Loading...
HomeMy WebLinkAboutTrans 2014-02-10 Item 2B - Change Orders #1-2 - Tukwila Urban Center Transit Center / Andover Park West Widening with Puget Sound EnergyTO: FROM: BY: Cyndy Knighton, Senior Program Manager DATE: February 7, 2014 SUBJECT: Tukwila Urban Center — Transit Center and Andover Park West Widening Puget Sound Energy — Facility Relocation Agreement, Contract No. 13 -121 Change Order Nos. 1 & 2 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Directo L. ISSUE Approve two change orders to the Utility Relocation Agreement between the City of Tukwila and Puget Sound Energy (PSE). BACKGROUND In July of 2013 a Facility Relocation Agreement was executed between PSE and the City. This agreement defined the roles and financial responsibilities for relocation of two underground vaults and two above ground switches in association with the TUC Transit Center and Andover Park W Widening Projects. The two switches are on the Westfield Southcenter Mall property and are therefore the financial responsibility of the City. The two underground vaults straddled the right -of -way line along the Mall frontage and therefore the relocation costs to move them out from the right -of -way are shared between Tukwila and PSE. A cost estimate was included for the relocation work and the Facility Relocation Agreement capped Tukwila costs at $738,400.00 (which included a 10% contingency), absent a mutually agreed upon change order or amendment. DISCUSSION PSE has completed relocating the northern vault along Andover Park W, referred to as V10, and the two above ground switches. The relocation costs have exceeded the original cost estimate partially due to excessive dewatering of the vaults, extensive traffic control, changes in field conditions, and additional property restoration. The additional property restoration was a result of PSE construction occurring prior to the City's construction project, The PSE estimate assumed that the utility relocation work would occur in conjunction with the City's project and that PSE's restoration costs would be minimal. Relocation of the southern vault, known as V12, will be completed after the City's contractor, Road Construction Northwest, removes the Firestone canopy structure. FINANCIAL IMPACT The total amount for Change Order No. 1 is $54,215.09, of which Tukwila is responsible for 71 % or $38,492.71 Change Order No. 2 is $37,422.09 and the City is responsible for 100 %. The total of the two change orders is $91,637.18 and Tukwila's portion of the costs is $75,914.80. The change orders are currently within the total project budget of $738,400, but the final PSE relocation costs for the second vault are not known at this time. There is a potential overrun of the utility relocation budget of $55,733, if the cost estimate for the V12 work is accurate. Any cost overruns exceeding the City's responsibility of $738,400 will be paid from the Project's construction contingency. RECOMMENDATION Council is being asked to approve Change Order Nos. 1 and 2 in the amount of $75,914.80 to Contract No. 13 -121 with PSE for the TUC Transit Center Utility Relocation and consider this item on the Consent Agenda at the February 18, 2014 Regular Meeting. Attachments: Summary Table Change Order Nos. 1 and 2 W:\PW EngIPROJECTSW- RW & RS Projects\Transit Center (90610402)1Constructionl #.200 - Correspondence1005 - Utility & Interlocal CoordinationlINFO MEMO PSE Ag CO #1 RRT gl 02- 07- 14.docx 15 PSE Electrical Vault Relocation Costs Change Order Summary Item V10 V12 SWITCHES Total Actual Estimate (Incl. CO #1) Estimate Actual Actual Estimate (Incl. CO #2) Estimate Actual Materials Construction Engineering &Management Right of Way Overhead (18 %) $55,163.57 $60,680.00 $177,065.77 $213,451.00 $19,673.97', $23,717.00 $0.00', $0.00 $45,342.601 $53,613.00 $63,345.56 $131,578.05', $14,619.78 $0.00', $37,717.81 $100,435.20'', $60,680.00 $107,846.22', $172,168.00 $11,982.91 $19,130.00 $0.00, $0.00 $39,647.58 $45,356.00 $218,944.33 $121,360.00 $416,490.04 $385,619.00 $46,276.66 $42,847.00 $0.00'', $0.00 $122,707.99', $98,969.00 Utility Relocation Total (Tukwila PSE Costs) $297,245.91 $351,461.00 $247,261.20 n/a $259,911.91 $297,334.00 $804,419.02; $648,795.00 Tukwila Costs Tukwila @ 71% Tukwila @ 81% Tukwila @ 100% Budgeted $738,400.00 Tukwila Total Amount $211,044.60 $249,537.31 $200,281.57 n/a $259,911.91 $297,334.00 $671,238.08 $546,871.31 Tukwila Change Order Amount $38,492.71 $37,422.09 $75,914.80 Remaining Budget $191,528.69 Potential Overrun @ Completion $55,732.51 PUGET SOUND ENERGY CHANGE ORDER V10 To: City of Tukwila Date: 11/18/2013 Project Number: 101080841 Attn: Cyndy Knighton Project Manager: GRENNER Project: TUKWILA - Andover Park W P.I Description of work: This change order is for the costs in excess of the original estimate provided in "Exhibit C" of the relocation agreement between the City of Tukwila and Puget Sound Energy. The excess costs associated with this portion of the relocation work were, but not limited to, 1)Dewatering of vaults. 2)Traffic control and pedestrian safety. 3)Wire crew performing night time cutover for commercial customers and rerouting unknown service cables out of existing vault V10 that were undocumented and unreferenced on the original estimate. Item Amount Comments Estimate Materials $ 55,164 Construction $ 177,066 Engineering & Management $ 19,674 Right of Way $ - Overhead $ 45,343 Estimate Total $ 297,246 Actual Materials $ 60,680 Construction $ 213,451 Engineering & Management $ 23,717 Right of Way $ - Overhead $ 53,613 Actual Total $ 351,460 Change Order Total $ 54,214 Allocation of Change Order Total Company 29% $ 15,722 Govemment Entity 71% $ 38,492 Change Order Total Note: This change order will be effective only when signed by both parties: Puget Sound Energy City of Tukwila Signed: Signed: Title: Title: Date: Date: (Please sign and return one copy) 3591 7 -04 Puget Sound Energy PO Box 90868 Bellevue, WA 98009 -0868 $ 54,214 PUGET SOUND ENERGY a subsidiary of PUGET ENERGY 17 PUGET SOUND ENERGY CHANGE ORDER SWITCHES To: City of Tukwila Date: 11/18/2013 Project Number: 101080841 Attn: Cyndy Knighton Project Manager: GRENNER Project: TUKWILA - Andover Park W P.I Description of work: This change order is for the costs in excess of the original estimate provided in "Exhibit C" of the relocation agreement between the City of Tukwila and Puget Sound Energy. The bulk of the "excess costs" associated with this portion of the relocation work were, but not limited to 1)Dewatering of vaults. 2)Traffic control and additional pedestrian safety implemented near the bus transit center. 3)Additional shoring, due to the unstable nature of the soil. 4)Additional resoration that was mutually agreed to by the City and Westfield property management. Item Amount Comments Estimate Materials $ 100,435 Construction $ 107,846 Engineering & Management $ 11,983 Right of Way $ - Overhead $ 39,648 Estimate Total $ 259,912 Actual Materials $ 60,680 Construction $ 172,168 Engineering & Management $ 19,130 Right of Way $ - Overhead $ 45,356 Actual Total $ 297,334 Change Order Total $ 37,422 Allocation of Change Order Total Company 0% $ Government Entity 100% $ 37,422 Change Order Total $ 37,422 Note: This change order will be effective only when signed by both parties: Puget Sound Energy City of Tukwila Signed: Signed: Title: Title: Date: Date: (Please sign and return one copy) 3591 7 -04 Puget Sound Energy PO Box 90868 Bellevue, WA 98009 -0868 PUGET SOUND ENERGY a subsidiary of PUGET ENERGY 18