Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 0055 - Wachter Building
This record contains information which is exempt from public disclosure pursuant to the Washington State Public Records Act, Chapter 42.56 RCW as identified on the Digital Records Exemption Log shown below. 055 Wachter Building 1205 Andover Park West RECORDS DIGITAL D- ) EXEMPTION LOG THE ABOVE MENTIONED PERMIT FILE INCLUDES THE FOLLOWING REDACTED INFORMATION Page # tode Exemption = 8rlef Explanatory DeSclriptiop �t�tutel ule The Privacy Act of 1974 evinces Congress' intent that social security numbers are a private concern. As such, individuals' social security Personal Information — numbers are redacted to protect those Social Security Numbers individuals' privacy pursuant to 5 U.S.C. sec. 5 U.S.C. sec. 2 DR1 Generally — 5 U.S.C. sec. 552(a), and are also exempt from disclosure 552(a); RCW 552(a); RCW under section 42.56.070(1) of the Washington 42.56.070(1) 42.56.070(1) State Public Records Act, which exempts under the PRA records or information exempt or prohibited from disclosure under any other statute. Redactions contain Credit card numbers, debit card numbers, electronic check numbers, credit Personal Information — expiration dates, or bank or other financial RCW DR2 Financial Information — account numbers, which are exempt from 42.56.230(5) RCW 42.56.230(4 5) disclosure pursuant to RCW 42.56.230(5), except when disclosure is expressly required by or governed by other law. 71-055 1205 andover park west wachter family mccann construction LEGAL 1 DESCR. LOT NO. [i .K TRACT (DCi ATTACHED SHEET) OWNER MAIL ADDRESS ZIP PHONE 2 / / l / A C g r - Y /v� 'o ' EAsr pi He Si Sear ?TG E� s'7 2 -1 CONTRACTOR D MAIL ADDRESS PHONE LICENSE NO. era s P , k4,reen ¢ p. C e I _1. / • .� , - 7 . s 0D o. 1.1., frr ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. a /1 J , u � ._ e-d < e - / ' 4 1 714 I /12-/614 .L • 6 3 ENGINEF.R MAIL ADDRESS PHONE LICENSE NO. 5 6 LENDER MAIL ADDRESS �..� / . /7e-0/.2._41.r ��.rr��// USE OF BUILDING 1_1&4141.1. orFic F-2 dec. 8 Class of work: XNEW ❑ ADDITION • ALTERATION ❑ REPAIR • MOVE ❑ REMOVE 9 Describe work: 10 Change of use from Change of use to 11 Valuation of work: cie PLAN CHECK FEE /' �� • � � PERMIT FEE / SPECIAL CONDITIONS: Type of �f'� /l Const. — Al occupancy r Group / Dlvlslon Size of BIdg&4/ (Total) Sq. Ft. No. of Stones ` Max. Occ. Load Fire Zone Use yy� Zone / �/ Fire Sprinkler Required es • NO � Y. APPLICATION ACC BY r/ ( / ) (/• PLANS C E KE Ito APPROVED FOR ISS CE BY No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered /,_. N O T I ��✓l SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM• MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR OCAL LAW REGULATING CONSTRUCTI • • • THE PERFO • CONSTRUCTION. r / / Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING FINAL SIGNATURE • ,NE: Or OWNS BUILD /Oa 7 57� TIJ,A AUTHORIZED ENT (DATE) BUILDING PERMIT A Pi Ex Applicant to complete numbered spaces only. CITK 3F TUKWILA BUILDING f ....MIT 14475 • 59th Ave. So. / Tukwila, Washington 98067 BUILDING PERMIT NO. N° 055 WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION rCK: M.O. CASH 1,7‘.. s /e1A 7/7/ 7 .q OCCUPANCY PERMIT REQUIRED /3 =5 ///1 /7/ / >7.C), legal description COPIES , DATE NO. DESCRIPTION 1 2 -11 -72 Certificate of Conformance from Strong -Tie Structures Division of SIMPSON Company - Weyerhaeuser Co. Laminated Lumber Product. TO GENTLEMEN:. WE ARE SENDING YOU iX Attached ❑ Under separate cover via McCann Construction Con{ Inc. 8013 Perimeter Road South Boeing Field SEATTLE, WASHINGTON 98108 206 RO 2.2555 206 RO 2.8124 City of Tukwila 14475 59th Avenue South Tukwila, Washington 98067 ❑ Shop drawings ❑ Copy of letter ❑ Prints ❑ Change order COPY TO ❑ Plans SIGNED: If enclosures are not as noted, kindly notify us at once. L EITIT1 2 ©F UMl1VNJLIVIJ DATE 2 -22 -72 JOB NO. 193 ATTENTION RE: Aptex, Inc. ❑ Samples the following items: ❑ Specifications THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use 0 Approved as noted ❑ Submit copies for distribution :. o As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS' na,r; d to T.rm.r CERT JOB NAME+ JOB LOCATION: HE UNDERSIGNED MANUFACTURER HEREBY CERTIFIES that the products identified below and on attached sheets Nos. _____._.__.__._ and the principal mem- bers of which are marked with the Collective Mark of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC) were manufactured in conformance with applicable provisions of U. S. Commercial Standard, CS 253-63, for Structural Glued Laminated Timber, and that such manufac- ture has been at our plant in Cot g tae Sarove, Oregon , which plant has a quality control system approved by the Inspection Bureau of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION and inspected periodically by such Bureau. The undersigned manufacturer further certifies that the work has been done in accordance with the applicable job specifications. and With manufacturing and fabricating provision of Chap 25 U.B.C. ,\ AgIE OF TIMi ,. . t:-• u ca IFICATE OF .5 CONFORMANCE APTEX PROJECT 193 •ITC NORM 1••1.70 TUKWILA WN CUSTOMER'S ORDER NO. DATE 1 -7 -72 MFGR'S ORDER NO. 1315 -0339 SIGNATURE tL�� �J WEYERHAEUSER CO ` �.v. l .__ } COMPANY LBR PROD TITLE Q C SUPERVISOR ADDRESS COTTAGE GROVE, ORE DATE _. � .-1 t - 1 2-- verified by the AITC Inspection Bureau. A � , E' l id f ddt f ,,.`,`► ••. v ' .. - • ( r + fi r= f it M ✓: AITC HEREBY CERTIFIES that the said company at its said plant is licensed by the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION to use the AITC Collective Mark in respect of products which comply with applicable provisions of said Standard, that the adequacy of the quality control system in effect at said plant is periodically inspected and verified by the Inspection Bureau of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION, and that, in the judgment of the undersigned, said company is capable of complying with applicable manufactur- ing and testing provisions of said Standard in respect of products manufactured at said plant. Conformance with the Standard in respect of any specific or particular product is the sole responsi- bility of the manufacturer; AITC's guarantee hereunder being that the said company is qualified to produce a product meeting the said Standard and that its plant is periodically inspected and AITC Certificate No. 910 5 9 Signed for AMERICAN INSTITUTE OF TIMBER CONSTRUCTION ,,,441-77 . f■eeuhve Vice P,e „dun, Manage,. Inspection Pomo') 01970 AMERICAN INSTITUTE OF TIM9ER CONSTRUCTION Job Name: APTEX PROJECT #193 Job Location. TUKWILA, WN Customer's Order No. Doted 1 -7 -72 Si II•.i. T No,......__. T TA CHMENT NUMBER TO / TC Certificate of Conformance No. 91059 Dated 1 -7-72 Mfgr's Order No. 1118 -0339 The following identifies the members and gives the basic specifications that were used on this job: LeIn Cm Member Identi• Quantity Size tication Combi• Adhesive nation Type Appear- ance Grade Bl, 9 6 3/4 x 18 A Ext Ind B2 9 6 3/4 x 31 1/2 A Ext Ind B3 9 6 3/4 x 24 A Ext Ind B4 9 6 3/4 x 27 A Ext Ind B5 5 10 3/4 x 28 1/2 A Ext Ind B6 2 ___12_114—_,&_28_312 A _BAIL__ Ind Cl 9 10 3/4 x 10 1/2 F Ext ind 09 9 10 3/4 x 10 1/2 R R Ext Ind C3 9 10 3/4 x 10 1/9 E Rift Ind FL 149 At WEY i ER S HAE Ia � ER' CO LAMINATED LBR PROD Company AITC Perm 1i•auS Oct: V .VLti L • �, E. vu�.) Plant Quality Control Supervise Dote 'Z -11 -1 Camber m 196S American Institute of Timber Construction T TA Cf NUMBER TO ITC Certificate of Conformance No. 91059 Dated Job Name. APTEX PROJECT #193 Job Location' AITC Form 19.3.65 TUKWILA, WN 1. LUMBER Species. WCDF Grading Rules. WCLB — 15 Paragraph: The following gives the additional specifications that were used in the manufacture of the members on this job: Customer's Order No Dated 1 -7 -72 Mfgr's Order No 1118 -0339 154 A, B, C Grades: Tens ion Lam L1 L2, L3 Slope of Grain. 1 in 16, 1 in 14, 1 in 12, 1 in 10 __ !L` ( 70 2. MOISTURE Range• n fi? CONTENT �r7 Variation per member: l Ct 3. END JOINT Standard Finger Joint 4. ADHESIVE Conforms to MIL— A -397B Type: Phenol Resorcinol WCO 313LN 5. GLUING Pressure 125 PSI Minimum Glue Spread 60-65#/MSqFt 1 ATE OF TIM P 149 a y ` � AITC Licensed Plant No. Plant uolity Control Supervisor WEYERHAEUSER CO LAMINATED LBR PROD � a - I i Company � Dote 1.1 I I PIu. . Pressure Period 8 -14 Hrs 1 -7 -72 specifications, Botch No I -- ® 1965 American Institute or Timber Construction I:17 .,, .. • lore r 1% C ; 4 ADDENDUM NO. 3 TO DEVELOPER'S AGREEMENT WHEREAS, the City of Tukwila and Sammamish Commercial Company, Inc., have previously executed a Developer's Agreement and tvc addendums to the developer's agreement dated March 17, 1970, and April 27, 1970, and WHEREAS, the parties desire to amend said agreement and WHEREAS, Sammamish Commercial desires to construct build- ings in the area encompassed in the agreements, and V6EAS, Tukwila is agreeable to said construction on certain terms and conditions, NOW, THEREFORE, the parties agree as follows: 1. Sammamish CommerciaX agrees to install one, sixty inch (60 ") storm drain from Minkler Boulevard to South 180th, all in accordance with the requirements of the City of Tukwila. 2. Sammamish Commercial agrees to extend the sanitary sewer system to South 180th. 3. The street from South 180th North to the northerly extent of the property now being developed or already developed with full street drainage shall have its first lift of asphalt all as required by the City of Tukwila. 4. The City shall reserve a fifteen foot 15') easement op the east side of Andover West for later installation of a second sixty inch (60 ") storm drain. 5. The building permit for. ,:''instruction of the building shall be issued when they'meet. - ,ne building code requirements. 6. No occupant ' tied .L be issued on said buildings until the sanitary sewer and storm di : ;:J.;ge provided for in Para- graphs 1 and 2 are and available use. 1 0 S cretary CITY OF TUKWILA BY: • : Mayor . Except as modified herein the Developer's Agreement and Addendums previously executed are still in full force and effect. DATED this /2._day of 14 1971, at Tukwila, Washington. SAMMAMIS BY: OMMERCIAL COMPANY, INC. McCann Construction Company, Inc. 8013 Perimeter Road South Seattle, Washington 98108 1. MTV OF TU Wu L. 14475 59TH AVENUE SOUTH TUKWILA, WASHINGTON 98067 2. South rear door to U.B.C. (Sec. South rear door unlocked during l Frank Todd, Mayor May 2, 1972 Attn: Mr. David H. Lowry Dear Dave: A re- inspection on May 1st, 1972 of your project 1193 has revv :a the fo %....:ang deficiencies: South rear door shall be marked exit. locking device, must be changed to 3303 •(c)). is a required exit door and. .shall hours of building occupancy. Items 1, 2, and 3 above shall apply to Wort':1.ear cor ": orm rerna1... Fire wall surrounding South staiwrrrll is not ,properly sealed at concrete wall in'warehouse. Fire wall enclosure at North stairwell 4; not ,roperl. ?.ed at Northeast corner of warehouse. • Nuts loose on metal connector - 1 -J. . pne bolt missing on metal connector - 1-G. Doors 1;;ading from warehouse through stairwells to extc `..a:• exit shall a permanently marked exit. 10. Doors inside stairwell providing egress from building .:;c.l be marked exit. 1:1, Locks on doors in item 01.2' above a conform to U.B.C. Sec. 3303(„ 12. Walls wlthin crate closet compartments shall be finished with a nor.• sorber,.: materiel to a height of four feet in all rest ry rooai ..ilities • )ec. ..: (a). Double door off mezzanine must, be locked at all times, except when specifically in use. These doors should be marked as dangerous opening. 15. Exits must be marked on mezzanine level to provide immediate recognition of exit location from any point in the hall way. These deficiencies shall be corrected prior to issuance of an occupancy permit. In addition to the above, this office should be provided with evidence of a plumbing permit and an electrical permit. Both permits should be signed off by their respective agencies. You understand that until the sewer project is complete and accepted to receive sewage, Project 193 will continue to function with a temporary occupancy permit. At such time as the sewer is ready for use (provided the above mentioned items are accomplished) this office will provide Project 193 with the necessary ac,cu— pancy permit. Very truly yours, Dear Sir, CITY of TUKWILA Building Department City of Tukwila Tukwila, Washington 14475 - 59TH AVENUE SOUTH TUKWILA, WASHINGTON 98067 April 26, 1972 Ref: Project 193 (Aptex warehouse) Requirements for issuance of occupancy permit. 1. Install portable fire extinguishers per NFPA No. 10. 2. Install hose stations per UFPA No. 14 : • Hose stations shall be located so that all portions of the building: are within 20 feet of a nozzle attached to 75 feet of hose. All exit doors must have landings per NFPA 101, 5 -2153. If I can be of further assistance, please call. Sincerely, Cary A. LaPine Fire Marshal April 25, 1972 McCann Construction Company, Inc. 8013 Perimeter Road South Seattle, Washington 98108 Attn: Mr. David H. Lowry Dear Dave: A final inspection of•your project #193 has revealed the following deficiencies: 1. South rear door hardware missing. 2. South rear door shall be marked exit. 3. South rear door locking device must be changed to conform to U.B.C. (Sec. 3303 (c) 4, South rear door is a required exit door and shall remain unlocked during hours of building occupancy. 5. Items 2, 3, and 4 above shall apply to North rear door. 6. Fire wall surrounding North. stairwell is not properly sealed at Northeast corner of warehouse. 7. Fire wall enclosure at.South stairwell is not properly sealed at concrete Wallin warehouse. 8. Nuts loose on metal connector 7 1--J. 9. One Bolt missing on metal connector — 1-0. 10. Doors leading from warehouse through stairwells to exterior 'exit shall be marked exit. 11. Doors inside stairwell providing egress from building shall be marked exit. 12. Locks on doors in item #12 above:shall conform to U.S.G. Sec. 3303(c). 13. Walls within water closet compartments shall be finished with a non- absorbent material to a height of four feet in all rest room facilit ;es. Sec. 1711 (a) 1 . .Double door off mezzanine must be locked: t all;times, except when specifically in use. These doors shduld.be marked as dangerous. opening. 15. Exits must be marked`on mezzanine level to provide immediate recognition of exit location from ana point in . the hall way. These, defibiencies shall be corrected prior to issuance of an occupancy permit. ;In.addition to.the above, this office should be provided with evidence of a .14umbing permit,and.an electrical permit. Both permits should be signed off: by their respective agencies. lo* understand that until the sewer project is complete and accepted to receive sewage, Project 193 will continue: to function with a temporary occupancy permit. At such time as.the,sewer is.ready for use (provided the above mentioned, items are accomplished) this office will provide Project 193 :with the necessary occupanpy permit. John B. Richards Office Engineer Very truly yours, City of Tukwila 14475 59th Avenue South Tukwila, Washington 98067 Attention: John Richards Re: Sanitary Holding Tank 1205 Andover Park West,. Tukwila, Washington Gentlemen: Enclosed are 2 copies of Purchase Order 12804 to United Services. United Services will be checking the sanitary holding tank daily and pump as required starting Monday, April 24, 1972, When the main trunk ,. line for the City of Tukwila is 'finished we will hookup side sewer to the main trunk line and will dispose of holding tank. Any damage caused by McCann Construction Company, Inc. at the 'location of the holding tank will be repaired by McCann Construction Company, Inc. ARL;`j f Enclosures McCANN CONSTRUCTION COMPANY, INC. 8013 PERIMETER ROAD SOUTH • BOEING FIELD SEATTLE, WASHINGTON 98108 April 21, 1972 Very trul,F.ours, 0I; A. R. Lowry Superintendent King County Health Department GENERAL CONTRACTORS 2061 RO 2 -2555 2061 RO 2-8124 McCANN CONSTRUCTION COMPANY, INC. 8013 PERIMETER ROAD SOUTH • BOEING FIELD • SEATTLE, WASHINGTON 98108 • PHONE (206) RO 2.2555 TO United Services, Inc. DATE April 21, 1972 DELIVERY DATE P. 0. Box 5035 ?UIZCHASE ORDER CHARGE TO 193 12804 C- 0.0935 Aptex Seattle, Washington 98107 'OWNER SHIP TO 1205 Andover Park West Tukwila Washin:ton PER PLANS & SPEC'S. NOTICE The above Purchase Order Number and/or Project or Job Number must appear on all invoices, packing and shipping lists. This Purchase Order must be signed below as accepted and returned to purchaser's address above. Resale certificate —State of Washington— C178.12495. If shop drawings or material samples are required as per specifications, or requested, submit six (6) copies of all, shop drawings and material samples for approval within five (5) days after receipt of this purchase order. PLEASE ENTER OUR ORDER FOR THE FOLLOWING: F.O.B. TERMS: 2% 10TH PROX. QUANTITY DESCRIPTION Check sewage holding daily and pump as required:., Pump and disposal of sewage @ $30.00 per trip. • TOTAL PRICE $ AMOUNT The terms and conditions on the reverse rseside hereof qnd Exhibit attached hereto are part of this Purihase Order and binding upon the supplier. THE ABOVE TERMS AND CONDITIONS ARE ACCEPTED: BY.. McCANN CONSTRUCTION COMPANY, INC. 'BY ?URCHASE ORDER McCANN CONSTRUCTION COMPANY, INC. 8013 PERIMETER ROAD SOUTH • BOEING FIELD • SEATTLE, WASHINGTON 98108 • PHONE (206) RO 2.2553 • TO United ServicQs, Inc. P. 0. Box 5035 CHARGE TO 193 Seattle. Washington 98107 OWNER Aptex SHIP TO 1205 Andover Park West, Tukwila, Washington PER PLANS & SPEC'S NOTICE The above Purchase Order Number and/or Project or Job Number must appear on all invoices, packing and shipping lists. This Purchase Order must be signed below as accepted and returned to purchaser's address above. Resale certificate —State of Washington —C178- 12495. If shop drawings or material samples are required as per specifications, or requested, submit six (6) copies of all, shop drawings and material samples for approval within five (5) days after receipt of this purchase order. PLEASE ENTER OUR ORDER FOR THE FOLLOWINGi DELIVERY DATE THE ABOVE TERMS AND CONDITIONS ARE ACCEPTED: BY QUANTITY DESCRIPTION i DATE April 9 1, 1972 TERMS; 2% 10TH PROX. Check sewage holding daily and pump as required Pump and disposal of sewage @ $30.00 per trip. TOTAL PRICE 12804 C- 0.0935 AMOUNT The terms and conditions on the reverse side hereof qnd Exhibit attached hereto aro port of Ms Purchase Order and binding upon the supplier. McCANN CONSTRUCTION COMPANY, INC. B Y City of Tukwila 14475 59th Avenue South Tukwila, Washington 98067 8013 PERIMETER ROAD SOUTH • BOEING FIELD SEATTLE, WASHINGTON 98108 April 17, 1972 -Gentlemen: •Enclosed`is a letter agreement with Mr. Raymond D. Wachter of:Aptex regarding a firms occupan y of their new building.in Tukwi S cer'ely, yours 2061 RO 2 -2555 2061120 2.8124 Mr, Raymond. D. Wachter 400 East Pine Street Seattle, Washington 98122 Dear Mr. Wachter: McCANN CONSTRUCTION COMPANY, INC. 8013 PERIMETER ROAD SOUTH • BOEING FIELD SEATTLE, WASHINGTON 98108 April 14, 1972 ,Re: Southcenter Industrial Park - Aptex, Inc. Office and Warehouse Building Project This will have reference to the above captioned project and the contract dated August 24, 1971, between McCann Construction . Company, Inc. as Contractor and Raymond D. Wachter, et ux, et al, as Owner and will have further reference to that letter agreement dated April 4, 1972, between yourselves and McCann Construction Company, Inc. 2061120 2.2.555 2061R0 2-8124 In consideration of McCann's permitting you access to the premises at this time, and before final completion and the issuance of an occupancy permit, for the purpose of storing and handling of your company's inventory materials in the warehouse section of the project, it is understood and agreed that you shall indemnify and hold harmless McCann Construction Company, Inc. and the City of Tukwila, and their respective agents and employees from and against any and all claims, damages, losses and expenses, including attorneys' fees arising directly or indirectly out of or resulting from the permitted access and the storage of materials as described. This agreement is intended to supplement those provisions contained in the above referred to letter agreement dated April 4, 1972, and the obligations, result- ing herefrom shall continue until such time as the project is turned over to you and an appropriate -occupancy permit issues. The understandings and agreements contained herein are intended to further modify the'terms and conditions of the above referenced construction contract including but not limited to Sections 4.18, 9.7 and 11.3 of the printed General Conditions of the contract as well as all applicable typewritten general and special conditions. In addition, you have been further advised that as of this date, the sprinkler system in the building struc- ture is not operable. GENERAL. CONTRACTORS • ft. ,.P ... , ... ., DSte / /I� very truly yours, If the foregoing is acceptable to you, would you ;kindly 'so indicate in the space provided below. By so doing, you are sign- ing for and warrant that you are authorized to sign on behalf of . all parties listed as "Owner" in the construction contract referred to above. y _ oss (jg71 S OVERLAKE E LJILDING CONSUSANTS • BELLEVUE, WASHINGTON 98004 • SH. 6-5223 16071 N.E. 2ND STREET November 1, 1971 Mr. Hubert Crawley Building Official City Hall Tukwila, Washington Dear Hubert* Plan Check No. 0 -408 Uses mercantile Type III -N Group F -2 Fire Zone # 3 Stories 1 Floor. Area' (Max.) 54,000 Sq.Ft. Total Floor Area 40,080 Sq.Ft. 1970 Uniform Building Code Seismic Zone # 3 McCann Development Corp. #193 I n d s a1 Gdou-tt p w We are returning to you under separate cover, the above subject plan which has been checked for conformance with the Uniform Building Code, and following are the comments of our plan checker* 1. 40,080 sq.ft. a 5612.00 + .60 x 1.06 multiplier = 513.36 per square foot. Value = 46535,469.00 = permit fee s/b 5672.50 plan check " s/b 336.25 These figures are taken from current,I.C.B.O. data, as published in "Building Standards Monthly." 2. Unobstructed yards of 70 feet should be maintained on two sides of the building for area purposes. Section 506. 3. Nonabsorbent finish and backing for toilet room walls and floor should conform to Section 1711 (e). 4. Parapet walls not less than 30- inches in height are required, on south end of building. Section 1709. 5. Final partition layouts and details should be submitted prior to installation to ,justify compliance with occupancy, fire - resistive, structural, and exit requirements on main level. 6. Walls and ceilings of corridors should be of one -hour fire - resistive construction. Section 3304 (g) & (h). 7. Interior openings into corridors should be protected as set forth in Section 3304 (h). 8. The space between wood floor construction and a suspended ceiling below should be divided into areas not exceeding 1000 square feet. Section 3103. 9. An approved. automatic fire- extinguishing system is required. Section -3801. 10.. Special` inspection in conformance with Section 305 is re quired for the following work: a. Structural concrete based on an ultimate compressive strength in excess of 2000 pounds per square. inch. 'b. Installation of high strength bolts. 11. Glued- laminated lumber should be fabricated in accordance with Section 2513 (c). A certificate of inspection should be submitted to the building official. Section 2513 (e). 12, Plywood grades should conform with .Table No. 25 -C. Very ,truly yours, .OVERLAK,EfAU4DING CONSULTANTS i I If we can be of further service, please: do not hesitate :to contact us. Please find enclosed, our invoice #4048 covering this plan check. .f YOUR ORDER NO. P.O. 2021 DATE SHIPPED QUANTITY ORDERED. QUANTITY SFIIPPED OUR ORDER NO. SHIPPED VIA Qra Lln• "ONAP•A•WAYO FORM . 44.401 3•PARTB IS WILSON JONES COMPANY • Cioa7 • PRINT'S. ..J U.R.A. Ovr , 160 -'.AKE 71 NE BUILDING CCNSt1LTANTS 2 Bellevue, :Waehington . 98008 SH '6 =5223 DATE $* 11n 11 /1/21 SOLD TO Building "Department SHIPPED TO City Hall Tukwila. Weehington Plan Check No. 0 -408 Plan check fee .STOCK NUMBER /DESCRIPTION . • • • DUPLICATE SALESMAN.:' F.O.B. Mercantile - McCann Dev..Corp. #193 • . 1 • • TERMS PRICE INVOICE NO. 4048 net PER AMOUNT FOLD .2.5. `1I68 site plan roof plan room finish schedule room paint schedule typical stair