HomeMy WebLinkAboutReg 2014-02-03 Item 3I - Purchase - 10 King Pedestrian Lighting from Tacoma Electric for $44,128.50COUNCIL AGENDA S
Aleeti IN Date
Prepared b ;
Ma3vr:r review
Comcil review
02/03/14
BG J
e4--
ITEM INFORMATION
OASIS
ITEM No.
3.1.
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA
" ATE: 02/03/14
AGENDA -ITN TITLE Street Department's Purchase of 10 King Luminaire Fixtures, Arms, and Poles
CATE7,GORY Di■-mssion
Mit Date
Motion
AN Date 02/03/14
Resolution
Alig Date
El Ordinance
ilvitg Date
Bid „Award
\Iig Dale
El Public fleari
lt,g Date
1] Other
N Date
SPONSOR J councii
LI Da) El Finance El Fire D IT D i"R fl .PTIV
SPONSOR'S
SUMMARY
This purchase is for 10 new King green pedestrian light fixtures. The pedestrian poles have
been used along Tukwila International Blvd, S 3.4e St, and the TUC Access (Klickitat)
interchange. We normally experience a loss of 3 poles each year, so this purchase will
supplement the existing need and the remaining will be added to inventory. Council is
being asked to purchase 10 King LED luminaires, arms, and poles from Tacoma Electric in
the amount of $44,128.50.
REVIEWED BY 0 COW Mtg. El CA&P Cmte
Utilities Cmte El Arts Comm.
ATE: 01/27/14
Ell IF&S Cmte Transportation Cmte
I] Parks Comm. ID Planning Corrirn..
COMMITTEE CHAIR: ALLAN EKBERG
RECOMMENDATIONS:
spoNsolt/ADmiN Public Works Department
CommITTEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPINDITURI: REQUIRED
$44,128.50
Fund Source: 000.16 STREETS
Comments:
AMOUNT BUDGETED
$216,000.00
APPROPRIATION REQUIRED
$0.00
MTG. DATE
RECORD OF COUNCIL ACTION
02/03/14
MTG. DATE
02/03/14
ATTACHMENTS
Informational Memorandum dated 01/24/14
Competitive Quotes
Minutes from the Transportation Committee meeting of 01/27/14
87
88
46146
r 40.6,
6, 6i
,1676,
TO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director
BY: Stan Anderson, Street Department Superintendent
DATE: January 24, 2014
SUBJECT: 2014 Street Department's Street Lighting Supplies
Purchase of 10 King Luminaire Fixtures, Arms, and Poles
ISSUE
Approve the purchase of 10 King decorative pedestrian light poles from Tacoma Electric of
Tacoma, WA for replacement and inventory.
BACKGROUND
This purchase is for 10 matching replacement King pedestrian light poles and fixtures
that have been utilized along Tukwila International Blvd (TIB), S 144th St and the Tukwila
Urban Center Access (Klickitat) Projects. Currently, there are 3 damaged poles on TIB
and the pedestrian light pole inventory was depleted in 2013. In addition, we normally
experience an average loss of 3 poles per year. All of the new lighting fixtures purchased
use the LED version of the King Luminaires and each complete assembly costs $4,030.
BUDGET SUMMARY
Three competitive bids were received and Tacoma Electric was the low bidder. Purchase
will be made out of the street lighting supplies and traffic control devices budgets.
Purchase Budget
000.16.542.630.31.01 Street Lighting Supplies $44,128.50 $ 30,000.00
000.16.542.640.31.01 Traffic Control Devices 186,000.00
Total $44,128.50 $216,000.00
RECOMMENDATION
Council is being asked to approve the purchase of 10 King pedestrian lighting poles and
fixtures from Tacoma Electric in the amount of $44,128.50 and consider this item on the
Consent Agenda at the February 3, 2014 Regular Meeting.
Attachments: Competitive Quotes
W:\Shared Copy Only \StarAKing Ped poles \ Info Memo LED Ped pole Purchase 1-24-14.docx
89
90
No.
CITY OF TUKWILA
6200 SOUTHCENTER BLVD. TUKWILA, WASHINGTON 98188 433 -1800
VENDOR NAME & ADDRESS
Tacoma Electric Supply
VENDOR CODE
Verbal Quote:
DATE
1311 E. Tacoma way
Written Quote: X
Tacoma, WA 98401
Quantity
Description
Fund
Dept
Basub
Element
OBJ
SubOBJ
Amount
10
Pedestrian light pole w /arm and fixture $4030 ea
000
16
542
630
31
01
$40,300.00
For replacement stock
Tax 9.5%
$3828.50
Replacements to match existing poles on TIB,
144th and Urban Access project.
$44,128.50
P.O. only no VISA
CF:
Project File:
Other Sources:
Sea -Tac lighting and controls
Blueridge lighting
Quote: $44,914.08
Quote: $45,162.38
Originator: Public Works — Maintenance & Operations
91
• TACOMA
ELECTRIC
SUPPLY iNC
JOB NAME
QUOTATION
(Quotation goad 30 days)
id Date:
Cut
attn:
).B. Shipping Point
F.O.B Factory with fuli freight allowed to destination
F,0,18, Destination
---"7-77:l7 7E'
pag
*Ccin ractor to verify all counts, voltages, wattages, finishicoior & dimensions.
ow if-2. weeks for submittal drawings, and /t)-/7--weeks for manufacturing
ment after release :and receipt of approved drawings.
Salesman Signature.
RO. Box 11308 Tacoma, WA 9841 53) 475-0540, Seattle:(206) 824-9592, To Free: (800) 422-0540
1311 South Tacoma Way, Tacorn A 9t9, Sales Fax: (253) 475-0707 Accounting Fax (253) 474-0092
16202' 57th Avenue East, Puyallup, WA 98375, (253) 531-7335, Fax (253) 531.-8 °
8719 Commerce Place Drive NE, Lacey, WA 98515, (360) 943-3773, Fax (360) 352-92
92
QUOTE # KHS14 -0011 DATE: 01 -14 -14 PAGE 1
Sea -Tac Lighting & Controls, LLC.
4439 S. 134th PI. Bldg E
Tukwila, WA 98168
www.seataclighting.com
To:
City Of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
Remarks:
Qty
10
Phone: 206 -575 -6865
Fax: 206- 575 -8013
Quotes Fax: 206- 575 -1557
Proj: TUKWILA DECO REPLACEMENT POLES
ngr:
Cont:
TUKWILA, WA
Mfg Description
STR3 TUKWILA 16' DECO POLE, ARM & LUMINAIRE
ASSEMBLY
CONSISTING OF
STR3 (1) K204 -FASH- III- 40(SSL)- 5000 - 120(MT)-
STR3 KPL10- XPG -WJW /D
STR3 (1) KA40 -T -1- 39.5 "- WJW /DG
STR3 (1) KM9ORE- 16- WJW /DG
STR3 (1) SHIPPING & HANDLING PER ASSEMBLY
ANCHOR BOLTS ARE NOT INCLUDED
Total =___
F.O.B. Per MFG Terms: Net 30 Days Lead time:
Prices firm for entry by: 45 Days (Shipment by:
Subject to manufacturer's published terms and conditions of sale.
Quotation is void if changed. Complete quote must be used, no partials
noted.
No hardware or accessories are included, unless noted.
ALL ballast quoted are not brand specific and are chosen at the factories discretion,unless
noted.
Verification of voltages, mounting methods,row information ceiling
is the responsibility ofDistributor/Contractor and is required at time ......,. -o f order.
Printed Printed 0 1/14L14 16:52:11 Per: ED ARISTO__
Unit Price
4098.00
Extd.Price
$40980.00
unless otherwise
style, finishes, etc.
93
QUOTE # KH014 -0024 DATE: 01 -14 -14 PAGE 1
Blueridge Lighting & Controls, LLC
1 5075 SW Koll Parkway, Suite K Phone: 503 - 644 -5618
Beaverton, OR 97006
Fax: 503 -644 -5619
To:
CITY OF TUKWILA
PUBLIC WORKS DEPT /MAINT DIV
600 MINKLER BLVD
TUKWILA, WA 98188
206 - 433 -1860 Fax 206 - 575 -3404
Proj: TUKWILA DECO REPLACEMENT POLES
TUKWILA, WA
Arch:
Engr:
Spec:
Cont:
Remarks:
Qty
Type
Mfg
Description
Unit Price
Extd.Price
10
STR3
TUKWILA 16' DECO POLE, ARM & LUMINAIRE
ASSEMBLY
4120.66
$41206.60
CONSISTING OF
STR3
(1) K204 -FASH- III- 40(SSL)- 5000- 120(MT)-
INCL
STR3
KPL10- XPG -WJW /D
STR3
(1) KA40 -T -1- 39.5 "- WJW /DG
INCL
STR3
(1) KM9ORE- 16- WJW /DG
INCL
STR3
(1) SHIPPING & HANDLING PER ASSEMBLY
INCL
NOTE
ANCHOR BOLTS ARE NOT INCLUDED
Total = = ==
$41206.60
F.O.B. Per MFG Terms: Net 30 Days Lead time: 155-11
Prices firm for entry by: 45 Days Shipment by: 60 Days q (b lrl0
This quotation is based SOLELY on information provided by you as of this date and time of
quotation. A new quotation will be required IF there are any changes in the plans or
specifications in the future by any addendums or other announcements. Verification of pole
and /or fixture color, wattage and voltage MUST be received in writing prior to order.
Blueridge Lighting & Controls CANNOT be held responsible for incomplete or inaccurate
information. Additional freight charges may be incurred for pre- shipment of anchor bolts.
Lamps are NOT included in pricing unless otherwise noted. Subject to manufacturer's
published terms and conditions of sale. Quotation is void if changed. Complete quote must
be used.
Printed 01/14/14 15:18:02 Per: KRIS HARTNETT
94
Transportation Committee Minutes January 27, 2014 - Page 2
C. Bid Award: Overlay and Repair - East Marginal Way South
Staff is seeking Council approval to award a bid to Miles Resources, LLC in the amount of
$1,738.991.50 for the Overlay & Repair - East Marginal Way South Project. This project will
include pavement repairs and an asphalt overlay of East Marginal Way South between South
81st Place and South Norfolk Street. Miles Resources, LLC was the lowest of six bids received
earlier this month, and the bid is under the Engineer's estimate of $1,867,221.00. WSDOT
concurred with the award after one error was discovered and corrected. An additional $65,000
for storm water improvements will come from the Small Drainage Program 412 Fund.
UNANIMOUS APPROVAL. FORWARD TO FEBRUARY 3, 2014 REGULAR CONSENT
AGENDA.
D. 2014 Street Department Purchase: 10 King Luminaire Fixtures, Arms, and Poles
Staff is seeking Council approval to purchase 10 King decorative green pedestrian light poles
from Tacoma Electric in the amount of $44,128.50 for replacement and inventory. These have
been used along TIB, South 144th Street, and the Tukwila Urban Center Access projects. There
are currently 3 damanged poles on TIB and this purchase will replace those and establish an
inventory of 7 for future replacement needs. All of the new fixtures use LED and each assembly
costs $4,030. Tacoma Electric was the low bidder of three, and funds for this purchase will
come from Street Lighting Supplies and Traffic Control Devices. UNANIMOUS APPROVAL.
FORWARD TO FEBRUARY 3, 2014 REGULAR CONSENT AGENDA.
E. King County Metro Transit Interurban Avenue South Leased Park and Ride Lot
As information only, staff provided an overview of the status of the King County Metro Transit
leased Park - and -Ride Lot on Interuban Avenue South. King County owns the large Park -and-
Ride Lot located at 13445 Interurban Ave S, and for the last twenty years has leased the small
parcel at the southwest corner of 52nd Avenue South as an auxiliary adjacent lot. Due to to a
50% increase in rent to $1500 per month, King County has chosen to terminate this lease
effective January 31, 2014, resulting in the loss of 41 parking spaces. It is anticipated that the
loss of commuter parking spaces could result in more complaints by residents as well as more
parking enforcement activity by Police. King County Metro Transit is currently exploring all
options to replace these parking spaces, and information will be shared with the Council when
available. INFORMATION ONLY.
III. SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBD) Meeting
The December 17, 2013 meeting summary and January 21, 2014 agenda were included in the
Committee packet. Tukwila was not in attendance at the December meeting. Committee members and
staff discussed attendance at future meetings, which may vary depending on Councilmember availability.
IV. MISCELLANEOUS
Committee members and staff briefly discussed the 2014 work plan. Chair Ekberg mentioned he will
provide notes from the Council Retreat, and that 53rd Avenue South street improvements were brought
up as a focal point of interest. Staff confirmed that the 53rd Avenue South project is currently in the
adopted Capital Improvement Program, with design and construction scheduled for 2015 -2017. Staff
also confirmed that apprenticeship guidelines are expected to be provided to the Committee in March.
Meeting adjourned at 5:53 p.m.
Next meeting: Monday, February 10, 2014
Committee Chair Approval
Minutes by LH, Reviewed by GL.
95