Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Trans 2014-01-27 Item 2C - Bid Award - East Marginal Way South Overlay and Repair
TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director' , c BY: David Sorensen, Project Manager DATE: January 24, 2014 SUBJECT: Overlay and Repair - East Marginal Way S (S 81st PI to Norfolk St) Project No. 91210406 Bid Award ISSUE Award the bid for construction of the Overlay and Repair - East Marginal Way S. BACKGROUND Project construction will include pavement repairs and an asphalt overlay of East Marginal Way S between S 81St PI and S Norfolk St. Work will also include new pavement markings, pedestrian safety upgrades, and storm water improvements. The main focus of the East Marginal Way S Overlay and Repair project is to preserve and maintain the street structure in a safe and useable condition by grinding off the top layer of asphalt and resurfacing it with new pavement. ANALYSIS A call for bids was advertised for the Overlay & Repair - East Marginal Way S on December 19 and 26, 2013 and six bids were opened on January 14, 2014. The lowest apparent bidder was Miles Resources, LLC, with a bid of $1,738,991.50. The engineer's estimate was $1,867,221.00. One error was found and corrected on the bid tabulations that did not change the results. WSDOT had minor concerns with DBE documents however, they concurred award to apparent low bidder Miles Resources, LLC. BUDGET AND BID SUMMARY (All amounts include sales tax) As there are storm water improvements in the project, an additional $65,000 of budget will come from the Small Drainage Program 412 Fund. Bid Amount 2014 Small Drainage Program Contingency (5 %) Total Bid Results $1,738,991.50 86,949.58 $1,825,941.08 Estimate 2014 Budget $1,867,221.00 $1,800,000.00 65,000.00 $1,867.221.00 $1,865,000.00 RECOMMENDATION Council is being asked to award the construction contract for the Overlay & Repair - East Marginal Way S Project to Miles Resources, LLC in the amount of $1,738,991.50 and consider this item on the Consent Agenda at the February 3, 2014 Regular Meeting. Attachments: Vicinity Map 2014 CIP Page 18 Bid Tabulation Consultant Recommendation W:IPW EngIPROJECTSIA- RW & RS Projects\EMW Overlay & Repair (91210406)IDesignlAd and Award Docs to WSDOTIDocs to TC Bid Award\Info Memo Bid Award Miles gl.doc 21 Project Location S 104 St S 107 St S108St Rainier Golf & Country Club S111PI 111 St m 5 116 St S 113 S114 S115St S118St' co `I S117St 599 g ■ S120PL —' • j j % NSWallaceSt a cc a W D m` 57 ; 5 A� erg; A`1, sS, D oP C' 1° S COff'+,� S121S s CD cn / td, : ' / / / / /�� % / /, /� .... 126 tN /�� do � to o ld \� Ot S �.;ea S e / %j / p7' S1 599 Ga /29 co f t St ac. • St Highline D m S-13 1 m co m iii, Specialty Center �maO • 131St Z,`o P- / '•• '43 'Gi .yR• , G l� 1. 011 W a 1›,P- • OC, / ao .A ''' /', �9 o / oP p D 513 m a W m ;•' / y m D S135St -0 tn < m ■■i%i��© /j/ 3 /1a5,� �P� m iii{�: S 138 St East Marginal Way South Pavement Resurfacin g 4s. *V 1 L4 x �z City o of Tukwila July 19, 2012 Vicinity Map �; :#•' 22 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Overlay and Repair - East Marginal Way S Project No. 91210406 DESCRIPTION: Construct pavement preparation and an asphalt overlay of East Marginal Way South between S 81st PI and S Norfolk Street, including new pavement markings. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure. STATUS: Advertise for construction bids in late 2013. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Federal grant funding available through PSRC 2012 STP /CMAQ for $1,000,000. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Project Location S 86 pi S 67 €N S 9 Po e Design .... 5GG T 125 eae IV CCeSs S r. GIS n .o I 125 Land (R/VV) 0 Const. Mgmt. 150 150 Construction 1,800 1,800 TOTAL EXPENSES 0 125 1,950 0 0 0 0 0 0 2,075 FUND SOURCES Awarded Grant 0 Proposed Grant 1,000 1,000 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 125 950 0 0 0 0 0 0 1,075 TOTAL SOURCES 0 125 1,950 0 0 0 0 0 0 2,075 2014 - 2019 Capital Improvement Program 18 23 Project Location S 86 pi S 67 €N S 9 Po e Ys', .... 5GG T � eae IV CCeSs S r. GIS n .o I 2014 - 2019 Capital Improvement Program 18 23 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS East Marginal Way South (S 81st St to S Norfork St) Project No. 91210406 Certified Bid Tabulation Prepared By E �roi�1- KpG SEATTLE - TACOMA 11 Fedara. P.E. o,y: Item No. Sect No. Item Description Oty Unit Engineer% Estimate Miles Resources, LLC Tucci & Sons, Inc. ICON Materials Gary Martino Cont a, Co. Lakeside Industries Washy/der Construclfon Co. Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount ROADWAY 1 1-04 Linea. - clad Site Ch..1 es 1 FA S 20 000 00 S 20,000.00 $ 20400.00 S 20 000.00 $ 20 000.00 $ 20,000.00 $ 20.000.00 S 20000,00 S 20 000,00 5 20 000.00 S 20 00000 $ 20 00000 S 20,000.00 S 20,000,00 2 1-07 Resotullon of Utility Contfcis 1 FA S 20,000.00 $ 20000.00 ' S 2000000 $ 20,000.00 S 20.000.00 S 20 000.00 $ 20,00040 S 20.000.00 S 20300.00 $ 20000.00 S 20000.00 20,000,00 $ 20,000.00 $ 20.000 -00 3 1 -07 SPCC Plan 1 LS S 1.00000 S 1,000,00 S 600.00 S 500.00 S 500.00 S 50030 S 500.00 5 500.00 S 300.00 S 30000 S 1,000.00 $ 1,000,00 S 2.00000 $ 2.000.00 4 1 -09 MObllralton 1 LS S 130 000.00 S 130000 OD $ 541700.00 $ 56 00000 - 3 69 800.00 $ 69 800.00 S 60.000.00 $ 60.000.00 . 132 000.00 3 132.040.00 $225400,00 S 225 000.00 $ 200 00000 $ 200,000.00 $ 1 -10 Traffic Control Su.: rvisor 500 FIR S 5500 S 27300.00 S 03.00 $ 31 50000 $ 75,50 S 37.75000 S 58.00 $ 29 000.00 S 6300 S 31.50000 $ 60,00 $ 30 00000 5 50.00 S 25 00000 6 1.10 Ftae • ers and S.olters 1700 HR S 4500 $ 76 50000 $ 45.50 S 77 350.00 $ 4660 S 79.220,00 S 49,00 $ 83 300.00 S 50.00 S 85 000.00 5 47:50 $ 80 750.00 $ 5000 S 85.00000 7 1.10 Other15ailic Control Labor 500 HR S 4500 S 22500.00 S 45.50 S 22 750.00 S 56.40 5 28200.00 $ 5000 S 25 010.00 5 58.00 5 29 000.00 5 47.50 S 23 750.00 S 5000 $ 25,000.00 0 1.10 Sequential ArrawS10 1000 HR $ 100 S 3.000.00 S 1,75 S 1,75000 S 2.00 S 2.000.00 $ 3.00 $ 3,000.00. $ 4,00 $ 4,000.00 S 2,00 S 2000,00 $ 2,00 S 230000 9 1.10 Portable Cha .r sane Messa. e S ,n 2000 HR $ 2,00 S • 00000 $ 3.60 S 7 00,00 $ 3.00 $ 6 000.00 $ 6.00 $ 10 000.00 S 4.50 S 9,000.00 S 590 5 10 004,00 $ 3.00 $ 6 000.00 10 1.10 Menem 00,00 Traffic Control 1 LS S 10.000.00 3 10.000.00 S 17,400,00 3 17 400.00 $ 5.000.00 S 5 000.00 $ 6.500.00 S 6300.00. $ 12000.00 5 17,000,00 5 5000.00 $ 6.000.00 $ 20 000.00 $ 20 00000 11 1 -10 Ott -Du Uniformed Police Officer 450 IIR S 75.00 5 33750.00 S '73.50 S 33075.00 5 68.00 S 30,600.00 $ 70.00 S 31,500.00 5 90.00 $ 40,500.00 $ 75.00 $ 33,750.0(} S 75.00 S 33750.00 12 2 -02 Pavement Removal Ind. Haul 130 CY S 5000 S 6 500.00 S 107.25 S T3 94250 S 100.00 S 1300090 S 10000 S 13,000.00 S 50.00 S 6 50000 5 0.00 6500.00 S 40.00 S 5,20000 13 2 -02 Cement Cone Sidewalk Removal Ind. Haul 500 SY S 30.00 S 15,000.00 $ 14.00 S 7,000.00 S 3700 S 18,50000 5 21.00 $ T0.500.00 $ 24.00 S 12,000.00 5 26.00 S 13000.00 $ 4500 $ 22,500.00 14 242 Cement Conc. Curb Removal Incl. Haul _ 650 - LF $ 10.00 $ 6 500.00 S 7,50 $ 4 875.00 ' S 6.00 $ 3 90090 $ 7.00 $ 4650.00 S 10.00 $ 6,50000 S 12.00 S 7 800.00 5 10.00 S 6,500.00 15 2 -02 Ref *5alofStructure and Obstru ion 1 LS S 5.00030 5 5000.00 S 3,50000 S 3500.00 S 350-00 S 3,50000 $ 6,600,00 5 6,600.00 S 1000.00 S 1000.00 1.10000 S 1.10000 $ 1,500.00 S 1,500.00 16 2 -03 Unsuitable Foundation Excavation Incl, Haul 25 CY $ 3000 S 750 00 S 6175 S 1,593.75 S 50.00 5 1250.00 5 195.00 $ 4 87500 S 4300 $ 1,075.00 S 50.00 5 1 1.00 5 40.00 5 1300.00 17 2 -03 Gravel Borrow Incl, Haul Construction Ge0105100 for Separation 50 75 TON SY S 30.00 S 5.00 S 1,500.00: S 375.00 S 21.75 S 6.50 5 1,087.50 5 637.50 5 25.00 S 1000 5 1,250.00 $ 750.00 5 35.00 S 8.00 5 1.75090 5 600.00 5 22.00 S 4,00 5 1,100.00 5 300,00 5 20.00 $ 5.00 S 1.000.00 5 37530 S 15.00 $ 5.00 $ 750.00 $ 375 00 18 2.12 19 4 -04 Crushed Surfacfn. To. Course 200 TON 5 30.00 S 6000.00 5 21.75 S 4,350.00 S 30.00 5 6000.00 $ 4530 S 9,000.00 5 5000 $ 1000000 $ 55.00 $ 11 000.00 $ 15.00 S . 3000.00 20 5 -04 Additional 3 Inch Grind tor Pavement Repair. Incl, Haul 9,00D SY 3 5.00 $ 45 000.00 5 6.30 S 55,700.60 $ 3.70 5 33,500.00 S 3,000.00 5 4.70 3 60.00 5 42300.00 $ 6.000.00 S 2.00 $ 86.00 $ 18 000.00 5 8.600.00- 5 3.80 5 50.00 5 34,20040 $ 5,000,00 5 3.00 5 50.00 S 27,000.00 5 5,000.00 21 5-04 PavementRop0ir Excavation 1nc0 Haul 100 CY S 55,00 $ 5,500.00 5 44.85 5 4,485.00 $ 3000 22 5-04 HMA CI. 112 "P3 64 -22 250 TON S 95.00 S 23.75030 5 9700 5 24 25000 5 108.00 S 27 000.00 5 110.00 5 27,500.00 S 10408 S 2606090 S 90.00 S 22 ...CO S 225.00 5 56 50.00 23 5 -04 HMA for Ovede CI. 112` PG 84 -22 7 300 TON $ 75.00 5 547,500.00 5 71.25 5 520,125.00 S 77.10 3 562 830.00 5 71.90 5 524370.00 $ 8830 $ 64 400.00 5 75.00 5 547 00,00 5 80.00 3 584.000.00 24 5 -04 HMA for Pavement Re air CI. 1/2' PG 64.22 1,900 TON 5 85.00 5 161 •1100 5 75.50 5 143 450.00 3 09.50 3 170 050.00 S 92.00 5 174 800.00 $ • 00 $ 174,800.00 3 7540 3 142 00.00 5 90.00 5 171 000.00 25 5 -04 Planing Bituminous Pavement 43.0011 SY 5 3 00 $ 129300.00 `, $ 4.44 S 190.92000 5 130 5 81.70100 3 2.50 5 107 600.00 5 1.90 5 81,700.00 S 3.00 S 121000.00 5 5.00 5 215,000.00 26 5 34 Joint/Greek Sealin, 1 FA $ 2.500.00 5 2 500.00. g 2.500.00 $ 2,500.00 $ 2 500.00 $ 2 ".00 3 2.50000 5 2 500,00 -5 500.00 5 2 500.00 5 2 500.00 5 2,500.00 $ 2 500.00 3 2 500.00 27 7 -12 Adtilst Water Valve 7 EA 5 350.00 $ 2,450.00 5 325.00 $ 2275.00 S 341.00 S 2 38700 5 32500 5 2275.00 S 350.00 3 2,450.0 $ 310.00 S 2 17030 S 500 -00 S 3.500,00 27A 7 -12 Lower Water Valve 5 EA 5 300.00 S 1500.00 $ 26000 5 1 300.00 S 385,00 S 1 05. 00 5 270.00 $ 1.35030 S 350.00 $ 1 750.00 5 250,00 5 1 250.00 5 300.00 S 1500.00 28 8 -01 ErosiotuWalotPODUtiOrtConical 1 M 5 5000.00 $ 5000.00 S 5,000.00 $ 5,00000. $ 5.00,00 5 50000,00 S 5.000,00 5 5,000.00 5 5,00110 S 5.000.00 3 5300.00 5 5,000.00 5 5000..00 5 500,00 29 8 -01 Inlet Protection Cement Conc. Tmflfe Curb and Rutter Adjust Monument Case and Cover 190 650 2 EA IF FA S 75.00 S 25.00 5 350.00 $ 14 250.00 5 16,250.00 3 700.00 5 50.00 5 16.80 ' 5 26000 5 9.50000 S 10 920.00 5 520.00 S 75.00 S 20.00 5 1,800.00 $ 14,250,00 S 13 000.00 S 3,600,00 $ 60.00 S 25,00 5 325:00 5 01400,00 S 1625000 5 650 -00 5 76.00 S 30.00 5 400.00 5 14.250.00 3 19,500.00 S 800.00 5 75.00 3 35.00 S 27500 5 14250.00 $ 22.75090 $ 550.00 S 80.00 5 40.0 5 1.10000 S 15 200.00 S 26 000.00 5 2,200.00 30 8 -04 31 6 -13 TRAFFIC SIGNALS 32 820 Traffic U4110310 Iron 28 EA S 658 00 5 18 424.00 5 68250 5 19 110.00 5 600.00 S 16,800.00 5 610.00 5 17.080,00 S 700.00 5 79 600.00 5 600.00 S 16 800.00 S 800.00 5 22 400.0 33 8 -20 APS SI 32 EA $ 655.00 S 27 360.00 S 1,365.00 S 43,680,00 . - 200.00 5 6,400.00 $ 215.00 $ 8 680.00 S 1,400.00 $ 44,800.00 $ 200.00 5 6.400.00 5 1.500.00 5 48 000.00 34 8 -20 Video Vehicle Detection S 1 LS 5 146 906.00 S 146 806.00 $ 149625,00 S 149,625.00 $ 145.000.00 5 145 000.070 5 148000.00 5 148,000.00 $ 154 000.00 S 154 000,00 3 145,000.00 5 145000.00 5 170.000.00 5 170.000.00 35 8 -20 S »nal S tam Mod4icafions, Go • NM 0 • final Wa S & S 96t0 PI 1 L$ 3 9 193.00 $ 9,193.00 5 1260,00 5 1.20.0 5 14.000,00 5 14 rr., 1. ' $ 15.000,00 $ 15.000.00 3 1 00.00 S 1.300.00 3 14,000,00 5 14 000.00 $ 2,000.00 5 2,000.00 36 8 -20 S. al S tem Modifications. Co dete E Ma . .I Wa S & S 94th PI 1 1.3 S 10,36900 S 10 369.00 $ 630.00 5 630.00 2 13 000.00 S 13.00000 5 14 00.00 3 14,00,00 S 600,00 5 600,00 $ 13.000.00 2 13 000.00 3 1,500.00 5 1 500.00 37 8 -20 M6' IMML,.','1111[?Sit'+Ti0M00 0,000LsP,6Ti1tt'FlP9A:*>ly:+l, , . 1 LS LS' 5 15 177.00 5 15 127.00 5 4.725.00 5 4,725.00 $ 20 000.00 S 20,000.00 S 21,000.00 5 21,000.00 $ 4 000.00 $ 4 00.00 $ 20000.00 3 20000.00 5 6300.00 S 0000.00 38 8-20 S. nal S , tem Modification - COm. 810 E Mat. 1051 WA $ & $ 901h PO 1 L5 . 5 125734.00 S '12 734.00 S 3 045.00 5 3 045.00 S 14.000,00 5 14,000.00 $ 15 000.00 5 15,000,00 $ 1000.00 5 3,000.00 5 14,000.00 5 14. 000.00 5 3,500.00 5 3.500.00 39 8•20 Signal System Mr7r/ieatlo0s, Complete (E Marginal Ways & S 87th P 1 LS 3 7,429.00 5 7,425.00 5 1260.00 5 1,260.00 5 13,000.00 $ 13,000,00 $ 14,000.00 S 1430000 S 1,300.00 $ 1,300.00 S 13,000.00 $ 13,000.00 3 1,500,00 S 1.50000 40 8 -20 S ,15 tem MocUicatior s. Complete E Ma . hal W a S & S 86th P 1 LS S 13,744,00 S 13 744,00 5 3.570.00 S 3 570,0 5 14 00.0 , 14.000 00 ' 5 15.000 -00 $ 15,000.00 3 200090 5 3.000,00 S 14.000,00 3 14.000,00 S 4.001,00 S 4 000.00 SIDEWALK 41 8-14 Cement Conc, Sidewalk 380 SY $ 40,00 S 15,20000 30.50 5 11 59000 $ 45.00 5 17100.0 $ 1.15.00 5 41700.00 5 50.00 6 19.000.00 S 5730 5 21 66030 5 8000 S 3020000 42 8 -14 Cement Canc. Curb Ram. T .o P. .ndicularA 11 EA 3 2000,00 5 2 0 000,00 $ 94000 $ 10.340,00 5 1,200.00 5 13 u.00 $ 1807000 5 19,800.00 $ 1100 -00 $ 12,100.00, 5 2.000.00 5 22000.00 3 1500.00 5 16,500.00 43 8-14 Cement Conc. Curb Ram. T .o ParallelA i EA S 2 000,00 S 2.000.00 5 1,030,00 S 1 030.00 $ 1 400.00 $ 1,400570 3 2500.0 5 2,500.00 5 1.200 00 5 1 .0.00 5 2.400 -00 2 2,400.00 5 1 500.00 $ 1 00.00 44 8 -14 Delectable Warning Surface 140 SF S 1000 S 1,400,00 5 36.75 5 5.145.00 5 35.00 $ 4,900.00 5 30.00 5 4.200.00 5 28.0 5 3,520,00 5 32.00 S 4.480,00 5 40.00 S 530000 STORM SEWER 45 734 Ductile Iran Storm Sewer Pipe, 12 In Dlam. 70 LF S 10000 $ 2000,00 $ 81.50 S 5. 705.00 5 11630 S 115000 5 8500 $ 5950,00 5 10030 5 7000.00 5 110.00 $ 7,700,00 $ 100,00 $ 700000 45A 734 Dustup Iron Storm sewor P'.. e, 81rt Dram. 360 IF S 90.00 32400,00 $ 46.60 $ 16 776.0 S 86.00 S 30,96003 $ 58.00 5 20,880.00 S 51.00 5 18 360.00 5 57.00 5 20,520.00 S 90.00 $ 32.400,00 46 7.04 Concrete Inlet 4 EA S 1.200,00 S 4,80030 S 1.055.00 $ 4,220.00 S 850.00 S 3.400.00 5 750.00 5 3.000,00 $ 1,300.00 5 5,200,00 5 1,500.00 5 6.000,00 S 1,000.00 S 4,000.00 47 7 -05 Catch Basin T' .0 1 4 EA S 1500.00 S 6 000.00 5 1 125.00 5 4 500.00 3 900.00 5 3 600.00 S 1,050.00 $ 0.20030 S 1.600,00 5 6 400,00 $ 1300.00 S 7.200.00 1000.00 5 4 000.00 48 7 -05 C0nnectO0 to .Existin / Drain al a Structure 1 EA $ 500.00 5 500,00 S 1650.00 $ 550.00 S 1,100.00 3 0100.00 5 900.00 S 900.00 S 500.00 S 500.00 $ 500.00 5 50000 5 50,00 5 5090 49 7 -05 A•' ust Catch Basin 33 EA $ 450.00 5 14 850.00 $ 475.00 $ 15,675.00 S 49530 5 16 335,00 5 470,00 5. 15.510 -00 $ 350.00 5 11,550.00 5 450.00 S 14,850.00 5 800.00 5 26 400 00 49A 7.05 Lower Catch Basin Storm Drain Marker 27 225 EA EA 3 400.00 5 20 00 $ 10600.00 0 4 500.00 5 395.00 $ 15.50 5 10,665.00 5 3 487.50 3 41200 5 16.00 5 11,124,00 $ 4.050 00 5 390.00 5 18.00 5 10,530,00 S 4 050.00 5 350.00 5 30.00 5 9.450.00 5 6.750,00 5 375.00 5 17.00 5 10,125.00 5 3.825 -00 5 400.00 5 15,00 3 10,800.00 S 3,37590 50 7 -05 SANITARY SEWER 3 47%00 5 450 S 3 3 800.00 3 6,401.00 51A 7-05 Lower Manhole 6 EA $ 400.00 $ 2400 00 S 395.00 $ 2,370.00 $ 41200 $ 24720 5 390.00 5 2340.00 3 350,00 $ 2,1100.00 $ 2,400.00 _ TRAFFIC CONTROL DEVICES 52 839 Raised Pavement Marker Type 1 64 HUND 6 180.00 S 11520.00 $ 15000 $ 9,600,00 S 14400 $ 9,216,00 $ 15600 $ 1984,00 S 150,00 $ 160100 3 144,00 S 021900 S 20090 $ 12,800.00 53 8 -09 Raised Pavement Marker Type 2 16 HUNO 5 340,00 5 5440.00 $ 375.00 S 6,000.00 3 357.00 5 5,712.00 $ 387.00 6 6.192.00 5 390.00 5 6,240,00 3 35700 $ 5,712.00 $ 200.00 3 3,200.00 54 8 -21 Pemnarxmt Signing 1 15 $ 5,000,00 $ 5,000,00 $ 4,200.00 $ 4,20000 S 4.900.00 $ 4.900,00 $ 4,800.00 $ 4,800.00 S 5,000.00 5 5.000.00 5 5.000,00 3 5.000 00 $ 5.000.00 3 5.00030 55 8 -22 Plastic Traffic Arrow 47 EA $ 200.00 $ 9,400.00 $ 68.25 $ 3,207,75 S 65.00 $ 3,055.00 $ 70.00 $ 3290.00 5 7200 $ 3.384.00 $ 65.00 3 3.055.00 5 100-00 5 4,700.00 56 8 -22 Plastic Slop Line 630 LF 3 10,00 5 6.300.00 $ 6.30 $ 3,969.00 $ 6.00 3 3.780.00 $ 6.00 S 3,780 00 3 6.00 $ 3.780,00 5 6.00 3 3.780,00 $ 5.00 $ 3,150.00 57 8 -22 Plastic Crosswalk Line 2,80 SF $ 10,00 $ 28,00090 $ 6.30 5 17,640.00 5 6.00 $ 16.800.00 $ 350 $ 9,80000 S 3 50 S 9.800.00 $ 6.00 S 16,800.00 5 3.00 3 8,400.00 58 8 -22 Plastic Line, 4-Inch 900 LF $ 3,00 S 2,700.00 $ 1.00 $ 90030 S 0.95 5 855.00 $ 1,00 S 500.00 $ 5.00 $ 90000 $ 0.95 3 855.00 3 1,00 3 900.00 59 823 Temporary Paint Line 30,00 LF S. 0.50 $ 15,000,00 $ 0.14 $ 4,200.00 S 0,10 $ 3,00.00 $ 0,25 $ 7500.00.5 0.40 S 12,000.00 3 0.13 3 3,900.00 S 0.25 $ 7,500.00 ROADSIDE DEVELOPMENT 60 832 Pro. e Restoration 1 FA $ 15,00.00 $ 15400.. 15,0(70 DO S - 1.5000,00 S 15 000.00 5 15,00,00 $ 15900.00 S 15.000.00 $ 15,000.00 $ 15 00000 $ 1530000 3 15,000.00 $ 15,000.00 $ 1 5000.00 FRANCHISE UTILITY ITEMS $ 325.00 61 8 -19 Adjust Gas Valve 8 EA $ 350,00 5 2 80000 S 325.00 5 2 60000 $ 345 00 $ 2,760.00 $ 336,00 $ 2,688.00 5 350,00 5 2,800.00 $ 310,00 $ 2,480.00 $ 50000 $ 400000 613 8 -19 l.oworGa5 Valve 3 EA 5 300,00 S 000.00 $ 260.00 $ 780.00 $ 275.00 $ 825.00 $ 270.00 S 810.00 $ 350.00 $ 1 050.00 $ 250.00 S 750.00 $ 300.00 $ 900.00 62 8 -19 Ad'us1 Private Ill i6 - , 40 EA $ 500.00 $ 20 000.00 S 825.00 $ 13,000.00 S 875.00 $ 35.000,00 S 860.00 $ 34 40.00 5 315.00 $ 12,600.00 S 795 -00 $ 31,800.00 3 800.00 3 32 000,00 623 8-10 Lower Private Utility Casting 26 EA $ 450.00 $ 11,700.00 $ 680.00 $ 17,680.00 $ 71 .00 $ 18,590.00 5 705.00 5 18,330,00 $ 350.00 $ 9,100.00 5 650.00 $ 16.900.00 $ 400,00 $ 10,400.00 TOTAL 810: 3 1,867,221.00 $ 1,738,991.50 $ 1,765,176.00 $ 1,788,824.00 $ 1,853,809.00 $ 1.921.003.00 $ 2111,850.00 Rene 1 oft 753 9th Avenue North Seattle, WA 98109 P: 206.286.1640 F: 206.286.1639 www.kpg.com January 22, 2014 Mr. David Sorensen Project Manager City of Tukwila, Department of Public Works 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 RE: East Marginal Way South (S 81st P1 to S Norfolk St) Project No. 91210406 Recommendation for Contract Award Dear David, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the East Marginal Way South (S 815` P1 to S Norfolk St) project. The lowest bidder in the amount of $1,738,991.50 is Miles Resources, LLC. References listed in the Completed Construction Project Reference List provided by Miles Resources, LLC in their bid package confirmed that recently completed contracts with the contractor on similar roadway overlay projects were successful. We checked the status of Miles Resources LLC on the Washington State Labor and Industries web page to confirm they are currently licensed. We also checked the online System for Award Management and Miles Resources LLC does not have any active exclusion records listed. It is KPG's recommendation that the East Marginal Way South (S 81St PI to S Norfolk St) project be awarded to Miles Resources LLC pending an independent review and recommendation by WSDOT. The bid tabulation is enclosed. Sincerely, KPG, Inc. rash Fedora, P.E. Enclosures: Bid Tabulation 25