Loading...
HomeMy WebLinkAboutReg 2014-02-18 Item 5E - Change Order #1 - 6450 Southcenter Boulevard Sewer Repair with Green River Construction for $104,462.03COUNCIL AGFNDA SYNOPSIS VIeetinc, Dale Pnpweri 1?) NI (1;14 r(>4 1' Co 14 n ci 1 review 02/10/14 BG .4) /7 k- Reloliaton 1\11g Date 02/18/14 B G - - ' , la Q ' .,..... . , I"', K 11/g SP( )NS( ( olliicil \LI)oi 1 111R 1 1 DC] ) I rihme I o e 11 1/i *R Polz‘e 1)117 SP( AN )1,(' ., Green River Construction was awarded the contract for the repair of the sewer main break St \t\I \Ry at 6450 Southcenter Blvd. After work began to install the new sewer manhole, the broken pipe was exposed and the scope of the project increased dramatically. Additional bypass pumping was required for the installation of 100 feet of sewer pipe, as well as additional traffic control and property restoration. Council is being asked to approve Change Order No. 1 to Contract #13-181 with Green River Construction in the amount of $104,462.03. RI VII \\ I 1) I3 1 I COW Mtg. RMATION ITEM No. 5.E. 79 S1 \I 1 Si)()\()R BOB GIBERSON 01t161\ \I A(,1 \I) \ I \ 1 I 02/10/14 At,IND\IiI 'u 'II Sewer Repair at 6450 Southcenter Blvd Approve Change Order No. 1 to Contract No. 13-181 with Green River Construction C \ 1 I :c R\ Di. filiron 1,kg1),i/e 02/10/14 ,_11otrop Ddk 02/18/14 Reloliaton 1\11g Date I 1 Ord1176111ce \IN. D, we Bid liPard \Irtq I) w R[//z: 1 learrq , lig 1 lair, I 1 lig K 11/g SP( )NS( ( olliicil \LI)oi 1 111R 1 1 DC] ) I rihme I o e 11 1/i *R Polz‘e 1)117 SP( AN )1,(' ., Green River Construction was awarded the contract for the repair of the sewer main break St \t\I \Ry at 6450 Southcenter Blvd. After work began to install the new sewer manhole, the broken pipe was exposed and the scope of the project increased dramatically. Additional bypass pumping was required for the installation of 100 feet of sewer pipe, as well as additional traffic control and property restoration. Council is being asked to approve Change Order No. 1 to Contract #13-181 with Green River Construction in the amount of $104,462.03. RI VII \\ I 1) I3 1 I COW Mtg. 1 Cmtc I ( \&P Cmte 1 1 P&S Critic '1 ransportation Cmte _. \ rts Comm. Park', Comm. Planning Comm. COMNIITTHE CI 'AIR KATE KRULLER Dtihttes DiV1 1-1 02/03/14 RECOMMENDATIONS: Si,()\()It/A1)\[IN Co \I\I] Public Works Department J1'I 1k Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE FAN \ 1)1 10k] RI Q1 IRI D AMOUN1 BUDGLII I) APPROPRIATION R1 QUIRE]) $104,462.03 $0.00 $104,462.03 Fund Source: 402 SEWER FUND Con/me/as A claim for the entire project costs will be a issued to Comcast and their contractor MTG. DATE RECORD OF COUNCIL ACTION 02/10/14 Forward to next Regular Meeting 02/18/14 MTG. DATE ATTACHMENTS 02/10/14 Informational emorandum dated 01/31/14 Change Order No. 1 to Contract No. 13-181 Photos of orange fiber optic ducts found during excavation Minutes from the Utilities Committee meeting of 02/03/14 02/18/14 No attachments 79