Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6473 - Radio Link Company - Antenna
;{ ■ RADIO L Co. -• -' - • •nl. Combined Transport Inc. SETBACKS: N- S- E- • W- FIRE PROTECTION: [] Sprinkierti ■Detectors Ki NJA .. 242 -6811 ADDRESS 16234 42nd Avenue South Tukwila WA 412 98188 CONTRACTOR Owner i.rilswiw.- . BUILDING :d AMOY, OF FICIAL PHONE �r. — - -- ADDRESS SIGNATURE: rI o dam/ ,I_ �, 4 4 ,r - ZIP PRINT NAME: ; `A , t (. L WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT PHONE ADDRESS ZIP .: year N/A SETBACKS: N- S- E- • W- FIRE PROTECTION: [] Sprinkierti ■Detectors Ki NJA UTILITY PERMITS REQUIRED? o Yes an No Publlo Works ZONING: BAR/LAND USE CONDITIONS? (] Yes ® No :ONDI ION other t an those noted on or attached to • , rmiU• lane ...0 - • J - ISSUANCE BY: — i.rilswiw.- . BUILDING :d AMOY, OF FICIAL - DATE: lj► �r. — - -- I hereby certify that I have read and exar�rtih'ed this permit and know the same to be true and correct. All provisions of lav and ordinances governing this work will be compiled with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating performance of work. I am authorized to sign for and obtain this building permit. construction or the rm SIGNATURE: rI o dam/ ,I_ �, 4 4 ,r - DATE: -- f,cr 2 PRINT NAME: ; `A , t (. L COMPANY: ( /q V v , ,i'K din . ITY OF TUKWILA )opt. of Community Development - Building Division 3300 Southcenter Boulevard, Tukwila WA 98188 '206) 431 -3670 PERMIT NO. BUILDING DATE ISSUED: ��3_ 1 S --� I 16238 42 AS_ 700.00 PROJECT NAME/TENANT Radio Link Co. ASSESSOR ACCOUNT # 537980 0689 - TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) ' U Grading/Fill WORK: 0 Rack Storage 0 Reroof ❑ Remodel (residential) © Other. Antenna DESCRIBE WORK TO BE DONE: TOTAL .Th is permit shall issuance, orlf th CERTIFICATE OF OCCUPANCY NO. Install radio communications antenna. °c menull an vo Work is suspen if BUILDING PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) RCP. >> BUILDINGP:.ERMIT:FEE PLAN: CH CK BUILDING SURCHARGE : FEES :<TOTAL < PLAN CHECK NO.: 91 -043 CODE COMPLIAN SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. TOTAL wa rk is pat com�eitZ � Arr �foned fdr perd PERMIT NO. CONTACTED LE m-e : Ck DATE READY DATE NOTIFIED 2nd NOTIFICATION 3RD NOTIFICATION r-� - l q) (snit.) - BY: (init.) BY: Init PERMIT EXPIRES AMOUNT OWING 0 BUILDING PERMIT APPLICATION TRACKING - PLAN CHECK NUMBER INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) FLOC l <`" SQUARE FEET TOTA OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEEL' OCC. LOAD TOTAL TOTAL. SQUARE FEET OCC. LOAD DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. O FIRE O PUBLIC WORKS O OTHER BUILDING - initial review itgl PLANNING 66 BUILDING - final review PROJECT NAME SITE ADDRESS 2 -I5-ci t REVIEW COMPLETED G ROUTED INIT :G%��72 INIT: INIT: INIT: IAA R■ a U r k L o , SUITE NO. 01 MOVIE NSU ANT: Date Sent - Date Approved - FIRE PROTECTION: • S • rinklers • Detectors V WA FIRE DEPT. LETTER DATED: ,1/'' INSPECTOR: S) 3 Al.: � '' ce�H ZONING: ]BARA.AND USE CONDITIONS? Yes REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTIL PERMITS REO IRED? 7 PUBLIC WORKS LETTER DATED: TYPE OF CO1STR RNbto • S- E- W- UBC EbTTION (year): lo 08)17/90 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION MUST BE FILLED, OUT CCSMPLETELY DESCRIBE WORK TO BE DONE: BUILDING USE (office, warehouse, etc.) OT / c NATURE OF BUSINESS: 6 m ,,il f cest WILL THERE BE A CHANGE IN USE? :1 No ■ Yes IF YES, EXPLAIN: PROPERTY OWNER ( p 7`tc hry / oF -'T /rtic_ DATE APPLICATION ACCEPTED BUILDIN ,a PERMIT APPLICATION ADDRESS /4,g, V- l/' ,v fl t` 6 • CONTRACTOR 71/044--7. C. FEE SITE ADDRESS SUITE # VALUE OF CONSTRUCTION - $ PROJECT NAME/TENANT ASSESSOR ACCOUNT # /43379 - /mod- ) 9 - a-3 TYPE OF New Building Addition Tenant Improvement commercial Demolition TYP g p ( ) (b uilding) WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 16V Other: /V S 7' f L 1, a, fi D c> M lti1 U /V/ /1. D r i9 n/ T rv,4 o 4'J 5 1- Cog e. SQUARE FOOTAGE - Building: / 9 O 0 Tenant Space: Area of Construction: N w �o RNc a. WILL THERE lag STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? USJ No 0 Yes IF YES, EXPLAIN: DATE APPLICATION EXPIRES '7DL1," PHONE y -C / PHONE EXP. DATE PHONE ql ZIP CG./s- ZIP ZIP DATE /- 3 G ,._ PHONE BUILDING OWNER OR PRINT NAME AUTHORIZED vd.1d 5; ,. AGENT ADDRESS i � CITY /ZiP . �,��j.. S' �i ,�i� S� • ,�r,... 9d' /�J� � � Je/ CONTACT PERSON d_iV■. LL _ PHONE APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT if the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations.. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. COMMERCIAL • •••. • . Struottiral calculations stamped bye WsshlngU SoUs report,ritamPed by , a..14Vitsitington State : " • „ „ El : gnergy,.calcUlations Stomped by a.ytiashingtOrt!tta. engineer Or. architect t.rigal description • . : • : • , oddng drawings, stamped by a Wilifilrigtori Sta. arttlitect,:wiiicb Include: : : . • „ :..COmpleted•titillty•pennit . .eppiloationlono : tor ................ (8) BOO of civil drawings NOTE See uzpennkabonaidchecksthrspe • . . • • ,• • • • • • • • •• • •• •• • • • ••••••••••••••:.•::::•:::: Two (2) sets of plane, which Include • • •• Building floor plan showing .......... . enartt.sPace floor plan showing m* s • • , • .tVQTE:ftr.ltg0..diaieriskm SUBMITTAL CHECKLIST COMMERCIAL TENANT IMPROVE1194111 TI Completed building permit application (one for each stntature or Li Assessor Accamt Number • ••• ..• .•• • •••• .• • • . •.• •••• •••••• . ••••• • NEW COMMERCIAL • .• • • Ej Completed building permit application(one.fOr.eacb , • , Completed building permit application (one for each $ • ... " .400 ption •.• ,• • AsSeSsor AtXotint Number :: „ . F4ACK Completed '•:•:'••••• .• ••" :-. • • .•••.• . ... building pe appllcatkn J] Structural calculations stamped by a WsshlngUm Stale RESIDENTIA . . . . •t+0:011 • Two .sets..(2) d wings, which Include . ,, 1 i'Foundation plan 400.6.446 plan .. . ... .. • Root plan Bulidng elevations (all views) Building cross suction • Structural fmmkig plans ''WashLngn State Energy Code data • . . . " • Architectural drawings stitieturii on s: ... • :....• .... ..... ,;,, fro;: 06.1 * 0 ::..f..!.:: : •... ... ••••••••• li ....:• ii - i6 O siti:i . : 4 .•-•'-'-'''''''.:iibt164''..)::'•,w,awn':'•:...::' '.. :*--0/- oe...S0b#!!......,.......:...:„•-..,.... footage t..:::.p.::.'1.1.!:1'..;t;:;:i:•..fPr°ndiP:613.--: tenant ap :.P.;'''........:.!..!'::•::.::•'•:':',...':::::::'.:4‘.;1i:.:.1")..'..1...‘.......11440.,.... ''''':.: . 1 . ':: : ' . '..1 ; . :,....,.......„..........' , .. :, .. „ . , .... ::.....:...: each i.:•.:.:::,,4:7onan.4.t.,,,,,,,,,,,.T.liftfrot.:outtond:':'':;'...:„:1:...:,.,.:i....,..,:be::::,:.:,:',091'?1.::::.:,...:,..,,,::::::::,:::::::::::.....:.:.,.i . ‘..‘ 1., :....::::•jil.(,!':':.,•,.:::::-.."...::::::.:•:, i,,i1..J.:!..",........1;•.:•iicit674i:::•i:.!.::::..k. 0 ,.. ...--- '•.- ••••••• • • • . ' ' ''... . stry............... , ....,..„..., e and i is to be ...., porno! - ::.ilit:'41!! '''.: .-:::. : ceiling 4 .., .........: .,....:::.: iiii i afi.. done . . ...c"'''' • •• • t for. 7?! . .....,,,:........ :. by Welk Wash ington uemy ..:i„1,;..........: attachm . S tampe d f . :...,..., .:... ,... separa .: .,...„............:.,.:.• iiriY Y?7!!.....,,,,::. be J raj' :...' -:'.b".!;ljts.!:::':*...;•:::,!!!!:.:f:.•7.,:::::i'::!:•••:'.,:'..,,.:::::::::::•••• . ..::::::' . • . ' .... ,. . :•:::::-.....!:::,J:...:....,.,:i..i NOTE :: ;-1*q0S i„,:....!•appileur) aft.:... - ;:.:::.............:::,• , ..::::::,:::::::::::::':,:':::' . .. . ,..,...:•:„.........:. .....,„,.....— . - ... . . . ...,,...„,„„:„:.,,:,.,:•,.,.....,.i„....„..„....:•.:,•,.,,, • • , .. .. ....;: ..... . .. .. .....,,,...,.....604i4c11,k7!,,..... ............::•::••••:•,..,,,,::::..E.•:::::.•:,,::::::::•••. •: fernoved H ..:.i.•••,•••• •,...iind:.:.........:.:,...„.. .. • . • • . (one tii,-.. each structure) —''''.....'.....': .... it,Pii! 1..:•,::::,',;":ikiiiii!..:','"!IIE.;c1.'.:.:•":•.;:'''';..iii ii0.0.::::..:4'i:':.-,:::-•:.-"*.••••:.'.::.'i iiiiiiiicr l.eite'... :;ii.-.'•:•:•.••••.........;:":!_,•:::,,,,,,,,:•:Ei=itiiiii7:::: .....,...,.......„..,......iii,,,.........,..........., • • ....,.,....„,..:,...,:::::::hiiiiiiniye .. • .. :.:•:....:•::... .......,.: off of thep ennlL . :,,.... isial.E.....1:::...;,.:..t14:.:bain,...::.,.........019,-..,..t!d!°1'-.---:....•.rfl,'... hyd - , ..—.P. n!'f ; • • Li Assessor Account Number wsepwhichIncWde Site Plan (showing bkng and location of ante saatWte d • engineer may be requhd 1Fitrttott.trOltrent . ••:•••.:: "::::...:•••••• ,,,..•••• • . . .. •••••:•-• .. • ..... . . attn Stiate.itipSrL Completed buikMng permit application ( one tar each structure Assessor Account Number '•••!**•• PROJECT: rPM t PM X 4 1 PERMIT NO. � ~ SITE ADDRESS: 1 i , , o &/Iii ' - DATE CALLED: TYPE OF INSPECTIO . = SPECIAL INSTRUCTIONS: DATE WANTED: NOM REQUESTER: cj..., ....- PHONE NO.: 7440 '' 5 (p 1 I INSPECTION RESULTS /COMMENTS: i INSPECTOR: INSPECTOR: DATE: • INSPECTION RECORD CITY OF TUKVVIL,A Dept. of Community Development - Building Division Phone: (206) 431 -3670 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 'ype of Inspection ite Address equestor 1$4 pecial Instructions nspection Results /Comments: CITY OF 1'UKWIIA Building Department 6300 Swhcenter Bo tukwil \ d 98188 (206) 4,,'. -3670 isoector 41-441-7 ' WwsG/Yea+wtlAfKtvG FWD. WM' RMMRNR .owMG +wF.IruWRRxrtiwertwww..,nwun v:.nw�. uro.u�....w..�...+... PERMIT iY 4-1 Date Date Wanted ' ' -- c1 Project g' -0(A t) L-t4'. k Phone # 7469 Date_ --1 fit -' .m "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 x 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431-3670 11 12 13 14 FIRE FINAL Insp: 575-4407 15 PLANNING FINAL 431 -3870 16 PUBLIC WORKS FINAL 431 -3670 x 17 BUILDING FINAL 431 -3870 I (INSPECTOR COMMENT SECTION ON REVERSE) CUILUIM(a rtrtmi I INSPECTION RECORD CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 16238 42 Av S (Post with Building Permit in conspicuous place) BUILDING (-1) PERMIT NO. PROJECT: Radio Link Co. CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied In place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or it underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation points dear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of thin type can often eliminate problems, delays and misunderstandings as the project progresses. 0W1NI By. Date i 6 Lk co . (1,0-wlyi 4.;4 'tr) '17?..'fL >t (°A.; t a 3 �.� ,, // 1) QC). 4. 4; ) --...Permit No.. TO'd . t2:t'0 OT/G0 TO rrodorrow I understand that the Plan Check, approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. Receipt of con= tractor's copy of •; roved pl acknowls • ed. • wv...• •• ••••• ah+•.••rrrwww1M. •••■••••f•• MC Iw w• +.ry k•••• •• Ado0 r r O F TI A JAN 30 1991 PERMIT CENTER .... , .....t., ,'.! 4" PROJECTION G. L. 6 .1 } COMPACTED SAND AND GRAVEL DRAINAGE BED MAX. REACTIONS MOMENT = 2,502 FOOT POUNDS SHEAR - 389 POUNDS VERTICAL = 1000 POUNDS ELEVATION i ti 1111 =1111= BASE "SECTION 2" MIN. APP'D. SALES:1.,._.DATE: FILE NUMBER: DRAWING NUMBER: A880445 6" MIN. r 2° 6" ROUND OR SQUARE -,; :U FEB A 91 CITY OF TUIVivILA PLANNING DEPT. TOWER AXIS AND CENTER OF PIER 1 L J NOTE: FOUNDATION DETERMINED U.B.C. SEC. te SECTION A--A 1b ' cSk DEPT BY VOLUME OF CONCRETE SQUARE PIER = 1.0 CU. YDS. ROUND PIER = 0.8 CU. YDS. THIS DRAWING IS TI-E PROPERTY OF UNR- RO-t9. IT IS NOT TO BE REPRODUCED, COPIED OR TRACED IN WHOLE OR IN PART WITHOUT OUR WRITTEN CONSENT. DRAWN BY: GPW DATE:02 /19/88 ROHN CHECKED BY : Gc C2.- GATE : 2 - 88 TITLE: APP' 0. ENG : X . DATE: 2-24 - `$8 FOUNDATION DETA I L 45 TOWER Td n:PO OT/50 TO P ct At f< (.1`,' 5 e & ¼ y /) olif■ •••""'"" 71 • it MOO 0 c,cv sc p \ t.‘ 0% A TOWER This tower is an 18 inch triangular pattern suitable for heights to 300 feet with proper guying! A true multi -use tower. DESIGN ROHN No. 45 tower is designed in an 18 inch equilateral triangular pat- tern. The three legs of the tower are of heavy, 14 gauge, special quality steel. The cross bracing is the ROHN "zig -zag" design using a continuous, solid steel rod, electric welded to side rails every 15 inches. All sections are 10 feet in length. USAGE This tower is suitable for mounting communication antennas or other equipment under normal conditions for heights up to a maximum of 300 feet. See specification sheets for complete guying and wind load information. CONSTRUCTION Entire tower is accurately constructed, utilizing precision machines and then electric welded throughout. Workmanship and materials are of the highest quality available and fully conforming to specifications. FINISH ROHN No. 45 tower sections are completely hot dip galvanized after fabrication to give permanent protection against corrosion. Because sections are galvanized as the last operation, all points of welding and other points of construction are fully covered with molten zinc that tends to seal itself should there ever be any breakage on the surface! SELF - SUPPORTING HEIGHTS FOR 453 TOWER* WIND LOAD Factor of Safety -1.5 No Ant. 2 Ft' 10.0 PSF (50 MPH) 90.6 14.4 PSF (80 MPH) 75.9 20.0 PSF (70.7 MPH) 64.2 *See Installation Instructions 84.0 89.1 57.8 Factor of Safoty -2.3 No Ant. 2 Ft' 72,9 66.5 61.8 54.5 51.8 45.4 ** * *Recommended Do not install towers or masts near power lines. All towers or masts should be Installed out of falling distance of power lines since every electrical and telephone wire should be considered dangerous. Unarco -Rohn recommends anti -climb sections on all towers to prevent un- authorized persons from climbing towers. All towers or masts should be installed by experienced and trained personnel. All types of antenna installations should be thoroughly inspected by quali- fied personnel and remarked with hazard and warning labels at least twice a year to insure safety and proper performance. All antenna installations must be grounded per local or national codes. ti RAD / 4 /vVK /fan /9'16- CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASIIINGTON 98188 PHONE U (206) 433.1800 Gary L. VanDusen, Mayor Plan Check #91 -043: Radio Link Co. 16238 42 Av S THE FOLLOWING COMMENTS APPLY TO AND BECOME ,PtT F THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), ,and Washington State Regulations for Barrier Free Facility (1990 Edition). 5. Notify the City of Tukwila Building Division prior to placing any concrete. 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. ( PLAN REVIEW COMMENTS PLAN CHECK # "1 � " c>i3 PROJECT ,4Dlb L REQUIRED INSPECTIONS to No changes will be made to the plane unless approved by the Architect and the Tukwila Building Division. Q Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277. 7272). O All structural concrete to be special Inspected (Sec. 306, UBC). 0 All structural welding to be done by W.A.B.O. certified welder and special Inspected (Soo. 306, UBC). 0 All high- strength bolting to be special Inspected (Seo. 306, UBC). 0 Any now ceiling grid and light fixture installation Is required to meet lateral bracing requirements for Seismic Zone 3. 9 t . Partition walls attached to coiling grid must be laterally braced 11 over eight (8) feet In length. tA. 16. All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall bo submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. Readily accessible access to roof mounted equipment is required. Engineoroed truss drawings and calculations shell be on site and available to the building Inspector for Inspection purposes. Documents shell bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 26 or lose, and material shall bear Identification showing the fire performance rating thereof. Subgrado preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. -Ws- All spray applied fireproofing as required by U.B.C. Standard No. 43.8, shall be special inspected. All wood to remain in placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1 Footings X 2 Foundation 3 Slab /Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Nall Board Fastening 11 12 13 14 FIRE FINAL 15 PWINNING FINAL 16 PUBLIC NORMS FINAL 17 BUILDING FINAL ( PLAN REVIEW COMMENTS PLAN CHECK # "1 � " c>i3 PROJECT ,4Dlb L REQUIRED INSPECTIONS to No changes will be made to the plane unless approved by the Architect and the Tukwila Building Division. Q Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277. 7272). O All structural concrete to be special Inspected (Sec. 306, UBC). 0 All structural welding to be done by W.A.B.O. certified welder and special Inspected (Soo. 306, UBC). 0 All high- strength bolting to be special Inspected (Seo. 306, UBC). 0 Any now ceiling grid and light fixture installation Is required to meet lateral bracing requirements for Seismic Zone 3. 9 t . Partition walls attached to coiling grid must be laterally braced 11 over eight (8) feet In length. tA. 16. All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall bo submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. Readily accessible access to roof mounted equipment is required. Engineoroed truss drawings and calculations shell be on site and available to the building Inspector for Inspection purposes. Documents shell bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 26 or lose, and material shall bear Identification showing the fire performance rating thereof. Subgrado preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. -Ws- All spray applied fireproofing as required by U.B.C. Standard No. 43.8, shall be special inspected. All wood to remain in placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. CITY* OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: ADDRESS: DATE: PLAN REV ►Jk �• (023_8 4 2 Pv Ave-, .Fe3 . 15 14ci PLAN CHECK NUMBER t! 6300 Southcenter Boulevard -- #100 Tukwila Washington 98188 ab F4. 1/2-\16‘-1 t tt) A 1.1TE'u1 s A `CbU.as t2 Aypos.uaL 2 1s /e 1 Prepared by DATE CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 -- /V 9/ ETt OEM FEB 141991 CITY OF TUKVVILA PLANNING DEPT. * * REVISION SUBMITTAL * * PROJECT NAME 1 ¢ /9 / e ADDRESS /G,) 3 FS _ L/. r / 2 V c , --5e> - CONTACT PERSON S/ IV1- 6 Ew L L- L_ PHONE 9 —34// e � ARCHITECT OR ENG PERMIT NUMBER 43 (If previously issued) G PLAN CHECK NUMBER 6 (I - - v TYPE OF REVISION: o c/ PV/d,, % / v 4 i L_. SHEET NUMBERS) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: /( t 1 1 v - $ 4 PL tt 0` gc\° INSTALLATION OF 30' 45G TOWER Foundation will consist of 3' of tower placed in foundation at time of pouring. Concrete will cure for minimum of 72 hours before additional section are installed. Tower will be grounded as per plans. Radio Link Company 16238 - 42nd Ave. So. Seattle, Wa. 98188. INSTALLATION OF 30' 45G TOWER Foundation will consist of 3' of tower placed in foundation at time of pouring. Concrete will cure for minimum of 72 hours before additional section are installed. Tower will be . grounded as per plans. Radio Link Company 16238 - 42nd Ave. So. Seattle, Wa. 98188 CITYOFTUKWILA FEB. , 4'199i PERMITCENTER ` .: ( C CONVERSATION RECORD DATE: ',// ( T SUN 'THU TIME :70 ; . r� 0 Pm TYPE: ❑ Visit ❑ Conference lTeiephone— 0 Incoming ,k:fautgoing Name of,pprson(s) contMi In contact with you: Organization (o ice, dept., bureau, etc.) Location of Visit/Conference: SUBJECT: f .— .4,,4Z 14 i SUMMARY: Jino-ta.GLcd-1,491L. -- -v ) j FOR OFFICE USE ONLY Telephone No.: 9 3 , -5