Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6386 - Tri-Land Corporation - Cort Furniture Rental - Storage Racks
PROPERTY OWNER Triland Corporation PHONE 624 -4495 ADDRESS 1325 Foruth Avenue, Suite 1940, Seattle, WA ZIP 98101 - 2510 CONTRACTOR Conesco PHONE 431 - 9630 ADDRESS 3225 South 116th Street, Suite 181, Seattle, WA ZIP 98168 WA. ST. CONTRACTOR'S LICENSE # CONESS131NO EXP. DATE 3/92 ARCHITECT Ray Frank PHONE 431 - 9630 ADDRESS 3225 South 116th Street, Suite 181, Seattle, WA ZIP 98168 USE (•()I)F (MOM IANC'F, FLOOR IV SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD • TOTAL TYPE OF CONST.: N UBC EDITION (year) 1988 SETBACKS: N _ S - E- W _ FIRE PROTECTION: Sprinklers Det ectors O NIA O UTILITY PERMITS REQUIRED? Yes O ( h Publis Public Works) p No ZONING: BAR /LAND USE CONDITIONS? 0 Yes XO No CONDITIONS (other than those noted on or attached to permiVplans) l CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING n3 �� PERMIT NO. SI APPROVED FO ISSUANCE BY: I CERTIFICATE OF OCCUPANCY NO. —L BUILDIKT3 PERMIT 1111 Andover Pk W Install rack storage for furniture. N IR (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE OTHER: TOTAL 204.80 4.50 209.30 4 -q I PLAN CHECK NO.: 90 -521 i BUILDING OFFICIAL CO DATE: / L 5 f ( O DATE: 35,000.00 PROJECT NAME/TENANT ASSESSOR ACCOUNT # Cort Furniture Rental 352304 - 9110 -06 TYPE OF O New Building Addition Tenant Improvement (commercial) Li Demolition (building) U Grading/Fill WORK: O Rack Storage O Reroof O Remodel (residential) O Other: DESCRIBE WORK TO BE DONE: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or t performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: PRINT NAME: /.O �, COMPANY: �` jl f- ���,.�� fiw�F �I rQ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. DATE ISSUED: wrtafflw ij CONTACTED DATE READY DATE NOTIFIED BY: (init.) PERMIT EXPIRES 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) BY: AMOUNT OWING f . > ' SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL 1.x >: PERMIT NO. CONTACTED DATE READY DATE NOTIFIED BY: (init.) PERMIT EXPIRES 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) BY: AMOUNT OWING 009 . � o • BUILDINGIPERMIT APPLICATION TRACKING PLAN CHECK NUMBER PROJECT NAME C.ort N‘in't-tu R.Qat SITE ADDRESS I A�f�O PK l�J SUITE NO. lII INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. PEP.I 7 .Ni; BUILDING - .... initial review UIR ITIt CONS LTANT: Date Sent Date roved - FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review l�•I�-�9U 12- I9 -`i0 I2•-Iq -gat (ROUTED) INIT: `1L INIT: INIT: INIT: /0 INIT: FIRE PROTECTION: ' ) Sprinklers U Detectors U N/A FIRE DEPT. LETTER DATED: � —1 q -V V INSPECTOR: S/ 3 ZONING: IBARILAND USE CONDITIONS? [ )Yes " No REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E. W- UTILITY PERMITS REQUIRED? [) Yes No PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: UBC EDITION (year): guk Alta*/ 1168 REVIEW COMPLETED CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION llliJ'-; 1 [IF FILLED OUT COIWPI E TEL Y DATE APPLICATION ACCEPTED BUILDIh PERMIT APPLICATION DESCRIPTION:<:::: BUILDING •PERMIT'FEE < PLAN' CHECK FEE' BUILDING SURCHARGE . ............... ................ . ................ . ............... OTHER: TOTAL AMOUNT: DATE APPLICATION EXPIRES RCPT: M DATE 3 SITE ADDRESS SUITE # 111 AD3V R PAR iJ TUKWILA 98188 BLDG E PROJECT NAME/TENANT CORT FUR aITORE RENTAL VALUE OF CONSTRUCTION - $ $ 35,000.00 ASSESSOR ACCOUNT # 352304 9110 - 06 TYPE OF U New Building U Addition Li Tenant Improvement (commercial) U Demolition (building) WORK: 0 Rack Storage O Reroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: RACK WAREHOUSE FOR FuR • TITURE STORAGE BUILDING USE (office, warehouse, etc.) i71\RE HOUSL FURiIITUR NATURE OF BUSINESS: r Ur TI'iUi<E RENTAL WILL THERE BE A CHANGE IN USE? LK) No Li Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: ����� Tenant Space: 1200 Area of Construction: 13500 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? (o No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER rRILrND coaP ADDRESS 1325 4th AVE STE 1940 SEATTLE 98101 - 2510 WA. ST. CONTRACTOR'S LICENSE # COLIESS131:40 ARCHITECT RAY FRANK PHONE (206) 624 -4495 CONTRACTOR COLJESCO PHONE (206) 431 -9630 ADDRESS 3225 S 116th STE 181 SEATTLE ;'JA 98168 EXP. DATE 3_92 ADDRESS 3225 4th AVE STE 1940 seattle WA ZIP98101 - 2510 ZIP (206)431 -9630 PHONE (206) 431 -9630 ZIR8168 )' BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE y /1 PRINT NAME ROY COX ADDRESS 1230 ANDOVER PARK E TUKWILA CONTACT PERSON ROY COX DATE 12 -17 -90 PHONE (206) 575 -4119 CITY /ZIP 96188 PHONE (206) 575 =4119 APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architectengineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. lo- l � -X11 07106!90 COMMERCIAL' • • NEW COMMERCIAL eWLDING/ADOmONS Completed building pannitapplication:(90*:10„.atii:ti •E/1alessorAccOunt -- ... sets Sped catlons Soils report stamped by a " ..:.... h. • aukr!!!!..,f1....:::::::::.',::::::::.•:, • • . ... .. mitafp Assessor building permit . ... '.. . Pi*I itiini , :.:.. .... , c '7L. : :..:::„ ,.. t 1 .. !:! ;P!) ',, i. fl din •:..,;':::::::::::T.!1:6,..,:(..2:)..,:!f!ii:....:;0 plan $ii0 • .. . 9!....01 be 1 0'....:.., ......;:: . '. E 701...47 40 ::.c......!:,....i....,::, Eitit doors 404. : : ::::::':•:.:'.....' , . : Enety calculations stamped by a Wash • :. engineer or Irthilect:H 1410.T:ffiCkghi. dimeOsians0 and .aritt. ways SPuctural CiiculatiOns. Stainpad by a We !Om! (nickatotaiS1 RESIDENTIAL .... . . . . SUBMITTAL CHECKLIST • 4 stamped bi a iO archllacZ Which indude ••••*itrat:d* Atitelaor*cCOUpt Whit* T sets (2) woriong* Wiclude • Foundation plan iridostoaocw:w te mocoro • Floor plan • Roof plan ‘. • Bilking elevations (alt views) • Building cross section ■ StniCaual framing plant Washington State knally Code dea C.ornplatacuility:pannitappiicat Siti of 0 !le47st.‘•:-7•`!' • NOTE 1 0 0 and 040044' 8441k1141 site plan n I o e 106 40 E .. 0 utWtj : can*iad. see permit application a clock, t t s 1,101 a kiktrmatIon may . ,Adationat topograph,-.-. AO- 69i site cottotipi . . . . " " '" " • • " Aisisior *cco000c.N o■iil.tioio#,:otoii 49#.040.1.0e..0.#*. *edlfsVuralwodiobe date (2 ats a:. RE1110E/(11AL.1.11..... • •- • • • Building elevations Buildg . c . •:: • - • • Structural fram NOTE and plans numt be submltte4 CITY OF TUKWILA 620, SOG THCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 MEMORANDUM . (60o x Ilo X 1p o x ) o PHONE q (2061 433.1800 TO: V11._ go` s 1 FROM: Sh-ei DATE: ID_Q_c ..rckb L t l +I 0 SUBJECT: RcaK 5—oi( r( .� nQox - x \ - j-r - X - c Roua.5 ¶ct o , C o (-o o = as ,-) q.30 lobo $ J Soo o Gary L. VanDusen, Mayor Project: // v Type of Inspection: Address : 16',' Date Called: Special Instructions: Date Wanted f -- — / am. �� Requester: Phone No.: ❑ Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 6380 ❑ Corrections required prior to approval. COMMENTS: ,, — 3, • / f lrrl Cam` 5 A,. r ho 7 L4. . T rJ /4?! nspector: ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, tee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. [He�.: Date: 1909 f City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Project Name . /= Address , current inspection schedule N eeds shift inspection Approved without correction notice / with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: r , Halon: Monitor: Pre -Fire: Permits: % .ri+•f -s `.. ,,_, f.., Authorized Signature !' ,l ,- ( /C' G , tom , ' `ti f I G TURWILA FIRE DEPARTMENT FINAL APPROVAL FORM • k. y Gary L. VanDusen, Mayor Control No. AJ Z.G� Permit No. Suite # n Date FINALAPP.FRM T.F.D. Form F.P. 85 R � Y4 BY ' , POY•O.10hG DATE 2 - 0140 c CHKD. BY DATE CLIENT !�O IZT �U2 / J 1� U2 ` 12.r_IJ7 PROJECT PA L t- cA C.k S RECEIVED j CITY OF TI IKWILA DEC 1 7 199U PER MIT CENTER SHEET ( OF if DEPT. OFS NO., NO. SUBJECT 581 9.87 , __ , I ; , i . . ._160.A._____ ICI 1 P) L __to..9.g..5._ l CTY P) ....__.....:4,_ _____........!...5P4A .: ;it • -- I 1 , a ` ..a.. ,I ' - I - - ; I . _ �_ 1 I I -- -___.- -- -J - - - ;- - 0a.�.� -- : 1 I 4' I I 11 ' _ _ ! _ _ .,.t.- _ T 1 t ''''- '`' 1 I I � I sr=c _, 1 1 l _ i , - ^ I 4.......5 j — I A. a I EKis i fi-� L I Etf.ann E I 1 i I 1 1 1 I_ AAr r I P ( I IX I I c2 -�` I I= S I , { - ��! - ----i —� �-- t- - - -i - I I I �, I 1 �' I'" 0 ,37 ' �� G N Ilkli l _� S 1.0,2 ( I � , : � i { I 3 X I 1 1 » IL►z 1 i' =1.1 —r t 4 . , -' I 11"7. _ �,� T om, , I ; ON r -�,r I LM J, 11 1 ( , !I I • . ,�I 1. " • tin ! L 13F 5 4)__L__:___ 3 Q t y L -r� , 1 , ----- .,p - -� - I - ---- .- -.....---4.---...-. __ 7 - 3Y�i9-� � o- . • __ : t ' O, D S 11 A - O, q 2 3'-2r . _ .. ' x i ��� I,� L �i f ,f I 0,77 5 0 1 I► i I . / z;-03; 1 1 i I I 1 I P3/ 1 1 i I I I 1 BY ' , POY•O.10hG DATE 2 - 0140 c CHKD. BY DATE CLIENT !�O IZT �U2 / J 1� U2 ` 12.r_IJ7 PROJECT PA L t- cA C.k S RECEIVED j CITY OF TI IKWILA DEC 1 7 199U PER MIT CENTER SHEET ( OF if DEPT. OFS NO., NO. SUBJECT 581 9.87 I _ _ 1 1 1 • r, n c. it / J, i I 1 i _J — yam _ a! � 5 00 I I I 1 r � , fir I 1 I , ; I ! i i • • . 1 • i ; ' 1 L • S ' 1 I i � I I 1 1 , I � S , I t -- � 123 f �3i/ j /2 3 44 S ' j i s i _. I - . ;_ -_ -�n ' _ - - _: D. si I •-:- _ - I I j I i r, 1 I '_ JTJT. _6A!?_ I i ._ -•.._ .__• - I 1 I _--- _ , 77777777 '--- ••_- T... �%4L `...F 1 1 • i. o_s0 I _C• 49"' , _ '5r I 1 • • "' . .2 : .. ` ^ N ! , ! i ' EON ' l 3.L2* 198E i U•3C I I i �� ';�� 0 ( 1 Se Sti1 /G1 LOA-t! 1 I i (A/J4 Y&E i 0 ('�t) ! I t/ 6 —k 1 i 1 I h iClcn4s) i 1 2 g l — i — i 1 )/J iii ( 1 • I • l j I 42, ! , ' i VIG — i • � [- I (; K 3�2 e )2 = 'q 8 1 1 I n -k ; L 11, � 1 i � i i 3 ! � 1 1 + �8 1 114 ! ! 1 1 rc I I i ( j 1 h 1 qel L I --1 , ? ; I ! i . 1 I 1 I t I ! I ' t j I I I I , 1 i 1 { I I I .QJ�] 1 k 1/ I [�/ ' �I� j I I f f v I -i e i ' 1 1 i I 1 ( _L ' I I 1 ! I • 1 ! UI, � t' I 1 1 I I ��? / I 1 � I j • 1 I I I � I BY S. e ' 119 0,0%01 CHKD. BY CUENT PROJECT • G e0 2.r DATE �`� I -)� DATE SHEET OF /I DEPT. OFS NO. NO. SUBJECT I' n e BY S, C, hwou�n1 DATE 12 -4-qt) CHKD. BY DATE CUENT � n7 RAP TO /2- 26(0`,4 PROJECT PALLET g7`a ILA GC_ rAC' - 1'. • OFS NO SHEET 3 OF JL DEPT. NO. SUBJECT I 1I I11iII!jii' I1; __ � i , „ 1 J S ' ;l 23; i I i _ =__ _- , -� =- 1 -- i — I 1 h _-1- t - t i i S J ! C =� ©J I : — ., ; ¶ T T T f . I Lj_i-- a3 s' i -. ' - -- ...__.__ : , „ ' I i i 1 1 i ! . 1 ! ! I ' — "Tz Ci ) / .1 1 0 03- 5 t . (/9?-j.) ' ! 1 I , L L! �j : 1 ! 1 �. 1 1 I i i j 1 7 r/ i i x-r. , w W i I f !L 11 i i . ., , 1 , . . , , +2 , • , �/, d,3 . , . , „ . , , 1 1 1 x , , • 0 - .0 i 3036 J23 --- I I 1 - i t I ro7x 0_,..2 - ,� l u l l l /i x Fs-c3 3 2i I j " zo I � i I I l 1 !! I t-- E 1 ? = a,o7 i -+ # 1 + i fi I 1 I II. t 1 r I 2z ;& r 1 1 , . X 471- 9 - . S • - 2 1 1 kc. I 4 T1R ,— Z X 47■ Rai = 22 1 1 h I • , , ,,, Y,A ., 1 —t I� • _3, + 1 -,, .4,-.....-,A., , ,. .- : I' n e BY S, C, hwou�n1 DATE 12 -4-qt) CHKD. BY DATE CUENT � n7 RAP TO /2- 26(0`,4 PROJECT PALLET g7`a ILA GC_ rAC' - 1'. • OFS NO SHEET 3 OF JL DEPT. NO. SUBJECT • ' 1 • • , • I I ' , • 1 ; • i i,i,tAc-rz.g. R2 Xi/ e s_r _I_, ; ___ _ 1 ..,EE i . :, , 1 • . – i ---..--- -- - ---- 14P I ■ : ! ! 14a0 ---- I ' , ; , 1 L i 1 PO4.-7/ e. A4 " rgeti) : i I W – .7-, ----L ' :: , .7. --- ;_: - ." " - ..--.--.. ; ' _, • .2..- • -i--•••-!--- 4— • - 1 alco : : ' • - • • ! • /au 0 .' _ _. k • __ ___...._ --A, ..:, C . 4 .2. 6 _s:4 -- i ' 1 - 73 , i _.: : 1 . • , 7.• //4 , . --.-• 12-7 : , , • --- I :. ! - -- ____. . ......_ . _ . . ! : ------1 47 3 I qY..e !-... : ---- / ; 2. = ...;( ! - : • : 4 -- VZ.V1- ; , . --, - -- .. - 7-- - -- i ----, ; ! : .. = c . . i ; ; s . _ _ .. . 1 . . ci. ' / •-• o / c. 5 ta --_, (-- - = - z. , —,--- Alei.)7 • i c?" i./. ----------1------ 60A-.0 . . ...___ , • , : — 7 -,--- : 22.- r • ..- '7 ' : -.--. --7----- t : ! .Szt ' ' .P-'\ s =- : ' C A " 7 7 kt/ II c. , , 1.78.c C • S :z.: , . • . 1 5832 ---, -- F II o '4- ! ii _________ ark ...:; 40'74 1/6 i i ! . , __ 4:e - f- _4-- • .22: 13 ___+_ . ! - r 4 Mats ! I , I - ,/P4 ----' - • /2j' I * -- '40.3 — T --- 1 -- 7 ---7 . ----- ' "..._._• i I I : '----"-!-' : ! 1 '.......' . 1 7 . • 3Pdt.4 _........_. + S r- _ ..__:..._____ ; . Ir-) i .._____ /a7 &, ,.,...,-- I i 1 . . I , • ti. '4 t- ,fi_T errs h , ---- 7 --- ;;" -- 2 7 Cfq , .: ' I *...__ !Is 1 I - /27 I _... 544 V i 1 t _ 1 ' , i —r — 1 - , 1 I 1 4/2o,sa,._;s6 -- ■-• 1 1 1 4 I c ----- ---i- i .0; --' ' • '4444 -* 44 - I — • 1 1 ___11 < 1 • J 12 alcIi ... . f c., 144- , 1 ' 3 --1-- ,z . A: , .., : ---7 " -- 7 ! ---- t - 1 I 1 ! r2 A 575 .-.----- I .....I ----I"'---",--"". ...„ ____ 46 1 ‘ . I . , to A 00 t N T T:V. , ' .4.,Iy f . ,.. ' --E, ',0 ' I ! _it . t 1 471 . C l a 1 —1 i ! , 1 _ _I - 'MA ... U r• . 1 m ',Ili ••''' i ■ t I • ti 03-i10: 1 _LE I - i Ep 1 iz3 I , 1 I 1, 7 • : %-.. +._ .i 1 6 4 7 ! T I is : . . ---1 1 , i ; 1 t : , : 1 . —1 3 c'b - I c___ ■ . 1.13 . : 1 I • i 1 1 .........,._ -.--- . —, • — -1- ! TM 71 c._ ..i.-_ 2(,; /: g A.1,4x - , Ay /44 . I _ _ , 1 L____! ..t , . . , ; 1 i . . ____I c , . ! 1 i • i i . ' 1 • . , . , • . a . A fil 1 I r , 1 , , : 1 1 i 1 1 r t BY C e . DATE CHKD. BY DATE. OFS NO. fi SHEET 4 OF • DEPT. NO Cu tar pC)/2,0/70124:. /2 CUENT PAUE S 6.€ PROJECT. SUBJECT 581 9-87 • BY Si C. MQ•►-- 10 K( DATE 12 9a 6 CHKD. BY DATE CLIENT Cofr FU!W/TOIZ 2EN PROJECT PALO -F T S to 2A G E ra.A c-45, SUBJECT -8 OFS NO. :ET S OF 11 DEPT. NO. T { ! I rl , i l ( i I Crvl! uMN i , © ! ! I i ! I ; 1 i ! 1 I I ! i ! I i ,.. - ire Lai, D I ! I i t I N i V V ,..,,,_ , , — ii. � Soo ;4. 2 j 11 _ f t'�G i , t i I ' ! i I , I i i i i I I 1 - : ,/,4 it,. ,_ i3o - ! 14 4 L i _` ' — '7 _e_ _�:+_ ' 2000 , . , I r- Psi . 4S _._ =574-77. , i I v 0 378 I I 1 09 I i I I_ 1 [ i i v I r I I _ r �— , � 4.2 _ i 3Q48� - 8 8 , - i� T i ;-a = s�zk,,'' I 1 i � 1 _ _F 6 � ,rall I c% I - - -., i C f/a /IdaI i 6 T/CS.T4' J , p r 1 r T : 57 2d4Gr 7 •s ; 230 Szcu - p 4 ■ C.• Aa ■ ■ • � – L c - 1 . /z,oc ILg - 201.0 .-.. 1.'18 31/g I - � -� 8 / <' •- ' o� �1 re moi --. ,`c„ - :1' [, , II ..,i....::::,....: . r 1 , L iiiiV n r;; 21 T I L. L 0 .., 100 • BY Si C. MQ•►-- 10 K( DATE 12 9a 6 CHKD. BY DATE CLIENT Cofr FU!W/TOIZ 2EN PROJECT PALO -F T S to 2A G E ra.A c-45, SUBJECT -8 OFS NO. :ET S OF 11 DEPT. NO. 'ON '1d30 /i dO 9 133HS 'ON SAO S i/Z/ -1 uaLS 131 7rid 1.O3renS 1L3rodd 7 b'-1.r/3"N VJo1Jrra'o _1.2/(rd 143n0 31V0 — AB 'ONH3 31VO ;, wool "c), 5 A6 1 i I J ■■■ ■ ■■ ■■■.. ■aa� a... 111P/ 11 ..1 3,1 4:1111 ts ivN. z 1 : r 1J ■ ■ s. ! ' 1 ■ 1.,,41 ■ 11 1� ......"4..t � ,gyp Eh L LJM v G, )0 [ i„ 11 ->-- )? C) rill ,-2"..* -I - IS N S • ti t i ,, AL _j oL j - _ _ � 0 -w rzs - rr�lss ? 1 ' 4 no/ s re L 'X Fb t ► i l ~ /SZ ! 1 ! i l I l '' C I L , L 0.4G 1/4. `,' ---.."-1 —. t ! I 1 I I ! I l l! L I • • I I LL'C I • h o;.u•6, •.1 G' ~' rS C i Zyr do .» • , 1_ i 11 � ____ 1 . I I .�_ a I ! I i , �' T I I__ a I r j y:� -r��- 1 1 . I n _l_ 1 —_. S oly - __ 1 ._,____4___ � r, c 1 _ ; S ....... r... –i i� _.. �*iH 1 j I yr ..._...1... i � i, L 11 j , -. ---- ; C z / I x_.t7 1 -41(1,_ _ i i I I f 1 j- A i 4 I i I -1 I--' 1 I I 1 1 1 i t I I I 'ON '1d30 /i dO 9 133HS 'ON SAO S i/Z/ -1 uaLS 131 7rid 1.O3renS 1L3rodd 7 b'-1.r/3"N VJo1Jrra'o _1.2/(rd 143n0 31V0 — AB 'ONH3 31VO ;, wool "c), 5 A6 BY � i 4at Gts r✓ 581 8.87 DATE • I. 9 OFS NO. SHEET 7 OF r / DEPT. NO. CHKD. BY DATE CUENT G0L7 PO It./ C:= R.E/JTA L PROJECT P L`r'�'r 2AG SUBJECT ' ! I i I 1 i I i I I I I I . I i pA E PLA_T r I ANC u0(L i!301Lr1 I Yi__: -._ I -� I i 1 I 1 I i � -f i; I -� � 1 i 1 ! 1 --I- ' IS I 1_1_1 1 1 , 1 I I i ! � -i __ __ 77, i --1------;<1.! I M CYA ro - -- - I 1.._.- i- 1___._ 1..... ' __L.!. __._- r ..... I .- I _ . __.—. •' -- -- -1---- , ....i.---1,- __..._ - - - _.- V _• •----- ; I ! , y i ; 1 1 : V4A I r. ;. I e _, y i I 1 1 1 , + 4 1 k �' 1 � !t S. 4.,.11 '2 •9,.. J iL_. ! I -- ' ..... -_ i _. - , - ---- 1 �" 1 14.• I 1 7 `. Vt 1 1 1. ;-•. ,iii I 1 I2. -co i -go, ; 1 1 i 1 ' I I = 1 IIJD i I 1 ` '' 1 ; 3 4 48 : 2 K ...t.._... J ' 2 i _ _ I� i �_� 1 ..1__ I ! I � 2 oDo ^ ' � lV 1 7 I I r 5oQ M = x = f I. I i --) I - I I ,--- o ,l�I i- Ir- d $ 1 r I I I SON go ' . i'kC ( I I I i► ° • ■■ •r� �` I ___ L. I GO NC S Ga B } i • V- 12,0 r & e 6 Ems Z T 1 . � 2 ll ffXF �a p a 4! friucif I9 2 s"� L� UI a f I, / � r��c//340T L gA, G &4. I ' t'a' 7 I ffr- 1 I 1 1 1___.. • i I i I • I -! BY � i 4at Gts r✓ 581 8.87 DATE • I. 9 OFS NO. SHEET 7 OF r / DEPT. NO. CHKD. BY DATE CUENT G0L7 PO It./ C:= R.E/JTA L PROJECT P L`r'�'r 2AG SUBJECT Mooet.. t ft d xx ic,* .2'723 Sxx. s •74.74 ri �.+ .7/6 3 y y �i� ✓� .Go33 rk . .4153 10 r OP , �� 1 A A 46'718 4 602.0. ,075 2 3/44 1-603o •o10 3 314- .7401- /.18c4 . v.4313 ),Z23 /.024 .3730 ,d147� ,4651 . ,01Z b/ /.093 ./114 L603,6- .. , 075 3%z. y 1. PSG 3 d 075 3 4 j,% 3 / q - > OM .6617 1'1$4 r/�3 1402 .1120 120 •'7 e', r L. t I C 3 6 .076 3 /40+73 /.343 .1700 4G15/ .14 14 4.6e. 4 0 * 'i- I I /2 24431 /.2747 1.538 1.166 •7074 .9921 J.12 1.6C. `j. S • 076' + /%2. 3.073 /.033 b 7 57 1.2447 .80zs / 01 I. 2 6,. L . 6a 5 " O .070 5 1 % . 444.31 04 1 6 - 1.901) 1.3902 , i qzl /, 044 •' :i 75 :.. i„,, il C 5'$ .075' S%z /N.. 5.710 :4003 7 o'r i 1.52�4 bins I.36 I. !SG 65-A ./06 02. 1 %i 7410 2.7571 2.6S$ 2,070/,3915 /4662 1.876 . L.$G 4oA ,/05 4 (%. 7.07 s.lttl 2.112 7.1/72 1.4517 1627 l.»' 1.6F359 _,075 3 1 et :.749.1 g 1. *env 1. 1.663% .3110 1.ojc 1.636 ,.S!sik 6 , .7931 4 6F 464 .075 4. 1 %y 2.O�I2 .9 /III 46F ii -o4. - .076 43/4. )% 2.7 2414l /,Lo j.(984 .$143 1.667 l.oif +6r C ) 1 ' - - 1 1 - - 0 1" 1-1 :+ : 3•:; LC.L. I 1•1E1' L_ T ECH t Looi M ETAL TECH. INC. • LODI, CALIFORNIA . ,. , :.'.: r .. •,.. r -..:.....7.7 . :4 ... _ .. 4 t . -, 1 .i,..; , . l-� 4444.. • 1 • ° .f, L g I " • i•4; i'l -i • , • t i • . 'Lit , • , . . . ,..i SEAM 5601 oN PR0P601 f4rEa ALL psMeN.r••••i 4 E.,.rr;if$ •N 1NeMff h 1 -1 x ` " ' y . ; : :� , . • r d 04-- .t 4 V P . PREPARED BY i•CY DATE JA'N:6 7 NO REVISIONS A.... 4 • r 0 1 SHEET NO, DRAWING NO. BY DAT! dr 11/ Cot..t.1 M P4 5 M 4 -T 1i°r ODI METALTEcH.,1t4c. Ro p M R. T 1M. S LODI, CALIFORNIA L'MC - -7 > . u ..J i. a 1'1 C. . .I •_ . L. L. 11 N 3 YY f RLPARI:D DY DATE .1 /11 /al a .. >. M s cf 7/// SHEET NO. R -2 DRAWING NO REVISIONS BY DAT I Asp ..`f• L^ G� 2 up. PAT a „ ?'a 5 poet. H 1b t. ARIA Wr. 16 r Salk rxx rYY $YY nor x M 10 N 1 .i1f .'!zs 00 .160 .16•5 '610%1 .1411 ,111.'1 :46,3 1 . NI IS 3 I5 .Di! .'315 0 .s576' .1111 %.2.•44 ,1126 .toff, ,(.'154• ,799 . ZO 3 3 .015 .564 1.19 .9964 • . 6659 1.1o14 .7295 ,4422 0111 1, 519 -M '6 % .IDS ,200 1&,12 1.3366' . SU c ' 1.29$4. ,9646 ,6055 1.018o t. S "7 .M ,M WI. ,Mviia .. °M / 94° E -IC 4f 4 G 1 "; •'f •' __ ('f. to /JIG 1, 922 l,00 3,60 1.1561 1,1707 1.t 4/ l.2ss9 42176 2.1742 .8570 1.4 ... 1.7710 1.7377 ?,62' .. 2,721 2502 .. 4.50 c4S 2,1914 1.4449 /.7412. 4.1444 4,84519 /.24703 1,3815' twig Lw ., 4 % 043 / .532 /.ao,, I 1,00S to rig OA' Slit Sgt Gal 49217 14851 12451 /.Ziff, /am 2.55 4,7 1549 S4k • /.7 .86 1.57o4 //, /.4251 1.74.74 44,21.s 2,9s'�s / 2. .M 1 ;to I.M i %o 3 G. ''i a . 2.5$ t9 t,9#S4 /.4gs6 1. 9434 3 4 •. f , .1st /.7424 t.M 40 5 3 1,4.461 I 1. 0118 1.166$ .1 IA& L01111 __ .. ..... 2.1/ ES 3 . 1178 2.86t.er .M 4 , , ►,M 4 % , 64442/ , 5 4 '. /.S2 f . 2.,953 2.5,44 4.2466 /. s ? 1, 8910 2,164$' 1.2631. l.teol l.17 ♦ 2 ' 7 . 1IA1 gel r1 . ' ; , l,'»04 2,00Z 6114'44 i.,1 YsZ 1.4Sr9 /,9 . /,7412.9 !•mss" Cot..t.1 M P4 5 M 4 -T 1i°r ODI METALTEcH.,1t4c. Ro p M R. T 1M. S LODI, CALIFORNIA L'MC - -7 > . u ..J i. a 1'1 C. . .I •_ . L. L. 11 N 3 YY f RLPARI:D DY DATE .1 /11 /al a .. >. M s cf 7/// SHEET NO. R -2 DRAWING NO REVISIONS BY DAT I Asp ..`f• L^ G� 2 up. PAT a „ ?'a 5 Letter Stamp On Anchor Length of Anchor (lathes) Lotter Stamp On Anchor Length of Anchor (Inches) From Up to But Not Including From Up to But Not Including ■ m Gil 2 2Y, 2 3 ' z o d 9 934 3 3Y, 34 ' 10 .' 10 4 4)4 - N () 10 12 4% 5 5 5 6 13 554 7 ? j 15 6 • 654 16 I 7 ! L M 7 71/2 71/2 8 Y Z 17 18' • 18 19 c•. Tru oft' Wedge Anchors FEATURES .. • Hole size = bolt size —Ideal when work being attached is drilled while in position, and drilling continues into the concrete, eliminating the need for templates and double handling. One piece wrap - around expansion sleeve — Provides true 360° hole contact for greater reliability. The large expansion sleeve area also reduces concrete unit stress. Works in bottomless hole —The bottom of the hole is not needed to set the anchor. In most applications, the anchor is set as the object is fastened in place. Supplied as a complete unit- -Nuts and washers are packaged with each box of TruBolt anchors to simplify installation and reduce inventories. 2 INSTALLATION Hole is to be drilled the same diameter as anchor, to any depth equal to or greater than the required embedment, using carbide - tipped drill bits conforming to tip diameter tolerances of ANSI B94, 12 -77. Drill hole. Insert anchor in ' Expand anchor by - hole. tightening nut. LENGTH IDENTIFICATION CODES i '•\ i • ;. • i • Ir • • 4 • Anchor A Hole Diameter (tn.) Standard 'Won Catalog Plumber Stainless Steel Tis Boil . Catalog Plumber 'A" Oman Length (in.) '8" Thread Length . lin.) "C " Mu. Tickness Id Material To 8e Anchored (in.) '0" Embedment Depth For Test ( Nt.) • Test Data Concrete Strength (psi) 3000 4000 5000 Tension . lbs. Shear lbs. Tensbo bs. Shear bs. lenslon lbs. Shear lbs. 114134 TSS14134 114 )4 115• 1940 1060 1975 1180 2010 1290 )4 114214 18514214 2X 1 114314 TSS14314 314 2 1)4 2480 1060 2550 1180 2620 1290 138214 TSS38214 214 16 X 115• 3610 3890 3875 3690 4150 3890 131300 15538300 3 1% I% 138334 15638334 3% 1% 2 738500 — 6 -': 115 394 4)5 5810 3890 6130 3890 6460 3893 . 712234 TSS 12234 2X li 294'.. 5120 7700 6360 7700 7610 7700 112400 15512400 4 . 194 —,-• % 112512 TSS12512 51i 2X 4 7710 7700 8890 7700 10070 7700 112700 — 7 4% T58312 75558312 2%' 8720 11200 9640 11200 10560 11200 159414 — 94 158500 15558500 158600 — . T6558700 158700 5 11810 11200 14930 11200 18040 11200 734434 7S534434 434 X 394• 11700 16750 12990 16750 14280 16750 134514 — 5)4 115 N . 134614 734700 134812 15634614 — . 16634812 6)4 7 814 N N N 2)5 _ 3X 4% • . . • 134100 — 10 6X 9 . 16980 16750 21130 18050 25290 19570 1/8600 —. 6 N N N 1% 4• • 16190 19520 17340 19665 18500 19810 X 179600 — 8 3% . 178100 — 10 5% 7 17680 19520 27130 19665 36580 19810 • 110600 — 6 2)4 94 4)5• 19000 26480 20350 29990 21700 33490 1 110900 — 9 2)4 3% 110120 -: 12 234 6% 8 24550 36550 32380 38620 40220 40680 , 111490 — 9 3% 2% 614* 22960 33940 27550 39240 32140 44530 • 111412 — 12 334 5% 10 39300 48850 45510 53730 51720 57420 X 114.114E — 214 X 111 — — — — — — — .• ap• • C. • ..• ;••••1'. • •.' . !....*•••• r • ••••.' F.•••;•-..L f:•r• kl SIZING' INFORMATION & TECHNICAL DATA • Minimum Embedment APPROVALS: 1. Underwriters Laboratories—Standard TruBolt diameters %" to ware U.L. listed. 2. Factory Mutual—Standard TruBolt diameters %" to 3 are Factory Mutual approved. 3. ICBO—Standard TruBolt anchors are ICBO approved under Report No. 2391. 4. Southern Building Code Congress (SBCC)— TruBolt anchors are approved, under the NOTES: Southern Standard Building Code, Section 703.6 'Alternate Materials and Alternate Methods of Construction" (Report No. 7304). 5. Federal Specifications—TruBoll anchors meet • the following specifications: Physical—FF-S-325, Group II, Type 4, Class 1. Plating—ASTM B 633-78, Type Il, Class FeZn 5, • SC-1 and QQ-Z-325C, Type II, Class 3. 1. All values are average ultimate loads. Industry standard Is to apply a minimum factor of safety of 4:1 to obtain working loads. 2. Test data based on independent laboratory testing In hardrock concrete. •■ • :•;•; • !":"7:. parer t•rtf 17'7; 1 . 7 .: 1 ; ,:f311.7iri. tv:t r r... ' ' . •••v: ,..*:•• • • ••• 177 e. 1 ' • 4 :; 4.. • • .;•:• • rnr.. ■• (•%••••• •■;• ' ":'• E;.;•••••• La).- •••• ' • 4 • ',sr. 11'n' 1: P•••-• r:; V41 .• ••••, .• • :t9 •.:••••'" "n ; s': • ; .." • ■•••• v. '.."..,"%; ia, t. • frt..; — • • !• I: , •••:„.• a..t;x:s 1 • 1• • 7l:, 1,04 e • • •••••...k, .1,i : iwt ` — E" r 7 .1r;- L". • r • t:%;; r...q A SUBJECT • -. .. . . - .. _ - -- . . — ........ ..■.....■...... I j • • • . ._ _ . __ . .. - . • ........ -... . .. ... .__.. -.... - .... _. .... ....._ - •... $ i , -.- .. _ .. . . . . ._......__ --- - .%•.% _ ,s.. .. .. _... --- -- .3: • 1— . eoe.Jel _ .. ...— ._ ---- . ..,. ... -. . . . - 1,11• I _a3 ldY /9�� � .. . �' i +," • 1.x., .2 1 R :C ERIVITC .... r .. . - . - CE VED 1 / . .. -in L - 1 N __ - 4 911 .. -- _ .. _ .._.... ___ .—... 1 .-- --[- ...._ ..._ --..— _........._ ..-- . - ....... . . .... ... ,. _ ...._ . . . . . .. . ....... -... _. . t-S .. 1 - ... - . . . - . . . .. . . _ •• ... .. -.. . .- % l i .... _ . , — .. ,.... ...-... ..... ....... . .. . — -. ... -.. . .... .......... .. . . . . . _ ..... . .. . . . .... . . . . . ....._ .. - . .-. .. — .. , . . „ . . . IN . . -. - . .. . . To ... ..... . . _ .. V .■.. -..,,.• • ... .• \. .. ••■•■• I I I I 1 . Fiii''!! .......... ••• . .. .. . .... - . —..... .. . • _ . . .... .... .- ... ... . - .. " 1!gv.-1 ........ . — . .. --..- —. . . ..- . ....... . . .— .... I/ •___ ) VI7 1 581 9.87 DATE ll 23 -9 By S C. PO MO. 40/ CHKD. BY DATE CUENT PT r 012 Al TOP. fi r4i7A L . c IT V.r gAcArs' PROJECT - • SHEET I OF 10 DEPT. OFS NO. NO. BY 1.11t 424 "" 416 i `f DATE 11. Ci CHKD. BY DATE CLIENT CO .T FOP-f'/ 7V ggorA PROJECT CA/JT Ws' v (C 670 P-AG s. SUBJECT 581 9-87 •.• SHEET _ 2 10 OF DEFT. NO. OFS NO. V2Aie _.... ._....... ' 1 ..... . .. . . _ _ ... .." ..... ___ . __ ..... _. _ ............__._.......... .... ... .... . __ .....__. __ _ ____ ... .. _..__ .. __ . ______ _ .._. _.__ ..... _. ____ 3/ . i. _ ..._ _ ...... ._ _ .. ___ ,. .. _. . . .. . . . ..... . . 'L.= .... . . ... . _ ... .0, ..... .__ .... ... ... ...... .... . 154 .. .... _...... ...... . ...._ .__. ._.. ............ ... . . . . .. _ . ....... ..... ... ... ... ... . . . • ' '7 177: 4 ,. ! 1 ..... cv _. ..... •.. . . .._ ......... . . _ ...._ .. ..... .... . H . t- / . " . r / 7.: ,. ..• 4. 1 • . . _ .. CE . . 1 *. 4 ' 1,, ..+ 1 '4% ' . . . . . . . . . _ . .... . .. . .. . . . _ .... ... . .. .. . .. . . . .. .. . . . .... __ . ._ .._ . . .._ ..... .... ... . .-... . ._ _. . . . .. ._.. . .. ... _ ..... .. .._. ..... .. _ ......_. _ . . ........ ... ... . .. _. . ........-. . . . ._ . . __ ... _•. ... _... _ __ _ .. ........ ..... ........ .. ... . ..... .. ... . _ . _.. .. _ _. ...... .._. . .... _ ___ ___. _ I. ..... _ __ ...._ ....... . ._. •• . • ..... _ .. . _ .... .. .... . . ..... . _ ...... . ..... ___ . _ ... .. . I V"- _ ____. _.... _ _. ...... _. _ _ _ ...... _ . .... _...• ....... • ! • t ; • ; . . : ' ' • 14 . _ _.. . .. ;/"' ti \%,' • -PI ..._ ...... .... _ _ ... ... ...... . _ _... _ ...... ..._ .„........... ....-'1'. _.. _ ... II I‘ VIA 4. . /.. IP au. __ _ _ ..... .... ...... _ iii::. . _ .... ii . . .. ____ .... ...._ _ . . .... _._ .... __. ___ _ _... _ _ ., . __ _. _._ __ ._. ._ .. . .... _ ..... ... .... ..... ..... . ..... _ .. _._ ..... . .. ,._ . ..... . . ..K. k . . ..... .. .. ........ .... l 78 _ ___ _ — .. .. _. ____. _._......... .... __ ___. ..._ _. ___ _ ___. BY 1.11t 424 "" 416 i `f DATE 11. Ci CHKD. BY DATE CLIENT CO .T FOP-f'/ 7V ggorA PROJECT CA/JT Ws' v (C 670 P-AG s. SUBJECT 581 9-87 •.• SHEET _ 2 10 OF DEFT. NO. OFS NO. BY gahut4Gh c DATE II 0 U CHKD. RV , DATE Cu COPT n go-I•17 L PR T GtJTIGEVF-A STag-Ac E F ACKS SUBJ5CT SHEET 3 OF DEPT. OFS NO. NO 581 9-87 -- _.._......... _.: - -• -- _.. _ _ : _ .... ....... • ....... __ : 1.. . _ .. ... ..... . .......... ... ;.._..i __. .. _ _ ___ .. -. .... - -- �_ : ..... I ... -- ____ ..._ ._..__ __ 0,115 .... - - -• •--_ - - ............. ..._ .. _._ A ...... __ _ ....... _ _ __. .___ _._.. _ .. _ _ ._ SST . _ _ -__._ .. _ ......_.._ ..._.. .- ._- .. - - . r.i -....._........ . ..... .. - -- ... _ ... _ ...... _.._ .._._ .. ._ ... _... \ 7, ~ `` .... O r- R - - - -- -- - -- - ��. w . `' -.. l6) • . .._ . .- ...... ... .. ...._ ___ _.._..._. \ ' _. ... .. y -- ..... ._ . ._.., - ___. . —. .. .... - -- - - -- - _-- ..... _.... __.._..... - - -- _ ... .... ... _. _ __...... ..... .. ,ry, _ F, .,. ... _ . _.._ ...._...._ _ . .I . c.T ._.0 ► �2 o 3� �iI.. I iii .. BY gahut4Gh c DATE II 0 U CHKD. RV , DATE Cu COPT n go-I•17 L PR T GtJTIGEVF-A STag-Ac E F ACKS SUBJ5CT SHEET 3 OF DEPT. OFS NO. NO 581 9-87 . BY (i° 4414kae4/lt DATE //— 23 -90 CHKD BY DATE CuENT CORI FUR- 1)/TU/ (,ENTAL PROJECT CAfJT(LF- VF_. IZ_ S TOP - ACE 2A 3 SHEET 4 OF DEPT. SNO. NO. 10 SUBJECT 581 9.87 _— _ _._ ___ _ —_ ._.._.. __._I.T pL W I u1� T� 'M._ A 1 , ! _ - -� _....A. 3;(,II. _. _.I... X • ( I - . .._ ... -__ 1 -- _ x_ _.._. _4._ -__ . r .2- _- . d. - -3. _.. ' 7_.. ..4i -_._ -_ .. - 'I i I. - , - . II.. I 2 _._._. _. _ _6 _ __ -- - ' .?•_ ___.__ 21_ ._ _ _._._ _• _ __ __ M - ` . M,._ _. _.._ C_ IA A. R-TI_ e _ • • G I t..5, . u l N 3 _! _.__ — - - 4 - _ -- __..___ ._...� _ _ — .__ -- ... -4-11 • � t19 �� - .t� .1i —_-- _x _....... 12, 1• : I I ._ _ . •, .____ q1 - ___ - __ I" I c 2.97 q1 -- •_•- -d -- 01 =al _ _ __ 11 LPL ..- 1� ' F .. -.__ _.._. III ■ t Ii I AU, O,.JJ -- __ LI ?- _• ... ---- e , --- - I _ ,I151c ._._,1S - ---- 7 3 •if Lo .r.) 2 .7' A.I 1. I .=-• � 3 ,I S - A!, Q I 1 I 1 in i cS• 1 I (i 1 , .. ,. .i ", C . .. • - r* t (); /2 ? o 1 . BY (i° 4414kae4/lt DATE //— 23 -90 CHKD BY DATE CuENT CORI FUR- 1)/TU/ (,ENTAL PROJECT CAfJT(LF- VF_. IZ_ S TOP - ACE 2A 3 SHEET 4 OF DEPT. SNO. NO. 10 SUBJECT 581 9.87 % BY S:0, R-0.E -6 Aj DATE , (- 23-.7° • CHKD. BY DATE CLIENT C0P4 PO4 J /TuP- . / iA L PROJECT e n 07 I LE ,_ .5 To A !' SUBJECT • SHEET OF (0 DEPT. • S NO NO. PE .?<..3.. � ... 4 I 7( - 3' ,_.__ t_ .!. _..- ‘ 7 s 1 _ .. _ ,... 'G_ ___ ! Ifs . ,c ... s.//s rt _... s ...... . _ . _ f • I i - ' i : ; ' I,2 ..../ r •:..-. _ .... f 6, __-._� ` -• I ,, ' ' _.. _. - ---- _.. .._ e _. _ -0,1t5 _. . _ : k I tI 11 LA I el, ' , • i ; I ea void syl A a G S" riT 1,2q O•' 5 ... r---- T ,.//.1 I ; ! III "I •,.4 I 14 ! )1, , ( /S)( = ti s' 2, Is . 15 i AI I 2. A/,5 2 r' 3 2 . Q, 7;1 L IS 3 1 ,-3 � f i f- I _ 2 r , t 5 Gera 4 .) , =ImLx — 72 i I , i i I P I. ''i e 2 i 2,s41 S (I \1 r-- 4,5 % BY S:0, R-0.E -6 Aj DATE , (- 23-.7° • CHKD. BY DATE CLIENT C0P4 PO4 J /TuP- . / iA L PROJECT e n 07 I LE ,_ .5 To A !' SUBJECT • SHEET OF (0 DEPT. • S NO NO. _._. __... 1919 _. _ _. — _ .• _.._ __.. .. sits I AI l.1r 3 . _._ . I 0 1 O ' • 1 l l _.... r c _ i 1 ...., ( q_0„.....t.J , . 6 (" .. . _ 2 j.. _. t40 • ?-41' L__... 1 •-• 1,;, .. "...I (. I 40. 1 „ .. -- — . u ____ ...__•_... I , 381 t-.� r " 211 ..._ ..- _. .... ' CAL. , 255 ._ _. �O M .__. ...... ` _ f 2_` 0 . CJ �. ( . i . i ... _... - -- .. .. _...._ 1919 _1919.... 1919..... 7:. .�, i I! C `' _ ) _ (Zw .- .. hn = - ' 4: ( - e 03 I g .=_.0 I aE 23 I .... 1919. - - _1919_..__.. - ............. -1919 19__19 - -- -_._ - 2 �t ,,,19.0. . -,:r_ J• _ : ��E Y1AJ; \�j ki . �. _ • _3�f,.._ • 311 C 1919.._ ._ I . ... I Id(' .1. �-- C4 1919... _ _ C (,'LS 7t. If s V 1 I, Q . , I I j 1 I _ . `` . — b 1919. •L. 1 d�. .. +t- � (� 1919 HH H ^ �� �02,�1� i 1919... 1 i Q1,I . sO csia c t 19,19.` " '' � . 2 . , _ , _ 1919 • �0 C, . _ �.. 7 S _... I I . • __ j ?� , I I r-- t-' G I i ' ' ? • I _' 19 .......... . W .JW . _ .. _. _1919_ BY S3's C. /(44nat t ( /-* 23 -90 CHKD. BY DATE CLIENT COR FUG-. _ ,ro 2! pg tit AL PROJECT CAA)7'ILf.:YF- Fz.A c S SHEET 6 OF w DEPT. OFS NO. NO. SUBJECT 581 8.87 _ _ --....-... ......._............ e ., ... ' . /D • .._ ...._.. ... _ .... .... . .. .. ... _._. ._......... . 1 . ....... ..... .... . ... .. . . _. . .._.. ...... ..._ _.... X. A. .i.q. . ..4?4. 1 ... . .1. ..... .. . 1 1 _ .. ___ _ ......44 _ .. Fo _ ff.. I ._ . : . _ le L 111 ? A./.1....a_.g......,.... 1 1. .._ /./.....,.. ....to .. 0g• ii ......... .. . . ... . .. . . .. . . . . .. ... . . ...... . ... _... . ... .. 1 , .. . . . , . i — 1 44 62 r- . .... .... ._. • 1.. ......... ..._...... . ...._ .. '11 _ ........ r _ ...... 5 t 7( _. _ _ __. . ei vz. _ pi i .. 111 I, 1 . I . ,. .... _._ ... . . . ____ ....... _.. ..... __ .._. . .. „ 1 n . . .... .. ...... .........._ . 7 ... ___. ... ...... .... ... .. ... _..... _ 7 a ___ _ .... _ I I •• f . --- _.... .. ..... ...... ._ .. ... .. .... ...... ..._ ____ ..... ii _ --..... _... .. .. . .. p _... . _ . . ■ , 1 - i .; ... 1 1 1 , .. 13,8 - a . .2 8/ . ‹ .. 1/33 ...__ _ ... .. . .. ..... ..... - - - - -- - 1 A I I S 150 . - . . • , I ' . _ ... %....■, . ; ) (......: I . It ' 1.11 . i 21 4 , 7 -..- — ..... - - -- ...... -- • ....... --- • .L ' ...... \...,-..'....',.° . . r'"/..,..T :. A :, -...›, , I ' ..... _ . .... .. . .. _. ........ I . 1 ..... ...._. ....._ .._. ....._ .. _ ..... .. .. .... f37( ....— . ....... .y. . ..4:..1,4:. ,I, I . . • BY i fja"a (1 " DATE I/ CHKD, BY. DATE WENT OR F0121.10 012.4 12.,E/J 7 C. PROJECT Ai.Jr1LEW STO tc g4<its. SUBJECT 681 9-87 SHEET / OF DEPT. OFfj. NO. BY Sc, Peti,Jar DATE II Z345 CHKD, BY DATE _It CUENT COP" rORMTURP- RF-/47 PROJECT CAnT/LEV.-P-- S a pAces SUBJECT 581 9-87 0(0. SHEET OF I DEPT. NO. E _ - - ----- /3 ,.... 6 . 1 Bo 6 _ 2, ...._. . (...7 .. I _. . ._... . s - ......._... __ _... 2.7o0 . .. 1 . .... .......... .. . ..._ . . .. . K /,3 ..... . .. 3 6 . ..... 3 . .. . . . .. .. _ • • . ...... .... . ii v, - • ;,I.C.-)..4. ' ) n Is. * It- ' ••: ... — I 1 I i 1 C ... V ft' ..,. 1 N.:: ...4*-..! •4, ,1;;,/ r 1.... .1....0.- , -'' /P './ I 1 ki. , . • ", • 1::,:.:, . .-1, 1 '...'.7't. •,!1 1 'ff.::r../ .. •• 1.... 1/ .- • ... . 4... 1 .•; -- i -,. ,., ••■1,. -.7.,•)• . A ...... . - - ... . - - -- ... - - - ._.._ . .,.- ..... ._ ..._ .. .._.. . _. 7 .... ...... .... .... _ _._ ... 1. _. _ - _ -..... . - ....... . = • • ; ' ' „ S I _M_ -...... . ... - ..-. - -'-' --- - )• --.. - - -- • , t I : • As --- .M. . 1 A(.ic 7 1 - -- ... . 1.01 . • .. ...__ .. _ .. ... 1 1 i 1 ,..I z ... ...... ... . .. . . . . .._. _. ...... ke . .... ... . ._ ..__.. ........_._...._. . .. , . .. ...._ .._... . _. Ai . _ . . ..._....... .._.... .___ _.... .- . . .. .. . .. ___. .._..._ .._ . _..._ FAT e.a940 _ _I . _ ... .. _. __. ....... ........., __..... ...... ... _. .. ... .. ...... . . _...... ... . • . .... - : ""‹. • .” I I . I , : • • • - .er . . . . _ .-- , •2 . • .. _ 0 2 - - _ I i ;11 _ _ _ . .. . . .. . .. ._.........._ ....__........___ _. _ ... .. ..... _ ..._...______ .._.. _ _._. ._........ ...... .. _....._ ___ I E 7E 7 ..._________ ....______._...____ 1- to ...._ . __................................ ..,..... . . . EDe 4- ... ..... ... /. 3 ••••.••..••• ..... A ,tdc11/z. ... . . . . _ ...... ... :i....: . ..... _ ___ .7 5 v __...... ___ ..._____ ....... _. _ ________ _ , ,......,_ BY Sc, Peti,Jar DATE II Z345 CHKD, BY DATE _It CUENT COP" rORMTURP- RF-/47 PROJECT CAnT/LEV.-P-- S a pAces SUBJECT 581 9-87 0(0. SHEET OF I DEPT. NO. tiY C it (alhI h DATE /t CHKD, BY . DATE CLIENT coRT pv/24 4/1 lep NTA G PROJECT c.,4 �J r /LTV ,F2 srat �' �A ck S . SUBJECT • SHEET 1 , OF I DEFT. OFS NO. NO. _._,._..� _ -- 24 - ---- .. . ._ . 12A / .._. ( .. �. t ( 1 I I ! I i .. i .. ii.V.14/. 4fT f rrAME ; . , .. .- . . . 531 -- ._..._ - .. ► I I ► 5376- -1,, _., I i 1 I -- ...._.... 0- • _. . . jj 4 111 ; YA! 740 5'31. 537 1260 ..... ..._..._. _ ... __.. - - -- .._..... _ ... 5 - -. l — F �h1 S I ` 1 ts 22e r 2 I^ `�� - . . 11 2- • !. - 1 . _ .. 12._ . _. __ .. . . .. 1I2 1 ,Tur I 1 � . c`O -UMi.) - ; . 1 MtMt=1J7 = ! 15 . . . .. - -- • ‘1.96P""-/Yr 5 ..._ � �..� �5q . ���� 1 (` l - 4�� ! : S I __ _ cr _ H.<1 l5b /'5 pp ► 77 _ p sjo r 18 ( �8 � .. i ... g _ s.$_ did • � �i 6 -_ rd a i 40ti.- cLJ . ` i... 4......."3:7a ker.„..it, •i_-:r il 'O.' -.4 Vi+Ia c l '-2 .. .1 i i -114 : -1 .. ••• I . V' ' 1 I - .0 IV ` S S I .. _.._. G „ - ... ` r9 , G Iv EC � yi� iir ?� ��� �I� 1 1 ,fin Q. C'�G __ �� I '. 21 � d 306 tiY C it (alhI h DATE /t CHKD, BY . DATE CLIENT coRT pv/24 4/1 lep NTA G PROJECT c.,4 �J r /LTV ,F2 srat �' �A ck S . SUBJECT • SHEET 1 , OF I DEFT. OFS NO. NO. ..........._ ___ 1?-0 _. .. .. ._... ... 1,.... _ • ....._ p _ .._ .. otil ,( 41)< . . .1. 1 1 • - — • = ''f ,I ; //A / . : , ... _ . .. . .._.. ...... .... . •• .... . ..„... . .._. .. . ----. ... .._. ...._ .._ . .... _ .... .,. . . ...._ .._. . ... — ........ 1 21 e.rj• 1 •• / i 0 4031 ic.110 i - • '6)c/Ae. zsoo S . .. . _ ... .. .. coc _. . . : /..440 . - . 1 . , 1 . I . 1 1 . ...., . ,:-/ , 1 , .... _ . . . . . ... ... - " ... . . . . . ._ ...... . . _ ... _. . ... -- .... .. .. . . ... . . .. . ....... ..A :II ........ ...... ..... .. . .. ........_ ... _ ..... ....._ .. ... .... ... - ... . - . _ ._ ...._. --. - . . .. . . .. ..... _ .. ._.... ._.. _ . _ _ ...... _ ._... —...... ...— ....... • — ...... . .._ . . ._. . ... _ ..... ... = ., _..... ...... _ _ .... . _ ...... ___ ._ ._ • . ...... . .. _.... " ---- _. ... . ..... -- — ... ... . .. ..._.. ..._ . — — ._ ... ..... _.... .._.. — —"" _ .__.. ..... . .. 1 .t r ' l l - 2 , 1 7 58 ... a ... ''..,.... trir";1.;.:4;,.. „ ,e. - • .. ... ... - - _ .1_ 4� — . --- -- __. .... ..... ... . ..... . 1 i I ''''' k% i. . . . . /1771 . 1 i I - ti 10 .. ••• / ....: c, " _ ..../. *" C : ' ..1 V 41 • .... .. _. /';',.., G. • i ../ ,,.... . NA ,...... , .... ...._ .. . ._. . .. • ' 1 ' 4 1 — , .._. . . . . . . r. 1 ' . . ... . . _____. ___ __ ___ _ _ _...... _ _ _._. _ _._............ ._ __ __ _..... ._, . ..._. ___. „ • • C v 14144"—e41 DATE ii-v CHKD. BY DATE COAT FOgNITOgg p__Etu7AL CLIENT PROJECT SUBJECT 581 9•87 sTr MckS. SHEET OF I DEPT. OFS NO. NO. CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #90 -521: Cort Furniture Rental 1111 Andover Pk W PHONE b (2061433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME A F THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER �Q RT Q . 1. No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. . All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 3. • All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition). • Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Cary L. VanDusen, Mayor "X' REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 11 ' 12 13 X 14 FIRE FINAL Imp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBUC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) ISUILVIP1U FCI'1MI INSPECTION RECORD (Post with Building Permit in conspicuous piece) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 111 Andover Pk W SUITE NO.: BUILDING (SI5 PERMIT N0. , DATE ISSUED: PROJECT: Cort Furniture Rental CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are In place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAIUNG - Prior to cover. 6. MASONRY CHIMNEY - Approxknately midpoint. 7. FRAMING - After rough-In inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points dear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminrfe problems, delays and misunderstandings as the project pregre.sse. owl' "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 X 14 FIRE FINAL Insp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL X BUILDING FINAL PLAN CHECK NUMBER C0 - 521 L OJECT: Cifit,"641Littth, THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER tIe No changes will be made to the plans unless approved by the 1lyyww����� .•Arefrrtee44and the Tukwila Building Division. /� 134441 MEWL. 1 2) Plumbing permit shall be obtained through the King County Health �•� Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). O Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872-6363). O 4 All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. O 6 When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O All structural concrete to be special inspected (Sec. 306, UGC). O B All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UGC). O 9 All high - strength bolting to be special inspected (Sec. 306, UGC). !0 Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. C o ) Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. iS Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). 16 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). (� All construction to be done in conformance with approved plans and 1 /�� requirements of the Uniform Building Code (1988 Edition),•Unitero• attrerrr . . O All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the Job site. l9 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.B.C. Standard No. 43 -8, shall be special inspected. O All wood to remain in placed concrete shall be treated wood. O All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. s Validity of Permit. The issuance of a permit or approval of �/ - ' plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. City oC Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 Fire Department Review Control Number 90 -521 (513) Dear Sir: Gary L. VanDusen, Mayor December 24, 1990 Re: Cort Furniture Rental - 1111 Andover Park West The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1)) Extinguishers shall be installed on the hangers or in the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.6), and shall be installed so that the top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1 -6.6) (UFC 10.301) Extinguishers shall be located so as to be in plain view (if at all possible), or if not in plain view, they shall be identified with a sign stating, "Fire Extinguisher," with an arrow pointing to the unit. (NFPA 10, 1 -6.3) (UFC 10.301) 2. Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit signs shall be installed at required exit doorways and where otherwise necessary to clearly City al Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Page number Gary L. VanDusen, Mayor indicate the direction of egress. Signs shall be of a contrasting color with the surrounding area and shall have letters not less than six inches high with a minimum letter width of 3/4 ". (UBC 3314) (UFC 12.108) 3. Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) 4. Sprinkler protection for rack shall be as described in N.F.P.A. standard 231C with the following considerations: 1) Flue spaces shall be provided every 4' both longitudinally and transversely. 2) Racks for encapsulated storage shall have in -rack sprinklers and the sprinkler system shall provide the densities in table 6.11.1 (y) as described. 5. Your street address must be conspicuously posted on the building and shall be plainly visible and legible from the street. Numbers shall contrast with their background. (UFC 10.208) All required occupancy separations, area separation walls, and draft -stop partitions shall be maintained and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) 6. A permit is required for storage of high -piled combustible stock. An application is enclosed. (UFC Page number 81.103) Yours truly, cc: T.F.D. "file ncd City oTukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 The Tukwila Fire. Prevention Bureau Gary L. VanDusen, Mayor To use any building or portion thereof exceeding 2,500 square feet for the storage of high-piled combustible stock. A floor plan showing the dimensions and location of the stockpiles and aisles shall be submitted with applications for such permits. (UFC 81.102) Plan Review PROJECT C epika low ADDRESS %lit G iQ , DATE =3 -ao OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HT. / NO. STORIES FLOOR AREA OCCUPANT LOAD ■ DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. CHAPTER 51 -10, W.A.C. u.) ‘QatioLbutztu:A.* EXITING REQUIREMENTS .�'fAALI N/q t9,1<, £4.te OA. NOTES: CITY OF TUKWILA DEPARTMENT OP COM 1 ' ' VITY DEVELOPMENT prepared by: PLANNING OI VIsSON PLAN CHECK NUMBER 90 --52t 110 •