Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit B96-0131 - UNTERSEHER RESIDENCE - DECK
City of Tukwila C. C (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 BUILDING PERMIT Permit No: B96 -0131 Type: B -BLDG Category: ASFR Address: 4110 S 114 ST Location: Parcel *: 335140 -0530 Zoning: Type Const: DECK Gas /Elec: Wetlands: Water: SEATTLE Contractor License No.: Status: ISSUED Issued: 05/30/1996 Expires: 11/26/1996 Type of Occupancy: DECK Slopes: Y Sewer: VAL VUE TENANT UNTERSEHER ROSEMARY Phone: 206 762 -1848 4110 S 114 ST, TUKWILA,.WA 98168 OWNER JOHNSTON D A & HARMON'A G 4110 S 114TH ST,- .SEATTLE WA 98168.. • CONTACT UNTERSEHER.ROSEMARY Phone: 206 762 -1848 4110 S 114 ST, TUKW.ILA, :WA 98168 k* kk********** k************* k*************** * * * *kk**k**•k.•k * *k **kkk**k*** *ilk ** Permit Description ADD 12 X 24' DECK TO BACK`OF HOUSE. SETBACKS Units: 001'° Front .0 Back: .0 Buildings' ;. 001 Left: .0 Right :. - .0 Fire Protection: N/A UBC Edition: 1994 Valuation: 2,432.00 Total Permit Fee: 127.84 ****k' k********* k*************************** * * * *k*k *kkkk * * * * * * * ** ** * * * ** * ** 5__3n_4So Permit.'Center, Authorized S ,gnature Date I hereby.',cert,ify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel'the provisions of any other state or local laws regulating construction .or he performance of irk. I • ani authorized to. sign for and obtain this.bu 1 ing, permit. S i g n a t u r e: _ 0-2",2lt rk�r„r/ /bate : 36? Print Name: F-CiM"X. f t .��(t��Q ��' Z �'L/ Title: �rtt 11/L� This permit shall becoiife, null and void if the work is not commenced within 1E0 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. AMOUNT OWING: 6 CONTACTED rPATiElw F ROYE ; .K � b .. : 4,� ,r r:, � .�;sw .�., t .. i . �y }(.' � �. { t REQUIRa EMEN �S / . :. r Y w1 A t.4�1� ±4 "1 .b, - 1�1twiT�c ..�t,i *y%.." .•S:�i?, :l.•t MlA ..iYi.§, . .1... 0 Plan Review Meeting DATE NOTIFIED 5-730 _, BYi:j 6 Y 2nd NOTIFICATION BY: (init.) 3ONSULTANT: Date Sent - Date Approved - 3RD NOTIFICATION O FIRE � BY: (init.) �r; � .;. ,i : " }y in9 .,u � i ' -A ��,'s D ATE ; y [{ I�1 lefo44014 i 1 rPATiElw F ROYE ; .K � b .. : 4,� ,r r:, � .�;sw .�., t .. i . �y }(.' � �. { t REQUIRa EMEN �S / . :. r Y w1 A t.4�1� ±4 "1 .b, - 1�1twiT�c ..�t,i *y%.." .•S:�i?, :l.•t MlA ..iYi.§, . .1... 0 Plan Review Meeting 5 - 1 � - ( - ,- , g S 6 O INIT: K-31 BUILDING - initial review (ROUTED) 3ONSULTANT: Date Sent - Date Approved - O FIRE � A) 0 �� P FIREPROTECTION: Q Sprinklers Q Detectors QN/A rIRE DEPT. LETTER DATED: INSPECTOR: INIT: O .PLANNING i -( (3 M 6 7 ZONING: PAR /LANDUSECONDITIONS? QYes 0 N lEFERENCE FILENOS.: INIT: MINIMUMSETBACKS: N- 5- E- W- Q PUBLIC WORKS N P jj JTILITYPERMITSREQUIRED? Q Yes Q No PUBLICWORKSLETTER DATED: INIT: ,. BUILDING - final review 6 .2` ? _ ct (, TYPEOFCONSTRUCTION: 1Gk-" CERT.OFOCCUPANCY? QYes (allo UBC EDITION (year): 1 y 4 INIT:-' 1 '‘ BUILDING OFFICIAL 152q- t b INIT: - 3 -3 c ``- 9e ' 7r�Ct PLAN CHECK NUMBER 69co-013( CITY OF TUKWILA `;,,,, Department of Community Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Building Permit Application Tracking PROJECT NAME r* r, Ili v ) Ro SITE ADDRESS (A SI�E NO L ifn INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N/A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. REVIEW COMPLETED 02'15/96 SITE ADDRESS SUITE # ii l 1 :) / ) (( - ) VALUE OF CONSTRUCTION - $ - , 4 f 3 Z PROJECT NA /TENANT D c �. U rlt 4 ' - I 0 Ro 2 is • . ASSESSOR ACCOUNT # 6 reel 3 - 5 /W-- 03 0 - O , --- (commercial) • D molition (building) © Other /1 e�t' /ma=r -.- /' bc'4 TYPE OF 0 New Building • Addition • Tenant I • : ovement WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) DESCRIBE WORK TO BE DONE // / // BUILDING USE (office, warehou se, etc.) j CSI '11 t ('( I C NATURE OF BUSINESS: A ) /A WILL THERE BE A CHANGE IN USE? ® No 0 Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: 3Cs = WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUIWING? J No 0 Yes IF YES, EXPLAIN: FIRE PROTECTION FEATURES: 0 Sprinklers 0 Automatic Fire Alarm System PROPERTY OWNER i Li -! ( c '/ 4 _ i 11D 1 , v 7 /i IS 'r 1 ( PHONE 76, ,).,_7 t ,, 11 ADDRESS / I i U S . 4// & 5`t-- ZIP /� CONTRACTOR NM PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT iv/i9 PHONE ADDRESS (ZIP I ..HEREBY ; CERTIFY THAT I; HAVE: REA AN. D EXAMINED',:THIS APPLICATION AND KNOW THE: SAME TO • BE TRUE 'AND : :CORK T,_AN S:: AM AUTHORI TO' APPL FOR : THIS : PE R MI T T ;:' BUILDING OWNER AUTHORIZED AGENT SI ATURE / L 12EAfIL4 . -A c.- -)/Pnyt ha Zv�nST�ln DATE 6 PHONE t - /d'L/8 P r ) T NAME it n f /'/S E'A e' / ADDRESS ! , i - t-s -/. - 72 Atoi/.� C , J) PA.,-(r CITY/ZIP 7 9 d' CONTACT PERSON Ic,s�,wYl i.i 0r 0 � - ��� Mor PHONE 7 -I.Pei CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION MUST BE FILLED OUT COMPLETELY PLAN CHECK NUMBER 9 to BUILDIJ PERMIT APPLICATION DESCRIPTION • BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE . • OTHER: TOTAL - AMOUNT b�. 16- RCPT # 'DATE APPLICATION SUBMITTAL I order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is . subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED 6-ig—qco DATE APPLICATION EXPIRES l H L - q(r� 0122/93 COMMERCIAL NEW COMMERCIAL BUILDINGS /ADDITIONS Completed building permit application (one for each structure) Assessor Account Number Two sots (2) of the following: Soils report stamped by a Washington State licensed engineer I 1 Topographical survey Energy calculations stamped by a Washington State licensed engineer or architect Legal description — 1 Working drawings, stamped by a Washington State licensed architect, which include: • Site plan • Architectural drawings • Structural drawings • Mechanical drawings • Elevations • Civil drawings • Landscape plan ri Completed utility permit application (one for entire project) `Six (6) sets of civil drawings NOTE: See utility permit application and checklist for specific utility submittal requirements. RACK STORAGE El Completed building permit application • I :Assessor Account Number Two (2) sets of plans, which include { Specifications SUBMITTAL CHECKLIST Structural calculations stamped by a Washington State licensed engineer Building floor plan showing: • Entire space where racks will be located • Exit doors • Dimensions of all aisles ' Tena space floor plan showing rack storage layout, aisles and NOTE: : Include dimensions of racks (height, width and.length), aisles and exit ways on plan n Structural calculations stamped by a Washington State licensed engineer (rack storage 8' and over).: RESIDENTIAL NEW SINGLE - FAMILY DWELLINGS /ADDITIONS Completed building permit application (one for each structure). Legal description Assessor Account Number Two sets (2) of working drawings;: which :include: • Site plan -. (On plan, show closest hydrant location • Foundation plan Include access to bullring, showing •. Floor plan width and length of access) <• Roof plan • Building elevations (all views •Building cross- section • Structural framing plans . Washington State Energy. Code data Completed utility permit application Six (6) sets of site plans showing utilities :;NOTE: Building site plan and utility site plan be combined. See utility permit application and checklist for specific submittal requirements.: Additional topographical and soils information May required if Unique . :.. site conditions. COMMERCIAL TENANT IMPROVEMENTS Completed building permit application (one for each structure or tenant) E Assessor Account Number Two (2) sets of constriction plans, which include: Site plan C Overall building plan *Tenant location • Use of adjacent (common wall) tenant • Overall dimensions of building or square footage. Floor plan of proposed tenant space • Tenant space plan with use of each room labelled.: • Exit doors, egress patterns. • New walls, existing wall, and walls to be demolished. Construction details • Cross sections showing wall construction and method of attachment for floor and ceiling. n Structural calculations stamped by a. Washington State licensed engineer may be required if structural work is to be done (2 sets) NOTE: . 1f any utility. work Is to be done, submit separate utility permit . application and plans. REROOF Completed building permit application (one for each structure) n Assessor Account Number Narrative describing existing roof, material being removed, and material being installed. NOTE: A certification letter is required prior to final inspection and sign- off of the permit. ANTENNA/SATELLITE DISHES F --- 1 Assessor Account Number Two (2) sets of plans, which include: Site Plan: (showing building and location of antenna/satellite dish) Details antennatsntellitw dish and mw'hnri of atta .chrkent (I RESIDENTIAL REMODELS Completed building permit application (one for each structure) • Assessor Account Number Two (2) sets of working drawings, which include: • Site plan •:Foundation plan • Floor plan • plan • Building elevations (all views) •: cross-section .:Structural framing plans NOTE ll any utility work is to be done provide. :sand plans must be. submitted, !I •• Location of tenant space .• Existing and proposed parking • Landscape plan (if applicable, i.e , change of use) Completed building permit application REROOFS • Structural calculations stamped by a Washington State licensed : engineer may. be required Utility permit application Completed building: permit: application (one for each structure) E Assessor Account Number Narrative describing existing roof:matenal being removed an material being installed NOTE: A certification letter Is required prior to final inspecton and sign: off of the permit Address: 4110 S 114 ST Suite: Tenant: UNTERSEHER ROSEMARY Type: B-BLDG Parcel #: 335140-0530 444*4404414 4***4***4 4 1 44 444 44 4 4 4 k*4 . 41 , Permit Conditions: 1. No changes will be made to the plan unless approved by the Architect or Engineer and_thejlAwTlaBuilding Division. 2 All permits, inspecti,onetorOndappyoved plans shall be available at the jpsote or to the any con- struction. Thes"e':eLdoCumentsare to be maintained,,and avail- able until finar-inspectAtinaPpraval is granted.. All construction tobei%.d6iiein= plans and•:Teguir'ements of the UniforM BUitdlng A.1994 EditionTas amended • 4. Notify the c1t of TukWilaBuTTding DiviSion placing, TOWpf'tiCedure is iri-addition-to'ar!y requy0Ments for O'becia.:r 0Jippect TOO 5. Valt4),tyx0f Permit. The'' a permit or app'rova1;of sbeCTfiCations:',:,:and OmpUtations shali n15 st760 t'., be a permft.::::16r, ,b,r'an—approval of anyviolation•:, • offStiy of the ''brovisTOns-o.rthe building ccdo or of any.. other or di of the No permit presuMilia to give authprity 0-vjOlate,Or Oa4Cel:the,provisions of:thts c00 be'yalid,L - • , ,• CITY OF TUKWILA Permit Na: B96-0131 Status: ISSUED Applied: 05/14/1996 Issued: 05/30/1996 : CITY OF TUKNILA� NA T���Sh{' **++++�+*+*k**++**k+*+��***�***�`�*��*+*+**+++*+*�+N+*^++ r 0 123 TRANSMIT Number: 96004134 Amount: 127.84 05714/96 |O:O� Payment Method: CHECK Notation: ROSEMARY UNTERSE lnit: GLU -------'------_--'-.---..--_-__..-_-----_----_-'-'---------' Permit No: U96-0131 Type: U-BLDG OUlLDING PERMIT Parcel No: 335140-0530 Site Address: 4110 S 114 ST Total Fees: 127.84 this Payment 127.84 Total ALL Pmts: 127.84 Dalaoce: .00 ++**A+A*+h Account Code Description 060/322.100 GUlLDING - kES 000/345.830 PLAN CHECK - K[S 000/386.904 STATE BUILDING SURCHARGE Amount 74.75 48.59 4.50 GENERA 127.84 TOTAL 127.84 CHECK 127.84 CHANGE 0.00 5427A000 16:39 Project: J / _ / _ Type of inspection: F � \ Address: 4 /0--S /f t � l Date called: Special instructions: Date wanted: 77 �`�� a.m. P.m . Requester: Phone No.: Approved per applicable codes. COMMENTS: Inspector: Retain a copy with permit INSPECTION RECORD �3 PERMIT NO. ` CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 I I Pns 431 -3670 Corrections required prior to approval. Dater / 41-- $42.00 FEE REQUIRED'. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Rdigipt No.: Date: Project:/ w ersey Type of insp e i Address., ✓ quo c 1/ x/ 5 1- / Date called: 7 _ b Special instructions: Date wanted: -7_15. t 7 � a : m Requester: 1�,7O, e / Phone No.:7/ I }Q �QApproved per applicable codes. COMMENTS: Inspector: # INSPECTION RECORD Retain a copy with permit INSP@CT1uN NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Date: PERMIT NO. (206) 431 -3670 Corrections required prior to approval. Li $42 ' EINSPECTION FEE R (WIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite,100. Call to schedule reinspection. Receipt No.: Date: COMMENTS: ra $0 v frc S l cze.. c / .- V acs, i)^ S G'. r S t7 )--- ( 1 4, 4 / 4.4..,7 3 y /0 3 g r g h 1.1.4 %C ti--14 ef Date wanted: i 1 • .m. 1 1) Ari e./ j// %g fr 4 c/a/A /41 A, r.l' a eid , Lru ) /Itt ; r d. i i .,I _ 47 ch Project:, e , `5j l , _ Type of inspecti � ,ww I t rc Address. (_r � 0 c5 Date called: If (,, Special instructions: Date wanted: i 1 • .m. Requester: ( Phone No.: Z'%/) 47 ch INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206) 431 -3670 Approved per applicable codes. Corrections required prior to approval. Date: 7 G ` 5 I I $42.00 REINSPECTION /EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: _. �. ».o ..c. 44. Project). vt si , Type of inspection 4i, - c o Address: , 1 I O s 114 Date called: Special instructions: Date wanted: e li ci (01 `0�'' P.m. Requester: 5 4 7 . ) Phone No.: ZN (4-4,4 Approved per applicable codes. I I Corrections required prior to approval. CO MENTS: .. fit•[ ' r i• — ' ' INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Date: ()4 0131 PERMIT NO. (206) 431 -3670 $42.00 REINSPECTION FEE 'REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: C 24 23 13 12 11 10 GUI 5 6 7 8 9 I MO 300114 I I `� ST ALT IMENNIMIE IIM1 di 1 Mil PE 10 MI II ill ILI U i!MiH1uhI e MHO Om pomp dig iiiiNNI Ind I .1 L i I .. rim! _L im NEE ANN iiIMMOMMINNI 1111 1111 MINN mom Nom NEM 1111 111 1111 1I1 MOE d=.0 4 z 22 4 - I 0 -1 -i- I if t - I - r H , } 4 -_ I -i- - = Ft MEM 10 11 12 13 14 15 16 17 10 64or ■ tse in► tv + w% a %. tike, It ckUh MNi1Ai w►r q la owes Design -It (TM) Deck System, Eagle 331, Customer number: , 05114195 Note: For clarity, only every other baluster is shown Co a, Q iii144 nerwesu'ele:1 CITY OF TWO/VILA AP PROVED NAY 2 9 1996 eukoIN Goivisro A i Front View Joists = 2" x 8" Rim Joists = 2" x 8" Beams = 4" x 12" Posts = x N 7 :r) H i l l III 1 II II DIII 1 11 11 1 c) Tier : 1 - Front View (No stairs shown) S EM Tier : 1 - Side View (No stairs shown) • Ikfrt (A-eAr Pr( 61, Cu iv �4.4. ig c.oXvtda. Fob.AA-I Left Side View Decking = 2" x 6" Co'( Max. Deck Height = 84" .A" x " (sew/La w■ latscA44 RECEIVED CITY OF TUKWILA MAY 1 4 1996 PERMIT CENTER Purl A P P R r �Kwi�a n t,E NAY 2 9 1996 FLOOR JOIST Post Bracing Perimeter posts over 5' high from ground to deck level need II to be braced. While'there are several methods of bracing, y L J BEAM "X "- bracing is the strongest and is the method we recom- mend. In X- bracing, 2x4 or 2x boards run diagonally from jus below the beams on one post 4'X4' POST to approximately one foot above ground level on the neighboring post. If the diagonal distance is less than 8', use 2x4s; if 8 feet or greater, use 2x6s. On corner posts, run the brace to the outside corner of the post, secure with 3/8 "x4" lag screws or 3/8 "x5 -1/2" carriage bolts. Tri e end flush with the post. Braces that meet at middle posts are cut to meet at the center line of the posts (leaving a slight gap for drainage), and attached with lag screws or carriage bolts. Where braces cross between posts, fasten them with a single 3/ 8 "x3 -1/2" carriage bolt. Note: Post hei. t s- aver_tQ .(g ound to deck level) may require the services of a profession andscape architecror•,civil engineer. Do not exceed a 10' post height with an these plans without proQs'ional consultation. Step 4 Attach Be a s to Posts You have the option of using 4x4 or 4x6 beams and attaching hem to the posts with ready -made connectors • using a double post and beam assembly - d fastening with carriage bolts. For the ringer and girder framing methods the joists/ stringe : or girders are set directly on the concrete piers US . • notched piers or connecting hardware; no posts I I i 11 are needed (See Step 3). 4X6 BEAM WITH CONN For double post and beam assembly, use a string an evel-to_fiud e desired deck floor height on the posts. Subtract the thickness of the deck boards and joist (use actual dimensions not nominals) to deter- mine the correct height for securing the beam to the post. Make a mark on all four sides of the post at this point. Use carriage bolts to fasten the beams flush with the mark. You can cut the posts that do not serve as railing supports before attaching the beams. If using a 4x4 or 4x6 beam, make the calculations above and also subtract the actual width of the beam. Cut off post flush with the mark and install beam on top of post with a connector. DOUBLE POST AND BEAM 13 RECEIVED CITY OF TUKWILA MAY 9 if 1996 PERMIT CENTER Railings Railings enhance the safety and appear- ance of decks. Railings must be sturdy and should be firmly attached to the framing RAIL members of the deck. They can be plain or POST elaborate and offer great opportunities for individual preference. Decorative ball tops and turned spindles as well as a variety of DECKING other specialty products are available to enhance railings. The options shown JOIST THROUGH FASCIA below are only a small sampling of what is • BOARD available. Support for the railings can come from the continuation of deck posts that extend up through the deck floor or railing posts that are bolted to the outside joists or joist extensions. A common rail height is 42 ", but check for any special code requirements for your area. With the stringer or girder framing methods, railing posts will have to be added to the framing. If you decide to use the deck posts, you may need to add intermittent or spacer posts for additional support. Never span more than 8 feet between railing posts. Check with your Osmose dealer for any local code restrictions. If you choose to attach posts to the outside joists or joist extensions, you must attach each post to the rim joist with at least two 3/8 "x5" carriage bolts. For a finished look, you may want to bevel cut the end of the 4x4 post below the screw heads. Decorative handrail posts, spindles and handrail designs are available to dress up your deck. Check with your Osmose dealer for these attractive options. Once the railing posts are cut to their proper height, you can install the cap rail and other horizontal rail members. Miter cap rails where they meet at right angles over a post. Galvanized screws should be used to attach the railing cap. Benches can be integrated into the railing on one or all sides. Privacy screens can enhance the beauty of the deck and offer privacy. Screening can also be used under an elevated deck for storage or to hide an unsightly view. TURNED SPINDLE 16 CITY OF TUXWILA APPRnVED MAY 2 9 1996 SU LDING DIVISION 11101: SQUARE SPINDLES lera 4h. 41 " blialw•e edktk , RECEIVED CITY OF TUKWILA MAY 1996 PERMIT CENTER Afr 41111h CITY OF TUKWILA APPROVED rmy 2 9 1996 DING DIVISION Tier : 1 - Three-Dimension View Note: For clarity, only every other baluster is shown and no decking boards are shown. 4' 0' 8' 0' Cu III I IIIIIIIIIIIIIIII III III 1.111.111111 .1.1 II IIIP glIIIIIII III IL 44 sr inIIIIIIIIIMI•NmMmeIIIIMaai 11 1 1 ::::::::::: 11." mam ell mmmmm IllaliaRillfieralli GUMMI. 111•1111111N OM 11111111111111• 11111111111111 HilrMiMii Tier : 1 - Top View 34, ru'lltwR 12' 0' RECEIVED CITY OF TUKWILA MAY 1 4 1996 PERMIT CENTER