Loading...
HomeMy WebLinkAboutTrans 2014-01-27 Item 2B - Bid Award - Americans with Disabilities Act ImprovementsTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Robin Tischmak, City Engineer DATE: January 24, 2014 SUBJECT: Americans with Disabilities Act Improvements Project No. 91210405 BID AWARD ISSUE Award the bid for construction of the Americans with Disabilities Act (ADA) Improvements to Iron Creek Construction in the amount of $84,450.00. BACKGROUND This is a new annual program that was created in 2013 to address City facilities which are not in compliance with the ADA. The 2013/2014 project will provide pedestrian access ramp repairs at multiple locations on Tukwila International Blvd (TIB) and one location on S 180th St. The project also includes the replacement of the actuated in- pavement flashing light crosswalk on TIB near S 152nd St (Taco Bell /KFC) with an actuated Rectangular Rapid Flash Beacon System. The project was advertised for bids on December 19 and 26, 2013. Eight (8) bids were received and opened on January 9, 2013. The lowest bid of $84,450.00 was received from Iron Creek Construction, LLC. The Engineer's estimate was $98,700.00. ANALYSIS The bids were reviewed and tabulated. No errors were discovered in any of the eight bids received. References from previous projects that Iron Creek Construction had completed for other agencies received positive feedback. BUDGET AND BID SUMMARY This project was designed and advertised based on the 2013 construction budget that should have been carried over into the 2014 budget. Construction (Base Bid) Contingency (10.0 %) Total Bid Results Estimate Budget (2013) $ 84,450.00 $ 98,700.00 $100,000.00 8.445.00 9,870.00 0.00 $ 92.895.00 $108.570.00 $100.000.00 RECOMMENDATION The Council is being asked to award the construction bid for the 2013/2014 ADA Improvements to Iron Creek Construction in the amount of $84,450.00 and consider this item on the Consent Agenda at the February 3, 2014 Regular Meeting. Attachments: Vicinity Map 2014 CIP, page 21 Bid Tabulation Rectangular Rapid Flash Beacon System W: \PW Eng \PROJECTS\A- RW 8 RS Projects\ADA Improvements (91210405) \Design \Info Memo - Bid Award gl.docx 13 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Americans with Disabilities Act (ADA) Improvements Project No. 91210405 DESCRIPTION: Construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. JUSTIFICATION: The enforcement of ADA laws and standards was delayed pending legal challenges and studies. Recent court rulings now mandate ADA compliance. The City must provide upgrades with most construction projects. STATUS: Provide annual funding to construct improvements as necessary. For 2013, develop a citywide plan with design and construction of the 1 of the 2 major crosswalks on Tukwila International Blvd. MAINT. IMPACT: Negligible. COMMENT: Project will be ongoing until City facilities and infrastructure meet ADA requirements. Only one year actuals shown in first column. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 45 5 5 5 5 5 5 5 80 Land (R/W) 0 Const. Mgmt. 18 8 8 8 8 8 8 8 74 Construction 100 50 50 50 50 50 50 50 450 TOTAL EXPENSES 0 163 63 63 63 63 63 63 63 604 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 163 63 63 63 63 63 63 63 604 TOTAL SOURCES 0 163 63 63 63 63 63 63 63 604 2014 - 2019 Capital Improvement Program 21 15 City of Tukwila Prepared by: 2013 ADA IMPROVEMENTS January 9, 2014 Bid Tabulation Iron creek Construction. LLC ' Engineers Estimate Trinity Contractors, Inc. Henderson Partners, LLC ltr-.-in No. Item With Unit Priced Bid Unit Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 IAOBILIZATION FA 1 $ 8.970,00 $ 8.970.00 5 4,400.00 5 4,400.00 5 10,000.00 $ 10,000.00 5 4,957.619 5 4,957.69 2 MINOR CHANGES LS 1 $ 5,000.00 $ 5,000.00 5 5,000.00 5 5,000.00 $ 5,000.00 $ 5,000,00 $ 5,000:00 5 5,000.00 3 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $ 10.000.00 $ 10,000.00 5 5,000.00 $ 5,000.00 5 10,000.00 $ 10,000.00 $ 7,000.00 5 7,000.00 4 TEMPORARY WATER POLLUTION! EROSION CONTROL FA 1 $ 5,000.00 $ 5,000.00 $ 100.00 5 100.00 5 2,000.00 $ 2,000.00 $ 500,00 5 500.00 5 RESOLUTION OF UTILITY CONFLICTS LS 1 $ 5,000.00 $ 5,000.00 5 5,000.00 5 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 5 5,000.00 6 PEDESTRIAN TRAFFIC CONTROL LS 1 $ 5,000.00 $ 5,000.00 5 1,500.00 5 1,500.00 $ 3500.00 $ 3,500.00 $ 1,200.00 5 1,200 00 7 REMOVING ASPHALT CONC. PAVEMENT SY 6 $ 5.00 $ 30.00 5 100.00 5 600.00 5 100.00 $ 600,00 $ 80.00 5 480.00 8 REMOVING CEMENT CONC, SIDEWALK SY 135 $ 20.00 $ 2,700.00 5 20.00 5 2,700.00 $ 40.00 $ 5,400.00 $ 80.00 $ 10,800.00 9 REMOVING CEMENT CONC. CURB AND GUTTER LF 45 $ 15.00 $ 675.00 5 20.00 5 900.00 $ 40.00 $ 1,8 00.00 $ 80.00 $ 3,600.00 10 PROPERTY RESTORATION FA 1 $ 4,000.00 $ 4,000.00 5 4,000.00 5 4,000.00 $ 4,000.00 $ 4,000,00 $ 4,000.00 $ 4,000.00 11 CEMENT CONC, SIDEWALK SY 55 $ 35.00 $ 1,925.00 $ 50.00 5 2,750.00 5 50.00 $ 2,750,00 $ 60.00 $ 3,300.00 12 MONOLITHIC CEMENT CONC. CURB AND SIDEWALK SY 32 $ 75.00 $ 2,400.00 $ 75.00 $ 2,400.00 5 85.00 $ 2,720,00 $ 85.00 $ 2,720.00 13 REINFORCED CEMENT CONC. CURB AND SIDEWALK SY 5 $ 100.00 5 500.00 $ 120.00 $ 600.00 $ 100.00 $ 500,00 $ 300.00 $ 1,500.00 14 CEMENT CONC, CURB RAMP TYPE PERPENDICULAR A EA 5 $ 2,000.00 $ 10,000.00 $ 4,000.00 5 20,000.00 5 1,800.00 5 9,000.00 $ 1,000.00 $ 5,000.00 15 CEMENT CONC, CURB RAMP TYPE DIRECTIONAL A EA 1 5 2,500,00 $ 2,500.00 $ 3,500.00 $ 3,500.00 $ 1,900.00 5 1,900.00 $ 1,000.00 $ 1,000.00 16 RECTANGULAR RAPID FLASHING BEACON SYSTEM COMPLETE LS 1 5 35,000.00 $ 35,000.00 $ 26,000,00 $ 26,000.00 $ 25,000.00 $ 25,000.00 $ 33,500.00 $ 33,500.00 CONSTRUCTION TOTAL $ 98,700.00 84,450.00 $ 89,170.00 $ 89,557.69 W :\PW EngiPROIECTSIA- RW R AS Projectsl,4OA Improvements i9121t405i55DeessigniRid Tabulativnot Pagc 1 or City of Tukwila 2013 ADA IMPROVEMENTS January 9, 2014 Bid Tabulation Road Construction NW Engineers Estimate MVG, LLC NPM Construction Co. Item No. Item With Unit Priced Bid Unit Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 MOBILIZATION FA 1 5 8,970.00 5 5,970.00 $ 18,000.00 $ 18,000.00 5 8,700.00 $ 8,700.00 $ 10,500.00 $ 10,500.00 2 MINOR CHANGES LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 5 5,000.00' 5 5,000.00 $ 5,000.00 $ 5,000.00 3 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 $ 10,000.00 5 10,000.00 $ 5,000.00 $ 5,000.00 5 10,000,00 5 10;000.00 $ 11,000.00 $ 11,000.00 4 TEMPORARY WATER POLLUTION / EROSION CONTROL FA 1 $ 5,000,00 $ 5,000.00 $ 3,000.00 $ 3,000.00 $ 1,500.00 $ 1,500.00 $ 1.100.00 $ 1,100.00 5 RESOLUTION OF UTILITY CONFLICTS LS 1 $ 5,000.00 5 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000,00 $ 5,000.00 $ 5,000.00 $ 5,000.00 6 PEDESTRIAN TRAFFIC CONTROL LS 1 $ 5,000,00 5 5,000.00 $ 2,200.00 $ 2,200.00 5 6,500.00 $ 6,500.00 $ 2,500.00 $ 2,500.00 7 REMOVING ASPHALT CONC. PAVEMENT SY 5 $ 5.00 $ 30.00 $ 20.00 $ 120.00 5 120.00 $ 720.00 $ 110.00 $ 660.00 8 REMOVING CEMENT CONC. SIDEWALK SY 135 $ 20.00 $ 2,700.00 $ 20.00 $ 2,700.00 5 45.00 $ 6;0755.00 $ 45 .00 $ 6,075.00 9 REMOVING CEMENT CONC. CURB AND GUTTER LF 45 $ 15.00 $ 675.00 $ 10.00 $ 450.00 $ 25.00 $ 1,125.00 $ 25 00 $ 1,125.00 10 PROPERTY RESTORATION FA 1 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 11 CEMENT CONC, SIDEWALK SY 55 $ 35.00 $ 1,925.00 $ 55.00 $ 3,025.00 5 125.00 $ 6,875.00 $ 145.00 $ 7,975.00 12 MONOLITHIC CEMENT CONC. CURB AND SIDEWALK SY 32 $ 75.00 $ 2,400.00 $ 65.00 $ 2,080.00 $ 165.00 $ 5,280.00 $ 250.00 $ 8,000.00 13 REINFORCED CEMENT CONC, CURB AND SIDEWALK SY 5 5 100.00 $ 500.00 5 120.00 $ 600.00 $ 372.00 $ 1,860,00 $ 650,00 $ 3,250.00 14 CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A EA 5 5 2,000.00 $ 10,000,00 $ 2,700.00 5 13,500.40 $ 2,620.00 $ 13,100.00 $ 2,100.00 $ 10,500.00 15 CEMENT CONC. CURB RAMP TYPE DIRECTIONAL A EA 1 $ 2,500.0.0 $ 2,500.00 5 2,200.00 $ 2,240,00 $ 2,620.00 $ 2;620.00 $ 3,100.00 $ 3,100.0.0 16 RECTANGULAR RAPID FLASHING BEACON SYSTEM COMPLETE , LS 1 $ 35,000.00 $ 35,000.00 $ 25.000.00 $ 25,000.00 $ 26,199.00 $ 26,199.00 $ 28,500.00 $ 28,500.00 CONSTRUCTION TOTAL 5 98,700.00 5 91,€375.00 5 104,554.00 $ 108,285.00 W:IPWEag1PROJECT5'A- RW&RSPtoj rt\ AJ. Atmprovcmutts( 9I2f0405 )1Dasign\BidTabulatiort.xEEx Page 2of3 City of Tukwila 2013 ADA IMPROVEMENTS January 9.2014 Bid Tabulation Westweter Construction Company Engineer's Estimate NW Cascade, Inc. Item No. Item With Unit' Priced Bid Unit Qty Unit Price To Unit Price Total Unit Price Total 1 MOBILIZATION FA 1 $ 8,970.00 $ 8.970.00 $ 6.250.00 6 6,250.00 $ 13,000.00 6 13,000.00 2 MINOR CHANGES LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 6 5,000.00 3 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 i $ 10,000.00 $ 10,000.00 $ 16.500.00 6 16,500.00 $ 1.5,000.00 5 15,000.00 4 TEMPORARY WATER POLLUTION 1 EROSION CONTROL FA 1 $ 5,000.00 $ 5,000.00 $ 3,000.00 5 3,000.00 $ 2,500.00 $ 2,500.00 5 RESOLUTION OF UTILITY CONFLICTS LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 6 PEDESTRIAN TRAFFIC CONTROL LS 1 $ 5,000.00 $ 5,000.00 $ 0,000.00 $ 9,000.00 $ 1,500.00 $ 1,500.00 7 REMOVING ASPHALT CONC. PAVEMENT SY 6 $ 5.00 $ 30.00 $ 100.00 $ 600.00 $ 250 .00 $ 1,500.00 8 REMOVING CEMENT CONC. SIDEWALK SY 135 $ 20.00 $ 2,700.00 $ 42.00 $ 5,670.00 $ 100 .00 $ 13,500.00 9 REMOVING CEMENT CONC. CURB AND GUTTER LF 45 $ 15 .00 $ 675.00 $ 40.00 $ 1,800.00 $ 50.00 $ 2,250.00 10 PROPERTY RESTORATION FA 1 $ 4.000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 11 CEMENT CONC. SIDEWALK SY 55 $ 35.00 $ 1,925.00 $ 120.00 $ 6,600.00 $ 250.00 $ 13,750.00 12 MONOLITHIC CEMENT CONC. CURB AND SIDEWALK SY 32 $ 75.00 $ 2,400.00 $ 150.00 $ 4,800.00 $ 300.00 5 9,600.00 13 REINFORCED CEMENT CONC. CURB AND SIDEWALK SY 5 $ 100.00 $ 500.00 $ 800.00 $ 4,000.00 $ 300,00 $ 1,500.00 14 CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A EA 5 $ 2,000.00 $ 10,000.00 $ 2,900.00 $ 14,500.00 $ 2,500,00 $ 12,500.00 15 CEMENT CONC. CURB RAMP TYPE DIRECTIONAL A EA 1 $ 2,500.00 $ 2,500.00 6 2,650.00 $ 2,650.00 $ 3,000.00 $ 3,000.00 16 RECTANGULAR RAPID FLASHING BEACON SYSTEM COMPLETE LS 1 $ 35,000.00 $ 35,000.00 $ 26,500.00 $ 26,500.00 $ 32.600.00 $ 32,600.00 CONSTRUCTION TOTAL 3 98;700.00 3 115,870.00 5 136,200.00 W:1PW EngtiIROJECTS'• RW & RS Pmjcce ADA Improvements (912E0405)1.Th ign\Bid Tahulnlinn.xlsri Page 3 of3 ADA Project will include Median and Overhead Median Two -Way Roadway Overhead Two -Way Roadway 19