Loading...
HomeMy WebLinkAboutPermit D03-115 - NEWPORT HEIGHTS APARTMENTS - CRAWL SPACENEWPORT HEIGHTS APTS. 5660 S 152 ST D03 -115 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 1157200210 Address: 5660 S 152 ST TUKW Suite No: Tenant: Name: NEWPORT HEIGHTS APARTMENTS Address: 5660 S 152 ST, TUKWILA, WA Owner: Name: EQR - R E TAX DEPT - 27119 Address: PO BOX 87407, CHICAGO IL Contact Person: Name: CRAIG SUTHERLAND Address: TERRA FIRM DRILLING, 1925 SW 172 ST Contractor: Name: TERRA FIRMA Address: 1952 SW 172ND, BURIEN, WA Contractor License No: TERRAF *030K8 DESCRIPTION OF WORK: RE -ISSUE IN ORDER TO COMPLETE WORK FROM PERMIT D01 -353. SHOTCRETE AND TIE BACK ANCHOR SLOPE STABILIZATION IN THE CRAWL SPACE OF THE BUILDING Value of Construction: $ $0.00 Fees Collected: $394.13 Type of Fire Protection: SPRINKLERS /AFA Uniform Building Code Edition: 1997 Type of Construction: 0001 Occupancy per UBC: 0001 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: doc: Devperm N N DEVELOPMENT PERMIT Number: 0 Start Time: Volumes: Cut Start Time: Private: Profit: Private: D03 -115 Permit Number: D03 -115 Issue Date: 04/21/2003 Permit Expires On: 10/18/2003 0 c.y. Phone: Phone: 1- 206 - 391 -4915 Phone: 206 - 391 -4915 Expiration Date: 08/28/2004 Size (Inches): 0 End Time: Fill 0 c.y. End Time: Public: Non - Profit: Public: Printed: 04 -21 -2003 . �. ":: :�- 51."..rLl ^L:' . Permit Center Authorized Signature: The granting of regulating const Signature: Print Name: a AL 2-t_q,., n doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Date: Qom' I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. presu a to give authority to violate or cancel the provisions of any other state or local laws ancof work. I am authorized to sign and obtain this development permit. Date: I/2-1 Z T This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D03 -115 Printed: 04 -21 -2003 Parcel No.: 1157200210 Permit Number: D03 -115 Address: 5660 S 152 ST TUKW Status: ISSUED Suite No: Applied Date: 04/21/2003 Tenant: NEWPORT HEIGHTS APARTMENTS Issue Date: 04/21/2003 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All structural concrete shall be special inspected (UBC - Sec. 306(a)1). 4: When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name, permit number and type of inspection being performed. 5: The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with approved plans and specifications and the applicable workmanship provisions of the UBC. 6: Subgrade preparation including drainage, excavation, compaction, and fill requirement shall conform strictly with recommendations given in the soils report. 7: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 8: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting f this • er it does not pr sume to give authority to violate or cancel the provision of any other work or local laws regulating cor4truct on or he p rforrryr ce of work. Signature: Print Name: rgAcci doc: Conditions City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 itUt PERMIT CONDITIONS D03 -115 Date: 4'/2-17o Printed: 04 -21 -2003 Parcel No.: Address: Suite No: Applicant: Receipt No.: Initials: User ID: Payee: doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 1157200210 5660 S 152 ST TUKW NEWPORT HEIGHTS APARTMENTS R03 -00492 SKS 1165 TERRA FIRMA DRILLING TRANSACTION LIST: Type Method Payment Check Description 6688 RECEIPT ACCOUNT ITEM LIST: Description Account Code BUILDING - RES 000/322.100 STATE BUILDING SURCHARGE 000/386.904 Permit Number: Status: Applied Date: Issue Date: Payment Amount: 394.13 Payment Date: 04/21/2003 02:50 PM Balance: $0.00 Amount 394.13 Current Pmts 389.63 4.50 Total: 394.13 D03 -115 PENDING 04/21/2003 7076 04/22 9710 TOTAL 394.13 CITY OF TUKWILA RECEIPT PW DCD 394.13 CHECK 394.13 04/22/03 10 04:J2 0097 7076 Printed: 04 -21 -2003 1J_.c '. �Li: r e ;>:is..s..�i�!a ±:.,t';:r.+iii .; ?ii i r;.:.i bl. ?S'n.'�t :1,L'7�.�i�, r.: 2 I�.41, a! f : ,.. Y. Hiai'ii:iN:+ti�i,.t+i�.tiii3:xhtit KF.t+cC+Gi'sS cti: �i!S _i'+Lvz at*a;++ara.i = -'� City of Tj:kwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 RECEIPT Parcel No.: 0003000049 Permit Number: PW03 -019 Address: 13500 INTERURBAN AV S TUKW Status: PENDING Suite No: Applied Date: 02/10/2003 Applicant: FOSTER GOLF LINKS Issue Date: Receipt No.: R03 -00444 Payment Amount: 1,050.25 Initials: LAW Payment Date: 04/09/2003 02:52 PM User ID: 1165 Balance: $0.00 Payee: FOSTER GOLF CLUBHOUSE - ACCT 411.00.594.760.41.19 TRANSACTION LIST: Type Method Description Amount doc: Receipt Payment Other ACCOUNT ITEM LIST: Description PW BASE APPLICATION FEE PW LAND ALT PERMIT FEE PW LAND ALT PLAN REVIEW PW PERMIT /INSPECTION FEE PW PLAN REVIEW 000/322.100 000/342.400 000/345.830 000/342.400 000/345.830 1,050.25 Account Code Current Pmts 250.00 209.00 49.25 271.00 271.00 Total: 1,050.25 ;,T .t TOTAL - D03- 0 - 3 v 23 0.00 • Printed: 04 -09 -2003 • 141 4N,41 Project: Type of Ins ection: Address: i Date Called: Special Instructions: Date Wanted,: �m. - 22 -03 p.m. Requester }- Phone No: r ,. 7( -- .7%l/- /% /..5" INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 • PER (206)43 T -3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: P v wt i \ O wl inspector .\ j2 Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 11 16cV Subject: Reference: Dear Craig: Creative Engineering Options, INC. A firm practicing in the geosciences September 23, 2002 Mr. Craig Sutherland Terra Firma Drilling 1952 172n S.W. Burien, Washington 98166 I • 1 l�Q3 BU LL iNG DEPARTMENT Geotechnical Verification Column Foundation Design Modification Emergency Foundation Repair Newport Heights - Building "5" Tukwila, Washington Geotechnical Engineering Study Report by CEO, Inc., dated August 12, 2002. As requested, this letter briefly summarizes the foundation underpinning design modification made for the subject project. Our original recommendation for foundation support of the long timber columns carrying the interior floor loads was to install driven -in -place small diameter steel pin - piles. When your staff begin excavating around the base of the old timber columns, a large concrete pad foundation was encountered at each location. Subsequent to clearing these pad foundations, it was determined that they were sufficiently competent to carry the column loads providing a sounder structural connection was made between the footing and the timber post. Therefore, a concrete plinth was developed to extend several feet up from the concrete pad foundation and to encapsulate the bottoms of the timber posts. The plinths were also structurally connected to the existing concrete foundations. As a result of the implementation of this design modification that originally recommended pin -piles were eliminated from the repair. 5418 159th Place NE • Redmond, WA 98052 • (425) 883 -6889 • FAX (425) 867 -9664 • www.ceogeo.com wt �t:vi�:tuhrwrxvax;.. py..Y.efn.H�s!�r 01- 2346 -1 Geotechnical Verification Letter Page 2 01- 2346 -1 EQR/Building 5 Newport Heights - Emergency Repair September 23, 2002 Based on the observed construction, it is our professional opinion that the concrete plinths were installed in a competent and professional manner and that they are functioning as intended. Based on our observations, it is our professional opinion that this foundation and modification is appropriate and that the foundation support should prove adequate for the reasonable lifetime of the building. We trust this information is sufficient to satisfy any concerns regarding the elimination of the pin -pile underpinning for these foundations. Our services on this phase of the project had been performed, and our recommendations and opinions have been derived, in a manner consistent with that level of skill, care and competence ordinarily exercised by other members of the profession in good standing currently practicing under similar conditions in this area only. No other warranty, express of implied is made. Should you have any questions regarding this issue, or if we can be of any additional geotechnical assistance, please call. Very truly yours, CREATIVE ENGI NS, INC. Glen Mann, President r'i COPY gm\EQR Foundation Design Modification letter\eb 0 11 4..1161v Subject: Reference: Creative Engineering Options INC. A firm practicing in the geosciences August 31, 2001 Mr. Craig Sutherland Terra Firma 1952 S.W. 172nd Burien, Washington 98166 Dear Mr. Sutherland: RECE 5V O :0113 BIPLEai G DEPARTMENT Geotechnical Opinion Proposed Design Modification Emergency Crawl Space Repair Anchored Shotcrete Wall Newport Hills Apartments Building # 5 Tukwila, Washington Geotechnical Engineering Report by CEO, Inc., dated August 9, 2001. 01 -2346 03� k IS �- 35 3) We understand that since the submittal of our above - referenced geotechnical report for this project your work crew has conducted some earthwork within the crawl space area of Building #5. This "excavation" of sloughed soil has exposed a series of concrete foundation pads approximately at the locations of each of the timber support posts for the wood floor above. As a result you believe it will not be necessary to use driven -in -place pin -piles to support these timber posts. As we understand the current situation your intent is to drill and epoxy grout four 3/4 -inch diameter expansion bolts into each of the existing concrete foundations and then to construct a four foot high and twelve (12) inch diameter reinforced concrete "plinth" atop each of the pad foundations. The timber floor support posts will then be structurally connected to the tops of the concrete plinths. 5418 159th Place NE • Redmond,WA 98052 • (425) 883 -6889 • FAX (425) 867 -9664 • www.ceogeo.com ift tr as :s r::. r. .;a144 /1 "t Varoi1444 e Geotechnical Engineering Recommendation Modification Page 2 01 -2346 Newport Heights - Building 5; Emergency Repair August 31, 2001 Based on our evaluation of these conditions and recommendations it is apparent that the concrete plinths will raise the timber posts well above the subgrade, or any additional fill surface, so that the posts will not be subject to wetting and decay. Providing the expansion bolts and plinth reinforcement are considered appropriate by the project structural engineer we see no geotechnical reason why this form of timber post support should not be acceptable. Furthermore, given the presence of the existing concrete post foundations, it is our professional opinion that the four driven -in -place steel pin -piles recommended for the post foundation support in our above - referenced geotechnical report are unnecessary. It is also our opinion that, as such, since these pin -piles are not required for post foundation support they need not be installed. We trust this information is sufficient to resolve any outstanding questions regarding this specific foundation design and construction element of the proposed repair work. Should you have any questions about this design modification, or if we can be of any additional geotechnical assistance, please call. Very truly yours, CREATIVE ENGINEERING OPTIONS, INC. Glen Mann, President EXPIRES April, 10 y4.,3 � COPY gm /EOR Pin -Pile Installation Modification Letter /eb79 1it. SN �?' �7!:�FNYrdi i:)k" REGISTERED, AS ,.PROVIDED BY LAW AS CONST CONT :.GENERAL � .REGIST. ## EXP DATE CCOi•` TERRAF *030K8-08/28/2004' EFFECTIVE.: DATE 05/28/1997 TERRA FIRMA. • 1952 SW 1.'72 D BURIEN, WAi, 98 Signature /I . t','1 `.! �� `^ � • Issued by DEPARTMENT OF LABOR AND INDUSTRIES oG_TAR... 1. 'JOHN R. EWING AND ASSOCIATES CIVIL♦''ENGiNEERING - LAND SURyE'(dRS, '+ O KENT, �� * , '(206) 8 52-663 ' 0 SEPIAR.Tt.' t. • IRrQUI 'ED 0 MECHANICA • LECTRICAL { '. L UMBING • GAS PIPING "To Ct Tv OF TU ,c 13IJILD'I.NG i•; r: p ei +x'5:4 =�j � ► c3j•p?O . a' a az Cc a7prc' •:s ate alt j 'S • ,*r 1 ,. p !f' r r, y .� . \ �'' � ,�IL�.r r r - � - IZ� "4. �1 1-1P r^ lc r , ,• • "� �'. tir y . w ,?J ly ` r L ,,. �^'. / : G•, ►'pN* s /p- --rr- i� ----- ' �.� -����, t F - s. v v• ,� _, 11 -.. 1. r.ti 'r. :.i �';' �.' . r•1,� Jib 4 ti •r • { • i'. V: 1�f•.I, � �k '`' �. ' ���: t 1' • • • c ;s & Z+n •.4At, to (r.,)w e',uJ.cvn •'o.. G ' v Ir.rr� J 1 1' ?'rl•ii�pjp J(1V �I v 1�.� , p',1 (Lit• , 1,46 Ga/PAGL°C F c ''', 5v,4T „p�V ' r,1•; `' Ge..4CL e:44:47/041.-''' ' , xIS'� /Aia`�ou(J/o �5.! ou�'�� 1'..k.- '' ,`r,u 'k� a A.ie •r/' %S E'!.7 . 5��..,�,,�., Etz v,,4 - 77 r .. c '•`#`s .� 1 v.� LV - t 7/• , • 704? . Uf. focK :!E'Y.. EheV 77P/v, ' 1, r 12 53 t- JOS ” w . l _ -- 2 XL ✓/ S . , iCc :'rEK 1C$ F , • -..► REV. N0. r r f 8 • hiSN ' / 2 • E ('R P OH 'C i(C►�Q GATE • • 7 7 • • - -- ' ` 4- • y 5 SHEE1TVCf11 a ,,, _ l :.�J �..�I� ?•.{.' /tj- • I V t • E 4 I NV. ft 16± N N Ex.sting x 2.7 x 1E' Concrete Cciurrins 0 iNote: Support beams not shown for clarity.] Crete Eng,roeet..^.i Opt • • . XL, 8" cThotcrote Face with 04 Pebar & Vertical 12" o.c Pro-ose;.• GroLted •""iia -back Anonors I I 1 N Exg 6" x x 16' T:rroer Cc _rrns Miradrain Eit)Ci or 18" Wide by 16 Deep Thickened Equivalent Dr ,cage Shotcrete to Act as 'Tempo: an( ma: Wall Fcoting Note. \Vali Jrani to be eutinect:,: to the existin6 building tooting drain ith ti buried , 4" i.d solid PVC pipe. ••■■••••• - ar, I I C ! - :-:;ct&: fc: Reinforce.: Sr...;:crete Face LNL '1 TYPICAL ANCHOR LOCATION PLAN Zoric LA No Li:. d I • 35 kip Design 120 kip ultimate ,' 'Titan 30/1 Ancnor) 30 Kip Design 60 Kip ultimate (Titan 30/11 Anchor) 1 F,a9le LEGEND • Nla,mum estimated neigh of shotcrete H • f.finimurn depth ci turiat al case of wail, D • Minimum, recommended width of Lase of wall, B • Minirnom aflowable soil coating a' base of wall • Maximum ailowabie aXl3i anchor capacity • Angie ci anchor installation, a • minimum estimated diameter of grouted anchor • Maximum recommended center-to-center anchor spacing • minimum non anchor length, LNL • Minimum loaded anchor length, LA NOTES Reanflorcing Seel fiefs :2" or Center to La He/rt - .zontai Re.ntorcrr.g SteE Bars - 2: .5, 4 - Eacr. S.ce or Anc-.or hea: • NOTE • Horizonto. and ver.cai stee, reinforcing cars forming - Awer oe.ime arown: ancnor - heaos snout° extend 'or rail lengtri or neicrit of tne shotcrete wait :ind should eicapsulate eacri anonor nea:, • - BOOK pocKeis' around anchor neaus are tiled w,tri concrete grout atter anchor •oad testing is comp eted. • All steel •e.. size and spacing to be verified by project structural engineer. = 16 feet = 18 inchur. 18 = 3,000 Ps; = 35 kips 15 degreifs = 5 inches = E feet = See Tab,: A See Tats i A • All anchors to be Titan 30;11 coarse threaded, hollow core rods. • Entire face of soil cut to be covered with Miradrain 6000 or an equivalent approveiJ In writing by the geotechnical engineer. • The size, lengths and spacing of all steel reinforcing ii shotcrete wall MUST be verified by project structural engineer. • Fill must be place to a depth of no less than 18-inches, and compacted against Init inickened toe of the shotcrete wall to help provide supplemental passive restraint. • • A:, anchor grout shall have a minimum 28-day compressive strength of no less than 4,000 ps, Creative Engineering Options C.111111111111111■■ Plate TYPICAL ANCHORED WALL SECTON 8 Scnemat:c Only - Not to Scale (Dirrterts,ons as inc:cateo on:y.) r c-c I II i 1 I I 1 I I 1 , -1-1— "-t 1 1 — II I i i L J .1 _ '_ II I 1 : 1 ;---- - T - 1Tii , —v - I I I I II I I It . Creative Engineering Options Jr•ri • • - 2SuareA3 E Ste., Lest Spreaer Pia:. Vert.cai Re.rfcroing Stee. Ears - ,2; NE, 4' - Eacn S oe Of Ancnor rreac NOTE: Special inspections are required lot the concrete, piling and shoterete, per ULIC Chapter 17. The special inspeetions shall be conducted by "Pacific Testing Laboratories" of Seattle, WA r. - onzcnta, Stec: Bars 12" cr. Cen:ei tt =Jit Wait Length TYPICAL WALL REINFORCEMENT I F I 10 • Cross-cut Dr:il B't with / r-oular Guide Grout Boo, (min. 20 Min ;14 cover) Reie.renc. Tr:- ii)rotn:is map' King Cc_r:, 2001 editiori THIS DOCUMENT iS 401YRiqHT PROTECTED AND IS THE SOLE PROP4TY OF .CREAIE OJGINEERING OPTIONS, INC. ANY REPRODUCTION OF THiS DOCUMENT WITHOUT THE WRITTEN AUTHORIZATION OF THE ABOVE CONSULTANT IS Si RICTLY PRCHBITED. ANY MODIFICATION OR USE OF THiS DOCUMENT FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF CREATIVE ENGINEERING OPTIONS, INC., SHALL RENDER 1HE ASO+ E CONSULTANTS HARMLESS FROM ANY LITIGATIONOR SUIT CAUSED BY ITS USE AND/OR MODIFICATION, OR BY THE RAMIFICATIONS OF ANY SUCH USE AND/OR MODIFICATION. 4 - ..A-- Hole for / I Tuba of anc Gtc.t.ng Cross-cut Bit Bonded Length L, CCreative Ilngareerinc. Opt.zns r +c, • Spacer 4(af' Se ar• 41.• • atiVAA 004.,e;OtOti ' Vet* . . Stao..zez Annulus • •• TYPICAL 'TITAN" ANCHOR DETAIL • EWA 1••■•••••• ••••■••■•■ Tape VICINITY MAP Coupler Free Lang jitl--442r Free (unoonded) Length L15 - Sheol Piie Wedge Disc each up to 12' r DT+ r A; - k NOTE: These diagrams MUST be used in conjunction with the stamped & signed Geotechnical report prepared by "Creative Engineering Options" dated Aug 9t 2001. Spericai Cola: Nut, Apply DENSCCLER Grease on Thread Load Distribution Acc. to Static Calculation Plate 1 ptETT7 r , 1 t RE, ; to. Date Sca.e Drawn Job U) 0 0 0 w w z Li L1.1 U Sheet co o3 — co Sheets Moment Version 3.03 Copyright o R:SA Techno1cczies.1993 MEMBER END FORCES No. : : Axial Shear Moment F1 :Help F2 :Plot F3:Oetail :D]isp [R:eac :E:Forc [W]Foro [AJlzSec :Plrint HOWE ENGINEERING CONSULTING ENGINEERS 2807 E LK. SAMMAMISH PKWAY N.E., SAMMAMISH, WA 98074 PHONE: (425) 881 . FAX: (425) 881 STRUCTURAL CALCULATIONS & DETAILS FOR NEWPORT HEIGHTS CRAWL SPACE REPAIR TUKWILA, WASHINGTON 0176 I come 4-7-07 - 1 9-17-0 load Comtination .....-.... Axia: Shear Load 7cmbinaticn Axial Shear Moment Date Scale Drawn