Loading...
HomeMy WebLinkAboutPermit D03-051 - TARGET - TENANT IMPROVEMENTTARGET 301 STRANDER D03-051 •-• • -• • • City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049005 Address: 301 STRANDER BL TUKW Suite No: Tenant: Name: TARGET Address: 301 STRANDER BL, TUKWILA, WA DEVELOPMENT PERMIT Owner: Name: DAYTON HUDSON CORP Phone: Address: C/O PROPERTY TAX DEPT, 777 NICOLLET MALL Permit Number: D03 -051 Issue Date: 02/28/2003 Permit Expires On: 08/27/2003 Contact Person: Name: JASON BERZINSKI Phone: 612 761 5059 Address: 1000 NICOLLET MALL, TPN - 1210, MINNEAPOLIS, MN Contractor: Name: RAINBOW FEDERAL, INC. Phone: 425 333 -4876 Address: P.O. BOX 1116, CARNATION, WA Contractor License No: RAINBFI172QG Expiration Date:05/13/2003 DESCRIPTION OF WORK: INSTALLING 1/2 "' POLYISE COVERBOARD AND A 60 MIL SARNAFIL MECHANICALLY ATTACHED ROOF SYSTEM OVER THE TOP OF EXISTING EPDM ROOF. REMOVING EXISTING EPDM ON WALLS AND CURBS ONLY, AS WELL AS EXISTING METAL COPING. Value of Construction: $83,700.00 Fees Collected: $1,459.39 Type of Fire Protection: SPRINKLERS Uniform Building Code Edition: 1997 Type of Construction: Occupancy per UBC: 0023 Curb Cut/Access /Sidewalk /CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Storm Drainage: N Street Use: N Water Main Extension: N Water Meter: Channelization / Striping: doc: Devperm Public Works Activities: Private: N Private: N ** Continued Next Page ** D03 -051 Public: N Public: N Printed: 02 -28 -2003 Signature: doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this •e if does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constru�,, . the performance of work. I am authorized to sign and obtain this development permit. stff Print Name: / This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D03 -051 Date: Date: J 2-- z 8/6 Printed: 02 -28 -2003 Signature: doc: Conditions City of Tukwila Print Name: / 2^'4 Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2623049005 Address: 301 STRANDER BL TUKW Suite No: Tenant: TARGET 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 4: A statement from the roofing contractor verifying fire retardant class of roof will be required prior to final inspection (see attached procedure). 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the • erformance of work. PERMIT CONDITIONS D03.051 Permit Number: D03 -051 Status: ISSUED Applied Date: 02/13/2003 Issue Date: 02/28/2003 Date: U Z�—y' z 0 j Printed: 02 -28 -2003 q,A44iL' ' 4' FEB 12 '03 04 :99PM TUKWILA DCD /PW CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Applications and plans must be complete io order to be accepted for plan review. Applications will not be accepted trough the mail or by fax. * *Please Print" Site Address: 3C)1 Tenant Name: Property Owners Name: C.3.!( Mailing Address: b P.2/7 I ,T2N i2 L( Q Lnf((ip�lIS( C y S fY1ki King Co Assessor's Tax No.: Suite Number: Floor New Tenant; ❑ ..., Yes fZi...No Zip Jo-3 Name: > >Gl Y1 . ' Z-1 �r1���.2 V Mailing Address : - I O.DO \\.l E -Mail Address: Day Telephone: (.(D (2 1(e,1 -� - 7-lb Minn(' is t3 L(i2 3 Fax Number: Company Name: \ XT L.) E- c° \( c k Mailing Address: Contact Person: c c c - J GYM E -Mail Address: I VA � rlaC�V c ai b't yi { 4 CI L) 4latc Zip Day Telephone: ( 42'S Fax Nutxiber :N7F,)37,23 � 3 Contractor Registration Number: mfr t\\ Br 11 Expiration Date: ' 1 103 _ **An original or notarized copy of current Washutgton State Contractor License must be presented at the time of permit issuance"* �� n ttit � ' yet d T Il i�nat ]� `4 ilt, , �r • y v, 'ri)Y' r `i r 1 � w h FE� 1 'r I,jS 1 i ! ?v L` l j�y`, ,d,' �� , di7� i�1 i� ;410, I;.,A �. } l.�t i +;til ' a lY:.^.��':r' ��i7��01id. + 'i �i1df?i:lvi h 1'1,�rljRal�i�` +Z ktY r 11>� r� G il . ry rl. .. 7�,.'��, •� d'a.,d .L� l) �.,.2{ y v A re Company Name: 1\11 VA Mailing Address: Contact Person: E -Mail Address: ) ' r r • f-' ",i7; -, ' + +!•fi4 ti:'1�• ;>< ``�n 1 ;!!fl Company Name: ►y I r _ Mailing Address: Contact Person: omit applittii00 (12003) 1/1003 E-Mail Address: Page City Day Telephone: Fax Number; City Day Telephone: Fax Number: StRiC Scat,; Zip Zip State Zip FEB 12 ' 03 04 :39PM TUKWILA CCD /PW � 'fyii��i Valuation of Project (contractor's bid price): S R 3 i - 700 • Scope of Work (please provide detailed infortnation):h2 , ■ Ii PDm 9 -4 (Y . \dipplt:aUvn ramie application (14Q03) 1nooi Will there be new rack storage? ]..,Yes (H... No '1C • for requirements. e r c ' ryte.fzi ( cop 1 1 (. , FrovideAll,Buil' i Arcos ;;in � If "yes" see handout No. 6v P. 3/7 Existing Building Valuation: $ �1Yll� OUP V (1 ( L C 4NejI OS_ PLANNING DIVISION: Single family building footprint (aea of the foundation of all *fractures, phis ally decks over 18 inches on overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: =Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence, Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑...Yes 0.. No If "yes " explain: FIRE 1 ROT ECTCON/HAZ�RDPUS MATERI4LS: Q .. Sprinklers ['.,.Automatic Fire Alarm D...None Q.. Other (specify) Will there be storage or use of flammable. combustible or hazardous materials In the building? 0 .. Yes O,..No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. UTILITY DISTRIQ & Note: lithe utility district is not City of Tukwila you must provide written verification and approval from that utility district at the time of permit application. Water 0 City of Tukwila Water District 0 .. Water District #125 0... Highlinc Water District 0... City of Renton Water District Sewer ❑ .. City of Tukwila Sewer District Q.. Vid Vue Sewer District 0...City ofltcnton Sewer District 0...City of Seattle Sewer DISITict Q „ Septic System (If property is served by a septic system, 2 copies of approved septic design from King County Health Department must be submitted at the time of permit application) Page 2 , s t :'lnttri ..' ' . R..t n . i' dtilition,,tt�. :'E �'� • , S �� ' �;tui;� e ' „ , ,:a` ew ;N , ; ?; yl�,a.,of. a tructit, � "e ,� " ' � ''� � ' , i XT,� . . ,Tynq:of' :G c d'' :c er c' , per' . Y.p .. ' � (fl3C� � . , 1't Floor: , ,, ' .._. _ ' ElpOrS ;,T;lh>u , ^'Acccssory.;Structtlt;C: ' '11.ttac i<cr:P ra o. _. .,... .. aDetaclt ed.Grage. �I — ttanccd,Ca :, , ' Co,Yete4:Dcck: a - FEB 12 ' 03 04 :39PM TUKWILA CCD /PW � 'fyii��i Valuation of Project (contractor's bid price): S R 3 i - 700 • Scope of Work (please provide detailed infortnation):h2 , ■ Ii PDm 9 -4 (Y . \dipplt:aUvn ramie application (14Q03) 1nooi Will there be new rack storage? ]..,Yes (H... No '1C • for requirements. e r c ' ryte.fzi ( cop 1 1 (. , FrovideAll,Buil' i Arcos ;;in � If "yes" see handout No. 6v P. 3/7 Existing Building Valuation: $ �1Yll� OUP V (1 ( L C 4NejI OS_ PLANNING DIVISION: Single family building footprint (aea of the foundation of all *fractures, phis ally decks over 18 inches on overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: =Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence, Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑...Yes 0.. No If "yes " explain: FIRE 1 ROT ECTCON/HAZ�RDPUS MATERI4LS: Q .. Sprinklers ['.,.Automatic Fire Alarm D...None Q.. Other (specify) Will there be storage or use of flammable. combustible or hazardous materials In the building? 0 .. Yes O,..No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. UTILITY DISTRIQ & Note: lithe utility district is not City of Tukwila you must provide written verification and approval from that utility district at the time of permit application. Water 0 City of Tukwila Water District 0 .. Water District #125 0... Highlinc Water District 0... City of Renton Water District Sewer ❑ .. City of Tukwila Sewer District Q.. Vid Vue Sewer District 0...City ofltcnton Sewer District 0...City of Seattle Sewer DISITict Q „ Septic System (If property is served by a septic system, 2 copies of approved septic design from King County Health Department must be submitted at the time of permit application) Page 2 Un.tt,typg ...;., .,.: .:0 .„., Ufit :Type- Y,- ;.- ..._ 1:! Uniti y'pe.', ;' "i ;. ,..' Q ;.:13oilerigc --- " - 3.15 prei'go0 ... 0 4 HP/ 100,000 BTU HP /500,000 BTU i Furnace <100K - B Air Ha ing nit >10,000 CFNI Cooler Other Mechanical T Equipment Furnace >100K BTU Floor Furnace - evaporator Ventilation Fan — 15-30 HP /1,000,000 BTU / - Suspend Wall/Floor Mounted Heater Ventilation System i 30-50 HP BTU Appliance Vent Hood 50 ' HP/ 1,750,000 T3 ' Hestt/Refrig/Cooling System Incinerator - Domestic — _ _ Air Handling Unit < =10,000 CFM Incinerator -Comm/Ind _ Contact Person: E -Mall Address: FEB 12 '03 04:41PM TUKWIL A DCD /FW x , ,7 •1(t �,'„� ; .)i r' +r,1R •� ;1!'� G l.",a'.+ 1i` ; /1 ( � 1•�' -Z � a r; �_' d rift • 1t�. %�i { }�:�,. �:ii.i l l,r ;•F�1: r1�1. .Y.iAfy:, i. • !'I Ri. JYr�lll ;�`). �1� MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: Valuation of Project (contractor's bid price): $, Scope of Work (please provide detailed information): Use: Residential: New ....0 Replacement Ej Commercial: New Replacement •.." 0 Fuel Ty.: Electric .,,.•D Gas -.0 Other: Indicate type of mechanical work being installed and the quantity below: BUILDING OWNER OR AUTT• RIZED AGENT: Signature: `.gC - Y d ( ippli:wQmlpoetic applioit )n (1 -2001) 1/2001 Date Application Accepted: t>2 -73 - 0.3 r. w Page a City ' (777;7' 'x ��..�. {� ti t � }�.,� ;��; i. � ;�•� :' Date Application Expires: Staff Initials: zi 3 � • �,�5 P,5 /7 City State Zip - Day Telephone: Fax Number: Contractor Registration Number: _ Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance'* t••% den" r � Q a ,'L' �tLr 4 lT f" , 7 . i� f,l. ;•� 'J`.17, r r� -T ;f u•' � �(' � w��.1 r'7: � 1 l';; I h ,.hy� �'iG�,i.. ., 1',I.tA; $ . � • r�,. ,�.) ) +'r+� !� ". r ,I.. .l '�t� '� ;���' •5���Vttw � �+�i1ryr ��,��p��i i 1 {]� � �1� � o 4 . ,, � 1 L i, 4 f 1 . : S' :4 " 1 �. Z r +u� S • x.1 .L + (�+. 1 'i, Af•� a i W; i1 u ' } y .J..( l� rt. :yYn u . 1:�� 7 ; �•� ' : ".1��1 i��.�. i1 i t : , "..).! .....� �I� �•L J..,�:'t!"Ai', �!,_:r ..'fi � i ��fil'1+'i�V,..(� .''1,rf,V� +'lA.�� .i'P!' ,,vr, .�.�. ta.� �1 • r roi�., { ;. ,. ��1+.• 1' i...}, �i ,C's�l�`.,L�`,:'ff ;t��vrY,•..• r�, {'L'.iif ,_ � "�!,�r ;.. {. � �r:r•�!<:7�' � 1, Value of Construction - In all cases, a valve of construction amount should be emend by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules, Expiration of Plan Review Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a perioc not exceeding 1$0 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. J HEREBY CERTIFY TI'[AT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT, Date: 2 --1)2-1 0 Day Telephone: Print Name: cut Q c'-7cf ( I Lisa 1' Y Y1n.:1 u1!1 ( '7 C.) J 4 Mailing Address: State Zip ta Sti, t'J:)Cd7drt�'C1�'9t' ',gaWtt' �1s'g� ;w,Li;;air )XJ<i a '«"fi'Lh4dYAr>}x.a'ari "..irx: TRANSACTION LIST: doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431-3670 ACCOUNT ITEM LIST: Description Account Code Current Pmts z 11- RECEIPT Ce 2 IL/ 6 m JO . Parcel No.: 2623049005 Permit Number: D03-051 o o 0 0 Address: 301 STRANDER BL TUKW Status: PENDING u) w Ili x Suite No: Applied Date: 02/13/2003 _IF_ Applicant: TARGET Issue Date: w u., tu 0 2 ?- g 5 Receipt No.: R03-00174 Payment Amount: 1,459.39 u_ < CO — 0 Initials: SKS Payment Date: 02/13/2003 11:03 AM i 1-- User ID: 1165 Balance: $0.00 i Z I-- 0 Z I— LIJ ai Payee: RAINBOW FEDERAL INC 2 D D CI O U) 0 — O I- Ill u j Type Method Description Amount I 0 I— ;— II 5 Payment Check 26179 1,459.39 4 Z w t) -I o I BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000/322.100 000/345.830 000/386.904 881.75 573.14 4.50 Total: 1,459.39 )2/.14 1 71.6 39 Printed: 02-13-2003 z. Protect I) R i Type of I / ctn ' Ad res d / s-7 6.100 F P I Q I:. Date ailed: — ° — Q 3 Special Instructions: r i `y-) " 7 :30 a# S T n 2 E Date Wanted: Pj -- // - 0 3 a m\ (p.m Requester: C / 9 0 2 0 / Phone y� " 5-3 3 3- /7' S 7 6 INSPECTION NO. CITY OF TUKWILA DIVISION sqj Approved per applicable codes. INSPECTION RECORD Retain a copy with permit 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. COMMENTS: vv) i . InsP ctor• 47` 0 REINSPECTION FE REQUIRED. Pr)or to inspection paid at 6300 Southcenter BI d., Suite 100. Call to schedule Receipt No.: Date: o ) , fee must be reinspection. Date: I Scope of work. • Foreman is to meet with store LOD daily to give progress updates.. • Remove all EPDM from the walls and curbs. • Clean up loose debris on job site daily a Remove ail loose objects that could puncture. the new membrane before installation • Overlay existing roof with V" ISO. Stagger boards and butt (max 1/4 "gap). Using 6 fasteners per 4x8 sheet. Where 4x4 sheets are required, use four fasteners. • Mechanically attach 60 mil PVC membrane using 2 3/8" seam plates and screws. 4 half sheets at the perimeter. Fasten perimeter sheets 6" on center. All field sheets shall be attached 12" on center. Corners will be overlapped in perimeter membrane. Fasten membrane at all transitions. Install a line of screws and plates 6" on center into the flat of the roof at the base of the walls, along each side of the expansion joints, and around all curbs and penetrations (drains, hatches, vent pipes). • All through wall ducts are to be rapped (See Ductwrap sketch) (Call Mark Ribbe for questions 713- 248 -5331) • All pipe penetrations are to receive a prefabricated boot. Boots are to be caulked and banded. • Place a T -patch at all T joint locations. Patches to be made out of extra material. • Remove and dispose of existing metal cap. • Refer to detail RR -1, Alt #2 for all walls. PVC is to be fully adhered to walls • Walkway pals must be installed around all motorized rooftop units and on three sides of the roof natcn. Walkpad must be installed with in 2" of unit. Walkway pad shall be fully welded around its perimeter (refer to detail TS -8). • PVC will be fully adhered to all curbs. (refer to detail RR - 2) • All inside and outside corners require a pre - fabricated corner patch at the base of the crotch.(refer to detail TS — 9 — comer detail only) • Probe completed roof area daily. It is required that a hand held probe be used in lieu of a probe taped to a stick. • Regardless of the predicted forecast, a nightly tie off will be done.(refer to tie -off detail) Contractor will be responsible for all property damage, merchandise loss and clean up labor, that is caused by no tie off, inefficient tie off or working in rain during the re-roof \A-•E. C O co �ais ac plan Clleok ap �pPco�al °f �'hu� the cson� sod 0 any ubje s a nd or t , so �o� o� con- e ot t° eccoc° u'illoc ze the idatio led9ed' svd does d fo oc nc ge O . of c adopted �o�y of ialp 'Ned o\ans tca�t0c illiv o. b ;u ;y.;. :� rs 104 ry , I xe4 ; u : u.«. CITY OF TUMILA APPROVED FEB 2 7 2 ` i ` RECEIVED CITY OF TIJKWtt FEB 1 3 2003 PERMIT CENTER Do3 -ofl RainboW Federal, Inc. P.O. Box 1116 Carnation, WA 98014 Ph: 425-333-4876 Fax: 425-333-0563 Target Southcenter Rainbow 20' 80' .............. Conduit Scrod 125' To Wd 73' ............... 50 . : . : . ..... ........... ..... ::::::: r .r.r ............................ ..... 3' Wall 209' 5' Wall • ................. .1 .0 ................................... •••••••••••••••••••••••••••000106.••••••••••••••••••• , • , • 1: : • • :• 1 : ................. . ........................................... ................... 139' .................. ••••••••••••• . :........... ......... ......................... THE EDGE Drawing Report Roof Plan 3 Wall GM OF TUKWILA APPROVED Legend Pitch Description .. ..... ...... <none> Roof Area <none> Wall Flashing <none> Gas Pipes <none> Curbs <none> A/C Units • <none> Pipes / Penetrations <none> Roof Drain • <none> Scupper FEB 2 2003 AS NuiED — FirEgtri 51; ;PW 57- 350' 350' SilindeY SF 150,701.08 Wednesday, February 12, 2003 4:13 PM Page 1 .................................. • •' ................... 3 Wall .............................. RECEIVED '.ITY OF TUKWILA PERMIT CENTER ... .................. ................................... ............................................................................. 1,846.78 289.08 730.42 393.72 718.67 FEB 13 2003 ............ •••••••• ......... 1 ................................................................ : ............................................................ ........... ....................................... ...... ...................... ................ .I::::::: 161 . ..... .................. a 24 :!'%V.601 . .. . ................ ........ ......... Vestibule 5' Wall LF EA 10.00 6.00 6.00 ' ' ; Cap Alternate #1: Reverse term bar at cap. Fix termbar to wood plate 6" OC and pull membrane tight. Install NP -1 into the joint between membrane and metal edge (to cut off air and wind -driven rain). Set aside existing cap, then re -munt with . gasketed TEK screws 12" O C 5" Max. NP -1 mounted I 24" wood I ' 24" behind kick as OC OC air /moisture cut -off RECEIVED 6" 6" CITY OF TUKWILA OC OC FEB 1 3 2003 CITY OF Tialatkf CENTER APPROVED FEB 2 7 2003 /6 HUt !:[.) (.... ..., CAP Alternate #2: PVC coated half -cap fixed to exposed masonry or wood. Coated metal fixed 9" OC into masonry and 6" into , wood. Intermediate bar: splits the space into equal heights, with one bar for every 24" of wall height. New membrane may not be adhered to loose existing flashings. New membrane cannot come in contact with asphaltic products -- use a separator film. Wall Flash /Reroof Drawing No. RR -1 Approved by Date TRD 5/1/00 Target Corp. Roofing Dept. Minneapolis, MN 800 694 -47337 ryg • Existing unit 6" OC 5" Marc. • PVC Membrane flashing adhered to seperating film, which is adhered to the existing BUR fleshings. (PVC membrane cannot make contact with existing BUR surface) . Existing Insulation 24 G galvanized counterflashing fixed 12" OC to curb. Position caulk behind the kick as a water cut -off. Fastener is self- tapping, gasketed TEK screw. (Corrrc...sc.To o 3vpie 9 RECEIVED CITY OF TUKWILP FEB 1 3 2003 PERMIT CENTER Title NOT TO SCALE Curb Flashing Drawing lto. RR -- 2 Approved By: TRD 5/1/00 Target Corp. Roofing Dept. Minneapolis, MN 800 694 -4733 ., /J.�1: n1iJt7:' iY'JL'vll�'ii.�.5' { '.z•n: =k:%: n, FAX NO. . Fix against unit wall with termbar, 6 "OC with sheet metal screws. Load NP -1 behind membrane at the bar. Where ductwork "stacks" supply and return, one over the other, simply wrap (adhere) both as a single duct. If need be, remove this hood to create working space. (replace) Ductwrap sketch -- Target View looking at r 'unit Oct. 22 2001 i1:25AM 1 RECEIVED CITY OF TUKWILA FEB 1. 3 2003 PERMIT CENTER ; F P:Y D :F APP ROVED AS NOTED • • Install Unreinforced Membrane as corner patch. Glue Membrane to Insulation surface with Bonding Adhesive. 4" Maximum / Fasten field sheet around perimeter of unit 6" OC. If the curb is a skylight that is not pre - insulated, DO NOT put a screw into the skylight curb, rather BOND the 1" iso board to the skylight curb. Metal Curb UNIT Drawing No.. TS -9 Pry nc . r' 7 rule Curb Flashing RECEIVED CITY OF TUKWILA FEB 1 3 2003 PERMIT CENTER Approved By Date TRD 1/1/97 Target Roofing Department Houston (713) 272-9601 New PVC Bonding '••• .Adhesive Zone 9 inches CITY OF TUKWILA APPR JYE D FED 2720113 J4� ►;� CITY RECEIVED Tieoffs are required at the end of each workday, regardless of whether rain is predicted for overnight or over a weekend. DO NOT run out so much reroof construction that cannot be tied for an unexpected rain shower. Line of NP -1 caulk at the outer lip edge, feathered into both the PVC and the EPDM FEB 1 3 2003 PERMIT CENTER Bonding Adhesive If existing EPDM is a ballasted roof then install a line of seam plates and screws, 12 inches on center along the inside line of the adhesive zone. If the existing EPDM is mechanically attached or fully adhered, then a line of attachment is floc necessary. DrawingNo. RR ?5 Title "A-Off to EPDM Drawnby Date TRS 10 /10 /01 Target Corporation 1000 Mtopst Mal . AtinnesooNs, 55403 The entire outside edge of each pad must be 100% welded. Probe and close all gaps and voids. Pad- to -oad joint may be butted, may be overlapped, but the FEB 1 3 2003 maximum gap allowed is 3/8". Protective Pad must be mounted around ALL active rooftop motors (from large HVAC units to small forced air vents) as well as the three active sides of the roof hatch. .64 1i • Title Walkway Pad Drawing No.. TS -8 Approved By TRD Gap between pad and curb must . not exceed 2 ". Hand -weld the pad alongside the' curb. CITY OF RECEIVED TI / PERMIT CENTE{. Date 1/1/97 • Target Rooting Department Houston (713) 272 -9601 . FROM Temporarily remove support brackets and re- fasten thru membrane after duct is wrapped. Caulk all holes and screw heads. Fully adhere membrane to metal duct. FAX NO. : Clean face wall with MEK and weld -off membrane to wall. Place a line of NP -1 at the edge of all wall welds, as a secondary precaution. II 1 Oct. 22 2001 11:25AM P5 Wrap membrane undernea edge and fasten with self - tapping panhead screws, 9 "OC Ductwrap sketch -- Taret View from unit looking at wall CITY OF RECEIVED TIIKW A FEB 1 3 2003 PERMIT CENTEF CITY APPROVED OF iGOM FEB 2 ? . • 4 L H.i^�w(Y:ti Sarnafil Specification Manual Code Approvals I. FACTORY MUTUAL RESEARCH /0 A c Sarnafil Inc. has one of the most extensive FM Approvals in the single -ply roofing•itidustry.for roofing membranes qualifying for use in Class 1 Roof Deck Constructions with windstorm classifications high enough for roof construction designed to perform under some of the most ` `'�` v,i`�• severe wind conditions. The Approval covers a wide range of commercially available FM- Approved roof insulation boards for use on new construction and reroofing applications over existing roofs, and some Approvals extend to all FM- Approved decks - steel, concrete, and treated lumber decks. FM Approvals cover both Sarnafil mechanically attached and adhered systems. Sarnafil ballasted roofing systems have also been accepted by FM, but because of the lack of an accepted test method, FM evaluates each ballasted roofing project individually to determine its acceptability. FM testing program The Factory Mutual Research testing program involves the following procedures: A. Calorimeter fire test 1/98 B. Burning brand test C. Simulated wind uplift test D. Simulated hail damage test Calorimeter fire test. This test determines the contribution that a roofing system over insulated steel deck construction would make to spread of combustion within a building. The Sarnafil system tested did not exceed the maximum heat release of 410 Btus per square foot per minute allowed to achieve a Class 1 rating. Burning brand test . This test evaluates the flammability of a roofing membrane when exposed to an exterior fire source. Sarnafil S327 and G410 roofing membranes have met the Class 1 requirements. Simulated wind uplift test. This test evaluates the capability of a roofing and deck assembly to resist uplift forces in pounds per square foot (psf). The tested roof assembly achieves a wind uplift rating categorized in 15 psf increments, i.e., 1 -60, 1 -75, 1 -90, etc., with no maximum. The rating a system can obtain is limited only by its strength. Certain Sarnafil roof systems have wind uplift ratings of 1 -150, 1 -165,1 -180. For higher ratings contact Sarnafil for more information. Sarnafil mechanically attached and adhered roofing systems have exceeded the 1 -90 wind uplift rating, recently the highest windstorm classification awarded by Factory Mutual. This classification means that the system, including insulation, fasteners, and membrane, was tested to perform under certain conditions that are correlated to building height, location, and wind velocity. Simulated hail damage test. This test evaluates the capability of a roof membrane to withstand a hailstorm without being punctured. In this test a 2 inch steel ball is dropped onto test membrane. The Sarnafil S327 and G410 roofing membranes passed this FM test. II. UNDERWRITERS LABORATORIES, INC. Sarnafil roofing membranes have passed Underwriters UL -790 test, which rates the fire resistance of roof covering materials. The test determines the surface burning characteristics of roofing membrane materials by the ASTM E -108 test method. Test procedures include evaluations for flame spread, intermittent flarne and burning brand. Sarnafil roofing systems have achieved Class A classification based on this testing program. Samafil has extensive UL listing for hourly ratings for various roofing assemblies. -(UL ratings are awarded for particular test roof assemblies, and are limited by the type of insulation, the combustibility of the deck, and the slope for the roof.) RECEIVED CITY OF Tl1KWIL FEB 1 3 2003 PERMIT CENTER CO r Introduction Approved 1 -13 ..N., µ ..;.+{{` u.u�u�wwu�aLtla�d'5:.tin` ?wl(.f.SG' �.. `?� _ ;�13�c,i }Af.4,:$ti(&5•'. . s w— we a am 1 NM w Roofing and Waterproofing Systems 01/98 S327 Roof Membrane 60 mil (1.5 mm) CITY OF TRECEIVED 1KWII,A FEB 1 3 2003 PERMIT CENTER Overview: S327 is a heat - weldable roof membrane made by the spread- coating process on Sarnafil's proprietary manufacturing equipment. S327 is formulated for direct expo- sure to the weather and is produced with an integral polyester scrim reinforcement for high strength. S327 is the Sarnafil roof membrane used within the Sarnafasr and Engineered mechanically- attached systems. S327 roof membrane is produced in two standard widths, 78 - inches (2 meters) and 39 inches (1 meter) and in a variety of lengths. Composition: S327 is a high - quality product containing ultraviolet light stabilizers, flame retardant, biocide and reinforcement. S327 has a unique lacquer coating applied to the top of the membrane to resist staining from airborne dirt and pollutants. The standard color of the weathering surface of S327 is off -white and the underside color is dark gray. Features: The spread- coating process causes S327 to have no built -in stress at time of produc- tion and to have a fully - encapsulated reinforcement with no risk of delamination or water- wicking. S327 can be produced in a variety of custom colors to complement unique buildings. S327 is thicker than many competitive products which can im- prove weldability and service life. S327 has a unique configuration of the scrim rein= forcement for high tearing strength, especially important for the Sarriafast seam -at- tached system. Packaging: S327 rolls are wrapped in a protective film and strapped to a wood pallet. Installation: S327 is installed by a Sarnafil Authorized Applicator. S327 is rolled out onto the insulation board or similar substrate, fastened to the roof deck with Sarnafasteners and Sarnadiscs or with Sarnafasteners and Sarnabar and heat - welded together by trained operators using Sarnafil's hot -air welding equipment. Availability: S327 is available directly from Sarnafil Authorized Applicators. Contact your Sarnafil Regional Office for further information. A:4'.1".0‘ Jai W-tJuf 4 3 FEE 12 '3 CI TY i Oi` W T VK L WI LA F.7/7 Permit Cent.. 6300 Southcenter Boulevard, Suite 100 Si M-6 Tukwila, ) 1 3674 1�8 Submittal Checklist RESIDENTIAL REROOF: Single - family structures are exempt from reroof permitRing,upless riff& structure is to be repaired or replaced, In which case a Resideritial;,Building Permit Is required. COMMERCIAL REROOF: If roof structure is to be repaired or replaced, a commercial building permit will be required. Req'd N/A I, 9/9199 apps'to44oc REROOFS Document Requirements Narrative describing existing roof, material being removed, and material being installed. Pre - roofing inspection required by U.B.C. Appendix 1515.2.1. 1. 1994 Washington State Non - residential Energy Code requires documentation showing • roof insulation conforms with W.S.E.C. Section 1132,1 Exception #6. Documentation must verify one of the following. a) The sub'ectt roof is currently insulated or conforms otherwise with the W.S,N.E.C. c?X�S 1 s l�F e t ��v ; u k It ►'1 r7 - / �� Ct _e f( t R rrt t, 'ti-ticl ix ( j• b) be► � The ma will in a ed to conform with the required re 2. Roofing manufacturer's specification and listing for fire retardant rating. el L- r 1 3. U.B.C. APPENDIX SECTION 1516 - BUILT -UP ROOFS: 1516.1 General. Built -up roof covering shall be completely removed before applying the new roof covering. New roofing conforming to Section 1503 shall be applied except that when the new roof is to be applied directly to a nallable deck which has residual bitumen adhering to it, a rosin -sized or other dry sheet shall be Installed prior to the installation of the new roof system. FT EXCEPTION: The building official may allow existing roof coverings to remain when inspection or other evidence reveals all of the following: 1) That the roof structure is sufficient to sustain the weight of the additional dead load of the roof covering. 2) The roof deck is structurally sound. 3) Roof drains and drainage overflows are sufficient to prevent extensive accumulation of water. 4) The existing roof covering is securely attached to the deck. 5) The existing insulation is not water soaked, 6) Fire - retardant requirements are maintained., NOTE: A certification letter is required prior to final inspection and sign -off of the permit. RECEIVED CITY OF TI IKWII FEB 1 3 2003 PERMIT CENT 4r'Sr {ai�i.3'.CStb, .!'i;,�..4$rrro" L. fii : ° •r *3rs1:t FEB • 26 'e3 12 :04PM TUKWILA DCD /PW :x�rtr �J. i� j 4 t, :e7 h..t.:; ;:4 _� . � in 4Q � � ' I ��� '. ._ T r ai 5 � IX:._� .�:.•��`', ��C � Revision submittals must be submitted in person at the Permit Center. Revisions will not he accepted through the marl, fax, etc. Date: 2 2 Plan Cbeck/Permit 003 -051 Response to Incomplete Letter # 1 ❑ Response to Correction Letter # • Revision # after Permit is Issued Project Name: Target - Reroof M -6 Project Address: 301 Strander Blvd. Contact Person: Carol VanWinkle Summary of Revision: Enclose . Pl ease see attachments i#1 _ 2 3 , 4 , 5 , & 6. 1. Addressing specified dead load specifications for roof deck & totals for Pxi st ng k ronf system wwi 2 Pxi st-i ng rg?f deck ,Ls 22 GA _,steel & i rt excellent_ conditism_ — .• ;Mt - .— '■.• • • — 4 — • .r — •.•t• •• 4. The exi Gt• i ng rc f ypri ng i s N"'PT WI Labb er moombrrita (me--111.1=11y_ attached / New system will be attached thr i ou __ex ghi.atincr, douhlncr attachment. . The existin• insulation is • and intact. 6 The n when a City of Tukwila Department of ConemtutiO Development - Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 4 ,L• .• lied over 1 mem•ran- r SheetNumber(s): I L ` �L ax a S "Cloud" or highlight all areas of revision including dare of revision Received at the City of Tukwila Permit Center by: ❑ Entered in Sierra on semis CITY OF TijKWit.. i APP Rt; v F L J AN stern P.2/2 Phone Number: 425 - 333 -4876 1 iso insulation on a metal deck. (See item #6) 08/30/00 PI' OF TUKWILA FEB 2 6 2003 PERMIT CENTER k.dsk!. vow': -1•;,'.< :�;dti'.;+ ?iak�i,U:ii�: tiya�.�usid:1adai February 26, 2003 Fax (425) 333.0563 • P.O. Box 1116 • Carnation, WA 98014 • Cont. #RAINBFI172QG City of Tukwila Department of Community Development — Permit Center 6300 Southcenter Blvd. Suite 100 Tukwila, WA 98188 Re: Target Retail Store 301 Strander Blvd. Per your request: 2.3" Polyiso Insulation: .045 Carlisle EPDM Membrane screws & seam tape (approx) TOTAL WEIGHT: ' /z" Polyiso Cover Board .060 Sarnafil PVC Membrane screws TOTAL WEIGHT: Commercial Roofing • Architectural Sheet Metal (425) 333 -4876 Existing Roof System: New Roof System to be Applied: TOTAL ROOF WEIGHT PER SO FOOT: Old Roof System New Roof System TOTAL OF OLD & NEW SYSTEMS: MAX DEAD LOAD SPEC TOTAL NEW & OLD ROOF WEIGHT .472 per sq. foot .33 per sq. foot .10 per sq. foot .90 lbs. per sq. foot .39 per sq. foot .086 per sq. foot .07 ea .581 lbs. per sq. foot .90 per sq. foot .581 per sq. foot 1.481 lbs. per sq. foot AMOUNT UNDER ALLOWABLE DEAD LOAD MAX 3.0 per sq. foot 1.481 per sq. foot 1.519 per sq. foot jturn OF T; Th !�j fj,s V E8 2 ? ?nr 1 �\ J�rV • s • :4 TARGET STORIES pier 1 - GENNRALP 1.1 SUMAMIIRY A. Section Includes: 1, Mechanically fastened, reinforced thermoplastic membrane roofing system. 2. Owner Furnished Materials. 3. Related accessories. • SECTION 07400 MEMBRANE ROOFING SYSTEM 1.2 RELATED ITEMS A. Doctuttent 00120 - Instructions to Bidders; for bidding submittal procedures. B. Document 00307 - Roofing System Bid Subn ittal Sheet. C. Document 00308 - Roofing System Material Estimate and Information Sheet. D. Section 06100 - Rough Carpentry; for wood Bailers, blocking and cants. E. Section 07600 - Sheet Metal Flashing and Trim; for sheet metal flashing at roof and non - thermoplastic sheet metal materials. F. Section 07720 - Roof Accessories. G. Section 07810 - Plastic Unit Skylights. H. Section 07900 - Joint Sealants; for Owner Furnished polyurethane sealant, (SLNT -7). i. Division 1; - ylechanical; for flashing flanges for roof drains, and thimbles for hot vents. J Division t Mechanical; for frost proof jock is for plumbing vents; t1a;:iing flanges for roof drains, and thimbles t r not vents PROTOTYPE-MARCH FE f.3 2 . 1.4 SYSTEM DESCRIPTION A. Design: 1. Architect's drawings are based on a generic thermoplastic roofing system. 2. System manufacturer and installer to provide necessary details to ensure roofing system meets specified regulatory and performance requirements, over building structure indicated. Tolerancei: Do not exceed maximum dead load for combined roof membrane and insulation system of 3.0 psf. I. Exception: Areas to receive roof walkway system may exceed maxi--num combined deadload by up . to4.Opsf. C. Roofing Contractor Responsihilities: CITY OF T4,ysv ri qi Provide complete membrane ArPl;ry't ' roofing system installation by acceptable manufacturers specified herein, conforming to requirements of this Section. ---- Pi'7 r - 'Li'. • .. . 1,3 REFERENCES A. Council of American Building Officials, (CABO). B. International Conference of Building Officials, (ICBO). Standard Building Code, (SBC): Factory Mutual System, (FM): • 1. FM, "Approval Guide - Equipment, Materials, Services for - Conservation of Property". E. Polyisocyanurate Insulation Manufacturers Association, (PIMA): I. PIMA, "Technical Bulletin 101; Roof Insulation Specimen Conditioning Procedure ". F. Underwriters Laboratories, (UL): 1. UL, "Building Materials Directory ": C. ri. VLGIOIJILL . • MEMBRANE HOOFING SY M 07500 - I AcFom ti �:Aiif1: ti�rt�RP orom ....... _ . _ . .. _..� • BUNDLE WEIGHT SQ. ET . /PKG NOM 111K R -WtWE PCS /PKG 4)18 4X4 4X8 4X4 ,t �Z Ssa= 0.13 PSF 1.8 6.0 48 382 tel 1472 736 1.1 6.7 41 372 186 1312 656 1.2 7.5 39 362 181 1248 824 1.3 8.3 9,6 355 176 1152 570 1.4 9.1 33 348 174 1068 526 1.5 10.0 31 341 170 992 498 1.6 11.0 29 340 170 928 464 1.7 11.7 ' 27 340 169 664 432 • 1.8 12.5 26 239 188 632 416 1.9 13.4 24 323 102 768 364 2.0 14.3 23 308 160 736 348 2.1 16.0 12 306 153 704 362 2.2 15.8 21 304 153 672 336 '2 .3 16.7 20 302 152 640 320 2.4 17.5- 19 301 151 608 304 2.5 16.0 18 290 146 576 248 2.6 19.0 18-- 295 149 5 288 $S/54: e s-i 3 =p, S'I 2.7 20.0 - "‘T 300 165 544 272 2.8 20.7 17 300 153 544 272 2.9 21.8 16 249 160 512 266 3.0 22.0 15 298 149 480 240 3.1 23.0 15 292 146 480 240 3.2 24.0 14 286 •143 448 224 3.3 24.4 14 264 142 446 224 3.4 28.0 14 282 141 448 224 3.6 26.0 13 260 140 416 208 3.6 26.7 13 278 139 416 20* 3.7 27.4 12 276 186 384 192 3.6 28.0 12 .274 137 364 192 .3..5 . 29. 12 ' 272 136 384 192 4.0 - 3840 1.1 • 220 OS 3512 : thi.. . p N C:: . r :!, r. . _ . t ) 4 a. r j t t `` - ( - jt' G.. r r • - 77'7'177:7 �'..•. i.'F:. li.'S : 1. " .y:.tii . ; -.. :tact •_' z ; �Z ce w aa = Jo . 0 0 N O CO w J = -_.... . . 0 ---20- I 2 til ell I - H w o i z� o r Z p w VO - O- c O F- w w a X V I- - 3> L ra r u" ~O --.3 Z 1 - -I A. O F- c z c u ' . . .• MILS • ',,: :'. ''''''. ;is Lt: L.: • .E : ' • • ..! : i: •••••!' ;c . • • :• DIMENSIONS • . • : .. COVERAGE -.' . , t .- : ,un ". 1: . ...: . . , OLIN°, . .PER ..;: ROLL ''••' ROLLS ; PER : SKID ' ... , • .1 i.. •. ' • ;`:,;•• ,;.. ..-; .:,• . r'l :Width ; Mal squares swoon • Engineered .,'', Per Roll ...•.• -- ,=.-..,,S,221:in. ftl.:-.: S7:2:00frp11 $1.05/sd/ft '.:':: -,..:...---_ $129.00/roli 48 11111111=1111111AIKUrangirMILIMI '. .1 1.82 4.12 396.00 • 0.9 / OM " '11111114CIUMILIKAIIIMIIIIIKtaill 9 'oz. Ell IEMIIIIMI 100 Oa 4. 6.os 6.29 205 15 - :f..1 $0.9' N/A • f 14 leiijkljIIIIUWIIII $4". • 1 4.14 160 1 10 go,347 so: . ' .• ... reVr..1211011 • 6 . 56 ' MON 6. . . ILIMIniumm . :0 5 . 6-. 112E1111111111M1111111Eal MEI V 4 :. ' . 0 -.4: . : ..•,, . .66 , .::. •ILItallaillillaiMINIIIMEN •• 0 • •.•:,-. ir., . • . -.,. 11136MWSIIIEMOLL-___._:. : ii.:9;oz.. , , •:• '' 85 ' ' ,. ,. 230 . .$ 7-,, ;T, , . $ • 0 ••i .- 2.95 . 4. 0 . 0 . . /A......,• ..; ::, .$318.00:. .it ;• 4.00 . 1.11011111011=1111 , . . 10 9564.a.* : 72 11111111111101111111111111121eilMill 1111111111g1111111LEAMILa1 9 oz. . MOM 49.2' 1 3.23 2.98 IINEMIIIIIIMEHIMMI 3.00 3.08 11111AMIIIMIN 150 19 $4A .00 $1.25 i $201.00 $1.2 10 $485.00 4 • 35 .9w:._....$ 1 4. 5 i'" .."_ .ssis.o0 .1. • . si.• $1.70 :!,. sr. ;O ' IPMENTSI BEEIGENI . . 6.• -1 t:IETLIIIIIIMIIiIIIIMIIIIMINEkalleNitiall . 3.25..il ! 1.60 1110EMIIIIIME011111112E111 .. .0 . . 3,1p ...:: -...18 -•:' :' .. 10 : : 8, !..,.. .a 98 roil 1111111111rIMEM 6.6 g..8' 2.15 1.89 . 144 24 $365.00 Over .0 ap: 5.5" for 0.91 Sarnafast N/A and 3' for Engineered 65 20 Si; • • . Component Pack Weight Price .. s arnabar 15 linear ft/bar 7 lbs/bar . $.80/lin;fte. S12:00/bar ' • . ,' -. Sarnacord - peentorein ccre 328 linear ft/roll 3 lbs/roll 40 fin/roil -- ,=.-..,,S,221:in. ftl.:-.: S7:2:00frp11 $1.05/sd/ft '.:':: -,..:...---_ $129.00/roli S327 - 9' Strip - Cover soli) for Serneber Or S327 fe:tback telgt jolts 164 linear ft/roll WO' .: . ' Description . :. , . r • . Peek 'Weight 1000/box - 7 lbs. .: Price $85.00/1000 ' Sarnadisc I" Round Membrane Attachment Disc flat Sarnadlso - XP 18 Gauge, linear plate 250/box - 15 - 11:77,ir , (1 ,.$47.50/25O r Note: 48 mil andard size non-feitbacked rolls are stock items at our Canton, MA, Elmhurst, IL, and Downey, CA locations. Call for ordering and avallibility of all other membranes. L. Mechanically Attached Systems Jam 4T 327 Standard Colo' ,Jembrane for Mechanically Attached System $Vstem Material Checklist - Sarnatast System: S327 Membrane Page 2 Flashing Membra^.e Page 7 Cove? Strip Membrane Page 1 Sarnatherm Insulation . Page 1C Adhesives °age 3 Faste'ers Page 8 8. Insulation Attachment Plates Page 8 & 9 Memorane Attachment Plates P age 2 Sarnaclad Coated Metal Page 6 & 7 Walkways Page 10 Vapor ietarde , Page 10 Al; other Accessories/Welders . . . Pace 10 2 L Material Checklist ..Engineered System: S327 Membrane Sarrabar Samacord Flashing Membrane Cover Strip Membrane Sarnathe'm lesulation Adhesives Fasteners Insulation Attachment Pia:es . Samac:ad Coated Metal.. Walkways . . Vapor Retarder . . , . I A;1 other Accessories Welders Page:2 Page 2 Page 2 Page 7 ... Page.2 ...... .page 10 . Page-3 Page 88.9 Page 8 & 9 Page 6 & 7 . . Page 10 . . . Page 40 Page 10 • itc ,10.1.PAer.r. *A' ge PAGE 1 Sure -Seal .045 Non - Reinforced EPDM Sure -Seal .045 HTM Non - Reinforced EPDM Carlisle Part # 302302 302331 302303 302304 302332 302349 302306 300367 302350 302308 302334 302812 302309 302351 302310 302335 300365 300354 300357 300358 300359 300360 300361 303026 Epichlorhydrin (ECO /CO) 300330 Sure -Seal .060 300175 Non - Reinforced EPDM 300176 300088 300089 Carlisle SynTec Roofing Systems Price List: Effective April 1, 2001 EPDM Membranes SS .045 NON -REIN EPDM 4.5' X 100' SS .045 NON -REIN EPDM 10' X 50' SS .045 NON -REIN EPDM 10' X 100' SS .045 NON -REIN EPDM 15' X 50' SS .045 NON -REIN EPDM 15' X 100' SS .045 NON -REIN EPDM 20' X 50' SS .045 NON -REIN EPDM 20' X 100' SS .045 NON -REIN EPDM 25' X 100' SS .045 NON -REIN EPDM 30' X 50' SS .045 NON -REIN EPDM 30' X 100' SS .045 NON -REIN EPDM 30' X 125' SS .045 NON -REIN EPDM 30' X 150' SS .045 NON -REIN EPDM 40' X 50' SS .045 NON -REIN EPDM 40' X 100' SS .045 NON -REIN EPDM 40' X 125' SS .045 NON -REIN EPDM 40' X 150' SS .045 NON -REIN EPDM 40' X 200' SS .045 NON- REIN•EPDM 45' X 100' SS .045 NON -REIN EPDM 50' X 50' SS .045 NON -REIN EPDM 50' X 100' SS .045 NON -REIN EPDM 50' X 125' SS .045 NON -REIN EPDM 50' X 150' SS .045 NON -REIN EPDM 50' X 200' SS .045 NON -REIN EPDM 50' X 205' 300332 .045 HTM NON -REIN EPDM 7' X 100' 300333 .045 HTM NON -REIN EPDM 10' X 100' 300335 .045 HTM NON -REIN EPDM 16.5' X 100' 300334 .045 HTM NON -REIN EPDM 20' X 100' .060 N -R EPICHLORHYDRIN 10' X 50' SS .060 KLEEN FR NON -REIN EPDM 10' X 50' SS .060 KLEEN FR NON -REIN EPDM 10'X 100' SS .060 dusted NON -REIN EPDM 10' X 50' SS .060 dusted NON -REIN EPDM 10' X 100' "1r SX Base times Sales Sales Unit Unit Qty Unit Weight FT2 450 ROL 135 FT2 500 ROL 165 FT2 1,000 ROL 305 FT2 750 ROL 225 FT2 1,500 ROL 450 FT2 1,000 ROL 305 FT2 2,000 ROL 580 FT2 2,500 ROL 733 FT2 1,500 ROL 450 FT2 3,000 ROL 876 FT2 3,750 ROL 1,031 FT2 4,500 ROL 1,238 FT2 2,000 ROL 580 FT2 4,000 ROL 1,172 FT2 5,000 ROL 1,470 FT2 6,000 ROL 1,650 FT2 8,000 ROL 2,272 FT2 4,500 ROL 1,346 FT2 2,500. ROL 780 FT2 5,000 ROL 1,380 FT2 6,250 ROL 1,794 FT2 7,500 ROL 2,078 FT2 10,000 ROL 2,860 FT2 10,250 ROL 2,932 FT2 700 ROL 214 Std Stock - Carlisle FT2 1,000 ROL 305 Std Stock - Carlisle FT2 1,650 ROL 503 Std Stock - Carlisle FT2 2,000 ROL 610 Std Stock - Carlisle FT2 500 ROL 260 Std Stock - Carlisle FT2 500 ROL 209 FT2 1,000 ROL 407 FT2 50) ROL 21'1 FTC 1 nnn Dr i Ann .enLrv� `sv a�itTih��i Standard Stock Standard Stock Standard Stock Membrane Availability Lead Time Standard Stock Standard Stock Lead Time Standard Stock Standard Stock Standard Stock Lead Time Standard Stock Standard Stock Lead Time Lead Time Standard Stock Standard Stock Lead Time Lead Time Lead Time Std Stock - Greenville Lead Time Standard Stock Lead Time Std Stock - Greenville Std Stock - Greenville Lead Time z • W J0 O 0 u) 0 WI I-- N LL WO g • -J LL = • d i w Z = f-- z1- w w ON w 1-- w z U= O~ z • Samafil ® Specification Manual Code Approvals Introduction I. FACTORY MUTUAL RESEARCH Samafil Inc. has one of the most extensive FM Approvals in the single -ply roofing industry for roofing membranes qualifying for use in Class 1 Roof Deck Constructions with windstorm classifications high enough for roof construction designed to perform under some of the most severe wind conditions. The Approval covers a wide range of commercially available FM- Approved roof insulation boards for use on new construction and reroofing applications over existing roofs, 11 (%r and some Approvals extend to all FM- Approved decks - steel, concrete, and treated lumber decks ./V/)/1,,' 17(ti.,, FM Approvals cover both Samafil mechanically attached and adhered systems. Samafil ballasts_ d; l roofing systems have also been accepted by FM, but because of the lack of an accepted test A' , method, FM evaluates each ballasted roofing project individually to determine its acceptability. 4. FM testing program The Factory Mutual Research testing program involves the following procedures: A. Calorimeter fire test B. Burning brand test C. Simulated wind uplift test D. Simulated hail damage test Approved Calorimeter fire test. This test determines the contribution that a roofing system over insulated steel deck construction would make to spread of combustion within a building. The Samafil system tested did not exceed the maximum heat release of 410 Btus per square foot per minute allowed to achieve a Class 1 rating. Burning brand test . This test evaluates the flammability of a roofing membrane when exposed to an exterior fire source. Samafir S327 and G410 roofing membranes have met the Class 1 requirements. Simulated wind uplift test. This test evaluates the capability of a roofing and deck assembly to resist uplift forces in pounds per square foot (psf). The tested roof assembly achieves a wind uplift rating categorized in 15 psf increments, i.e., 1 -60, 1 -75, 1 -90, etc., with no maximum. The rating a system can obtain is limited only by its strength. Certain Samafil roof systems have wind uplift ratings of 1 -150, 1 -165,1 -180. For higher ratings contact Samafil for more information. Samafil mechanically attached and adhered roofing systems have exceeded the 1 -90 wind uplift rating, recently the highest windstorm classification awarded by Factory Mutual. This classification means that the system, including insulation, fasteners, and membrane, was tested to perform under certain conditions that are correlated to building height, location, and wind velocity. Simulated hail damage test. This test evaluates the capability of a roof membrane to withstand a hailstorm without being punctured. In this test a 2 inch steel ball is dropped onto test membrane. The Samafir S327 and G410 roofing membranes passed this FM test. II. UNDERWRITERS LABORATORIES, INC. Samafil roofing membranes have passed Underwriters UL -790 test, which rates the fire resistance of roof covering materials. The test determines the surface burning characteristics of roofing membrane materials by the ASTM E -108 test method. Test procedures include evaluations for flame spread, intermittent flame; and burning brand. Samafir roofing systems have achieved ClassAdassification based on this testing program. Samafil has extensive UL listing for hourly ratings various=roofiing assemblies_(ULratings are awarded for particular test roof assemblies, and are limited by the type of insulation, the combustibility of the deck, and the slope for the roof.) 1.12 July 3, 2003 Jason Berzinski 1000 Nicollet Mall, TPN -1210 Minneapolis, MN 55403 RE: Permit Application No. D03 -051 301 Strander Boulevard Dear Permit Holder: City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: • Call the City Of Tukwila Permit Center at (206) 431 -3670 to arrange for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one -time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection or request and receive an extension prior to August 27, 2003, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Stefania Spencer Permit Technician Xc: Permit File No. D03 -051 Bob Benedicto, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206-431-3665 February 19, 2003 Mr. Jason Berzinski 1000 Nicollet Mall TPN -1210 Minneapolis, MN 55403 RE: Letter of Incomplete Application #1 Development Permit Application Number D03 -051 Target — 301 Strander Blvd Dear Jason: City of Tukwila Department of Community Development Steve Lancaster, Director This letter is to inform you that your application received at the City of Tukwila Permit Center on February 13, 2003, is determined to be incomplete. Before your application can begin the plan review . process the following items need to be addressed: Building Department: Ken Nelsen at (206) 431 -3670, if you have questions concerning the following: 1. Applicant must provide information required on the last section of City of Tukwila Form M -6 (exception). Please address the above comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 433 -7165. Sincerely, end Stefania $"pencer Permit Technician File: Permit File No. D03 -0051 Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 -431 -3670 • Fax: 206- 431 -3665 08/06/2003 13:00 14253330563 DATE: TO: FROM: Fax (425) 333-0563 • P.O. Box 1176 • Carnation, WA 98014 • Cont. #RAINBF /172QG Ce 0 RAINBOW FEDERAL INC PAGE 01 Commercial Roofing • Architectural Sheet Metal (425) 3334876 TIME: O N� sifA-aJt`b,- MESSAGE: iu✓ o r_LA/ ice-. tw o !ter j , I d i & `' NUMBER THIS OFFICE IS FAXING TO: `v 1� 7( & J TOTAL NUMBER OF PAGES BEING SENT, INCLUDING COVER: y 'x'rIF YOU EXPERIENCE PROBLEMS WITH THE TRANSMISSION OF THIS FAX PLEASE CONTACT CAROL AT: (425) 3334876. , "'"4,41: G. r.: wsH L. ::sAa ":v..,:;activ:'...a.. -- - - -- .iin.�•,w.w:::L.::...�,., 08/06/2003 13 :00 14253330563 DATE: `c l (P.1 ` FROM: MESSAGE: tkY Commercial Roofing • Architectural Sheet Metal (425) 333 -4878 Fax (425) 333-0563 • P.O. Box 1116 Carnation, WA 96014 • Cont. ORAINBFI17206 RE: RAINBOW FEDERAL INC 1 TOTAL NUMBER OF PAGES BEING SENT, INCLUDING COVER: NUMBER THIS OFFICE IS FAXING TO: c? q 3/ - Yos **IF YOU EXPERIENCE PROBLEMS WITH THE TRANSMISSION OF THIS FAX PLEASE CONTACT CAROL AT: (425) 333 - 4876. PAGE 02 08/06/2003 13:00 14253330563 Membrane System: Sarna 60mil MA over EDP.M z Store LOD and BS Tech Jerry informed me that the start of the roofing project was "a little ~ w re 2 rough" with a few leaks popping up here and there. I met with Frank, the foreman of the project 6D and provided him with a hand -copy of this punchlist. The following is the formal punchlist. v • 0 U U Store was not reporting any leaks from recent rains associated with roof leaks. They do have w problems with the walls at the district office where "ever since the earthquake a few years back, J F-- leaks show up at the walls when the rains are hard and directional." w 0 Add a hardboard at the walkway pad at the door -hatch entry. Simply slit open the pad, insert the g board, and patch the slit. This will prevent insulation crush from repeated traffic, always stepping LL- off onto the roof at the same place. = d z = I showed Frank how future seam samples should be cut and tacked to the patch over the seam sample. Cut a cross -seam strip 2 inches by 8 inches, then cut that sample in half down to one inch z O by 8 inch. Pull one half apart for your own benefit. Tack the other half to the patch. Date the w • w patch in dark crayon. p • N Cut open the drain holes to the maximum allowed by the metal ring, but do not cut into the bolt 0 0 H iu locations. A few drains were six inch cut when the opening could be eight inch cut. w Add fire caulk at the generator exhaust collar, collar- to-pipe. Any underhood caulk from NAPA LI O � z U co H Foam in the throat of the western Mitsuibishi condensor line. O • auto supply will take the heat and not cook off. I showed the SBS that I did not like the one to two inch gap between the brick columns and the walls at the sides of the district entry. Buy backer rod and colored NP -1 caulk. Jamb foam backer rod into the gap, then caulk over the gap. I marked seven seam defects on the roof for Frank to patch over. Only one of them was a leaker. ThinvNe di .A T627 Tukwila WA (near SeaTac airport) Re -roof inspection, Wednesday June 18 2003, (Frank Foley 561 702-7193) Roofing Contactor: Rainbow Federal J. 2L Caulk writ skit anador of sc PPor cloning. rt�rlrl�o wall X AK RAINBOW FEDERAL INC PAGE 03 k,1•; 08/06/2003 13:00 14253330563 RAINBOW FEDERAL INC PAGE 04 < Clean the debris out behind, and finish up the flashing of the metal comterflashing at the x z northwestern-most HVAC unit. re 2 0 As a rule, the workmanship was excellent, particularly considering the bad weather and the rain- 0 dodging that must have occurred during this installation. u) W I No re-inspection is required. N. 08/06/2003 13:00 14253330563 RAINBOW FEDERAL INC TRANSMISSION VERIFICATION REPORT PAGE 05 A TIME : 06/27/2003 09 ;57 DATE,TIME 06/27 09:56 FAX NO. /NAME 12064313665 DURATION 00:01 :10 PAGE() 03 OK MODE RESULT STANDARD ECM APPROVALS OR CORRECTIONS: PLAN SUP ACTIVITY NUMBER: D03 -051 PROJECT NAME: TARGET - REROOF SITE ADDRESS: 301 STRANDER BOULEVARD DATE: 02 -13 -03 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: detaa, Bul ding Division im Public Works ❑ Complete ❑ Documents/routing slip.doc 2.28 -02 1n5 I PIK /c »3 Fire Prevention Structural ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete Planning Division Permit Coordinator DUE DATE: 02 -18-03 Not Applicable ❑ Comments: Permit. Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 6 S' TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: REVIEWER'S INITIALS: PERMIT COORD COP'S DUE DATE: 03 -18 -03 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: I r.2:41 :2•00I 1SiUrt1 t: I r• DEPARTMENT OF LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL -# EXP DATE CCO1 ' RAINBFI172QG 05/13/2003 EFFECTIVE DATE 11/07/1983 RAINBOW * FEDERAL INC 2807 HIGHLAND AVE EVERETT WA 98201 Detach And Display CenitltAt. REGISTERED AS PROVIDED BY LAW AS; CONST CONT GENERAL REGIST. # EXP. DATE CCO1 RAINBFI172QG 05/13/2003 EFFECTIVE DATE 11/07/1983 RAINBOW FEDERAL INC 2807 HIGHLAND AVE EVERETT WA 98201 7 Sipature Issued by DEPART 1E- T OF LABOR AND INDLSTRLES e jv,L10 ��C�I' 1 b(' C -t C1/4_(\ck Ft) \:ThefDroac.cintv I'? d L 6-F N Ota ejmiLeileat (V\., )1) ( EY- 1K L-1 - - - 0 a. Please Remove And. Sign Identification Card Before Placing_ In Billfold