Loading...
HomeMy WebLinkAboutPermit D04-426 - KHAN DEVELOPMENT - DETENTION VAULTKHAN DEVELOPMENT 13821 MACADAM RD S EXPIRED 02 -09 -07 D04 -426 Cit y GA Tukwila Parcel No.: 3229200010 Address: 13821 MACADAM RD S TUKW Suite No: Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us Tenant: Name: KHAN DEVELOPMENT Address: 13821 MACADAM RD S, TUKWILA WA DEVELOPMENT PERMIT Owner: Name: AIA INTERNATIONAL VENTURES Phone: Address: 24719 43 AV S, KENT WA Permit Number: D04 -426 Issue Date: 03/08/2005 Permit Expires On: 09/04/2005 Contact Person: Name: HAL P. GRUBB, P.E. Phone: 425 251 -6222 Address: 18215 72 AV S, KENT WA Contractor: Name: AIA CONTRACTING INC Phone: 253 854 -7005 Address: P.O. BOX 3280, 306 N 1ST AV Contractor License No: AIACOI *990KU Expiration Date: 10/18/2006 DESCRIPTION OF WORK: INS`i OF DETENTION VAULT FOR THREE (3) LOT DEVELOPMENT. SEE D04 -426 FOR STRUCTURAL APPROVAL OF VAULT. Value of Construction: Type of Fire Protection: Type of Construction: Public Works Activities: $15,000.00 Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fees Collected: $518.28 International Building Code Edition: 2003 Occupancy per IBC: 0026 Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c,y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Private: Storm Drainage: N Street Use: N Profit: N Water Main Extension: Water Meter: doc: IBC - Permit N N Private: D04 -426 Public: Non - Profit: N Public: Steven M. Mullet, Mayor Steve Lancaster, Director Printed: 03 -08 -2005 Z • • • Z re L0 6 U O 0 0 w= CO u_ w g 5 w ? co = w ►— _ z � I-0 Z I- w U� O N O H w .. z Uw 0 Permit Center Authorized Signature: doc: IBC - Permit Cit y oi Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: ci.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: D04 -426 Issue Date: 03/08/2005 Permit Expires On: 09/04/2005 Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit. Signature: Date: .e53 °'8' ' 5' Print Name: 5 7 . 1 ,P. /ex; ,, .� This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. 004 -426 Printed: 03 -08 -2005 z W 6 J U 0 U O CO w 0 2 g CO —0 • w z = E- 0 z F— LU • w U� O U '. • H w W H V r LL- 0 . w z U= z ��•�.l���L;:.��..r ,.r.. .,-,.— 's:,.fu3:l.�iw�— ....:.cu.LYA ..::u:tLu:+:+ City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 3229200010 Address: 13821 MACADAM RD S TUKW Suite No: Tenant: KHAN DEVELOPMENT 1: ** *BUILDING DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS Permit Number: D04 -426 Status: ISSUED Applied Date: 11/29/2004 Issue Date: 03/08/2005 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: The special inspections and verifications for concrete construction shall be required. 5: The special inspections for steel elements of buildings and structures shall be required. All welding shall be done by a Washington Association of Building Official Certified welder. 6: The special inspection of bolts to be installed in concrete prior to and during placement of concrete. 7: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 8: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 9: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 10: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** z _� w 6 oC� 00 -3 1.- w w 2 t a u. . co d z t— Z 0 LLI w U 0 0 — C3 t— wW X- ti O .. z W ~O F- z .: 014)1A ( �w':-' s�Zts4+5Niw °J.yirdu t i�a:H: doc: Conditions D04 -426 Printed: 03 -08 -2005 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any regulating construction or the performance of work. Signature: Print Name: 5:4i/Z 1J.4r) doc: Conditions D04 -426 Date: os " ° .S of law and ordinances other work or local laws Printed: 03 -08 -2005 z 1 Z U O yO W = J i-.. W O 2 g u - ?. = d . I -w z = O z l- w 2 • o O N O I-- WW O w Z ■ ' O z SITE LOCATION Tenant Name: N/A 4,441 Palliriopinmr Property Owners Name: Saraj Khan Mailing Address: 24719 43rd Avenue South Name: Hal P. Grubb, P.E. Mailing Address: 18215 — 72nd Avenue South E -Mail Address: hgrubb @barghausen. com Company Name: Company Name: E -Mail Address: Company Name: Mailing Address: \applicationstpennit application (7.2004) CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 To be determined N/A Br an Collons Collons E 195 Front Street North Pace I W TUKWILA W Building Permit No. :12 Mechanical Permit No. Public Works Permit No. Project No. (For office use onl ) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** A.fg A4fr fi7 d'ef,d - King Co Assessor's Tax No.: 322920 -0005 . -0010 • 152304 -949 Site Address: Suite Number: oor: Kent City CONTACT PERSON Day Telephone: New Tenant: ❑ Yes ❑ .. No WA State (425) 251 -6222 WA 98032 Kent City State Zip Fax Number: (425) 251 -6222 GENERAL CONTRACTOR INFORMATION - (Mechanical Contractor information on back page) Mailing Address: Zip State City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** ARCHITECT OF RECORD — All plans must be wet stamped by Architect of Record Mailing Address: Zip State 98032 Zip City Contact Person: Day Telephone: Fax Number: ENGINEER OF RECORD — All plans must be wet stamped by Engineer of Record i Issaquah WA cRf77 City State Zip Contact Person: Bryan Collons Day Telephone: (425 ) 369 -1101 E -Mail Address: unknown Fax Number: (425) 369 -1157 z • z ce W QQ � JU O 0 to o co w J H • W W 0 W Q _ • CI 1_ W Z = W • O U � 0— a l-- W H El z U= O ~ z BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $05 , 000 Existing Building Valuation: $ N/A Scope of Work (please provide detailed information): Install detention vault for 3 —lot development Will there be new rack storage? ❑ .. Ycs ] ...No If "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below — N/A PLANNING DIVISION: N/A Single - family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ . No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: N/A ❑...Sprinklers ❑...Automatic Fire Alarm Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ ...Yes ❑ ...No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. lapplicationslpermit application (7-2004) ❑...None ❑...Other (specify) Pace 2 i Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC is' Floor 2nd Floor 3r' Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $05 , 000 Existing Building Valuation: $ N/A Scope of Work (please provide detailed information): Install detention vault for 3 —lot development Will there be new rack storage? ❑ .. Ycs ] ...No If "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below — N/A PLANNING DIVISION: N/A Single - family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ . No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: N/A ❑...Sprinklers ❑...Automatic Fire Alarm Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ ...Yes ❑ ...No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. lapplicationslpermit application (7-2004) ❑...None ❑...Other (specify) Pace 2 i PUBLIC WORKS PERMIT INFORMATION — 206 -433 -0179 Scope of Work (please provide detailed information): Install concrete detention vault \applications \permit application (7.2004) Please refer to Public Works Bulletin #1 for fees and estimate sheet. N/A Water District ❑ ...Tukwila ❑ ...Water District #125 ❑ ... Water Availability Provided Sewer District ❑ ...Tukwila 0... ValVue 0... Renton ❑ ... Seattle ❑ ... Sewer Use Certificate 0... Sewer Availability Provided 0... Approved Septic Plans Provided 0... Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. Submitted with Application (mark boxes which apply): ❑...Civil Plans (Maximum Paper Size -22" x 34 ") ❑...Technical Information Report (Storm Drainage) ❑...Bond ❑...Insurance ❑ ...Easement(s) Proposed Activities (mark boxes that apply): ❑ ... Right -o f -way Use - Nonprofit for less than 72 hours ❑ ... Ri f -wa Use - No Disturbance ❑ ... Construction/Excavation/Fill - Right-o f -way Non Right -of -way ❑...Total Cut cubic yards 0... Work in Flood Zone ❑ ...Total Fill cubic yards 0... Storm Drainage ❑ ... Sanitary Side Sewer ❑ ... Cap or Remove Utilities ❑...Frontage Improvements ❑...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... ❑ ... Temporary Water Meter Size .. ❑ ... Water Only Meter Size ❑ ... Sewer Main Extension Public ❑...Water Main Extension Public_ „ „ ,, Call before you Dig: 1- 800 -424 -5555 ❑ ...Abandon Septic Tank ❑ ...Curb Cut ❑ ...Pavement Cut ❑ ...Looped Fire Line WO# WO# WO# Private Private 0... Highline 0... Geotechnical Report ❑ ...Traffic Impact Analysis 0... Maintenance Agreement(s) ❑ ...Hold Harmless ❑... Ri -o f -wa Use - Profit for less than 72 hours ❑... Right-of- -way Use— Potential Disturbance FINANCE INFORMATION ' N/A Fire Line Size at Property Line ❑ ... Water ❑ ...Sewer ❑ ... Sewage Treatment Monthly Service Billing to; Name: Number of Public Fire I-Iydrant(s) Day Telephone: Mailing Address: Zip City State Water Meter Refimd /Billing; Name; Mailing Address: Zip Day Telephone: City State Page 3 ❑...Renton ❑ ...Grease Interceptor ❑ ...Channelization ❑ ...Trench Excavation ❑ ...Utility Undergrounding ❑ ...Deduct Water Meter Size Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >I00K BTU Evaporator Cooler Diffuser 3 -15 IIP /500,000 BTU Floor Furnace Ventilation Fan Thermostat 15 -30 I-IP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood /Gas Stove 30 -50 I-IP /1,750,000 BTU Appliance Vent Hood Water Heater 50+ HP /1,750,000 BTU Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator Air Handling Unit <10,000 CFM Incinerator - Command Other Mechanical Equipment i MECHANICAL PERMIT INFORMATION — 206 -431 -3670 i MECHANICAL CONTRACTOR INFORMATION Company Name: N/A Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other: Indicate type of mechanical work being installed and the quantity below: PERMIT APPLICATION NOTES — Applicable to all permits in this application i Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review- Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THELAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER R AUTI- ORIZE o AGENT: Signature: Print Name: Hal P. Grubb, P.E. Mailing Address: 18215 - 72nd Avenue South Date Application Accepted: \applications\permit application (7-2004) Pace 4 Day Telephone: (425) 251 - 6222 Kent - city Date: ne -V `t WA State Date Application Expires: Staff Initials: .gKtcS 98032 Zip i Z =F.. • If— W re 2 JU O 0 ND J t- F- • W W D Q co = W Z 1- 0 Z 1- W O — O 1- W W H � U. O 11 Z = 0 Z doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Payee: AIA CONTRACTING RECEIPT Parcel No.: 3229200010 Permit Number: D04-426 Address: 13821 MACADAM RD S TUKW Status: ISSUED Suite No: Applied Date: 11/29/2004 Applicant: KHAN DEVELOPMENT Issue Date: 03/08/2005 Receipt No.: R05 -00732 Payment Amount: 58.00 Initials: LAW Payment Date: 05/20/2005 12:12 PM User ID: 1630 Balance: $0,00 TRANSACTION LIST: Type Method Description Amount Payment Check 3715 58.00 ACCOUNT ITEM LIST: Description BUILDING INVESTIGATION Account Code Current Pmts 000/322.800 58.00 Total: 58.00 3369 05/20 (t16 TOTAL 5840 Printed: 05 -20 -2005 Parcel No.: Address: Suite No: Applicant: Receipt No.: Initials: User ID: Payee: Payment ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila KHAN DEVELOPMENT R04 -01592 SKS 1165 TRANSACTION LIST: Type Method 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 3229200010 13821 MACADAM RD S TUKW BARGHAUSN CONSULTING ENGINEERS, INC Check 52626 BUILDING - NONRES PLAN CHECK - NONRES Description RECEIPT Account Code 000/322.100 000/345.830 Permit Number: Status: Applied Date: Issue Date: Payment Amount: Payment Date: Balance: Amount 268.68 Current Pmts 66.28 202.40 Total: 268.68 D04 -426 PENDING 11/29/2004 268.68 11/29/2004 03:21 PM $249.60 Printed: 11 -29 -2004 COMMENTS: S e(c.4..r ..., r) e- ( Mr, C .c.e (4(.4 %Me )( Special Instructions: ."' .-- a.m. P.m. ./ Phone No: Prpjmt: i i \ r 4114 /4_ IA 1, e Type-oLInspection: i t --- 01 , 1A (1 ci r) e- ( Mr, C .c.e (4(.4 %Me Date Called:( 1 .? '•,:7) Special Instructions: ."' Date Wante : a.m. P.m. Requester: Phone No: . . ii4;:e■4' 4444.t.4`ti..;" A !em: • . • . . • . . . .rlegtV,VM0 .1 rr INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670 Approved per applicable codes. El Corrections required prior to approval. Inspector: Date:4 L : J $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. r eceipt No.: Date: COMMENTS: Type of Inspectin furiz,... V\i fa Address: 13'&; Mt crLeilet I AA p Date lied: c , vig 7/0 s - eak,,,,a,3,- LieL.,, c / / n itk 72) 3 i 12t Ce/05 Requester: 5. ctA i iteA i 02: / s 21c.5. pt 4 :(0-- r Project: V., Vuo-44 le \ke-1 . Type of Inspectin furiz,... V\i fa Address: 13'&; Mt crLeilet I AA p Date lied: c , 1 0 5- Special Inst ctions: Itt -60.4.1 C4c...e.k I \Z it iA- I AI'l-et ate Wanted: i 12t Ce/05 Requester: Phone No: - 1 -- )c .- 7u2ce.— 9'4-(: INSPECTION RECORD Retain a copy with permit bt)(ft-Pti? INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670 Approved per applicable codes. 0 Corrections required prior to approval. Inspector: !Date: la/2 5 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: Receipt No.: z 0 00 (n COW w u,. u j 0 < w a LLI Z 1— 0 Z 0 0 22 o w I 0 I- --- w Z c-2 01- Z Projec : Type of Inspection: Address: 13tA ( Og-cidavil kiti Date Called: t .0, Special Instructions: / /r �� t CO( 2 ► � � 'L+� a k `" 0' • J�'e1U 1 . W Q lHI.49 C4Ay2 1 . Date Wanted: a.m. /� /�0 j05 Requester: � Phone No: 4 S ----. 7C)t?' `�cp 7 INS ECTION NO. Apprd ed per pplicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 Corrections required prior to approval. COMMENTS: 0o4 ›,-∎1 ,&_1_ I�` t�� 1 v■A - ((mac , 7 -�i K 1,. I M -ex ( fib )4\t ,tee p to ai Receip No.: Date: 40 fO'c REINSPE ON FEE • EQUIRE'. Prior to inspection, fee must be at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: W UO 0 wi- W O 2 g Q . = a W Z = W w O ▪ N O H W W u. O W Z U= O~ Z Project: Type of Inspection: A dress: 1 ry\oczocoucm 0 Date ailed: S . I 0 ( 'SID 5 Special Instructions: . Ail eP-C4tequester: Date Wanted: a.m. 5 Irf kk-e_._. \. Phone No: 7Cace — ‘12 4/7 - 1 INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-367 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: & i Ai LeAk-e-v A-1 • 10 ( zz) to - rAA......KA Date: / EINSPECTIOM FEE REQUIRED Prior to inspection, fee must be id at 6300 Southcen er Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: • ""'"? ,- .' ' t 7' (.) ••••k z 1 z fr 6 n -J O 0 CO 0 CO W W -i-- S LL ) uj 0 2 g < co I w Z I-0 Z uj O 0 O - • C12 CI I— LL! I 0 4. 3 z Loi O 1— Z Poe t: LG - U-� Type of Inspection: 5 c.,' GoA,t D to Cal ed: i Di - D✓4)_ Date Wanted: { a.m. ! b 1 "3�IDS -- Address: 1S6,)i 1 Special Instru ions: Requester: ciAIC. ii. Phone l `o Le'` t, - 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 IS Approved per applicable codes. Corrections required prior to approval. COMMENTS , 1 ( A (( A rev (2)- •ee CI :01/41A- 'elf& ('7 - n A \ ( << A * ro f Z Q 1 I Spector: A /,t A.M. EINSPECTION FEE RIEQUIRED. Pri to inspection, fee must be at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Date: 11 COMMENTS: n . J..,",..4._ ctuzivt_.1 rr4- -c __K)' - --... ] .� Gf " c hia.)U .4-6kN\ r c- e cC -Q-v' m�.J , , , D to Cac+ - S ll d: 5/ Special Instructions: t2;10 - L; 0 111.0 D f D-61) 4 Date Wanted: Sig 0‹ _ Requester: c — VL Pho a No: N PJ[ncti � V -e a Type oflnspection: a .� Gf " c hia.)U A ss: �` : ? 1 a�.n �c D to Cac+ - S ll d: 5/ Special Instructions: t2;10 - L; 0 111.0 D f D-61) 4 Date Wanted: Sig 0‹ _ Requester: c — VL Pho a No: l El Approved per applicable codes. INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #1 00, Tukwila, WA 98188 .DD4 El Corrections required prior to approval. Date :... / p AY") Inspe' 'tor: GvY1 A- 'lA r :A ,A )(A- - $58.00 REINSPECTION FE REQUIRED. Prior fo inspection, fee must be paid at 6300 Southcenter tvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: Sg Z • Z • W O 0 U) o • LU W I W o u_¢ 3 u. 1 Z = ZI- tU w U� (.12 0I- W I-- O 6.1 Z = O~ z P oje t: I Type ( Inspection: • i I. ' — 6—.14 Date Ca led` .'. e r Z 15 Special Instruction . Date Wanted: . Requester: it. Li, Phone o: 2 30 ""zc 7 0 _ 69 op • INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. COMMENTS: INSPECTION RECORD Retain a copy with permit Inspecto}¢` � Date: 5 (a $58.00 REINSPECTION E REQUIRED. Prior to inspection, fee must be 4� paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. (2'6)431-3670 Corrections required prior to approval. Cee Receipt No.: Date: l9 S e/ Pro•ect ( A (4' �- e,Ve - , T pe of I lion: ,(, 1 (1;F ,1 tad IN' Ad ress• � (l ,, -� � Date Called: Special Instructions: i�0d i ,•) e -r. 3 oa� fO P q ;c9oa, l cio fro OL0 - 1 Dat Wanted: t sja /0 �m p.m. Requester: -� ((( (4 Ph -1 P h n No: /•� o - e 400 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERM, (206)431 -3670 El Approved per applicable codes. Corrections required prior to approval. COMMENTS: (9//,,, M�• Inspector: ( Date: U $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: z z W aa = JU 00 N O W • = N W U Q = W H = ? F- WO • W U 0 w 01- W W H 0 . W Z U =. 1= I.,_ z COMMENTS: 10t Af (A I fl v\ `` 00-t , A r n v\ 4 c--) r b vv\000,,,),,,r Address: } \ �J ,� PM( CAL (� 1,„ C ampo a-“,[c. \ ro poi-A- chi. t _l-e S A -4) V' C, p(oV -(,4 000 1 1 Dt 4 .P V\rnt) 4 e \ t (A (7Vx . 11't° J11 00( 47 ■4' Cone CUVv c ■ -(1 � v✓_ pnel "I--0 Project: 1 1)P0 khrAIn Type of spection: OCR Address: } \ �J ,� PM( CAL (� 1,„ Date Called: . Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: ;tsa'at' INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERM N I CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 jQl Ll) 0 6)431 -3670 Approved per applicable codes. fJ Corrections required prior to approval. Inspector: [In Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Z Z W QQ • � J O 0 CO O 11.1 11,1 W O 2 u . co i s w W W U � O N O I-- W W - U ~ - O • = O ~ z COMMENTS: L , 44 C address: /3 • t / 1 L)f) ; \ s C�e• VA ci(),}G�,o/) c r-c r v X r� 0 0 4 i r* - -P6t C\ v — 4- , (((((( 4 61144 _ Special Instructions: /, I 'O � ° ( V 0 -e-. a • ' .)\ r"i- f`1 L'72 . lM tJ Cl ( v -P lo-P PVI ( I �' r,nfl(`rVP/ • irovt C1.P \N-` -e -1-. c rS ) ((( Q "trr)1M Co'e C.►` c4 r •NN.9f'f)VU Phone N )170 Pr% ' It } , ^ ' /,, • AM ` �`II Type of Inspect' n: y 0 � C address: /3 • t / Sia 4 £y ateCallecl: 4/05 --- Special Instructions: /, I 'O � ° ( V 0 -e-. a • 1 _ . Date Wanted: r t .Gt //2f45 p.m. Requester: SUS Phone N )170 ,1 l INSPECTION RECORD .: Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 • 1 A pproved per appli able codes. PERM (206)431 -3670 El Corrections required prior to approval. Date: 1-1- El $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: 'Date: AYA CONTRACTING 306 N 1` Ave Kent, WA 98032 Fax 253- 854 -7027 Mtn: Sukh Gentlemen: INSPECTIQN 3 TLSTNIO SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES MTTP'JMMNY.SPEARS•ENGINEER ING.COM Re: Project: Permit#: Report Date: SPEARS ENGINEERING & TECHNICAL SERVICES Site Inspection 3 -Lot Project on Macadam Road South ® S 138' Street D04426, B05069 9/30T2005 This letter is to certify that the footing drains and storm drains were installed per engineers recommendation. Backfill around the storm retention vault and behind the retaining wall have been accepted and were placed per engineers recommendations. We appreciate this opportunity to be of service to you and we look forward to working with you in the future. If you have any questions concerning the above items, the procedures used, or if we can be of any further assistance please call us at (253)833-7967. cc: Bryan Collons, Collons Engineering, LLC Hal Grubb, Barghausen Consuhing Engineers P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Respectfully Submitted. SPEARS ENGINEERING & TECHNICAL SERVICES - .1. Frank Spears, P.E. Principle PHONE: (253)833 -7967 Fax: (253) 735 -2867 Report # 05001 -015b Page 1 of 1 RECEIVED err a OF TUKWIU OCT 2 8 2005 PERMIT CENTER 20 October 2005 City of Tukwila Building Division 6300 5outhcenter Blvd Tukwila, Washington 98188 Project: Kahn Three Lots Address: 13821 Macadam Road 5 We herewith certify that we have completed the following special inspections. To the best of our knowledge, the work inspected was in conformance with the approved plans and specifications and the applicable workmanship provision of the building code. All typewritten reports have been mailed to your office or are enclosed. All reports appear to be complete. This report should not be considered as a warranty for conditions and /or details of the building. Items inspected are: 1. Reinforcing steel 2. Reinforced concrete Sincerely, OTTO) cENAU 4 ASSOCIATES, TES, INC. Jeanne L. Parvin fax c: AIA Contracting / OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing 6747 M. L. King Way South, Seattle, Washington 98118 -3216 USA Tel: (206) 725 -4600 • Toll Free: (888) OTTO -4 -US • Fax: (206) 723 -2221 WBE W2F5913684 • WABO Registered Agency • Website: www.ottorosenau.com RECEIVED OCT i 212005' Permit Numb rs: 004 -426 (detention v D04 :069 (retaining wall) Job Number: 05 -196 COMMUNITY DEVELOPMENT )1-W ce U O co o WI J I w O . g a = w Z F- O Z 1— uL O - 111 u IL f- O W Z U N . O z OTTO ROSENAU $ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Job Number: Project: Kahn Three Lots Address: 13821 Macadam Rd S, Tukwila Date: 4/15/2005 Description/Location: Retention vault slab Resteel verified: Yes Placement Data Supplier: Stoneway Mix Number: 5500 Slump Spec: 5" W/C Ratio Spec: .50 Air Spec: Total Yards: 20 Placed Via: chute Consolidated: Yes Required Strength (psi): 3000 Sampling and Testing Data ASTM C 172, C 31 Cast Samples: 1-4 Cast Samples: Weather: Overcast Date Samples Picked Up: 4/8/2005 Other Test Methods / Standards Used: Specimen Number 1 2 3 4 Tested in general accordance to: ASTM C39 Copies to: X Client Architect Engineer CONCRETE REPORT 05-196 Report Number: 24501 Test Field Date Cure 4/22/05 Resteel grade: 60 Time Made 8 :00 Contractor x Building Dept. X Batch Plant Age mays). 7 Client: Address: Inspector: on ground and footings at thickened edge. Manufacturer: Nucor Design ® Actual ® Batch Weights /Cubic Yard Cement (lbs./type): 517# 517# Fine Agg. (Ibs): 1400# 1460# Coarse Agg. (Ibs/size): 1936# %" 1956# Coarse Agg. (lbs/size): Coarse Agg. (lbs/size): Fly Ash (Ibs): Water (Ibs or gal): 250# 235# Admixtures (specify): Cubic Yards 10 Water Slump Added C143 5gal 4" Slump Range: Initial Curing Method: Comments Excluding ASTM C31 - 12.1.5 COMPRESSIVE TEST RESULTS x ASTM C109 ASTM C617 Note: Type of fracture does not apply when testing in conformance to ASTM C1231 Final curing in calcium hydroxide water storage tank at 73° ± 3° F Technical Responsibility: AIA Contracting 306 N 1 Ave, Kent Ted Christie Air % Conc. Temp C 231 C 1064 63° FtECEIVEl3x) MAY 12. 2005 COMMUNITY DEVELOPMENT Permit Number: Ambient Temp 48° Air % Range: Initial Curing Temp: ASTM C1231 x Truck No. 424 Pending Notes REINFORCING / PLACEMENT: Conforms x Does Not Conform Size Area Max Load Strength Type of Fracture (In.) (Sq.In.) Weight (Lbs.) foil (other than cone) 6x12 28.13 29.31# 112,590 4000 David Lyal, Technical Director This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report, except in full, without written permission from our firm is strictly prohibited. Page 1 of 1 6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725 -4600 or 1- 888- OTTO -4-US — Fax (206) 723 -2221 Ticket No. 509980 Excluding ASTM C31 - 10.1.2 OTTO ROSENAU &ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Job Number: 05 -196 Project: Kahn Three Lots Address: 13821 Macadam Rd S, Tukwila Date: 4/15/2005 Resteel verified: Yes Placement Data Supplier: Stoneway Mix Number: 5500 Slump Spec: 5" W/C Ratio Spec: .50 Air Spec: Total Yards: 20 Placed Via: chute Consolidated: Yes Required Strength (psi): 3000 Sampling and Testing. Data ASTM ;C 172, C`31 Cast Samples: 1 -4 Cast Samples: Weather: Overcast Date Samples Picked Up: 4/8/2005 Other Test Methods / Standards Used: Specimen Number 1 Test Field Date Cure 4/22/05 2 5/13/05 3 5/13/05 4* *Discarded Tested in general accordance to: ASTM C39 Copies to: X Client Architect Engineer Contractor x Building Dept. X Batch Plant CONCRETE REPORT Report Number: Client: Address: Inspector: Description /Location: Retention vault slab on ground and footings at thickened edge. Initial Curing Method: Excluding ASTM C31 -12.1.5 Comments . COMPRESSIVE TEST RESULTS x ASTM C109 Note: Type of fracture does not apply when testing in conformance to ASTM C1231 Final curing in calcium hydroxide water storage tank at 73° ± 3° F 24501 Permit Number: D04 -426 AIA Contracting 306 N 1 Ave, Kent Ted Christie Resteel grade: 60 Manufacturer: Nucor Design ® Actual ® Batch Weights /Cubic Yard Cement (Ibs. /type): 517# 517# Fine Agg. (Ibs): 1400# 1460# Coarse Agg. (lbs/size): 1936#'/." 1956# Coarse Agg. (lbs/size): Coarse Agg. (lbs/size): Fly Ash (Ibs): Water (lbs or gal): 250# 235# Admixtures (specify): Time : - Cubic :: Water ; Slump - Air % Conc. Temp.. :Ambient Truck ..Ticket :Made Yards Added <. C143 • :. 9,231 C 1064 Temp No No. 8:00 10 5gal 4" 63 48° 424 509980 Slump Range: Air % Range: Initial Curing Temp: Pending Notes REINFORCING / PLACEMENT: Conforms x Does Not Conform Age Size Area Max Load Strength Type of Fracture (Days) (In.) (Sq.ln.) Weight (Lbs.) foil (other than cone) 7 6x12 28.13 29.31# 112,590 4000 28 6x12 28.16 29.46# 161,890 5750 28 6x12 28.16 29.38# 173,140 6150 ASTM C617 ASTM C1231 x Technical Responsibility: ,_5.0Q0,,.n 1 0D !1.Cui - 1Y10.,1Q.✓ 4 David Lyal, Technical Director This report applies only to the items tested or reported and Is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report, except in full, without written permission from our firm is strictly prohibited. Page 1 of 1 6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725 -4600 or 1- 888- OTTO -4 -US - Fax (206) 723 -2221 Form No.: ADM /N -62 -02 (Rev 04/04) Excluding ASTM C31 - 10.1.2 Z ;I Z re W 00 rn c -I I N IL. W O g Q N = W Z �.. I- O Z uj U 0- O I— W W H 0 O U =. O ~ Z P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 L' r"( A::0 .4.:.1.44 •40,14U.+w:Wotvs 4.6 SPEARS ENGINEERING & TECHNICAL SERVICES enY NOV 7 7.144111, 2004 Peiltf irCENT ER PHONE: (253) 833 -7967 FAX: (253) 735 -2867 AMERICAN CANADIAN REAL ESTATE, INC. PO Box 3280 f Kent, WA 98032 pleased to continue our role as geotechnical engineers during the project implementation. We appreciate this opportunity to be of service to you and we look forward to working with you in the future. If you have any questions concerning the above items, the procedures used, or if we can be of any further assistance please call us at (253) 833 -7967. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Respectfully Submitted, SPEARS ENGINEERING & TECHNICAL SERVICES SPEARS ENGINEERING & TECHNICAL SERVICES IEXPIRES 08/16/05 , z Z � W QQ � J U 00 w 0 J I- � U- W u_ Q = W z = ZI- U w 0I— W W I IL O ui z I= I I Z PHONE: (253) 833 -7967 Report # 04001 -067 FAx: (253) 735 -2867 Page 1 of 14 Table of Contents Subsurface Investigation 3 Introduction: 3 Authorization: 3 Purpose: 3 Scope: 3 General: 3 Geology Of Area: 3 Climate Of Area: 4 Field Exploration 4 General Notes: 4 Drilling & Sampling Procedures: 4 Laboratory Testing Program: 4 Project Description 4 Subsurface Conditions 4 General Notes: 4 Description Of Foundation Materials: 5 Foundation Discussion & Recommendations 5 General Notes: 5 Foundation Design Recommendations: 5 Slope Stability Modeling & Analysis: 6 Slope Recommendations: 6 ) Construction Considerations Excavations: 7 Lateral Earth Pressures: 7 Floor Slab-On-Grade: 7 Groundwater Control: 8 Geoseismic Setting: 8 Liquefaction Potential: 8 Summary 8 Geotechnical General Notes 9 Soil Property Symbols 9 Drilling And Sampling Symbols 9 Relative Density And Consistency Classification 9 Particle Size 9 Site Location Earthwork: Structural Fill: INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES I-11"1 P.O. Box 1007 AUBURN, WASHINGTON 98071-1007 Table of Contents SPEARS ENGINEERING & TECHNICAL SERVICES 2 6 6 7 10 Site Plan with Boring Log Locations 11 Boring Log #1 12 Boring Log #2 12 Boring Log #3 13 Site Photos 14 PHONE: (253) 833-7967 FAX: (253)735-2867 Report # 04001-067 Page 2 of 14 4 V•j,,,11",41. Z Ct —J C.) 00 U) 0 11.1 111 • u. w 0 2 LL < CD I (21 • LLI Z p- 1— 0 Z W ui 0 0 S 11J w I r - U. 3 Ili to 0 We were not requested to provide an Environmental Site Assessment for this property. Any comments concerning onsite conditions and/or observations, including soil appearances and odors, are provided as general information. Information in this report is not , ) intended to describe, quantify or evaluate any environmental concern or situation. INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: /NWWV. SPEARS - ENGINEERING. COM INTRODUCTION: This report presents the results of a soils exploration and foundation analysis for the proposed residential construction to the 3 -lot development on Macadam Road South just south of South 138 Street. This investigation was conducted for Mr. Saraj Khan. AUTHORIZATION: Authorization to perform this exploration and analysis was in the form of a verbal authorization to proceed from Mr. Saraj Khan. PURPOSE: The purpose of this foundation exploration and analysis was to determine the various soil profile components, the engineering characteristics of the foundation materials and to provide criteria for use by the design engineers and architects in preparing or verifying the suitability of the foundation design. SCOPE: The scope of the exploration and analysis included a review of geological maps of the area and a review of geologic and related literature; a reconnaissance of the immediate site; the subsurface exploration; field and laboratory testing; and an engineering analysis and evaluation of the foundation materials. G ENERAL: The exploration and analysis of the foundation conditions reported herein are considered sufficient in detail and scope to form a reasonable basis for the foundation design. Any revision in the plans for the proposed structure from those enumerated in this report should be brought to the attention of the soils engineer so that he may determine if changes in the foundation recommendations are required. If deviations from the noted subsurface conditions are encountered during construction, they should also be brought to the attention of the soils engineer. The soils engineer warrants that the findings, recommendations, specifications, or professional advice contained herein, have been promulgated after being prepared according to generally accepted professional engineering practice in the fields of foundation engineering, soil mechanics and engineering geology. No other warranties are implied or expressed. This report has been prepared for the exclusive use of Mr. Saraj Khan and his retained design consultants. Findings and recommendations within this report are for specific application to the proposed project. All recommendations are according to generally accepted soils and foundation engineering practices. GEOLOGY OF AREA: The soils in the area of the project site are in the Alderwood Association and the Urbanized soils types as classified by the Soil Conservation Service from the Department of Agriculture. The Alderwood soils generally consist of moderately well drained gravelly sandy loams over consolidated glacial till. In particular these soils are listed as Alderwood gravelly sandy loam, 6% to 15% slopes (AgC). With some listed as Alderwood & Kitsap soils, very steep (AkF) . Runoff is medium to rapid and the erosion hazard is moderate. The Urbanized soils are native soils that have been so disturbed over the years from development over the years that the native soils are so blended so as to not be classified. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Subsurface Investigation PHONE: (253) 833 -7967 FAX: (253) 735 -2867 SPEARS ENGINEERING & TECHNICAL SERVICES Report # 04001 -067 Page 3 of 14 Z �z ce QQ � J U 00 0 UJ J1.- U) u. w 2 LL Q _ I— w Z H Z U 0 I— Ww u O LLI 0 0 Z INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: //W WIN. SPEARS - ENGINEERING. COM SPEARS ENGINEERING & TECHNICAL SERVICES CLIMATE OF AREA: The climate of the site and surrounding area as taken from the USDA Soil Conservation Service Survey consists of an annual precipitation of 40 to 60 inches per year, and a mean annual temperature of 50°F with a frost free season of about 190 -200 days per year. Field Exploration GENERAL NOTES: The field exploration to determine the engineering characteristics of the foundation materials included a reconnaissance of the project site, excavating the test borings, performing field penetrometer and vane shear tests and recovering disturbed grab samples. A total of three test borings were placed on the site. The test borings were advanced to 10 feet below the existing ground surface. A site plan supplied by Barghausen Consulting Engineers was used to locate the proposed building orientations and position the excavations. The test borings were located by the field technician by means of normal taping and pacing procedures and are presumed to be accurate to within a few feet. After completion, the test borings were backfilled with excavated soils and the site cleaned and leveled as required. DRILLING & SAMPLING PROCEDURES: The soil borings were performed with a conventional hollow stem hand auger. Representative samples were obtained from the borings at various soil intervals. The samples obtained by this procedure were classified in the field by a soils technician, identified according to test boring number and depth, placed in plastic bags to protect against moisture loss and transported to the laboratory for additional testing. LABORATORY TESTING PROGRAM: Along with the field investigation, a supplemental laboratory testing program was conducted to determine additional pertinent engineering characteristics of the foundation materials necessary in analyzing the behavior of the proposed building structure. The laboratory testing program included supplementary visual classification and water content determinations on all samples. In addition, selected samples were subjected to Atterberg Limits Tests - ASTM designation D -4318, and Grain Size Analysis - ASTM designation C -117, C -136. All phases of the laboratory testing program were conducted according to applicable ASTM Specifications and the results of these tests are to be found on the accompanying Logs located in the Appendix. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Project Description The purpose of this section is to enumerate details of the proposed structure. The following information was provided by the project engineer. The buildings will be a one -two story daylight basement residential structures. Conventional spread footings and slab -on- grade floors are contemplated. Differential settlements are limited to 3 /, inch. The site of the proposed building addition upon which this soils exploration has been made is located on Macadam Road South just south of South 138 Street. The site topography consists of a steep stair stepping slope that runs across the site and drops about 40-45 feet in a 140 -150 feet distance. The site drainage consists of natural runoff and infiltration. The site vegetation consists of a heavily treed site with thick and lush undergrowth. Subsurface Conditions GENERAL NOTES: The types of foundation materials encountered have been visually classified and are described in detail on the test boring logs provided in the Appendix. The results of the field penetrometer and vane shear tests, moisture contents and other laboratory tests are presented on the logs. It is recommended that the logs not to be used for estimating quantities due to highly interpretive results. PHONE: (253) 833 -7967 FAx: (253) 735 -2867 Report # 04001 -067 Page 4 of 14 INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: /Iwww.SPEARS- ENGINEERING. COM SPEARS ENGINEERING & TECHNICAL SERVICES DESCRIPTION OF FOUNDATION MATERIALS: The soil profiles encountered were relatively consistent among the borings. The surface of the proposed construction site is covered with 6 to 12 inches of topsoil that should be removed prior to the start of any construction due to the high compressibility of these soils. Silty Gravelly Sandy Loam to silty sand layers were encountered beneath the existing topsoil that are typical of the Adlerwood series and the Alderwood Kitsap series and these extended to depths beyond the scope of this investigation. Lines of demarcation represent the approximate boundary between the soil types, but the transition may be gradual. It is to be noted that, whereas the test borings were placed and sampled by an experienced technician, it is sometimes difficult to record changes in stratification within narrow limits. In the absence of foreign substances, it is also difficult to distinguish between discolored soils and clean soil fills. It is recommended that the logs not to be used for estimating quantities due to highly interpretive results. Foundation Discussion & Recommendations GENERAL NOTES: Various foundation types have been considered for the support of the proposed building structure. Two requirements must be fulfilled in the design of foundations. First, the load must be less than the ultimate bearing capacity of the foundation soils to maintain stability; and secondly, the differential settlement must not exceed an amount that will produce adverse behavior of the superstructure. The allowable settlement is usually exceeded before bearing capacity considerations become important; thus, the allowable bearing pressure is normally controlled by settlement considerations. Considering the subsurface conditions and the proposed construction, it is recommended that the structure be founded upon conventional spread and continuous wall footing foundations. Settlements should not exceed tolerable limits if the following design and construction recommendations are observed. _ 1 FOUNDATION DESIGN RECOMMENDATIONS: On the basis of the data obtained from the site and the test results from the various laboratory tests performed, we recommend that the following guidelines be used for the net allowable soils bearing capacity. D All footings are to be placed upon firm and unyielding native soils. Any soft spots exposed during construction should be over - excavated and re- compacted. D Continuous wall footings should be a minimum of 18" in width and the slab for the proposed building should be suitably reinforced and connected to the footings so as to limit the effects of differential settlement and to provide some degree of uniform settlement ability for the building. D Upon excavation the subgrade soils may be very soft due to the amount of moisture in the soils. Footing drains and downspout drains will be needed for all residential buildings. D If the native soils are too soft at grade level when excavated then the use of pin piles may be needed for the footings. This can be determined at the time of inspection upon excavation of each site as it is developed. D All fill operations should be monitored by a representative of our firm for proper placement and compaction. Footing Depth 24 inches P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 ASTM D 1557 Subgrade Compaction 95% PHONE: (253) 833 -7967 FAX: (253) 735-2867 Net Allowable Soils Bearing Capacity 2,000 lbs/ft The footings should be proportioned to meet the stated bearing capacity and/or the Uniform Building Code 1997 minimum 1 requirements. Total settlement should be limited to 1 inch total with differential settlement of 3 /4 inch. Any excessively loose or soft -� ) spots or areas that do not meet the compaction requirements that are encountered in the footing subgrade will require over - excavation and backfilling with at least 2 feet of structural fill. In order to minimize the effects of any slight differential movement that may Report # 04001 -067 Page 5 of 14 Z r4 w U 0 N Ui • _ U) LL, w ° � in_a = W H Z � I- O Z I•- w • w U� O - O I- w W r z L6 Z U= 0 Z .p.�flrisi • SPEARS ENGINEERING & TECHNICAL SERVICES occur due to variations in the characters of the supporting soils and any variations in seasonal moisture contents, it is recommended that all continuous footings be suitably reinforced to make them as rigid as possible. INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP. /M INV.SPEARS- ENGINEERING.COM SLOPE STABILITY MODELING & ANALYSIS: Slopes may fail by a number of mechanisms, depending on the nature of the soil involved and the arrangement of natural earth materials at the site in question. slope failures occur because forces tending to cause instability exceed those tending to resist it. Generally, the driving forces are represented by a component of soil weight down slope, and the resisting forces are represented by the soil strength acting in the opposite direction. The factor of safety (FS) of the slope is expressed as the ratio of the resisting forces or "moments" to the driving forces or "moments ". When the FS is 1 or less, the slope must fail. when the FS exceeds I, the slope is theoretically stable. When estimating the FS for the slopes encountered, we considered the following types of information: I) The soil and water profiles. 2) The kinematics of the potential slope failure. 3) The strength and weight of the soil. 4) The proposed slope geometry. 5) Static and seismic (dynamic) loading conditions. The site was modeled using Geo- Slope's Slope/W program (version 4). The native soils were modeled using 120 lbs. /fl unit weight with a phi angle of 34° and no cohesion. A ground acceleration of 0.20g's was used in both the vertical and horizontal direction for the dynamic loading conditions. We have calculated various "worst case" scenarios and have found that the site shows no indications of any deep seated instability of the slope under either static or dynamic loading. SLOPE RECOMMENDATIONS: } We recommend that the proposed structures be built using the site plan as proposed by Barghausen Consulting Engineers. This site plan is in our opinion the best use of the site. We do not anticipate that the proposed residential structures and construction of the project will have any off-site impacts. On -site care should be taken during construction to make sure that runoff caused by wet weather be directed away from all open excavations. The site is stable enough to support the proposed residential construction within the recommendations made herein. Construction Considerations EARTHWORK: Excessively organic top soils generally undergo high volume changes when subjected to loads. This is detrimental to the behavior of pavements, floor slabs, structural fills and foundations placed upon them. It is recommended that excessively organic top soils be stripped from these areas to depths of 6 -12 inches and wasted or stockpiled for later use. Exact depths of stripping should be adjusted in the field to assure that the entire root zone is removed. It is recommended that the final exposed subgrade be inspected by a representative of the soils engineer. This inspection should verify that all organic material has been removed. Any soft spots or deflecting areas should be removed to sound bearing and replaced with structural fill. Once the existing soils are excavated to the design grade, proper control of the subgrade conditions (i.e., moisture content) and the placement & compaction of new fill (if required) should be maintained by a representative of the soils engineer. The recommendations for structural fill presented within this report, can be utilized to minimize the volume changes and differential settlements that are detrimental to the behavior of footings, and floor slabs. Enough density tests should be taken to monitor proper compaction. For structural fill beneath building structures one in -place density test per lift for every 1,000 f1 is recommended. In parking and driveway areas this can be increased to two tests per lift for every 1,000 11 Excavation equipment may disturb the bearing soils and loose pockets can occur at the bearing level that were not disclosed by the soils borings. For this reason, it is recommended that the bottoms of the excavations be compacted in -place by vibratory compactors. -) The upper 12 inches should be recompacted to achieve an in -place density of not less than 95% of the maximum dry density as `--' determined by ASTM D -1557. P.O. Box 1007 AUBURN, WASHINGTON 98071 - 1007 PHONE: (253) 833 -7967 FAX: (253) 735 -2867 Report # 04001 -067 Page 6 of 14 z MZ � J U 00 LO H W J � H Z t— ZO LU U� O aE- W W Il. W Z = O~ z ,r ... .. N..r....9. -,... axarftRnar v.u�aar. ■ ( ) INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: /NW WV.SPEARS- ENGINEERING. COM SPEARS ENGINEERING & TECHNICAL SERVICES STRUCTURAL FILL: Structural fill should consist of a 3 inch minus select, clean, granular soil with no more than 5% fines (- #200). Suitable structural fill should consist of material that meets one of the following specifications, WSDOT Section 9 -03.10 Aggregate for Gravel Base, WSDOT Section 9 -03.14(1) Gravel Borrow, WSDOT Section 9 -03.14(2) Select Borrow, WSDOT Section 9 -03.9(3) Crushed Surfacing (Base Course Specs), WSDOT Section 9 -03.9(3) Crushed Surfacing (Top Course Specs), APWA Class A Pit Run, or APWA class B Pit Run. Material that does not meet one of the specifications should be submitted with sieve analysis results for approval prior to placement. The fill should be placed in lifts not to exceed 12 inches in thickness. Each layer of structural fill should be compacted to a minimum density of 95% of the maximum dry density as determined by ASTM designation D -1557. For structural fill below footings, the area of the compacted backfill must extend outside the perimeter of the foundation for a distance at least equal to the thickness of the fill between the bottom of the foundation and the underlying soils. If it is elected to utilize a compacted backfill for the support of foundations, the subgrade preparation and the placing of the backfill should be monitored continuously by a qualified engineer or his representative so that the work is performed according to these recommendations. The use of on -site soils as structural fill is recommended. However, these materials may require high moisture contents for compaction and/or require a long time to dry out if natural moisture contents are too high. This can make moisture content, lift thickness, and compactive effort difficult to control especially during the wetter winter months. EXCAVATIONS: Shallow excavations required for construction of foundations that do not exceed four feet in depth may be constructed with side slopes approaching vertical. Below this depth it is recommended that slopes not exceed one vertical to one horizontal. For deep excavations, the soils present cannot be expected to remain in position. These materials can be expected to fail, and collapse into any excavation thereby undermining the upper soils materials. This is especially true when working at depths near the water table. Proper care must be taken to protect personnel and equipment. Care must be taken so that all excavations made for the foundations are properly backfilled with suitable material compacted according to the procedures outlined in this report. Before the backfill is placed, all water and loose debris should be removed from these excavations. This information is provided for planning purposes. It is our opinion that maintaining safe working conditions is the responsibility of the contractor. Jobsite conditions such as soil moisture content, weather condition, earth movements and equipment type and operation can all affect slope stability. All excavations should be sloped or braced as required by applicable local, state and federal requirements. LATERAL EARTH PRESSURES: Lateral earth pressures are dependent upon the backfill materials and their configuration and moisture content. Three inch minus sand and gravel mixtures that are free draining are recommended for backfilling walls greater than four feet tall. There are below grade retaining walls or walls designed for retaining earthen fills on this project. The following values may be used for this site. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Earth Pressure Coefficients Active, K At Rest, IC,: Passive, K 0.283 0.441 3.537 Earth Pressure Active: At Rest: Passive: Coefficient of Friction: PHONE: (253) 833 -7967 FAx: (253) 735 -2867 35 50 420 0.40 lbs. /11 lbs. /li lbs. /11 FLOOR SLAB -ON- GRADE: Before the placing of concrete floors or pavements on the site, or before any floor supporting fill is placed, the organic, loose or obviously compressive materials must be removed. The subgrade should then be proof rolled to confirm that the subgrade contains no soft or deflecting areas. Areas of excessive yielding should be excavated and backfilled with structural fill. Report # 04001 -067 Page 7 of 14 Z Z • w O 0 u 0 Ili_ H w 0 g Q = • d �.w Z = I- O Z uj U op N 0 I- UJ H - U w z c) 0~ z ib'.a{'F,;iii:;a; :. t.4, 4.. siy 4:4:4404d u4MJ;r4+' 4' 4#4.— SPEARS ENGINEERING & TECHNICAL SERVICES Any additional fill used to increase the elevation of the floor slab should meet the requirement for structural fill. Structural fill should be placed in layers of not more than 12 inches in thickness, at moisture contents at or above optimum, and compacted to a minimum density of 95% of the maximum dry density as determined by ASTM designation D -1557. INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP. /IUW WV. SPEARS- ENGINEERING.COM GROUNDWATER CONTROL: Groundwater was not encountered beneath the existing grade at the time the field exploration was conducted. Groundwater is not expected to cause any difficulties during construction of this project. It is recommended that runoff caused by wet weather be directed away from all open excavations. The on -site silty soils can be expected to become soft and pump if subjected to excessive traffic after becoming wet during periods of bad weather. This can be avoided by constructing temporary or permanent driveway sections should wet weather be forecast. GEOSEISMIC SETTING: This project site is located within a "Zone 3 Area" as per the 1997 edition of the Uniform Building Code. All building structures on this project should be designed as per the U.B.C. Requirement for such a seismic classification. Additionally the on -site soils should be classified as type SD per the 1997 U.B.C. Table 16 -1 These types of soils have a shear wave velocity in the range of 600 to 1,200 fl/sec and an undrained shear strength of 1,000 -2,000 psf with blow counts in the range of 15 -50 blows per foot. The following may be used for the seismic coefficients. Seismic Coefficient Ca Cv Summary Z=0.3 0.36 0.54 ) LIQUEFACTION POTENTIAL: In our review we found no evidence of liquefaction of the soils in the immediate area from any recent earthquakes. Also, the site is located within the category III region of the Des Moines quadrangle liquefaction susceptibility map (GM -41) which has a low susceptibility rating for liquefaction; therefore, we consider the site as having a low susceptibility to any seismic liquefaction. When the plans and specifications are complete, or if significant changes are made in the character or location of the proposed structures, a consultation should be arranged to review them regarding the prevailing soil conditions. Then, it may be necessary to submit supplementary recommendations. It is recommended that the services of our firm be engaged to test and evaluate the soil conditions during the construction phase of the project. The design values and recommendations made herein are valid only insomuch as they are followed during the construction phase. Additionally, monitoring and testing during the construction phase needs be performed to verify the subgrade conditions and that suitable materials are used and that they are properly placed and compacted. While the recommendations made herein are considered sufficient in detail for the construction of the proposed project, there are many alternative methods of construction which are available. We can discuss various other options for construction at your request. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 PHONE: (253) 833 -7967 Fox: (253) 735 -2867 Report # 04001 -067 Page 8 of 14 ' Z Z w 6 00 CO o w i- w o L ? w d. I H = I- O Z F- al ill U � O — O I— WW H r_ 4- O w Z U = O 1- z SOIL PROPERTY SYMBOLS Q ■: Q: r M: LL: PI: DD: WD: WT: INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION/PROJECT MANAGEMENT SPECIALIZING IN ROADS 8 BRIDGES HTTP: //vwIwsPEARS- ENGINEERING. COM Standard "N" penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2 inch O.D. split- spoon. Unconfined compressive strength, tons/ft Penetrometer value, unconfined compressive strength, tons/ft Vane value, ultimate shearing strength, tons/ft Water content, % Liquid limit, % Plasticity index, % Natural dry density, lbs/ft Natural wet density, lbs/ft Apparent groundwater level at time noted after completion. DRILLING AND SAMPLING SYMBOLS SS: Split -Spoon - 1 3/8" I.D., 2" O.D., except where noted. ST: Shelby Tube - 3" O.D., except where noted. AU: Auger Sample. GB: Grab Sample. DB: Diamond Bit. CB: Carbide Bit. WS: Washed Sample. Geotechnical General Notes RELATIVE DENSITY AND CONSISTENCY CLASSIFICATION Terms (Non - Cohesive Soils) Very Loose Loose Slightly Compact Medium Dense Dense Very Dense PARTICLE SIZE Terms (Cohesive Soils) Very Soft Soft Firm (Medium) Stiff Very Stiff Hard Boulders Cobbles Gravel Bin.+ 8in. -3in. 3 in. -5nun P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Coarse Sand Medium Sand Fine Sand Standard Penetration Resistance 0 -2 2 -4 4 -8 8 -16 16 -26 Over 26 Standard Penetration Resistance 0 -2 2 -4 4 -8 8 -15 15 -30 Over 30 5 mm - 0.6 mm 0.6 nun -0.2mm 0.2 mm - 0.074 mm PHONE: (253) 833 -7967 FAX (253) 735 -2867 SPEARS ENGINEERING & TECHNICAL SERVICES Q. - (tons/ft 0 - 0.25 0.25 - 0.50 0.50 - 1.00 1.00 - 2.00 2.00 - 4.00 4.00+ Silts 0.074 mm - 0.005 mm Clays 0.005 mm & Smaller Report # 04001 -067 Page 9 of 14 z W . JU 00 co 0 J = H � LL W 0 u_ u) w = z I- -O Z I- U D O N O I— w u- w 0 I . .'asu::�::u;u�:stFt�'+' • .., F��'% y,:- v. i:: Sx. 1atS:; w,.. isILJ. a:; al.:: u: s.L'raaval:�;r...:biiS.r- :'1r.: INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION /PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: //WWW.SPEARS- ENGINEERING.COM \ ( Sn thist Park i . l, � r RNevkriGea i I ceirelerY � 139th St vi • , ` , S -13)th St � . l _. .... �, . 41 Slt�Tec 3 °140th St S _1401b 51 ; — m ._. �. Q . d E M IS 142WJ SC ° I . ".� , to : _. ` ; . 1 �f 1 .-- Cr) -- ----- - -,.-- - -s 14401 Sr_ ___ _ .___.__._ , r .._ _ _ ..__ . t i1 Co. At Ml oaofl Co •. andf., o. .All AN iunnnd. f P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Site Location PHONE: (253) 833 -7967 FAX: (253) 735-2867 SPEARS ENGINEERING & TECHNICAL SERVICES Report # 04001 -067 Page 10 of 14 —1• z -z . rt JO 00 c o W i w � I F- W Z _.. 1— 0 Z w • w 0 O — O I- 11.1 u j I U. 1- Z W • C° = O ~ Z S INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION /PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP : //WWW.SPEARS- ENGINEERING.COM P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Site Plan with Boring Log Locations Site plan supplied by Barghausen Consulting Engineers PHONE: (253)833 -7967 Fax: (253)735 -2867 SPEARS ENGINEERING & TECHNICAL SERVICES HELL WIG'S ADD UNRECORDED BLOCK 1 LOT 3 Report # 04001 -067 Page 11 of 14 Z Ct W aa = 10 00 U) 0 J N LL W 0 lL = ▪ W 1.0 Z • W U � O — O I- W W I - r - - O Z W = Off"'. Z INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION /PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP : //WWW.SPEARS- ENGINEERING. COM P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Boring Log #1 SPEARS ENGINEERING & TECHNICAL SERVICES (R) 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 a Date: 4/27/2004 soling Log I I Boling Type: Hollow Stem Hand Auger Field Change Description in Soils %M Topsoil SM, Silty Sand with Gravel ML, Sandy Silt ML, Sandy Silt with Gravel end ofboring 16.1% 26.7% 24.5% V % "A' 1.00 90.1% 82.2% 1.25 100.0% 99.9% 1.50 95.8% File 4: 04001 -067 Client: Saraj Khan Depth Drilled: 10 feet % -44 % -#40 %4200 Comments 86.2% 65.3% 95.5% 59.8% 31.9% 66.2% 52.6% AU, moist, mottled AU, moist, dark brown to grey, firm AU, wet, grey, still' Boring Log #2 th (R) 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Field Description Topsoil ML, Sandy Silt ML, Sandy Silt ML, Sandy Silt with Gravel end of baring Date: 4/27/2004 Boring Log it: 2 Boring Type: Hollow Stem Hand Auger Change in Soils %M 32.9% 30.0% 27.4% V % }/4 0.75 100.0% 1.00 100.0% 1.50 ! 97.6% File 4: 04001 -067 (]lent: Saraj Khan Depth Drilled: 10 feet %-/14 %-#40 %-4200 Cormlerds 99.5% 99.4% 78.5% 94.6% 59.6% 95.9% 66.8% 64.5% : 56.1% 4 AU, wet, mottled AU, wet, dads brown to grey, firm AU, wet, grey, stiff PHONE: (253) 833 -7967 FAx: (253) 735 -2867 Report # 04001 -067 Page 12 of 14 INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION /PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP: //1MMN.SPEARS- ENGINEERING.COM D* (Ft) 1.0 2.0 3.0 4.0 5.0 r 6.0 : r Field Description Topsoil SM, Silty Sand with Gravel ML, Sandy Silt 7.0 r 8.0 f 9.0 10.0 end of boring ML, Sandy Silt with Gravel Date: 4/27/2004 Boring Log #: 1 Boring Type: Hollow Stem Hand Auger Change in Soils %M 26.8% 19.1% r r 15.6% : 2.00 f a. V % %" %-#4 %-#40 %#200 Comments r Y i i Y 1.25 : 96.0% ; 84.8% : 62.9% : 37.3% :AU, moist, mottled Y Y Y Y Y I I I I 1 I I I I 1.50 File it 04001-067 Client Saraj Khan Depth Drilled: 10 feet 95.2% ; 88.4% ; 78.6% ; 62.6% AU, moist, reddish/dark brown/grey, :firm 1. 1 I 1 1 r I I I 1 I I I . 1 r r r r r I I I I I I I ✓ r P : : 98.2% : 84.3% : 63.3% : 55.7% :AU, moist, greyish brown, stiff ✓ r 'r 'r f I i. i i. i. 1. I I I 1 • a. P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Boring Log #3 PHONE: (253) 833 -7967 FAX: (253) 735 -2867 SPEARS ENGINEERING & TECHNICAL SERVICES Report # 04001 -067 Page 13 of 14 1 W . CO 6 CI W= J H M lL w g u. to ' E- C) Z I-- • 0 • cn .O -. O I--. IU LLO w = • O~ • Z S INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTION /PROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP : //WWW.SPEARS- ENGINEERING.COM A: Looking northwest across Macadam Road South at the north 'A of the site. Note the lush vegetation and the lack of any indications of slope instability. C: Looking south from Macadam Road South at the north end of the project site. The driveway (adjacent property to the north) in the foreground is actually on the project site P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Site Photos PHONE: (253) 833 -7967 FAX: (253) 735 -2867 SPEARS ENGINEERING & TECHNICAL SERVICES B: Looking northwest across Macadam Road South at the south ''A of the site. Here again the existing slope appears to be very stable. Tree growth indicative of the high moisture contents of the native soils. D: Looking north on site at the cut bench area where the previous residence was located. In the area of boring #2. Report # 04001 -067 Page 14 of 14 c i•.jy •••. .J :f'Y: ^'�.'^': Y.v ..etF':�Y .., fib. ° .. Collons Engineering, LLC 195 Front Street N • Issaquah, WA 98027 p: (425) 369 -1101 • f: (425) 369 -1157 February 20, 2005 . Mr. Bob Benedicto, Building Official City of Tukwila 6300 Southcenter Blvd. Suite 100 Tukwila, WA 98188 RE: Building Permit plan Review Khan Detention Vault Project No. D04 -426 Dear Mr. Benedicto: Structural Sincerely, Collons Engineering, LLC Bryan L. Collons, PE, SE Encl. cc: Hal Grubb, Barghausen Phil Brazil, Reid Middleton DOZ,I, RECEIVED FEB 2 8 2005' COMMUNITY DEVELOPMENT REVIEWED FOR CODE COMPLIANCE MAR - 2 2005 City Of `i uRwiia BUILDING DIVISION 2VOLI bids' Ops Jo -42l0 As requested in your review memo dated December 6, 2004 we have reviewed our calculations and plans and made corrections where noted. The attached drawings and supplemental or revised calculations are submitted for your review. FILE COPY '- fr - - - - -- I. Completed special inspection forms will be provided by the owner. 2. Mr. Frank Spears of Spears Engineering & Technical Services has provided the attached letter confirming the use of 4,000 psf allowable bearing for the footing design. 3. We have reviewed the slab for a 16 kip point load point load located at mid -span and at the slab edge for the worst moment and shear conditions. The reinforcing and concrete strength shown on the plan are adequate for the imposed loads. Attached are supplemental calculations for your review. It was not necessary to update the plans. 4. The footing depth and reinforcing is specified in the table on sheet S2. For a 2' -3" wide footing the depth is 12 ". 5. Detail 20 /S I and the loading criteria have been revised to reflect the appropriate grade elevations. The design is unchanged. See also item 3. 6. See response to item 2. Please contact me directly if you have any questions. The owner is anxious to resolve permit issues expeditiously. I will be out of the office February 20th & 2I st. •1q z • z re QQ � J U O 0 N � _ w 0 ▪ < co d = w I- z � I- 0 Z ~ U � 0 o F- LU W u- z u. 0 z • 2/4/2005 9:50 AN FROM: Spears Engineering Spears Engineering _rechncial Services, PS MA CONTRACTING 306N 1 Kent, WA 98032 Attn: Mr. Sabir Khan Gentlemen: INSPECTION & TESTING SERVICES GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING CONSTRUCTIONIPROJECT MANAGEMENT SPECIALIZING IN ROADS & BRIDGES HTTP : / /WWW.SPEARS- ENGINEERING.COM Re: Project: Report Date: As per your request, we have reviewed the allowable soils bearing report prepared for the above referenced job site. As per our discussions with Collons Engineering, LLC it is our understanding that the detention vault will be placed at 11 feet below the existing grade. hi accordance with generally accepted engineering practice the net allowable soils bearing capacity of 2,000 psf may be increased to 4,000 psf due to depth at which the soils bearing will be applied for the vault.. The soils bearing may also he increased by another 1/3` for seismic loading conditions. Additionally, we were on -site at the project to begin monitoring the subgade excavation. There will be approximately 3,000 yds' removed from the site and two retaining walls constructed that are 10 -11 feet in height. We discussed with the site foreman that excavation and placement of the upper wall will need to he completed prior to excavating for the lower retaining wall. It is critical that during these wetter winter months that proper drainage of the site be maintained and that the exposed subgrade he covered with plastic as much as possible to protect the subgrade from becoming saturated. We appreciate this opportunity to be of service to you and we look forward to working with you in the future If you have any questions concerning the above items, the procedures used, or if we can he of any further assistance please call us at (253) 833 -7967. cc: Bryan Collons, Cottons Engineering, LLC Hal Grubb, Barghausen Consulting Engineers P.O. Box 1007 AUBURN, WASHINGTON 98071 -1007 Site Inspection 3 -Lot Project on Macadam Road South @ S 138 Street 02/04/2005 Respectfully Submitted, SPEARS ENGINEERING & TECHNICAL SERVICES J. Frank Spears, P.E. Principle PHONE: (253) 833-7967 FM: (253) 735 -2867 Page 2 of 8 PAGE: 001 OF 001 SPEARS ENGINEERING & TECHNICAL SERVICES I EXPIRES 06/16/05 I Report # 05001.016 Page 1 of 1 Z 1 z w c 11 6 00 NC W = J CO u. w L1< N rr = ? • z0 U � ON 0 W H� O Z UN 1= _ O~ Z • Page 3 of 8 COLLONS ENGINEERING 195 Front Street North • Issaquah, WA 98027 p: (425) 369.1101 • F (425) 369.1157 PF2M t r ' t•4 N T S By BLG Sheet 11 EY1 S C/a -ADC- - 13o ko I 34.ID 1 s (Z9 Covert - t2 5 -6 A AT wc�rt�,t �✓�5 Ave Gt S 133,30' �L= zkofe,F. C am Q C v N \ rOR-M ') 5 . Pa , ► .sr 34,1 b __ ________ 1 - St Iv- ot CMG, S 4 �(L u rh2..- M = ozno < 11 1 3 . 69 'AO Project Khan 3 -Lot Development Project Na 04-016 l �K Date 7 "//9 , 10.5 Sketch C -IL pbiL_sr Lb e ` "J', s �U�c:l2 *. ';'+1 ;�`t� ) ! �J� rDT ?- ' C..O As = 5. LA o.coostA /6 i3 11 - 15io poten Is %) t✓" r 1 ...,.. ui Vai;%411 _ f:.:is'1L::f.:iGa.ii..�..roi.Sz sdst `::k d•i i; COLLONS ENGINEERING 195 Front Street North • Issaquah, WA 98027 Protect Khan 3 - Lot Development p: (425) 369.1101 • f: (425) 369.1157 FSQ -MAT c.t■Muer\rS . 6t iri • c' 4 Gvv 6g- C OOH r II c 8Z Cr) VF L � � Protect No, 04016 Date Zl /.;4 0 By BLG 9,E. C.ovrk - Zag C_oNvbcC- Tt4-tb&A �SvtL w!� I Sb( l) v p�1= k f 2 "Soil, lav�C -)4- ") z Z 1 8. H (zo/, Y 1-4 (o.BZs 4 0.82:0 \. -7 /- z' = lb, 424 \lo_ Iq•'1241 y 2 6.41-r ►(_ =) I (b`l CSZGL- P Page 4 of 8 Sketch Sheet 1 Z re 11 4 aa � JU O 0 • 0 W= W O J < w = W H !— O Z 1- W U O N O I— WW I LL O tai Z 0 Z ADAPT - STRUCTURAL CONCRETE SOFTWARE SYSTEM ADAPT -RC Version 4.01 Date: 2/20/2005 Time: 1:32:07 PM File: Khan -Point 1- PROJECT TITLE Khan Vault Lid 1.1 DESIGN STRIP Khan - Point 2 - MEMBER ELEVATION [ft) 9 ^ 11.00 l-r ___,„ 3 -TOP REBAR 3.1 User selected 3.2 User selected 3.3 ADAPT selected 3.4 ADAPT selected 5 - BOTTOM REBAR 5.1 User selected 5.2 User selected 5.3 ADAPT selected 5.4 ADAPT selected : ®3 #7X90_ : 6 - REQUIRED & PROVIDED 6.1 Top Bars ma a -. r in equired .... __.. _. °'- provided 1.0 BARS 0.00 -_ I I I 1 2.>` 6.2 Bottom Bars a rnax 3.36 8 - LEGEND 9 - DESIGN PARAMETERS 9.1 Code: ACI P = 5 ksi f = 60 ksi (longitudinal) f = 60 ksi (shear) 9.2 Rebar Cover: Top = 1 in Bottom = 1 in Rebar Table: ASTM - US Customary bars (Non- redistributed Moments) 10 - DESIGNER'S NOTES Page 5 of 8 Z W 6 J U 0O' N D -- U) WO }} J LL Q � Z = F- ' 1— O Z LU I- U � c o 0 1- W UJ Z I- - . I- . 0 Z U= o • Z • ADAPT CORPORATION STRUCTURAL CONCRETE SOFTWARE SYSTEM 1733 Woodside Road, Suite 220, Redwood City, California 94061 ADAPT -RC FOR REINFORCED CONCRETE BEAM /SLAB DESIGN Version 4.01 AMERICAN (ACI- 318- 99 /UBC -1997) ADAPT CORPORATION - Structural Concrete Software System 1733 Woodside Road, Suite 220, Redwood City, California 94061 Phone: (650)306 -2400, Fax: (650)364 -4678 Email: Support @AdaptSoft.com, Web site: http: / /www.AdaptSoft.com DATE AND TIME OF PROGRAM EXECUTION: Feb 20,2005 At Time: 13:32 PROJECT FILE: Khan - Point P R O J E C T T I T L E : Khan Vault Lid Khan - Point 1 - G E N E R A L D E S I G N PARAMETERS CONCRETE: STRENGTH at 28 days, for BEAMS /SLABS 5000.00 psi for COLUMNS 3000.00 psi MODULUS OF ELASTICITY for BEAMS /SLABS 4030.00 ksi for COLUMNS 3604.00 ksi CREEP factor for deflections for BEAMS /SLABS 2.00 CONCRETE WEIGHT NORMAL SELF WEIGHT 150.00 pcf REINFORCEMENT: YIELD Strength 60.00 ksi Minimum Cover at TOP 1.00 in Minimum Cover at BOTTOM 1.00 in ANALYSIS OPTIONS USED: Structural system ONE -WAY Moment of Inertia over support is NOT INCREASED Effective flange width consideration NO 2 - I N P U T G E O M E T R Y S F( P OI A RI LENGTH! WIDTH N MI ft I in -1 3 - - - -4 5 1 1 11.00 72.00 LEGEND: 1 - SPAN C = Cantilever < - -- CLASS - - -> D = DEAD LOAD L = LIVE LOAD 1 L C 1 D U 1 SW U 2.1.1 PRINCIPAL SPAN DATA OF UNIFORM SPANS DEPTH! in I 6 12.00 2.2 - S U P P O R T W I D T H A N D SUPPORT < LOWER COLUMN > WIDTH LENGTH B(DIA) D CBC* JOINT in ft in in - -1 2 3 4 5 6 1 .00 8.00 120.00 8.00 (2) 2 .00 8.00 120.00 8.00 (2) 3 - I N P U T A P P L I E D LOAD I N G I TOP IBOTTOM /MIDDLEI I FLANGE I FLANGE I REF I width thick.! width thick.IHEIGHTI in in I in in I in I 7 8 9 10 - - - -11 -12.00 *THE COLUMN BOUNDARY CONDITION CODES (CBC) Fixed at both ends ...(STANDARD) Hinged at near end, fixed at far end Fixed at near end, hinged at far end Fixed at near end, roller with rotational fixity at far end TYPE > U = UNIFORM P = PARTIAL UNIFORM C = CONCENTRATED M = APPLIED MOMENT Li= LINE LOAD Intensity ( From ... To ) ( M or C SPAN CLASS TYPE k /ft "2 ( ft ft ) (k -ft or k -1 2 3 4 5 6 7 .480 .00 11.00 .00 11.00 NOTE: LIVE LOADING is SKIPPED with a skip factor of C O L U M N D A T A 16.00 5.50 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR "'HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 1.00 Khan- Point.doc Page 6 of 8 MULTIPLIER left right 12- - - -13- .50 .50 3 - FORM 1 = Rectangular section 2 = T or Inverted L section 3 = I section 4 = Extended T or L section 7 = Joist 8 = Waffle 11 - Top surface to reference line UPPER COLUMN > LENGTH B(DIA) D CBC* ft in in 7 8 9--- -10 - -- .00 .00 .00 (1) .00 .00 .00 (1) ...At) ...ft) 8 1 2 3 4 Total on Trib k /ft 9 2.880 .900 1 of 3 3.1 - LOADING AS APPEARS IN USER'S INPUT SCREEN PRIOR TO PROCESSING 4.1 For Uniform Spans and Cantilevers only UNIFORM (k /ft ^2), ( CON. or PART. ) (MOMENT ) SPAN CLASS TYPE LINE(k /ft) ( k @ft or ft -ft ) ( k -ft @ ft )_ - 1 2 3 4 5 6 7 8 1 L C 16.00 5.50 1 D U .480 NOTE: SELFWEIGHT INCLUSION REQUIRED LIVE LOADING is SKIPPED with a skip factor of Note: - -- = Span /Cantilever is Nonuniform, see block 4.2 1.00 4 - C A L C U L A T E D S E C T I O N P R O P E R T I E S SPAN AREA I Yb Yt in ^2 in ^4 in in - 1 2 3 4 5 1 864.00 .1037E +05 6.00 6.00 5 - DEAD LOAD MOMENTS, SHEARS & REACTIONS < 5.1 SPAN M OMEN T S (k -ft) > < 5.2 SPAN SHEARS (k) > SPAN M(1)* midspan M(r)* SH(1) SH(r) -1 2 3 4 5 6 1 .00 57.17 .00 -20.79 20.79 Note: * = Centerline moments Note: * = Centerline moments Calculated as ( 1.40D + 1.70L) 10.1 FACTORED DESIGN MOMENTS (k -ft) Note: * = face of support 10.2 FACTORED REACTIONS 10.3 FACTORED COLUMN MOMENTS (k -ft) (k) < -- LOWER column - -> < -- UPPER column - -> JOINT < 5.3 REACTIONS (k) > <- 5.4 COLUMN MOMENTS (k -ft) -> JOINT max min max min max min - -1 2 Lower columns - -- -Upper columns -1 2 3 4 5 6 7 1 20.79 .00 .00 1 42.71 29.11 .00 .00 .00 .00 2 20.79 .00 .00 2 42.71 29.11 .00 .00 .00 .00 6 - L I V E L O A D M O M E N T S , S H E A R S & R E A C T I O N S S < -- 6.1 L I V E LOAD SPAN MOMENTS (k -ft) and SHEAR FORCES (k) - -> < left* > < - -- midspan - - -> < - - -- right* > <- -SHEAR FORCE - -> SPAN max min max min max min left right - 1 2 3 4 5 6 7' 8 9 -- 1 .00 .00 44.00 .00 .00 .00 -8.00 8.00 <- 6.2 REACTIONS (k) -> < 6.3 COLUMN MOMENTS (k -f t) > < - -- LOWER COLUMN - - -> < - -- UPPER COLUMN > JOINT max min max min max min - -1 2 3 4 5 6 7 - -- 1 8.00 .00 .00 .00 .00 .00 2 8.00 .00 .00 .00 .00 .00 10 - F A C T O R E D M O M E N T S & R E A C T I O N S < left* > < - - -- midspan - - - -> < right* > SPAN max min max min max min - 1 2 3 4 5 6 7 1 .00 22.44 154.85 80.04 .00 22.44 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Page 7 of 8 - Khan- Point.doc 2 of 3 11 - M I L D STEEL Top bar extension beyond where required Bottom bar extension beyond where required 11.1 - M I L D S T E E L - T O T A L 11.1.1 TOP STEEL SELECTION AT MID -SPAN (in ^2) < -- SELECTION - -> SPAN ( ULT MIN *) NO SIZE LENGTH - -1 2 3 4 - - -5 6 1 ( .00 .00) 11.1.2 TOP STEEL SELECTION AT SUPPORTS (in ^2) < -- SELECTION - -> JOINT ( ULT MIN *) NO SIZE LENGTH - -1 2 3 4 - - -5 6 1 ( .00 .00) 2 ( .00 .00) 11.1.3 TOTAL WEIGHT OF REBAR = 134.9 lb S T R I P 12.00 in 12.00 in BOTTOM STEEL AT MID -SPAN (in ^2) < -- SELECTION - -> ( ULT MIN *) NO SIZE LENGTH 7 8 9- 10 11- ( 3.36 1.56) 6 # 7 x 1l' -0" BOTTOM STEEL AT SUPPORTS (in ^2) < -- SELECTION - -> ( ULT MIN *) NO SIZE LENGTH 7 8 9- 10 11- ( .00 .00) ( .00 .00) AVERAGE = 2.0 psf Note: Min* = Minimum rebar listed under column 3 and 8 is calculated based on "rho min = .0018 b h * (60ksi) " Number of bars listed under column 4 is based on either area of bar under column 2 or column 3, whichever is larger. Number of bars listed under column 9 is based on either area of bar under column 7 or column 8, whichever is larger. 11.4 - S E L E C TI O N . O F R E B A R 11.4.1 STEEL PROVIDED SPAN ID LOCATION NUM BAR LENGTH [ft] AREA (in ^2] - - 1 - - - -2 3 4 - - - -5 6 7 1 1 B 3# 7 x '13'0" 1.80 1 2 B 3# 7 x 9'0" 1.80 Notes: Bar location - T = Top, B = Bottom. NUM - Number of bars. Refer to steel disposition tables and PTsum graphical display for positioning of bars. 11.4.2 STEEL DISPOSITION - TOP BARS I TOP STEEL 1 SPAN 1 ID LOCATION 1 NUM BAR LENGTH [ft]I - 1-- - -1 - -2 3 ) --- 4 - - - - 5 6 1 11.4.3 STEEL DISPOSITION - BOTTOM BARS BOTTOM STEEL 1 LOCATION I NUM BAR LENGTH (ft)1 3 I --- 4 - - - - 5 6 1 FULL I 3# 7 x 12'0" 1 RIGHT 1 3# 7 x 7'7" I 1 12 - S H E A R D E S I G N FOR BEAMS AND ONE -WAY SLAB SYSTEMS (ACI 318 -89) No shear reinforcement required 13 - MAXIMUM SPAN D E F L E C T I O N S Concrete's modulus of elasticity Ec = 4030.00 ksi Creep factor K = 2.00 Values in parentheses are (span /max deflection) ratios < DEFLECTION ARE ALL IN inches, DOWNWARD POSITIVE > SPAN DL DL +CREEP LL DL +LL +CREEP -1 2 4 5 6 1 .03 .09( 1479) .03( 4037) .12( 1082) Khan- Point.doc NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Page 8 of 8 3 of 3 Collons Engineering, LLC 195 Front Street North • Issaquah, WA 98027 p: (425) 369 -1101 • f: (425) 369 -1157 P Khan 3 -Lot Development Detention Vault Project Khan 3 -Lot Development Location Tukwila, Washington Contractor Saraj Khan American Canadian Real Estate, Inc. PO Box 3280 Kent, WA 98032 Structural Bryan Collons, P.E., S.E. Project Number 04 -096 Date REVIEINED FOR CODE COMPLIANCE isroopoltro MAR - 2 4305 City or Thkw a�In,�la BUILDING DIVISION n. � yN1. MItl..M �'Y.MI x � w At�:wryyyt�Y1 November 24, 2004 FILE Cop g2 nrg" ". p4, n. Atrat NOV 29 Z PEaMirC �I /ZkId EXPIRES 11/2/200V COLLONS ENGINEERING 195 Front Street North • Issaquah, WA 98027 p: (425) 369.1101 • f: (425) 369 -I 157 W t\ 1 32. Z IS 3A. 12d 34\'1 ■•'1 Project Khan 3 -Lot Development Project No. 04-016 Date Sketch By BLG Sheet Cif PLA l 3L Jz� 1 34 - Na 1 Project Information Khan 3 -Lot Development Detention Vault Tukwila, Washington Saraj Khan American Canadian Real Estate, Inc. PO Box 3280 Kent, WA 98032 Geotechnical Report Reference Spears Engineering & Technical Services Report 04001 -067. Dated May 3, 2004 Vault Geometry Length 42.00 ft - Interior Dimensions Width Cell 1 11.00 ft - Interior Dimensions Lid Thickness 1.00 ft Soil grade over vault Max. 134.00 ft Min. 131.00 ft Under Side of Vault Lid 128.50 ft Top of Vault Lid 129.50 ft Vault Bottom 120.13 ft Soil Cover Wall Height Loading Criteria AASHTO Loading H2O (H20 or H25) Surcharge 240 psf Equivalent Loading 80 psf uniform thrust 2.00 ft of additional fill Geotechnical Design Values Allowable Soil Bearing Native Soil 4,000 psf Struct'l Fill 4,000 psf Detn Vault 1- span.xls 11/24/2004 1:48 PM 4.50 ft 8.37 ft Material Strengths Concrete Walls 3,000 psi Footings 3,000 psi Lid 5,000 psi Reinforcing Steel 60,000 psi Project Number 04 -096 Z EFP Restrained 40 pcf EFP passive 420 pcf EFP uniform - seismi 167 psf 34 Seismic load of 34 x wall height / 1.7. Actual seismic load fac EFP uniform - gravity psf Uniform pressure of 0 x wall height. Live load factor = 1.7 Friction Coeff. 0.45 Soil Density 120 pcf Lid Density 150 pcf (85 pcf =HCP, 150 = Concrete) - of 10 Project Information Khan 3 -Lot Development Project Number 04 -096 Detention Vault Tukwila, Washington Saraj Khan American Canadian Real Estate, Inc. PO Box 3280 Kent, WA 98032 Exterior Walls Wall Thickness 8.00 in Soil Grade at Calculation Point: 134 ft Concrete Strength 3,000 psi Rebar Grade 60,000 psi Soil Pressure top 467 psf base 802 psf Design Values Service Factored 1.7 Moment 5,672 lb -ft 9,643 lb -ft R top 2,423 lb 4,119 lb R bot 2,890 lb 4,913 lb Reinforcing Wall Shear Footing dowel Slab dowel Shear, Vn, at top of wall Shear, Vn, at base of wall Detn Vault 1- span.xls 11/24/2004 1 :48 PM Horizontal Reinforcing Options: Rho Horiz #4 @ 12 in o/c rho = 0.0020 #5 @ 18 in o/c rho = 0.0020 #6 @ 18 in o/c rho = 0.0025 Crack Control z - limit to 145 k /in Vertical Reinforcing Options: fs [ksi] dc [in] Ac [in2] z [k /in] #5 @ 9 in o/c 24 2 36 100 OK #6 @ 13 in o/c 24 2 52 113 OK #7 @ 18 in o/c 24 2 72 126 OK #8 @ 24 in o/c 24 2 96 138 OK #5 #5 One -way shear, Vc, with dowels at center of wall 5.26 kips /ft One -way shear, Vc, with dowels at inside face of wall 7.89 kips /ft Wall shear OK Footing dowel shear with friction coefficient = 1.0 & #5 dowel 18.60 kips /bar Place #5 footing dowels 2- inches from inside wall face. Space dowels at 38 o/c max. Space dowels at 46 o/c max. Place #5 slab dowels in center of wall. 4.85 kips /ft 5.78 kips /ft z Z • w .J U. U O (I) J H WO u. co 7 - 1 Z I- w z � I-O Z O • N w O ui 0 z ;4+.. ; .:: r ;,,::. • Project Information Khan 3 -Lot Development Detention Vault Tukwila, Washington Project Number 04 -096 'of (0 Saraj Khan Z American Canadian Real Estate, Inc. Q PO Box 3280 W Kent, WA 98032 a 1. JU 0 u) 0 Exterior Footing - ALL Si DES J to Footing Thickness 12.00 in Soil Grade at Calculation Point: 134 ft U- • . Wall Thickness 8.00 in Allowable Soil Bearing: 4000 psf W O Tributary Width 6 ft J Concrete Strength 3,000 psi t� a Rebar Grade 60,000 psi = W 1- _ ' z r . Design Loads Service Service Factored H O . Dead Soil 540 psf 2,970 plf 4,158 plf w ~ uj Lid 150 psf 925 plf 1,295 plf Wall 837 plf 1,172 plf U N Ftg weight 338 plf 0 Soil Wedge at Heel 1,318 plf W W Live Surchai 240 psf 1,480 plf 2,516 plf - U 7,867 plf 9,141 plf Z iii Width 1.97 ft Use 2.25 ft Wall Load for Slender Design Soil Bearing Service 3,497 psf DL 3,895 plf O F- Factored 4,063 psf LL 1,480 plf Z Moment Mu 5.1 kip -ft Shear Vu 0.5 kip Vn 0.6 kip Vc Shear OK, calculation not required, cone shear failure. Reinforcing Longitudinal Reinforcing Options: 3 #4 2 #5 2 #6 Detn Vault 1- span.xls 11/24/2004 1 .4R PM Transverse Reinforcing Options: #5 @ 21 in o/c #6 @ 31 in o/c #7 @ 42 in o/c #8 @ 55 in o/c Transverse reinforcing not required. Cone shear failure. Project Information Khan 3 -Lot Development Detention Vault Tukwila, Washington Buoyancy Saraj Khan American Canadian Real Estate, Inc. PO Box 3280 Kent, WA 98032 Vault Geometry Length Width Lid Thickness Detn Vault 1- span.xls 11/24/2004 1:48 PM Soil grade over vault Under Side of Vault Lid Vault Bottom Bottom of slab Soil Cover Wall Height Allowable Water Table Potential uplift Walls Lid Soil Cover Footings Floor 5 in thick Soil Column 19.00 in proj Slab Rebar T = 1123 plf As = 0.021 in ^2 /ft Callout: #4 @ 10 oc transverse 43.3 ft - outside dimensions 12.3 ft - outside dimensions 1.00 ft 132.50 ft 128.50 ft 120.13 ft 119.71 ft 1.50 ft 8.4 ft 124.0 ft 128,648 lb 93,186 lb 6,681 lb 96,200 lb 37,575 lb 33,403 lb 267,044 lb 179,803 lb Ratio 3.473 Set footing drain no higher than Elev. 124.00 ft Floor Slab Gross Uplift 266.6 psf Slab Weight 62.5 psf Net Uplift 204.1 psf Project Number 04 -096 Average Cover Depth perimeter only perimeter only Vu = 1.91 klf Vn =2.25 klf Vc = 3.29 klf 5 of /0 Total amount of ftg that extends beyond the wall face. Accounts for both sides of the vault. Accounts for dry soil above ftg drain only. « Design floor reinforcing for net uplift » COLLONS ENGINEERING 195 Front Street North • Issaquah, WA 98027 p: (425) 369.1101 • f, (425) 369.1157 ths-vuT L � . CO j 4,s' SOIL — p 4, sx. )moo = SAD pSF L■ E L b Z SOIL. z40?5F b S cot.) wr1T1- �F, , 4, ovop Protect Khon 3 -Lot Development Project No. 04 -016 Date Sketch 10 / 16 By BLG Sheet LP ADAPT - STRUCTURAL CONCRETE SOFTWARE SYSTEM ADAPT -RC Version 4.01 Date: 11/24/2004 Time: 1:37:23 PM File: Khan 1- PROJECT TITLE Khan Vault Lid 1.1 DESIGN STRIP 2 - MEMBER ELEVATION [ft] 11.00 0 ___.L 3 - TOP REBAR 3.1 User selected 3.2 User selected 3.3 ADAPT selected 3.4 ADAPT selected .—.-- . ® 9 #5x2'0" 5 - BOTTOM REBAR 5.1 User selected 5.2 User selected 5.3 ADAPT selected 5.4 ADAPT selected . i Q13#7X12'0 6 - REQUIRED & PROVIDED BARS 6.1 Top Bars m2X 2.59 (in 1 required .._ . --- .. o. provided i 1. 2. 3. 6.2 Bottom Bars m 4.51 8 - LEGEND 9 - DESIGN PARAMETERS 9.1 Code: ACI P, = 4 ksi f = 60 ksi (longitudinal) f = 60 ksi (shear) 9.2 Rebar Cover: Top = 1 in Bottom = 1 in Rebar Table: ASTM - US Customary bars (Non- redistributed Moments) 10 - DESIGNER'S NOTES v „ ADAPT CORPORATION STRUCTURAL CONCRETE SOFTWARE SYSTEM 1733 Woodside Road, Suite 220, Redwood City, California 94061 ADAPT -RC FOR REINFORCED CONCRETE BEAM /SLAB DESIGN Version 4.01 AMERICAN (ACI- 318- 99 /UBC -1997) ADAPT CORPORATION - Structural Concrete Software System 1733 Woodside Road, Suite 220, Redwood City, California 94061 Phone: (650)306 -2400, Fax: (650)364 -4678 Email: Support @AdaptSoft.com, Web site: http: / /www.AdaptSoft.com DATE AND TIME OF PROGRAM EXECUTION: Nov 24,2004 At Time: 13:38 PROJECT FILE: P R O J E C T T I T L E : Khan Vault Lid 1 - G E N E R A L D E S I G N PARAMETERS CONCRETE: STRENGTH at 28 days, for BEAMS /SLABS 4000.00 psi for COLUMNS 3000.00 psi MODULUS OF ELASTICITY for BEAMS /SLABS 4030.00 ksi for COLUMNS 3604.00 ksi CREEP factor for deflections for BEAMS /SLABS 2.00 CONCRETE WEIGHT NORMAL SELF WEIGHT 150.00 pcf REINFORCEMENT: YIELD Strength 60.00 ksi Minimum Cover at TOP 1.00 in Minimum Cover at BOTTOM 1.00 in ANALYSIS OPTIONS USED: Structural system ONE -WAY Moment of Inertia over support is NOT INCREASED Effective flange width consideration NO Khan 2 - I NP U T G E O M E T R Y S Fl P 01 I A RI LENGTH WIDTH N Mj ft I in 1 3 - - - -4 5 1 1 11.00 120.00 LEGEND: 1 - SPAN C = Cantilever JOINT 1 1 1 1 1 2 c - -- CLASS - - -> D = DEAD LOAD L = LIVE LOAD SPAN CLASS TYPE -1 2 3 L D SW 2.1.1 PRINCIPAL SPAN DATA OF UNIFORM SPANS DEPTH in 6 12.00 3 - FORM 1 = 2 = 3 = 4 = 7 = 8 = 11 - Top 2.2 -SUPPORT W I D T H AND 3 - I N P U T A P P L I E D LOADING U .240 .00 U .540 .00 U .00 11.00 11.00 11.00 TOP BOTTOM /MIDDLE FLANGE f FLANGE I REF I width thick.I width thick.IHEIGHTI in in I in in I in I 7 8 9 10 - - - -11 -12.00 SUPPORT < LOWER COLUMN > < WIDTH LENGTH B(DIA) D CBC* LENGTH in ft in in ft 2 3 4 5 6 7 .00 8.00 120.00 8.00 (2) .00 .00 8.00 120.00 8.00 (2) .00 *THE COLUMN BOUNDARY CONDITION CODES (CBC) Fixed at both ends ...(STANDARD) Hinged at near end, fixed at far end Fixed at near end, hinged at far end Fixed at near end, roller with rotational fixity at far end < TYPE > U = UNIFORM P = PARTIAL UNIFORM C = CONCENTRATED M = APPLIED MOMENT Li= LINE LOAD NOTE: LIVE LOADING is SKIPPED with a skip factor of 1.00 Khan.doc NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR'tHAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. surface to reference line COLUMN DATA 1 2 3 4 MULTIPLIER left right 12- - - -13- .50 .50 Rectangular section T or Inverted L section I section Extended T or L section Joist Waffle 2.400 5.400 1.500 UPPER COLUMN B(DIA) D CSC` in in 8 9--- -10 - -- .00 .00 (1) .00 .00 (1) Intensity ( From ... To ) ( M or C ...At) Total on Trib k /ft "2 ( ft ft ) (k -ft or k ...ft) k /ft 4 5 6 7 8 9 1 of 3 OV 0 3.1 - LOADING AS APPEARS IN USER'S INPUT SCREEN PRIOR TO PROCESSING UNIFORM (k /ft"2), ( CON. or PART. ) ( MOMENT ) SPAN CLASS TYPE LINE(k /ft) ( keft or ft -ft ) ( k -ft a ft ) -1 2 3 4 5 6 7 8 1 L U .240 1 D U .540 NOTE: SELFWEIGHT INCLUSION REQUIRED LIVE LOADING is SKIPPED with a skip factor of 4 - C A L C U L A T E D SECTION P R O P E R T I E S 4.1 SPAN -1 1 For Uniform Spans and Cantilevers only Note: * = Centerline moments 1 AREA I Yb Yt in "2 in "4 in in 2 3 4 5 1440.00 .1728E +05 6.00 6.00 Note: = Span /Cantilever is Nonuniform, see block 4.2 5 - DEAD LOAD MOMENTS, SHEARS & REACTIONS < 5.1 SPAN M O M E N T S (k -ft) > c 5.2 SPAN SHEARS (k) > SPAN M(1)* midspan M(r)* SH(1) SH(r) -1 2 3 4 5 6 1 .00 104.36 .00 -37.95 37.95 JOINT < 5.3 REACTIONS (k) > <- 5.4 COLUMN MOMENTS (k -f t) -> -1 2 Lower columns - -- -Upper columns 1 37.95 .00 .00 2 37.95 .00 .00 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 6 -" L I V E L O A D M O M E N T S , S H E A R S & R E A C T I O N S c -- 6.1 L I V E LOAD SPAN MOMENTS (k -f t) and SHEAR FORCES (k) - -> < left* > < - -- midspan - > < - - -- right* > <- -SHEAR FORCE - -> SPAN max min Max min max min left right -1 2 3 4 5 6 7 8 9 -- 1 .00 .00 36.30 .00 .00 .00 -13.20 13.20 Note: * = Centerline moments <- 6.2 REACTIONS (k) -> < Calculated as ( 1.40D + 1.70L) 10.1 FACTORED DESIGN MOMENTS (k -ft) Note: * = face of support 6.3 COLUMN MOMENTS (k -f t) < - -- LOWER COLUMN - - -> c - -- UPPER COLUMN - - -> JOINT max min max min max min 1 2 3 4 5 6 7 - -- 1 13.20 .00 .00 .00 .00 .00 2 13.20 .00 .00 .00 .00 .00 10 -FACTORED MOMENTS & R E A C T I O N S < left* > c - - -- midspan - - - -> < right* > SPAN Max min max min max min -1 2 3 4 5 6 7 1 .00 31.48 207.78 146.07 .00 31.48 10.2 FACTORED REACTIONS 10.3 FACTORED COLUMN MOMENTS (k -ft) (k) < -- LOWER column - -> < -- UPPER column - -> JOINT Max min max min Max min -1 2 3 4 5 6 7 1 75.57 53.13 .00 .00 .00 .00 2 75.57 53.13 .00 .00 .00 .00 Khan.doc 2 of 3 11 - M I L D S T E E L Top bar extension beyond where required 12.00 in Bottom bar extension beyond where required 12.00 in 11.1 - M I L D STEEL - TOTAL 11.1.1 TOP STEEL SELECTION AT MID -SPAN (in - 2) c -- SELECTION - -> SPAN ( ULT MIN *) NO SIZE LENGTH -1 2 3 4 - - -5 6 1 ( .00 .00) 11.1.2 TOP STEEL SELECTION AT SUPPORTS (in - 2) < -- SELECTION - -> JOINT ( ULT MIN *) NO SIZE LENGTH -1 2 3 4 - - -5 6 1 ( .00 2.59) 9 # 5 x 1' -0" 2 ( .00 2.59) 9 # 5 x 1' -0" 11.1.3 TOTAL WEIGHT OF REBAR Note: Min* = Minimum rebar listed under column 3 and 8 on "rho min = .0018 b h * (6oksi) " Number of bars listed under column 4 is based on column 2 or column 3, whichever is larger. Number of bars listed under column 9 is based on column 7 or column 8, whichever is larger. 11.4 - S E L E C T I O N O F R E B A R STEEL PROVIDED S T R I P SPAN ID LOCATION NUM BAR LENGTH (ft] AREA [in - 1 - - - -2 3 4 - - - -5 6 7 1 1 T 9# 5 x 2'0" 2.79 1 2 T 9# 5 x 2'0" 2.79 1 3 B 8# 7 x 12'0" 4.80 BOTTOM STEEL AT MID -SPAN (in "2) < -- SELECTION - -> ( ULT MIN *) NO SIZE LENGTH 7 8 9 - -10 11 - -- ( 4.51 2.59) 8 # 7 x 11' -0" BOTTOM STEEL AT SUPPORTS (in < -- SELECTION - -> ( ULT MIN *) NO SIZE LENGTH 7 8 9 - -10 11 - -- ( .00 .00) ( .00 .00) 198.6 lb AVERAGE = 1.8 psf is calculated based either area of bar under either area of bar under Notes: Bar location - T = Top, B = Bottom. NUM - Number of bars. Refer to steel disposition tables and PTsum graphical display for positioning of bars. SPAN -1- 1 1 DESl IA" 1 b S- 4.gk \O 11.4.2 STEEL DISPOSITION - TOP BARS TOP STEEL ID LOCATION 1 NUM BAR LENGTH (ft]1 -2 3 1- --4- -- -5 6 1 1 LEFT 1 9 # 5 x 2'0" 2 RIGHT 1 9# 5 x 2'0" f l 11.4.3 STEEL DISPOSITION - BOTTOM BARS BOTTOM STEEL SPAN 1 ID LOCATION 1 NUM BAR LENGTH [ft]1 1-- - -f - -2 3--- 4 - - - -5 6 1 1 3 RIGHT 1 8# 7 x 11'11" 12 -SHEAR D E S IG N FOR BEAMS AND ONE -WAY SLAB SYSTEMS (ACI 318 -89) No shear reinforcement required 13 - MAXIMUM S P A N D E F L E C T I O N S Concrete's modulus of elasticity Ec = 4030.00 ksi Creep factor K = 2.00 Values in parentheses are (span /max deflection) ratios c DEFLECTION ARE ALL IN inches, DOWNWARD POSITIVE > SPAN DL DL +CREEP LL DL +LL +CREEP -1 2 4 5 6 1 .03 .10( 1350) .03( 5269) .12( 1075) 6.4s%nz1> �1 g I (v .� (,5 to Khan.doc NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 3 of 3 1 01 -02 -2007 HAL P. GRUBB, P.E. 1821572AVS KENT WA 98032 RE: Permit No. D04 -426 13821 MACADAM RD S TUKW Dear Permit Holder: City of Tukwila Steven M Mullet, Mayor Department of Community Development Steve Lancaster, Director • • In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or fmal inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writinE and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 02/09/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, shall, Permit Tec i cian xc: Permit File No. D04 -426 • • k 6300 Southcenter Boulevard, Suite #100, • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206 - 431.3665 z Iz �w J U 00 N = . w Q . N3 0 = w Z� F-0 Z F- 111 uj U D c o 0 - 0 l-- V H co Z O ~ z October 23, 2006 Sabir Khan AIA Contracting 306 N 1st Ave Kent, WA 98032 RE: Request for Extension Development Permit No. D04 -426 & D05 -069 Khan Development— 13821 Macadam Rd S Dear Mr. Khan: This letter is in response to your written request for an extension to Permit Numbers D04 -426 and D05- 069. The City of Tukwila Building Division will be extending the expiration date of your permits for an additional 180 days. Therefore the expiration date for Permit Numbers D04 -426 and D05 -069 is now February 9, 2007. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, A n fer arshall m i Te hnician File: Permit No. D04 -426 & D05 -069 P:Vennifeaxtension Letters\Pem»ts1D04 -426 & D05 -069 Permit Extension 2.doc Page I of I jest City of Tukwlla Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director (UNAtw.......1 4.64,4 r- .- ...,...,r:w. ;w.w:+.::+JM..+r�,.:r141 .' x_. aiid. u�4o .veYZ.:;::ri:A+.�,��uz..:ddct•.' 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431.3670 • Fax: 206 - 431 -3665 10/03/2006 23:00 2538547027 6300 Southcenter Boulevard, Suite #100 TUKWILA, WA 98188 RE: P e r m i t No. i )05 069 1 i { - Zlp 13821 MACADAM RD S TUKW AMERICAN CANADIAN RE AlA CONTRACTING October 4, 2006 Dear Jennifer Marshall: In reply to your letter, we had some issues with the construction site and we now have them all cleared up. We would appreciate it if you could extend the permit for another 90 mss, although the project will be completed within 30 days. We appreciate your time and patience and help in this manner. 4 9 4 ;d Sincerely, Sabar Khan Manager 306 N 1ST AVE • KENT, WA • 98032 PHONE: 253- 261 -9716 • FAX: 253- 854 -7027 PAGE 03/03 CITY O OCT 0 4 2005 PERMIT CE NTE z re w 00 coo W= J 1.- U) u. w O u - a (0 a = W Z F.- 1— O z t— w U � O co CH W U1 . H �. u. O W Z z 1 10 -03 -2006 HAL P. GRUBB, P.E. 1821572AVS KENT WA 98032 RE: Permit No. D04 -426 13821 MACADAM RD S TUKW Dear Permit Holder: In reviewing'our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division: Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by permit is not . . commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or. abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of tiinelor additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 11/11/2006, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, arshall, Permit Technician xc: ' Permit File No. D04 -426 Guy of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 April 25, 2006 Sabir Khan 306 N 1st Av Kent, WA 98032 Cizy of Tukwila Department of Community Development Steve Lancaster, Director RE: Request for Extension Development Permit No.'b04 =426:& D05 -069 Khan Development- 13821 Macadam Rd S Dear Mr. Khan: If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, ifr 1�I arshall Permit Technician 154-40 File: Permit No. D04 -426 & D05 -069 P:Vennifer\Extension Letters\Pemiils\D04.426 & DOS -069 Permit Extension.doc Page I of 1 jem Steven M. Mullet, Mayor This letter is in response to your written request for an extension to Permit Numbers D04 -426 and D05- 069. The City of Tukwila Building Division will be extending the expiration date of your permits for an additional 180 days. Therefore the expiration date for Permit No. D04 -426 is now October 23, 2006 and the expiration date for Permit No. D05 -069 is now November 11, 2006. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 z w i t 6 JU U 0 H w O 2 g -I u. a �d = W F- _ Z f... I— O Z 1-- w uj n o: U O N O t- = U . E- ;- O , Z _ w H rzz Z` 0 1- z ...e.,.u..,�........�._..,,rt. �.w:d: �r tto.,.,_,Ln::i:w... ..., ...;: aL ,1�ki?l::.L'.y:: ✓,.a,aw..s:Mtl tln.. aa..et�:+2:,u.� N/, t�..n.,,.....,:.,i.:,.,:w.w,..t ...•n4e,,, :.a..u, /2( _eta" /vc 44 - .1,/:0A) 1/4,er. fort "e- /Ai t44/..-G3' APR .2O., 2006 PERMIT CENTER ;Zr 14 6e/ e ; 6- ea. -6" 6z,a4e4e7 1 7e _ /*/ ex/e Arf__74t f A (4 _114*__ 1/ 140 5- /e,4e--- /5:S ;. Ae -.1?",e(C/.4 /7/1r c/t S e/t01-3 Zoe"' )'24 e;f_r__/ 9 ,6cled\i-/A44LA -4Ze.Ya&÷ 4/2 e-teA. t-17(49 • liu) v- ‘,>c+. iP 03 -03 -2006 HAL P. GRUBB, P.E. 1821572AVS KENT WA 98032 RE: Permit No. D04 -426 13821 MACADAM RD S TUKW Dear Permit Holder: Based on the above, you are hereby advised to: Thank you for your cooperation in this matter. Sincerely, ifer arshall, Permit Technician xc: Permit File No. D04 -426 City of Tukwila Steven M Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Call the City of Tukwila Inspection Request Line at 206- 431 -2451 to schedule for the next or final inspection. . This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one or more extension of time for additiona perios not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 04/26/2006, your permit will become null and void and any further work on the project will require a new permit and associated fees. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206.431 -3665 z z 6 U 00 W =. J I- N LL LU0 g LL Q N d I W F- _ I— 0 Z 1 — U 0 c o 0 — C3 I W W H O W Z • = O Z 10 -03 -2005 HAL P. GRUBB, P.E. 1821572AVS KENT WA 98032 RE: Permit No. D04 -426 13821 MACADAM RD S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one - time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 11/05/2005, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Permit Technician Ciiy of Tukwila Call the City of Tukwila Permit Center at 206 - 431 -3670 to arrange for the next or final inspection. lM ' • OUP v\I Q Jenni - arshall, xc: Permit File No. D04 -426 Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206 - 431 -3665 z z w J U O 0 N c W= J F— w 00 • } g w Q co = w O Z I— O N O I— w w u' O . w Z U N P. 0 z Reid iddleton February 25, 2005 File No. 262004.005/00802 Mr. Bob Benedicto City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — Final Submittal Khan Detention Vault (D04 -426) Dear Mr. Benedicto: We reviewed the proposed project for compliance with the structural provisions of the 1997 Edition of the Uniform Building Code as amended and adopted by the City of Tukwila. The applicant responded successfully to our comments. Sheets Si and S2 were submitted in response to our initial plan review and inserted into the original drawing set. The other sets of drawings should be reconciled in preparation for permit issuance. Enclosed is one complete set of the structural drawings (bound with the civil drawings submitted originally) and two additional copies of the revised structural sheets. We are also forwarding the structural calculations, geotechnical report, and correspondence from the structural engineer for your records. If you have any questions or require any additional clarification, please call. Sincerely, Reid Middleton, Inc. KtrAF Kyl K. Iamatsuka, P.E., S.E. Senior Engineer Enclosures cc: Hal Grubb, Barghausen Bryan Collons, Collons Engineering ti j\26se \planrevw \tukwi la \04 \t008r2.doc \kky FEB 2 R 7005 C6' • .' DEVELOPMENT Washington Oregon Alaska Engineers Planners Surveyors Reid Middleton, Inc. 728134th Street SW Suite 200 Everett, WA 98204 Ph: 425 741 -3800 Fax: 425 741 -3900 November 30, 2004 Dave Swanson, P.E. Reid Middleton 728 - 134th Street SW, Suite 200 Everett, WA 98204 RE: Structural Review Khan Detention Vault - DO4 -426 13821 Macadam Road S, Tukwila Dear Mr. Swanson: Please review the enclosed plans and documents for structural compliance with the 2003 International Building Code. If you should have any questions, please feel free to contact me at (206)431 -3672. Sincerely, Kit k iVel h . Brenda Holt, Permit Coordinator encl xc: Permit File No. D04 -426 city of Tukwlla Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206. 431 -3665 Reid iddleton December 6, 2004 File No. 262004.005/00801 Mr. Bob Benedicto, Building Official City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — First Submittal Khan Detention Vault (D04 -426) Dear Mr. Benedicto: giGt RE ci;vED DEC 0 8 2004 We reviewed the proposed project for compliance with the structural provisions of the 2003 International Building Code (IBC) as amended and adopted by the state of Washington and the city of Tukwila. The permit applicant should address the comments below. Note that the "WSxx" code references are to Washington State Amendments of the applicable code. General 1. Responses to the review comments below should be made in an itemized letter form. We recommend the permit applicant have the structural engineer respond and resubmit two sets of the revised structural drawings and one copy of the supplemental structural calculations. All information should be submitted directly to Reid Middleton, Inc. Geotechnical 1. Special inspection by the Geotechnical Engineer of Record should be provided for at least the aspects of construction noted below, as recommended in the geotechnical report by Spears Engineering and Technical Services (undated). See IBC Sections 1704.7 and 1802. a. Site excavation and grading. b. Verification of soil - bearing capacity. c. Placement of structural fill and soil compaction. d. Placement of foundation and retaining wall backfill. D OpM T Washington Oregon Alaska Engineers Planners Surveyors Reid Middleton, Inc. 728134th Street SW Suite 200 Everett, WA 98204 Ph: 425 741 -3800 Fox: 425 741 -3900 Mr. Bob Benedicto, Building Official City of Tukwila December 6, 2004 File No. 262004.005/00801 Page 2 Architectural 1. No comments. Structural r ~ � 1. Structural special inspection by qualified special inspectors should be provided, per IBC Sections 1704 and.1707. The following is a summary of the structural special inspections: a. Concrete construction: Continuous, see also Section 1704.4. b. Reinforcement at concrete construction: Periodic, see also Section 1704.4. 2. The allowable vertical soil pressure in the geotechnical section of the structural notes, Sheet SI, and Note 2 of the Footing Schedule, Sheet S2, should be changed from 4,000 to 2,000 psf as recommended on page 5 of the geotechnical report. The widths of the footings should be reviewed for structural adequacy. 3. The design live load in the section of the structural notes on criteria, Sheet SI, is specified as H20, which refers to concentrated wheel loads of 4 kips and 16 kips located 6 feet by 14 feet apart, per ASSHTO specification. The live load assumed in the calculations is 240 psf. Sheet SI should be revised to specify the assumed live load. 4. Section 20 /S1 references the plan for the depth of the footing. The foundation plan on Sheet S2, however, does not appear to provide this information. The footing depth(s) should be specified on the drawings for review. 5. Sections 20 /S1 specifies the ground surface elevation above the vault as 131.24 feet minimum and 132.52 feet maximum. The calculations, however, assume a maximum elevation of 134 feet (see page 2) and Sheet Cl indicates a top -of- paving elevation above 134 feet. The structural and civil drawings should be coordinated. 6. Based on the service loads determined on page 4 of the calculations and allowable vertical soil bearing value recommended by the geotechnical engineer, the width of the footings should be increased to 4 feet. Reid iddleton Z ' cc LL/ w iO U y0 WX -I F- � u. w ga - u. ( S. w Z �. E- O Z 2 • 0 O co O - w w • U k w z U = O ff " ; Z • ae.Ltw.{:a AS% Mr. Bob Benedicto, Building Official City of Tukwila December 6, 2004 File No. 262004.005/00801 Page 3 Responses to the review comments above should be made in an itemized letter form. We recommend the permit applicant have the structural engineer respond and resubmit two sets of the revised structural drawings and one copy of the supplemental structural calculations directly to our office. Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project. If you have any questions or need any additional clarification, please contact us. Sincerely, Reid Middleton, Inc. -p Phil' Brazil, P.E., S.E. Senior Engineer cc: Hal Grubb, Barghausen Bryan Collons, Collons Engineering ti j\26 \planrevw \tukwi la \04 \t008r 1.doc \prb Reid iddleton 1 re 6 6u. J U; 0 N 0: W= N w O' g i z � z ° • LU U O ' O — O F— = w. - U '. U. /E w z O ff '" z • ACTIVITY NUMBER: PROJECT NAME: D04 -426 DATE: 11 -29 -04 KHAN DEVELOPMENT SITE ADDRESS: 13821 MACADAM ROAD SOUTH X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision #_afterrbefore permit is issued 1 DEPARTMENTS: ' �06 Building Iiision L Public W 7rH'1l� [ F � PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP l C� 4t- //- o Planning Division C J Structura lAp r P Permit Coordinator i pir �J nn 4` - I Z/27`.� Fire evention DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11 -30 -04 Complete [d Incomplete ❑ Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route [ Structural Review Required [ No further Review Required ❑ Q Q REVIEWER'S INITIALS: DATE: DUE DATE: 12 -28 -04 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slIp,doc 2-28-02 PERMM1f' COORD COPY DATE: z z w r QQ � JU 00 co 0 -J w w g � u_ co d = w f-- _ Z F .. ZO W • w U O co 0 -- w W • O •• z W • = O ~ z • .w ..l,vra s' r.,. i��..,. v... v... .,.i.+...+,...�::.ta.4:.r.h.., _ .«icir . «ws v1.44;.:.a wr ...i•. x�t,Ui�.l r.....eF.e.va�til. iJ�*ih }:w'.SI_:.+, .s + cr• S- ti:: d 7 ri' �.o:cd , ii w,}VJ.r:53i;.^la�X �"'T aiFi,?�trl ? %Xti3et4:p.' NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 68086 KM= LINEN XOE Oa at∎TI IuLNO k I'S( NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. General Structural Notes (THE FOLLOWING APPLY It E56 3HO 41 OTHERWISE ON TIE DRAWINGS.) CRI TERIA ALL_MAr IALS SHIP DE516N NO CONSTRUCTION SHALL CONFORM TO TIE DRAWIN66, SPECIFICATIONS, AND TIE INTERNATIONAL BUILDING GODS (IBC), 2003 EDITION. .,/ _. _._�� -, . D5I6N LOADING CRITERIA: LIVE LOAD H2O t, DEAD LOAD 6' TO 4' -41' Cf DIRT (SEE CIVIL) STRUCTURAL DRAMIN66 SHALL BE USED IN CGN.IANGTION HIM GIYIL MAKINGS FOR BIDDING AND GONSTRIUGTION. CONTRACTOR SHALL VERIFY DIIEN5ION5 NV CCMVITIONS FOR GGIPATIBILITY AND SHALL NOTIFY GIYIL ENGINEER CF ALL Dl GA ES PRIOR TO CONSTRUCTION. V CONNTRACTOR SHALL PRO1IDE TEMPORARY BRACING FOR TIE STRUCTURE AW STRUCTURAL CCWCIENTS UNTIL ALL FINAL GIMMICKS HAVE BEEN COMPLETED IN ACCORDANCE METH THE DRAMIN66. MtKTILR SHALL BE BIBLE FOR ALL SAFELY PRGGAUTIO S NV TIE IETHOD5, TEGINIQUES, 552AXES OR PROCEDUR5 REQUIRED TO PERFORM TIE M. CGNIRAGTOR- INITIATED CHANGES SHALL BE SUBMITTED IN TOTING TO TIE GIVL AND STRUCTURAL 14611 FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. GIIN16E5 WIN ON SHOP DRMIN6S ONLY MILL NOT SATISFY THIS IEQUIREMNT. DRANIN66 INDICATE 6EHERAL NV TYPICAL DETAILS OF CONSTRUCTION. MIRE GOIWITION5 ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS 5HGNI, SIMILAR DETAILS OF 6051*JGTION SHALL EE USED, SUB.EGT TO REVIEW MD APPROVAL BY THE CIVIL MD THE STRJGiUR*L 0451tEER. ALL STRUCTURAL 5Y511315 GOHPO,ED OF GOMPOIfNT5 TO BE FIELD ERECTED SHALL BE SUPERVISED BY THE SUPPLIER DURING HAMJFACTURIN6, DELIVERY, LINKING, STORM,E AND ERECTION IN MGORDANGE MITE INST)GTI05 PREPARED BY 11E SUPPLIER. SHOP DRAMIN66 FOR RE:1WORGING 51EE1. SEAL EE SUBMIT1ED TO TIE CIVIL n STRUCTURAL ENSI EER FOR REYIE i PRIOR TO FABRICATION OF THESE ITEMS. CONTRACTOR SHALL SUBMIT MALL ELEYATICN DRAMIN(fi OF AT LEAST 1/8' : I'-0' SCALE INDICATING LOCATIGML5 OF GatEGTION DOEVIENTS AND NAL,L OPENINGS FOR REVIEK PRIOR TO CONSTWCTICN. CONTRACTOR .SOH, LL COORDINATE METH REI CW.DE1T SHOP DRANING6. SHOP DRMIN6 R'VIEM: 1/I10I5ION5 AW QUANTITIES ARE NOT REVIDED BY TIE BN$IM33R OF IEGORD AW II13EFORE MUST BE VEERIFIED BY THE CONTRACTOR. 11E CONTRACTOR SHALL I VIEN AND STAMP DRAMIN% PRIOR TO REVIDI BY D46ItEER OF RECORD. SUBMITTALS SHALL INCLUDE A REPRODUCIBLE MV OfrE COPY. 11E REPRODUCIBLE SHALL BE HMI) RV MITRED. 5H01' DRAM* SUBMITTALS MESSED BY TIE 8N$IMIR NE NOT CHANGE ORDER. TIE PURPOM OF 5f10? DRAMS SUBMITTALS BY TIE CONTRACTOR 19 TO DEANSTRATE TO TIE INNER THAT TIE CONTRACTOR Uhr ERSTMb5 THE DESIGN CONCEPT BY IWIGATING PHIGH MATERIAL 15 !MENDED TO BE f M1ISIED AW INSTALLED NV BY DETAILING TIE INTENT XD FABRICATION NV INSTALLATION IETHOD5. IF DEVIATIONS, DISGREPANGIES, OR CONtIG15 MUM SHOP DRJIM1IN6 SUBMITTALS AND TIE WW1 vowels T5 ARE DISGOVEFED, EITHER PRIOR TO CR AFTER, SHOP WANING SUBMITTALS ARE PROS BY THE ENGIMIR, TIE DE5I6N DRAMIN66 AND SP CIFICATIOl6 SHALL CONTROL ARV SHALL BE FOLUM. SHOP MAKINGS CF DESI6N BUILD Gam, INCU.VING UTILITY VAULT LIDS N4 MA1fbLL SHALL INCUIVE TIE DE'SI6NIN6 PROFYS6IONAL ENSITEE R'S STAMP, STATE OF MIUHIN6TON, AW SHALL. BE APPROVED BY TIE GO1rCIE NT DE5I6IIEZ PRIOR TO CURSORY REVI81 BY THE E46IIE OF RECORD FCR LOADS Iif'IOSED ON TIE BASIC 51Rk LURE. THE Cafa 3NT DESICIER 15 li fttIS1BLE FOR CODE NV ALL ItGESSARY GaIUTI0N5 NOT SPECIFICALLY GALLO OUT ON CIVIL OR STRUCTURAL DRMIN66. 5IIOP DRAMIN66 SHALL INDICATE MMNITUDE AND DIRECTION OF ALL LOADS IPIV5ED ON BASIC 511;UG1URE. DE5I6N mamas SHALL BE MADE AVAILABLE UPON IEQJEST. DEMOTIC* CCN RETE CONSTRUCTION, 51 k 1URAL STEM FABRICATION ND ELECTION ( taur iN6 PIELD MEAING AND HI6H- 51R6+15T4 FIELD 80LTIN6) , EXPANSIGN BOLTS, THREADED EXPMi5ICH INSERTS, AW EPDXY 6ROUTID II TA LATION SHALL BE 9 JFRVISW IN ACCCRDANGE MITHI SECTION 1101 OF TIE MC MD TIE FT .EGT SPEGIFICATW I'S BY A QUALIFIED TESTING MEW DESIGNATED BY 1IE CIVIL. 1W CIVIL NV STRUCTURAL O16IIER SIA.L BE FURNISIED METH Ca :1E5 OF ALL INSF6GTION REPORTS lab TEST RESULTS. GEOTEGNIGAL FOUWATICN N711:5: 5126RADE REPARATION WI INS DRALNA6E, EXCAYATION, GOIE'NTLON, R4 FILLING >EWIIEeU15, SHALL C WCRI STRICTLY MiTH REGOMODATIOI5 6IVEN IN 11E 5011.5 FEW CR A5 DIRECTED BY TIE 6EORECRIIGAL 13NGIIER. FOXIN66 SHALL BEAR ON FIRM, UNDISTURBED EARTH CR GON1W LL , COMM STRWIURAL FILL, AT LEAST lb' BB.OMt VIE% ADJAaNT FINISIEU GRADE. FOOTING DEPTHS/ ELEVATIOTS 90tH ON TIE DRAMIN% ALE MINIMUM ND FCR MIME ONLY; TIE ACTUAL B.EVATION5 OF FOOTINGS SWILL BE E5TAPL.JSHED BY TIE CONTRACTOR IN TIE FIELD MORKING METH TrE TESTING LAB NV wow::GIluiGAL ENGIMEER. BAGICFiLL EEHIID ILL RETAINING MNI L5 KITH HEE DRAININ5, 6RJal .m FILL AM PRDifIDE FOR SUBSURFACE DR'AINME AS NOTED IN TIE errattIC1L ALLOMABIE SOIL FREGURE SOIL DENSITY GOEFFIGEMTr OF FRICTION LATERAL EARTH FRE6URE - LAMM. EARTH RESSURE - . . _ NATIVE _ . . 51t UGT'L FILL ACTIVE: tESTRADED - DRr RESTRAIN - SATURATED PA66IVE:RPSTRAIIW - DRY • 4,000 ?SF 4,000 PT 120 PCF 0.40 50 PCF 80 PCF (Ar56UME)) 420 PCF - i 5EOf6GIRCR RBRT E: 9 JIK BN6I1EERIN6 l TECINIGAL S3 VIGEi. N)Ite Oaf- 0 61. DA 1w MY 3, 2004 SUFRBINTAL IOIORADA OM ISION 4, 20th CONCRETE CONCRETE SHALL BE HIRED, PROPORTiONT , CONVEYED AND PLACED IN M CCRAWGE MITFI IBC SECTION 1105 AND AG1 301. STRENGTHS AT 28 DAYS AND NiX CRITERIA 5HAU. BE AS FGLLOMS: TYPE OF GONSlIGTIGN A. FOOTINGS B. HALLS AaV CURBS C. VAULT LID 11E MINIMUM AIIOUMi5 OF GEMENTITIOUS MATERIAL MAY BE CIIM164? IF A CONCRETE FETfO MKE NIX IS SUBMITTED TO TIE STRUCTURAL EN5IttiR A1'b TIE BUILDING DEPARTMENT FOR APPROVAL Tit MIS PRIOR TO PLACING ANY CONCRETE. THE FT330RNANGE MIX SHALL INGUJDE TIE JJiOIJI S OF WENT, HIE AN? COARSE A66R66ATE, MATER NV ADMIXTURES, AS HEEL AS THE MATER -GWENT RATIO, SUJMP, 04401E YIELD RV SUBSTANTIATING STRENGTH DATA IN AI(,CORDANCE META AGI 3I8 41, CHAPTER 5. Willi OF NIX SUBMITTALS BY TIE ENGIER OF RECORD INDICATES CItY THAT IWORNATION PRESENTED COIM* 6EWALLY MATH CONTRACT DOCUMENTS. GONTRIGTOR OR SUPPLIER MAINTAINS PULL RESPONSIBILITY FOR SPECIFIED PE#IFORMAWCE. ALL CONCRETE WITH SURFACES EXPOSED TO STANDING MATER SHALL BE AIR- DI1RAINED WITH AN AIR - CONTENT GGWORNIN6 TO IBC TABLE 1 CONCRETE MAY BE PLACED BY TIE 'SHIOTGRETE' PE`TIIOD, FROiiIDED HIE AFPROiIAI.S, 1515, NV INSPECTIONS IEWIRED BY TIE BUILDING DEPARTMENT ARE OBTAIIE?. 51OrGRETE MATERIALS, ECIJIP1ENE, FROCERIFES, FRXR11045, BATGHIN5 AND MIXING, AND PLMEIE NT SHALL BE IN ArrGORDMICE MITHI MI 506R -40 AND IBC SECTION 1114. REIWCRGIN6 51B3. SHAD. CONFORM TO ASTM A615 (INGU)DING SUPPLEMENT SI) , 6RADE 60, fy 60,000 PSI. EXCEPTIONS: BARS SPECIFICALLY NOTED AS SUCH CH THE DRAMIN66 SHALL BE GRADE 40, fy = 40,000 PSI . 6RADE 60 REIWORG1N6 BARS MHICH ARE TO BE MELDED SHALL WOW TO A514 A106. REIWGR O 4T GOIFLYING KITH ASTN Ab15(51) MY BE MELDED ONLY IF TIE CONTRACTOR SII34I15 MATERIAL ?STERN REPORiS INDICATING GC ORTAI E KITH YELPING PRA SPECIFIED IN A.M.S. D1.4. REINFORCING 5TEM SHALL BE DETAILED ( INCLUDING NOM RV BOO IN AGGORDANGE KITH AGI 315-12 AND 318 -1'I. LAP ALL CONTINUOUS REIIFG GENT (*5 SMALLER) 40 BEAR DIAMETERS CR 2' -0' MINIMUM. PROVIDE CORER BARS AT ALL MALL AND FOOTING IN1EMWGTIO S. LAP CORER BARS (*5 MV SMALLER) 40 BAR DIAIErE S CR 2' -0' HINI)V14. LAPS CF LARGER BARS STALL BE MADE IN AGGORDANGE METH AGI 318 -1'I, CLASS B. LAP ADJACENT MATS OF PELDED MIRE FABRIC A MINIM OF S' AT SIDES AND ENDS. NO BARS PARTIALLY El BRED IN HOMED CONCRETE SHALL BE FIELD BENT LJl& 6 OBERMISE NOTED ON HIE DRAMIN66 OR APPROVED BY TIE 51*JGTURAL ENSILE. CONCRETE FROlEGTION (co) VER FOR REIWORGIN6 511$ SHALL BE AS FOL.LQ+6: 0 p `CE CAIST - -IN- FLAME CONCRETE: SEE CIVIL DRAMIIN66 FOR DUCT LCiGATICKS AID DIIENSIa5 OF RIFE FEIETRATIOKS NV OPENINGS IN CONCRETE MALLS RD WILT LID. FUE COP Perna Man 'view approval 1e subject to anus does and Approval �0�°3°r' or art/ adopted code gPf Dew -49g City (ilia& NE 1/4 OF SE 1/4 OF SECTION 16, TOWNSHIP 23 N, RANGE 4 CITY OF TUKWILA, WASHINGTON 26 PAY STRENGTH ( cl 3,000 PSI (1.) 3,000 PSI (1.) 5,000 PSI (2.) I. NIEES SHALL BE PROPORTIOI& 50 AS NOT TO EM S° TIE MAXIM SLUM'S INDICATED. 2. PROPORTION MIX FOR SLAM HYDRATION RATE AND Lai HEAT SE ATION TO MINIMIZE PLASTIC 5IPII A6E CRACKS. FOOTINGS MD OPER )AFC O? SURFACES CAST MAINST Jab PERMNE NTLY DAZED TO EARTH: FOLD SMAGES EXPOSED TO EARTH (1 .e. MALLS BELOM 6RoL V) CR TO MEATIER ($6 BARS CR LUBBER (1 BARS CR SMALLER) GOLUNN1 TIES (OR SPIRALS) AND BEAM STIRRUPS !LABS AND MAULS ( INTERIOR FAZE) 6REATE1t OF (BAR DI METER PLUS 1 /6') or 4' REVIEWED .sue f :.' Zc,tifal c:af:.R'J:..�e �.1:s de fG'k iii(. F. I ^.v9.1 M is rL'>t�� Pro.is'_ •cif lk T.:L:roue:cal 8:i' •;•:, Code . ; a ear 11Aur: a a:si CA* 1 - 7 . MINIMUM GENT CONTENT MAX. N C FER aim TARP RATIO 4 SACKS 4i SACKS 5i SACKS 0.50 0.48 0.46 BMWS No changes shall be mob to the solve ViCe* without pier approval of Tz!kwIla EdMD NOTE: Rev w® rag ins a new plan submittal and may include adddoafrl plane tees. G:::. 3 VS General Notes 18 • , W.M. GORIER BARS TO MATCH EXTERIOR HORIZ. REINF. H111E1IIEIll5 - I • 11= 111E111E $3 '4 $5 $6 #3 $4 $5 $6 $1 $3 $4 *5 #6 NORMAL FOOTING REINFORCING ADDITIONAL VERT. BARS 16' 22' 21' 35r 21' 28' 35' 46' 63' • 13' 11' 21' 21' 16' 22s 21' 35 48 ' 6' 15' 10' 12 SINGLE CURTAIN CRONES MU. MIN I1404 STRAI6411' DEVELOPMENT LENGTH (14) 14 141' 23' 31 MINIMUM LAP SPLICE LENGTHS n.$) (aAss B) 18' 24' 30' 40' 54 GORIER BARS TO MATCH CROSS MALL HORIZ. REINF. (ALT. HOOKS) Lilt OF EXCAVATION f : 3000 P51 ft = 4000 tO 5000 P51 BAR SIZE TOP BARS OTTER BARS TOP BARS OTHER BARS 'TOP BARS' ARE HORIZONTAL BARS WITH MORE THAN 12' DEPTH OF CONCRETE CAST BELOW THEM. IF CLEAR CONCRETE CLOVER 15 LESS THAN 2x THE DIAMETER OF TIE BAR OR TIE CENTER-TO-CENTER SPACING 15 LESS THAN (4) BAR DIAwETL , THEN VALUES SHALL BE INCREASED BY 43% f ft : 4000 t0 5000 P5I BAR SiZE TOP BAR5 OTTER BARS TOP BARS OTTER BARS 'TOP BAS' ARE HORIZONTAL BARS NTH MORE THAN 12' DEPTH OF CONCRETE CAST 1313.0/411e4. F CLEAR CONCRETE COVER 15 LE561WM 2x TIE DIAMETER OF TIE BAR OR 11E Gairet- TO-cet1ER SPAGII'L5 IS LESS 1IWI (4) BAR DIMMERS, TEEN YALLES SHALL BE INCREASED BY 43%. 14110104 Emeaxteir LE'i6T145 AM FOR 5TA1'DARD DV HOOKS A. for general : BAR 511E fG = 30010 P5I f`G : 4000 to 5000 1 6' T g' 10' L SIDE COVER MST BE Ems. TO OR 6REATEt THAN 2 '. 2. EEO COVER FOR 410' HOOKS HET EE EQUAL TO OR 6RFATEe TIAN 2'. 12' 15' la' 24' 16' 14' 23' 31' 42' 4 Comer Bars 9 Reinfon:ementoevelopment Length and Spice s 19 6AWAi' IZED I'0 DAR (AMTM A96)- I' WIDE RADIUS }EAT TREATED BENDS 36 15x I8'oc 'HORIL' RM. PER wawa OF 52 'VERT.' RF.E PER 5GHEDU.E OF 52 1 EEVELEP KEY -- - Efts 5iON SHOYW I5 FOR TYPICAL VAULT. LENGTH MAY EE INCREASED TO FOR ACCESS PEEPS Reinforcing at Wall Penetrations STEPS ---v41 i 4 i : ce i 5' VERT. REINF. PER WALL SECTIONS 11TH AWL VERT. BAR EACH SIDE OF OPENING 6' SLAB AND REIF. FER FLAN - HORIZ. REIPF. PER WALL SECTIONS RaOStee SURFPCE S/ Access Ladder 10 -, .' . 1 v \V1. (2) 1 5 Rid 15xx•12'o0 ALT. NOOK PALL PER PLAN FOORIN6 DRAM: Ab EL 1240 MAX. PVC 11A11ERSTOP • LONG.' RAF. TER % EIN E CF 52 i S' "MAW R IW . SCMI E OF 52 1'ID M PER A. Dry4,42.6 I 20 • 0 0 2 n z 0 CC 4 Or 0 n CC 0 N 0 z F 0 a 0 2 Z z 0 0 v z EXPIRED MIT Mat COLLONS ENGINEERING 195 Fat Sheet N • Is>saquahs, WA 98127 Ix 425.369.1101 • F. 425.369.1157 emaE Ispe onstkancastnet 43 ;6. tol W li 4u E 0 a, c 0 C- 1 M � • . ♦r al et Id ca DATE AMON 0 II/24104 For Permit 2A6165 Porn* Garments dal Notaut Details D M CO S i Vto 0 • • I • • r) N i 3 1 g 4 igg ill Rom gg PP' . c::7 0 e n v 1 y a (g) rrr 12 13 P 0 E I 2 �o P Project: IZI-4" t I j ;UL f1A�.. I A;GIN11 kI•r1 ,/1 RI NVI a. h ( AW c'cwWNfUI r 10 ull Nlll l IMINARV ANI) ON — ' I AI nl VIC• CON If'N r ANO ')tiF OP SAME VA 1HIN TFIf Sr DRAWINGS OR PI ANS. NO PORTION OF THE DESIGN OR PLANS ARE Khan 3 -Lot Development Detention Vault Tukwila, Washington g Owner: ■ gg 1 v I- 0 m 4. American Canadian Real Estate, Inc. P.O. Box 3280 Kent, Washington 98032 Ph: (253) 854-7002 TO BE. REPRODUCED, CHANCED, OR ASSIGNED TO A THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION FROM COLIONS ENGINEERING R9 2004 rn: • o ' c rn no : m y on -1 o c z > -4I o g l Coco ss o 0 zz z m in If • • 1 Job Number 11217 $1 §t ■ ti^ ......., fl1 'C>• • £2002 ve r co fir ti Opp I Illiiiii% i 4gifeh NOM ?nbalg 1 :911 g l 9£00 V 6)2 [nig' I I C _ .„ e 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251 -6222 (425)251-8782 FAX CML ENGINEERING, LAND PLANNING, " V0 eNa1N SURVEYING, ENVIRONMENTAL SERVICES 4 :,/1: 1 I • 0 ;u 1 C.) rr 11 F 0 4 ht,oc.00.6.fN 11: Designed JAL Drown IB Checked _.IEG_ Approved Date L t i 4m .N ! ligi h:R P g C4- Seale: Horizontal 1'-20' Vertical N/A y rrl co rn co mg/ N 2?, p 1 ; 0' g I TR 1 Ur. I I 1 / \.,n9Ineanng\ 1 1 % 1 % -gm l .dwg polo /limo: 10 2b .004 10:12 Scale: 1 -20 tstephens Xrels: 21 1217 —t,z1 1217b,hol,11217 - -G� M,S_Kohn, ■ •O s 0 o h &Rsiggl sig q _.. — G NOM Ighli P 1 I it \ 'Q'_l .......--VP t-- . I --...,,, --\ 1 -- - •••,1` i r .. *. .,�, � 1 •. ._... _ _. ...... p U is ._._.._ ��LA� P �,,.,...�.,_. f ,, ,,..--__-7 -..._ a�•...... X c — _._,..,.__ —� I �,... '-- .. --.. . — . c/3 ... ... .... -r`- .•._.. -.. (1:1)• ■ * " .. 4 .. - • ".... •.M...-•■• For: AMERICAN CANADIAN REAL ESTATE, INC. P.O. BOX 3280 KENT, WASHINGTON 98032 (253) 854 -7002 - - mAy C) 2 Ql N R # u � W'I f— g it j rn Ni N N N 6 Fri g 11 lc zoluft o;Np 6 ,7,11S 1-6 se N NIA sloe Nig INN *4.0 v v 1 u _ ---- -- 0 O 0 v z n ^ Li D o mz0 c m ��D -9- 0 Z ; rr n m u 6J3 Z 0D M � r R>. 3 10/22/04 TES HPG HPG REVISED DETENTION VAULT 2 7/19/04 TES HPG HPG REVISED HOUSES PER ARCHITECT I 1 5/7/041 KIB I HPG HPG REVISED PER CITY COMMENTS No. Date By Clod. I Appr. 1 Revision GRADING AND DRAINAGE FOR KHAN 3 -LOT DEVELOPMENT