Loading...
HomeMy WebLinkAboutPermit D03-334 - TUKWILA COMMERCE CENTER - BUILDING 30 - REROOFTUKWILA COMMERCE CENTER 1000 - 1016 INDUSTRY DRIVE -BLDG 30 D03 -334 W J.U. 00 co 0 iu J H WO lLQ' N D I 1.W Z I- I- O Z 2 p. D- o W W. HU O .. Z W 1= _ O F.1: Z City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2523049071 Address: 1000 INDUSTRY DR TUKW Suite No: Tenant: Name: TUKWILA COMMERCE CENTER - BLDG 30 Address: 1000 -1016 INDUSTRY DR, TUKWILA WA Owner: Name: CALWEST INDUSTRIAL PROP Phone: Address: CIO DELOITTE & TOUCHE LLP, 2235 FARADAY AVE #0 Contact Person: Name: CHUCK MAHLUM Address: 4910 15 AV NW, SEATTLE WA Contractor: Name: HAIGHT ROOFING COMPANY INC. Address: P.O. BOX 70150, SEATTLE, WA Contractor License No: HAIGHRC269QK DESCRIPTION OF WORK: TEAR OFF EXISTING ROOF TO WOOD DECK. INSTALL NEW BUILT -UP ROOF SYSTEM. Value of Construction: $ $35,090.00 Type of Fire Protection: SPRINKLERS Type of Construction: Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N DEVELOPMENT PERMIT Permit Number: D03 -334 Issue Date: 11/03/2003 Permit Expires On: 05/01/2004 Phone: 206 784 -8414 Phone: 206 784 -8414 Expiration Date:05 /01/2004 Fees Collected: $833.38 Uniform Building Code Edition: 1997 Occupancy per UBC: 0016 Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Private: n Public: n Storm Drainage: N Street Use: N Profit: N Non - Profit: N Water Main Extension: N Private: n Public: n N Water Meter: doe: Devperm ** Continued Next Page ** D03 -334 Printed: 11 -03 -2003 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 �t / " Permit Center Authorized Signature: '���.t.Gl�- v Dat e: /c/ L =' I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construct' g r the performance of work. I am authorized to sign and obtain this development permit. Date: `A. 'o c 3 Signature: Print Name: &f,t,6e4 "0#141-_. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: Devperm D03 -334 Printed: 11 -03 -2003 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 PERMIT CONDITIONS z i t— CL J U 00 W J = H w LL < w I f .. w Z = 4: A statement from the roofing contractor verifying fire retardant class of roof will be required prior to final F- HO inspection (see attached procedure). z F— • w 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). p O 1- 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be = w construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any H H other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this L- p code shall be valid. tii Z co O ~ z Parcel No.: 2523049071 Permit Number: D03 -334 Address: 1000 INDUSTRY DR TUKW Status: ISSUED Suite No: Applied Date: 10/29/2003 Tenant: TUKWILA COMMERCE CENTER - BLDG 30 Issue Date: 11/03/2003 1: ** *BUILDING DEPARTMENT CONDITIONS* ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 7: The following conditions apply to re -roof permits: 1. All re- roofing projects will be accomplished in compliance with Appendix Chapter 15 of the Uniform Building Code (UBC). 2. Inspections: a) New roof coverings shall not be applied without first obtaining a pre- roofing inspection from the Building Division and written approval from the Building Inspector. The pre- roofing inspection shall pay particular attention to evidence of accumulation of water. Where extensive ponding of water is apparent, an analysis of the roof structure for compliance with section 1506, U.B.C., shall be made and corrective measures, such as relocation of roof drains or scuppers, resloping of the roof or structural changes, shall be accomplished. An inspection covering the above listed topics prepared by a qualified special inspector, as determined by the Building Official, may be accepted in lieu of the pre- inspection by the Building Inspector. b) A final inspection and approval shall be obtained from the Building Division when the re- roofing is complete. As a condition of the final inspection for roofs that require a fire retardent roof covering under the provisions of Table 15 -A, 1997 U.B.C., the roof installer shall provide the inspector with a written statement indicating the following (or something similar): "I have installed a roof membrane assembly, including insulation if applicable, consisting of (manufacturer), Specification No. , data sheet enclosed, which meets or exceeds the requirements for Class A or Class B roofs. This roof was installed at (address), under City of Tukwila Building Permit No. (NOTE: This statement shall include the name of the roofing company that installed the roof, signature of installer and date.) I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws doc: Conditions D03 -334 .Sx�:il�i',Cijlk:a±ttsl ':sv 41AS bSW:u .:+'$'C �iei sril�:'. !, �. Printed: 11 -03 -2003 doc: Conditions City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431-3670 regulating construction or the performance of work. D03-334 ,,••••••■• Date: A3.-to Printed: 11-03-2003 Site Address: i0c0- 101k, ►t-\D'- i 2� I?� Tenant Name: O taP'A i a-1 17210e SLAY -NJ ILA, CC,,...10N c..0- 1TL- 42,New Tenant: .... Yes 15,.No Property Owners Name: ' tvl�svi T CzDt..tPph l`r Mailing Address: 1(GEDD C.+- -16T 1 4p k [CA 'T v41/4.) vJA 9c3 (63S City State Zip Name: c -tc.\(.W._ 0/ t KA Mailing Address: Act (tJ t D AvE A.A.) E -Mail Address: •I'►ukc - ha 11/1+(o0 -(%41 . Gcn'1 Company Name: (- 1 {►tAlo Mailing Address: q° i o Lc', 1 -1 l Av.) Contact Person: E -Mail Address: Contractor Registration Number: t4POGi- P- c-ZL4 O. -- Company Name: D C �►.� 5:- L- t k 1 (►, L. Mailing Address: 4\ 01 W �S1 r L-1 -7� Ac-� t o� Contact Person: E -Mail Address: Contact Person: E -Mail Address: \applications \permit application (3.2003) 3/2003 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Gt.kc_.c_ _- Lt�CZCZ Page 1 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print* King Co Assessor's Tax No.: ra2o�a T ' fb7/ Suite Number: Floor: Day Telephone: 2c - - 764 -- al 4- kA)A ggt U' SL City State Zip .coo Fax Number: City Day Telephone: Fax Number: Expiration Date: CS /c,Z 12Cx�- **An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** ARCHITECT RECORD : —Ail p lans: must be` OF we tamped: by Architect:of Record CA g21.c+v0 City w State 98t 0 Zip State Zip Day Telephone: 6 14 4 3 - y55 - 2 7 7 Fax Number: C'1 19 - 2-9 =: OFrRECORD ` Ail:pians must bewet tamped by:Engineer -of Record Company Name: t ( A Mailing Address: City Day Telephone: Fax Number: State !CY Zip ILRING, PERMIT INFORM `' Ib = 2Od 6431 -36 41* tes Valuation of Project (contractor's bid price): $ E S / pq Scope of Work (please provide detailed information): vJot:7�� Will there be new rack storage? ❑ ..Yes D.. No \applications \permit application (3 -2003) 3/2003 Page 2 Existing Building Valuation: $ • if "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below to Existing Structure Floor;: 3`a Floor :Floors hru: Basement :' Accessory Structure* Attached •. • Detached Garage Attached Carport; ;Detached Carport: Covered Deck Uncovered Deck Interior Remodel. Type of Construction per UBC Type of Occupancy per. UBC PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus.any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ ....Yes ❑ ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: › ❑..Automatic Fire Alarm El _None El . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 ..Yes No If "yes", attach list of materials and storage locations on a separate 8-1/2 x 11 paper indicating quantities and Materia Safety Data Sheets. t Ps: i.'f x.`•':5;4 +t ❑ ...Total Cut ❑ ...Total Fill FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer Monthly Service Billing to: Name: Mailing Address: Water Meter Refund /Billing: Name: Mailing Add esk.x' 4 S: RMIT =: \applications \permit application (3.2003) 3/2003 cubic yards cubic yards ❑...Sanitary Side Sewer ❑ . ..Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ,..Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size.. ❑ ...Water Only Meter Size ❑ .. Main Extension Public _ ❑ ...Water Main Extension Public _ „ „ „ tMATIO Scope of Work (please provide detailed information): Water District ❑ ...Tukwila ❑ ...Water District #125 ❑ ...Water Availability Provided Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Sewer District ❑ ... Tukwila ❑... ValVue ❑ .. Renton ❑ ...Seattle ❑ ...Sewer Use Certificate ❑ ... Sewer Availability Provided ❑ .. Approved Septic Plans Provided ❑ ...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. Call before you Dig: 1- 800 - 424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way . Abandon Septic Tank . Curb Cut . Pavement Cut . Looped Fire Line „ „ WO# WO# WO# Private Private ❑ .. Highline 'z. • Rs7 r9 ❑ ...Renton ❑ .. Geotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) ❑...Hold Harmless ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment • Page 3 ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size Day Telephone: City State Zip Day Telephone: City , . ;Statq �tS$iS� °r �Fws'.�iF l'4f5wgid Unit Type:. " Qty > Unit Type: Qty Unit Type: Qty Boiler /Compressor: .Qty Furnace <100K BTU Air Handling Unit >= 10,000 CFM Other Mechanical Equipment 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan 15 -30 HP /1,000,000 BTU Suspended /Wall /Floor Mounted Heater Ventilation System 30 -50 HP /1,750,000 BTU Appliance Vent Hood 50+ I -IP /1,750,000 BTU Heat/Refrig /Cooling System Incinerator - Domestic Air Handling Unit <= 10,000 CFM Incinerator — Comm /Ind MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Contact Person: E -Mail Address: Contractor Registration Number: Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Indicate type of mechanical work being installed and the quantity below: Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas ....❑ Other: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN,. / A THORIZED AGENT: Signature: f Date: Print Name: /PSG— - 4 u t`i Mailing Address: 4q(c) t Sn-∎ Av.) Day Telephone: 2(x2 - - 764 - v.1A 98)0 - 7 State Zip City Date Application Accepted: Date Application xpires: I Staff • \applications\permit application (3.2003) 3/2003 Page 4 TRANSACTION LIST: ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 z RECEIPT ,�W CC Parcel No.: 2523049071 Permit Number: D03 -334 6 v Address: 1000 INDUSTRY DR TUKW Status: APPROVED o 0 Suite No: Applied Date: 10/29/2003 W = Applicant: TUKWILA COMMERCE CENTER - BLDG 30 Issue Date: L u F , W 0 Receipt No.: R03 -01327 Payment Amount: 220.40 ga n I.L. a co Initials: LAW Payment Date: 11/03/2003 12:07 PM = User ID: 1630 Balance: $0.00 i _ Z 1- 11- 0 Z 1- Payee: HAIGHT ROOFING COMPANY INC D 0 0 O N O 1-- W — Type Method Description Amount I U L I F- Payment Check 23475 220.40 Z U1 co 1-- H O z BUILDING - NONRES 000/322.100 STATE BUILDING SURCHARGE 000/386.904 Account Code Current Pmts 215.90 4.50 Total: 220.40 — 4701 .1,1 04 971.6 TOTAL 220.40 Printed: 11 -03 -2003 Parcel No.: Address: Suite No: Applicant: Receipt No.: Initials: User ID: Payee: TRANSACTION LIST: Type Method doc: Receipt Payment City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 2523049071 1000 INDUSTRY DR TUKW TUKWILA COMMERCE CENTER - BLDG 30 R03 -01313 SKS 1165 ACCOUNT ITEM LIST: Description HAIGHT ROOFING COMPANY, INC. Check 23474 BUILDING - NONRES PLAN CHECK - NONRES Description RECEIPT Account Code 000/322.100 000/345.830 Permit Number: Status: Applied Date: Issue Date: Payment Amount: Payment Date: Balance: Amount 612.98 Current Pmts 286.45 326.53 Total: 612.98 D03 -334 PENDING 10/29/2003 612.98 10/29/2003 02:07 PM $220.40 7 1 J0/29 9716 TOTAL 1101.34 Printed: 10 -29 -2003 Z Z cc 0 0 CO ILI J CO Li. w g (.2 d w z1 1--0 Z 1- O N 0 W W 0 O .Z W U = O 1— z • Project: C. T� \u Cow, . CA e. Type of Inspection: Address: Woo _ 1011.0 rJVS4.,. Date Called: Special Instructions: I Date Wanted: a.m. p.m. Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit 133 - 33 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. n Corrections required prior to approval. COMMENTS: C P t v P! 1 `t- 1 via A P v m i4- l Oven 1-e 4--f Inspector { c v Date / I _ CL) $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: SS Pr Type of Inspection: Addre MO— ss: /O / / t Date Calle 5 /2S/ Special Instructions: 9" ..lt .e) Date Wanted: ( Requester: Phone No:, 2)6-9.Z -- 19 2 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PE R 4 l (20 • )431 -3670 Approved per applicable codes. COMMENTS: VVA l )-e recJr cj Inspecto tr?c1/4,,,Pv 'Corrections required prior to approval. Date: 5y)-149-01" E] $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: "SINCE 1919" April 28, 2004 Stephania Spencer City of Tukwila — Permits Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Permit Application No. D03 -334 — Request for Extension Dear Ms. Spencer: We respectfully request a one -time extension for this permit, as we were unable to complete the project prior to cold weather setting in last year. The roof is complete with exception to the cap sheet, which should be set in temperatures above 60 degrees when feasible. We are now beginning our roofing season and expect to complete this project within the next couple of weeks, at which point we will be able to call for final inspection. Thank you again for your help in this matter. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File Original to follow via US Mail HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS Via Facsimile 206 - 431 -3665 Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK 1 "SINCE 1919" May 27, 2004 Stephania Spencer City of Tukwila — Permits Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Letter of Completion Dear Ms. Spencer: HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS We have installed a roof membrane assembly, including insulation if applicable, consisting of GAF Materials Corporation, Specification No. N- B -M/P6, data sheet attached, which meets or exceeds the requirements for Class A or Class B roofs. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File This roof was installed at1000 —1016 Industry Drive under City of Tukwila Building Permit No. D03 -334. Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK GAFGLAS® Specifications N- B- 4 -M /P6 and N -B -4 -M GAFG1 Ply GAFGLAS Mineral Surfaced Ca Sheet � 2"11daLap -- Natlabie Deck • Sheathing Paper (If required) Sete Sheet (see below) :. Rooting Asphalt `. :.c 2" Side Lap 25 7 1 .'rr?; ;) 7n(in Nailable decks up to 6 inches per loot slope, except for lightweight insulating concrete decks which are limited to a maximum slope of 1" per foot. Wood, plywood, poured gypsum, precast gypsum planks, other acceptable nailable decks For lightweight insulating concrete decks. see page 9. Materials Sheathing paper (1 ply, if reg'ec Base Sheet : �'`.t; GAFGLAS Ply (2 plies) GAF Materials Corporation Roofing Cap Sheet ,: r:• ;. :ir,;rlt GAFGLAS Mineral Surfacedtap Sheet Approximate Weight per Square-, ;175 -250 Ibs.'::, Design and Application Considerations detailed in this Manual shall apply in addition to the following recommendations and specifications. 1 Over entire surface. lay one ply of sheathing paper where applicable. Lap eacn sheet 2 inches over preceding sheet. Nail sufficiently to hold in place. 2 Starting at the low point of the roof, lay one ply of Base Sheet, lapping each sneet 2 inches at edges and not less than 6 inches at end laps. Nail along lap of base ply at intervals not to exceed 9 inches and stagger -nail down center of sheet in two rows with nails spaced at 18 inch intervals in each row. Use fas- teners with integral metal heads at least 1 inch in diameter or square that are r ecommended by GAF Materials Corporation or the deck manufacturer. (See 'Special Instructions below.) 3 Starting at the low point of the roof, mop two plies of GAFGLAS Ply shingle fashion: lapping each sheet 20 V1 inches over the preceding sheet: solidly mopping to the underlying base sheet to provide three plies over the entire roof area. iInterpty moppings of Roofing Asphalt must be applied in a continuous film and shall consist of approximately 25 pounds per 100 square feet of root area with a tolerance not to exceed 20% plus or minus. The appropriate asphalt for the slopes involved must be used. ' „r.,!- "TO'w"vr.,rT}\r,,. Pert , rv40.1•L! /tU -'- jt' ; i'Ti • GAF MATER CORPORATION Slope per foot . Asphalt Type Up to 3' Steep ASTM Type III 3 "- 6' HT -Steep ASTM Type IV On slopes up to'/ inch per foot. Flat ASTM Type II may be used except in Florida, Texas, New Mexico, Arizona, and California. Apply GAFGLAS Mineral Surfaced Cap Sheet in accordance with the application instructions on page 20, so that the laps are offset from the laps of the ply sheets 1. See recommendations for use over gypsum decks on page 9. 2. Acceptable Base Sheets include: STRATAVEN7 Nailable required for Ireshly poured gypsum decks, GAFGLAS #75 Base Sheet. RUBEROID' Modified Base Sheet, GAFGLAS"FlexPly6, and GAFGLAS Ply 4. For wood decks and structural wood fiber decks, when GAFGLAS Ply 4 or GAFGLAS' ;FlexPl76 is used as a base sheet, a sheathing paper is required. 3. See "Nailing of Base Sheet," page 19. 4. For roof slopes of 1 inch per foot or more. all ply felts must be back - nailed 4 inches in from the back edge of the felt. See "Installation on Steep Roofs.' page 10. '.11f... UL Class . Substrate . Slope „ C . NC C 2 .. 3' 3 ' /i 1. Substrate C = Combustible and Noncombustible Combustible = Wood planks, boards, etc., plywood (min. 'VI? inch thickness). oriented strand board (min. ' /2 inch thickness). NC = Noncombustible only Noncombustible = Steel, poured or precast structural concrete. lightweight insulating concrete, gypsum, structural wood fiber, etc. 2. Slope Maximum slope allowed, in inches per foot. Guarantees Available Specification Liberty Guarantees N- B- 4 -M/P6 N- B- 4 -M /P6 N -B -4 -M 15,12, 5 yr. West Zone only, Wood Decks. 15,12,10,5yr. Lightweight Insulating Concrete. (See page 9.) 12, 10, 5 yr. 4 1 "SINCE 1919" October 29, 2003 City of Tukwila Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Dear Examiner: Sincerely, Haight Roofing Company, Inc. Enclosures Charles E. Mahlum Project Manager KO CHANGES SHALL SE M, OS TO 7-3:7 SCOPE OF F ''OINK WITHOUT FAK.:4•:.. OF TUKWiLA i- ,UILDI s�' .... EOTE: REVISIONS WILL REQUIRE A NEW PLAN SUEStanil MID WAY Ind LLIOE ADDITIONAL PLAN FIEVICW FEES: HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 - 8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF D REROOFING SPECIALISTS FILE COPY I understand that the Plan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. CITY Of OYOl� OCT 3 NO A6 NO i LU j ib- - 76 - bi — CMY ) By �l Date •0 Permit No. RE: Narrative of re -roof at 1000 —1016 Industry Drive, Tukwila, WA «Gv b „ z�A` r.`^:. w?' k:. s: 6il�fy` S, h: t..• :�11r'.i«t}.s?a ":;.14'�?P7'u�; The existing roof system for the above mentioned location is: 1/2" plywood covered with two plies of fiberglass roofing felt set in roofing asphalt and a mineral surfaced cap sheet set in roofing asphalt completes the system. Others have patched numerous areas with various roofing products in attempted repairs. The system is in otherwise good condition and not currently leaking. Using GAF Roofing Products we will tear off the existing system to wood deck; sweep broom clean; nail red rosin and base sheet. We will then solidly set two plies of fiberglass roofing felt in hot asphalt and cap with a mineral surfaced sheet also set in hot asphalt. RECEIVED CITY OF TIJKWII ' OCT 2 9 2003 PERMIT CENTEF bc 3y Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK April 29, 2004 Mr. Chuck Mahlum Haight Roofing Company, Inc. P.O. Box 70150 Seattle, Washington 98107 City of Tukwila Steven M. Mullet, Mayor Dear Mr. Mahlum: Department of Community Development Steve Lancaster, Director RE: Request for Extension — Permit No. D03 -334 —1000 Industry Drive — Bldg 30 This letter is in response to your written request for an extension to Permit No. D03 -334. Based on the information received, the City of Tukwila Building Division will be extending your permit to November 1, 2004. Please be advised that this will be the only extension granted for this project and no further notice will be given prior to the expiration date. A new permit and associated fees will be required after the above -noted expiration date. If you should have any questions, please contact our office at (206) 431 -3670. Sinc 1y, G►bd Robbrt Benedicto Building Official /sks File: Permit No. D03 -334 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206-431-3665 Sent By: HAIGHT ROOFING CO INC; 2067841058; Apr -28 -04 3:19PM; Page 2/2 "SINCE 1919" April 28, 2004 Stephania Spencer Via Facsimile City of Tukwila — Permits Center 206 -431 -3665 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: Permit Application No. D03 - 333 — Request for Extension Dear Ms. Spencer: We respectfully request a one -time extension for this permit, as we were unable to complete the project prior to cold weather setting in last year. The roof is complete with exception to the cap sheet, which should be set in temperatures above 60 degrees when feasible. We are now beginning our roofing season and expect to complete this project within the next couple of weeks, at which point we will be able to call for final inspection. Thank you again for your help in this matter. Sincerely, Haight Roofing Company, Inc Chuck Mahlum Project Manager CC: File Original to follow via US Mail HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 7848414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784 - 1058 INSULATING CONCRETE ROOF DECKS REROOFING SPECIALISTS RoFE ED oiTY ApR 2 8 200 PERMIT CENTER Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- 1-1R- C269QK �l :i :rd;id.4w�.1:�n,. 214 :� :zu,•�;iiti'r D i <(..4rx,4r « .::i <a:L.�:vi3 April 6, 2004 Chuck Mahlum 4910 15th Avenue NW Seattle, WA 98107 Dear Permit Holder: City of Tukwila Department of Community Development Steve Lancaster, Director RE: Permit Application No. D03 -334 1000 Industry Drive In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work. is commenced for a period of 180 days. Based on the above, you are hereby advised to: • Call the City Of Tukwila Permit Center at (206) 431 -3670 to arrange for the next or final inspection. Steven M. Mullet, Mayor This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one -time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection or request and receive an extension prior to May 1, 2004, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Stefania Spencer Permit Technician Xc: Permit File No. D03 -334 Bob Benedicto, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206-431-3665 'l'irR+b. tit F,:r k *CYIfi2?� M PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D03 -334 DATE: 10 -29 -03 PROJECT NAME: TUKWILA COMMERCE CENTER - BLDG 30 SITE ADDRESS: 1000 -1016 INDUSTRY DRIVE X Original Plan Submittal Response to Incomplete Letter # - _Response to Correction Letter # Revision #_after /before permit is issued DEPARTMENTS: J mil' AV 1(7— U —U.5 Buildin Div sion Public Works ❑ Documents /routing slip.doc 2.28 -02 511 Plitt_ it* .I -13 Fire Prevention Structural El Planning Division Permit Coordinator DETERMINATI N OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 10 -30 -03 Complete Incomplete ❑ Comments: REVIEWER'S INITIALS: PERMIT COORD COPY Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route , Di Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11 -27 -03 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: A: 3s�:: s.' C: x: is�' ir: l� :Fr.uyJ?v;ii'iadidkZU?t'k%ri' •cty- �i�a9ait xh:.tal:u a. YS.4. ` > - :r. r.. State of Washington DEPARTMENT OF LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST,CONT GENERAL .,,.....: CC 01 ✓ :HAIGHRC26'9QK" 05/02 /2004 EFFECTTVE`DATE 11/12/1974 HAIGHT ROOFING COMPANY INC PO BOX.70150 SEATTLE WA 98107 DEPARTMENT OF LABOR & INDUSTRIES PO BOX 44450 OLYMPIA WA 98504 -4450 HAIGHT ROOFING COMPANY INC PO BOX 70150 • SEATTLE WA 98107 DL? F&DF, WA. vzs FIRST CLASS MAIL US POSTAGE PAID 10,LY ']Al 1 PERMIT NO 312 Z Z — I C.) UO co CI W = J 1.- I L 1. w al 2 • o 0 O co � I— W • w ' • O 1 z I U , . O z