Loading...
HomeMy WebLinkAboutPermit 6420 - Segale Business Park - IDS - OfficeSegale Business Park 575 -3200 ADDRESS P.O. Box 88050 Tukwila WA ZIP • 81 8 CONTRACTOR Segale Business Park PHONE 575 -3200 ADDRESS P.O. Box 88050, Tukwila, WA ZIP 98138 WA. ST. CONTRACTOR'S LICENSE# SEGALBP151M5 EXP. DATE 7 -09 -91 ARCHITECT Lance Mueller & Associates PHONE 325 -2553 ADDRESS 130 Lakeside, Seattle, WA ZIP 98122 USE ..fy j 1 c'ODE COMPLIANCE l . > ' . / =LODR SQUARE FEET OCC. I.OAP SQUARE . i OCC. . • . p SQUARE OCC, O ' SQUARE _LSO OCC. 1 10 SQUARE E OCC. LOAD TOTAL SQUARE FEET TOTAL OCC, LOAD roTAL 4.--- OMMIMMINIIMI• TYPE OF CONST.: v -1 hrUDC EDITIOONN (year) 1988 SETBACKS: N- S - E - W - (through Public Worigil FIRE PROTECTION: ©Sprinklers 0 Detectors 0 N/A UTILITY PERMITS REQUIRED? D yes El No ZONING: BAR /LAND USE CONDITIONS? 0 Yes © N o .'ONDITIONS other than those noted on or attached to • ermit/• fans CITY OF TUKWILA Dept. of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. DATE ISSUED: (0 1" BUILDW PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES A QUNT BUILDING PERMIT.FEE 39.00 1 »16 -9'1 25.00 BUILDING SURCHARGE :. THERi TOTAL PLAN CHECK NO.: 68:50 91 -024 BPA PF1OJECT INFORMATION V l - !t S ADD APPROVED FO ISSUANCE BY: 18000 Andover Pk W 103 Add one office. SIGNATURE: .� PRINT NAME: CERTIFICATE OF OCCUPANCY NO. [ DATE ISSUED: ASSESSOR ACCOUNT # PROJECT NAME/TENANT IDS TYPE OF New Building ■ Addition Tenant Improvement (commercial) U Demolition (building) Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential 0 Other: DESCRIBE WORK TO BE DONE: I hereby certify that I have read and exam ned this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. DATE: /-Zs — ,/ COMPANY: . 5Cv/yie 511 SS Pol,sk This permit Shalt become null and void if the work is not commenced within .180 days from the date of :. Issuance, or If the work Is suspended or abandoned for a period of 180 days from the last Inspection. PERMIT NO. CONTACTED 1/45t-e Uyz_ N ,Q15Un I BY: , , pQ DATE READY DATE NOTIFIED 1 _ -t PERMIT EXPIRES 2nd NOTIFICATION BY: (Init.) AMOUNT OWING 3RD NOTIFICATION BY: Init. BUILDING PERMIT APPLICATION TRACKING PROJECT NAME PLAN CHECK NUMBER q( 4 6 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) :.; ■.. "1 TOTAL DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. qBUILDING - initial review FIRE 0 PLANNING O PUBLIC WORKS O OTHER BUILDING - final review REVIEW COMPLETED SITE ADDRESS j SUITE NO. 1 -c ROUTED 122/1/ INIT: �) INIT: INIT: INIT: 1 C INIT: (��,I•� IR ; L•:.•i:.i : ii:::: r: i•; ±i:: iii +iii;::.. ...... CO SUL ANT: Date Sent - FIRE PROTECTION: S! S • Inklers ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? PUBLIC WORKS LETTER DATED: TAPE OF CONSTRUCTION: S- Yes `�-- I 4 . See. ■ Date Approved N/A FIRE DEPT. LETTER DATED: © INSPECTOR: , j/ Z BAR/LAND USE CONDITIONS? ( ]Yes No MSC EDITION (year): Property Owner: Sagale Business Park Phone No.: 575 -3200 Address: PO R nx R8050 City /State/Zip Tukwila , WA 98138 Contractor: Se ale Bus iness Park Phone No.: 575 - 3200 Address: City/State/Zip WA State Contractor's License No.: SEGALBP151M5 Expiration Date: 7 Architect: Lance Mueller & Associates Phone No.: 325 -2553 Address: Lakeside City /State/Zip: Seattle, WA 98122 I hereby certify that 1 have read and examined this application and know the same to be true and correct, and I am authorized under Blanker Permit Agreement No. to apply for and obtain this permit. i Signature: _0, l A IIIIIII Organization: Segale Business Park Print Name: Steven R. Nelson so Phone No.: - Address: PO Box 88050 City /State/Zip: Tu wi a CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard — #100, Tukwila WA 98188 (206) 431 -3670 PLAN REVIEW n+ O �.�� Q V NUMBER: "� APPLICATION MUST BE FILLED OUT COMPLETELY Blanket Permit Agreement No.: 90-001 BPA Site Address: 18000 Andover Park Wes Project Name/Tenant: IDS Type of Work: Describe Work to be Done: Add one office Building Type: B - 2 Building Use (office, warehouse, etc.): Office Square Footage - Entire Building: 2 6 6 8 2 If "Yes ", explain: Date application accepted: ( BLANKET PERMIT Tenant improvement Application I b3 Tenant Improvement O Demolition (interior) C) Other: Nature of Occupancy (printing, manufacturing, etc.): Offices Will there be a change in use? el No Q Yes If "Yes ", explain: FEES (for staff use only) Value of Construction: Construction Area: 133 1650.00 Assessor Account No.: 352304 Tenant Space: 2458 Will there be storage or use or flammable, combustible or hazardous materials in the building? 'Q No Q Yes Will there be ANY structural work? ® No Q Yes If "Yes ", describe: See reverse side of application for specific plan submittal requirements and information. Date application expires: "�— 1 GENERAL INFORMATION This tenant improvement application may be submitted for non- structural interior construction which is authorized under an existing approved blanket permit agreement. It Is the responsibility of the applicant to be aware and comply with all the terms and conditions as set forth In the agreement. The work is limited to that shown on the plans as submitted with this application, and such work is limited to non- structural interior construction only. The following work Is not covered under the blanket permit process and separate approvals, permits and inspections are obtained through the applicable agencies. ELECTRICAL - Department of Labor and Industries (872 -6363) PLUMBING/GAS PIPING - King County Health Department (296 -4732) FIRE PROTECTION - City of Tukwila Fire Department (575 -4404) MECHANICAL - City of Tukwila Permit Center (433 -1851) RACK STORAGE - City of Tukwila Permit Center (433 -1851) . BUILDIN PERMIT APPLICATI • N Application Submittal - Application and plans must be complete in order to be accepted for plan review. Make sure to till out the application completely and follow the plans submittal checklist which follows. Handouts are available at the Permit Center which provide more in -depth detail on preparing the submittal. Authorized Agent - The applicant must be an authorized agent as Identified in the Blanket Permit. Fees - The permit fees are based on valuation of construction as declared by the applicant on the application, and shall include all the work to be covered under the permit. The valuation will be reviewed and is subject to revision by the Building Official to insure compliance with current fee schedules. To obtain a fee schedule, contact the Permit Center at 433 -1851. UBMITTA HE ICLI T ❑ Completed Building Permit Application ❑ Attachment #1 - Architects Statement Er Three (3) sets of construction drawings, which include: Q Plan, showing: O Building location on property O Adjoining public right -of- way(s) O Parking layout O Location of tenant space or area of work within building O Overall dimensions of building O Overall dimensions of tenant space, or area or work O Name of each common wall tenant(s) and type of business or occupancy ❑ Floor plan of entire floor or tenant space that the work is taking place, showing: (?f Tenant space layout with use of each room labeled a All exit doors, corridors and egress patterns ©' All new walls, existing walls and proposed walls (provide construction key) Cpl All other proposed construction ❑ Construction details O Construction key O Cross sections showing wall construction and method of attachment, floor and ceiling Oro Reflected ceiling plan (ii applicable) ❑ Miscellaneous O 6" x 8" blank space provided on lower right hand corner of each page of plans (for use by the plan checker) O Title block on each sheet, identifying: • Project name • Company job number (If applicable) • Site address • Blanket permit agreement number • Architect, address and phone number O Each sheet of plans stamped by a Washington State licensed architect O Minimum sheet size 18" x 24" O Plans must be drawn to scale and clearly dimensioned Drawings shall be prints which are clearly readable (original pencil or highlighted drawings are not acceptable.) ❑ Permit Fees (plan check fee, building permit fee and state building surcharge) Is any part of the work proposed under this application Include structural work or affect structural components of the building? 0 Yes 0 No If yes, has the structural work been authorized by the Tukwila Building Official to be included in this application? 0 Yes 0 No Does the proposed work comply with the requirements of Chapter 33 of the Uniform Building Code (1988 Edition)? Q9 Yes 0 No If no, please explain: Associates Business Phone: 325-2553 COMPANY JOB NO.: Will any special inspections be required per Chapter 3 of the Uniform Building Code (1988 Edition)? 0 Yes 0 No If yes, list specific inspections: City/State/Zip: Seattle, WA - 98122 As a result of this proposal, does the parking meet the requirements of Tukwila Zoning Code parking requirements? @ Yes 0 No if no, please explain deficiency: Architect/Engineer Stamp: �� :, ._.... i s, _. 9 �: ,C SIANC uf 1.'.' -.... -.._� Architect/Engineer Signature vow ` • Print Name: ,�c)� �,n 3 W(J-..3 Firm Name: Lance Mueller & Associates Business Phone: 325-2553 COMPANY JOB NO.: ,,)ta Street Address: 130 Lakeside City/State/Zip: Seattle, WA - 98122 SITE ADDRESS: 18000 Andover Park West Suite 103 PROJECT NAME /TENANT: IDS COMPANY JOB NO.: 91 862 - 02 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Bouthcenter Boulevard — #100 Tukwila Washington 98188 Phone: (206) 431 -3670 ( BLANKET PERT TTI AGREEMENT Tenant Improvement Application Attachment 1 — Architects Statement PLAN REVIEW NO.: BLANKET PERMIT AGREEMENT NO.: q(-- EP& 90 -001 BPA PROJECT: c PERMIT NO. , 92 - ) .., 7 - 7 -- ) SITE ADDRESS: g A. . . DATE CALLED: 9 --72,.---/ II.M. TYPE OF INSPECTION: DATE WANTED: REQUESTER: SPECIAL INSTRUCTIONS: Ammo PHONE NO.: INSPECTION RESULTS/COMMENTS: ...r- All -0 - INSPECTOR: ...,W. _.........e... _.# DATE: • 2 ,,....../ ' CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTIOci RECORD 1 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: T . /O PERMIT NO. ,- '�—� SITE ADDRESS: ) ' L 4A2..�1 IM 1 DATE CALLED: r, — / J -- q TYPE OF INSPECTION: 2#01011 DATE WANTED: „ — /c. --'J ',' SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: 5 - q Cj INSPECTION RESULTS /COMMENTS: �� �� / �� f/I-4 >v e 7� , ... ,- t INSPECTOR: � ', - .,� d�l'L - DAT CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ... u�+ ar..+': F;;✓ Ert{ r;; .. ; *.}Y.. ".i1z INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 The following items. A "ref of G ere ( CITY OF TUKWILA Building Division 8200 Southcenter Blvd. Tukwila, WA 98188 433 -1845 /7 ` / Job Address / CORRECTION NOTICE are found to be in violation of Ordinance (/7 3( and shall be Signed Building 'Official/Inspector corrected. PROJECT: Aramiri PERMIT NO. SITE ADDRESS: r 1 I t ade, 0 DATE CALLED: • TYPE OF INSPECTION: g SPECIAL INSTRUCTIONS: DATE WANTED: - - I 1 , 1 11, MESTER: MIIIIIIIIIIMI PHONE NO.: miMili MIN11111) 111 M) a I A f all a o i r wasolum INS - ECTI •I RESULTS/CO MENTS: A .4Whill11111111 c IINE111111111111 INSPECTOR: Ai DATE: c›,- No "iiiimiiIIIIIIIIIIIII CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 41 -3670 INSPECTIOcl RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: ilo ; , PERMIT NO. rOMIIIIIIII I a ct SITE ADDRESS: . S. ov-er P TYPE OF INSPECTION: , vo to woe, ti ill a.m. SPECIAL INSTRUCTIONS: • IA • 6 REQUESTER: '' \J ' k. • 1 PHONE NO.: S • 00 INSPECTION RESULTS/COMMENTS: ( 1 00 - tik - --/A-4-1.. LA A-41L-tir- b (4-A- d ,..N........„ ,N,.......4. a.,,...„,....,,,L • ....„............ C....JO...AA ' r c13-e. • 1 CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTIOti RECORD 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 FINALAPP .FRM City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 ' • Project Name -- Address TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM / (1 (700 • r■ YV'e../ • Retain current inspection schedule Needs shift inspection Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire : Permits: 4 :Authoriied Sin&ture imisso■vemerr Approved without correction notice Approved with correction notice issued Gary L. VanDusen, Mayor /04 Control No. Permit No. Suite # Date CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91 -024: IDS 18000 Andover Pk W #103 PHONE # (2061433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME pApT OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER t n . 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 6. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 7. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 8. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary L. VanDusen, Mayor "X" REQUIRED INSPECTIONS PHONE • ' DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 1 Footings 431 -3670 2 Foundation 431 -3670 . 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 X 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 x 10 Wall Board Fastening 431 -3670 11 12 13 x 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 x 17 BUILDING FINAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 18000 Andover Pk W rs u I L.uInic i INSPECTION RECORD (Post with Building Permit in conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: 0 103 IDS CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site In the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - tf structural slab or it underslab Insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation pointss clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other Inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 0171114111 I � PLAN REVIEW COMMENTS PLAN CHECK # )2' PROJECT 1 - C REQUIRED INSPECTIONS Le No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). . All structural concrete to be special inspected (Sec. 308, UBC). O All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). (48( 15. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277.7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special Inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being Inspected. All high-strength betting to be special inspected (Sec. 308, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. Readily accessible access to roof mounted equipment Is required. Englneereed trues drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). Ler All construction to be done In conformance with approved piano and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 0 All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 2984787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the Job site. 0 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special inspected. p All wood to remain In placed concrete shall be treated wood, All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. `EJ Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney )<,(7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 `,, x rr �. 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL I � PLAN REVIEW COMMENTS PLAN CHECK # )2' PROJECT 1 - C REQUIRED INSPECTIONS Le No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). . All structural concrete to be special inspected (Sec. 308, UBC). O All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). (48( 15. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277.7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special Inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being Inspected. All high-strength betting to be special inspected (Sec. 308, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. Readily accessible access to roof mounted equipment Is required. Englneereed trues drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). Ler All construction to be done In conformance with approved piano and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 0 All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 2984787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the Job site. 0 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special inspected. p All wood to remain In placed concrete shall be treated wood, All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. `EJ Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Yours truly, City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control Number 91 -024 The Tukwila Fire Prevention Bureau T.F.D. file ncd Gary L. VanDusen, Mayor January 22, 1991 Re: I.D.S. - 18000 Andover Park West, Suite #103 Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. All modifications to sprinkler systems shall have the written approval of the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Fire Department, No sprinkler work shall commence without approved drawings. (City Ordinance #1528) (NFPA 13, 1 -9.1) (UFC 10.307) Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: ADDRESS: t o 00 4 ‘sID c»j 13t *.1 DATE: OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HEIGHT /#I OF STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS L) DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. CHAPTER 51-10, NOTES PLAN REVIESN 0o-r44 W ecs- A Re,4 8F W.A.C. ire 13 - 2 C) Ftc.t_. C.ORkeI. �C 5 hJn OF PLAN CHECK NUMBER � l - ca Z �� 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 I T FLT PREPARED BY: DATE: I- ke-`l "" ` REQUIRED INSPECTIONS APPROVED INITIALS D CORRECTION N TICE ISSUED X 1. Framing 2. Insulation 3. Suspended Ceiling 4. Wallboard Fastening X BEYOND THIS UP WITHIN 24 HOURS POINT UNTIL TH BUILDING PERMIT OF NOTIFICATION THAT THE IS ISSUED. PERt1 IS READY. DO NOT PROCEE PERMIT MUST BE PICKED CiTY OF TUKWiLA Dept. of Community Development - Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 BLANKET PERLJT AGREEMENT Tenant Improvement ]rnj�prary Inspectio Date Issued: I- - ct Plan Review No. Blanket Permit Agreement No.: 90-00) efk Project Name /Job No.: r j Site Address: (app o If m-er Pk Suite No.: CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (431 -3670) (have Plan Review number, Blanket Permit Agreement number, project name and site address read CONTRACTOR/APPLICANT BEGINS WORK AT THEIR OWN RISK PER THE TERMS OF THE BLANKET PERMIT AGREEMENT. INSPECTIONS 1. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 2. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation points clear. 3. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 4. WALLBOARD FASTENING - Prior to taping (See UBC Chap. 47 and Table 47G). 5. PLAN CHECK INSPECTION - Immediately after the Tenant Improvement Permit is picked -up by the applicant.Work may not proceed until the City Inspector delivers the plans and new Inspection card to the site. This inspection should be scheduled at the Permit Center when the permit Is obtained. • Construction will not proceed past required inspections. • The Building Permit and approved plans shall be picked -up by the applicant within 24 hours of notification that the permit is ready. Failure to do so may result in a stop work order. • Construction may not deviate from that shown on the plans as submitted at time of application. • All corrections shall be undertaken within three (3) days of notification by Building Inspector, unless otherwise agreed to by both parties. • No more than 30 days shall elapse between the last required inspection and the "Building Final." • Unauthorized occupancy and/or use of the remodeled area shall not occur until the Building Inspector completes the "Building Final," which takes place after the Building Permit and Permanent Inspection Card has been issued. • The City reserves the right to stop work at any time that In its Judgment the work presents a safety problem, warrants a building permit prior to continuing work, Is not proceeding according to approved plans, or otherwise would not qualify for consideration under the blanket permit process. • The following work is not covered under the blanket permit process. This work shall not start until approvals and permits are obtained through the applicable agencies, under their normal process: Electrical — Department of Labor and Industries (872 -6363) Mechanical — City of Tukwila Permit Center (431 -3670) Plumbing/Gas Piping — King County Health Dept (296 -4732) Rack Storage — City of Tukwila Permit Center (431 -3670) Fire Protection — City of Tukwila Fire Department (575 -4404) If special inspections are required, work shall not proceed past where special inspection is required, or special inspections must be pre - arranged with Building Official. THIS IS A TEMPORARY INSPECTION CARD ONLY AND WILL BE REPLACED BY A PERMANENT INSPECTION CARD ' THEN THE BUILDING PERMIT iS ISSUED. ovlleo •. i • r,c , ‘,. . c7 *LEV. OFFICE OFFICE U twargo""" 4 14 . 11 • 444 04 4 . 44 41714411•441101443410.041461114 • 4 • PA:1 FIRST FLOOR FIct 0 0 WOMEN KECEPTION oN/;TO, coomoce • 4 0 le 'Hs Imo, 1 2 3 5 6 7 ON 444 4 4 ■144440 DOOik TO P4 WO ti1441. RE. 1.11E SIM TO c•C' , , ••s.. • .1 • 4 ■ac. . , • , . " • .. '41 fr rtaifittat; ....,7.,s, ..i.,.... I I I I I I I I I I I I I I I I 1 111 1 111 1 111 1 11 I 11111 1 1 4 1 1 1 .1V I IIIIIIIIIIIIiIIIIIIIIIIIIIIIWITIlliplillillili 11 111111111111111111111 1 11111WIIIIIIIIIIIIIII111111111111!111111111111111111111111111111111 I oz 8 9 10 11 Kkofmc•Enom 12 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the original document. • 0€ 6Z LZ 9? SZ VZ EZ ZZ I Q e 61 91 LL 91 St in Cl Zt IL 01, 6 8 Z. 9S " C 0 1111111111111,111111;111111111116111Alaffililh11111111140111611ffilliillilrillffill RECEIVED emv 11 TP IKUIRLA ,IAN 1 6 199i PERMITCENTER KEY t DifS VULL 14 BP. FN. — sweffeemum ew sis FULL I-11. YP. BD, PTI' . TD M kT4 EKIg, =w-4mg= 6/5 Iztu1 ¶0 ulh1C.11 EAIST*, p(Acrict,L r, NS 1.)C.IPLEX OLITLel" ( 11401C. txiSimkerT 44( `6/ LE.PI40v.M OLATLET ) 11401C E X.\ Si I - 07.0 13/5 Pk Bit OUTLET (E.) I 01e., 6x■ LIG4I QV. PER, ?.1 RetY cope YiL C IDS OFFICE ADDITION JOB # 91-862-02 90-001 BPA LANCE MUELLER & ASSOCIATES 130 LAKESIDE SEATTLE, WA 98122 325-2553 1.710t5)-.‘ Fr • .11110440 -e- 7 #7 VITL. letV6A1.) rAisti plA414. mft 61vo Wt\t-4.. • angsseca, EG Us' 0.21.111010111111101?=.-MIMPANOINCIIII, BUiLDING 862 TITLE 91) Ew orrtc,e -ro t Ft 12.c1 FLOOR sE6 AtLe, SO- DESIGNED DRAWN CHECKED DATE PROJECT NO. SCALE L 1 r, • 1000 LE 61014A SUITE 404 %ARIL WA 98i21 (206) 623.907.4 GARY OWEN DESIGNS, INC. SHEET NO. 1 tl ; t . • __ —�.... �...� —_ _ _ • _ —__ r _ --- \ i?:4/mN6 \'/,G1 '•••.••t1.. /?: .3 .94 A 8 S`.33 RI 300.0o : 11:/2 • T Qw WO I Mien iL.GUI P •0.116 • N4 cap. SW, NE� 7 231/ ,6' vitT 7C 2 re c31.l7 o ,'oic , !,S'vra/Ty ' EA5C/•'/ENr 1. M rc 2•'r a, \7‘-- 7c 2.1.2.s" 05 re ell .J c • •• O'25 "/6 -' / S2,9 G. ONE WAY / 3.� } ,E"X /3r/NG •' /l • f c L' -2 98. .5 i 2 i 3 r4 • zz'- -�.. 0 ' Sa.Y/ P.m? y . -- z 3 '011 � . o �.'.r wr.i�• —ay .fe+t.;atf.�J 'S'u ta.`.i • C 3 s ©a yi" * .cc 'Y✓ 12 3 ---. 0 '---,:',..,_._.. IP ----.....,....,,,„,.......d ,-,..,..:`'.--„.1.k I • l AIt1120 ;1 2 4 . � zs — Er nos nwc Ca PA/ZK \.JEST` (.SEGA l E zit' v r A) ee.' ' /10 G ra ~' t (I I If j IIIJIIIII 0 is THS INCH 1 2 3 1, ccr 4 1 C ,CC' ? ° ` _IIM �-- .. •• %./ , Cc- �--� = 1 1 ,�,z • We c n /a v ri/ / !y 6A 5c'rlt� vr (E c /s; � .,'G,) • S � �10£ 1 , /.�1 z K j�/ � •CG .._ -- _ __ _ .,.._ y �• /nG'w�,c • ki 23 l !I IIII IIIIII IIIIIIIII I I!I I IIII I I IIII IIII IIIII I IIII I IIIIIIIII IIIIIIIII II III I II IIIII II II IIII'II II I I II I I I II I I I I I I I II I I I IIIIIII II IIIIIIII 4 5 6 7 8 9 10 11 WDE IN OeRMANY 12 NOTE: If the microfilmed document is less clear than this notice, it is due to the q ;;.ality of the original document. 0E; 6Z a! G I Z 9Z GZ *73 CZ. ZZ lZ Q' 6l 81. LA 91. Gt hl Ei Zl ll 01. 6 8 L 9 s 7 c Z l ww Q IIIii!!IIII!III!I!l! IIII! IIIIIIIII!I tl! IIIIII!!! IIII! III IIIIII! liy !Illlii!1I1!!!Ills!II!IlIII!!! II IIi lIIIIII!IIliilllll!!!Ii!IllII Ii! III! I!I i!! IhUIl 11 lllllll!!! ill ! illl!IIIIIIIiIIIIIL'I!lIIIIIl III!l iIIII! IIII!!! Iill!l IIIIIIiillllllllil lllll lllllll llllll�!I!!!IIIIiii!III!� . .._..�- • 2 z7//< /'BOA ,••• •••••, 30 — • 3Z r+_.. •• ----• • Non' : 7 L Cuad nut's AeX 93 2O r _ ._ *. - - - -- --- r- .••••••.•••—..-• as -�--"" .r-• o (,cy77/ & ,=====i--- . t. a He Cog. 5w;,NVi 5.3: TAN, wr1 p2 - SEPPME PE0 11. f APPO jR~ra �© R 097/-r e i.0 fa,,voov W w,rsr eke • • J 1 1 l • • ssto/, • 0 N pt - s . #:d rlior r 3 I n/t SIG E L31/51/1/[55 •PM W /C /N/T Y /TAP • SCALE • 2- c /00 /V 0 f n iile � ; fc II \ 1 / 1 ill JUL 2O Sq CITY AN Date "` 2- Permit No. — sloe W/WC 4�1 FILE COPY I understand that the Flan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. B 3e/:•d J•Jax I _ .l;N wirti Iwrin/Y/i7kwA1 d � .Sy 01 or ACC - -s • .„.._ /jam 1 PERMIT CENTER SITE PLAN vvitedsciemy .57 To 9 ATTACHMENT #1 SBP/MAS BUILDING 862 IDS OFFICE ADDITION JOB # 91-862-02 90-001 BPA LANCE MUELLER & ASSOCIATES 130 LAKESIDE SEATTLE, WA 98122 325-2553 CITY OF TUKWILA JAN 1 6 1991 SEGALE BUSINESS PARK DRAWING NUMBER DRAWN; BY