Loading...
HomeMy WebLinkAboutPermit D03-333 - TUKWILA COMMERCE CENTER - BUILDING 38 - REROOFTUKWILA COMMERCE CENTER 1128 -1136 INDUSTRY DRIVE D03 -333 z 1W. re 2 6 J U: O 0. N O: w=` J I_ • U. W 0' N d. I- a Z F- LLI w. gip'_ O -: O I- U` 0 ~_ z City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2523049071 Address: 1128 INDUSTRY DR TUKW Suite No: Tenant: Name: TUKWILA COMMERCE CENTER - BLDG 38 Address: 1128 -1136 INDUSTRY DR, TUKWILA WA Owner: Name: CALWEST INDUSTRIAL PROP Address: C/O DELOITTE & TOUCHE LLP, 2235 FARADAY AVE #0 Contact Person: Name: CHUCK MAHLUM Address: 4910 15 AV NW, SEATTLE WA Contractor: Name: HAIGHT ROOFING COMPANY INC. Address: P.O. BOX 70150, SEATTLE, WA Contractor License No: HAIGHRC269QK DESCRIPTION OF WORK: REMOVE EXISTING ROOF MEMBRANE,DOWN TO WOOD DECK. REPLACE WITH NEW BUILT -UP ROOF SYSTEM. Value of Construction: $ $17,476.00 Fees Collected: $488.36 Type of Fire Protection: SPRINKLERS Uniform Building Code Edition: 1997 Type of Construction: Occupancy per UBC: 0016 Water Meter: doc: Devperm Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N DEVELOPMENT PERMIT ** Continued Next Page ** D03 -333 Permit Number: D03 -333 Issue Date: 11/03/2003 Permit Expires On: 05/01/2004 Phone: Phone: 206 784 -8414 Phone: 206 784 -8414 Expiration Date:05 /01/2004 Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N Profit: N Non - Profit: N Water Main Extension: N Private: N Public: N N Printed: 11 -03 -2003 ik n ,.sGa.:= ia.::..u..::�rJ doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 f/ Permit Center Authorized Signature: 'T �(„LLC,Q . (/)/41-! Date: / /// /13 v I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructio r he performance of work. I am authorized to sign and obtain this development permit. Signature: Date: #'0?' °c3 Print Name: 6/"46- /4//t-CIAA-- This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D03 -333 Printed: 11 -03 -2003 City of Tukwila PERMIT CONDITIONS Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2523049071 Permit Number: D03 -333 Address: 1128 INDUSTRY DR TUKW Status: ISSUED Suite No: Applied Date: 10/29/2003 Tenant: TUKWILA COMMERCE CENTER - BLDG 38 Issue Date: 11/03/2003 1: ***BUILDING DEPARTMENT CONDITIONS* ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 4: A statement from the roofing contractor verifying fire retardant class of roof will be required prior to final inspection (see attached procedure). 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 7: The following conditions apply to re -roof permits: 1. All re- roofing projects will be accomplished in compliance with Appendix Chapter 15 of the Uniform Building Code (UBC). 2. Inspections: a) New roof coverings shall not be applied without first obtaining a pre - roofing inspection from the Building Division and written approval from the Building Inspector. The pre- roofing inspection shall pay particular attention to evidence of accumulation of water. Where extensive ponding of water is apparent, an analysis of the roof structure for compliance with section 1506, U.B.C., shall be made and corrective measures, such as relocation of roof drains or scuppers, resloping of the roof or structural changes, shall be accomplished. An inspection covering the above listed topics prepared by a qualified special inspector, as determined by the Building Official, may be accepted in lieu of the pre- inspection by the Building Inspector. b) A final inspection and approval shall be obtained from the Building Division when the re- roofing is complete. As a condition of the final inspection for roofs that require a fire retardent roof covering under the provisions of Table 15 -A, 1997 U.B.C., the roof installer shall provide the inspector with a written statement indicating the following (or something similar): "I have installed a roof membrane assembly, including insulation if applicable, consisting of (manufacturer), Specification No. , data sheet enclosed, which meets or exceeds the requirements for Class A or Class B roofs. This roof was installed at (address), under City of Tukwila Building Permit No. " (NOTE: This statement shall include the name of the roofing company that installed the roof, signature of installer and date.) f hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws doc: Conditions D03 -333 "Vera ar�YNYa'dPW`h.: Printed: 11 -03 -2003 regulating construction or the performance of work. Signature: Print Name: 6.r4,4g6" doc: Conditions h City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 D03 -333 Date: l-DLT Printed: 11 -03 -2003 ■ King Co Assessor's Tax No.: 01.���0 «" 07/ Site Address: { t 26 Su ite Number: Floor: Tenant Name: 38'tt'1Xs► 2-1 C-ays11 —New Tenant: J .... Yes '15,..No Property Owners Name: 2Z ` �F k4A1-1P4L- ►^�1 - C z —W'P�1 ? Mailing Address: Ito0C0 C 1-E34 5 'ma Qt 1.- AVuJtL % L.VA City State Name: C_I- LACtL NAPA t -�1►✓1 Mailing Address: 4910 1S,i.1 Av.- E -Mail Address:Ch t CILm @_ +kart ro orct''g -Lr v1 Company Name: 4Jp.cG4" j�cx�-t-t - C-ov -APP4V Mailing Address: 491© l 5 1 1-1 A t Contact Person: E -Mail Address: Contractor Registration Number: 1 lea %-2(.c R-C-2bct G L.. Expiration Date: c5 /OZ 2 cC 1- **An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** CHITECT OF RECORD All plans must be wet stamped by Architect of Record Company Name: - D - 7 Co iJ �u t�T► LJG, Mailing Address: 410 -'- P# i t cc O c -z:1 "F +Gt- GA q ZZ�OQ City State Zip Day Telephone: q - q5 " Z - 71 Fax Number: 949 - 955 - Contact Person: KAAl2 -v.: - E -Mail Address: ::ENGINEER OF °RECORD Alf plans,must be wet stamped by Engineer of Record Company Name: Mailing Address: Contact Person: E -Mail Address: \applications \pcnnit application (3.2003) 3/2003 CITY OF TUKWILA• Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Page 1 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Day Telephone: ZC�~ 7 41 64 14 ;tip c/S t o`T City State Zip Fax Number City Day Telephone: Fax Number: Wics S State Zip q 3i O Zip Zip City Day Telephone: Fax Number: I 'DING' PERMIT: =INFORM` 'q Val tieni`t i'f Prdject (e6ntractor's:bid price): $ 1 1 Scope of Work (please provide detailed information): 6-.431 -36 F — 1C,P \ A T mot.- 2 . Will there be new rack storage? 0 ..Yes No If "yes ", see Handout No. , 41c71 ' �� Existing Building Valuation: $ 1 — cu- )(. l t■1 7..4r t" IAA SY 1l for requirements. : Provide All Building Areas in Square Footage Below 1 ";Floor :. 2 " Floor 3 Floor Floors Basement Accessory Structure* Attached:Garage • : Detached Garage Attached Carport Detached:Carport Covered Deck Uncovered Deck Interior. Remodel Addition to Existing Structure Type. of Construction per UBC Type Of: Occupancy per `UBG. PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 ....Yes 0 ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: M . Sprinklers 0 ..Automatic Fire Alarm ❑..None 0.Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑..Yes ,X,No If "yes", attach list of materials and storage locations on a separate 8-1/2 x 11 paper indicating quantities and Material Safety Data Sheets. \applications\permit application (3.2003) 3/2003 Page 2 1 Water District ❑ ...Tukwila 0... Water District #125 ❑ ...Water Availability Provided Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size.:' ❑...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public _ \applications\permit application (3 -2003) 3/2003 cubic yards cubic yards „ S'T'ERMITINT 2MATIUN 206=433-01 Scope of Work (please provide detailed information): „ Call before you Dig: 1- 800 - 424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet Sewer District ❑ ...Tukwila ❑... ValVue ❑ .. Renton ❑ ...Seattle ❑ ...Sewer Use Certificate ❑... Sewer Availability Provided ❑ .. Approved Septic Plans Provided ❑ ...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line WO# WO# WO# Private Private ❑ .. Highlinc ❑ ...Renton ❑ .. Geotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) ❑...Hold Harmless ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer Monthly Service Billing to: Name: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address' Number of Public Fire Hydrant(s) ❑ ... Sewage Treatment Day Telephone: City State Zip Day Telephone: Page 3 i* ifS; r,<G >'�i�Jh.4:a.1�}:n Irn '.�.%• 4J'�:tS ''v Unit Type: Qty Unit Type; Qty Unit Type::: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >= 10,000 CFM Other Mechanical Equipment 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System 30 -50 HP /1,750,000 BTU Appliance Vent Hood 50+ HP /1,750,000 BTU Heat/Refrig/Cooling System Incinerator - Domestic Air Handling Unit <= 10,000 CFM Incinerator — Comm /Ind 6=431` -36 GRA ;FO1.,,,4IATI MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number: Expiration Date: Contact Person: E -Mail Address: Contractor Registration Number: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New .... 0 Replacement .... El Commercial: New .... Replacement .... 0 Fuel Type: Electric 0 Gas ....E] Other: Indicate type of mechanical work being installed and the quantity below: ATION NO' p1 permits Yn the app Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNS . AUTTHOR AGENT: /2-9 / Signature: t/ y�;�yu'v" Date: IO �g 1 o "S Date Ap 102 p . j Staff Initials: Print Name: �t C- . Vt 1s G�v Mailing Address: 49 i0 IS: * 14v0 \applications\permit application (3.2003) 3/2003 Page 4 Day Telephone: 2.c e 7 vv* 98b37 City State Zip doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Payee: HAIGHT ROOFING COMPANY INC Payment Check 23474 BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000/322.100 000/345.830 000/386.904 RECEIPT Parcel No.: 2523049071 Permit Number: D03 -333 Address: 1128 INDUSTRY DR TUKW Status: PENDING Suite No: Applied Date: 10/29/2003 Applicant: TUKWILA COMMERCE CENTER - BLDG 38 Issue Date: Receipt No.: R03 -01312 Payment Amount: 488.36 Initials: SKS Payment Date: 10/29/2003 02:01 PM User ID: 1165 Balance: $0.00 TRANSACTION LIST: Type Method Description Amount 488.36 ACCOUNT ITEM LIST: Description Account Code Current Pmts 293.25 190.61 4.50 Total: 488.36 . 4171 .10/29 9716 TOTAL 1101.34 Printed: 10 -29 -2003 Project: 1 J \LU.:t� (w w\ Cc r 3P Type of Inspection: , ht, I Address: - 11 1 %) 3v\ Cv5$ry ' ' Date Called: Special Instructions: ( , Date Wanted: a.m. p.m. Requester: Phone No: z INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 �a 3- 333 (206)431 -3670 K Approved per applicable codes. Corrections required prior to approval. COMMENTS: -r N . PC ,,,.P c( 4 , V� \ - e4 ir \ - evei Cow rLP 4 Inspector: r Date: l 2_1 El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Pr ct: //��,� Ur ( j 7 4 4 Type of Inspec ion: - n G� A/I n9' / 3 / I --77 GO l Date Called: �/ .r f /p S eci Instructions: P p _1- 3!� � D ate Wanted: Sf 2� ern: `` p. m Requester: Phone No: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit PER -- (206)431 -3670 a Corrections required prior to approval. COMMENTS: Ins pecto . Date: ,�6, 04_1 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: ( Type of Ins on: 47 Address: /1 .[ / ; G/ /eL 6 /) 4' Date Called S /e' ' Special Instructions: Date Wanted: - /r a.m. p.m. Requester: - L a..s -(1 Phone No:e £ 2‘ ?7/- / //?' • )0 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PE (206)431 -3670 Ei .Approved per applicable codes. D Corrections required prior to approval. COMMENTS: (2_ 7", Inspecto Date: 7 .-117/-4 7 / //. efr ri $47.00 REINSPECTIoN FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: "SINCE 1919" May 27, 2004 Stephania Spencer City of Tukwila — Permits Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Letter of Completion Dear Ms. Spencer: We have installed a roof membrane assembly, including insulation if applicable, consisting of GAF Materials Corporation, Specification No. N- B -M/P6, data sheet attached, which meets or exceeds the requirements for Class A or Class B roofs. This roof was installed at1128 Industry Drive under City of Tukwila Building Permit No. D03 -333. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK i'i ' orai . , `-'r.' 1 "777. 7 _•,•r 7.;.,r,TP 1. .777 ,..j.. »rt„*";" .., :', »7r!,n7: .t..a. 77:Tr:'.'!rt:.: ?.'7:I") Mr.7.iavr 1. f i 4 GAF MATERIALS CORPORATION GAFGLAS® Specifications N- B- 4 -M /P6 and N -B -4 -M CAFGLAS Mineral Surfaced Ca Steel Sellable Deck' Sheathing Paper (It required) Bate Sheet ) (see below) truth, South. and 1t1nsf Zones Nailable decks up to 6 inches per foot slope, except for lightweight insulating concrete decks which are limited to a maximum slope of 1" per foot. Wood, plywood, poured gypsum, precast gypsum planks, other acceptable nailable decks. For lightweight insulating concrete decks, see page 9. : "Mateilals Sheathing paper (1 ply, if require Base Sheet : • '; .: � : GAFGLAS.Ply (2 plies) .GAF Materials Corporation Roofing Aspha Interplies; +:Cap Sheet; GAFGLAS Mineral Surfaced.Cap Sheet :Approximate Weight per S iiF I'.ifiC 3Iion S gp.nrral Design and Application Considerations detailed in this Manual shall apply in addition to the following recommendations and specifications. ^lir.ailnn of Rerflnfi P,ipmhiznr. 1. Over entire surface, lay one ply of sheathing paper where applicable. Lap each sheet 2 inches over preceding sheet. Nail sufficiently to hold in place. 2. Starting at the low point of the roof, lay one ply of Base Sheet, lapping each sheet 2 inches at edges and not less than 6 inches at end laps. Nail along lap of base ply at intervals not to exceed 9 inches and stagger -nail down center of sheet in two rows with nails spaced at 18 inch intervals in each row. Use fas- teners with integral metal heads at least 1 inch in diameter or square that are recommended by GAF Materials Corporation or the deck manufacturer. (See "Special Instructions" below.) 3. Starting at the low point of the roof, mop two plies of GAFGLAS Ply shingle fashion; lapping each sheet 20 inches over the preceding sheet; solidly mopping to the underlying base sheet to provide three plies over the entire roof area. .1111 ?I! r. n, rlllil nl;;;?i;tc, F ,IInterply moppings of Roofing Asphalt must be applied in a continuous film and shall consist of approximately 25 pounds per 100 square feet of roof area with a tolerance not to exceed 20% plus or minus. The appropriate asphalt for the slopes involved must be used. ..Slope per foot Asphalt Type Up to 3' :.. ,; ;. f " . "'• Steep ASTM Type Ill 3'- 6' . • ''HT -Steep ASTM Type IV On slopes up to 'h inch per foot, Flat ASTM Type II may be used except in Florida, Texas, New Mexico, Arizona, and California. Apply GAFGLAS Mineral Surfaced Cap Sheet in accordance with the application instructions on page 20, so that the laps are offset from the laps of the ply sheets. `;I IiCfai inrinir.hnns 1. See recommendations for use over gypsum decks on page 9. 2. Acceptable Base Sheets include: STRATAVEN7 Nailable required for freshly poured gypsum decks, GAFGLAS #75 Base Sheet, RUBEROID' Modified Base Sheet, GAFGLASIFIexPly6, and GAFGLAS Ply 4. For wood decks and structural wood fiber decks, when GAFGLAS Ply 4 or GAFGLAS7.lexPly6 is used as a base sheet, a sheathing paper is required. 3. See "Nailing of Base Sheet," page 19. 4. For roof slopes of 1 inch per foot or more, all ply felts must be back - nailed 4 inches in from the back edge of the felt. See "Installation on Steep Roofs," page 10. ;il. Cla:;sifica!inn UL Class. ; . Substrate . Slope ! II . (hail KC.V 1. Substrate C = Combustible and Noncombustible Combustible = Wood planks, boards, etc., plywood (min. ' inch thickness), oriented strand board (min. /: inch thickness). NC = Noncombustible only Noncombustible = Steel, poured or precast structural concrete, lightweight insulating concrete, gypsum, structural wood fiber, etc. 2. Slope Maximum slope allowed, in inches per foot. Guarantees Available Specification Liberty Guarantees N- B- 4 -M /P6 N- B- 4 -M /P6 N -B -4 -M 15,12,10, 5 yr. West Zone only, Wood Decks. 15,12,10,5 yr. Lightweight Insulating Concrete. (See page 9.) 12, 10,5 yr. 41 "SINCE 1919" April 28, 2004 HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 -1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS Stephania Spencer Via Facsimile City of Tukwila — Permits Center 206- 431 -3665 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Permit Application No. D03 -333 — Request for Extension Dear Ms. Spencer: Thank you again for your help in this matter. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File Original to follow via US Mail RECEIVED yT DC LL, �T,rr`,N We respectfully request a one -time extension for this permit, as we were unable to complete the project prior to cold weather setting in last year. The roof is complete with exception to the cap sheet, which should be set in temperatures above 60 degrees when feasible. We are now beginning our roofing season and expect to complete this project within the next couple of weeks, at which point we will be able to call for final inspection. Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK April 29, 2004 Mr. Chuck Mahlum Haight Roofing Company, Inc. P.O. Box 70150 Seattle, Washington 98107 RE: Request for Extension — Permit No. D03 - 333 — 1128 Industry Drive — Bldg 38 Dear Mr. Mahlum: This letter is in response to your written request for an extension to Permit No. D03 -333. Based on the information received, the City of Tukwila Building Division will be extending your permit to November 1, 2004. Please be advised that this will be the only extension granted for this project and no further notice will be jiiven prior to the expiration date. A new permit and associated fees will be required after the above -noted expiration date. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, Ro•ert Benedic Building Official /sks File: Permit No. D03 -333 Cizy of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 - 431 -3665 ,kcw.1.14%,vri'.•K7.kavY,+ Sent By: HAIGHT ROOFING CO INC; 2067841058; Apr -28 -04 3:18PM; Page 1/2 "SINCE 1919" April 28, 2004 Stephania Spencer Via Facsimile City of Tukwila - Permits Center 206 - 431 -3665 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Permit Application No. D03 -334 -- Request for Extension Dear Ms. Spencer: We respectfully request a one-time extension for this permit, as we were unable to complete the project prior to cold weather setting in last year. The roof is complete with exception to the cap sheet, which should be set in temperatures above 60 degrees when feasible. We are now beginning our roofing season and expect to complete this project within the next couple of weeks, at which point we will be able to call for final inspection. Thank you again for your help in this matter. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File Original to follow via US Mail o,K � rJzel� HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150. Seattle, WA 98107 Area Code: (206) 764 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS R EGE�� KWII �, � ry ( 1F ApR 2 8 2pp4 Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK April 6, 2004 Chuck Mahlum 4910 15th Avenue NW Seattle, WA 98107 City of Tukwila. Department of Community Development Steve Lancaster, Director RE: Permit Application No. D03 -333 1128 Industry Drive Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Sincerely, Xc: Permit File No. D03 -333 Bob Benedicto, Building Official • Call the City Of Tukwila Permit Center at (206) 431 -3670 to arrange for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one -time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection or request and receive an extension prior to May 1, 2004, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Stefania SlYencer Permit Technician Steven M Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • "SINCE 1919" October 29, 2003 City of Tukwila Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Dear Examiner: Sincerely, Haight Roofing Company, Inc. L Charles E. Mahlum Project Manager Enclosures 110 cfii J3? ... ,S . � r o 'IN;.4 ti;." o T[- U SCOPE OP '' V...0 WITHOUT P R1OTl 1 RO AL OF TUK.Vd'ilat BUILDING DIVi' i O .1, Ire:sfl'tn; s 1+J {: �. {,fi r, 1' : P t1 SUr2i 1. HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS CITY GC Tiro APPROVED FILE COPY I understand that the Flan Check approvals are subject to errors and omissions and approval of plans does not autho, ize the violation of any adopted code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. Date /'S •o3 By Permit No. RE: Narrative of re -roof at 1128 —1136 Industry it ive,kwiia; = The existing roof system for the above mentioned location is: 1/2" plywood covered with two plies of fiberglass roofmg felt set in roofing asphalt and a mineral surfaced cap sheet set in roofing asphalt completes the system. Others have patched numerous areas with various roofing products in attempted repairs. The system is in otherwise good condition and not currently leaking. Using GAF Roofing Products we will tear off the existing system to wood deck; sweep broom clean; nail red rosin and base sheet. We will then solidly set two plies of fiberglass roofmg felt in hot asphalt and cap with a mineral surfaced sheet also set in hot asphalt. OCT 3126 A HuiL, i. r3' �ITRECEIVED WIIa OCT 2 9 2003 PERMIT CENTER X03 -333 Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK ..t1.4 3i..6,0 y f i lSd'! 1 :',a'ri 4. i egad ACTIVITY NUMBER: D03 -333 DATE: 10 -29 -03 PROJECT NAME: TUKWILA COMMERCE CENTER - BLDG 38 SITE ADDRESS: 1128 -1136 INDUSTRY DRIVE X Original Plan Submittal Response to Incomplete Letter # - _Response to Correction Letter # Revision #after /before permit is issued DEPARTMENTS: 1W C Building'uivision Public Works ❑ Documents /routing slip.doc 2 -28.02 PERMIT COORD COP PLAN REVIEW /ROUTING SLIP d Mf /o-3)` Fire reven ion ❑ Structural ❑ REVIEWER'S INITIALS: PERMIT COORD COPY Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 10 -30 -03 Complete d Incomplete ❑ Comments: Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route [ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11 -27 -03 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ;cs '4;tt ' • "--•-•-•:=.77..=:','..*.fr.:.:!;:..'"-X?:.;•, DEPARTMENT OF LABOR AND INDUSTRIES State of Washington REGISTERED AS PROVIDED BY LAW AS CONST.CONT GENERAL REGIST' W, EXP DATE tC 05/02/2004 'EFFECTIVE 'DATE' - - ' 11/12/1974 • • • ,•: . , HAIGHT ROOFING COMPANY INC PO BOX.70150 SEATTLE WA 98107 DEPARTMENT OF LABOR & INDUSTRIES PO BOX 44450 • OLYMPIA WA 98504-4450 .• HAIGHT ROOFING COMPANY INC PO BOX 70150 SEATTLE WA 98107 OLY P&OF, WA. FIRST CLASS MAIL US POSTAGE PAID lexwmma/1 PERMIT NO 312 • • . CO LL, uj 0 :.? • • • gEi .! u. a: io. :,• co D y cy. gi. ,_ w I 1-0 z i—: 1 .1 21; W. . 2 D 1. n CI 0— 01- 11.1 al I 0. I— P , , z w co , 0 . ,._.— .1. ,....: 0 . z 3.