Loading...
HomeMy WebLinkAboutReg 2014-02-03 Item 3G - Bid Award - 2013-2014 Americans with Disability Act (ADA) Improvements to Iron Creek Construction for $84,450COUNCIL AGENDA SYNOPSIS Meelins Date 02/03/14 Prepared ID BG.M Alayor's review Coun,i1 review 043-- ITEM INFORMATION ITEM No. CAS NUMBER: STAFF Si oNSi )R: BOB GIBERSON ORIGINAL AGENDA DATE: 02/03/14 AGENDA ITEM Tril.E Americans Bid Award with to Iron Disabilities Act Creek Construction, (ADA) Improvements LLC. :l.lation Dale 02/03/14 El Bid Award AN Date 0 Public Healing A f txDate U Other C.VIII:GORY • Discussion 11 Resolution Ordinance Mtg Date AN 1li Date , bx Date Ilits Date SPONSOR LI Council Ei Mayor HR LI DCD • Finance Fire E 17. pea LI Po/cc El P1! SPONSOR'S The 2013/2014 ADA Improvement Project was advertised for bids on December 19 and 26, SUMMARY 2013. Eight bids were opened January 9, 2014 with the low bid of $84,450.00 from Iron Creek Construction, LLC. Iron Creek has successfully worked for other cities in the past and their bid is within budget. The 2013/2014 locations include ramps on Tukwila Intl Blvd and S 180th St, and an upgrade to the flashing crosswalk at S 152nd St. Council is being asked to award the bid to Iron Creek Construction in the amount of $84,450.00. REVIEWED BY D COW Mtg. E Utilities Cmte DATE: 01/27/14 0 CA&P Cmte U F&S Cmte Comm. CHAIR: ALLAN 0 Transportation Cmte LI Planning Comm. EKBERG U Arts Comm. • Parks COMMITTEE RECOMMENDATIONS: SPONSOR/ADMIN. Commr171.1- Public Works Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE RI •QI.Illt_ED AMOUNT BUDGETED APPROPRIATION REQUIRED $84,450.00 $100,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS (PAGE 21, 2014 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 02/03/14 MTG. DATE j ATTACHMENTS 02/03/14 Informational Memorandum dated 01/24/14 Vicinity Map 2014 CIP, page 21 i Bid Tabulation Rectangular Rapid Flash Beacon System Minutes from the Transportation Committee meeting of 01/27/14 57 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Robin Tischmak, City Engineer DATE: January 24, 2014 SUBJECT: Americans with Disabilities Act Improvements Project No. 91210405 BID AWARD ISSUE Award the bid for construction of the Americans with Disabilities Act (ADA) Improvements to Iron Creek Construction in the amount of $84,450.00. BACKGROUND This is a new annual program that was created in 2013 to address City facilities which are not in compliance with the ADA. The 2013/2014 project will provide pedestrian access ramp repairs at multiple locations on Tukwila International Blvd (TIB) and one location on S 180th St. The project also includes the replacement of the actuated in- pavement flashing light crosswalk on TIB near S 152'11 St (Taco BeII /KFG) with an actuated Rectangular Rapid Flash Beacon System. The project was advertised for bids on December 19 and 26, 2013. Eight (8) bids were received and opened on January 9, 2013. The lowest bid of $84,450.00 was received from Iron Creek Construction, LLC. The Engineer's estimate was $98,700.00. ANALYSIS The bids were reviewed and tabulated. No errors were discovered in any of the eight bids received. References from previous projects that Iron Creek Construction had completed for other agencies received positive feedback. BUDGET AND BID SUMMARY This project was designed and advertised based on the 2013 construction budget that should have been carried over into the 2014 budget. Construction (Base Bid) Contingency (10.0 %) Total Bid Results Estimate Budget (2013) $ 84,450.00 $ 98,700.00 $100,000.00 8,445.00 9,870.00 0.00 $ 92.895.00 $108.570.00 $100,000.00 RECOMMENDATION The Council is being asked to award the construction bid for the 2013/2014 ADA Improvements to Iron Creek Construction in the amount of $84,450.00 and consider this item on the Consent Agenda at the February 3, 2014 Regular Meeting. Attachments: vicinity Map 2014 GP, page 21 Bid Tabulation Rectangular Rapid Flash Beacon System WiPW EngIPROJECTSW- RW & RS Projects\ADA Improvements (912iO4c5)IDesignNinfo Memo - Bid Award gi.docx 59 PROJECT SITE SEA -TAC AIRPORT VICINITY MAP N_ T.S. 2013 ADA IMPROVEMENTS COVER SHEET 61 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Americans with Disabilities Act (ADA) Improvements Project No. 91210405 DESCRIPTION: Construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. JUSTIFICATION: The enforcement of ADA laws and standards was delayed pending legal challenges and studies. Recent court rulings now mandate ADA compliance. The City must provide upgrades with most construction projects. STATUS: Provide annual funding to construct improvements as necessary. For 2013, develop a citywide plan with design and construction of the 1 of the 2 major crosswalks on Tukwila International Blvd. MAINT. IMPACT: Negligible. COMMENT: Project will be ongoing until City facilities and infrastructure meet ADA requirements. Only one year actuals . shown in first column. FINANCIAL in $000's1 Through Estimated 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 45 5 5 5 5 5 5 5 80 Land (RAW) 0 Const. Mgmt. 18 8 8 8 8 8 8 8 74 Construction 100 50 50 50 50 50 50 50 450 TOTAL EXPENSES 0 163 63 63 63 63 63 63 63 604 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 0 163 63 63 63 63 63 63 63 604 TOTAL SOURCES 0 163 63 63 63 63 63 63 63 604 2014 - 2019 Capital Improvement Program 21 63