HomeMy WebLinkAboutPermit 6443 - Rocky Mountain Bank - Storage RacksRocK°1
MouJThti
BA'JK MOTE
�P�Co4`f
775 V N ER
Bedford Pro.erties
N • 1
241 -1103
ADDRESS 12720 Gateway Drive, Seattle, WA
ZIP 98168
3ONTRACTOR Owner
PHONE
ADDRESS
ZIP
WA. ST. ONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
David Kehle Architect
PHONE
433 -8997
ADDRESS Interurban Avenue South, Seattle, WA
Z1P 98168
•. .. .T. n. . •
N / A I:T 1 . 1 year 1988 ...
SETBACKS: N- S- E-
W -
FIRE PROTECTION:
Sprinklers Detectors
Q 0 WA
UTILITY PERMITS REQUIRED? Yes
[] CX No
Pu411c Warkat
(Publich
ZONING:
an t ose not . on or attach . to permit/p anal
BAR/LAND USE CONDITIONS?
(] Yes
OD No
30NDITIONS (ot or
• ..
ari
•
. p - ' r d• "' =
ISSUANCE BY:
' I/r / BUILDING
fj OFFICIAL
DATE:
a- ls " q
:ITV OF TUKWILA
)ept. of Community Development- Building Division
'300 Southcenter Boulevard, Tukwila WA 98188
206) 431 -3670
BUILDING
PERMIT NO.
)ATE ISSUED:
PROJECT
IT A PROJECT NAME/TENANT Rocky Mountain Bank Note
TYPE OF ■ New Building U Addition I Tenant Improvement (commercial)
WORK: CD Rack Stora _ e 0 Reroof 0 Remodel residential 0 Other:
DESCRIBE WORK TO BE DONE:
lsa =a
oars:
roTAt
Lot-1
(
3325 S 116 St
Install rack storage.
BU1LDI1 PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN CHECK NO.:
I
r # i
VA It
SQUARE OCC. SQUARE OCC.
SQUARE
OCC.
TOTAL
TOTAL
I hereby certify that I have read and examined this permit and know the same to be We and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
SIGNATURE:
PRINT NAME:
Th is permit become null an
Issuanc , hr f worts: Is suspen
CERTIFICATE OF
OCCUPANCY NO.
ZOO
DESCRIPTION
BUILDING': PERMIT FEE':` >>
AMOUNT »::
BUILD I NGI.SU RCHARGE. :
DA -
91 -061
S `'0 0`- 15,000.00
ASSESSOR ACCOUNT # 102304-9012
DATE: Z - 16 _ I
Demolition (building)
Grading/Fill
COMPANY: J 1 S) }G, Le A�2t`N 1 ACT'
snot commenced within, day from t a date. o
to period of 180 days from the las
DATE ISSUE):
PERMIT NO.
CONTACTED
r in(kt
hrl�-
DATE READY
DATE NOTIFIED
2nd NOTIFICATION
I
a- 1
l
BY:
I (Init.) --
BY:
(init.)
PERMIT EXPIRES
AMOUNT OWING
3RD NOTIFICATION
BY:
PLAN CHECK
NUMBER
C� (DI
REVIEW COMPLETED
PROJECT NAME
SITE ADDRESS
BUILDINCI PERMIT
APPLICATION TRACKING
3 lib SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for Information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
O Plan corrections shall be completed and approved prior to sending on to the next department.
O Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE OCC. SQUARE OCC. SQUARE CCC.
TOTAL
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
TOTAL
UTILITY PERMITS REOUI D?
PUBLIC WORKS LETTER DATED:
CITY OF TUKWILA
Department of Community Development - Building Division ig1,Y�s t�t2 4t fi' (0' 4 - mil!
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670 DEEDRIPTIok
BUILDING PERMIT: FEE
PLAN CHECK FEE`
BUILDING %SURCHARGE
APPLICATION MUST BE
FILLED OUT. COMP
VALUE OF CONSTRUCTION - $
atIck u,6 I � tzv
PROJECT NAME/TENANT � ASSESSOR OUNT #
I' 941-HblIj Itiate _ M
TYPE OF Li New Building Addition U Tenant Improvement (commercial) U Demolition (building)
WORK: .0 Rack Storage O Reroot O Remodel (residential) O Other:
SITE ADDRESS
/70 I 6iii 64,
DESCRIBE WORK TO BE DONE: low.
i levieui PA
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS: 'b`f 1 - 0 Nt bvj Giirtarit
WILL THERE BE A CHANGE IN USE? 1 1•No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - . Building :p Tenant Space:1 Area of Construction: 1ff1
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 0 No O Yes IF YES, EXPLAIN:
FIRM Fik0i2tletv
PROPERTY OWNER
ADDRESS I o
CONTRACTOR . 12 � {Q � t 01161 red650114-'
ADDRESS
WA. ST. CONTRACTOR'S LICENSE #
ARCHITECT
ADDRESS I va0- h0 bll�
DATE APPLICATION ACCEPTED
Iz', 2 105-. 4'f tblepcie, 4rkp risio et Nu ell e rz
VP?
SUIT "
,t
BUILDING OWNER SIGNATUR:iii DATE 7,
417,
OR 1
AUTHORIZED PRINT NAME •
AGENT ADDRESS [ J 4 CITY /ZIP MtD?
CONTACT PERSON o E / PHONE - ?
BUILDH PERMIT
APPLICATION
D E
PHONE
EXP. DATE
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed Information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION EXPIRES
cn
PHONE Wlit)
ZIP
iZIP
PHONE 5, moyi
Z1P(ala tit
COMMERCIAL
E] Specifications
.. ' Sta ....................... engi neer
. • • • •
• ••••••"''''
Structural Was._
•
. ..
•
:.Topog raphical
„:. • • .•••
• Eneirgnir. or ,architect • • ....
Energy calculati . • ..
• .
Legal descilptlon
Woridng drawings,
iarkt,;ith inclu
,
• Si Arch itectural draw ings
• Mechanical drawings
• Elevations
Ciil drawings
• • Ili.) drawings
Lands .."1:„.• •
Completed utility permit application (one for entire project)
U Six . boo
(6) sets of civil drawings
NOTE: See utility P •••'• .
, ..‘.
submittal • requ
•
RACK STORAGE
Completed building permit application
Assessor Account Numbor
Two (2) sets of plans, which include:
Blinding floor pl
• • • • • EntitO:spapa:0farO
• Exit doors
• Dimensions of cli aisles
Tenant pace floor plan showing tack stote tayout aisles end
. .
RESIDENTIAL
S6BMITTAL CHECKLIST
• .
•
Legal 002Ciiptian
Inclu dimensions ''91(4CkS (h.0 :**Ith.
•
and exit ways on p1w,.
.:'Structural calculations stamped by o Washington State licensed
. . angtnaer (rack : storage.w.apo
. . .•
Completed building permit appliCattaa(01,•:.tat each structure)
' ' •"..” •
Assessor Account Number
Two sets (2)0*orking.ctrawtaga,•:whick.
•••••• • Site Plan ---.-. (Ql plan, shole.etoseethydran..... . „;:......
• Foundation plan Include access to
• Floor plan . .
*.RoOf plan
• Bulldog elevations (all
• • Building cross-section.:.,
• Structural framing plans
Washington State Energy Code data
Completad utility permit application •
• i Six (6) sets of site plans showing utilities • . .
. ,
) YE: Building site plan and utility site plan may b000Mblnad Sea
permit application and checklist for Specific sobinittat requirements.
'citional topographical and soils infonnadon may be requked if unique
• conditions. * • '
. .
. „ . „ . . . . .......... . . . . .. . ...
• • • ...:• •
„., „;,;., • :
Completed building permit application
Assessor Account Number :
Two (2) sets of .......
......................................
......... .......... .............
Bite Ftti6...:(atiO0aibirilditiOland:1OCatiakatapoaaaitaao!!00'cii01.i
Details ensenna/sstallfte sh and method of attachment
Stnmctural calculations stamped by a Washington State licensed
' engineer may be required
•
•
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
TO: Vic_ #(41-0(.
FROM: 5h- e.1
DATE: V-21 7 , I qQ
SUBJECT:
MEMORANDUM
PHONE # (206) 433.1800 Gary L. Vanpusen, Mayor
x L- n-Qo r
O
V
1 -1 So
• roe :
ress:
/ 6' 574—
o nspect on:
Ar....ipo
Sp : ► : nstruct oils:
Date ant: ' :
Z- 3 -,
a d •
Requester:
Phone f o.:
INSPECTION RECORD '
Retain 'a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (20 4 -3670
Approved per applica• =des- "Drrections -req :d prior to approval.
COMMENTS:
nspector:
Receipt No.:
O . $30.00 REINSPECTI FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Date:
1751721 L
"
::' Addre
3 Z—
4
/
.7
-----
alled:
Specie
structions:
Date Wanted:
/1-2"(
am.
Requester:
Phone No.:
•
PE
D../Approved per applicable'codes.
INSPECTION RECORD C
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206) 431 -3670
I $30.00 REINSPECTION FEE REQUIRED: Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection
eceipt No die:
Corrections required prior to approval.
•7., ^:SKr ^^r m. �^ —^ rr .....'.r, .4x?
t- :" �' �:.j+:5'. itv' , ,;..1�"�i,',"4yu''r�i•c��;i� it
Project Name / or
.Address
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575-4404
TUKWILA DEPARTMENT
FINAL APPROVAL FORM
y Retain current inspection schedule
I
Needs shift inspection
Sprinklers:
Fire Alarm:
Hood & Duct:
Halon:
Monitor:
Pre -Fire:
Permits:
_ Approved without correction notice
Approved with correction notice issued
Gary L. VanDusen, Mayor
Control No. --/y6 4/
Permit No.
"X"
REQUIRED INSPECTIONS
PHONE
APPROVED
INITIALS
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wail Board Fastening
431 -3670
X
11 A nchor Bolts
431 - 3670
12
ti
13
X
14 FIRE FINAL insp:
576 -4407
/// ll/ ,
`� � )
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
(INSPECTO
. - - 47/ q
COMM NT
SECTION
ON REVERSE)
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
3325 S 116 St
tlUILUIUIti YtFfMll
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
BUILDING (pL/ r "l , PERMIT NO.
PROJECT:
Rock Mountain Bank Note
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
rC�
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points dear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type "cn often eliminate problems, delays and misunderstandings as the
project progresses. ,�,ai
Rocky Mountain Bank Note
apeedrack Racks
Location:
Seattle, WA
(Zone 3)
Prepared For:
Hoj Engineering
Salt Lake City, UT
Prepared By:
Eugene D. Birnbaum And Associates
Consulting Structural Engineers
1626 Silver Lake Boulevard
Los Angeles, CA 90026
(213) 663 -9218
This Document and the design it Codta'ns is c•pyright by Eugene D. Birnbau • "
and Associates. it is provide e- iris r ' •(9t of service, and shall not
be reproduced in any fashion, thout th it •n permission of Eugene D.
Birnbaum and Associates. ; ,,•1 ,.
0
1
AW" fr4 Nisi,
4:19000 .•
, , w N A0
l4 r
Peter S. Higgins, S.E.
Job Number 19451
December 30, 1990
Notice to : uilding Departments
If this calculation is submitted for building permit approval, it shall
contain all sheets of calculations as listed in the table of contents on
the next page(s), and shall be accompanied by all drawings listed in
Section 1. All documents shall bear appropriate seals and signatures in
ink of a contrasting color with the same Job Number Reference. The
calculation shall be signed across this block.
REPRODUCTIONS OF SIGNED COPIES ARE INVALID,
RECEIVED
CITY OF TUKWILA
FEB 8 1991
PERMIT CENTER
Et NE D. BIRNBAUM AND ASSOC }ES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
Table of Contents
Job. No. 19451
Sheet i
1 Configuration 1 2
1.1 Components and Geometry 2
1.2 Check Beams 2
1.2.1 Design Forces 2
1.2. Beam Properties 2
1.3 Check Posts (Dead plus Live Loads) 3
1.3.1 Load to Post 3
1.3.2 Post Properties (net section) 3
1.4 Longitudinal Seismic 3
1.4.1 Base Shear 3
1.4.2 Design Forces 3
1.4.3 Post - Combined Stresses 3
1.4.4 Beam Connections 3
1.4.4.1 Design Forces 3
1.4.4.2 Connection Capacity 4
1.5 Transverse Seismic 4
1.5.1 Base Shear 4
1.5.2 Design Forces 4
1.5.2.1 Stability 4
1.5.2.2 Brace 4
1.5.2.2.1 Tension 5
1.5.2.2.1.1 Design Force 5
1.5.2.2.1.2 Brace Capacity 5
1.5.2.2.2 Compression 5
1.5.2.2.2.1 Design Force . 5
1 .5.2.2.2.2 Brace Capacity ...... .... 5
Slab on Grade . . ... ..... ... .................
Jr
Elk .141E D. BIRNBAUM AND ASSOCI CES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
1 Reference Data
This calculation reviews the installation of storage racks for
structural adequacy. The sealing of drawings is for the struc-
tural review of the storage racks only. Other information is not
reviewed, nor approved.
1.1 Documents
1.1.1 Drawings
1.1.1.1 By Eu.- e •. Bir baum and Associates
SR - 1
1. .1.2 By Others
Hoj - Drawings to come
1.2 Loads
1.2.1 Vertical (Dead plus Live)
Loads per level =1.8 kips
Design beams for 25% impact
V =ZIRCSW
Thus:
1.2 Seismic
1.2.2.1 General
VS W 50.10SW
13.30
Where:
Z =0.75
1 =1.00
Job No. 19451
Sheet 1
K =1.00 (Complete load carrying
space frame)
C 1
a 1Sq
S <1.5 (unless lower value per -
mitted by soils report)
W =Total Load (Dead Load of rack .
is usually negligible)
T may be determined by any rational method, or the
default CS of 0.14 may be used:
E::NE D. BIRNBAUM AND ASSOC 'ES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
2 Configuration 3,
,2.1 Components and Geometry,
W
W =96"
a =60"
b =60"
Beam Type
Rig
2.2 Cheek Beams
2.2.1 Design Forces
L
< W
M (2)(8)
=13.5 inch kips
2.2.2 Beam Properties
1"
K4C
D=4.00"
1__ = 1.625" t =14 ga
2.625"
t
F1
A,.
• H =144"
D =42"
1 =43"
Upright Type
FAR
S =1.12 in
I =2.32 in4
S min
M
30
=0.45 in
Job No. 19451
Sheet 2
O.K
E :NE D. BIRNBAUM AND ASSOC CES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
2.3 Check Posts (Dead plus Live Loads)
2.3.1 Load to Post
2.3.2 Post Properties (net section)
1.6251.375"
It
1.625"
L—
2.4 Longitudinal Seismic
2.4.4 Beam Connections
1 at of levels) (L)
2
=1.8 kips
EB Column
t =13 ga
A =0.80 in
S in
r =0.99 in
S =0.65 in
r =1.10 in
2.4.1 Base Shear
Use Code Default Values for CS
V= 0..105W =0.19k
2.4.2 Design Force$
P <1.8K; V<0.19K
M <Va- (1.3)P
< (0.19) (60) -
=9.0 inch kips
2.4.3 Post - Combined Stresses
1.3)(1.8)
l /r =39
a /r =61
F =22.6 ksi
P =18.1k
M
Job No. 19451
Sheet 3
(fixity due to width
of • base plate)
= 0.65 <1.33 O.K.
EU(NE D. BIRNBAUM AND ASSOC ES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
2.4.4.2 Connection Capacity
4 "I
3/8" diam. Pin
Va = 4.6 kips
(Double Shear)
2.5 Transverse Seismic
2.5.1 Base Shear
Use Code Default Values for CS
V =0.105W =0.38K
2.54 Design Forces
D
II'
P EQ
2.5.2.1 Stability
Standard Connection
O.R.
Use min. 3/8" diam. ICBO approved expan-
sion anchors.
Minimum embedment 2" into slab.
Ma= (1.33)(4.6)(4)= 24.5in k
Job No. 19451
Sheet 4
Vh'
P D
h' =90 inches
P =0.8 kips
Note: Bracing shown is schematic see
this section, subsection .2 for actual
geometry.
Peq <gD +L - Stable -No Uplift. Anchors provide added Factor
of Safety.
O.R.
2.5.2.2 Brace
Vote - Allowable stresses increased by 1.33, design forces
increased by 1.25
:NE D. BIRNBAUM AND ASSOC 'ES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank. Note
December 30, 1990
2.5.2.2.1 Tension
0.5.2.2.1.1 Design Force
Tb <0.7K
2.5.2.2.1.2 Brace Capacity
7/8 Diameter X 20 ga. tube. A =0.092 T =3.7 kips
O.K
2.5.2.2.2 Compression
2.5.2,2.2.1 .Design Force
Pb
2.5.2.2.2.2 B ace Capacity
TS 11/4 X 1; X 18 ga As =O.23 in
r =0.49 in
Q =1.00
Fa P
(ksi) (k)
L kl
(in) T
36 74
20.2
6.20 O.R.
Job No. 19451
Sheet 5
E( NE D. BIRNBAUM AND ASSOCI ES
CONSULTING STRUCTURAL ENGINEERS
Project: Rocky Mountain Bank Note
December 30, 1990
.6 Slab on Grade
Treat slab as equivalent unreinforced square footing
B = 12 P
Q a
=16.1 in
1 (B-b-t
12 • 2.
=0.86 in kip /ft
Where:
P = 1.8 kips
b = 3 in. (average)
t = 4 in.
f'c = 2000 psi
Qa = 1.0 ksf
S (12)(0)
6
=32 in3_ /ft•
Me
C '
QQLc
0.027 ksi
QaL (12) 54)17-7:
°callow— 1.7
=0.085 ksi
Job No. 19451
Sheet 6
March 20, 1991
City of Tukwila
Attention: Shelly Bates
6300 Southcenter Blvd.
Tukwila, WA 98188
Dear Shelly,
The address shown on the permit application for Rocky Mountain Bank
Note (Gateway North - Building 2) is incorrect. Instead of Suite
157 it should be Suite 161.
The tenant has already printed cards and stationery with the #161.
Please revise your records accordingly.
Thank you.
Sincerel
Robert A. Hart
Project Manager
RAH : as
cc: Chief Olivas
Tukwila Fire Department
ItvdIord Properties, Inc
A Diversified Real Estate
. Development and
Management Company
BriDFORD PROPERTES
{�2 i�t'S
rJ r �37a •
C9L-1 1
��ru3
oy3�r -m
12720 Gateway Drive i'Telephone
Suite 107 ;2061241 -1103
Seattle; Washington Fax
9tb lt,t3 206/241 -2191
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91 -061: Rocky Mountain Bank Note
3325 S 116 St #164
PHONE # (206) 433.1800 Gary L. VatDascn, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME VI APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
3. When special inspection is required either the owner,
architect or engineer shall notify the Tukwila Building
Division of appointment of the inspection agencies prior
to the first building inspection. Copies of all special
inspection reports shall be submitted to the Building
Division in a timely manner. Reports shall contain
address, project name and permit number of the project
being inspected.
4. All high - strength bolting to be special inspected (Sec.
306, UBC).
5. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
6. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
• other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
PLAN REVIEW COMMENT
PLAN CHECK #9t- beo I PROJECT ¶tC\ lV `�1JT�1�C
REQUIRED INSPECTIONS
Le
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
'V Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, including all gas piping (296-
4722).
O Electrical permit shall bo obtained through the Washington State Division of Labor
and industries and all electrical work will be inspected by that agency (277. 7272).
0 J All mechanical work shall be under separate permit through the City of Tukwila.
O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
All high - strength bolting to be special Inspected (Sea. 308, UBC).
0 Any new ceiling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
0 Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
0 Readily accessible access to root mounted equipment Is required.
0 Engineereed trues drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
15.
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All permits, inspection records, and approved plans shall be posted at the job site
prior to the start of any construction.
When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the Inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being inspected.
Any exposed insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear Identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given In the soils report
prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Health Department
sign•ott prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 296-4787, at least throe working days prior to desire Inspection date.
On work requiring Health Department approval, It Is the contractor's responsibility
to have a set of plans approved by that agency on the job site,
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the tire performance rating thereof. Such
Identification shall be issued by an approved agency having a service for
inspection at the factory.
0 Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special Inspected.
All wood to remain In placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7.
1 .4;1- - '' — Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid,
1 Footings
2 Foundation
3 Slab /Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11 A -- (30L--rs
e X
12
13
14 FIRE FINAL
15 PLANNING FINAL
16 PUBLIC WORKS FINN,
)(17 BUILDING FINAL
PLAN REVIEW COMMENT
PLAN CHECK #9t- beo I PROJECT ¶tC\ lV `�1JT�1�C
REQUIRED INSPECTIONS
Le
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
'V Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, including all gas piping (296-
4722).
O Electrical permit shall bo obtained through the Washington State Division of Labor
and industries and all electrical work will be inspected by that agency (277. 7272).
0 J All mechanical work shall be under separate permit through the City of Tukwila.
O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
All high - strength bolting to be special Inspected (Sea. 308, UBC).
0 Any new ceiling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
0 Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
0 Readily accessible access to root mounted equipment Is required.
0 Engineereed trues drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
15.
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All permits, inspection records, and approved plans shall be posted at the job site
prior to the start of any construction.
When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the Inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being inspected.
Any exposed insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear Identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given In the soils report
prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Health Department
sign•ott prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 296-4787, at least throe working days prior to desire Inspection date.
On work requiring Health Department approval, It Is the contractor's responsibility
to have a set of plans approved by that agency on the job site,
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the tire performance rating thereof. Such
Identification shall be issued by an approved agency having a service for
inspection at the factory.
0 Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special Inspected.
All wood to remain In placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7.
1 .4;1- - '' — Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid,
♦,f
Dear Sir:
a
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -061
(513)
Gary L. VanDusen, Mayor
February 14, 1991
Re: Rocky Mountain Bank Note - 3325 South 116th Street,
Suite #1
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Maintain fire extinguisher coverage throughout.
2. No point in a sprinklered building may be more than
200 feet from an exit, measured along the path of travel.
(UBC 3302(d))
Exit signs shall be installed at required exit
doorways and where otherwise necessary to clearly
indicate the direction of egress. Signs shall be of a
contrasting color with the surrounding area and shall
have letters not less than six inches high with a
minimum letter width of 3/4 ", (UBC 3314) (UFC 12.108)
(Provide a marked exit to serve the northeast corner
of the manufacturing area)
3. Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Page number 2
°7 77
The Tukwila Fire Prevention Bureau
nf�
Gary L. VanDusen, Mayor
In double row racks with heights of storage up to and
including 25', an average nominal 6" transverse flue
space between loads or at rack uprights shall be
maintained. (NFPA 231C 4 -3.1)
Refrain from blocking sprinker coverage with shelving.
NFPA Standard #13 states that any shelving or decks in
excess of 4 feet in width will require the .
installation of sprinklers thereunder. (UFC 10.302)
(This applies to the low flow rack as well as to
shelving)
4.. All required occupancy separations, area separation
walls, and draft -stop partitions shall be maintained and
shall be properly repaired, restored or replaced when
damaged, altered, breached, penetrated, removed or
improperly installed. (UFC 10.401)
This review limited to speculative tenant space only -
special fire permits may be necessary depending on
detailed description of intended use.
Yours truly,
CITY OF TUKWILA
Department of Community Development - Building Division
Phone: (206) 431 -3670
qOcKY K\ooKrrAt E)Pci,AV
ADDRESS: 3 2.5 U_ __
DATE:
PROJECT:
OCCUPANCY GROUP
TYPE OF CONSTRUCTION
LOCATION ON PROPERTY
BUILDING HEIGHT/1 OF STORIES
FLOOR AREA (g, 3
OCCUPANT LOAD
EXITING REQUIREMENTS
DETAILED REOUIREMENTS V
OCCUPANCY
TYPE OF CONSTRUCTION
PART V, CHAPTER 23, U.B.C.
W.B. E.C.
CHAPTER 51-10, W.A.C.
NOTES
PREPARED BY:
P•
�AcK jibirQ A �L
- �-1
TS
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
Rf\C-
O
DATE:
Z. it A(
Type
t
(ga)
A
S
rx
r
AC
14
0.41
0.37
1.16
0.57
AB
13
0.48
0.43
1.15
0.56
AA
12
0.56
0.49
1.14
0.56
DC
14
0.52
0.38
1.05
0.65
DB
13
0.62
0.45
1.04
0.64
DA
12
0.72
0.51
1.03
0.64
EC
14
0.67
0.47
1.00
1.11
EB
13
0.80
0.55
0.99
1.10
EA
12
0.97
0.62
0.98
1.09
FC
14
0.83
0.54
0.97
1.43
FB
13
0.98
0.63
0.96
1.42
FA
12
1.18
0.72
0.95
1.42
GC
14
0.67
0.60
1.33
0.68
GB
13
0.80
0.70
1.32
0.67
GA
12
0.93
0.80
1.31
0.67 1
Type
n
t
(ga)
S
aY
K4E
4.00
16
0.90
1.86
K4C
4.00
14.
1.12
2.32
K5E
5.00
16
1.23
3.20
K5C
5.00
14
1.54
4.00
K6E
6.00
16
1.61
5.04
K6C
6.00
14
2.01
6.29
K6A
6.00
12
2.82
8.81
BRR
1.63
14
0.37
0.30
LAS
2.75
14
0.72
1.00
BAR
3.00
14
0.51
0.76
LAB
3.25
14
0.89
1.48
LBS
3.75
14
1.18
2.27
BBR
4.00
14
0.80
1.59
LCS
r
4.25
14
1.42
3.12
LDS
5.25
14
1.91
5.10
LDT
5.25
13
2.22
5.86
LDO
5.25
12 '
2.57
6.84
r
IPA YIMONNIMINNINNIIM..
DIRTR/,ICN•PCST cL.wP INT MOON
1I
5
1 8 a rt
xM = 4 1.25
TuaUL. FZ.
COLUMN
Y
Type
Past Details and Properties (units: inches u>o)
(all properties net section)
1 ita u 4, HQLs
v
U
3 /b4'L OGI`t P1Ca
P Hs'
1 .625"
3"
1.6251.375"
1.625"
T e P Type
CONNeGToK.
ANGLE - 76A.
( -3/, 8 , 4 CONNECTos„
1.625"2.375"
L__
1.625"
1.625"
COWNEGTCS
�NGL.E
1�
Note:
K -7 and - -R
Beams are
one piece
Others are
two piece
beams
(units: inches uno) 2 .6 2 5 "
2 1,
1� '� T i._ �' � �� E C T I O
.625
t
Beam Details and Properties
C -o Lu r4
MIN. 3 /s AM K09610
EXPAN51oN AtdGHo
2 •EMSEDMeNT
I AA-wo
I:GA.
PHIL.L. RED HEADS TO eE
INSTAL.L_ED Ps R. RR O2.7 -45
5112 EASE PLATE
ALL DATA ON THESE SHEETS
ARE THE EXCLUSIVE DESIGN OF
EUGENE D. BIRNBAUM AND AS-
SOCIATES, AND NO PART OF
THESE. DRAWINGS SHALL SE
COPIED OR USED WITHOUT THE
KNOWLEDGE AND WRITTEN CON -
SENT OF EUGENE D. BIRNBAUM
AND ASSOCIATES.
eS:
11I,nr_»I
111
FROHT ELEVATION ERA ION.
GENERAL WQTEB
1. This drawing shows standard details of the rack product line
only. See engineer approved installation drawings (same Job
Number) for components used, special details, arrangement,
and site specific information. The installation drawings
govern over this drawing.
2. MATERIAL .
Steel - ASTM A570 Grade 50 UNO
Welding Electrodes - AWS E70 -XX (all welds single• pass
fillet welds designed at 50% stress levels)
Expansion Anchors shall be ICBO approved types.
Hilti Kwik Bolt (ICBO RR #2156))
Phillips Red Head JS type (ICBO RR # 1452)
Ramset TruBolt (ICBO RR #2391)
Embedment shall be minimum 5X Bolt Diameter.
Other similar anchors may be used if ICBO approved. The
anchor types, sizes, and embedments shown on the installa-
tion drawing govern over the sizes shown on this drawing.
Special inspections are not required unless noted on the
installation drawings.
3 Unless noted 'therwise on the installation drawings, the
allowable soli bearing value is 1.0 KSF.
EUGENE D. BIRNBAUM
AND ASSOCIATES
STRUT 1U)AL ENGINEERS
1 828 SILVER LAKE BLVD.
LOS ANGELES 90028 CALIF.
(213) 883.9218
•TRUCTURA:. tNSINKR.
1
.g.
RECEIVED
• rrvn1=rrIKINILA
FEB 8 X991
PERMIT CENTER
3.
rereffl
- 1YPIGAL. 6L P-KINen
I2' NIGN X 42. 6 1411
CAL C U L-MI I S riP PN
SG I, I-I I c
U
=IP
i = a
i:::
•111[
� }::
I I r ...:'
44111114111I11111IIIIIIII 11111111111 I
I 11141111111441141111111 1111111111
S
/4i11111 1111111111 1141111141 111111111111 111111111111
1114111 111111{1111111IIIIII1I111111
N-
N-
N-
N-
N-
MON.
N—
Ids.
1 1111III111IJIIf 111I111I111IIJI111II1I1II1111 {II►11111111IIIJII111111 Il1111IIIIIIII111 II111111111011111111111I 1IIII1111IJIHN1I11111III111111III1III1II1IH 1111111141111111 11111111111
1
i—
PA
CUT 1∎10
f
u 1
SAC
—f-- —4
-- TPIAL gtr KAGAINI6
I?
141GI-I 42 176F x e WIPE
2 >..6v5I (ALcdt.A1IO'4
T`tPICW. coNv4 Y019
Z
J
{ I W O
• ZZZ
--
U
QO
S
SCALE: 1 /8" _
• -a— m
1 ,_ 0 "
9
I
LA
O
196
„
J
r iOCE3 RE.A
5Et 5 1fir ET
T /A--I FDA
a C.6 FLAN
0
IIII 111 111 1111II11nlill 1111l
1
24'-6"
II111III1111d11[1IIIIII 1111114 11111111111
T
Loki - PLOW - PA%K
1 1
U
1111111(11111 1 1111111�t1111I 11 hlilhl1I1�1111r 111111tI1111111 1 � 1ltill1I1111111 I � 11111111111111 I
� . 2 3I 4
I No.1 �`wv
;111 111 r 9 9 Y;� S,: K, Z t ''+
1lri il iilriii 1ililirli Ir11111fi rrriI i 111111 rrrilf111
24' -6"
- 1 1 / 4 1Pk -.Al. STEM. FiAGKIti
Ia' i-i x 4 ''boEP , g' W E
\ Z I-l;Vet• S6E cmLcj i -tiokis
.. i oI 1i .,
rJ
24'--
„
12'-
„
o�
B
c0
•
•
0
0
N
A
By
Date
Permit No. - .--
1
,
understand that the Plan Check approvals are
subject to errors and omissions and approval of
plans does not authorize the violation of any
adopted code or ordinance. lsacE'.nowied�ed.
trector's copy of approved plans
1Jolvi
SitE+ua` Tus'PEcrioAl
IkMcAok SOLTs •
4
RECEIVED
rrty op r► wwILA
FEB 8 1991
P€RMITCENTER