HomeMy WebLinkAboutPermit 6409 - Costco - Truck Door5i
TYPE OF CON • 1 -T e ' year
- III -N 1988
SETBACKS:
N- S- E- W-
FIRE PROTECTION: Sprinklers 0 Detectors () N/A
UTILITY PERMITS REQUIRED? 0 Yes 50 No pu buo worfcsf
ZONING:
BAR/LAND USE CONDITIONS?
[] Yes II) No
CONDITIONS ( other than those noted on or attached to Ee It /plans)
a .
BY: /t / �v OFFICIAL
Aetn.e
-l6 -
,
i hereby certify that i have read and examined this permit and know the same to be true and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presuuii . 1 ' • a violate or cancel the provisions of any other state or local laws regulating
construj: -.. . - • : � . • :: wo ' I am authorized to sign for and obtain this building permit.
SI ,,,,� �I!
DATE: /--..2 - 9i
COMPANY: p T .__
.. :.. ..... -
.
CITY OF TUKWILA
Dept. of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA
(206) 431 -3670
BUILDING � O ��
PERMIT NO. -1
DATE ISSUED:
PROJECT NAME/TENANT Costco
TYPE OF New Building Addition
WORK: 0 Rack Store e 0 Reroof ■
DESCRIBE WORK TO BE DONE:
Saw cut between
POOP
•. • f•1
ADDRESS
CONTRACTOR
ADDRESS
USE
FLOOR
TOTAL
l -tea -a r
1160 Saxon Dr
Paul & Eleanor Sadi
Royce Construction
O CER TIFICATE OF i
CCUP
Division
98188
585 Pt. San Pedro Road,, San Rafael. CA
P.O. Box 1012, Woodenville, WA
WA. ST. CONTRACTOR'S LICENSE # ROYCECI159KW
ARCHITECT Mulvanny - Lee Architects
BUILDII'G PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
AMO N
FEES
::::153.00
( '�'�' I�C1NM
111 :'" a
UMW IS
99.0
0 SCRIPTI • N
BUILDING PERMIT
P ANC ECK FEE
BUILDING SURCHARGE
OTHER:
TOTAL tl:
256.:50
PLAN CHECK NO.:
91 -019
ASSESSOR ACCOUNT # 252304- 9063 -05
Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
Remodel residential 0 Other:
two exterior truck doors and enlarge to one truck door.
I
PHONE 641 -2028
EXP. DATE
PHONE 881 -
ZIP
ADDRE 12200 Northru Wa Bellevue, WA X8005
CO 11PLIANCE
14,000.00
2!P 94901
98072
10 -08 -91
1 _ SQUA E L
OCC. SQUARE
OCCC SQUARE
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
000.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD_
This permit shall become .null and void if the work Is not commenced 'thin 180 days from the date of
Issuance, or If the work is suspended or abandoned for a period of 180 days from the last inspection.
DAT ISSUED:
PERMIT NO.
CONTACTED
`
DATE READY
DATE NOTIFIED
l I , I 5 (1
`J' " l
BY: D ee
(init.) - i./
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
`
r
-J
3RD NOTIFICATION
r
BY:
(Init.)
i
• BUILDING PERMIT
APPLICATION TRACKING
PROJECT NAME cc)
PLAN PLAN CHECK
C IUMD /R
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
TOTA
OCC. SQUARE
SQUARE
OCC.
OCC.
OCC.
TOTAL
AR .
TOTAL
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
BUILDING -
initial review
O FIRE
O PLANNING
o PUBLIC
WORKS
O OTHER
REVIEW COMPLETED
SITE ADDRESS L cop s
HMI - a) 1
(ROUTED)
INIT:
INIT:
INIT:
. . ... ...................... ............
t'A NSULT'AIJT: Date Sent -
FIRE PROTECTION: Sprinklers Detectors N/A
FIRE DEPT. LETTER DATED: INSPECTOR:
ZONING: BAR/LAND USE CONDITIONS? Yes No
REFERENCE FILE NOS.:
EM
MINIMUM SETBACKS: N- S-
UTILITY PERMITS REQUIRED? Yes
PUBLIC WORKS LETTER DATED:
"Dr
SUITE NO.
Date Approved -
INIT:
BUILDING - � _15_ q ` 15 -c OF COS T : UBC EDITION (year):
final review II INIT__\ <C h 1 --TS 5pe.. lams
SITE ADDRESS SUITE #
/ /6 SA xay . o/z . 7 / ZA
VALUE OF CONSTRUCTION - $ , ea°
PROJECT NAME/TENANT
57C
ASSESSOR ACCOUNT #
25230 - 9a3 - C
TYPE OF • New Building • Addition 1 Tenant Improvement (commercial) • Demolition (building)
WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE:
5M w - c vT 87 " (2) ,EX . 7 K .P/2. 4 'D E/✓L,,.a24 otiB 7 e ,p )rz
BUILDING USE (office, warehouse, etc.)
Gv42 r/ --/dvS e
NATURE OF BUSINESS: Ge.///U L 65 yaL rs G-1—e//3
WILL THERE BE A CHANGE IN USErtS No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 2Z4' a , 0 , 0 • Tenant Space: A-7 Area of Construction: VA
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 'g No ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER ppriG f4 4-2, .,ta tvo,n 5 4,o/
PHONE
ADDRESS S 8"S • /a7. SIB/✓ P,4D2a k/), 5- ,94/ 12 . iez c../)9 .
ZI P p 91/
CONTRACTOR / .1/C-4' -...i.-s}>"'"7::
PHONE � / z
ADDRESS tea. 8 - /0/ 2. 44_4,2,7,D //✓ z Z ,z'„ w.o,
ZIP 2-
WA. ST. CONTRACTOR'S LICENSE # n0 y Gam 67 ,.S q x G✓
_9,
EXP. DATE /0 - S • 9 /
ARCHITECT 7 /JL Li - L � z/Z c,l�
PHONE �g1, -
ADDRESS / Z z �d o'/ZT i/v� w �-
ZIP ��JS
:......................... ...............................
•
Mtn
THAT �: 'fit ExAMI .. CAS'iO�At�4�. HMO.. W.. T�fE:.. 6AMr *.:TC,..I�E. >:;.::«<: >::::::
AP I..Y t=t� ..:TH)ta�:F?!~: ::> �:::><>::>::::::::<: :;
AID .A . �` t�!
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE j /
DATE / ly 9/
/
PRINT NAM /4,6 - a/2./.,)gaT ,iv4erN7 „a/t- !-o'S,
PHONE a d d'
ADD SS
/ 2 z ao y✓ar•T,l,/e/i
CITY /ZIP �,,,5
Cg�'lz, y8'
CONTACT PERSON Z.-4 • 4 Ain 2-?—
PHONE $-g�, 76 •c '
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER 9L-
APPLICATION MUST BE
FILLED. OUT COMPLETELY
BUILDIN PERMIT
APPLICATION
i'QINGPERMI F
PLAN`CHE K ,.EE
UILDING:SURCHARGE
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed Information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations: The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPTED I DATE APPLICATION EXPIRES
.. • :
....RACK STORAGE .. .. • .
Completed building • • •
0 Assessor Account Number
. . . •
Two (2) sets of plans, which Indude
andex ways 9/1
• ••
...StrUatural talculationti hitt byaoSigtqn,
engineer (rack storage
RESIDENTIAL
• :v
NEW SINGLETAIAlLY DWEL4NGS/AD
: • .
Completed huilding permit application (one for each ttuoture
guBMITTAL CHECKLIST
Assessor Account Number
...; • . " "
Two sets (2) of worWng drawings, Which include
•'• 6 1:Foundation plan,
site (Ci ptan 41hCM'. bin,
•••• • Floor plan ,
••• • Roof plan •
Bulking elevations (all
• Building cross ootlon
. .
• framing plans
Washington. Sta Energy Code data
Completed uuuty permit application
, . ..„.: •• „.......
" " . ..•• •"• • •
:.E21 site plans showing utilles
NOTE:. Building site plan and utility. site plan may be
uWIly permit application and checklist for specific submit WI requfroments
• • • ••••• .• • • • ••••
. .
:•••Adrperial topographical and 60119 Information maybe requitediTUnieUrt:
site conditione. • • • • .• • • • .". •• •;•.:,•••
•-•
Existing and proposed parking
Overa building plan
•••
.(Cartanert te rtanty•:;:i.: , ...::.,,
: i0 1 # 0 0000#. 0 440.!N;q.94 0 r*tqc"
plan of proposed tenant apace
'Now walls, existing wall and walls to be demoll&
•
INI=MINAINIMMINMI■
O Narrative desCribing .existing materiel heing•remeyed; and
material •
. : . •,..,
:•
NOTE Anertifleation letter Is filkr:to final Inspection and
off of the permit:1' , • •1•• • • •:: :
PROJECT: („b CA c 0
PERMIT NO. 6, q
SITE ADDRESS: 1 1 I, ty Svs- )t-
DATE CALLED: - ..
TYPE OF INSPECTION: k—t. t.-.1 Ps
k. .
DATE WANTED: 2. - i c (
SPECIAL INSTRUCTIONS: ---
REQUESTER:
PHONE NO.:
INSPECTION RESULTS/COMMENTS: 2(21/€0 - cA-t.4..4.w o-a)* sA‘Al i S - e*IG 4 . , T° v's"'" ri
jrktS \I 02-6kt.-- CowoivoroArt LA% 1/4Ctk hna•list 11.-c - ID Ni I'lle SeC 1 r4-5Nr--q&i:8 /Leed ILA"'
1-ticr1 o Not PElt-rA4v.A - CO cAA:rviv-IG, krsto f)t- t c i OC; NriAG
c.c.t.,,v,id i-t,...ebra , wt.% ic+1 1..41-4 Ow_ .
..z.z. TIN.) , 4.* 4
Ali I 17 %A% t - 0 4. • a: , • ' ,,,
..
Varrx
2:- 'An AtO 'a A Vt.S.t.kfri- i r,j Spit d o a-ts--.
—
INSPECTOR: DATE: r- -17 I
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431-3670
INSPECTION RECORD v
6300 Southcenter Boulevard - #100
Tukwila Washington 98188
INSPECTOR
AND. DATE
cc: 1-Owner
1- Architect
1- Engineer
1- Contractor
1 -Bids. Dent.
OTTO ROSENAU & ASSOCIATES, INC.
CONSTRUCTION INSPECTION & TESTING
6747 M. L. King Way South .• Seattle, WA 98118
(206) 725.4600 • Tacoma 627.4477 • Fax (206) 723.2221
INSPECTION OF STRUCTURAL STEEL
•PROJECT: Costco Wholesale Warehouse Remodel
ADDRESS: Andover Park E & Saxon Drive, Tukwila
ARCHITECT, :. Douglas Mulvanny
CONTRACTOR: Royce Construction
INSPECTOR'S REMARKS
PERMIT NUMBE
JOB NUMBER
ENGINEER: Shutler Consulting
INSPECTED AT:. , Job. Site
0. Rosenau Inspected structural steel and welds at the jobsite. Everything
1 -25 -91 was as per plans and /or changes approved by the Structural Engineer.
I confirmed the Engineers approval on all changed via telephone.
WABO certified welder: Gerald Hall 10- 1 -91. Electrode used was
E -7018.
FEB 0 4 1991
CI r >tA.�r rukwrr
This report is: the'eclusive..property:of our or u= in' producing
a final report to obtain a Certificate :of'Occupancy. Use of this
report by any other firm is strictly prohibited without written permission
from our firm.. This report:may be a_matter.of public record at government
agencies.etc., but it is'public. record for viewing only, not for personal
or.'financial gain..
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91 -019: Costco
1160 Saxon Dr
PHONE 11 (206) 433.1800 Gary L. VanDusen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME1Q o 91F THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER c'j
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. When special inspection is required either the owner,
architect or engineer shall notify the Tukwila Building
Division of appointment of the inspection agencies prior
to the first building inspection. Copies of all special
inspection reports shall be submitted to the Building
Division in a timely manner. Reports shall contain
address, project name and permit number of the project
being inspected.
5. All structural welding to be done by W.A.B.O. certified
welder and special inspected (Sec. 306, UBC).
6. All high - strength bolting to be special inspected (Sec.
306, UBC).
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
8. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
"X"
REQUIRED INSPECTIONS
PHONE
AP DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation .
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wail Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
X
7 Framing
431 -3670
5 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wail Board Fastening
431 -3670
X
11 Bolts
431 -3670
X
12 Welding
431 -3670
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
18 PUBUC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
(INSPECTOR COMMENT SECTION ON REVERSE)
BUILDI PERMIT
INSPECTION RECORD
� S[ I E ADDRESS:
1160 Saxon Dr
CITY OF TUKW ILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
(Post with Building Permit In conspicuous place)
BUILDING (QL(CO\
PERMIT NO.
PROJECT:
Costco
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
AINIMMINIMMININ
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied In place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAIUNG - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points dear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALLBOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECI1ON - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although'not
required, it Meeting of this type can r eliminate problems, delays and misunderstandings as the
project progresses,
'X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
X 7
/
Framing
•
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
X 1'
8cL5
13
14 FIRE FINAL!nap:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
17 BUILDING FINAL
PLAN CHECK
• NUMBER
PROJECT: CC) 5
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER
o changes will be made to the plans unless approved by the
Architect and the Tukwila Building Division.
O Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency,
including all gas piping 1296 - 4732).
Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical wore will co
Inspected by that agency (872- 63631,
l I)
All mechanical work shall be under separate permit through the
� City of Tukwila.
All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
when special inspection is required either the owner, architect or
'""���.../// engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection. shall of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O All structural concrete to be special inspected (Sec. 106, USC).
\QYAII structural welding to be done by W.A.D.O. certified welder and
pecial inspected (Sec. 306, USC).
" [J All high - strength bolting to be special inspected (Sec. 306, UDC).
1 0 Any new ceiling grid and light fisture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
It Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
12 Readily accessible access to roof mounted equipment is required.
13 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
Any exposed insulations backing material to have Flame Spread
Rating of 25 or less, and material shall bear identification
showing the fire performance rating thereof.
0 Subgrade preparation including drainage, e.cavation, cospaetion,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
A statement from the roofing contractor verifying fire retardancy
of roo4 W111 be required prior to final inspection (see attached
procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code 11908 Edition), washignton State Energy Code (1989
Edition), and Washington Stag Regulations for Barrier Free
Facility (1989 Edition).
10 All food preparation establishments must have King County Health
Department sign-off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296 -4787, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
19 Fire retardant treated wood shall have a flame spread of not over
25. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
20 Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
21 All spray applied fireproofing as required by U.I.C. Standard No.
43.8, shall be special inspected.
22 All wood to remain in placed concrete shall be treated wood.
23 All structural masonry shall be special inspected per U.S.C.
Section 306 (a) 7.
Validity of Persit. The issuance of a permit or approval of
plane, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any ,of the
provisions of this code or of any other ordinance of the
jurisdlitlon, Nq permit presuming to give authority or violate or
cancel he provist.•'• of this code shall be valid,
ana SHUTLER
ISM ® CONSULTING
NEW MIN ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA. 88007 •
(208) 885-4473
(
STRUCTURAL CALCULATIONS FOR:
COSTCO WAREHOUSE
TUKWILA, WASHINGTON
ARCHITECT:
DOUGLAS MULVANNY /Architects
12200 Northup Way
Bellevue, Washington 98005
(206) 881-7600
JOB COSTCO /TUKWI
SHEET P40 COVER 1 OF
CALCULATED Br A. Bresko DATE 1 -14 -91
CHECKED BY JJS DATE
SCALE
DESIGN CRITERIA:
CODE.., UNIFORM BUILDING CODE, 1988 ed.
WIND LOAD. 80 MPH ZONE, EXPOSURE "B"
SEISMIC ZONE ..:..ICI Z =0.3
SIT RECEIVED
JAN 14 1991
PERM ITCENTER
4111111 - .4 UTLE R
Walk. CONSULTING
Mr MIN ENGINEERS
IMM111111101■11116 AMMO
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
JOB
e,5 rxo t pleet-00-
,
SHEET HO -5- I
CALCULATED BY -10
OF
DATE
CHECKED BY DATE
SCALE
•
-•
II
Dim t
{ .4
,11 r.
40
III
I I
p
Y5
I.
i
Id k- k MUM
1.41.
. ' '
..a.
r
Y .00$1
,,...„
IIIRMININI
,_,,,,,,,,,,,,,
1 1
1 I
•
zr _.
I
•
.
.
, V
1, i
f 11
1
,
%
r-• /."3
1'
,,,
.. .. ...
—
-- -
....
..
...
'
MI
74
?
S )zr
0
17
...
-.
).&1.)._
_
;t:
...„_
aurseammit
. _
r
k
I I _
.6
1111
...
-r--)1Z
g
•
•
'11.
•■■ S
...._
_
III
L
_________111
__
. r09
..
o I
(91
NJ...
II
_
-
y r
.
Nr..
EN
t
imii
..
,-
.
Li
}■"I fl
.8
•
(24,f)
AV
)
4
,..;..
1
.
‹ ..1
.,
...._ ......
1
..,..
L
(--,-‘
_
•
i
.. . ..
1
./ -7.4.
X
,
.
IA
: -
I 5:
cm
L •
•
....
..... ..
4111111 - .4 UTLE R
Walk. CONSULTING
Mr MIN ENGINEERS
IMM111111101■11116 AMMO
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
JOB
e,5 rxo t pleet-00-
,
SHEET HO -5- I
CALCULATED BY -10
OF
DATE
CHECKED BY DATE
SCALE
.
'
e•
N4 1 .117
1 hi
N.1
Ii
pri
.
i
I-
.zY
N, I
1
III „I
millir
. e
IL
i
v
.
- 9
.
_
.._.
, ,
__7
. . .
II
kr - 1
..„...?...
el
_(..z)_
A
9r
.
K 4(4.
do __.;'
1
1
i•
01.1=;1
...
,
1 1E1
,
r-
,e
....._
- --
II 111 I
.
f.._
•■,),
11 1
.
I
N
I
aill
--
-
-
11
a.
1 •
.
•
...
1111
111111111
IIIIIIII
1111
,. ..
III
a.
AUTLER
111111111 CONSULTING
IMP Mil ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
JOB
6.' 71, joielb„N.CA
SHEET NO, 4'
CALCULATED BY 4,5
OF
DATE
CHECKED BY DATE
SCALE
AEI all 11111111 SHUTLER
Ma.
CONSULTING
Mir INN MIN ENGINEERS
ANIL
IMINOMINENNUNINWINNI
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
Joe -Zeivre
SHEET HO 3
OF
CALCULATED BY DATE
CHECKED BY DATE
SCALE
uaauaa
MN
a
2
liii
,„
re
I,
z
/
z
*
:.. 1 li !
n J
0
11
PU!
1 It
1 11 1
I
_____
It
41
I
,
I
me
i
It
vD
I
'
I
a l •
EWE
In
II
1
:41j
1
1
1 1
MI I 1
I
III
1
is
III
11
1
II 1,1
1 11 1 1 1. 11 11 1
1 1 1 1
I
In
1::17111111111
" 1
1
1
II
I III
1111
II MU 101 IN
MIN
AEI all 11111111 SHUTLER
Ma.
CONSULTING
Mir INN MIN ENGINEERS
ANIL
IMINOMINENNUNINWINNI
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
Joe -Zeivre
SHEET HO 3
OF
CALCULATED BY DATE
CHECKED BY DATE
SCALE
SHUTLER CONSULTING ENGINEERS Tits:
14450 N. E. 29th PLACE Scope :
SUITE 116 Number:
BELLEVUE, WASHINGTON 98007 Misc
(206) 885 -4473: Dsngr :
ec T .ew2
s -�
08- Jan -91
STEEL COLUMN DESIGN Page
DESCRIPTION »
>>
COLUMN DATA DESIGN DATA
AISC SECTION » ts8x8x5 /16 Fy = 46 ksi
TOTAL COLUMN HT. = 24 ft LOAD DURATION FACTOR = 1
COMBINE LL k ST 7 N y/n
SUPPORT FIXITY - --» 1 (<
1 =Pin /pin, 2 =Fix /Fix SIDESWAV 1 :Restrained, 0:Free
3 =Pin /Fir,, 4 =Fir, /Pin X -X AXIS = 1
(Bottom /Top) Y -Y AXIS = 1
UNBRACED LENGTHS: EFFECTIVE LENGTH FACTORS:
X -X AXIS - 24 ft X -X AXIS -
V -Y AXIS = 24 ft Y -Y AXIS =
APPLIED LOADS
AXIAL DEAD LOAD - 26 kips ECC. for X -X MOMENTS = in
' LIVE LOAD = 19.9 a " ' Y ' = in
' SHORT TERM - "
Dead Live Short SLoc ELoc
X -X AXIS MOMENTS: TOP = k -ft
BOTTOM =
BTWN ENDS = It
Y -Y AXIS MOMENTS: TOP = k -ft
BOTTOM =
BTWN ENDS = It
POINT LOADS: (k) X -X -
Y -Y _
UNIFORM: (k /ft) X -X 0.24 24 It
Y -Y -
SUMMARY L:
I USE : TSBXB0/16, Max Stress Ratio = 1,05
I Load Comb...)) Dead . Live 0 +1. D +L +ST
I Formula 1.6 - la = 0.390 0.753 1,049 NG! . i 4
I Formula. 1.6 - lb = 0.402 0.710 0.710 OK
1. Formula 1.6 - 2 = . 0.365 OK
X -X Y -V I
Fa : Allowable = 15.85 ksi Fb : Allowable 30.36 30.36 ksil
fa Actual _. 4,90 " fb Actual 16,16 I
STEEL SECTION DATA
DEPTH = 8,00.in 1 -xx
WIDTH = 8.000 in S-xx
FLANGE THICKNESS - 0.313 in R -xx
WEB THICKNESS _. 0.313 in . I -yy
AREA _ ' 9.36 in ^2 , S -yy.
WEIGHT = 31.85 # /ft R -yy
r -T -
'- INTERMEDIATE STRESSCALCULATION.VALUES
psi F'ex (DL+LL +ST)
psi' "F'ey (DL +LL +ST)
• F'ex (DL+LL),•
F'ey (DL+LL)
= 90.900 in^4
22.725 in^3
= 3.116 in
= 90,900. in ^4.
_ 22;73 in''3,
= 3.116 in
1 (4-8 .
, 2
= 17484. psi
= )7484. 'psi..
Mil UI LER
41111k111 coNsULTING
I IIMP ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
JOB
SHEET NO 6.< OF
CALCULATED BY 40 DATE
CHECKED BY DATE
CA LE
C.
earlitde) idgeWILL4e
' PRIERNI
INNAIMMI
AIL
111111
irg
• •
0
" 1
_Z.Z.Clay.-)
44
2
531
S/ 4
'
Z
I I I
I
i P II
.
•
. -
•
--o,
.. .
9 A
..,644-4-
- • -
t
'
I
I =
,
V I
: ! !
I 1 I r •
i 1 I 11,;
II i .
. . .
l it
i
fe
[TT t Ori
- NI • 1
• I A,
L ' $
I
.
L H L.
.
7
•
0
E 1
-
I
I
I
I II
11E1
a
fe
F ss
it i4
.
34-
II
I
111P
I
•
1
mie°
I
•
I
id
i
rimiliel
I
.
Mil UI LER
41111k111 coNsULTING
I IIMP ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
JOB
SHEET NO 6.< OF
CALCULATED BY 40 DATE
CHECKED BY DATE
CA LE
C.
earlitde) idgeWILL4e
MIK UTLER
Ink CONSULTING
OM* MN MN ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
Jon CAF
SHEET NO
CALCULATED BY 1
CHECKED BY
OF
DATE
DATE
SCALE
MEd,
I I I I
Ill
•
1
i
I� ity
1111
1111
I P I 1 di
Ai
�► E ?l I i
m 0 r 1
41
I
1
rill Iiii
1 a
Id
4111
em
..
I
MI
Lir
1
1 4i.
iii....
al
;puha
0
I
a
a s
Frit.
. 1 P 161,111
1
a
ass
1
• lilitill...a.
L.
I
- a
MIK UTLER
Ink CONSULTING
OM* MN MN ENGINEERS
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
(206) 885-4473
Jon CAF
SHEET NO
CALCULATED BY 1
CHECKED BY
OF
DATE
DATE
SCALE
AIM dill Mit . AMER
1111111 ■ CONSULTING
EN WI MN ENGINEERS
4MMINV 4111=11
14450 N.E. 29th Place, Suite 116
Bellevue, WA 98007
6) 885-4473
JOB e°ST‘v Ip .rw. u Air
SHEET NO
S -7
OF
DATE
CHECKED BY DATE
SCALE
CALCULATED BY 0
COPIES
DATE
NO.
DESCRIPTION
Z.4
/•//1/
s '- I
S irs• PLAIN/ — Vie,/ /07 fri7)401 er- a'1,/. A.A'755'
Z-04.-
/.//.7 l
51
SrA t/ oTul2xv._ S' cr/ e- s .•_ -• i L a .. 4 Z• G
i L.E k" 7/ "d✓ - /2.& : A.'A " lao'a,2. 4/a.,srir// d
DOUGLAS MULVANNY / Architects
MULVANNY • LEE
& Associates
12200 Northup Way • Bellevue,Wa 98005
(206) 881.7600 itT RECEIVED
1OUIL.A
FAX 868.2563
JAN 1 4 1991
PERMIT CENTER
TO �G /T'V o TU /< (,'JG A
GENTLEMEN:
WE ARE SENDING YOU Attached ❑ U ndyr separate cover via
❑ Shop drawings ❑ Submittals Prints
❑ Copy of letter ❑ Change order ❑ Originals
❑ Signed contract ❑ Field Order ❑ As-built
drawings ❑
THESE AgE TRANSMITTED as checked below:
W F r approval r approval
le your use
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ Reviewed as submitted
❑ Reviewed as noted ❑ Return copies for distribution
❑ Return corrected submittals
REMARKS �p . ` 64 1 oedd
COPY TO SIGNED'
11 enclosures are not as noted, kindly notify us at once
DATE J OB. NO.
/r•9, g�•7s
ATIENTION
FA/
RE:
Gn S'7t.e - SC7 . c r/', rckkl
❑ Preliminary ❑ Specifications
❑ Field Report ❑ Certificate of insurance
❑ Resubmit copies for review
the following Items:
VICINITY MAP
PAWKY= el
that portian of GQvemount Lot 1 of Section 35 and Government
Lot 1 of Sa.^tion 36 are; Government Lot 8 of Section 25 and that
portion of the southeast quarter of the southeast quarter of Suction
26, all in Township 23 North, Range 4 East, W.M. , in KLnq County,
Washington deocri is follows:
Reginniaeg at the, northeast corner of said Government Lot 1 of
Sactiors; 33;
thence south 01°19'01' west along the east line of Government Lot 1
of said Section 35 a distance of 62.31 feet to the true point of
beginning;
thence north 88 west a distance of 167.24 feet;
thence north 01°51'39' east a distance of 83.55 feet;
thence north 01'47 °29' east a distance of 515.60 feet;
thence along a curve to the right having a radius of 300.00 feet,
an mo,.dietancee of 99.43 feet through a central angle of 18°59°26 ;
thence south 84 °12'31" east a distance of 723.22 feet;
thence south 01 °47'29'° west a distance of 471.67 feet to the west
margin of the Jules Christensen Road;
thence nouth 30 °24'21" west along said west margin a distance of
60.06 feet;
thence south 07 °32'21' west along said west margin a distance of
174.0E feet;
thence north J8°38' 21' west a distance of 526.22 feet to the , true
point of beginning.
TOGETHER WITH a permanent and irrevocable non-exclusive easement
over the following described 30 foot strip of land, commencing at
the east line of Andover Park East, proceeding eaeter1y to the
east line of the grantee's (Parcel k) property, said 30 foot strip
of land is described are follows:
That portion of the southeast quarter :7f the southeast quarter of
Section 26 and Government Lot 8 of Section 25 all in Township 23
North, Range, 4 East, W.M., in the City at Tukwila, Ring County,
Washington, 4elscribed as follows:
Beginning at the eoutheaest corner of said southeast quarter of the
southeast quarter of Section 26;
thence north 87 °44'08' west along the south line of said southeast
quarter . of the southeast quarter of Section 26 a distance of 166.45
feet;
thence north 01°47'29" east a distance of 515.60 feet;
thence along a curve to the right having a radits of 300.00 feet,
an arc distance of 99.43 feet thr dugh a central angle of 18°59'26"
to the true point; of beginning;
LECAL EIESCRIPTION
thence north 88°12'31° west a distance of 247.91 foot to the VASIEJIL
easterly margin of Andover Park Mast;
thence along said easterly mr_rgin along a
the center of which bears south 71 ° 29'01'
270.00 feet, an arc distarnce of 20.33 fest
curve;
thence along a curve to the left Having a
an arc distance of 11.46 feet;
thence south 88 °12'31" east a distance of
thence south 01°47'21' 'vest a distance of
east corner of the above described parcel;
thence north 88°12'31* west along the not
described parcel a distance of 723.22 feet
beginning.
curve ••:o the right
gest having a radius of
to a point of reverse
radius of 330.00 feet,
470,.63 feet;
30.00 fast to the north*
h lino of the above
to the true point of
PARCR. 8.
That portion of Goverteeent
Raenq 4 East, N.M., in the
lel coribeee as follows:
Beginning at the northeast
Section 35;
thence south 01°19'01* west along the east line of said Government
Lot 1 a distar_ze of 82,38 feet;
thence north 88 °08'21" west a distance of 167.24
point of beginning;
thence continuing north 88'0821" west a distance
to the oast line of Andover Park East;
thence north 01'51'39" east along said east line
feet;
thence south 88 °08'21" east a distance of 253.00
line of Parcel 6 A 6 ;
thence south 01 °31'39" west along said west line
48.00 feet to the true point of beginning.
•
Lot i, in Section 35, ?ownehip 23 North,
City of Tukwila, Kine County, Washington,
corner of said * Governsent Lot 1 of
feet to the true
of 233.00 fest
a distance of 48.00
feet to the west
a distance of
That portion of Government Lot 1, in Section 35, Township 23 North,
Range 4 Rant, W.N., in King County, Washington, described as follow
beginning at the northeast corner of said Government Lot 1,
thence north 8744'08' west along the north lino thereof 166.45
feet to the centerline of C. N. ST. P 6 P RR R/W easement;
thence south 1'51'39' west along said centerline 03.55 feet;
thence north 88 °O8'21" west 253.00 feet to the true point of
beginning of this description;
thence south 88'08'21" east 226.10 feet;
thence south 86 °25''18` west 211.95 fest;
thence south 37°43'51" west 23 feet to a point from which the true
point of beginning beers north 1'51'39' east;
Seance north 1°51' 39" oast to the : .rue poiee of beginning.
j� atovit.laHr 1 01 Mme,,
Z. Z''.0i`Nlr~'eo
'n'- rfo'L. sL1 I L N to Pqacvab. 1 oI r, 0 o o cmrs
INDEX OF DRAWINGS
GENERAL NOTES
viorc -e- ' '(- PC =Q- ��G'lr /.! -••!r fX.1.- .e."
71- .1T12-$:...6 -TC)1 \,fie 'F'Y ..L.� �7TI1...! 9'•r`1 i..1`'t ?l ••�`2
.h }• 1 . 7 D a 1 l J c ' � ( I r"�� .� I -.:•' fz.
i•J 17 t ? / .5. ": ?-4 F, 1
F
i
SAXON ORIV
EXBT'I3 ACCESS RO.
444444 44=4
I `
:i
mommom0000moyi
omooM
:,,
„.�, .4.41, • "-
4
r : 1 I L,
4Y r. . - _..._ ... _ _...__ LAND PiN4: -- >
/.'.' I 1-16 PC HC
'' / I I I
I
I -4--1
I ! 4 I I 1
l L -
00 U
1
1 t '
rsr
'.
COSTCO WHOLESALE
'froze. DOp'(". 1 IC LIP& 11.4-1,4;34
41444 4 04441•111111111MON OP Mt IIININIIMONOMMISall4M111111144•114114
a r .. .* L ca
- r
o I% !' •i 1" ---
fit.•! r_ u
5T 1, , FAzit t
MINIM" IOWA
3 \
_ 1
J EE 1 I 1
g
,',t
1111111111111 11111111 11111111111j1I1j11tjl ia•I IIIIII1IIIIIIII11jIIIjI I9t(111111Ij111 111111111 1111111
3 4 5 6 7 8 9
NOTE: If the microfilmed document is less cleax than this
notice, it is due to the quality of the original document.
0 16 THS INCA 1 ' 2
tjl1ljl'lj1 jlll j, 1 1 1 1 1 111 1 1 1 1W1 1 11 11111111111111111111{
10 11 I ti 12
` 4 Wb' 0
Ilid 1111illll �l???I{ III�S?? I�Illi' ll! HHIIIIfI�i ?!?!Ilii�':;I!�I?flI!1!? !I�? ?!►•I�II!I�{ ?II 1?ilil{!?II�III Mil' �11! ?�Illl�i!!I�Ilil�llll�!I!I{IIII NII M 1 'j ' ►I 'I� I �' i 'ICI , !! I11 '
- ,:... IIIlllill�llil�l..,iljillllli {111111111+ n,lllll' ,Il111111111111nlflllllllll,
.. 1 1 iIlIJ lll 11,1
,� f-,.' ... ,., . -'... .� -� - .jr�;.. .� Y.a: :Y... +•..a .k ♦f , .,: ,mot•. II '.. ^'4:
t � .. , .. .. ,_. [.., r . 1 .:.., t/' „w, -1+- ,..r ,,r. .. � .,., r i S4 •. eY -C,:tT 5. � ' .lr ti . a �
r . .,r, 7.. v 11 1 �:. ,
li� .x •.n �l:,. rx. w �f1 S�
*'� .•� f;,,h
..:: `... � / .:e� � , ,:. n;'.'.. r �,•.. : n.S -.. •,,. �.. ,. ..... ... , ^;>~:G�- .,kFe. ..t ... r,.,.... w.. r. ., 1:. �...�". +�d.. �. r_'ti..._ .i.; ":.._2+^"•.�3.�S _. k ., ... ...� j _. -.... .......r .- ., . ... �1 "r. -. ,. .. . .. .. v' ... .. .. ...... .., _. r .L.. ,r~
� � l
-�Jk^ { � F f^' J Jjj !- M1S9�iC'• f ^, ..
"ng : LASE- 64G) PRZ.K16
•
■
.....m.m= ow SO
' L
PI Gi`°i
�+F
1 1,E -�s
2„, GLDL 3L
understand that the Plan Check approves are
subject io error's and omissions and approval of
plans does not auth.rim, he vio►ation of anti'
adopte _ _ _ _ t of con.
1$ 1 I owledged.
‘07( NRk.00A
C 4V ia
30 5199A
MANED
etevosTIDOMA
JAN 1 4 1991
remonrcenet