 f y XP,1wft ft�,t �ww7 � £ � #,r;r {�{,1 r rri 1Wt�y�4;S�ff}fr. ;tS fi'f }yitU7•1:{ ri .itr. sir, ??! .�f_+ -k�f �{C�}� 9 a s ',' �4Eyi' ��� �?. k+ 1 , tt , S} d Yk 5 r 7} 1 ji a� srrC�yyr $' .,,.'.�.,jy ■ ig- L fL .'" f i( ?.,''':' }��(j{ 'f, ). >"'1.( C� { .i�1+ y rf�•,.Ks ,�++7.1�i`_.�. IrGtx i It � }yM(� j rf[" ' y1 '? 'f..yk•,.J .� 1'}q' c ( 1 7JY t i Vn i <�. rt't. °. } iy t "',4!L�. + "Q "fv ) '�•ra r 6{ets.f : a t e } a! f .. ' '•�;frp, t: F k'ASp�� f•J ,�F•>' ti k P. A. J f Jff 7r• /'^+. •) 'i: y f'a � f + K A. u i ..• i• F�. ,,t��N�l, rs t< s•• 7•. iy.f..1 ,r ^•'. �'ft4t�t1,i, '�••. i .,' ' is '' Is. � y. ;b aF i( 7�',t'i{ S ! tl .xSw)4 \�7)•f.' � `j H i 4t {.t'1,,,1 :;J , }f. N'✓'! {r ) . i i , 1. ft /�r yii rt t fi jl. ;• rt =tfb }',rl„ �` ,,v�;.'} 'j;- ' f.,S.G. tray ' . y:';i7 ,.k. 4"{� .t r i,., ., a (LL, 47 tr;,. ,'7lIZ /" kr`, ` «4i drv_`r.rj '».�:.. {,.• f $4., <;.0 k t'Y `p ' ri•{f4.A,,�i ♦•iC. ','r;_, +.t.: 1 'nfry ] 1. •'', • 0M ei i,. xab it r% k•_ •'Ti „li• ' f.a �l a`4l �5L i5. !' I`[r'< I' �t ,R,t +(��,t1 {T� '�.A,,Y '�' �• ": >fti, 4+! H•'• j illy'II)}�4•u�H� {�i...+�.• P r`i' y:�i ) 'N� Ml': �J. jY �i '3 irjl (.iFZ�' k' 4 �� flv, }�t, .� }� i�ryV �f' f i )JJJ' :1.tf ��V��' �'' f 'J1* `} C{ ` N 7yt } Itt� M�i 1�ljpj Y J { ) ' x.:'LL•:.,� ^':i if ^!i }4F },�'yS`{•'�!, „, :j' ::}f'.liAt`'k3�} fY' ��*,�� •'`.4.24i,'). 'r� 21 ;�,f S 'i: r•Y r it i t .ti �{ Y :. .'; ' ' ( >'f v ill, r i :{, 'h h Y\.. }, F -'r: ` •• i Jam' fiw�r- {I ?" + sy ��' Yf� 3 ,it , •� j Yf .t r 4 'il J• 'h.• rt fn �'� {�+Ij'• r y I .,1f;,(+'' 'I: f.,;+{ '•'`. ' 0,., •F { }1L��(y".. ii'rj',i ra, :� �fAt�li�F♦ ; 4 '', t�elX4N`∎411� {)i�t1��✓ .u.G�)..tli.lr. .f. .....:i aLEK,ie ,Y \'.' h.t '1'i'� i "AL' L.; ital.. {..'.:14..., :YYY, .i11�....F,. sYaF.%1.t • i•? , .'' } 1 1 f' i +J' h f, 1e t'. is r + } r1 l �, 1 SI. fit r�,: "'! -f�: C)(1:•:' New 3X3X12 inch metal corners installed to stop wind blown water intrusion. �L' M. ^f?'t:91fM`Fd',h:4lt'GH'M?;.ii, tw?4.,;�5."Q�7;�iiH•',4I"j°,i L.�,''�,'iy;��(.I'.X.�ti1)•'AM; b}iAS r'.n- �.j «,., -nr. riwa.... t•.. ..x,:,'.sfw+.......w.....,tli.f �, /.f Upper photo shows original flashing and cap with new tall, flat roof flashing along side. Lower photo shows flashing installed with new B- Vent caps. (Note. 8 new caps were installed replaces worn out caps. Not all old caps were re . laced, only ones no longer serviceable). Nordstrom reroof -Pa :e 11 New galvanized S hangers were installed over wall to hold conduit. Note roofin • was installed over wall cap. All internal drain collars were tapped out and new bolts were installed to secure drain clamp rings. Report distribution: Powell Development (2) Wetherholt and Associates (1) Tukwila Building Dept. (1) W E T H E R H O L T A N D A S S O C I A T E S , I N C. May 5, 2004 Lynx Enterprises 1911 Southwest Campus Drive, No. 451 Federal Way, Washington 98028 Attn: Dave Link Ref: Site Visit M -4 / Nordstrom Warehouse 1020 West Andover Park West Tukwila, Washington Greetings, Phone # 253 - 925 -1503 Fax # 253- 925 -1521 At the request of Dave Link, this writer met on site with Mr. Link on April 28, 2004 at the above referenced location. The purpose of the meeting was to review existing roof conditions in preparation for the installation of a capsheet over the existing smooth surfaced roof assembly. Items of Understanding The building is a tilt -up concrete panel structure. The current roof was installed in 1988. The roof assembly consists of a plywood substrate (deck assembly is a panelized "Berkley" assembly), mechanically fastened 28# basesheet (attached with Simplex type fasteners), and Dibiton Poly IV smooth surfaced sheet torch applied over the basesheet. The surface has been coated twice in the last 16 years with a Karnak aluminum coating. At the time that the roof was installed, the owner elected to not install the capsheet that was specified with the assembly. Mr. Link has since been retained to install the capsheet this summer. Mr. Link was the installer of the current roof and has also maintained the roof with a minimum of two inspections per year as well as patching and stripping -in any new or abandoned equipment. The roof has been well maintained and is in excellent condition. We understand that the installation of the capsheet is preventative, prior to the deterioration of the existing roof assembly to extend the life of the roof. The proposed work by Mr. Link is to install a Polyglass Tri-ply capsheet and replace 15 remaining smoke hatches that have not yet been replaced. Prior to the installation of the torch applied capsheet, Mr. Link indicated that he intended to clean the existing roof surface and apply a heavy application of Henry's asphaltic based primer (the primer will be applied one week before installation of the capsheet). titCtYV OF TUKWil A 13104 N.E. 85th Street • P.O.Box 816 • Kirkland, WA 9808:WTCENTER 425 -822 -8397 • FAX 425 -822 -7595 • M.; F s. r 4 April 28, 2004 Site Visit Lynx Enterprises M -4 / Nordstrom Warehouse. Discussions & Recommendations Page 2 May 5, 2004 We believe that Mr. Link's proposed installation of a capsheet at this time will appropriately extend the life of the roof. While the roof is in good condition and the roof coating appears to be well bonded to the surface of the roof, our concern is that the coating may act as a bond breaker for the new capsheet, preventing full adhesion. We understand that the owner is interested in the torch application of the capsheet as an economical option to extend the life of the roof. While we feel that the application of the primer and the quality of work we have seen with Mr. Link will allow for a better chance of full adhesion, our recommendation would be to install the capsheet set in cold adhesive. We would recommend the installation of a Derbi -color capsheet (manufactured by Performance Roof Systems) set in Permastic over the primed surface and seams heat welded. In addition, the owner should also understand that while the capsheet may be fire rated, the total system may not be a fire rated assembly. The owner's required fire rating for this building should be reviewed and the total system should be verified that it will meet the required rating. In addition to the installation of the capsheet, we understand that all of the coping metal will be replaced. The coping metal should be installed over a new wood nailer (fastened to the top of the concrete wall) and beveled cedar siding (for positive slope). The coping metal should be mechanically fastened at 24" on center at the inside face and a continuous 22 gage clip across the outside face. During our site visit, we noted one area of decking that has significantly deflected. This location is to the south of the north drain on the east perimeter of the roof. At this location, the existing roof assembly should be cut back, the area reviewed, and the appropriate support provided to correct the deflection. We hope this information has been helpful. Please call if you have any questions or if e may be of further assistance. Reviewed b sh Mullen RR R , CDT Bill Cypher, RRC Senior Field Engineer Senior Field Engineer Enclosures: Photographs (Mailed w/ Hard Copy) Please note that this inspection is provided at the request of Dave Link with Lynx Enterprise, who we understand is representing the building owner. No liability, warranty of merchantability, or guarantee of roof service life is accepted or implied. Wetherholt and Associates, Inc. is a neutral consulting engineering/roofing consulting firm specializing in resolving building and roof related problems. M:jnemoJosh'Nordstrom Warehouse.doc 11 t -i bzo td t Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photograph Description Photo #1, overview along the west perimeter from the southwest corner. Photo #2, overview from the southwest corner to the northeast. • t4, 4 I t. A LIME twa Wetherholt and Associates, Inc. M-4 / Nordstrom Warehouse April 28, 2004 - • , • 7Z. - _., , `1. • 711'; •".'"x" .--..- ... t1";•..t. . ,.. •--, , 1• 1'.. ..., Z 17 '717.1"7. ' ' --- . '''''i- 4 -7-17 71 4* . — ,..., -tr "t •'?, , i i , ' 0 re" ,r• 1 . . ,. ., ,., „ .. .., . ,11t* .t. .. 4 t, • 4 . .„. , t -4 ''P:3•*;-`1 . qAd- , Y ‘4,, .7.7! . . '••-•‘vt,-4-`,:' 1 MO • P . . 4. ,,,,IrAT, . V 4'4 0 IN-^ if tr , . '11 ' t . tk¼ vs •.. .. 1,444' '4 It Irt -; , .=,:t.,,,,:. , , %,,.., <14, 0 ■-■ . At!,?;7:•1,‘•;•.•;•.•!,;;•,. ' tie Photo #3, overview along the south perimeter from the southwest corner. 4 ,..• „,,,,,..:. - -.. . . tJ' s' 1. , .). t•-.0 A'1 - . ..” • -,... A!4 1 •••••.„:. , . , ...11,.. t. ' ' l' ^,t 5-, ‘'• t, . 4 Vv., ,;••• , 7.', ' :t-- , ,.... 4,.. 1.57.• 41. ”, . .. ' ,,P, P ' 'Ei.;-= a ,, - .. ...,,, s.,,,,•,4,47., --.,.., "x - •,- • 0 - 9,- , ':$.4 J .' tgb '.k.it , , "4.,a .7-- 4' ..,,..,-.,....:;*":!!"4 p...:4,, .t. 4 4.. .., - „ .• : ,•:; , ,••,..2., • • • . . ,., . • ' _ ., !, , ',„r 2004 . Photo #4, overview of the southwest corner. fak t aM I '1 ta.4 Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photo #5, typical roof penetrations — roof penetrations should be flashed with lead flashing. Photo #6, minimal crazing noted in coating. Also noted that the laps on the existing ply are approximately 5" Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photo #7, header installed between the two areas of roof at a seam where the end laps were not staggered. Photo #8, typical roof scuppers along the west perimeter. �. :.�.:j.R_i:�:..i.�: �.:,.c�:::l,!.zx,i... :.:lW:i�c?,L,::,c;i,.i...v�« • ��b.;' SaiS' R''. .xi",::::i.+i�i.;:.a.:i;ricw:,. Wetherholt and Associates, Inc. M-4 / Nordstrom Warehouse April 28, 2004 Photo #9, typical skylight of the 15 to be replaced. Photo #10, duct work covered with membrane to prevent water leaks at the northwest area of the roof. I ; fa 141 (41 ij tJ Wetherholt and Associates, Inc. M-4 / Nordstrom Warehouse April 28, 2004 Photo #11, flashing should be extended and or replaced at condenser units. Photo #12, overview to the west from the northeast corner. fi • Wetherholt and Associates, Inc. M-4 / Nordstrom Warehouse April 28, 2004 Photo #13, overview to the southwest from the northeast corner. Photo #14, overview of the east perimeter from the northeast corner. z < • Z re LI-12 O 0 U) a W• I Q LL w 0 < cn = 1—'1' LI z F._ 0 z LLI w O co O — uj I- LL. Fa . Z W to o fr t 4c.11 Oar Wetherholt and Associates, Inc. M-4 / Nordstrom Warehouse April 28, 2004 Photo #15, area of significant deck deflection noted to the south of the north drain on the east perimeter — roofing should be removed and decking reviewed and corrected as needed. Photo #16, typical roof drain and overflow scupper along the east perimeter. • .oz, • ' " •••••• . ter 4 lar VI II 1 : Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photo #17, overview of the field of the roof — coating and membrane is in exceptional condition. 10 -01 -2004 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director DAVE LINK 1911 SW CAMPUS DR, #451 FEDERAL WAY, WA 98023 RE: Permit No. D04 -165 1000 ANDOVER PK W TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and /or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or . abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Permit Center at 206 - 431 -3670 to arrange for the next or anal inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last, inspection; or if the project should be considered abandoned.. If such determination is made, the Building Code does allow the Building.Official to approve a one- time-extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 11/29/2004, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Stefania Spencer, Permit Technician xc: Permit File No. D04 -165 Bob Benedicto, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206-431-3665 3A1L.Ot�4 1 W E T H E R H O L T A N D A S S O C I A T E S , I N C. July 12, 2004 Lynx Enterprises 1911 Southwest Campus Drive, No. 451 Federal Way, Washington 98028 Attn: Dave Link Ref: Site Visit — July 1, 2004 M -4 / Nordstrom Warehouse 1020 West Andover Park West Tukwila, Washington Greetings, RECEIVED Phone # 253 - 925 -1503 Fax # 253- 925 -1521 ti JUL DEVELOPM NT At the request of Dave Link, this writer met on site with Mr. Link on July 1, 2004 at the above referenced location. The purpose of the meeting was to review the recently installed capsheet and related roof flashing at the above referenced location. Items of Understanding This writer reviewed the existing smooth surface roof assembly with Mr. Link on April 28, 2004 (See Wetherholt and Associates, Inc May 5, 2004 Memo) prior to the start of work. It was our understanding at that time, the owner wished to extend the life of the installed roof assembly with the installation of a capsheet over the smooth surfaced plysheet, completing the originally specified system. Mr. Link reviewed the possible concerns and options with the owner prior to the start of work. The owner selected the use of the Polyglass Tri-Built capsheet. During the month of June, Lynx Enterprise installed the Tri-Built 180mil. Fire Retardant capsheet with propane fueled torches. Prior to installing the materials, the contractor cleaned the existing roof surface and applied a heavy application of primer to the existing roof surface. Following the installation of the roof materials, the related sheet metal components were replaced, including the installation of new perimeter coping metal. The contractor modified the attachment from the existing installation which was a single metal coping set in mastic to a revised detail which is more secure. The modified detail incorporated a galvanized metal coping set in Performance adhesive tape and fastened in place using power actuated PA" fasteners and 1" washers. The galvanized metal acted as a continuous clip /receiver for the prefinished coping metal which was installed over, hooked at the outside face at the drip edge and then tonged in place at the drip on the inside face. The laps were set in two rows of Vulkem 911 urethane sealant. 13104 N.E. 85th Street • P.O.Box 816 • Kirkland, WA 98083 -0816 425 -822 -8397 • FAX 425 -822 -7595 tip} "inil4rG!rti:.. July 1, 2004 Site Visit Lynx Enterprises M -4 / Nordstrom Warehouse Page 2 July 12, 2004 The contractor removed the roof at the area along the east perimeter where significant deflection was noted during our initial site visit. At that time, it was discovered that the wall had shifted causing the joists in that area to become dislodged. The contractor coordinated with Rick Hudson (Richard Hudson and Associates, Consulting Engineers) to review the exposed conditions. Mr. Hudson reviewed the condition and provided direction to stabilize the wall and reinstall the joists in that area. Mr. Link has provided a copy of the proposed fix as well as photos documenting the repair to our office. Observations The capsheet was installed and appears to be well adhered. The roof area was walked and the seams checked. Instances where the seams were not torched completely were sealed with mastic by the contractor prior to this site visit. No instances of unadhered or open laps were noted. The remaining deteriorated skylights were replaced. At the corners of the curbs, the sheet metal flashing was terminated with the installation of a new corner metal. New storm collars were installed at heat stacks and other various roof penetrations. The coping metal was adjusted to accommodate the offset in the perimeter wall at the panel noted above requiring structural adjustments. The offset appears to be appropriate and Mr. Link indicated that the roofing wraps up and over the top of the parapet, providing protection from water entry. At the large unit to the northwest where prolonged leaking has occurred, the duct was resealed to prevent water entry and the roof in that area was removed to review the substrate to verify possible moisture damage. Derbigum was reinstalled in this area to provide a more robust system around the unit that is serviced on a regular basis. Mr. Link also balanced the unit across the sleepers to allow for proper drainage of condensation from within the unit. New clamping ring bolts were installed at the drain locations. A new sheet metal pan was installed under the condenser unit at the northeast corner of the roof. The conduit previously attached to the wall was removed and reinstalled, hanging in metal straps in lieu of fasteners through the roofing and into the wall. This installation also allows the conduit to move without placing stress on the roof assembly at the baseflashings. Junction boxes and other fixtures mounted on the wall were sealed and an additional piece of flashing material installed over the top to create a hood over the units. A propane tank, torch, and ladder were left on the roof. Mr. Link indicated that this was done to repair any deficiencies that may be noted and has since been removed from the roof. At this time, we see no additional work that is required as a part of the contractor's scope of work. To the best of our knowledge, the installation and work appears to meet the requirements of the scope of work, manufacturer, and building codes applicable to the project. ?.i�;Ga attlm::.3�.t: �:u::.t.r+w�au:71:. L':1'.x:uy. eta•." 414iA.z4,,L4.16 . 44,a July 1, 2004 Site Visit Lynx Enterprises M -4 / Nordstrom Warehouse Page 3 July 12, 2004 Attached with this report are photographs taken during the final inspection for you review and records. We hope this information has been helpful. Please call if you have any questions or if we may be of further assistance. Respec, ul , osh ullen RRC/RRO, CDT Senior Field Engineer Enclosures: Photographs (Mailed w/ Hard Copy) Reviewed by: Bill Cypher, Senior Field Engineer Please note that this inspection is provided at the request of Dave Link with Lynx Enterprise, who we understand is representing the building owner. No liability, warranty of merchantability, or guarantee of roof service life is accepted or implied. Wetherholt and Associates, Inc. is a neutral consulting engineering/roofing consulting firm specializing in resolving building and roof related problems. M:\MemoVosh\Nordstrom Warehouse final.doc Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photograph Description Photo #1, galvanized metal receiver installed at the perimeter parapet. Photo #2, prefinished coping metal installed over the receiver at the perimeter parapets. Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 ,r :- - - • . Photo #3, overview of the completed capsheet installation facing to the northeast. } .:r 1 t� r :jj •+� ry «f :-7. `.{ S� ,L..,. kY !t '7 r tf I .�` u/ 1Xi'?",` .1 �� i i y •r' 3x % ;V .3� 1j . . , ..¢ ; ac tv �i it "h,G e, 2 •fit �i7' . ' r' i �e.� t f L} • `,"1.- T*-, - � + II*.Fi'} ,� YY t, ! 4`, t:. by i�w "1 76;x F !r4•Mrk ` �t�K1 k...',La> w. . I� Jt rti ' T�'� Pik x +E ' 'p# H" WI t j1 G i' � t '�r '"' ' +yi .� >} `i),j' •' � 'n1+, ,+,� ,.,,k ' *.-....„:4..., { C atns.s ( Ptli - h 'r i�t�4f >y1 n, F 4 r J kt � ,U Ili g U w I, ' 7 z jif is n ma,�y tv N3 y se{ t i�:5 ?: lls - ,t 'XS rl� i Le 0 s•,.. } .T� xj w I },vy ) ",p y� { Y xv ?yii t ` ll. RF 17P`"' .i °•;Y ;�i YY` ' }, +-7° • i- F• I,Q,oZY 4 t tY «` a'7ti. }� k ti. 1 y � t i � x+4$7' 't ,;y, t'" f `' "f>a i 1L I j '�i. w tr 'SO i tiL�4 '[' l' }�y�•} y M(f �`r' + (.y, 7 z) yr ..' 7. ! ti i' ,?IS ,[{ft •'th •f` tl'f '.j sF.t i•EY .� '•t.FF''. ? 4r, 'g , • )4. -ter 41'.' n 4;,yt AF ?r 71f71 f •w3". — ___ - .„ �`�'" ff "I' C 1•.�'y±,4, � ]`+ . M � �wri''Z is• }(,y�'.: s i, ,S,�r•:: ii�Et l'�✓ •Y'j t ? +j'n°.G? : T Y .•�TLr >} i i t B t c i � 7 r{ tCii 4&ri"��ji.. Yi c.�k r .� F'�r • [�'Q� t i �7�I .(�35^t14. f {4�i" •ya '� : ft •.•1+1.�t i7',yy�. 6,. 't �7 at?.%. ^ �a'a;v.. �'" '� >! J {a Li.,f �#,�,r�✓1 //iiyy 7 !'. ,•4, ++{{ }�`ry ���rtyfx �'f�(.. (1 =' 'i "�y'{�y' .rK` V ' �fi; ✓ I t. V J .T fi };y:f / "ti 'y,,• •�,J',- ` Yi`i �+. '1 T WJV •, C'y 5 yYa Ilfr•�1 rY lyr�.7: 1ge .t '., . VV.1 { SI : f� };,frJ 7� 1 th!- f-h t: �`ZN 4, C(,< if''+•;, t 7 X17 G f r t 'A fit<4il'� �"�,�{� f�. p pl SiAaRxFt�kmary. 4rd7 '�. ; t . ;fic�" IM Scay av t.iR 1 art t� r., 'F� ,' i J2.. i s + tfyt 3u � C�^� x j kYl4irtrl r yy ;hl ' �'P�7�f+y�'1..... `tF� " i .4t 4N- ' is��,4 R{' 7 1f to "''f l 1 a i?b ttt {Jav 1k1 Sr t r� r oN c a idf r l t'�1 t i �'e i SyLi�j t��L! .! R „ t✓ 5a it i•% fi, x i rt i. T G �. f f. •' . JS i l l 1 Y } . r l ' f 41!'tbF4Y r t1 f,r1� i , . Ir'i�i1l�iM1'y i tz "t L , 'T�J � r t T ' t'ISu X : x { i �.$ tt.T `3 4' L•.-y, ) i h '(�' . �a{.7M y, �, t vin �r.j.,',i}d's t"• t x. • � y �iiFvy'o •y•wf �t i(ii} l SS ^ }".r ,v 4?.q P /,1 4r. x " 1 "" f 1` � � 8 �7 .: 1. 5 . i�..l!, Y!'F r r it+.• t 1p 'i.:,,.,; •t' 7 p•-Y 4 ryiS .i- !'y . 1�`Y'>S �e t . ..._.�._.— ..,..iii�:..1..r,i .s >.•t ;I J•L�:iSd.1:_.aaSI.'2 r. `t j% �ni: �Sr.. J;ni. �t „� C .. k `, "" 5 f "[i•f }N'' ' . _ '1�Z'r�vri�:.K TW.7i qi 'h .. ,• rFfyry� ' �[Sti Cry s•'�[•iei2y}, .Lyy�rv�p� 4y1. t JMfti' J d , , r y; ,f 1 It {'q�t Q`X tP'•' d ' �...i x,2r ; 1, 4 4 '� rt• x , J i` { f ' 1 ? , '. ., .t !rf ^y r ya i ' _ a• }t Photo #4, overview of the completed capsheet installation at the southwest corner. • at',i . kirRin'rdr... •.'+:.'r«+..:.w,�.w.W.. Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 3•c f .-.c. � _ uh � ;i i ' + i ,y 1.: :v �?t +•sj t • pr . ''',„ 4Y .� JUL 1 2004. Photo #5, typical conduit straps installed at the perimeter. 1 \2i. '3'5 11y5.'i x ,� ,)iii. t �•` - t` , T1 •4�.. y' ,1 '? -y� 60,4 , , ,i 1.'hk ", 14 vc r'"' i k`ir A*1 t3 i' ; ' v, :. 34:3. 'fr'"�]{jyjy�� `+ a! k: ;' ° < '' ; ∎� ��,,t , . A1; . v `y ' r • !.. • ` G Z ■ }r K,e rir , T' •,' l i' '" °::?g* i' 1 y 4 ►•! . ., " Photo #6, new pads installed under conduit blocks. '..3J:.. «' .':.:. twii: i. s: au;.:i: art,> fr: : >f..i'rr: s":zi:�:,:.:4w.1.;:: - . .... Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 t 1 r 1 T 'l k R t 1 fl ryf y r' ,f C t 9r v ,y l tom' XRT tt (' laY <1 19 r } k , k ' r) .. t t } 71 ✓ 44nd F S�' 3• rl.��j( A Ge ` iii l F+ } I.4. a t Y( .L+,r'��t7�Y AC,#t'Yj+. 2 F' �w It f rx �t. ,t� 4r 4 L rt 1 4`' ct,) rt 1. `l Lcti�f�Y Jf4E :mil t I t t t� C 2 L 1` t;� ♦�1+ .) . 'mot 1 S t. -f,. '1, ' %e, :4. c,- ti:,... d. ;;' +`•�` 1 4:erf itr,��t? #; •'i *�S;'.'` -' tP.'. ; Y , .(2,10' ,6 W 2 % 1 1 111 •] . ' 4 Photo #7, new skirt metal installed at units. 1 '' : ' lkf"� -. 1'1� S ({ kr>1 � \ 55 •dt� ` � )= i `.�A j4( �tY�.,.��iny %fj t !{ ? y i\ A \f fi J ,Y1i; lK :. L 1 t !' f�'Y ..5r 1� �1er ..jilt , Pf�'r;}.ri 1+ Ir7� 4r q! }t {.4r ji alit -4it 4 754 } v a f L ♦' r Ib ;, i,t - j • )Q 1 .� r ! �, c( r r� Sri Sid ) .ci f,r 4 )lrr, j it)). r 7 xJ. _ 5!4 .r 7 r )h:i� . t ) i. •C?: Photo #8, additional material installed to create hoods over boxes mounted to the perimeter parapet. Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 Photo #9, new pan flashing installed under the condenser unit at the northeast comer. Photo #10, new braces installed at the shifted panel on the east perimeter. Wetherholt and Associates, Inc. M -4 / Nordstrom Warehouse April 28, 2004 ti ca� � ♦ y fW4 u ( .••t ,f R{{{yyyj! i ° "a`yf t° f, t '� t ' r 1'. � ki .-+ 11ii la x� ; ;. Photo #11, overview of the completed ca sheet installation at the lower south roof — ladder was reportedly removed. 191 1 S.W. Campus Dr., Suite 45 1, Federal Way,Washington 98023 ENTERPRISES (253) 925 -1503 Fax (253) 925 -1521 May 18, 2004 City Of Tukwila Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Dear Planning Department, Thank you in advance for you consideration for an over the counter permit or a quick turn around for our request for a reroofing permit. The owner just signed the contract and the building that is occupied by Nordstrom's needed to have the project completed in June. Enclosed is an original inspection report from the roofing consultant, Wetherholt and Associates, (who were also the consultants on the roof work in 1988), copy of plans from 1975 and a copy of the contract document. The original roof from 1975, a class B roof, consisting of a base sheet -two interply of #11 fiberglass and a cap sheet was removed in 1988. The fire rated cap material maintains the same Class B rating. See page 9 from Polyglass /Tri -built fire rated specifications. Thank you again. Sincerel e Li Lynx Enterprises y h+:.:.:•,1. 4-4 •,4044- 7.1:4., es 4 ..t... cy7),*ati, ,47:4 ?ft "Doq46,s' yyK."tt Jryr.. "fay',r :.. Name: Address: I.NX 19.1 1 S.W. Campus Dr., Suite 45I, Federal Way,Washington 98023 ENTERPRISES (253) 925 -1503 Fax (253) 925 -1521 Proposal and Contract Job Location: Powell Development 5/10/04 Attn: Ms. Laura Kubinski P.O. Box 97070 Kirkland, WA. 98083 -9297 M -4 (Nordstrom) Building 1000 -1040 Andover Park West Tukwila, WA. 98188 Dear Sir: We propose to furnish all materials & perform all labor necessary to complete the following: Contractors License # LYNXEI "077JH Federal ID # 91- 1586691 Phone: 1) Remove all metal coping and roof debris, haul away and dispose of in a legal manner Repair roof deck area on east wall noted in Wetherholt report of May 5, 2004 at Powell's currant T &M rate not to exceed $750.00. 2) Primer existing roof deck surface and parapet walls with asphalt roofing primer to assure good adhesion of new roofing materials. 3) Install new Polyglass 4.5, Modified Tri -Built FR (FIRE RATED) granulated layer of roofing to entire area of roof. Install extra ply to all cants and roof penetrations. 4) Install new flashing and collars to B -Vent heater stacks. Install new lead flashing as necessary. Note: Necessary caps will be replaced at cost plus 10% OH &P. 5) Raise and move HVAC unit and install new curbs and roofing. 6) Install new 26 -gauge metal coping. Coping will be hemmed and will extend 4 inches down sides and color to match painted sign band around building. 7) Full 10(ten) year workmanship warranty on all roofing work. Product warranty will be 12 (twelve) years. RECEIVED CITY OF TUKWILA pY 1 9 2004 Respectfully submitted, c:� ���� Dave Link All of the above work to be completed In a subsl8 �idGOrkmanlike mannTs fo YY e tQ, Jrd practices for the sum of dollars (S �ll� 11 ). $ 152,250.00 + sales tax Payments to be made 1/3 (one third) of amount will be billed at start of project, 1/3 (one third) s.' .11 if .' , •1 ies 1 s ' 1 1 el Acceptance You are hereby authorized to furnish all materials and labor required to complete the work mentioned In the above proposal, for which agree to pay the amount mentioned In the sold proposal, and according to the terms thereof. Accepted May 5. 2004 8:35AM • POLY•LAii USA. Iwo. Corporate Offke aad Manufacturing Fedllry 151 teen aln IONIEX NEVADA 001 (100) 222.97112 PAX (775) 575.2314 Maevf tt dig Facility HAZLETON,PENNMVANIA 11101 (100)10445U MAX (571) 3144117 E -aril: custaraerservi a pohnlass.wm Woke: www- etplass.com Worldwide Neaislwsas and Nenulacturin9 Facility POLTL1LA$S SPA Treviso, ITALY Subsidiary Co. and $aavladudni iadRM M$P $aMlamci LTD., 0laseaw GREAT PRAM No.2026 P. 1 POLYGLASS WATERPROOFING MAT88IALS AND INSULATING SYSTEMS FACSIMILE TRANSMITTAL SHEET :171.9Ac- � .. ' is) ( TOTAL NO.OF PAGES 1NCLUD1�tG C SENDER'S REFERENCE NUMBER RE NOTWCOM MENts: YOUR REFERENCE NUMBER PLEASE COMMENT PLEASE REPLY PLEASE RECYCLE C 'ROF: TUKWILA MAY 1 4 2004 PERMIT CENTER 1 i MaY. 5. 2004 8:35AM No.2026 P. 2 November 1, 2003 To Whom It May Concern: T Will - E3•)uIT TRI SUILT ROOFING PRODUCTS 13601 South Western Avenue Blue bland, Dlinois 60406 Effective immediately, Allied Building Products will be changing the name of "TR1- FLEX" line of modified roofing products to "TRI- BUILT" All of the products will be of the sank quality as before, made to our exacting specifications.. The change was made for marketing reasons, and will allow us to bring more quality commercial roofing products to the marketplace. The TRI BUILT name represents premium roofing products, installed by premium applicators, serviced by the premium national distributor. TRI -BUILT is exclusively distributed by Allied Building Products. Regards, C. Richard Schurman National Manager TRl -BUILT Roofing Products Yi14�....;J1!lTrv.iliJ{Al �4J:. i. p4l JJA1v�NiwiaY( W4:... suttrNhJxkY4Y0JS 'raih{3:NiN�i1{N'}�'.JAJ�/�%'i MaY. 5. 2004 8:35AM No•2026 'P 3 Eastern Operations • Hazleton. Plant 555 Oakridge Road Humboldt SW Industrial Park Hazleton Pennsylvania 18201 (570) 384.-1230 - (570) 384 -3282 April 21, 1999 Mr. Doug Miller Underwriters Laboratories 333 Pfingsten Road Northbrook IL 60062 Re: Alternate Listing Dear Jim, We would like to have an alternate listing created and added to the UL directory. Listed below are the alternate product names and the currently UL Listed Polyglass products which they relate to. Since this is an alternate listing owned and maintained by Polyglass 1 wasn't sure if the multiple .listing document should be used or not. i The alternate named product listing should contain the same listings, . where applicable, as the origiionai Polyglass listing. with the exception of the .name change. Please,.review the list of products below and let me know if you will require any additional information. ELASTOSHIELD TS4 TM-FLEX 308 • ELASTOSHIELD• TS4 FR • • TRI -FLEX 308 FR ELASTOFLEX V • TRI - FLEXX 307S ELASTOFLEX VG 307 , ELASTOFLEX VG F TRI -FLEX 307 FR ELASTOFLEX S6 TRI -FLEX 3068 ELASTOFLEX S6 G TRI-ELEX 306 .. , ELASTOFLEX S6 G FR •' TRt- FY:,EJC:3 FR ;; • . POLYBOND G "`'. - Tg-17,0G '. POLYBOND ''' "" . "- TF -170• POLYFLEX G �'.. IF-4G •-c•• POLYFLEX G FR TF-4G FR •- . POLYFLEX TF-4 • • The address for TRI -FLEX to be listed in the book will be; TRI FLEX SYSTEMS PO BOX 842 POLYGLAS5 USA_ Inc. Home Office: 150 Lyon Drive. Fernley. Nlevada 39408 F:,• r,r; ^•. a May. 5. 2004 8:35AM No.2026 P. 4 TGFU August 12, 1998 [Roof Covering Materials] Roofing Systems TRi -FLEX SYSTEMS PO BOX 842, LAKE HOPATCONG NJ 07849 (A card) Z SINGLE PLY MEMBRANE SYSTEMS Z Unless otherwise indicated, the insulation and base sheet are mechanically fastened in place; the membrane is heat welded in place_ (Optional) Noncombustible deck classifications are applicable for use over combustible (15/32 in. mm v N 0 plywood) decks when Y: in. (min) gypsum board or Y." (min) tieon3ia- Pacific Corp. "liens lleck(Keg. ):m.) u) w Overlayment" are used directly over the deck with all joints staggered 6 is (min) from plywood joints. General statement for use of vapor retarders and/or deJiesutatien adhesives (NC decks only): When. such 2 0 ELI vapor retarders or deck /insulation adhesives areacceptable to 1BI -FLEX SYSTEMS they may be utilized. "TRI -FLEX G2 Base" may be used in lieu of any Type G2 base sheet in any NC Classification. Those N products may also be used in any C-15/32 Classification in which a generic Type G2 is referenced (.e. not = C) brand specific). "TRl -FLEX Ply 4 ", "TRl -FLEX Ply 6" (Type GI) and "TRI- FLEX vaned Base" may be E- _ used in any NC Classification. Z F" References to poly isocyanutate insulation tatty inchule TRI -FLEX Products W O "TRI -FLEX 307" granule surfaced membrane may be used in place of "TRl -FLEX 307S smooth surfaced ? 0 manbrane for existing systems. v ON D l- Clats 1! - Balbged = w 1— I. Deck: C-15/32 Incline: 3 tL 0. Insulation: Polyisecyanur^"te, perlitelpolyisocyanurate composite, glass fiber, Ferlit:,any thickness. N Ply or Base Skeet: 1 ply Type 15 felt, Tlil 1 LEX 306 ", O Membrane: 1 or more layers "'IF- 170 ", "TF -1700 , "TF -4 ", "TF -40" or (modified bitumen), heat welded, Z or 1 or more layers of "TRI -FLEX 306S ", or "TRI- FLEX 308 ", mopped in hot asphalt. Surfacing: Gravel, embedded in hot mopping asphalt. Optionally, gravel can be applied loosely, but incline cannot exceed 2 iw Class B - Ballasted I. Ark: C-15/32 Incline: 3 Base Sheet: Type G2. Membrane: "TF -170 ", "TF-1 70G", "TF -4 ", "TF -4G" (mM. i&ed bitumen), heat welded, or 1 or more layers of "TRI -FLEX 307S", "TRI -FLEX 306S" mopped in bot asphalt. Surfaces: Gravel; embedded in hot mopping asphalt. Optionally, grave can be applied loosely; but incline Carmot exceed 2 in. Class A - Fully Adhered May, 5. 2004 8:36AM No.2026 P. 5 1. Deck: NC incline: % fnsdation: Polyisocyanurate, pekte/polyisocyanurarte composite, perlite/urethane composite, glass fiber, phenolic or perlite, any thickness Base Sheet: One or more layers "TRI -FLEX 307S ", Type 15 felt or Type G2 base sheet. Membrane; "TF- 170 ", "TF- 1706 ", "TF-4" or "TF -4G" (modified bitumen), heat welded. Surfacing: Kokem Products "Sunguard Acrylic Roof Coating" at 1 gal/sq or Karnak No. 97 Fibrated Aluminum Asphalt Roof Coating or Karnak No. 97 Asbestos Free Aluminum Roof Coating at 1 to 2 g sq 3. Deck: C -15/32 Indine: 1/4 insulation: Two or more layers (insulation joints staggered a min of 6 in. from plywood deck joints) polyisocyanurate,, perlitelpolyisocyanurate composite, glass fiber or perlite, any thickness. Base Sheet: One or more layers "TR1 -FLEX 307S ", Type 15 felt or Type G2 base sheet. Membrane: "TF- 170", "TF- 1706 ", "TF-4" or41TF -4G" (modified bitumen), heat welded. Surfacing: Kokem Products "Sunguard Acrylic Roof Coating" at 1 gal /sq or Karnak No. 97 Fibrated Aluminum Asphalt Roof Coating or Karnak No. 97 Asbestos Free Aluminum Roof Coating at 1 to 2 gal/ sq. 4. Deck: 615132 [aclirne: '/ Insulation: 1 /. in. thick Georgia- Pacific Corp. "liens Dcck(Reg. 'rm.)" overlayment board, perlite, wood fiber or glass fiber. 1 in,., mechanically fastened. Base or Ply Sheet: One or more layers of "TR1 -FLEX 307S" or Type G2 base sheet (mechanically fastened or hot mopped). Membrane: "T F-170", "TF,- 170G", "TF --4" or "I 'F-4G" (modified biuunen), heat gilded_ Surfacing: Money Products Co. "Endure Aluminum Roof Coating ", "WeatherCheck" or 'Pro-Grade Ahrminwn Roof Coating", 1.5 gal/sq or Karnak No. 97 Fibrated Aluminum Asphalt Roof Coating or Karnak No, 97 Asbestos Free Aluminum Roof Coating at 1 to 2 gal sq S. Deck: NC Incline:1 Insulation (Optional): Polyisocyanurate, glass fiber, perlite, wood fiber, any combination, any thickness.. But Sheet: "TRI -FLEX 307S" or Type G2, mechanically fastened or hot mopped Membrane: "TF -170 ", "TF- 1706 ", "TF-4" or "TF-4G" (modified bitumen), heat welded, Surfacing: Grundy Industries "al MB Aluminum Roof Coating" at 1 -2 gal/sq. 6. Deck: C -15/32 Incline: 1 Tnuilntion ;'A in, to 2 in, Partelc Paroc Cap Board,' /+ in, to 2 in. f berglan, or I in, to 2 in, i5ocytmunte„s with all joints staggered 6 in. from the plywood joints or 1 layer `Insulbase" (seams Kent welded). Base Sheet; 2 or more layers (in any combination) of Type 02 base sheet, "TF -4", "TRI FLEX 3075 ", "TRI -FLEX 308 ", mechanically fastened or hot mopped. Ply Sheet (Opticnai): "'IT -4", (mechanically fastened or heat welded), "'*R:. L. 307S", "TRI -FLEX 308 ", mechanically fastened or hot mopped. Membrane: TRI.F.LEX "TRI -FLEX 307SG FR ", heat (.use:: or hot mopped. 7. Deck: C -15132 Incline: 1 Bate Sheet: I ply of TR1- FLEX, "TR1 -FLEX 307$ ", nailed, Ply Sheet: 1 ply ofTRU -FLEX or "TRI -Ft.EX 307S", hot mopped. Z W re 2 6 JU O 0 u,0 CO ILI Ill = CO W w • }O gJ �< w a =W Z F. 1— O W~ • W U� O N CI H Ww H 1- -O .. Z w U= O~ z May 5. 2004 8:36AM No.2026 P. 6 Membrane: TRIFLEX "TRI -FLEX 307S0 FR", heat lined. S. Deck NC Iactine: 1 Insulation: Polyisecyanurate:, pesste/polyisocyanuraze composite, glass Eher, pulite or wood fiberboard. Any thickness. Base Sheet: 1 or more layers of "':R1 . LEX 307S" or Type G2 base shed. (hot mcppi or mechanically fastened). Membrane, "TF-40 FR" (sr.odif d bitumen), heat fieled 9. Deck: C -15/32 Iodine: 'ii Base Shat 1 or more layers c:'- "TO.r.FLEx 307S" or Type 02 bass sheet (hot mopped or mechanically fastened). Ply Sheet: 1 or more layers of "TRI -FI M 307S" or Type G2 base sheet (hot mopped). Membrane: "TF-40 FR" (modified bitumen), heat fussed. IO.Deek: C45/32 Iodine: Si Insulation: Polyisocyanurate (2 in. min), perlitc (3/4 in. min), glass fiber (7/16 in.. min), . peeiite/polyisoeyanrtrste composite, or (2 in min) pnlyisn yanurate covered with 'h in penile or wood fiberboard. • Base Sheet 1 or more layers of "TRI -FLEX 307S" or Type 02 base sheet (hot mopped or mwhaniccally fastened). Ply Sheet: 1 or more l; yes of "TRl FLEX 307S" or Type .02 base sheet (hot mopped)_ Membrane: "TF- 4G -FR" (modified bitumen), heat fused. 11.Deck: NC Iodine :1 /2 Iasolation:.Polyisocjan:Lr: , . eri te/polyisocyanurate composite, glass fiber or wood fiberboa'd, orMae, any thickness. Anse Shed: l or more layers of "TRI -FLEX 307S" or Type G2 base sheet (hot mopped or mechanically fastened). • M4mbrana "TRI -FLEX 305S . 3 EB • or "T1u- .EX 307SG FR" (modiSed bit msen), hot mopped. 12.Deek C -15/32 Iodine: IA Base Sheet: 1 or more layers of " ZRI -FLEX 307S" or Type G2 base sheet (hot mopped or mechanically fastened). Ply Sheet: 1 or more layers of "TR1 -FLEX 307S" or Type G2 base sheet (hot mopped). Membrane: "TRI-FLEX 306S 0 FR" or "TR1 -FLEX 307SG FR" (modified bitumen), hot moppecl- 13.Deck: P •15/32 Iodine: 34 . _ Insulation: Polyisocyanurate (2 in. min), perlite (3/4 in. min), glass fiber (15/16 in. min), perlitt/polyisocyarwrate composite. Base Sheet: 1 or more layers "TRI -FLEX 3075" or Type G2 base sheet (hot mopped or mechanically fastened). Pty Sheet: 1 or mom layers of "TRI -FLEX 307S" or Type G2 base sheet (hot mopped). Membrane; "TRt -FLEX 306S G FR" or "TRI -FLEX 307S0 FR" (modified bitumen), hot mopped. Z re W 6 JU O O W (0 Ili J = wO J u. to I=— _ z� 1=0 z~ U O 0 5 O I— WW Z • = O~ z MaY. 5. 2004 8:36AM No.2026 P. 7 17.Deek: NC Wdire: 1 Insulation: Cellular concrete, gypsum concrete, vermiculite concrete, perlite concrete or structural concrete. Primer Not UL Classified -as required by manufacturer. Membrane: "TF- 170 ", "TF- 1700 ", "TF -4 ", "TF -4G ", "TF-4 G FR", Serfadng; (not required for "TF-4G FR") Money Products Co. "Endure Aluminum Roof Coating ", at 1.5 aal/sq or Grundy Industries "al MB Aluminum Roof Coating", at 1 -2 gal/sq 13.Dedu NC Iodine: 1 Insulation (Optional): Any thickness, one or more layers UL Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanuratelcomposite, EPS/wiod fiber, EPS/perlite, EPS/compos ite or Partek Insulation Inc. "Faroe" roof insulation. Blue Sheet One or more layers Type GI or Type G2. Membrane_ One or more layers, "TF- 170 ", "1P- 170G ", "11 -4" or'TF -4G" (modified bitumen), heat fused. Surfacing: Fields Corp. "F350 Heat Shield Aluminum Coating" or "F630 Mutt Shield Fibered Alumwmm Coating", 1-1/2 ,n. al/sq 19.Deek: NC Wine: % Barrier Board: ' in. gypsum board. Insuladoo: Polyisocyanurate, any thickmess_ Base Sheet (Optional): Type 02,. "TRIcFLEX 307S" Membrane: "TF -4G FR", (heat fused), "TRI -FLEX 306 FR" (hot mopped) or "TRI -FLEX 307 FR" (heat fined or hot mopped). 20.Deck: C -15/32 Incline: 1 Insulation: OVA in. thick Georgia - Pacific Corp, "Dens Deck(Reg. Tm.)" overlayment board, perlite, wood fiber or glass fiber, 1 in., mechanically fastened. Ply Sheet: Type G2, mechanically fastened. 1Vlembrane: "TF- 170 ", "TF-4" (modified bitumen), heat welded. Surfacing: lionaey Products Co. "Endure Ahnnirann roof Coating, "Weather Check" or "ProrGrade Aluminum Roof Coating ", 1.5 gal/sq. 21:Deelo NC lediner % Insulation' Polyisocyanurate, pedite, glass fiber or wood fiberboard, any thickness. Base Sheet: 1 ply of G2 hot mapped or mechanically fastened. Membrane: "TRI -FLEX 306 FR ", hot mopped. 22.Deek: C -15/32 T.wclioe:'h Base Sheet: 1 ply of G2 mechanically fastened.. Ply Sheet: 1 ply of G2, hot mopped. Insulation (Optional): Polyisocyanurate, perlite, glass fiber, any thickness. Membrane: "TRI -FLEX 306 FR ", hot mopped. Z re w 6 -.I C.) U 0 CO O J� W u_ w0 2QQ =• d o. w Z= W O O N • 1- wW u-- 0 WZ O ~ z May. 5, 2004 8:36AM No.2026 P. 8 23 -Bee C -13/32 Incline: '4 Insulation. Polyisocyanurate (2 in. min), glass fiber (15/16 in. min), perlite/polyisocyanurate composite, Base Sheet: 1 or more layers of "TRI -FLEX 307S" or Type G2 base sheet (hot mopped or mechanically fastened). Pty Sleet (Optional):1 or more layers of "TRI -FLEX 307S" or Type G2 base sheet (trot mopped). Z Membrane: "TF -4G-FR" (modified bitumen), heat fused. 1 w 24.Deck: C -15/32 %dine: % re Insulation: Polyisocyanurate (2 M. min), glass fiber (15/16 in. min), periite/polyisocyanutate composite. 0 Base Sheet: 1 or more layers of "TRI -FLEX 307S" or Type 02 base shed (hot mopped or mechanically to 0 fastened). w H Ply Shed (Optional):1 or more layers of "TRI -FLEX 307S" or Type 02 base sheet (hot mopped). W ti Membrane: "TRI -FLEX 306 FR" or "TRI -FLEX 307 FR" (modified bitumen), hot mopped. 2 }G} J 2$.Deek: C -15/32 Incline: 54 u. Note: (unsupported plywood joints are covered by a min 6 in. wide strip of Celotex Corp. GS Roofing, = w Tamko Asphalt Products or Black Warrior Roofing, Inc. Type G2 base sheet nailed in place prior to toofag. Z H Base Sheet: 1 or more layers of "TRI-FLEX 307S" or Celotex Corp. GS Roofing Tamko Asphalt 1— 0 Products or Black Warrior Rooting, Inc. Type G2 base sheet (mechanically fastened). W W Ply Sheet: 1 or more layers of "TRI -FLEX 307S" or Celoteic Corp, GS Roofing, Tango() Asphalt Products D 0 or Black Warrior Roofing, Inc. Type G2 base sheet ( medianically fastened).. 0 to. Membrane: "TF-4G FR" (modified bitumen), he Rased. " ` w H =W I-,U 26.Deck: C -15/32 Incline: 1 u. ~O insulation: 1 /. in. thick Georgia- Pacific Corp "Dens Deck" overiayment board, petiite, wood fiber or glass Z i i fiber, 1 in., mechanically fastened. v H Ply Sleet: Type G2, mechanically fastened. Z I— Membrane: "TF -4 ", heat welded. Surfacing: Money Products Co. "Endure Aluminum Roof Coating", "Weather Check" or "Pro-Grade Aluminum Roof Coating ", 1.5 gal/sq 27.Deck: NC Indhte :'h Barrier Board: in. gypsum board. Xnsolatton: Polyisocyanurate, 2 in. max. Base Sheet: One or more plies Type G2. Membrane: "TRI -FLEX 307 FR ", heat fused or hot mopped. May. 5. 2004 8:36AM No.2026 P. 9 Class B - FeOy Adhered 4. Deep: C -15132 Indine:'A Insulation (Optional): Any thickness, one or more layers UL Classified pedite, wood fiber, glass fiber, Polyisocyanurate, polyisocyanuatelcomposite, EPS/wood fiber, EPS/periite, EPS/composite or Partek Insulation Inc. "Faroe" roof insulation. Base Skeet: One or more layers Type GI or Type G2. Membrane; One or more layers "TF-4G FR ", "17- 170 ", "TF- 170G ", "TF-4" or "TF -4G" (modified bitumen), heat fused. Surfacing: Fields Corp. "F530 Heat Shield Akuninum Coating" or "F630 meat Shield Fibered Aluminum Coating ", 1-I/2 gal/sq or Money Products Co. "Endure Aluminum Roof Coating", "Weather Check" cu- "Pro-Grade Aluminum Roof Coating", 1-1/2 gal/sq. S. Deck C -15/32 Iodine: 1 -112 Brace Sheet Type G2 mechanically fastened. Ply Sheet: "TR1 -FLEX Base ", heat fined Membrane: "TF- 4G -FR" (modified bitumen), heat fused, 6. Deck: 15/32 Incline: 1 -1/2 Insulation: Glass fiber (15/16 in. min_) mechanically fastened. Base Sheet: Type G2 base, hot mopped. Membrane: "TF-4G FR "(modifiod bitumen)hat fused. Class C - Fully Adhered 1. Deck C -15/32 Incline: 2 Base Sheet: OCF's "Perms Ply IV" (Type 02). Membrane: `1 F- 170G ", "TF -40" or "TF-4G FR" (modified bitumen), heat welded.. . • • : -..• .•... -... • • •••• N. 41 ° '-i;;-,•-4 rn .11-•••.• rli • X • '`.:1;.7:. e•:•-;••■''; I: • lei .- • • co.;••••,-4::•:-..,i, • . .. • . Ny-A.;•..-:!tn A • f-T5 • tau) • al • • '• • • 1 • • I • • r 4 .t • • 1 1• [. .... , .. 1 - - • f . •t- • . ..., . - • 6. . .".:„ • rit: •4 .r em! .. -: • .• r . , • j . . i .;• ,.. .. t • . • a . ;,„ 1 . t. . C . . .• --- • • • r..... .i',..: . • i • • r 2 „, , ... Lrfl.!nt.' $ 1 1. ' e..-.. .1' . 1 I/ . • 1 °• . . .' }.. *$ •••■••• •• 4 • ' . • -J. • ,,,. • .' ' . 4... . sb •. Z . it frt..; Jet, a • c . . . 4'14 ...e • , . q ••• yr • r ••■• A. .. ' . .11 i• , ..* • ... i : : . : . .: :: 7. etc.' :,- ;.; .11;it.e. 1,10411liblierf' 4111041111,Pinfria 'bail+. t4. -% W, 4 1.• ..or • :1' IV • V* - • • • g f •*„. quo or) in • prip I, .. „sof Z'Vt %INA" • A . . . • • *. 1 • . • ••■ • 14eicofii a1/1i. .1 ft-A)%1 Ak4+4 A. ! A.? rlenP- 11.44-.1 C^1:1612..02. 6L-elki1 it7t.k) 4 PA.45er. k.4 Ox-'0,(:!ot-1. WALL a•*-;e. e..(;44sr:7.-t.- v1/44.i3osa "f7eie? A (, r2ZIC 4 eisre-Yel-'" A,7 qrA r;tsvrAil. _ -T--0166,L cbriftkIL Fant.;C:14.-'1"1 FLANt.) CsCer riA/411t,&. 074 rA4,1 510...KoT v41,4.g.c2 C>C44tt-■ 151.K '‘ Illr,i0t■.1C 7 Fi.44:11 ,ti1) 4 v#4..1#2 44, ‘7.1 V/ALL ‘"ei -T1716."1-- vs/Au, cv-fAILF, 's TtrL FgAitic•I 4S. 19 Fe..A1AI t4Cos 1,±orko4.01,ii ruime. me! ptm- 64*4.3 fez 47UL C;er'AJL tie ft.#4,1 ,z rte Fl./64J 4 kiee, cae* 41-,CA- 04C0Z44A , -1-160. 4 it eat.WOULfatt t.r"14‘f 'Co 4 6mit F ILF GpPY uildeTstand mat Plan Gnecic approvals are = I%) errors and on-ii-sscris arid approval of nians does r‘ot authorize the violation of VI 'adopted CO( 3 or ordinance. Receipt of con tragt,or's co,/ of applovri plans • • r (1) W Ins U Ct W U CO LI 0 L) 3 2 a o g— w .1 4 wt.. I re w cc cx a • e• 0 a 2 a 0 IL J 4 0 0 0 2 4 0 x 2 0 a a IL 4 4 4 4 2 4 4 0 N 4 X 2 IN 0 a • 1 .• •••.'? 1,1 12-1 OH Ac. pifr s'il\F-424tar -r(--441, or It SHEET TITLE ORAW10.03 NO , • • ••• .41.• **AN • " ••■••4 41•2. •;4! r it • , 4.• -me.* •••••..-4 46.04•••••16, 4.1.41111-1111.11.... ••••••••■•••• ••• ••■•••••... 4 • • It • r • !' • ., 4 • .; • • • • w•' • Ilt1 • • . • • .., • • • •%en..• • 4= ii/'•Plijr •'T h' '• r r.olt, I Tt ..^,, • . • R .. ' M••+ • S we. • •! I, 1. . • "ir ,tp r q. ••• r••■• . I.rt ~', vs- "IPA -"'" • ""■`•.",••• • L'^ • ••• , m gat t� 1r 1 ••+Mr..*0 A•4111 'M1 1, Iraldf`•• •' "11411' • r i n t 1 _ :V••••••1 .` •.+,',, • ' • �= �•• • • y . _ '�'• �t � '!►! � tiON• s ; ` • + • Ifi 41,4 �• . It .• ' ``► • • .: .•: i.ir LE; •C I. i'3'. ••. i .• °ilk'• ' � sir` :, ~ ,, �,c�r. ,±� �' , %�.^�'• ..4 • ' ` : f° r1` ► "` .. , 0, ,. • • •C• - • .•• • AM • A :.. 4- I v M y • !�• • rJ arw • 'f\ • . 17. » 4•.-• • ' � � r i t !. . _.p. � .7. !. � •f. y.t fF � JF • M!I ♦.� � �.•1°."•f+'• R� • !�: �. fR•4•'•� •. R ■ • \\ � W 1�� -�+ �• 4, 1, 1 I• f. • i.. ;mss • • • • - % . *Jodi /.a ". • • grft-dixivi... • • Y u 1 u 0 2 0 • 0 • Cl C ti 'A • $ * • • . • • : ID • • • • • • : • • • `• S. a.• .. - i • . . • ♦T.i•: •0 • • • • •'ii . •• _ %NW. . :./.:. •t • , • • ... t .; • �i . • „4 • . • . h•` • • . •b, OP. . f w . ., • • .,• �. . x . • ..• • .` n • it • -14k •; +•• • • • • • • 4• . 7• - i 416 • • 1 • .3 • 1 ►• • •�