HomeMy WebLinkAbout11-039 - WA State Department of General Administration - Energy / Utility Conservation Project Management Services11- 039(e) Council Approval N/A f� SaI i. STATE OF WASHINGTON DEPARTMENT OF ENTERPRiSE SERVJCES 1500 ,Jefferson, Olympia, WA 98504 October 12, 2011 TO: randon J. Miles, City of Tukwila FROM: &ie Miller, Contracts Specialist, (360) 407 -9363 RE: Contract No. 2011 -188 G (1 -1) Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval COP No. 1 Change Order No. 1 The Department of Enterprise Services, E &AS, requires funding approval for the above referenced contract document. The amount required is as follows: Contingency Amount Requested (with Tax) $21,223.32 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Division of Facilities, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using/client agency bears the liability for any issues related to 41 too the funding for this project. By 4- k WIN i 1 T' 1 Title Date Pleas sign and return this form to E &AS. If you have any questions, please call me. 2011 188Gcofundcm I 4::�rc) ff r STATE OF WASHINGTON DEPT. OF ENTERPRISE SERVICES Facilities Division, Engineering Architectural Services City of Tukwila CONTRACTNO. 2011 -188 G (1 -1) CO 1 CONTRACT CHANGE ORDER Lighting Upgrade COP No 1 PROJECT Tlr_E TO: Ameresco Quantum, Inc. CONTRACTOR PROPOSAL REQUEST DATE You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to: See attached COP No. 1. Assignment To Successor Washington State Government Entity Due To Transfer Of Authority. In the event that the authority of GA is withdrawn by operation of law or otherwise. and that authority is transferred and vested in a successor Washington State government W entity, with written notice to the ESCO from an authorized agency of the State of Washington, this Contract may be assigned to such p successor Washington State government entity. The assignment of this Contract under the aforementioned conditions shall not relieve the parties of their duties and/or obligations hereunder. J a O REASON FOR CHANGE a .v_ O CL DATE PROPOSAL REQUIRED CHANGE ORIGINATED BY PROPOSAL REQUESTED BY WE PROPOSE TO PERFORM ALL CHANGES DESCRIBED IN THE PROPOSAL REQUEST FOR: TO: (A/E) TO: PM (E &AS) CONTRACT PRICE CHANGE: ONO CHANGE ®INCREASE DECREASE o OF Twenty -Four Thousand Six Hundred Sixty -Five and No /100 Dollars $24,665.00 11 0. (Washington State Sales Tax Not Included) TO: STATE OF WASHINGTON O In accordance with the General Conditions, Cost Estimate Detail Sheet(S) are attached hereto U CONTRACT COMPLETION DATE: �NO CHANGE ®INCREASE DECREASE OF 120 CALENDAR DRYS 0 The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that work shall not begin prior to authorization. a Ameresco Quantum, Inc. CONTRACTOR BY DATE TO: STATE OF WASHINGTON We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. O N= O Z 2 AIE DATE E&AS COST VERIFICATION DATE 2 0 U W cc A'Et7CY 5.ntt CONTRACT SUMMARY (BY E &AS) ORIGINAL CONTRACT SUM $107,342.00 PREVIOUS TOTAL $107,342 PREVIOUS ADDITIONS $0.00 CHANGE AMOUNT $24,665.00 PREVIOUS DEDUCTIONS $0.00 NEW TOTAL $132 ,007.00 OZ 'i RACT COMPLETION DATE 11/25/2011 240 DAY'S PERCENT CHANGE FROM ORIGINAL CONTRACT AMOUNT 22.98% N NEW CONT 7 The final amount of this change order differs from the cost proposal. Invoices incorporating this change order constitutes acceptance by the O F contractor as total reimbursement due in connection with this change order. Q The State of Washington hereby accepts the foregoing proposal and authorizes the performance of the changes specified. This constitutes a change order to the contract on €y when authorizing signature is attixeo. AUTHORIZING SIGNATURE DATE Todd Flynn, P.E., Energ Engineer em FORM GEN•F.AAg9 (Revised 1?J971 Y 9 PROJECT COMPLETION AND COMPENSATION Energy Services Compensation Fee Energy Audit and Energy Services Proposal Lump Sum Design 6.0% Construction Management 5.0% Overhead and Profit M 15.0% Energy Services Sub -total Maximum Energy Services Fee Amount (New Previous) Energy Services Authorization Total $35,009.00 Compensation New I Previous 0.001 0.00 Ik,740.00 1 6,339.00 J.,450.00 5,283.00 ,4,349.00 15,848.00 $'v 7,539.00 27,470.00 $35,009.00 Value of this Amendment $7,539.00 (Plus Washington State Sales Tax) Scone of Work This Amendment to the Authorization is related to professional services provided for Change Order No. 1 on Contract 2011188 G (1-1). Professional services include design, construction management, and overhead and profit for the work performed under Change Order No. 1. Assignment To Successor Washington State Government Entity Due To Transfer Of Authority. In the event that the authority of DES is withdrawn by operation of law or otherwise, and that authority is transferred and vested in a successor Washington State government entity, with written notice to the ESCO from an authorized agency of the State of Washington, this Agreement may be assigned to such successor Washington State government entity. The assignment of this Agreement under the aforementioned conditions shall not relieve the parties of their duties and/or obligations hereunder. Schedule For Completion Final completion, including I" year M &V, by November 25, 2012. 2011188Aam lem Authorization No. 2011 -188 A (1) Page 2 of 2 .j STATE OF WASHINGTON DEPT. OF GENERAL ADMINISTRATION DIVISION OF ENGINEERING ARCHITECTURAL SERVICES CWIVAOrea 11 Ci of Tukwila V.O. CONTRACTCHANGEORDER lriDht� s Upg rade COP ft 1 T0: Ameresoo Quantum CONTRACTOR PROPOSAL REQUEST DATE 9128/1 You are directed to prepare a coat proposal for work described below and w dstalled on the alteohment mferred to Actual casts for existing measures came in less than budgeted for the contract. The savings are being applied to the following new scope of work: Light fixture replacement and retrofit per the attached ilghting spreadsheet, Labor and Material Cast $28,893.00 Bond Insurance 388.00 Base Contract Savings -$4,716.00 Total cost $24,686.00 All work to be complete by 12/1!i 1 REASON FORCHANGR Owner Reauest CNANQE oitia Aw aY Brandon Miles PROPOSAL REQUES eY TF DATE PROPOSAL REQUIRED 9/28/11 To Ameresco Oauntum (Ate) Todd Flynn Ppl (E &A) WO propose to perform ati changes desoribed In Propoestaleusatftr CONTRACT PRICE CHANGE: NO CHANGE INCREASE DECREASE OF Twenty four thousand. six hundred. sixty five and no/1 00 24,666.00 (Waehtnptan Stets SslaaTex Notlnotuded) :n accordance with the general Conditlons attached hereto is at Ea mete Detail 9heet(s) Nos 1# CONTRACT COMPLETION DATE: NO CHANGE INCREASE DECREASE OF 120 CALENDAR DAYS The foregoing amount cover* everything required In connection withAe. change. All other pr the in full fords and effect we understand thatwork shall not begin prior to authorlsollon. Ameresco Quantu CONTRACTOR BY 19d ft DATE_ TO. 8TAT8 OF WA8HIN a s N this proposal and "n the co to be remAsbter Therefore, end acoeptanoa. OA] CONTRACT SUMMARY (8yE&A8) Orlow Contract sum Prevlouq Addltiaoa 8 Prevfoue Deductions PREVIOUS TOTAL CHANGE AMOUNT NEW TOTAL s NEW CONTRACT COMPLETION DATE PERCENT CHANGE FROM ORIGINAL CONTRACT AMOUNT The final amount of this change order dtftars from the cost proposal. Invoices Incorporating this change order constitutes acceptance by the contractor ae total rsimburamerd due In connectlon with tMs change order. The State of Washington hereby accepts the foregoing proposal and suthcrbces the performance of the changes specified. This constitutes a change order to the contract only when authorizing signature is affixed. AUTHORFZINa SiGiNATURE DATE vurgete"" fnwrada" STATE OF WASHINGTON DE'P TMENT OF ENTERPRISE SERVICES 9500 Jeff4rs0rt, Olyarpia, WA 98504 October 12, 2011 TO: Brandon J. Miles, City of Tukwila FROM: l wddie Miller, Contracts Specialist, (360) 407 -9363 RE: Authorization No. 2011 -188 A (1) Amendment No. i Project No. 2011 -188 G (1 1) Project Title Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval 11-039(d) Council Approval NIA The Department of Enterprise Services, E &AS, requires funding approval for the above referenced contract document(s). The amount required is as follows: Design Implementation of Energy Conservation Measures 7,539.00 Sales Tax (9.5 (includes tax on audit proposal 716.21 TOTAL 8,255.21 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Facilities Division, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using/client agency bears the liability for any issues related o the funding for this project. to 14 f 1 Name Title 0 Date ease sign and return this form to E &AS. If you have any questions, please call me. 11-039(c) Council Approval N/A U n lAtl9 �Dy State of Washington Department of General Administration Facilities Division Engineering Architectural Services 210 11 Avenue, SW PO Box 41012 a Olympia, WA 98504 -1012 (360) 902.7272 o FAX (360) 753.2848 March 10, 2011 TO: r don J. Miles, City of Tukwila FROM:: ddie Miller, Contracts Specialist, (360) 902 -7219 RE; Authorization No. 2011 -188 A (1) Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval The Department of General Administration, E &AS, requires funding approval for the above referenced contract document(s). The amount required is as follows: Design and Implementation of Energy Conservation Measures 27,470.00 WSST Tax (9.5 2.609.65 Total 30,079.65 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Facilities Division, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using /client agency bears the liability for any issues related to the funding for this project. By 70/ �l a t, t.eci, c,, 1 7, Gtr- gY tnm Jitle Date Please sign and return this form to E &AS. If you have any questions, please call me. -19 3°9e1 11- 039(b) Council Approval N/A srnTg of 0 4 2. n� 0 9y .uses v State of Washington Department of General administration Facilities Division Engineering Architectural Services 210 11 Avenue, SW PO Box 41012 Olympia, WA 98504 -1012 March 10, 2011 (360) 902.7272 e FAX (360) 753.2848 TO: Brandon J. Miles, City of Tulcwila FROM: ddie Miller, Contracts Specialist, (360) 902 -7219 RE: Contract No. 2011 -188 G (1 -1) Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval The Department of General Administration, E&AS, requires funding approval for the above referenced contract document. The amount required is as follows: ESCO Contract Amount 107,342.00 Sales Tax (9.5 10,197.49 Contingency Amount (with Tax) 5.784.86 Total 123,324.35 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Facilities Division, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using/client agency bears the liability for any issues related to the funding for this project. 1 B y r Aak c,G V7, A0 11 Cr I Tiifle Date Please signs and return this form to E &AS. If you have any questions, please call me. s �C/ lo ej 611(,1 ee� 11 -039 (a) Council Approval NIA INTERAGENCY Amendment Department of General Administration Date: March 10. 2011 Agreement No: 2011- ERG -560�i Project No.: 2011 -188 APR Amendment No: 1 4 Z��� COMMUNITY DEVELOP i# Interagency Agreement Between the Department of General Administration And City of Tukwila The parties to this Agreement, the Department of General Administration, Facilities Division, Engineering Architectural Services, hereinafter referred to as "GA and City of Tukwila, hereinafter referred to as the "CITY hereby amend the Agreement as follows: 1. Statement of Work GA shall furnish the necessary personnel and services and otherwise do all things necessary for or incidental -to the performance of the work, set forth in Attachment "A" and Attachment "C attached hereto and incorporated herein by reference. Unless otherwise specified, GA shall be responsible for performing all fiscal and program responsibilities as set forth in Attachment "A" and Attachment "C Energy/Utility Conservation projects shall be authorized by Amendment to this Agreement. 1.1 Lighting upgrades outlined in the Ameresco Quantum, Inc. Energy Services Proposal dated February 9, 2011. 4. Consideration Compensation wider this Agreement shall be by Amendment to this Agreement for each authorized project. Each Amendment will include a payment schedule for the specific project. For Project Management Services provided by GA under Attachment "A" of this Agreement, the CITY will pay GA a Project Management Fee for services based on the total project value per Project Management Fees Schedule set forth in Attachment `B If the CITY decides not to proceed with an Energy /Utility Conservation project that meets the CITY's cost effective criteria, then the CITY will be charged a Termination Fee per Attachment "B The Termination Fee will be based on the estimated Total Project Value outlined in the Energy Audit and Energy Services proposal prepared by the Energy Services Company (ESCO). Interagency Agreement No. 2011 ERG -560 Page I of 2 If monitoring and verification services are requested by the CITY and provided by GA under Attachment "C" of this Agreement, the CITY will pay GA $2,000.00 annually for each year of monitoring and verification services requested. Compensation for services provided by the Energy Services Company (ESCO) shall be paid directly to the ES CO by the CITY, after GA has reviewed, approved and sent the invoices to the CITY for payment. 4.1 Energy Project Management Fee for the lighting upgrade is $10,500.00. Anticipated billing date for this Amendment is August 1, 2011. The new total Agreement value is $10,500.00. All seV ions above have been fully amended and are shown in their entirety. All other terms and conditions of this Agreement remain in full force and effect. The requirements of RCW 39.34.030 are satisfied by the underlying Agreement and are incorporated by reference herein. Each party signatory hereto, having first had the opportunity to read this Amendment and discuss the same with independent legal counsel, in execution of this document hereby mutually agree to all terms and conditions contained herein, and as incorporated by reference in the original Agreement. City of Tukwila Department of General Administration Facilities Division En Bering Architectural Services og igfie]FP.E cor m Enerav Program Mana -er 3-X* Tim Date Title Date 201 I S601AAam1 em REVIEWED BY GA CFO 3/9/11 Interagency Agreement No. 201 1 -ERG -560 Page 2 of 2 VAT, 0 4. 0 State of Washington Department of General Administration Facilities Division Engineering Architectural Services 210 11 Avenue, SW PO Box 41012 Olympia, WA 98504 -1012 March 10, 2011 (360) 902.7272 FAX (360) 753.2848 TO: Brandon J. Miles, City of Tukwila FROM: 4die Miller, Contracts Specialist, (360) 902 -7219 RE: Contract No. 2011 -188 G (1 -1) Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval The Department of General Administration, E&AS, requires funding approval for the above referenced contract document. The amount required is as follows: ESCO Contract Amount 107,342.00 Sales Tax (9.5 10,197.49 Contingency Amount (with Tax) 5.784.86 Total 123,32435 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Facilities Division, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using/client agency bears the liability for any issues related to the funding for this project. B y Tic s ih� 7, 1► Tide Date v Please sign and return this form to E &AS. If you have any questions, please call me. IS-1 L-3 o O Y State of Washington Department of General Administration Facilities Division Engineering Architectural Services 210 11 Avenue, SW PO Box 41012 a Olympia, WA 98504 -1012 (360) 902.7272 o FAX (360) 753.2848 March 10, 2011 TO: r don J. Miles, City of Tukwila FROM: ddie Miller, Contracts Specialist, (360) 902 -7219 RE; Authorization No. 2011 -188 A (1) Lighting Upgrade Ameresco Quantum, Inc. SUBJECT: Funding Approval The Department of General Administration, E &AS, requires funding approval for the above referenced contract document(s). The amount required is as follows: Design and Implementation of Energy Conservation Measures 27,470.00 WSST Tax (9.5 2.609.65 Total 30,079.65 Jn accordance with the provisions of RCW 43.88, the signature affixed below certifies to the Facilities Division, Engineering Architectural Services that the above identified funds are appropriated, allotted, and that the using /client agency bears the liability for any issues related to the funding for this project. By s r1 t a,.l' n y `�YLe�ti c,�- 1 7 2o I G4, Na j (title Date Please sign and return this form to E &AS. If you have any questions, please call me. 11 -039 Council Approval 2/22/11 Interagency Agreement Department of General Administration Date: January 12. 2011 Interagency Agreement No: 2011- ERG -560 Interagency Agreement Between the Department of General Administration and City of Tukwila This Agreement, pursuant to Chapter 39.34 RCW, is made and entered into by and between the Department of General Administration, Facilities Division, Engineering Architectural Services, hereinafter refereed to as "GA and City of Tukwila, hereinafter referred to as the "CITY". The purpose of this Agreement is to establish a vehicle for GA to provide future Energy/Utility Conservation Project Management and Monitoring Services to the CITY and to authorize the development of the energy services proposal. Now therefore, in consideration of the terms and conditions contained herein, or attached and incorporated by reference and made a part hereof, the above -named parties mutually agree as follows: 1. Statement of Work GA shall furnish the necessary personnel and services and otherwise do all things necessary for or incidental to the performance of the work set forth in Attachment "A" and Attachment "C attached hereto and incorporated herein by reference. Unless otherwise specified, GA shall be responsible for performing all fiscal and program responsibilities as set forth in Attachment "A" and Attachment "C Energy/Utility Conservation projects shall be authorized by Amendment to this Agreement. 2. Terms and Conditions All rights and obligations of the parties to this Agreement shall be subject to and governed by the terms and conditions contained in the text of this Agreement. The CITY shall provide the Energy Services Company (ESCO) with any additional contract language necessary to comply with federal requirements under the American Recovery Reinvestment At of 2009 (ARRA) and the Energy Efficiency and Conservation Block Grant (EECBG). The ESCO and their subcontractors are required to comply with all applicable federal regulations and reporting procedures. 3. Period of Performance Subject to its other provisions, the period of performance of this master Agreement shall commence when this Agreement is properly signed, and be completed on December 31, 2013 unless altered or amended as provided herein. 4. Consideration Compensation under this Agreement shall be by Amendment to this Agreement for each authorized project. Each Amendment will include a payment schedule for the specific project. c of a ar c�vttia Q/1> Interagency Agreement No. 2011 -ERG -560 Page 1 of 4 For Project Management Services provided by GA under Attachment "A" of this Agreement, the CITY will pay GA a Project Management Fee for services based on the total project value per Project Management Fees Schedule set forth in Attachment `B lithe CITY decides not to proceed with an Energy /Utility Conservation project that meets CITY's cost effective criteria, then the CITY will be charged a Termination Fee per Attachment `B The Termination Fee will be based on the estimated Total Project Value outlined in the Energy Audit and Energy Services Proposal prepared by the ESCO. If monitoring and verification services are requested by the CITY and provided by GA under Attachment "C" of this Agreement, the CITY will pay GA $2,000.00 annually for each year of monitoring and verification services requested. Compensation for services provided by the ESCO shall be paid directly to the ESCO by the CITY, after GA has reviewed, approved and sent the invoices to the CITY for payment. 5. Billing Procedure GA shall submit a single invoice to the CITY upon completion of each authorized project, unless a project specifies a Special Billing Condition in the Amendment. Each invoice will indicate clearly that it is for the services rendered in performance under this Agreement and shall reflect the Agreement number. GA will invoice for any remaining services within 60 days of the termination of this Agreement. 6. Payment Procedure The CITY shall pay all invoices received from GA within 90 days of receipt of properly executed invoice vouchers. The CITY shall notify GA in writing if the CITY cannot pay an invoice within 90 days. 7. Non-Discrimination In the performance of this Agreement, GA shall comply with the provisions of Title VI of the Civil Rights Act of 1964 (42 USC 200d), Section 504 of the Rehabilitation Act of 1973 (29 USC 794), and Chapter 49.60 RCW, as now or hereafter amended. GA shall not discriminate on the grounds of race, color, national origin, sex, religion, marital status, age, creed, Vietnam -Era and Disabled Veterans status, or the presence of any sensory, mental, or physical disability in: a) Any terms or conditions of employment to include taking affirmative action necessary to accomplish the objectives of this part and b) Denying an individual the opportunity to participate in any program provided by this Agreement through the provision of services, or otherwise afforded others. In the event of GA's non compliance or refusal to comply with the above provisions, this Agreement may be rescinded, canceled, or terminated in whole or in part, and GA declared ineligible for further Agreement with the CITY. GA shall, however, be given a reasonable time in which to cure this noncompliance. Any dispute may be resolved in accordance with the "Disputes" procedure set forth therein. S. Records Maintenance The CITY and GA shall each maintain books, records, documents, and other evidence that sufficiently and properly reflect all direct and indirect costs expended by either party in the performance of the services described herein. These records shall be subject to inspection, review, or audit by personnel of both parties, Interagency Agreement No. 2011- ERG -560 Page 2 of 4 other personnel duly authorized by either party, the Office of the State Auditor, and federal officials so authorized by law. GA will retain all books, records, documents, and other material relevant to this agreement for six years after expiration; and the Office of the State Auditor, federal auditors, and any persons duly authorized by the parties shall have full access and the right to examine any of these materials during this period. 9. Contract Management a. The CITY Representative on this Agreement shall be: Brandon J. Miles, Senior Planner City of Tukwila Department of Community Development 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 -8548 Telephone (206) 431 -3684 The Representative shall be responsible for working with GA, approving billings and expenses submitted by GA, and accepting any reports from GA. b. The GA Project Manager on this Agreement shall be: Todd Flynn, P.E. Dept. of General Administration Facilities Division Engineering and Architectural Services PO Box 41012 Olympia, WA 98504 -1012 Telephone (360) 902 -7251 Todd Flynn will be the contact person for all communications regarding the conduct of work under this Agreement. 10. Hold Harmless Each party to this Agreement shall be responsible for its own acts and /or omissions and those of its officers, employees and agents. No party to this Agreement shall be responsible for the acts and/or omissions of entities or individuals not a party to this Agreement. 11. Agreement Alterations and Amendments The CITY and GA may mutually amend this Agreement. Such Amendments shall not be binding unless they are in writing and signed by personnel authorized to bind the CITY and GA or their respective delegates. 12. Termination Except as otherwise provided in this Agreement, either party may terminate this Agreement upon thirty (30) days written notification. If this Agreement is so terminated, the terminating party shall be liable only for performance in accordance with the terms of this Agreement for performance rendered prior to the effective date of termination. Interagency Agreement No. 2011- ERG -560 Page 3 of 4 13. Disputes If a dispute arises under this Agreement, it shall be determined in the following manner: The CITY shall appoint a member to the Dispute Board. The Director of GA shall appoint a member to the Dispute Board. The CITY and GA shall jointly appoint a third member to the Dispute Board. The Dispute Board shall evaluate the dispute and make a determination of the dispute. The determination of the Dispute Board shall be final and binding on the parties hereto. 14. Order of Precedence In the event of an inconsistency in this Agreement, unless otherwise provided herein, the inconsistency shall be resolved by giving precedence in the following order: a) Applicable Federal and State Statutes and Regulations b) Terms and Conditions c) Attachment "A Project Management Scope of Work; Attachments `B Project Management Fees; and Attachment "C Monitoring Services Scope of Work, and d) Any other provisions of the Agreement incorporated by reference. 15. All Writings Contained Herein This Agreement contains all the terms and conditions agreed upon by the parties. No other understandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the parties hereto. AUTHORIZATION TO PROCEED. Agreed to and signed by: City of Tukwila Department of General Administration Facilities Division Engineering Architectural Services 91 u Signature 4-'17 1-1/4,,IV v o 'I'Aq ottra Roger Winfield. P.E. Name Name v Name Enerev Program Manager Title Title 0 2vI 2 2 Date U Date The Department of General Administration provides equal access for all people without regard to race, creed, color, religion, national origin, age, gender, sex, marital status, or disability. Contract information is available in alternative formats. For more information, please call Eddie Miller at (360) 902 -7219. 2011560IAAem REVIEWED EY GA CFO 1 /10 /11 Interagency Agreement No, 2011- ERG -560 Page 4 of 4 ATTACHMENT A Scope of Work Energy/Utility Conservation Projects Management Services Statewide Energy Performance Contracting Program Master Energy Services Agreement No. 2009 -151 GA will provide the following project management services for each specific project for the CITY. Each individual project shall be authorized by Amendment to this Agreement. 1. Assist the CITY in the selection of an Energy Service Company (ESCO) consistent with the requirements of RCW 39.35A for local governments; or 39.35C for state .agencies and school districts. 2. Assist in identifying potential energy /utility conservation measures and estimated cost savings. 3. Negotiate scope of work and fee for ESCO audit of the facility(s). 4. Assist in identifying appropriate project funding sources and assist with obtaining project funding. 5. Negotiate the technical, financial and legal issues associated with the ESCO's Energy Services Proposal. 6. Review and recommend approval of ESCO energy /utility audits and Energy Services Proposals. 7. Provide assistance during the design, construction and commissioning processes. 8. Review and approve the ESCO invoice vouchers for payment. 9. Assist with final project acceptance. 10. Provide other services as required to complete a successful energy performance contract. Interagency Agreement. No. 2011 -ERG -560 ATTACHMENT B 2009 -11 Interagency Reimbursement Costs for Project Management Fees to Administer Energy/Utility Conservation Projects PROJECT TOTAL PROJECT VALUE MANAGEMENT FEE TERMINATION $5,000,000 or more 1.1% of project cost $25,500 Below 5,000,000 $68,800 $25,500 4,000,000 64,900 23,600 3,000,000 59,900 21,700 fl 2,000,000 52,800 19,600 1,500,000 47,800 17,150 1,000,000 40,800 16,150 900,000 38,900 15,000 800,000 36,900 13,950 700,000 34,600 12,800 It 600,000 31,900 11,500 500,000 28,700 10,100 400,000 24,800 8,800 300,000 19,800 7,300 200,000 10,500 4,400 100,000 6,500 3,000 ft 50,000 4,000 2,000 20,000 2,000 1,000 1. These fees cover project management services for energy /utility conservation projects managed by GA's Energy Program. 2. Termination fees cover the selection and project management costs associated with managing the ESCO's investment grade audit and proposal that identifies cost effective conservation measures if the CITY decides not to proceed with the project through GA. 3. If the project meets the CITY' s cost effectiveness criteria and the CITY decides not to move forward with a project, then the CITY will be invoiced per Attachment B Termination or $25,500.00 whichever is less. If the CITY decides to proceed with the project then the Agreement will be amended per Attachment B for Project Management Fee. 4. If the audit fails to produce a project that meets the CITY's established Cost Effectiveness Criteria, then there is no cost to the CITY and no further obligation by the CITY. Interagency Agreement No. 2011 -ERG -560 ATTACHMENT C Scope of Work Energy /Utility Conservation Projects Monitoring Services Statewide Energy Performance Contracting Program Master Energy Services Agreement No. 2009 -151 If requested GA will provide the following monitoring services for each specific project for the CITY. 1. Monitor actual energy use and dollar costs, compare with the ESCO's annual Measurement. and Verification (M &V) report and any ESCO guarantee, resolve differences, if needed, and approve any vouchers for payment. 2. Monitor facility operations including any changes in operating hours, changes in square footage, additional energy consuming equipment and negotiate changes in baseline energy use which may impact energy savings. 3. Provide annual letter report describing the ESCO's performance, equipment performance and operation, energy savings and additional opportunities, if any, to reduce energy costs. Interagency Agreement No. 2011 -ERG -560