HomeMy WebLinkAboutTrans 2014-02-10 Item 2C - Handout Distributed at Meeting - I-405/SR 167 Corridor Funding and Phasing Report- 4
..,6•74ze,
(I)
LYNNWOOD
1 express
toll lane
BOTHELL
J
INTERSTATE
TUKWILA
Corridor
Funding and
Phasing Report
KENT
2 express
toll lanes
167 link
RENTON
AUBURN
FEDERAL
WAY
January 2014
t1 express
lane
TACOMA
FIFE
Table of Contents
About this Report 1
Executive Summary 2
1. Project Overview 6
a. Introduction to the Corridor 7
b. Express Toll Lanes Study History 11
2. Carpool Policy 16
a. Carpool Scenarios 19
b. Traffic and Gross Revenue Analysis 22
c. Net Revenue Analysis 26
d. EAG Recommendation 32
3. Financing, Funding and Phasing 33
a. Express Toll Lane Financing Challenges 33
b. Analysis by Office of the State Treasurer 35
c. Funding and Phasing Options for Phase 2 39
d. EAG Recommendation 43
4. Public and Stakeholder Outreach 44
5. Next Steps 49
a. Phase 1 49
b. Phase 2 50
Appendices 51
About this Report
The I -405 SR 167 Corridor Funding and Phasing Report summarizes WSDOT's
recent analysis in preparation for implementing and operating an express toll lane
system in the 1-405 SR 167 corridor. This report results from requirements set by the
Washington State Legislature in 2011 through RCW 47.56.886, which reads:
(2) The department, in consultation with the transportation commission, shall use the
information from the traffic and revenue analysis and the corridor -wide project management
plan to develop afinance plan to fund improvements in the Interstate 405 and state route
number 167 corridor The department must include the following elements in the finance
plan:
a) Current state and federal finding contributions for projects in the 1 -405 and SR 16'
corridor;
A potential future state and federal funding contribution to leverage toll revenues,
Financing mechanisms to optimi_e the revenue available for capacity improvements
including, but not limited to, using the full faith and credit of the state,
d) An express toll lane system operating in the 1-405 and SR 167 corridor by 2014;
and
e) Completion of the capacity improvements in the Interstate 405 and state route num-
ber 167 corridor:
b)
c)
(3) The department and the transportation commission must consult with a committee
consisting of local and state elected officials from the 1 -405 and SR 167 corridor and
representatives from the transit agencies that operate in the 1 -405 and SR 167 corridor while
developing the performance standards, traffic and revenue analysis, and finance plan.
(4) The transportation commission must provide the traffic and revenue analysis plan,
and the department must provide the finance plan, to the governor and the legislature by
January 2012. The department shall provide technical and other support as requested by the
transportation commission to complete the plans identified in this subsection.
The report was originally scheduled to be delivered to the Legislature in 2012.
Because of the complexity of the necessary independent analyses. the Washington
State Transportation Commission worked with the Legislature to extend the deadline.
WSDOT has provided ongoing updates to the Legislature about the progress of this
work. In addition, because of the significance of the carpool policy decisions under
consideration, it was essential to allow the necessary time for the I -405 SR 167
Executive Advisory Group members to come to consensus on well - vetted, data - driven
recommendations.
WSDOT is currently briefing the WSTC on toll rate setting policies, including carpool
exemptions, based on the analysis, process and EAG recommendations documented in
this report. WSTC plans to make final decisions in spring 2014.
Washington State Department
of Transportation Secretary
Lynn Peterson
Preface 1
Funding and Phasing Report
Executive Summary
January 2014
The Washington State Department of Transportation
is building a 40 -mile system of express toll lanes
from State Route 167 in Puyallup to Interstate 405 in
Lynnwood. Express toll lanes offer a needed solution
to the heavy congestion that commuters experience
daily, including carpool lanes that often fail to meet
their performance standards during peak periods.
The Washington State Legislature authorized
Phase 1, construction of express toll lanes between
Bellevue and Lynnwood, through RCW 47.56.880
in 2011. This phase is currently under construction.
That same legislation also required this I- 4051SR
167 Funding and Phasing report, which WSDOT
developed in consultation with a committee
consisting of local and state elected officials from the
I -405 and SR 167 corridor. known as the 1 -405SR
167 Executive Advisory Group.
The work in this report is consistent with the 2002
I -405 Master Plan and more than a decade of
technical analyses and collaboration with corridor
stakeholders, including the 1-405 SR 167 EAG. The
Legislature has continued since 2005 to ask WSDOT
to evaluate express toll lanes as a way of offsetting
corridor improvement costs.
Throughout 2013, WSDOT re- engaged the EAG and
hosted four meetings. In addition, WSDOT consulted
with the I- 405 /SR 167 Interagency Working Group,
composed of technical staff associated with each
EAG member. As part of their 2013 work, WSDOT,
the EAG and the IWG worked to answer the
following questions, covered in this report:
Carpool Policy
• What is our 2+ to 3 + carpool transition plan?
Funding and Phasing
• What is the timing to complete the 40 -mile
system?
• What are the strategies for financing capital
improvements for the 40 -mile system?
�Washington State
2 TI/ Department of Transportation
40 -mile system: Phase 1
Cellout d
❑ web Mrs o mineuceenn Maee
completed conswaten
40 -mile system: Phase 2
2 express
toll lanes
Loped
— Toll Lane
1
— Tetl Lane
r ,AL1nk
Completed
rate , Etyrue
Tetl Lane
isa 2 Erma
TeN Lent
r 167L
2 express
Wanes
1 express
ail lane
tellout Legend
mme„caen phase E completed coeswaen
Construction is underway on Phase 1 of the 40 -mile express toll lane system
to address continued heavy congestion and decreasing trip reliability in this
area. This report summarizes WSDOT's evaluation of carpool policy options for
Phase 1, scheduled to open to traffic in 2015. The report also covers funding
and phasing options for Phase 2 which extends the express toll lanes from
Bellevue into Renton and connects them to the existing SR 167 HOT lanes.
EAG Recommendation Summary
Carpool Policy
3+ carpool free peak/2+ carpool free off -peak
Funding and Phasing
Medium traditional funding option ($960 million)
I- 405 /SR 167 Corridor Funding and Phasing Report
Carpool Policy: What is our 2+ to 3+ carpool transition plan?
EAG Recommendation: 3+ carpool free peak/2+ carpool free off -peak is a workable transition
to 3+ carpool free; has least impact on commuters, transit, financial needs; and maintains
speeds of 45 mph or better.
Carpool scenarios evaluated
WSDOT has studied I -405 express toll lanes in detail during the past five
years. In previous studies, WSDOT evaluated two "bookend" scenarios:
• 2+ carpool free Vehicles with two or more people are exempt from
tolls in the express toll lanes.
• 3+ carpool free Vehicles with three or more people are exempt from
tolls in the express toll lanes.
When WSDOT and the EAG concluded their previous work, which national
express toll lane experts confirmed in 2010, there was an understanding that
a 3+ carpool free definition would be necessary to sustain free -flow speeds in
the express toll lanes during peak periods. However, the EAG recognized the
challenges of moving to 3 + carpool free and requested transition options.
At the EAG's request. WSDOT in 2013 introduced two transition scenarios:
3+ carpool free peak/2+ carpool free off -peak Vehicles with
three or more people would be exempt from tolls all day, two- person
carpools would be exempt from tolls during off -peak periods (10 a.m.
to 3 p.m. and 8 p.m. to 5 a.m.).
• Carpool discount Vehicles with two or more people would receive
a discount on the toll to use the express toll lanes. WSDOT evaluated a
$0.50 cent discount and a $1.00 discount.
Although WSDOT and the EAG evaluated many factors, they gave special
weight to whether the carpool scenarios would meet two performance
metrics outlined by RCW 47.56.880:
• Traffic: Express toll lanes must maintain speeds of 45 miles per hour
at least 90 percent of the time during peak periods.
• Revenue: Express toll lanes must pay for all related operating
expenses within two years of opening.
Only three of the options studied (3+ carpool free, 3+ carpool free peak/2t
carpool free off -peak, and $0.50 discount) meet both criteria.
WSDOT is briefing the Washington State Transportation Commission on
this analysis as part of the I -405 toll rate setting process. WSTC will make
the final decision on carpool exemptions for the express toll lanes.
Executive Summary
Legislative Direction
RCW 47.56.880
(4) The department shall monitor the
express toll lanes project and shall
annually report to the transportation
commission and the legislature on the
impacts from the project on the following
performance measures:
(a) Whether the express toll lanes
maintain speeds of forty-five miles
per hour at least ninety percent of the
time during peak periods;
(b) Whether the average traffic speed
changed in the general purpose lanes;
(c) Whether transit ridership changed;
(d) Whether the actual use of the
express toll lanes is consistent with the
projected use;
(e) Whether the express toll lanes
generated sufficient revenue to pay
for all Interstate 405 express toll lane -
related operating costs;
(f) Whether travel times and volumes
have increased or decreased on
adjacent local streets and state
highways; and
(g) Whether the actual gross revenues
are consistent with projected gross
revenues as identified in the fiscal note
for Engrossed House Bill No. 1382
distributed by the office of financial
management on March 15, 2011.
(5) If after two years of operation of
the express toll lanes on Interstate
405 performance measures listed
in subsection (4)(a) and (e) of this
section are not being met, the express
toll lanes project must be terminated
as soon as practicable.
3
Funding and Phasing: What are the funding options for the 40-mile
express toll lane system?
EAG Recommendation: The medium traditional funding option was endorsed because it funds
the Renton to Bellevue section and the I- 405 /SR 167 Direct Connector; Phase 2 needs to move
forward as soon as possible.
Three funding scenarios evaluated
WSDOT considered three different options to fund the $1,175 million needed to complete the 40 -mile express
toll lane system (Phase 2). As part of each of the options, WSDOT looked at two ways to close the funding gap:
financing from toll revenue and pay -as- you -go.
• High traditional funding: Relies on gas tax or other traditional revenues for 100 percent of the project
funding ($1.175 billion).
• Medium traditional funding: Relies on gas tax or other traditional revenues for $960 million of the $1.175
billion needed. The remaining $215 million would come from toll revenues (toll- backed general obligation
bonds or pay -as- you -go).
• Low traditional funding: Relies on gas tax or other traditional revenues for $675 million of the $1.175
billion needed. The remaining $500 million would come from toll revenues (toll- backed GO bonds or pay -
as- you -go).
The EAG ultimately recommended the medium option and urged WSDOT to move forward as soon as possible.
Legend
Auxiliary lane
Express toll lanes
Direct connector
Funded
Unfunded
Medium Traditional Funding Option:
Project Costs and Funding
Costs
Renton to Bellevue
One lane between NE 6th Street and
SR 167 (accommodates N. 8th)
$675 million
I- 405 /SR 167 Direct Connector $285 million
1-405 - 112th Ave. SE to 1 -90 $175 million
auxiliary lanes
NE 6th Street Extension
Total Cost
$40 million*
$1,175 million
Funding
Total State Funding $960 million
Funding gap $215 million
(to be supplied from tolls)
*Assumes funding from other sources
r►
Washington State
4
7/2 I Department of Transportation I- 405 /SR 167 Corridor Funding and Phasing Report
How has WSDOT involved the
public?
Throughout 2013, WSDOT conducted public and
stakeholder outreach to provide education and seek input
about operating and funding express toll lanes throughout
the full 40 -mile 1-405 SR 167 corridor.
Major outreach approaches included:
• Briefings with corridor elected officials, city councils,
transit agencies, businesses and civic organizations
• Ongoing correspondence with interested citizens
• Four focus groups about carpool policy
A major express toll lanes outreach and marketing
campaign associated with the Phase 1 Bellevue to
Lynnwood project will launch in 2014.
Next Steps: Completing the
40 -mile express toll lane system
WSDOT is currently on schedule to open Phase 1 of express toll
lanes between Bellevue and Lynnwood in mid to late 2015. The
agency will continue to settle important policy decisions. work
with the Washington State Transportation Commission on rate
setting, and conduct public outreach before the new lanes open
to traffic.
Meanwhile, the agency will continue to work with the
Legislature and stakeholders on funding Phase 2 of express toll
lanes between Renton and Bellevue, including the I -405 SR 167
Direct Connector, and for the SR 167 HOT lanes extension.
If full funding becomes available in 2014, Phase 2 could be
open as early as 2020. If two years of toll collection experience
from Phase 1 is necessary for bonding purposes, the project
could open as early as 2022.
In the longer term, WSDOT plans to continue collaborating with
corridor partners to identify and move forward with completing
additional Master Plan improvements.
Complete 40 -mile system
1 express
toll lane
2 express
toll lanes
AUBURN
TACOMA
167 Iink
N70N
1 express
Poll lane
PUYALLUP
The 40 -mile system of express toll lanes, shown in this
configuration endorsed by the 2010 I- 405 /SR 167 Executive
Advisory Group, would extend from 1 -5 in Lynnwood to SR
167 in Puyallup.
Executive Summary 5
I- 405 /SR 167 Corridor
/z +rrraiv000
1 express
toll lane
2 express
toll lanes
167 link
1 express
toll lane
TACOMA
t'-0E'_iiF
Figure 1: WSDOT has a plan for a system of
express toll lanes on the 40 -mile I- 405 /SR
167 corridor, which stretches from Lynnwood
in the north to the King- Pierce County line in
the south.
i
Washington State
�6 W Department of Transportation
What is the purpose of this report?
This report, required by RCW 47.56.886, summarizes the Washington
State Department of Transportation's recent analysis in preparation for
implementing and operating an express toll lane system in the Interstate
405'State Route 167 corridor, as shown in Figure 1.
The report describes analysis for key policy decisions related to Phase
1 of express toll lanes between Bellevue and Lynnwood, including
recommendations for a carpool scenario that will meet traffic performance
and revenue requirements set by the Washington State Legislature for the
I -405 express toll lanes. The report also includes a detailed analysis of
methods for funding and phasing related to Phase 2 of express toll lanes
on the I -405; SR 167 corridor, specifically for the area between Renton and
Bellevue.
Whom did WSDOT consult to develop
these findings?
As part of their traffic, revenue and financing analyses, WSDOT consulted
with the I- 405 /SR 167 Executive Advisory Group, a committee consisting
of local and state elected officials from the 1 -405 and SR 167 corridor
and representatives from the transit agencies that operate in the I -405 and
SR 167 corridor, as well as representatives from the Federal Highway
Administration, Federal Transit Administration and Washington State
Transportation Commission. In addition to holding four 2013 meetings
with the EAG, as shown in Figure 2, WSDOT organized briefing sessions
with a corridor Interagency Working Group, composed of technical staff
associated with EAG members.
2013 EAG Meeting Schedule
Meeting 1 Meeting 2 Meeting 3
Background Carpool policy Funding &
phasing
2013 Sept. 19,
Public outreach
Meeting 4
Final
Recommendation
Nov. 7, 2013
Figure 2: WSDOT held four meetings with the I- 405/SR 167
Executive Advisory Group leading up to this report.
I- 405 /SR 167 Corridor Funding and Phasing Report
Introduction to the Corridor
The I- 405iSR 167 corridor, sometimes referred to as
the Eastside Corridor, is one of Washington state's most
important roadway networks for people, businesses and
freight. These highways, when combined with State Route
512, form the only limited access north -south alternative
to Interstate 5 for travel between Lakewood in Pierce
County and Lynnwood in Snohomish County.
Currently, the I -405 SR 167 corridor serves an estimated
950,000 vehicle trips per day, according to WSDOT loop
data and occupancy counts. The Puget Sound Regional
Council predicts that these volumes will increase to about
1.5 million vehicle trips per day in 2030. This corridor
makes a substantial economic impact on the state, hosting
major companies such as Microsoft, Google, Costco,
Boeing, and Paccar, as well as major regional retail
destinations in Auburn, Kent, Tukwila, Renton, Bellevue.
and Lynnwood.
This corridor also ranks as one of the state's most heavily
traveled and congested roadway networks. Commuters
currently encounter heavy traffic and delays for up to
eight hours each day. With regional growth projected to
increase by approximately 1 million people and 700,000
jobs during the next 20 years, according to PSRC, the
corridor faces increasingly congested traffic conditions
that demand effective solutions.
According to WSDOT's 2013 Corridor Capacity
Summary, the amount of delay for the average 1 -405
commuter increased by 14 percent from 2010 to 2012.
In I -405's most congested section between Tukwila and
Bellevue, morning commute times increased by up to 11
minutes in this 13 -mile area during the same period.
To respond to these challenges, the Washington State
Department of Transportation has progressed steadily
on building improvements identified by the 2002 I -405
Master Plan. Through the first phase of funding, WSDOT
has delivered 13 projects along the length of the corridor,
as shown in Figure 3. The overall program has tackled
congestion by addressing key chokepoints as well as
improving safety and creating regional jobs.
Chapter 1: Project Overview
More than 10 years of project delivery
�\l
4 NE 195th St. to SR 527
- NB Auxiliary Lane
4 NE 116th St. Interchange
eV ProJect
4 Bellevue o Lynnwood
iti) Widening & ETL Project
4 Kirkland Nickel Stage 1
Ihtt Widening ProJect
.Q NE 101h Street Bridge
Crossing Stage 2
ao. a tr.,
NE 8th St. to SR 520
CO Braided Ramps Project
Thunder Hits Creek
Culvert - Emergency Repair
4 NE 10th St. Bridge
4x Crossing Stage 1
Renton Stage 1
X24 Widening ProJect
4 South Bellevue
tze Widening ProJect
Renton Stage 2 W dening 8
AV SR 515 Interchange Proles
Spdngbroak Creek Wetland
& Habitat Mitigation Bank
tlth St. E o S 277th St.—
Id HOT lane (Stage 4)
ConatntlAn 9.1
2015 I
oorn m troc
2017
A.
SR 167 HOT Lanes
AV Pilot Project
4 NB HOV 151h St. SW la
15LV 15th St. NW
Figure 3: The I- 405 /SR 167 team has completed 13 projects
along the corridor since adopting the 2002 Master Plan.
7
A key component of this Master Plan is operating a system of priced managed lanes —also known as high occupancy toll
(HOT) lanes or express toll lanes —that will ultimately extend 40 miles from the 1-5 1-405 interchange in Lynnwood to
SR 167 at the Pierce -King County Line. This strategy responds to the challenging situation faced by 1 -405 carpool lanes.
which have lost their effectiveness during peak travel times because of increased demand, resulting in reduced benefits
for carpoolers, vanpoolers and transit users. Through dynamic pricing for the express toll lanes, WSDOT is better able to
manage demand in these lanes to provide drivers a reliable trip.
What projects does this report cover?
This report outlines strategies for a phased approach to completing a 40 -mile system of express toll lanes from SR 167
at the Pierce/King County line to the 1- 405'I -5 interchange in Lynnwood, as shown in Figure 4. The I -405 SR 167 EAG
endorsed this 40 -mile plan in 2010 after careful evaluation of five different study options.
As endorsed by the EAG in 2010 and subsequently authorized by the Legislature in 2011 (RCW 47.56.880), WSDOT
is currently moving forward with Phase 1, which builds express toll lanes between NE 6th Street in Bellevue and I -5
in Lynnwood and is scheduled to open in 2015. Chapter 2 of this report describes policy decisions related to Phase 1.
including a new carpool policy, which is important to Phase 1 operations and Phase 2 funding.
WSDOT continues to explore strategies to implement Phase 2, which would extend the express toll lane network
between Bellevue and Renton, build the I -405: SR 167 Interchange Direct Connector to connect the 1 -405 express toll
lanes with the SR 167 HOT lanes, and extend these HOT lanes to the King- Pierce County line. Chapter 3 of this report
describes potential strategies for funding his next phase of express toll lanes.
Why build express toll lanes?
The region's general purpose lanes, and most of its
carpool lanes, are already congested during peak periods,
and those peak periods are becoming longer all the time.
Priced managed lanes, also called high occupancy toll
(HOT) lanes and express toll lanes, provide a way to
operate highways more efficiently and manage traffic
demand with more commute choices.
WSDOT introduced managed lanes to the state through
the SR 167 HOT Lanes Pilot Project in 2008. These lanes
provide the sustainable, long -term solution to congestion
relief that commuters and businesses have come to rely
on, while simultaneously providing a revenue source to
maintain roadways.
More information about express toll lanes is available at:
www wsdot wa. gov/tolling /EastsideCorridor
Now in their fifth year of operations, the SR
167 HOT lanes have delivered improved travel
speeds and are covering their costs.
$1.50
8
WWashington State
w Department of Transportation
I-405/SR 167 Corridor Funding and Phasing Report
What projects are funded?
Phase 1: Bellevue to Lynnwood Widening
and Express Toll Lanes
The I -405 NE 6th Street to I -5 Widening and Express Toll
Lanes project, currently under construction, will add one
continuous northbound and southbound lane between NE 6th
Street in Bellevue and SR 522 in Bothell. This new lane, when
combined with the existing carpool lane, will operate as a dual
express toll lane system from downtown Bellevue to Bothell
Woodinville. In addition, the existing carpool lane from SR
522 to I -5 will be converted to a single express toll lane.
The project is fully funded by the 2003 and 2005 gas taxes,
and the State Legislature authorized tolling in 2011 through
RCW 47.56.880. WSDOT awarded this design -build project
for construction in February 2012. The new lanes are
scheduled to open in mid to late 2015.
SR 167 HOT Lane Extension, Stage 4
Phase 1 also includes $82 million in funding for Stage 4 of the
SR 167 HOT lanes project, which would extend the existing
southbound SR 167 express toll lanes to the King Pierce
County line.
This project will begin construction in 2014 and is scheduled
to open in late 2016 (FY 2017).
Figure 4 illustrates the project limits for both Phase 1 projects.
40 -mile system: Phase 1
1 express
toll lane
Legend
Construction
1 Express
Toll Lane
2 Express
Toll Lanes
e 167 Link
Completed
tr 1 Express
ji Toll Lane
- 2 Express
Toll Lanes
r 167 Link
TUKWILA
2 express
toll lanes
PFNTON
AUBURN
1 express
toll lane
1 express
toll lane
TA COM,
Callout Legend
❑new with this
construction phase
PUYALLUP
ricompleted construct on
Figure 4: Construction is underway for Phase 1 of
express toll lanes between Bellevue and Lynnwood
(top), and preliminary engineering has begun for Stage
4 of the SR 167 HOT lane extension (bottom).
Chapter 1: Project Overview 9
40 -mile system: Phase 2
/LYNNWOOD
1 express
toll lane
'+ SEATTLE
Legend
Construction
rotas 1 Express
Toll Lane
2 Express
Toll Lanes
e. 167 Link
Completed
1 Express
Toll Lane
2 Express
Toll Lanes
f 167 Link
rUKw1LA
KENT
AUBURN
1 express
toll lane
1 express
toll lane
PUYALLUP
2 express
toll lanes
2 express
toll lanes
167 link
RENTON
FEDERAL
WAY
TACOMA
Callout Legend
nnew with this n competed construction
construction phase
Figure 5: WSDOT is seeking funding to complete
the 40 -mile express toll lanes system on 1-405
between Renton and Bellevue (middle) and on the
far south end of northbound SR 167 at the King -
Pierce County line.
�Washington State
10 A Department of Transportation
What is the next phase of express
toll lanes on I-405 and SR 167?
Phase 2: Renton to Bellevue Widening and
Express Toll Lanes and the I- 405/SR 167
Direct Connector
The proposed, unfunded Phase 2 includes the critical direct
connector at the I- 405/SR 167 interchange and the Renton to
Bellevue express toll lanes project, as shown in Figure 5. This
project currently has a total funding need of $1,175 million. If
full funding was made available in 2014, Phase 2 could be open
as early as 2020. If two years of toll collection experience from
Phase 1 is desired, the project could open as early as 2022.
The Renton to Bellevue Widening and Express Toll Lanes
Project would add a new lane in each direction and pair the
new lane with the existing carpool lane to create a two -lane
express toll lane system in each direction between Northeast
6th Street in Bellevue and SR 169 in Renton. This project
would also add auxiliary lanes near the 1-90 1-405 interchange
and fund a portion of the Northeast 6th Street extension in
downtown Bellevue (eastward across I -405) to further enhance
traffic operations. The total cost for this project is $890 million.
The I- 4051SR 167
Direct Connector
project would add
new flyover ramps to
connect the SR 167
HOT lanes with the
future I -405 express
toll lanes. This
project is critical to
extend the benefits
of the SR 167 HOT
lanes, as well as
connect and upgrade
the system to operate
as a robust 40 -mile-
long express toll
lanes system.
The Direct Connector "s new flyover
ramps (visualization above) will connect
the future 1 -405 express toll lanes with
the SR 167 HOT lanes. improving traffic
flow and safety at this interchange.
I- 405 /SR 167 Corridor Funding and Phasing Report
The Direct Connector already has $40 million for
preliminary engineering and right -of -way acquisition
and could be ready for construction as early as January
2015. However, the project still requires $285 million
in construction funding for a total cost of $325 million.
In 2010 WSDOT estimated the project's costs at $490
million but has since reduced this estimate by re-
engineering. The Master Plan build -out of the Direct
Connector involves four levels of ramps. Using practical
design principles, WSDOT moved the Direct Connector
from the third level of ramps to the second level,
requiring fewer walls and a shorter bridge. This approach
did not change the interchange functionality but reduced
costs for the next phase.
Chapter 3 of this report provides more detail on funding
and phasing the second phase of express toll lanes.
SR 167 HOT Lane Extension, Stage 5
Phase 2 also includes SR 167 Stage 5, which would
extend the existing northbound High Occupancy Toll
(HOT) lane so that it starts at the King/Pierce County
line, similar to the southbound direction. This project
is currently unfunded and requires $35 million for
preliminary engineering, right -of -way acquisition and
construction.
Express Toll Lanes Study History
WSDOT's I -405 project team has evaluated the merits of a
priced managed lane system along the I -405 corridor since
2001. All of the studies have concluded that priced managed
lanes benefit traffic operations and generate revenue.
Over the years, WSDOT has examined a range of
transportation options to address the projected increase in
population and employment along this corridor. Beginning
in 1998, WSDOT collaborated with a variety of project
partners, including local and federal agencies, 13 cities, and
two counties, to develop an inclusive and balanced corridor
master plan. The product of this process, the I -405 Master
Plan, outlines a long -term multimodal vision.
1 -405 Master Plan Vision
• Adding two lanes in each direction on
1-405.
• Making improvements to local
arterials.
• Improving transit facilities and
carpool lanes.
• Adding a bus rapid transit (BRT)
system and nine new transit centers.
• Increasing transit service by 50
percent.
• Building carpool direct access ramps
and flyer stops.
• Adding 5,000 new Park & Ride
spaces and 1,700 new vanpools.
• Enhancing the environment.
Investigating the implementation of a
priced managed lanes system.
Chapter 1: Project Overview 11
Early Studies
The early I -405 corridor studies analyzed the preferred alternative, generally
a five -lane section with one or two carpool lanes or priced managed lanes.
This study envisioned a 3+ carpool occupancy requirement for toll -free
travel.
The findings, which were presented to the 1 -405 technical and executive
committees in 2002, showed that managed lanes provide improved overall
corridor travel speeds. As a result, managed lanes were recommended for
inclusion as an operational option. From this early analysis in 2001 and
2002, the I -405 Corridor Environmental Impact Statement recommended that
priced managed lanes be further evaluated on I -405.
Subsequent studies between 2003 and 2009 evaluated the merits of both
single and dual (two) managed -lane systems, as well as both 2 and 3+
carpool requirements for a toll -free trip on the north end of the corridor.
These analyses concluded that a dual system of priced managed lanes is
superior to a single lane, and that a 3+ carpool definition is the optimal long-
term solution.
Recent Studies
Eastside Corridor Tolling Study
Published January 2010
In 2009, the state Legislature requested a traffic and revenue study, including
potential funding for future improvements and express toll lanes on I -405.
WSDOT's Eastside Corridor Tolling Study final report in January 2010 reviewed
five study options that included incremental improvements to complete a dual I -405
express toll lane system, connected to a single SR 167 express toll lane system.
This study analyzed a 3 + carpool designation for toll -free use of express toll lanes
with a 2+ carpool sensitivity analysis.
Major findings included:
• Traffic performance (the number of vehicles and people moving at free - flowing
speeds of 45 mph to 60 mph in all lanes) improves as the express toll lane
system becomes more complete.
• Express toll lanes allow for more efficient use of all lanes (better long- term.
reliable traffic performance), when compared with only adding general purpose
lanes.
• A 2+ carpool free designation significantly increases toll rates due to less space
available for those who wish to pay a toll to use the express toll lanes.
• Setting a maximum toll cap, and/or using a 2+ carpool free designation, will
reduce toll revenue collections into the future.
• The 2+ carpool free designation did not provide traffic performance benefits,
particularly in the single lane portion of the express toll lanes system.
� Washington State
12 -/gr Department of Transportation
1 -405
Corridor
Program
Record of Decision
O F.d. Trout ' on
FNen4 '* La n
The 1 -405 Corridor Program Record
of Decision serves as the corridor's
master plan.
ab5 CD
Eastside Corridor
Tolling Study
The Eastside Corridor Tolling Study.
prepared for the state Legislature.
supports moving forward with express
toll lanes on I -405.
I- 405 /SR 167 Corridor Funding and Phasing Report
Guiding Principles: I- 405 /SR 167
Executive Advisory Group
During its 2009 meetings, the I- 405 /SR
167 Executive Advisory group adopted
the following principles in support of the
Eastside Corridor express toll lane vision.
Performance
1. Move more people.
2. Manage corridor to improve speed
and reliability to free flow conditions, a
minimum of 45 mph.
a. May require change in minimum
HOV occupancy.
3. Prioritize and accommodate transit
performance and HOV users.
4. Minimize diversion to arterials or
neighborhood streets.
5. Improve mobility for freight and drivers
in all lanes.
6. Spotlight capacity and 2+ HOV versus
3+ HOV.
Funding
7. Retain tolling revenue in the Eastside
Corridor.
8. Secure financing with fair terms,
similar to other corridors. Leverage
traditional resources.
9. Exempt transit and carpools from tolls.
10. Continue to monitor national and
regional trends to better understand
how to fund toll projects.
11. Leverage toll revenue with other funds.
Implementation
12. Express toll lanes should be built in
incremental steps and begin with
funded projects.
13. Express toll lanes should fit within
the long range regional planning and
tolling system.
14. Sensitivity to construction phasing on a
regional level.
Public Outreach
15. Grow awareness, experience and
support by engaging the public, local
agencies and elected officials.
16. Make tolling operations mainstream
and improve access.
Chapter 1: Project Overview
The 2009 I -405 SR 167 Executive Advisory Group. convened as
part of this study process, supported moving forward with Study
Option 4, which constructs a 40* mile express toll lane system
from the King/Pierce County line on SR 167 to Lynnwood at the
I -405 I -5 interchange. This option includes a two -lane express
toll lane system on I -405 between the I- 405 /SR 167 and SR
522 interchanges. Figure 6 shows the plan, as well as the EAG
members throughout the corridor and region who approved it.
The EAG also recommended beginning right away with the
funded projects in the north end of the 1-405 SR 167 Corridor
to allow WSDOT to gain traffic and revenue experience with
express toll lanes, thereby lowering perceived risks and the
cost of financing future express toll lane projects that use toll
revenues.
Regional Support for 40 -mile express toll lane system
Dave Gossett
Snohomish County Coundlmember
ateomerg lbr forme rEAG ember end S 'r
County Cnrr_Yna robe/ Wee Cooper
Reagan Dunn
King County Coundl
eliadalwee
Richard Ford
WA State Transportation Commission
Sue Sue Singer f/
Puget Sound Regional Council
kJ/
Ronald Posthuma
Ring County Dept. of Transportation
Roger gush Chair
Pierce County Council
/express
to/Ilene
+'7oan McBrlde�
Mayor of Kirkland
2
tog lanes
Lama.ed
ter
fad Lam.
rr 2Erma
Tod Lama.
4P ,arum
tnr
Tonne
teltelLana
L
I LAO
Grant Degginger
Bellevue Clty Councilmembe r
Sonny Putter
Newcastle City Coundlmember
,r H
ton
Mayor of Tukwila
Randy Corman
Renton City Coundlmember
Aweerr..-"--— SuzeFEe Cooke
Mayor of Kent
Peter lewls
Mayor of Auburn
David Hill
Mayor of Algona
Richard Hildreth
Mayor of Pacific
Kai
athy Turner
Mayor of Puyallup
Figure 6: WSDOT's plan for 1 -405 express toll lanes drew broad
regional support.
13
Expert Review Panel Study
Published December 2010
As questions arose after the January 2010 traffic and revenue study, the
Secretary of Transportation directed WSDOT to consult an independent
Expert Review Panel to provide a neutral perspective on the findings. The
panel included national experts from academia, transportation policy and
planning, and finance. The panel issued its final report in December 2010.
The ERP found that a corridor -wide express toll lanes system will keep
the I- 405'SR 167 vision moving forward and is a viable implementation
strategy for the corridor Master Plan. They found the express toll lanes to
be aligned with federal. regional and state policies on tolling, carpooling
and livability. The panel confirmed the validity of the previous traffic and
revenue analysis, agreed with moving forward on Option 4 (40+ mile
express toll lane system). and made a series of recommendations to help
assure successful completion of the project and generate the expected
benefits in a timely manner.
Washington State Transportation Commission
Independent Study
Published September 2012
In RCW 47.56.886, the Legislature directed the Washington State
Transportation Commission to conduct an independent traffic and
revenue analysis for the development of a 40 -mile system of express
toll lanes on 1 -405 and SR 167. WSTC hired Cambridge Systematics to
complete this analysis. Although the WSTC report's traffic and revenue
methodology differed from WSDOT's previous Eastside Corridor
Tolling Study, the WSTC report confirmed that express toll lanes provide
drivers a choice for a more reliable trip when needed. The WSTC report
also forecast toll revenues that fell within the range of WSDOT's 2009
findings, as illustrated in Figure 8.
14 17Washington State
1.; Department of Transportation
E N. _ .
en %raw Rand Drum
The Expert Review Panel study
confirmed that express toll lanes are
a viable strategy for the I- 405 /SR 167
corridor.
OIL
Eastside Corridor
Independent Traffic
and Revenue Study
,a,.po „c n!Mfr.
I ,;o., carom., an
ccmnr.ene snrem, c, Inc
scce Sys :ems G ap Icrh Assurance Ilc
CAMBRIDGE
mmiCOCCIMMIll
4
The Legislature directed the
Washington State Transportation
Commission to complete an
independent traffic and revenue study
of 1 -405 express toll lanes.
I- 405 /SR 167 Corridor Funding and Phasing Report
Most recent study
updates
In 2012 and 2013, WSDOT
revised its 2009 study results to
provide an updated data set for
future work and to reflect similar
inputs as the WSTC study, which
allows a closer comparison of
the findings. Figure 7 shows the
updates in inputs for each of the
three studies.
The latest results took into
account updated Puget Sound
regional forecasts, willingness to
pay information, minimum toll
rates, forecast years, and project
opening years. The WSDOT
analysis reflects WSDOT's policy
to use photo tolling (explained in
more depth in Chapter 2) to offer
driver consistency with the SR
520 bridge.
WSDOT's newest updated results
for the 31 carpool definition fell
within the range of the WSTC
independent study results, as
shown in Figure 8.
Comparison of WSTC and WSDOT Study
Methodology and Inputs
Model Input
2009 WSDOT
2012 WSTC
2012 WSDOT
Willingness to pay
2006 data
2011 data
2011 data
Minimum toll
Forecast years
Project opening
date
Ramp -up period
Photo tolling
$1.00
2020, 2035, 2040
2015
(entire corridor)
2 -year ramp up
No photo tolling
$0.75 $0.75
2015, 2018, 2030 2015, 2018, 2030
2014 (north end): 2014 (north end),
2018 (south end) 2018 (south end)
3-4 year ramp up
3 -year ramp up
No photo tolling Photo tolling
Figure 7: The 2009 WSDOT and 2012 WSTC studies used different methodology and
inputs for their traffic and revenue modeling, but both assumed that WSDOT would not
be using photo tolling for the 1 -405 express toll lanes. WSDOT's updated 2012 analysis
used similar inputs to WSTC except it included the photo tolling policy assumption.
Comparison of WSTC and WSDOT Revenue Forecasts for 3+
Carpool Free Scenario
2012 Dollars (in Millions)
$300
$250
$200
$150
$100
$50
$0
Cam bridge 5,stematics2012 WVSDOT2009
15th Percentile (Low)
85th Percentile (High)
WSDOT 2009 Forecast Range
- -• Low
,..■■• High
MOOT 2012
50%
WSDOT 2012 5O% Forecas
2014
2019
2024
2029
CS 2012 Forecast Range
2034
2039
Figure 8: The chart above demonstrates that WSDOT's 2009 (purple lines and
shading) and updated 2012 (green line) revenue forecasts for a 3+ carpool definition
in the express toll lanes are consistent with the range (tan lines and shading) found
by WSTC's independent consultant, Cambridge Systematics.
Chapter 1: Project Overview 15
Legislative Direction
RCW 47.56.880
(4) The department shall monitor the express
toll lanes project and shall annually report to the
transportation commission and the legislature
on the impacts from the project on the following
performance measures:
(a) Whether the express toll lanes maintain
speeds of forty -five miles per hour at least
ninety percent of the time during peak periods,
(b) Whether the average traffic speed changes
in the general purpose lanes;
(c) Whether transit ridership changed;
(d) Whether the actual use of the express toll
lanes is consistent with the projected use;
(e) Whether the express toll lanes generated
sufficient revenue to pay for all Interstate 405
express toll lane - related operating expenses:
(r) Whether travel times and volumes have
increased or decreased on adjacent local
streets and state highways, and
(g) Whether the actual gross revenues are
consistent with projected gross revenues
as identified in the fiscal note for Engrossed
House Bill No. 1382 distributed by the office of
financial management on March 15, 2011
(5) If after two years of operation of
the express toll lanes on Interstate 405
performance measures listed in subsection
(4)(a) and (e) of this section are not being
met, the express toll lanes project must be
terminated as soon as practicable.
ti►
Washington State
16 ir, Department of Transportation
What are the legislative requirements
of Phase 1?
In 2011, the state Legislature in RCW 47.56.880 confirmed the
selection of study option 4 (building a 40+ mile express toll lane
system) as the direction for future improvements in the I -405
corridor. The legislation authorized WSDOT to construct a dual
express toll lane system between NE 6th Street in Bellevue and SR
522 in Bothell, and to convert the carpool lane between SR 522 and
I -5 in Lynnwood to a single express toll lane.
RCW 47.56.880 establishes several key performance metrics for the
Bellevue to Lynnwood section of the express toll lanes, including:
• Traffic: Express toll lanes must maintain speeds of 45 miles per
hour at least 90 percent of the time during peak periods.
• Revenue: Express toll lanes must pay for all related operating
expenses within two years of opening.
If the lanes do not meet these performance requirements within two
years, the legislation calls for terminating the project.
In order to meet these legislative requirements, WSDOT must
carefully consider the volume of free trips. A final decision on the
carpool definition is the key to determining the volume of free trips.
which in turn allows WSDOT to manage traffic performance and
generate revenue for future corridor improvements.
I- 405 /SR 167 Corridor Funding and Phasing Report
How will the express toll lanes operate?
WSDOT has already made a number of operational decisions for the I -405 express toll
lanes between Bellevue and Lynnwood, as described on the next page. Prior to opening the
I -405 Bellevue to Lynnwood project in 2015, WSDOT will need to finalize a number of
other policy decisions, as described in Chapter 5.
Bellevue to Lynnwood Project Area
The Bellevue to Lynnwood express
toll lanes will have designated access
points along the corridor that allow
drivers to enter and exit the lanes.
Travelers choosing to use the express
toll lane system may access the system
from designated access points on
mainline 1-405 and from local streets,
using the direct access ramps located
at NE 6th Street in Bellevue and NE
128th Street in Kirkland.
•
2281h St SW
SNOHOMISHOUNTY
KING C NTY
NE 195th St
BOTH
522
1 Express Toll Lane
2 Express Toll Lanes
Transit Shoulder
Access Point
Direct Access to
Express Toll Lanes
t
1
KIRKLAND
NE 11.01h St
NE 1Mh St
w'
z.
NE 432nd SI
NE 128th St.
LAKE
WASHINGTON
St
NE 85th At
NE 70th St
3ELLEV.LI
NE 10th St
NE 6th St
E 12th St
NE 811,31
+ 41
HOV GP
++
ETL GP
+ 41+
HOV GP
+ 41
GP
ETL
Existing
With express
toll lanes
Existing
With express
toll lanes
Chapter 2: Carpool Policy 17
What is the basic concept of operations?
Number of express toll lanes
Dual lane section: WSDOT will add one new express toll
lane in both directions between Northeast 6th Street in
downtown Bellevue and SR 522 in Bothell, and convert
the existing carpool lane in this area to an express toll lane.
Together, these lanes will operate as a dual express toll
lane system.
Single -lane section: Between SR 522 in Bothell and I -5 in
Lynnwood, WSDOT will convert the existing carpool lane
to a single express toll lane in both directions.
Dynamic toll rates
Toll rates will rise and fall based on current traffic speeds
and volumes in the express toll lanes to ensure traffic in
these lanes flows freely. Embedded traffic sensors will
collect data used by the pricing algorithm that calculates
the toll rate, similar to the SR 167 HOT lanes.
Access points
Drivers will access the express toll lanes from limited
locations. Drivers will enter and exit the express toll lanes
using both direct - access connections to local roads and
access points from mainline I -405 that allow merging
between express toll lanes and general purpose lanes.
Buffer zone
Clear, visible separation between express toll lanes and
general purpose lanes is necessary to prevent erratic lane
changes in and out of the system and to facilitate higher
speeds. A buffer zone, marked by solid white stripes, will
divide the express toll lane from the general purpose lanes.
The standard width of the buffer will be four feet, with
a minimum width of two feet. This approach will create
a facility that operates independently from the general
purpose lane congestion by discouraging lane changes
between the two facilities.
Destination -based pricing
Tolls will be priced by the distance of travel based on
three toll zones. Drivers will be charged a price for travel
based on where they enter and exit the express toll lanes.
Washington State
18 �pr Department of Transportation
Toll collection for the express toll lanes will be all
electronic. Drivers choosing to use the express toll lanes
should open a Good To Go! account. Those without an
account will be billed at a higher Pay By Mail rate.
Road signs will display up to three toll rates based on
destinations. Today, the SR 167 HOT lanes are priced the
same whether drivers travel one mile or the entire length
of the system. I -405's three toll zones will allow for better
congestion management.
Photo tolling /Pay by mail
In order to promote a consistent customer experience with
the SR 520 bridge, which offers Pay By Mail and Pay By
Plate, WSDOT has chosen to offer both of these payment
options for the I -405 express toll lanes. Pay By Mail
will allow customers without a Good to Go! pass to be
identified by their license plate and mailed a toll bill with
a premium rate to cover the additional processing costs.
Drivers that qualify for a free trip as a carpool will be
required to register or have a new transponder that declares
their eligibility for a free trip.
All- electronic tolling without toll booths
All tolls will be collected electronically, either directly
from customers with prepaid Good to Go! accounts, or via
photo tolling in which customers receive a bill in the mail.
Enforcement
Washington State Patrol will perform on -site enforcement
of express toll lanes by visually identifying violators of the
carpool requirements and directing them to a safe pullover
location for further investigation and, if appropriate. a
traffic citation. A light at each toll point will indicate to
troopers if a carpool is registered, so that they can verify
vehicle occupancy.
I- 405 /SR 167 Corridor Funding and Phasing Report
Carpool Policy Study Scenarios
The 2009 Eastside Corridor Tolling Study evaluated two
scenarios: 2 . carpools travel toll -free and 3- carpools
travel toll -free. During that study process, the I -405
SR 167 Executive Advisory Group recognized that a
move to a 3+ carpool policy would eventually need to
occur in order to improve traffic performance on the
corridor. However, this group of local leaders also asked
WSDOT to consider transition options that could ease
the public's shift from the current 2+ carpool policy to a
new 3+ carpool policy.
Since Phase 1 construction began in 2012, WSDOT
has continued to work closely with the I- 405'SR 167
EAG to gather input on carpool policy decisions for the
40 -mile express toll lanes system. WSDOT held four
EAG meetings and three Interagency Working Group
meetings, as well as a multitude of other staff and
council briefings. in 2013.
Chapter 4 provides more details on the EAG meetings
and the public outreach process.
As a result of feedback from the EAG on the need for
transitional carpool options, WSDOT and WSTC's
independent consultant conducted additional study on
four basic options in 2012 and 2013. The methodology of
these studies varied, as described in the previous chapter.
Notably, the WSTC study did not assume a photo tolling
policy in their analysis.
The most recent analyses considered the two "book-
end" scenarios (2+ carpool free and 3+ carpool free) as
well as two transition options: carpool discount ($1.00
and $0.50) and 3+ carpools ride free at peak periods,
2+ carpools ride free at off -peak periods. Additional
sensitivity analyses occurred from those transition options.
Carpool Scenarios
Scenario A
2+ carpool free
The 2+ carpool free policy would maintain the existing policy in effect for the
I -405 carpool lanes, allowing vehicles with two or more occupants to use the
express toll lane system without paying a toll. The SR 167 HOT lanes currently
have this policy.
How was this option studied?
• WSDOT'CDM Smith analyzed this option with both photo tolling and
transponders and transponders only.
• WSTC/Cambridge Systematics analyzed this option with transponders
only.
Scenario B and B -2
Carpool discount ($1.00 and $0.50)
This analysis considered two versions of the carpool discount, which aims to
incentivize carpooling. The original carpool discount scenario analysis did not
consider the effects of photo tolling because that policy decision had not yet
occurred. Under that original scenario, all carpools with two or more occupants
would receive a $1.00 discount from the current toll rate. Because the minimum
toll was assumed to be $0.75, at some times of the day carpools would travel
for free. During the peak periods, when the toll rate rises above the discount
amount, eligible carpools would pay the lower rate.
Chapter 2: Carpool Policy
Sample toll rate signs
Scenario B - $1.00 carpool discount
EXPRESS TOLL LANES
NE 124th ST
NE 6TH ST
52.00
$2.15
$2.35
Carpool $1.00 discount
Scenario B -2 - $0.50 carpool discount
EXPRESS TOLL LANES
NE 124th ST
NE 6TH ST
52.00
52.15
52.35
Carpool $0.50 discount
19
However, as will be discussed later in this section, the $1.00 discount did not meet the net revenue performance
requirement set by the Legislature and would likely still not meet this requirement even if photo tolling were
included in the analysis. Because there was still interest in this option, WSDOT developed new analysis using a $0.50
discount and assuming photo tolling. By contrast, the $0.50 discount with photo tolling does meet the net revenue
requirements. However, under this option, carpools would not be given a free trip, because the discount would be less
than the minimum toll, assumed at $0.75.
How was this option studied?
• WSDOT.,CDM Smith analyzed this option with transponders only (no
photo tolling) for the $1.00 discount (Scenario B), and with photo tolling
and transponders for the $0.50 discount (Scenario B -2).
• WSTC Cambridge Systematics analyzed this option with transponders
only (no photo tolling) for the $1.00 discount only.
Scenario C
3+ carpool free at peak periods
2+ carpool free at off -peak periods
Under this scenario, the occupancy level required for a toll exemption varies
by time of day in order to retain some benefits for two - person carpoolers
while still maintaining free -flow conditions in the express toll lanes. This
analysis assumed the peak periods to be 5 a.m. to 10 a.m. and 3 p.m. to 8 p.m.
for toll -free travel with vehicles carrying three or more occupants. Between
10 a.m. and 3 p.m., vehicles with two or more people would travel for free.
How was this option studied?
• WSDOTICDM Smith analyzed this options with photo tolling and
transponders (Scenario C), and transponders only (no photo tolling).
• WSTC Cambridge Systematics analyzed this option with transponders
only (no photo tolling).
Scenario D (E, F - no photo)
3+ carpool free
The 3+ carpool free scenario exempts vehicles with three or more people
from paying a toll to use the express toll lanes at all times.
How was this option studied?
• WSDOTCDM Smith analyzed this option with photo tolling and
transponders (Scenario D), and transponders only (no photo tolling)
(Scenario E).
• WSTCiCambridge Systematics analyzed this option, known in this report
as Scenario F, with transponders only (no photo tolling).
Ana
� Washington State
20 �/1 Department of Transportation
Sample toll rate signs
Scenario C - 3+ carpool free peak/2+
carpool free off -peak
EXPRESS TOLL LANES
NE 124th ST
NE 6TH ST
$0.75
$0.75
$0.75
2+ free 10 a.m. - 3 p.m.
EXPRESS TOLL LANES
NE 124th ST
NE 6T" ST
$2.00
$2.15
$2.35
Orw
3+ free 5 a.m. -10 a.m.
Scenario D (E,F - no photo) -
3+ carpool free
EXPRESS TOLL LANES
52
NE 124th ST
NE 6TH ST
$2.00
$2.15
$2.35
3+ Required for Carpool
•
I- 405 /SR 167 Corridor Funding and Phasing Report
What factors did WSDOT consider when reviewing the
carpool scenarios?
In their evaluation of the carpool scenarios, WSDOT considered several different factors, both
quantitative and qualitative.
Quantitative factors
Traffic performance
This metric is especially important because of the legislative requirements (both at the state and
federal levels) that the express toll lanes operate at 45 miles per hour, 90 percent of the time
during peak periods. The next sections describe this analysis in greater detail.
Initial net revenue
Net revenue refers to the amount of revenue generated from tolling after subtracting operating
and maintenance costs. This metric is also important because of the legislative requirement that
Phase 1 of I -405 express toll lanes between Bellevue and Lynnwood cover their operating costs
within two years of opening. The next sections describe this analysis in greater detail.
Toll rates /pricing
WSDOT considered how each of the carpool scenarios would affect the amount of toll rates
required for paying express toll lane customers.
Qualitative factors
Public acceptance
WSDOT used focus groups in 2013 and previous surveys to assess the level of acceptance for
each of the carpool scenarios. Most focus group participants understood that the carpool lanes
are not functioning properly today but resisted the idea of changing to a 3+ system because they
wanted to retain some benefits for 2+ carpools. Chapter 4 provides more detail on the focus
group findings.
Usability
WSDOT considered how user - friendly and understandable each of the carpool scenarios would
be for the general public.
Enforcement
WSDOT considered the level of difficulty for the Washington State Patrol to enforce each of the
carpool scenarios.
Regional operations /future decision
WSDOT also considered whether the carpool policy selected for the first phase of I -405 express
toll lanes would be effective on a regional basis or would need to be revisited soon.
Chapter 2: Carpool Policy 21
Traffic and Gross Revenue Analysis
WSDOT retained CDM Smith in 2012 to assist with developing traffic and gross revenue forecasting and analysis for
several carpool scenarios:
• 3+ carpool free (transponder and photo billing, and transponder only)
• 2+ carpool free (transponder and photo billing, and transponder only)
• 3+ carpool free peak/ 2+ carpool free off -peak (transponder and photo billing)
• Carpool discount: $1.00 (transponder only) and $0.50 (transponder and photo billing)
Methodology
For each option, CDM Smith developed
traffic and revenue forecasts of toll rates,
vehicle use of the express toll lanes, and
gross revenue estimates. In developing these
forecasts, CDM Smith considered three
major inputs: how much demand exists for
the lanes today and how that demand will
grow over time, how much of the traffic can
be expected to use the express toll lanes,
and how much drivers will be willing to pay
to use the lanes, as shown in Figure 9.
Econometric
Modeling
Traffic and
Revenue
Estimates
Figure 9: This diagram shows CDM Smith's
basic process for traffic and gross revenue
forecasting. More detailed methodology is
available in the full report in Appendix 1.
To answer these questions, CDM Smith used the following types of models:
• The Puget Sound Regional Council regional forecasting model to estimate future travel demand for the area,
• Traffic microsimulation tools to model traffic operations and performance of the roadway network under various
tolling configurations, and
• A market -share demand model to estimate the amount of traffic that would use the express toll lanes and their toll
rates.
Key Modeling Assumptions
Toll rates
• The minimum toll to use the facility is $0.75 when the facility opens (in year of expenditure dollars).
• Minimum tolls increase with inflation over the life of the facility.
• There are no maximum tolls. The toll is not capped, and the lanes are not closed to non - carpool vehicles at an
arbitrary point.
• Models are based on PSRC forecast for the years 2014, 2018 and 2030. To avoid overstating traffic projections, the
models assume no traffic growth after 2030.
Washington State
22 ♦/ Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Vehicle eligibility and hours of operation
• Heavy trucks and trailers are not eligible for the express toll lanes (similar to carpool lane policy
today).
• The facility was modeled based on operating hours of 5 a.m. to 8 p.m. daily. This duration is one hour
longer than the current I -405 carpool lane hours, which operate from 5 a.m. to 7 p.m. daily.
Facility goals
In order not to overstate revenues, the model assumed that the objective of tolling is for traffic
optimization, meaning that toll rates aim to maximize use of the express toll lanes while maintaining free -
flow conditions in the express toll lanes.
Traffic modeling results
All of the carpool scenarios studied operate similarly during the peak periods with the exception of the
2+ carpool free option. They operate similarly because the goal of the traffic and revenue analysis was
to maximize demand for the express toll lanes. The models used pricing to achieve the highest levels
of demand while maintaining free - flowing speeds in each carpool scenario. The models found that the
number of tolled and toll -free trips will vary depending on the carpool scenario selected and the time of
day. Appendix 1 contains the full report, including the tolled and toll -free trip information by scenario.
2+ carpool free scenario does not meet traffic performance
standards today or in the future
Permitting two - person carpools to ride for free in the express toll lanes does
not meet the traffic performance criteria of maintaining 45 miles per hour
speeds or greater 90 percent of the time during peak periods, as shown in
Figure 10. In fact, the single carpool lane does not meet the criteria today.
The existing carpool lane north of SR 522, the one lane section, is at
capacity during peak periods today. A 2+ carpool free scenario would
continue to experience these operational problems and would not meet the
performance objectives. Under this scenario, the express toll lanes would
continue to have performance problems, and the lanes would need to be
closed almost daily to non - carpoolers, leaving all travelers without reliable
trip options.
Scenarios that meet traffic
performance requirements
Scenario name
Scenarios
moving
forward
B $1.00 carpool discount
B -2 $0.50 carpool discount
C 3+ carpool free peak/
2+ carpool free off -peak
D 3+ carpool free
The 2- carpool free scenario does not meet the
legislative traffic performance requirement.
Chapter 2: Carpool Policy 23
Carpool lane speeds on southbound 1 -405 south of SR 527
(2012, average of Monday through Friday)
Speed
(M des per hour)
..•
70
50
40
20
10
•
• •
•
•
•
•
s•=• ••• '• •;!ij
• 1111111111111
•:r•
i •• •
au
•• . .• , •�
--A- Average 2012 Mon -Fri
•
•
•
•
•
•1
•
•
• •.
•
• $
•
• _
•
••
•
P. P. O. . P. P. P. P.
0 0 0 0 0 0 0 0 0 0 0 o g $ o0 0o S o0 00 00 00 00 8 8
0 0 0 0 0 0 0 0 0 0 0 0
N .. N M b n OD N M N b !` 00
Time ofDam
Figure 10: This chart shows the 2012 hourly speeds for all weekdays on southbound 1 -405, south of SR 527. The green
solid line represents speeds throughout a typical day in this area. and each of the dots represents an average speed
for a 15- minute period throughout the day for one day of the year. On average the speeds at this location drop below
50 miles per hour and frequently drop below 40 miles per hour during peak periods in both the morning and afternoon.
Speeds below the dashed red line do not meet the legislative requirement today.
Washington State
24 f, Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Gross revenue modeling results
CDM Smith developed gross toll revenue estimates for each of the carpool scenarios. These estimates show the gross
annual revenues prior to revenue adjustments and deductions for toll collection operations and maintenance. (The next
section discusses net revenue potential for each of the scenarios studied.)
As illustrated in Figure 11, all of the carpool scenarios have similar annual gross revenue streams, with the exception
of the 2+ carpool free scenario. The gross revenue for the 2 . carpool free scenario is significantly lower than the
others because of the limited amount of buy -in space available for single- occupant vehicles and a larger volume of
carpool vehicles traveling for free.
Additionally, as discussed previously, this scenario will require periods of closure to non- carpoolers to keep traffic
moving, further reducing gross revenues.
Estimated Gross Toll Revenues for Carpool Scenarios
340
250
200
150
100
50
2015
2+ carpool free
$0.50 carpool discount
-,I- 3+ carpool free peak/2+ carpool free off -peak
+F 3+ carpool peak
-X— $1.00 carpool discount - no photo tolling
40 -mile system
complete
2020
2025
Year
2030
2035
2040
Figure 11: This chart shows the estimated gross toll revenues for each of the major carpool scenarios studied by CDM
Smith. All of the scenarios would generate similar gross toll revenues except for the 2+ carpool free scenario, which
would generate significantly lower revenues because of the limited amount of buy -in space available for solo drivers.
Chapter 2: Carpool Policy 25
Net Revenue Analysis
The Bellevue to Lynnwood express toll lanes (Phase 1) is scheduled to open for toll operations in 2015 (FY 2016). RCW
46.57.880 established that net revenues, after revenue adjustments and deductions for toll collection operations and
maintenance (O &M), must be positive at the end of FY 2017.
Overview of net revenue components
The traffic and revenue projections presented in the previous section represent the potential gross revenue that would
result if WSDOT collected the correct toll from every customer in the express toll lanes, In order to determine if
net revenues are positive after two years, and ultimately the net toll revenue available long term to support capital
investments through financing or pay -as- you -go expenditures, it is necessary to account for a series of revenue
adjustments and O &M expenditures, as illustrated in Figure 12.
Net Revenue Flow Chart
Mo
Gross Toll Revenue
R & R and Other
Reserve Accounts
Excess Net Revenue
Available for Other Uses —
Uncollectible
Accounts
Credit Card Fees
Toll Collection 0 & M
Facility 0 & M
Net Revenue Available
Coverage for Debt Service
Figure 12: This graphic illustrates the process of
calculating net toll revenues from gross toll revenues.
Phase 1 of 1-405 express toll lanes must generate
positive net revenue after the first two years.
ANIL
Washington State
26 -i1 Department of Transportation
Revenue Adjustments
The primary component of revenue adjustments is uncollectible revenue.
When operations include photo tolling, anyone without a Good To
Go.' account can still pay to use the lanes as a Pay By Mail customer.
This leads to two types of uncollectible revenue: revenue not
recognized and unpaid toll revenue,
Revenue not recognized occurs when a customer's license plate is
obstructed or otherwise unreadable, as well as when the owner of a
vehicle with a readable license plate cannot be identified.
Unpaid toll revenue occurs when customers who are sent a toll bill
in the mail do not respond to first and second toll bills with 80 days
of the date of travel. While some portion of unpaid toll revenue will
likely be recovered through the civil penalty adjudication process
that begins after 80 days of non - payment, to be conservative, no
allowance for recovered toll revenue has been included in the net
revenue projections documented herein.
For scenarios without photo tolling, uncollectible revenue occurs
anytime a non - carpool vehicle without a transponder uses the lane.
This could be intentional scofflaws or accidental users. With fewer
payment options, demand is assumed to be lower for such scenarios,
and uncollectible revenue would be a larger share of the potential
revenue.
I- 405 /SR 167 Corridor Funding and Phasing Report
Other categories of revenue adjustments include various
fees. The Pay By Plate fee of $0.25 for Good To Go!
account customers without a transponder that are instead
identified by their license plate has already been included
in the gross traffic and revenue projections prepared
by CDM Smith. However, because drivers will need a
switchable transponder to declare their carpool status
and potentially receive a free trip, this analysis assumed
that most paying customers will choose the transponder
option, as opposed to other payment options, because they
will likely be eligible for a free trip at some point.
Toll statement rebilling fees have not been included in
the forecasted revenue adjustments at this time. If a Pay
By Mail customer's first toll bill goes unpaid, the second
bill will have a $5.00 rebilling fee added to the one or
more trips being invoiced. If the rebilling fees had been
factored in to the revenue adjustments, gross revenues
would have been about 1.5 percent higher over the
forecast period, with the revenue share slightly higher in
the early years because of lower average toll rates.
Adjusted Gross Toll Revenue refers to the amount of toll
revenue that would actually be collected after accounting
for the aforementioned revenue adjustments but before
considering the O &M costs discussed below.
Operations and Maintenance costs
Routine annual operations and maintenance (O &M) costs
include those for toll collections and for the highway
facility. Toll collection costs collectively include annual
expenditures for the following items.
• Credit card and banking fees — costs associated
with customer payment of tolls and account
deposits and refunds.
• Customer Service Center (CSC) costs — 1-405
SR 167 Corridor's share of these state -wide
vendor costs for systems software and operations,
which includes processing of toll trips for
payment, mailing toll bills, and other customer
communications.
• Roadway Toll Systems (RTS) — operations and
maintenance of the roadway toll systems (RTS)
hardware that identifies the beginning and end
of all toll trips as well as the applicable toll, and
transmits that data to the customer service center
Chapter 2: Carpool Policy
for processing.
• WSDOT Toll Division — I- 405'SR 167 Corridor's
share of the Toll Division's costs for management,
vendor oversight, marketing, and auditing, as well
as direct costs for toll bill printing and postage and
out -of -state driver license look -up fees.
• Washington State Patrol (WSP) enforcement
--- costs for enforcement efforts, which includes
expenditures for vehicle patrols and roadside
shoulder observation to monitor vehicle occupancy,
buffer violations and other traffic violations.
Enforcement costs are specific to the Eastside
Corridor and are not allocated over the entire
WSDOT toll system. Three levels of enforcement
costs were considered and applied to the toll scenarios
as follows.
1. The lowest level was applied to the photo tolling
scenarios with a constant carpool definition, e.g.,
Scenario D with 3 -+ carpools toll -free.
2. The mid -level cost was applied to the more
complex scenarios, including the $0.50 carpool
discount in Scenario B -2 and the variable carpool
definition by time of day under Scenario C.
3. The highest level of enforcement cost was applied
to the remaining scenarios that excluded photo
tolling, since without a Pay By Mail option,
non - carpools without transponders would be
violators, and patrol officers would have fewer
technological aids to ascertain for which vehicles
to check occupancy.
Facility operations and maintenance activities include the
routine annual activities for pavement repair, signage and
lighting, lane striping, litter pick -up, landscaping, and
other related roadway maintenance. These costs are not
unique to express toll lanes, but rather apply to the entire
highway corridor.
Until the majority of Phase 1 and Phase 2 corridor
construction is completed, facility O &M expenditures for
I -405 and SR 167 are assumed to be paid from existing
WSDOT maintenance funding sources in the same
manner as they are today.
Starting with FY 2022, when the majority of construction
is assumed to be completed for purposes of the traffic and
revenue projections, it was assumed that tolls would begin
to contribute a pro -rated share of the corridor facility
27
O &M costs. The Legislature would finalize this policy. In the case of a five -lane cross - section of highway
with two express toll lanes, it was assumed that tolls would contribute 40 percent of facility O &M costs.
Net toll revenues are calculated as adjusted gross toll revenues less the O &M costs described above. Net
revenue represents the cash flow available to support capital investments, which could include one or more
of the following: debt service on funds borrowed for up -front construction (toll financing). pay -as- you -go
construction funding where net toll revenues from completed toll sections contribute to the construction of
new sections, and/or periodic capital repair and replacement (R &R) costs.
Repair and Replacement costs
Non - routine, periodic repair and replacement (R &R) costs are divided into two categories: facility R &R and
toll collection R &R.
• Facility R &R costs include periodic, major highway repairs such as repaving. Projected facility
R &R costs are reported as the express toll lane pro -rated shares of the full corridor costs to isolate
the amounts assumed to be funded with tolls.
• Toll collections R &R costs include cost items related to periodic replacement or upgrades of the
RTS toll equipment and hardware and state costs associated with periodically re- procuring CSC
and RTS vendors.
Because these R &R costs represent capital replacement rather than routine, annual operating expenses, they
are shown as expenditures after the calculation of net toll revenues. In the case of a toll financing, certain
R &R costs may be required to be paid from toll revenues. In such cases, including for the SR 520 bridge
financing, R &R costs are paid from a reserve account that is funded by annual contributions from excess
(coverage) revenues left after paying debt service.
However, the initial financial modeling conducted by the Office of the State Treasurer and documented
in Chapter 3 of this report has taken a more conservative stance that assumed R &R costs would be paid
from toll revenues prior to paying debt service, resulting in a smaller amont of net revenues to leverage for
financing.
Early year net revenue performance findings
This study prepared net revenue projections for the first eight years of operations for the carpool scenarios
described in the previous sections. Figure 13 presents the estimated net revenues for the early years of each
scenario and uses green circles to indicate which scenarios meet the legislative requirements. Appendix 2
contains more detailed tables related to these findings.
Projections for annual toll trips, gross revenues, revenue adjustments and O &M costs, and net revenues
before and after R &R costs through the year FY 2055 are shown in traffic and revenue (T &R) tables for
each scenario in the Appendices.
s
WI; Washington State
28 Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Net revenue projections for I- 405 /SR 167 express toll lanes
In millions of dollars, assumes Renton to Bellevue section opens 1/1/2022
Fiscal
Year
2016
2017
2018
2019
2020
2021
2022
2023
Fiscal
Year
2016
2017
2018
2019
2020
2021
2022
2023
Fiscal
Year
2016
2017
2018
2019
2020
2021
2022
2023
Scenario A - 2+ Carpool Free 1 Photo Tolling
Toll Toll -
Trips Free Trips
Potential
Gross Toll
Revenue'
Adjusted
Gross Toll
Revenue'
Less:
Operations &
Maintenance
Costs'
Net Toll
Revenue
(before R &R)
2.4 M
7.8 M $2.8 M
3.9 12.2 4.7
$2.6 M
4.3
($5.0 M)
(6.4)
(52.4 M)
4.5 13.7 5.6 5.2 (7.1)
4.7 14.0 6.1 5.6 (7.3)
4.9 14.1 6.6 6.1 (7.6)
52 14.3 7.2 6.6 (8,0)
10.4 28.3 22.0 20.2 (19.4)
18.3 50.9 44.1 40.5 (27,5)
(2.0)
(1.7)
(1.5)
(1,4)
0.9
13.0
Scenario B - $1.00 Carpool Discount
Full Discount Potential Adjusted
Toll Toll Gross Toll Gross Toll
Trips Trips Revenue' Revenue'
Less:
Operations &
Maintenance
Costs'
Net Toll
Revenue
(before R &R)
3.1 M 10.2 M $3.9 M $3.3 M
(56.2 M) (52.8 M)
3.9 12.7 5,3 4.5 (6.9) 2.4
43
4.5
4.5
4.8
10.5
19.1
14.1
15,4
16.8
18.4
28.5
45.7
6.3
7.0
7.9
8.9
35.7
77,7
5.3
6.0
6.7
7.5
30.4
66.0
(7.4)
(7.8)
(8.3)
(9.0)
(19.1)
(25.9)
Scenario B -2 - $0.50 Carpool Discount 1
Photo Tolling
Full Discount Potential Adjusted Less: Net Toll
Operations &
Toll Toll Gross Toll Gross Toll Revenue
Trips ' Trips Revenue' Revenue' Maintenance (before R &R)
Costs'
4.1 M
4.7 M $6.9 M
5.2 6,0 9.3
$6.4 M
8.5
($5.9 M)
(6.7)
$0.4 M
6.0
7.0
8.0
9.3
16 0
26.4
6.9
8.4
10.1
122
18.4
29.1
11.2
13.5
16.3
19.6
46.5
88.4
10.3
12.5
15.0
18.0
42.7
81.3
(7.6)
(8.5)
(9.6)
(11.1)
(22.5)
(30.5)
2.7
4.0
5.4
7.0
20.2
50.8
Toll
Trips
Scenario D - 3+ Carpool Free 1 Photo Tolling
Toll -
Free Trips
Potential
Gross Toll
Revenue'
Adjusted
Gross Toll
Revenue'
Less:
Operations &
Maintenance
Costs'
Net Toll
Revenue
(before R &R)
5.0 M 1.3M $5.3M 54.9 M (54.6 M) $0.3 M
7.9 2.1 9.0 8.3 (5.8)
IMP
9.0
9.2
9.5
9.7
21.2
39.1
23
2.3
2,4
2,4
7.3
15,3
10.8
11,7
126
13.6
44.2
91.1
9.9
10,8
11.6
12.5
40.5
83.7
(6.4)
(6 5)
(6.7)
(7.1)
(19.3)
(28.3)
3.5
4,3
4.9
5.5
21.2
55.4
Toll
Trips
Scenario C - 2+ Carpool Free Off -Peak 1
3+ Carpool Free Peak 1 Photo Tollin-
Potential Adjusted Less:
Toll Operations &
Gross Toll Gross Toll
Free Trips Maintenance
Revenue Revenue'
Cost?
Net Toll
Revenue
(before R &R)
4.4 M 3.5 M $4.9 M $4.5 M ($5.0 M) ($0.5 M)
7.1 5.5 8.2 7.6 (6.4)
8.0
8.3
8.5
8.7
18.2
32.8
6.1
6.2
6.3
6.3
14.5
27.7
9.9
10.8
11.8
12.8
40.8
83.7
9.1
10.0
10.8
117
37.5
76.9
(7.1)
(7.2)
(7.4)
(7.8)
(19.8)
(28.7)
2,1
2.8
3.4
3,9
17.7
48.2
NOTES:
' Year of collection dollars. toll traffi: and gross potential revenue projections
prepared by CDM Smith.
a Adjusted for potential uncollectible revenue. Excludes rebilling fees.
Includes facility O &M costs start ng I n FY 2022, plus toll collection costs and
credit card fees in all years.
11/13/2013
Figure 13: These tables summarize express toll lane trips, adjusted gross revenues, O &M costs, and net revenues for
the five main toll scenarios (Scenarios A, B. B -2, C and D) during the first eight years of toll operations. This analysis
assumes that Phase 2, which includes 1 -405 express toll lanes between Renton and Bellevue, as well as the SR 167
HOT lane operations, will open to tolling in mid FY 2022, or approximately six years after the opening of Phase 1
between Bellevue and Lynnwood. Analysis for scenarios E and F (3+ Carpool Free without photo tolling) is available in
Appendix 2.
Chapter 2: Carpool Policy 29
Scenarios that meet net
revenue requirements
Scenario name
A 2+ carpool free
B $1.00 carpool discount
Scenarios
moving
forward
B -2 $0.50 carpool discount
C 3+ carpool free peak/
2+ carpool free off -peak
D 3+ carpool free
Only three of the remaining scenarios
evaluated meet the legislative requirement
of positive net revenue within two years of
opening.
Washington State
30 Wil; Department of Transportation
2+ carpool free and $1.00 discount scenarios do not
meet net revenue requirements
Of the toll scenarios studied, two scenarios — Scenario A (2 carpool
free) and Scenario B ($1.00 carpool discount) —do not meet legislative
requirement of positive net revenue by the end of the second year of Phase
1 operations.
Scenario A, in which 2+ carpools would ride for free, does not result
in a sufficient number of revenue - generating vehicles to offset the fixed
and variable costs of toll collection. For example, these costs include
carpool detection in order to exempt vehicles with two or more occupants.
Scenario A is not predicted to have positive net revenues until Phase 2
opens in mid FY 2022.
Scenario B assumes that all two- person or greater carpools would be
offered a $1.00 discount. Because in the early years, there are many
times of day in one or both travel directions in which the minimum toll of
$0.75 is in effect, carpools subject to a $1.00 discount would pay nothing.
Similar to Scenario A, Scenario B's high volumes of effectively toll -free
use does not result in a sufficient number of revenue - generating vehicles
to offset the fixed and variable costs of toll collection in the early years.
Scenario B also would not meet the positive net revenue requirement
until mid FY 2022 when Phase 2 opens. Once Phase 2 opens, Scenario B
is projected to generate significantly more net revenue than Scenario A
because of its higher number of toll - paying trips.
Remaining carpool scenarios meet net revenue
requirements
The three remaining carpool scenarios — Scenario B -2 ($0.50 discount),
Scenario C (3+ carpool free peak/2+ carpool free off -peak) and Scenario D
(3 + carpool free)— would meet the legislative requirements.
Because everyone would pay some amount under Scenario B -2, the
predicted toll revenues are sufficient to offset the operating costs and yield
positive net revenues of $1.8 million for FY 2017.
Scenario C strikes a balance between carpool exemptions and revenue
generation by allowing two- person carpools to travel toll -free in off -peak
times while allowing only carpools to travel for free when both carpool
and non - carpool demand is high during the morning and afternoon peak
periods. This scenario would generate about $1.2 million in FY 2017.
Scenario D, in which only 31 - carpools are exempt from tolls. generates
the most net revenue early on, with $2.5 million expected for FY 2017.
I- 405 /SR 167 Corridor Funding and Phasing Report
Summary of Carpool Scenarios
As discussed earlier in this chapter, WSDOT conducted both quantitative and qualitative assessments, which
include a number of different factors, when comparing the carpool scenarios. WSDOT presented the EAG
with its analysis of several factors related to carpool policy, as shown in Figure 14.
In this analysis, the 2+ carpool free scenario poses the greatest challenges in each of the categories
evaluated, notably the two performance criteria set by the state Legislature: system reliability and initial
net revenue. The $1.00 discount scenario met the traffic performance criteria but did not meet the revenue
requirement. The 3+ carpool free scenario would pose the fewest challenges across the board. aside from
in the public acceptance category. However, many stakeholders, including the EAG, also consider public
acceptance to be important to the success of the system.
After accounting for the traffic and net revenue findings described in this chapter, three scenarios remained
viable for consideration: B -2 ($0.50 carpool discount), C (3+ carpool free peak/2- carpool free off -peak)
and D (3+ carpool free).
• ID
Good/ Somewhat Poor/
Easy easy/hard Hard
A.
A.44 Carpool
Free
B.
zpp+ Carpool
9"P Discount
C. a+
414 Peak Free
z. Off -Peak Free
D.
Carpool
Free
System reliability/
Operations
Toll Rates /Pricing
Initial Net Revenue
Public acceptance
Usability
Enforcement
000•so
$1 0.50
401
0 1 •
0 I
C 1 0
I
ID 1 C
410
C
I)
ID
: -a;
ii
®
C
0
411)
Regional operations/
Future derision
I
I)
0
Figure 14 This table summarizes the ratings for the five primary carpool scenarios in each of the categories that
WSDOT considered. Good performance in the "system reliability/operations" and "initial net revenue" categories
is key to meeting legislative requirements.
Chapter 2: Carpool Policy 31
EAG Carpool Recommendation:
3+ carpool free peak/2+ carpool free off -peak
After extensive analysis of traffic performance modeling, net revenue estimates and public opinion expressed in focus
groups, the EAG reached a consensus recommendation to support Scenario C (3+ carpool free peak/2+ carpool free
off - peak).
Several members of the group recognized that ultimately a 3+ carpool definition is necessary. However, the group
decided that Scenario C's hybrid approach would best accomplish the Legislature's direction while providing some
benefit to two- person carpools. This option meets both the traffic and revenue benchmarks while easing the public's
transition to a 3+ carpool system. The group formalized its recommendations in a November 2013 letter to WSDOT
Secretary Lynn Peterson and members of the Washington State Transportation Commission (see Appendix 3 for full
letter). Figure 15 shows the signatories of this letter.
Excerpt from EAG interest letter
As representatives to the 1- 405 /SR 167 Executive
Advisory Group, we are writing to convey our
shared support and consensus of Scenario C (3+
Carpool Free Peak/2+ Carpool Free Off - peak).
Consistent with performance measures outlined
in RCW 47.56.880, WSDOT staff developed six
scenarios related to carpool requirements for the
1 -405 express toll lanes in the northern segment
(Bellevue to Lynnwood), now under construction
and scheduled to open in 2015. This decision
will also potentially inform policy for the unfunded
southern segment (Bellevue to Renton). Scenario
C would allow 3+ carpools to travel for free in
the express toll lanes during peak hours and 2+
carpools to ride for free at off -peak times. Transit,
registered vanpools and 3+ carpools would
ride for free at all times. This innovative hybrid
approach appears to best meet the Legislature's
direction, as it meets both traffic and revenue
benchmarks while easing the public's transition
to a 3+ carpool system.
Figure 15: Members of the 2013 I- 405 /SR 167
Executive Advisory Group signed an interest
letter in November 2013 to WSDOT and WSTC
endorsing carpool policy and funding and phasing
recommendations.
� Washington State
32 �/i Department of Transportation
Joan McBride
—_ Mayor of Kirkland
Kevin Wallace
Bellevue City Councilmember
Jim Haggerton
Mayor of Tukwila
David Hill
J Mayor of Algona
x
Dave Enslow
Mayor of Sumner
Peter Lewis
Mayor of Auburn
Rich Crispo
Mayor of Newcastle
Fred Butler
Sound Transit Board Member
Harold Taniguchi
King County
Carol Thompson
Community Transit
Dave Gossett
,, . / Snohomish County Councilmember
Puget Sound Regional Council
I- 405 /SR 167 Corridor Funding and Phasing Report
Phase 2 of the 40 -mile system
Legend
— — — Auxiliary lane
Express toll lanes
rDirect connector
Figure 16. Phase 2. which covers roadway
improvements between Renton and Bellevue,
is largely unfunded.
Although Phase 1 is fully funded and under construction, the details of the
funding and phasing plan for implementing Phase 2, illustrated in Figure
16, have not yet been settled.
However, it is clear that tolls alone cannot provide the necessary
funding for the timely implementation of the Phase 2 projects. In fact,
the funding plan for completing Phase 2 hinges on the provision of new
state transportation funding legislation in concert with toll funding as
some combination of toll bond financing for up front construction and/or
incremental pay -as- you -go funding.
Express Toll Lane
Financing Challenges
As described in earlier chapters, the price to use the express toll lanes will
vary dynamically to reflect the time savings and reliability that they provide
relative to the general purpose lane traffic conditions. This approach seeks
to balance the demand for express toll lanes with the available lane space in
order to maintain speeds of 45 miles per hour or greater at least 90 percent
of the time.
Because the decision to use the lanes can be very sensitive to small changes
in the performance of the adjacent general purpose lanes, express toll
lane projects have higher day -to -day demand and revenue volatility than
traditional toll roads. This potential for wide swings in managed lane usage
makes it difficult to accurately predict express lane traffic and revenues.
For many drivers, the choice to use the lanes is highly situational and price
sensitive, even if the travel time savings are relatively consistent day to
day. Although some users will be regular customers, many will choose to
use the lanes only on occasions when they highly value arriving on time or
having a predictable travel time, such as for an appointment or an important
meeting. As such, a good portion of the customers will be a different people
day to day, where those with a high situational value of time will opt to
pay. These uncertainty factors create a relatively high degree of skepticism
among investors and credit rating agencies when they evaluate the traffic
and revenue projections of express toll lane facilities.
Chapter 3: Financing, Funding and Phasing 33
Recent reports on managed lanes financing
Fitch Ratings and Moody's Investors Service both published reports in 2013 on priced managed lanes that struck a
cautionary tone regarding the unique risks and benefits compared with traditional tolling. The May 9 Moody's report
notes that there is very limited history and national experience with the financing of price managed lane projects, with
"little operating data to help guide us on the ramp up and demand scenarios for what is a highly discretionary, but
desirable service." Moody's notes that for many such projects: "Pricing is designed to meet a speed and congestion
threshold, not revenue maximization. This model is not compatible with the use of standard rate covenants that protect
investors when traffic and revenue is below expectations." This statement suggests that there is limited ability to increase
tolls if revenues are insufficient to meet obligations.
The November 7 Fitch report notes that every project is unique, with traffic performance that is inherently volatile,
making it difficult to develop comparison benchmarks. Fitch expects managed lanes to generate the vast majority of
revenue during peak and peak shoulder periods because of their role as an alternative to congestion. In evaluating price
managed lane projects, Fitch applies more conservative (pessimistic) assumptions to several inputs to evaluate risk
within the traffic and revenue forecasts. These downside sensitivity tests tend to be more stringent than those used for
regular toll facilities.
Both Fitch and Moody's acknowledge that there is limited national market experience with financing express toll lane
projects. Less than a dozen express toll lane projects nationally have used toll bonds that achieve an investment -grade
credit rating in combination with other funding sources to pay for their implementation. With the exception of SR 91
in Orange County, Calif., these examples are still in the early stages of their debt amortization, and several have not
yet started revenue operations. More than half of the relevant examples also involve public - private partnerships with
private equity and or a U.S. Department of Transportation- subsidized TIFIA loan as part of the funding, such as the I -495
Express project in Virginia.
TIFIA loan analysis
If a USDOT TIFIA loan application is successful, the loan can be used in place of a portion of standalone toll revenue
bonds. Shifting some of the traffic and revenue risk to the TIFIA loan may serve to bolster the creditworthiness of the
toll bonds by effectively providing them with higher debt service coverage. In addition, TIFIA loans can be structured to
defer some of the early -year interest and, principal payments when the project is in ramp -up status and produces lower
initial revenues.
Until there is substantially more industry experience in financing and operating express toll lane facilities, only
the strongest projects may be able to obtain investment -grade credit ratings on toll revenue bonds. Compared with
conventional toll roads, the investment community will likely continue to apply conservative financial assumptions and
analysis methods, including:
• Higher debt service coverage ratios;
• Additional liquidity; and
• The ability to withstand more stringent discounting of input assumptions and revenue projections.
34 Department of Transportation %/ I- 405 /SR 167 Corridor Funding and Phasing Report
Financial Analysis by Office of the State Treasurer
Assumptions
In 2013, WSDOT worked with the Office of the State Treasurer to evaluate potential toll financing options and assess
their financial capacity to contribute to up -front construction funding. OST and their financial advisor analyzed two
different debt structures: standalone toll revenue bonds and toll- backed general obligation (GO) bonds. Figure 17
shows the key features of each type of bonds.
Standalone Toll Revenue Bonds
Toll- backed
General Obligation (GO) Bonds
Tolls are the only source of funds pledged to debt
repayment.
With the full faith and credit of the state behind the bonds,
the state pledges to repay the debt with other sources
(e.g., motor vehicle fuel tax revenues if toll revenues are
insufficient).
Traffic and revenue risk is transferred to and borne by The state retains traffic and revenue risk.
the investors.
Higher investor risk = higher cost credit, higher debt
service coverage and /or reserves, and thus, less toll
funding.
Lower investor risk = lower cost credit, lower debt service
coverage, and thus, more toll funding
Figure 17: Comparison of debt structures analyzed by OST.
Although OST evaluated both types of debt structures in their financial capacity analysis, they expressed strong
concerns about the viability of using standalone toll revenue bonds for express toll lanes in today's market, given the
aforementioned risks and uncertainty issues.
Because toll- backed general obligation bonds only transfer revenue forecast risks to the state rather than mitigate
them altogether, OST opted to use conservative financing assumptions in their financial capacity analysis.
Figure 18 summarizes the financing assumptions by debt structure type. Debt service coverage is the factor or
multiple by which the annual net revenues available for principal and interest payments (debt service) exceed annual
debt service costs. The debt service coverage assumptions in this table are the minimum values.
Of particular note are the OST timing assumptions that revenue operations would be delayed one year and that toll
funding would be needed as early as FY 2017. If other funding could be obtained for the early years of Phase 2
construction, delaying the need for toll bond proceeds until FY 2019 or later, the toll funding contribution would
increase by reducing capitalized interest costs. Similarly, keeping to the construction schedule to allow tolling to start
on time would have a similar effect, reducing capitalized interest costs and increasing the toll funding contribution.
Chapter 3: Financing, Funding and Phasing 35
Assumption
Standalone Toll Revenue Bonds
Toll- backed GO Bonds
Credit rating
BBB
AA+
Interest rates
7.50 - 7.85%
5 50 -6.00%
Debt service coverage 2.5x
2.0x; 1.3x as a sensitivity test
R &R costs
Funded from tolls ahead of debt service' Funded from tolls ahead of debt service'
Maximum maturity 25 years
25 years2
Funding availability FY 2017 -22
FY 2017 -22
Start of tolling
Delayed one year to mid FY 2023 (111/23) Delayed one year to mid FY 2023
(1/1/23)
Figure 18 Assumptions for each bonding type analyzed by OST
OST tested paying for R &R costs both with and without a pre - funded reserve account and found that the difference in
financial capacity was negligible because in both cases, tolls paid for R &R costs in advance of debt service.
2 The state constitution allows for state - backed debt maturities of up to 30 years.
Financial Results
OST's financial analysis focused on three of the WSDOT toll scenarios:
• Scenario A (2+ carpool free)
• Scenario C (3+ carpool free peak/2+ carpool free off -peak)
• Scenario D (3+ carpool free)
OST also analyzed Scenario F, the Washington State Transportation Commission's independent analysis
case for 3+ carpool free, as the "high bookend" for comparison purposes. This case did not include the photo
tolling policy assumption, as described in more detail in Chapter 1 of this report.
OST's analysis preceded the development of Scenario B -2 ($0.50 carpool discount): however, its financial
capacity would likely be similar to that of Scenario D, based upon its net revenues. which start out slightly
lower but exceed those of Scenario D by FY 2027.
Figure 19 summarizes the financial capacity for three representative cases for the various combinations of
financing assumptions analyzed by OST. The three cases are:
• Standalone toll revenue bonds with a BBB credit rating, 2.5x minimum debt service coverage,
ascending debt service, and R &R paid from a pre- funded reserve account ahead of debt service;
• Toll - backed general obligation bonds with the state's AA 4 credit rating, 2.0x minimum debt service
coverage, level debt service after FY 2031, and R &R paid from a pre - funded reserve account ahead of
debt service; and
• Toll- backed general obligation bonds as above except with 1.3x minimum debt service coverage.
Scenario A, in which 2 . carpools travel toll -free at all times, does not yield substantial toll funding,
regardless of what financing assumptions are applied. Even under the most optimistic assumption of
ascending debt service paired with the toll- backed general obligation bonds at 1.3x coverage (not shown in
Figure 19), potential toll funding would still fall short of $100 million.
im • Washington State
36 -J' Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Scenarios C and D, which allow fewer vehicles to travel toll -free, would provide substantially more
potential toll funding. Scenario C, the Executive Advisory Group's recommendation, would potentially
yield $215 million with stand -alone toll revenue bonds at 2.5x debt service coverage. With toll- backed
general obligation bonds, Scenario C would potentially yield $390 million with 2.0x coverage and $595
million with 1.3x coverage. Delaying the receipt of the toll bond proceeds by a year or two, delivering the
Phase 2 projects on time, and/or structuring the debt with ascending debt service could potentially increase
the amounts shown in Figure 19.
The highest toll funding amounts with 1.3x coverage, shown in the blue bars of Figure 19, are intended to
be optimistic bookends, and may represent a higher level of traffic and revenue risk than the state would
be willing to bear. However, this financing case still serves a useful purpose as a proxy for a more realistic
alternative case. This case would combine toll- backed general obligation bonds at the 2.0x coverage funding
levels (shown by the green bars) with a USDOT TIFIA loan, leveraging additional net toll revenues to bring
the aggregate debt service coverage level down to 1.3x.
Potential Toll Funding by Toll Scenario and Debt Structure Option
Millions of dollars
900
Standalone Toll Revenue Bonds (2.5x DSCR /Ascending Debt Service /BBB /7.50- 7.85 %)
800 Toll- Backed General Obligation Bonds (2.0x DSCR /Level Debt Service /AA +/5.50- 6.00 %)
700 L ToII-Backed General Obligation Bonds (1.3x DSCR /Level Debt Service /AA +/5.50 - 6.00 %)
600 _
500 -
400 -
300
200 -
100
0
Scenario A
2+ Carpool Free
Photo Tolling
Scenario C
3+ Carpool Free Peak/
2+ Carpool Free Off -Peak
Photo Tolling
Scenario D
3+ Carpool Free
Photo Tolling
Scenario F
3+ Carpool Free
(WSTC Independent
Forecast by CS)
Figure 19. This chart illustrates OST's preliminary findings about the potential funding available from four different
carpool scenarios and three different debt structure options. Of the options considered by the EAG, Scenarios C
and D show the greatest funding potential.
Chapter 3: Financing, Funding and Phasing 37
Preliminary Findings
In their preliminary financial analysis, OST shared with WSDOT several observations and findings:
• OST expressed concern that standalone toll revenue bonds are not viable at this time because of the high
level of risk. Toll- backed GO bonds would likely need to draw on traditional (motor vehicle fuel tax)
revenues.
• As previously acknowledged, OST notes that toll revenues alone are insufficient to fully finance
construction of the $1.175 billion Phase 2 express toll lanes project (Renton to Bellevue) under any toll
or financing scenario.
• OST notes that interest rates have risen by more than 1.25 percentage points since their analysis in late
spring 2013, putting downward pressure on the toll funding estimates.
• Toll revenues will be limited until the Renton to Bellevue extension opens (assumed in the traffic and
revenue forecasts to be in mid FY 2022), and the start date could be vulnerable to construction delays.
• Nationwide, express toll lane toll revenue bond financing is limited. Among the dozen or so examples,
three recent financing efforts are of interest:
• SR 91 Express Lanes Extension, Riverside
County, Calif. --- $174 million in public toll
bond financing backed only by tolls, a $421
million TIFIA loan and $716 million from other
non -toll funding sources;
• I -10, Harris County, Texas — $255 million in
public toll bond financing backed by pooled
revenues from a system of toll roads; and
• I -495, Virginia — public - private partnership
with $589 million in private activity toll bonds.
a $589 million TIFIA loan and $890 million
from other non -toll funding sources.
SR 91 express lanes in California
• Experience from a functioning Bellevue to Lynnwood express toll lane system will provide valuable
information about the predictability, volatility and reliability of express toll lane revenues.
• Level debt service structuring for the outer forecast years reduces the financing risks associated with
reliance on revenue growth.
• A TIFIA loan may be an option for partial financing, as the program was designed for projects in need
of credit enhancement. However, recent tightening of credit quality requirements for TIFIA applicants
may reduce the potential benefits of a TIFIA loan's favorable terms.
• Finally, the state should identify other construction funding sources so as to rely less on express toll lane
revenues financed for up -front construction to complete the 40 -mile system and to use more pay- as -you-
go revenue to cover ongoing system operating expenses and construct additional improvements.
ANIL
• Washington State
38 -I! Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Funding and Phasing Options for Phase 2
The 2009 Eastside Corridor Tolling Study recommended Study Option 4 for implementation in two
phases. Although Phase 1, which builds express toll lanes from Bellevue to Lynnwood on the north end of
I -405, received full funding primarily from the 2003 and 2005 gas tax packages, Phase 2 remains largely
unfunded.
Since that report, WSDOT has reviewed and updated the project cost estimates and timelines for Phase
2. WSDOT completed a Cost Estimate Validation Process (CEVP) to evaluate the costs, risks and
opportunities associated with the original Phase 2 projects and revised the project costs, as shown in the
table below. In addition, identifying program savings to fund engineering and right -of -way acquisition
for the Direct Connector project has helped to reduce program needs. WSDOT reviewed the Renton to
Bellevue project to identify component elements, as reflected in Figure 20.
Pha
e
gIL��
Renton to Bellevue
One lane between NE 6th Street and SR 167
(accommodates N. 8th)
1-405 - 112th Ave. SE to 1 -90 auxiliary lanes
NE 6th Street Extension
I- 405 /SR 167 Direct Connector
Total cost
_i
$675 m
$175 m
$40 m
$285 m
$1,175 m
Figure 20: Phase 2 has a funding need of $1,175 million (calculated
assuming 2017 construction start).
The major work of this project would
build a new express toll lane between
SR 169 in Renton and NE 6th Street in
downtown Bellevue. WSDOT will also
convert the existing carpool lane to an
express toll lane to create a dual lane
express toll lane system.
WSDOT also evaluated how to fund
and phase the remaining elements
listed in Figure 20. The 1-405 SR 167
Direct Connector remains a vital link
to creating a robust 40 -mile system
of express toll lanes. Other important
elements include building auxiliary
lanes near the I -90 interchange and extending the NE 6th Street eastward across I -405, providing greater
accessibility to and from downtown Bellevue directly into the new express toll lanes.
Overview of Three Funding Options
During the EAG meeting process, WSDOT developed three funding and phasing options that build toward the
Option 4 improvements selected through the 2009 study:
High traditional funding
Relies on gas tax or other traditional revenues for 100 percent of the project funding ($1.175 billion).
Medium traditional funding
Relies on gas tax or other traditional revenues for $960 million of the $1.175 billion needed. The
remaining $215 million would come from toll revenues (toll- backed general obligation bonds or pay -
as- you -go).
Low traditional funding
Relies on gas tax or other traditional revenues for $675 million of the $1.175 billion needed. The
remaining $500 million would come from toll revenues (toll- backed GO bonds or pay -as- you -go).
Chapter 3: Financing. Funding and Phasing 39
High Traditional
Funding Option
• Uses traditional funding sources, such as gas tax
revenues, to fund all of the elements to complete
the full 40 -mile system envisioned in the 2009
study.
• Would build all of the project elements at one time,
with an assumed opening date of 2022.
• Would not rely on any toll revenue to finance
these projects. Pay -as- you -go financing of future
improvements in the I -405 corridor would be
possible with the accumulated toll revenue.
• Would generate approximately $500 million in toll
revenues by fiscal year 2028 to use toward future
improvements (assuming 3 carpool free definition
and 2017 construction start).*
High Traditional Funding Option:
Project Costs and Funding
Costs
Renton to Bellevue
One lane between NE 6th Street and
SR 167 (accommodates N 8th)
$675 million
I- 405 /SR 167 Direct Connector $285 million
1-405 - 112th Ave. SE to 1 -90 $175 million
auxiliary lanes
NE 6th Street Extension
Total Cost
$40 million
$1,175 million
Funding
Total State Funding $1,175 million
Funding gap $0 million
(to be supplied from tolls)
* The 3- carpool free definition was used for discussion
purposes and to provide a basis of comparison for the funding
options. The EAG ultimately selected Scenario C, the 3+
carpool free peak/2+ carpool free off -peak option, which will
take slightly longer to accumulate the needed revenues.
A
WIZ Washington State
40 Department of Transportation
Legend
— — — Auxiliary lane
• Express toll lanes
Direct connector
PUYALLUP
I- 405 /SR 167 Corridor Funding and Phasing Report
Legend
Auxiliary lane
Express toll lanes
Direct connector
Funded
Unfunded
PUYALLUP
Medium Traditional
Funding Option
• Uses traditional funding sources to fund $960
million of the Renton to Bellevue project and the
SR 167 Direct Connector. These components are
assumed open to traffic by 2022.
• There would be two options available to fund the
remaining project elements (shown in orange),
which are the auxiliary lanes and NE 6th Street
extension:
• Use toll- backed GO bond financing to fill
the $215 million funding gap and build
improvements by 2022.
• Use pay -as- you -go financing to fill the funding
gap. The revenue to build these project
elements is projected to be available by FY
2026 (assuming a 3+ carpool free definition
and 2017 construction start).*
Mediutn Traditional Funding Option:
Project Costs and Funding
Costs
Renton to Bellevue
One lane between NE 6th Street and
SR 167 (accommodates N. 8th)
I- 405 /SR 167 Direct Connector $285 million
1-405 - 112th Ave. SE to 1 -90 $175 million
auxiliary lanes
NE 6th Street Extension $40 million
Total Cost $1,175 million
$675 million
Funding
Total State Funding $960 million
Funding gap $215 million
(to be supplied from tolls)
* The 3-+ carpool free definition was used for discussion
purposes and to provide a basis of comparison for the funding
options. The EAG ultimately selected Scenario C, the 3+
carpool free peak/2+ carpool free off -peak option, which will
take slightly longer to accumulate the needed revenues.
Chapter 3: Financing, Funding and Phasing 41
Low Traditional
Funding Option
• Uses traditional funding sources to fund $675
million of the Renton to Bellevue project. This
basic system could open to traffic by 2022.
• Would not include the Direct Connector, auxiliary
lanes, and NE 6th Street extension in early
construction.
• There would be two options available to fund the
full 40 -mile system:
• Use toll- backed GO bond financing to fill the
$500 million funding gap when feasible.
• Use pay -as- you -go financing to fill the gap.
Toll revenue to build the Direct Connector is
projected to be available in FY 2027, and the
revenue for remaining work to complete Study
Option 4 is projected to be available in FY
2031 (assuming a 3 carpool free definition
and 2017 construction start).*
Low Traditional Funding Option:
Project Costs and Funding
Costs
Renton to Bellevue
One lane between NE 6th Street and
SR 167 (accommodates N. 8th)
I- 405 /SR 167 Direct Connector
1-405 - 112th Ave. SE to 1 -90
auxiliary lanes
NE 6th Street Extension
Total Cost
$675 million
$285 million
$175 million
$40 million
$1,175 million
Funding
Total State Funding $675 million
Funding gap $500 million
(to be supplied from tolls)
* The 3+ carpool free definition was used for discussion
purposes and to provide a basis of comparison for the funding
options. The EAG ultimately selected Scenario C, the 3+
carpool free peak/2+ carpool free off-peak option, which will
take slightly longer to accumulate the needed revenues.
42 .7Washington State
/7 Department of Transportation
Legend
Auxiliary lane
Express toll lanes
Direct connector
Funded
Unfunded
PUYALLUP
I- 405 /SR 167 Corridor Funding and Phasing Report
EAG Funding and Phasing Recommendation:
Medium Traditional Funding Option
The EAG reached a unanimous consensus that the funding and phasing of the Renton to Bellevue express toll lanes
needs to occur as soon as possible. The group expressed a preference for the high traditional funding option but
recognized that competing state priorities exist.
With that recognition, they recommended the medium traditional funding option because it allows construction of
the Renton to Bellevue express toll lanes and the I- 405/'SR 167 Direct Connector. If bond financing becomes necessary
to complete the 40 -mile system, the group urged WSDOT to seek additional bonding authority from the Legislature to
ensure the option of using state - backed debt (toll- backed GO bonds). This approach reduces the financing cost to the
public but does require the state to bear the traffic and revenue risk.
Excerpt from EAG interest letter
There was unanimous consensus that the
phasing of the Renton to Bellevue express toll
lanes needs to occur as soon as possible.
While we prefer the "high traditional funding'
option we realize there are competing state
priorities. Fully funding the Renton to Bellevue
express toll lanes and the I- 405 /SR 167 Direct
Connector ramp from gas tax revenues and
related gas tax- backed bonds if needed will allow
the projects to be built as quickly as possible.
This option also provides a revenue stream, via
toll revenue collected from express toll lanes,
to fund future Master Plan improvements.
Understanding that the "high" funding option
represents a large allotment of resources, we
recommend the "medium" traditional funding
option, which allows construction of the Renton
to Bellevue express toll lanes. If bonding
becomes necessary to complete the 40 -mile
system, we urge WSDOT to seek additional
bonding authority from the Legislature to ensure
the option of using triple- backed bonds, which
are often more affordable to the public.
Figure 21: Members of the 2013 I- 405 /SR 167
Executive Advisory Group signed an interest
letter in November 2013 to WSDOT and WSTC
endorsing carpool policy and funding and phasing
recommendations. The full letter is available in
Appendix 3.
Joan McBride
—__. Mayor of Kirkland
Kevin Wallace
Bellevue City Councilmember
Jim Haggerton
Mayor of Tukwila
David Hill
Mayor of Algona
Dave Enslow
Mayor of Sumner
Peter Lewis
MayorofAubum
Rich Crispo
' Mayor of Newcastle
Fred Butler
--Sound Transit Board Member
0-a4
Harold Taniguchi
King County
Carol Thompson
Community Transit
Dave Gossett
p� Snohomish County Councilmember
40,0 /�� Puget Sound Regional Council
Chapter 3: Financing. Funding and Phasing 43
e
Public Involvement Process
Legislature /Governor
Figure 22: In developing this report, WSDOT
consulted with key corridor stakeholder groups,
conducted an array of briefings, and corresponded
with members of the public
�Washington State
44 �!/ Department of Transportation
Throughout 2013, WSDOT conducted public and stakeholder
outreach to provide education and seek input about operating and
funding express toll lanes throughout the full 40 -mile I -405 SR 167
corridor.
Major outreach approaches included briefings with corridor
elected officials, city councils. transit agencies, businesses and
civic organizations; ongoing correspondence with interested
citizens; and focus groups about carpool policy. Figure 22
illustrates this process.
What were the goals of the public
involvement process?
Through outreach to stakeholder groups and the public, WSDOT
sought to:
• Solicit input and build consensus among stakeholder groups
on key policy questions surrounding I -405 express toll lanes
carpool policy and funding and phasing for the 40 -mile express
toll lane system;
• Begin to educate the public about the benefits of and policy
decisions surrounding express toll lanes;
• Obtain market data on issues and barriers to support for express
toll lanes;
• Inform the Washington State Legislature and the Washington
State Transportation Commission as they conduct rate - setting
and set carpool policy for I -405 express toll lanes; and
• Support WSDOT in developing its funding and phasing
recommendations for the Governor and Legislature.
I- 405 /SR 167 Corridor Funding and Phasing Report
How did WSDOT reach the public?
Stakeholder advisory group meetings (EAG and IWG)
Continuing engagement with corridor communities has proven to be a highly
successful tool for achieving consensus and results in the I -405 SR 167
Corridor. WSDOT successfully used an Executive Committee process to
develop the I -405 Master Plan in 2002. In 2009, WSDOT convened the 1 -405
SR 167 Executive Advisory Group and Interagency Working Group for its
Eastside Corridor Tolling Study process. Work with these groups culminated
in the selection of a preferred option for I -405 express toll lanes.
Although EAG membership has changed over the years, some members have
participated since the Master Plan development. The 2013 EAG included state
legislators, mayors, council members and other elected representatives from
cities and counties from the length of the 1-405 SR 167 corridor. The group
also included representatives from the Federal Highway Administration,
Federal Transit Authority, Washington State Transportation Commission,
Puget Sound Regional Council, local transit agencies, and regional counties.
WSDOT hosted four public EAG meetings between January and November
2013 in Bellevue, Kirkland and Renton. Craig Stone, Toll Division Assistant
Secretary, chaired the group, representing the Transportation Secretary.
WSDOT issued a press release before each meeting and publicized upcoming
meetings on its website. Each meeting included a period for verbal comments
from members of the public.
2013 Executive Advisory Group Membership
City of Algona
Mayor David Hill
City of Auburn
Mayor Pete Lewis
City of Bellevue
Councilmember Kevin Wallace
City of Bothell
Mayor Mark Lamb
Federal Highway Administration
Dan Mathis
Federal Transit Authority
Rick Krochalis
City of Kent
Mayor Suzette Cooke
King County
Harold Taniguchi
The EAG met four times in 2013 to review
key policy information and to reach a
consensus recommendation on carpool
policy, and funding and phasing for the
1-405 express toll lanes
City of Puyallup
Mayor Rick Hansen
King County Council City of Renton
Councilmember Reagan Dunn Councilmember Randy Corman
City of Kirkland Sound Transit
Mayor Joan McBride Board Member Fred Butler
City of Newcastle City of Sumner
Mayor Rich Crispo Mayor Dave Enslow
City of Pacific City of Tukwila
Vacant Mayor Jim Haggerton
Pierce County Council Washington State Transportation Commission
Councilmember Jim McCune Commissioner Charles Royer
Puget Sound regional Council! All corridor members of the Washington State
Snohomish County Council Legislature
Councilmember Dave Gossett
Chapter 4: Public Involvement 45
To complement the EAG work, WSDOT re- engaged the I -405 SR 167 Interagency Working Group,
composed of technical staff from local jurisdictions and transportation agencies. The IWG's primary role
was to assist the EAG members in remaining fully informed throughout the process. Prior to the first three
EAG meetings, WSDOT hosted an IWG meeting in which the team provided more detailed information on
the complex topics that would be discussed at the upcoming meeting. Before the final meeting. WSDOT
conducted one -on -one briefings as requested by stakeholders. WSDOT also conducted regular briefings
in between meetings with cities and transit agencies that compose the IWG, as well as other interested
businesses and organizations. Appendix 3 contains all of the meeting materials, including agendas,
summaries and presentations.
Government, business and civic outreach
In the months leading up to and throughout the Executive Advisory Group process, the I- 405 /SR
167 project team provided briefings to a large number of corridor elected officials, including six
state representatives, four state senators and seven mayors. The briefings also reached local civic
groups, such as the Bellevue Downtown Association, Eastside Transportation Association, Eastside
Transportation Partnership and Kirkland Rotary; and key businesses, such as Boeing and Microsoft. A
full listing of briefings is available in Appendix 3.
The briefings generally focused on project scope and schedule, financing and phasing options,
information about 1 -405 express toll lanes, and carpool and operational policies. The intention of these
briefings was to complement the EAG and IWG meetings and, in many cases, reach audiences who
were unable to attend these meetings.
Citizen correspondence
Between October 2012 and December 2013, the 1 -405 program received more than 50 comments or
inquiries specifically about I -405 express toll lanes or the Executive Advisory Group process via e-mail,
phone, or online comment forms. The primary themes of these communications were:
• Questions about occupancy requirements for free use of express toll lanes (carpool size,
motorcycles, two - seater cars, vanpools, transit)
• Questions about the EAG meeting schedule, roster and participation
• Comments about increasing the 21 carpool occupancy requirement to
3+
• Questions about Good to Go! pass requirements and
other logistics regarding how to pay to use the future
express toll lanes
• General questions about how express toll lanes work
and how they will affect levels of traffic congestion in
the general purpose lanes
WSDOT has created a number of print and online materials
to inform the public about express toll lanes and the
Executive Advisory Group process, including a project
construction folio mailed to about 12,000 households within
the Bellevue to Lynnwood project area during summer 2013.
� ▪ Washington State
/
46 �/ Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
Focus groups
As referenced in Chapter 2, WSDOT conducted four focus groups in spring
2013 to gather more information about public attitudes and awareness about
express toll lanes and proposed carpool policy changes.
The focus group moderators asked these groups their impressions of
congestion on I -405 and SR 167 and presented them with three carpool
options under consideration: 3-- carpools ride free; 3 carpools ride free at
peak times 2+ carpools ride free at off peak times: and all carpools receive a
$1.00 discount. Appendix 3 contains the full focus group moderator's guide
and summary report of findings.
1 -405 is not reliable during peak travel times
Most of the participants agreed that during afternoon peak travel times on
I -405, the carpool lanes were not as a fast as they expected them to be. were
not reliable for a faster trip, and were sometimes as slow as general purpose
lanes. Most of the participants also agreed during morning peak travel times.
the I -405 carpool lanes were slightly more reliable for providing a faster trip.
The SR 167 carpoolers thought that the SR 167 HOT lanes are more reliable
than carpool lanes on 1 -405.
On the topic of carpool policy, 4 of the 32 total participants said the 3+
carpool option was their first choice. They chose this option because
they liked the revenue benefit for completing projects more quickly and
understood existing overuse of carpool lanes. Most of the participants who
preferred this option were existing SR 167 HOT lane users who already
better understand the concept of managed lanes and their benefits.
Two - person carpools should retain some benefits
However, most participants believed there should be some benefit for two -
person carpools. As such, about one -third of the participants selected the 3+
carpool free at peak times/2+ carpool free at off -peak times option as their
preferred choice, and half of them listed this option as their second choice.
About half of the participants preferred the $1.00 discount option over the
other options. Some participants suggested an even larger discount would be
desirable, suggesting that the $0.50 cent discount developed and evaluated
after the focus groups by the I -405 SR 167 team would not generate much
public acceptance.
In general, participants wanted some advantage for two- person carpools.
However, participants with experience on the SR 167 HOT lanes were
more likely to prefer the 3+ carpool peak/2+ carpool off -peak option as
their first choice and the 3+ carpool free option as their second choice. This
information is consistent with WSDOT's 2009 focus groups, which found
that support for express toll lanes increases with use.
Focus Groups Profile
The two -hour focus groups, which
each had eight participants,
represented a mix of gender, age,
race, income and home locations.
The groups included the following
participants:
1. Good to Go! account holders
2. General 1-405 and SR 167 users
3. 1-405 carpoolers /vanpoolers/
transit users
4. SR 167 carpoolers /vanpoolers/
transit users
Previous research
As part of its 2009 study,
WSDOT conducted four
focus groups, an online
survey and statistically valid
phone survey to understand
the public's attitude and
awareness around express
toll lanes on 1-405 and SR
167. This research was
consistent with the 2013
findings, notably, that
people who understand the
benefits of express toll lanes
support them, and the most
common reason people
support express toll lanes is
congestion relief. The 2013
focus groups built off the
information gained from the
2009 work.
Chapter 4: Public Involvement 47
Website
As in previous years, WSDOT used its branded I -405 SR 167 Eastside Corridor Tolling Study website
(www.wsdot.wa.gov Tolling EastsideCorridor) to publicize information about upcoming EAG meetings,
share agendas and summaries, and provide answers to frequently asked questions about the express toll
lanes project in general. Figure 23 shows a screen shot of this website.
A comprehensive project library also houses background materials spanning the life of the project. In fall
2013, WSDOT updated this website to include more comprehensive information about the I -405 express toll
lanes. The public continued to use this website as a resource, as the main page and associated pages received
more than 7,600 unique page views during 2013.
c
it Convert - : Slot
was u.- :....b'Easi.deCendow
€'. WSDOT . 1405 and 56167_
News Enwkryrrc,x Goad Te0 C.,tfF 11 W.::Z)OT Home
Wm pings 81ata
Oepn 1 of Tt-rreporta0m
Traffic & Cameros Projects nosiness Environment Maps & Data
More Information I -405 and SR 167 Eastside Corridor Tolling
Study Nome
Fr epueel {ILeatlerj
Purer-I I Riau
2313 1 -465/36 167
LLLL'ats'e Moon
Tolling Video
V14- ew e!'mc r41.
[1b,.T.b.'i
Comments?
- cvelact
Key Dates
2013 1-465/SR 167
Executive Advisory
Group worldng
meetings
May
2011 Fr'rtr on mcnta
,c;sessnent M h'khed
Apra 2011 ET10 1382
authorized toting on 1
405 between Bellevue
and Lynnwood
Mummy 2011 Expert
Review Panel Flnel
Prolect Status
December 2013
The fourth and final 1.405/56 167 Executive
Advisory Group meeting was Thursday, Nov,
7. 2013 in Renton. Slew aY rn cent. decals
m argil sis.
Overview
The Eastside Conidor, which stretches down I-405 and SR
167 to SR 512 - Is the only north south highway attemaave
to 1 -5 In the Puget Sound region
WSOO1 has looked at a range of options for transportation
Improvement to address the projected Increase In
population and employment along the Conidor. Successful
examples are the t 109 Corr)do: Mast01 aan -pdt 171 kb'
and the 55 1.57 5 111,, F, etwax'7'ttn Both Plans
adnwwledge the Importance of connecting 1-405 and SR
167 r oform a seamless corridor, and together they form
the basis for the I- 405/SR 167 Corridor vision.
The 1- 405 /5R 167 amid.- Master Plan Indrdm new
hghway lanes. hnproved Interchanges. express tog lanes,
expanded transit service inducting bus rapid transit (BST)
and etpardrd ■anoaal oeoara MS, Other feat..., such as
the SE 7 16 Esryess 1.71 La -es P/ot P,Oif1;. the CR 162
+, 1 n... n l .Lars n,., L.c.'s .,e..>=fhb. riot..
0.10,31.405501 IV- Gm:Wm 4.43.7
r wr w.nw °P.... w... ..... 1-M
1.n.•`x n....es
..s• "44 We. IA
oolse 15. -.>d
argawn t.t..e+■nbn m1
13 •—•
I*I -4-•
(coal 50d4!5 ]
Figure 23: WSDOT's Eastside Corridor Tolling website serves as a central location for reader - friendly project
information.
Washington State
48 T,� Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
.74
®hapter
a, ._
This report marks the culmination of several years of study on traffic performance and revenue potential as they relate
to carpool policy, as well as funding and phasing, for the I -405 express toll lanes. A number of important steps remain
before WSDOT can complete the 40 -mile system.
What policy decisions remain for Phase 1?
Before the new lanes open in 2015, the
Washington State Transportation Commission
and WSDOT will make several major
decisions about the first phase of express toll
lanes through its toll rate setting process.
WSTC began its rate setting process in
November 2013 and expects to wrap up its
decision - making in spring 2014.
Major policy areas under discussion include:
• Minimum and maximum toll rates:
Although the express toll lanes will have
dynamic pricing determined by demand
for available space in the lanes, WSTC
can choose to impose a minimum and or
maximum toll rate.
• Pay by mail rates: Because of the
additional costs associated with billing
users by mail, WSTC will decide what
additional cost these customers will pay
in addition to the posted toll rate.
• Carpool policy: As discussed at length in Chapter 2, WSTC will decide which carpool types will be exempt from
paying tolls in the express toll lanes and at what times.
• Other exemptions: WSTC will consider whether motorcycles, high - fuel - efficiency vehicles, and or other types of
vehicles receive a free ride in the express toll lanes. The authorizing legislation (RCW 47.56.880) already requires
exemptions for transit and registered vanpools.
• Hours of operation: WSDOT will decide whether the express toll lanes facility operates 24 hours per day or for
some more limited time period.
• Transponders and carpool declaration: WSDOT will decide on the appropriate transponders and declaration
method for ensuring that carpools who qualify for a free trip are able to receive one.
1-405 express toll lanes between Bellevue and Lynnwood, shown in this
visualization, are on track to open in 2015.
Chapter 5: Next Steps
49
Phase 2 of the 40 -mile system
r-
i
1 express
tot lane
Legend
Construction
L n
Td I Lam .
__—. 7 Espro,
Tdl Lerw,
167 Link
Completed
+— tRpm.
TO Lane
rZEex LT= ena
t67LYek
2 express
foll lanes
12 express
toll lanes
1 express
toll lane
Gallant Legend
new with nn
consnseon pose
competed conewcnon
What are the next steps for completing
Phase 2 and the 40 -mile system of
express toll lanes?
WSDOT is currently on track to open Phase 1 of express toll lanes
between Bellevue and Lynnwood on schedule in mid to late 2015. The
agency will continue to settle important policy decisions and conduct
public outreach before the new lanes open to traffic.
Meanwhile. the agency will continue to work with the Legislature
and stakeholders on funding for Phase 2 of express toll lanes between
Renton and Bellevue, including the I -405 SR 167 Direct Connector, and
for the SR 167 HOT lanes extension.
If full funding was made available in 2014, Phase 2 could be open as
early as 2020. If two years of toll collection experience from Phase 1 is
desired, the project could open as early as 2022, as shown in Figure 24.
In the longer term, WSDOT plans to work collaboratively with corridor
stakeholders to identify and move forward with completing additional
Master Plan improvements.
Proposed project schedule endorsed by 2013 Executive Advisory Group
Bellevue to
Lynnwood
I- 405 /SR
167 Direct
Connector
Renton to
Bellevue
2013 2014 2015 2016 2017 1 2018 2019 r 2020 2021 2022
Open iota summer 2015
ra,
PEIRW
•EN•
110
Toll vendor 167 OC/RTE
Open SR 1675178 to toll
Figure 24 This diagram shows the proposed schedule for implementing Phase 2 improvements if full funding is received.
Washington State
50 v.mir Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report
rfadH(.
Appendices to the 1 -405 SR 167 Corridor Funding and Phasing Report include detailed
information and analysis that support the findings and observations presented in this
summary report. These appendices can be found on our Web site at www.wsdot.wa.govl
Tolling/EastsideCorridor'.
WSDOT will also provide appendices upon request by contacting Amy Danberg, I -405.. SR
167 Corridor Public Information, at: amy. danberg- consultant @i405.wsdot.wa.gov.
1. 2012 Planning Level Traffic and Revenue Study
Prepared by CDMSmith
2. Net revenue tables for carpool scenarios
3. Public information and Executive Advisory Group materials
I -405 SR 167 Executive Advisory Group meeting
presentations and summaries
EAG interest letter
Briefings calendar
Focus groups moderator guide and summary report
Appendices 51
•
The complete report and all report appendices are available on our
website at: wwvv.wsdotwa.gov/Tolling/EastsideCorridor/
For more information, you may also contact:
Amy Danberg
Public Information, I- 405 /SR 167 Corridor
600 108th Avenue NE, Suite 405
Bellevue, WA 98004
425- 456 -8585
amy. danberg- consultant @i405.wsdot.wa.gov
Alternative Formats: Persons with disabilities may request alternative formats — large print, Braille,
cassette tape, or computer disk. Please call the WSDOT ADA Accommodation Hotline at 206 - 389 -2839.
Persons with hearing impairments may access the Washington State Telecommunications Relay Service
at 711.
TITLE VI NOTICE TO THE PUBLIC — It is the Washington State Department of Transportation's
(WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin and sex,
as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in. be denied
the benefits of, or be otherwise discriminated against under any of its federally funded programs and
activities. Any person who believes his /her Title VI protection has been violated, may file a complaint with
WSDOT's Office of Equal Opportunity (OEO). For Title VI complaint forms and advice, please contact
OED's Title VI Coordinator at (360) 705 -7098.
Washington State
52 W, Department of Transportation
I- 405 /SR 167 Corridor Funding and Phasing Report