Loading...
HomeMy WebLinkAboutPermit 0137 - Koll Business Center - Dock High - ShellJOB ADDR ESS 750 Andover Park East DATE September 15, 1972 LEGAL 1 DESCR. LOT NO. r117.1( 'TRACT IXSEE ATTACHED SHEET) OWNER MAIL ADDRESS ZIP PHONE 2 Koll Business Centers 1901 Dove St., Newport Beach, CA 714/833 -3030 CONTRACTOR MAIL ADDRESS PHONE LICENSE NO. Eberharter & Gaunt, Inc. 1115 NW 51st Seattle 98107 Su. 4-8844 223 -01 -959 ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. Leason Pomeroy, A.I.A. 44 Plaza Square, Orange, Ca. ENGINEER MAIL ADDRESS PHONE LICENSE NO. Kelly Pittelko Fritz & Forssen LENDER MAIL ADDRESS BRANCH Union Bank Union Bank Sq. Orange CA C -578- 053 -292 USE OF BUILDING Spec. Warehouse Shell Only 8 Class of work: El NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR • MOVE ❑ REMOVE 9 Describe work: Construction 71,500 conc. tilt up spec. warehouse shell 10 Change of use from Change of use to 11 Valuation of work: $ 476, 000.00 1 PLAN CHECK FEE 3 01 . 25 PERMIT FEE 602 SPECIAL CONDITIONS: Type of Const. III N Occupancy Group F Division 2 Size of Bldg. (Total) Sq. Ft 500 No. of Stories 1 Max. Occ. Load 0 Fire Zone III Use Zone 0 Fire Sprinklers Required r yes ■ No APPLICATION ACCEPTED BY JER. PLANS CHECKED BY L. Quatie APPRO D FOR ISSUA CE B r / IF 4i No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered 7 NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. 7 . &p O " . Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING FINAL IGN RE or OWN or OWN DE • ea, Y. ?. 777. SIGNA URE OR AU RIZEO A • I DATE l BUILDING PERMIT A t -c complete numbered spaces only. CIT. OF TUKWILA BUILDING K. ,MIT 14475 - 59th Ave. So. / Tukwila, Washington 98067 PLAN CHECK VALIDATION WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT M.O. CASH PERMIT VALIDATION OCCUPANCY PERMIT REQUIRED BUILDING PERMIT NO. N 137 M.O. CASH Mr John Richards CITY , OF TUKWILA Building Department 14475 59th South Tukwila, Washington . t• i Dear John Enclosed you will.. find the legal description' for the doc ' high : building in ` Andover :Industrial Park as we ` discussed' on my last visit. I have instructed Wilsey & Ham to. prepare' Meets and Bounds description for the multi- tenancy b uilding 'and will send . it to you as soon as it is availabl (7,1.4) 833 - 3 Lots, portions of lots,. ancl .a tract, all located within Andover Industrial Park, City of Tukwila, King County, Washington, more particularly described as follows: Parcel A: Parcel C: • That portion of Lot 6 of Andover Industrial Park. No. 3, as recorded in Volume 78 of Plats, on pages 6 and 7, records of King County, Washington, lying south of a line which is 185 feet as measured southerly of and perpendicular to the north.line of said Lot 6. a.wiuu D Parcel B: . Ali cif Lots 1, 2 and 3 of .Andover Industrial Park No. 5, as . recorded in Volume 83 of Plats, pages 22 and 23, records of King County, Washington. All that portion of Lot 7 of Andover Industrial Park No. 5, as above referenced, • lyiing north of the. following described line: Beginning at the southwest corner of said Lot 7, thence. north 1 ° 47'28" east, .149.78 feet; thence northeasterly along the curve to the right having a radius of 216.37 feet through a central angle of 5 ° 21'43 ", an arc distance of 20.25 feet to the true point of beginning of said line; thence south .88 ° 12'3 2 " east, 339.74 feet to the east boundary of said Lot 7; which is the end of said line. Pracel D: 'gy a. A-L6tk A.tract, being a portion of the northeast quarter of the scuth- east quarter of Section 26, Township 23 Nbrth, Range 4 East, W.M.., more particularly described as follows: Beginning at the southwest corner of Lot 8 of the plat of Andover Industrial Park.No. 5, as recorded in Volume 83 of Plats, pages 22 and 23, records of King County, Washington; thence south 01 °47'28" west along the southerly extension of the west line of said Lot 8 a distance of 545.00 feet to the true point of beginning; .thence south 88 °12'32" cast a distance of 297.00 feet; thence south 01 °47'28" west a distance of 422.27 feet;. thence north 88 ° 12'32" west a distance of 247.00 feet to a point of curve; thence along a curve to the right having a radius of 50 feet and a central angle of 90 ° 00'00 ", an•arc distance of 78.54 feet to the easterly margin of Andover Park East; thence north 01° 47'28" east a distance of 372.27 feet to the true point of beginning. Subject to an easement for utilities over the west 15 feet and the south 15 feet thereof and subject to easement for rail- road over. the east 27 feet thereof. dock high site plan details