Loading...
HomeMy WebLinkAboutPermit 6493 - Sams Tire Service - Awning5AM. I1E. CONTRACTOR Washin: ton Tent & Awnin_ Inc PHONE 2 -8 3 ADDRESS P.O. Box 5387 Tacoma WA ZIP ' 8 0 WA. S7. CONTRACTOR'S LICEN E # WASHITAl22L2 EXP. DATE 6 - 14 - 91 AR HITECT PHONE ADDRESS ZIP Awning I :' • 1 y ear 1988 SETBACKS: N - S - E- W- FIRE PROTECTION: 0Sprinkiers_O Detectors Q N/A UTILITY PERMITS REQUIRED? 0 Yes (J No p b WQrks,t BAR/LAND USE CONDITIONS? 0 Yes CD No ZONING: CONDITIONS lather than those noted on or attached topermlt/plans) ;n • P .11V. ji J'- BUILDING ISSUANCE BY: 4 L ■ � � _ ' OFFICIAL DATE: _ / I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the •,erformance of work. 1 am authorized to sign for and obtain this building permit. ■ . DATE: 3 - 26-q ) SIGNATURE: • C" - . PRINT NAME: I 4 K ! �► � t - A ore) t) COMPANY: - T ; f 40110 :ITV OF TUKWILA )ept. of Community Development- Building ►300 Southcenter Boulevard, Tukwila WA 206) 431 -3670 BUILDING . PERMIT NO. 3 DATE ISSUED: _. , . C7 r IMbPERT( OWNER ADDRESS ISE .. woR ( PROJECT NAME/TENANT Sam's Tire Service Division 98188 BUILDING PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) BUILDING.PERMIT MIIEEETIIAMEIN BUILDING SURCHARGE »> FEES AMOUNT:. 72'. 8108 Awning Manufacture and install vinyl covered awning with graphics. This permit shall become null and void If the work is not commenced within 180 days from issuance, or if the work Is suspended or abandoned for a period; of 180 days from the let CERTIFICATE OF OCCUPANCY NO. z ASSESSOR ACCOUNT 1 102304-9041 TYPE OF ■ New Building ti Addition ■ Tenant Improvement (commercial) • Demolition (building) ti Grading/FM WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) © Other. DESCRIBE WORK TO BE DONE: Ed Sado F�� g3�gw 3G74 P.O. Box 1031 �Z1P '9 OCC. L OAD SOUAREC. SQUAR FEET LOAD FEET OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL LOAD • FEET LOAD FEET LOAD SQUARE FEET 000. LOAD PERMIT NO. " CONTACTED L-e-c-t- In''23,(3 DATE READY DATE NOTIFIED 1 _as . 1 BY; , (snit.) --kJ∎ BY: (Init.) PERMIT EXPIRES 2nd NOTIFICATION AMOUNT OWING 0 3RD NOTIFICATION BY: InIt BUILDING- PERMIT APPLICATION TRACKING PROJECT NAME PLAN CHECK NUMBER 1 c)q3 INSTRUCTIONS TO STAFF arn!5 3C: r V (cam.. SITE ADDRESS SUITE NO. 1D113 E • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE OCC. SQUARE 000. SQUARE OCC. TOTAL TOTAL DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. RTM l± T M BUILDING - ' �- I �.•� O CO LTA S NT: bate Sent - Date Approved - initial review ___SROUTEDZ„_ 3_Z I FIRE PROTECTION: Sprin kiors Detectors t 1 N/A FIRE DEPT. LETTER DATED: Z f f�jf 4 ! INSPECTOR: 50.-- E FIRE PLANNING O PUBLIC WORKS O OTHER BUILDING - final review REVIEW COMPLETED INIT: 9/, � ZONING: (BAWLAND USE CONDITIONS? Yes REFERENCE FILE NOS.: INIT:��i MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? INIT: INIT: 9 INIT. PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: t/4 Aavr S- Yes UBC EDITION (year): /`ice SITE ADDRESS SUITE # VAL OF CONSTRUCTION - $ 5 8TH PR•JECT NAME/TE I . NT Mv l ' in GQ-' ASSESSOR ACCOUNT # V�23c�� -10 1.4 (com a cial) U emolition (building) A Other: TYPE New Building Addition XTenant Improvement TY OF WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) DESCRIBE WORK TO BE DONE: VON 1c i ( 444 a Ui ut t ca v -e�rei 0 GO in i w `- vze � / U ` . BUILDING USE (office, etrU ■ c C .l-c warehouse, etc.) ( -- v g , ,VIMMIMININIMMEIT NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? No • Yes IF YES, EXPLAIN: ' SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: 6� , ., .r-t WILL THERE BE TORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No ❑ Yes IF YES, EXPLAIN: PROPERTY M CONTRACTOR c PHONE I ADDRESS o - L e.„ KyT - Lerv, I (.UiA EXP. DATE ZIP q . 05- ( / L1 __.(4 f WA. ST. CONTRACTOR'S LICENSE # W i i WA - ( - /4 (29,1-2_ ARCHITECT - - - -- - -- • HONE _ __ _. ___ - -_ � ADDRESS----------- _ -- — - - - - -- --- I P CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION MUST BE FILLED OUT COMPLETELY PLAN CHECK NUMBER <I: <:HEREB.Y CERTIFY =TI • TRUE AND,C`ORRECT BUILDING OWNER SIGNATURE OR AUTHORIZED AGENT qi- PRINT NAME )4,1,P v --c -• BUILDIN PERM APPLICATION 1 D SCRIPT BUILDING PERMIT FEE PLAN' CHECK FEE BUILDING :SURCHARGE. OTHER :''" ON A O T :50 RCPT # CODS DATE.: :TOTAL ANt EXA.MIN: D!THIA A:P DATE PHONE ( - 2: ADDRESS o?,t(- C � 16.4e1 CITY /ZlP -�- , f.Ul4 qt( CONTACT PERSON Toe r e PHONE I -572 r APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete In order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES COMMERCIAL ::••••••••••••"'•.Arciiitectirral drawings "•••••••••.:,:•••••• Structural drawings • ''•• Mechanical drawings 'CM &awlngs Completed Utility" permit'appilaition lane for entire pro . . • •• • " • Six (6). sets of civil drawings ‘.. NOTE:':$0iUtt101$efililt end:CheattliSt,ta(' subiiiitta requ irements. ' ' RACK •••:•."...•,„ , Completed building permit application Asset iipt.AccOUnt Number Two (2) sets of *Otani, which Indudo [1 Buildin fleer plan showing:, . .,.,..,.. , .,....,.., .„ Entire apace, where.,,recks will be fc • • Exit doors of arictee fieer Specfications Structural calculations stamped ,by e State:license :Topographical,. survey " - - -.. --- . • ''.:tYPTE:•,..'"Irrelu de cGmenslone:Of racksialargh. (4...kildt end exit ways on pien, „:::::!-.• ,.,,,, ..,::,,,,: i . ..: • : ..:........,:.-:: :. • .: .. :, ,.:: .:. :,... , .. ,, , :.,.:.:,,,,,,...........,,,,,,,....,...,......,..,:.:„.. .... ...,... ..... „..,.,„: ...,.. : E:1 Structural calculations stamped by:a Washington Statekeri „.... , .... ....... ........., :.:. .. engineer (rack storage 8' and oveter,::::•:':' RESIDENTIAL S6I3MITTAL CHECKLIST ••. : engineer.... ••• .. ••• .:....• .........,..„.... ....,... ... Soils stamped by a Washington State flee - • neer:•::::::::::;:-..•:'i:.:".."i , .• , .......,,,..„:„................„.:......„..... ..............,,....,..„:„.•„::::::::, • ..„.......,........y... •....„..... . '':•:••••••":"'''''''::'"'":• • • . • '.•-• :. ''' •••••••.::.::::::"..."...,:..... .......:,................„. •••••••..."..,..-::::„,...,,.,..... ....• .. ... ,...., ...,........,.........„.....„.... :.............,..........„....:,:.:::::::,....„......„.,:.::::„...,,,,.:........... Energy calculations stamped, by •ii architect.:.p, '.,,.,,:,:.,,....,',:..:::,.. '- • ...........,,,,,,,,,,.-,,.....:...,......:',...--,-,.:::.•:.,:::::::::.... ..:... ..... .... ...,....:.::.........:....., . „: : . :„.....................„....................,:,..................,.......,:„...„..„,:::;,:„. . .....,,,.......,....,............. ....•...•„.„•..........,............„.„.......,........... ..„.:::::::::::........„.. Legal deScription.„ .. .",Workirig stamped bya.:Wathingten.StiteliCeri : erchitect; .1.4,110 irtclude:::::.: .:.'"'••••••:::::: . .."•••••."•:•::•••••••,::::':::::',."'"."•:::•"';''''':''''''''''''''''''''' ''''''' ... •......... . ...„...„ •• •••••:: • :." ••• • 2 . • "'"' ••• • ••••"••••• .• . • • • NEW SINGLE-FAMILY • . -• . • • . : . ... . .......„„... Completed building permit application (one, for each.etructure): , • • . ......................... . • .. ...• • •••••• ... •• • Legal description .•• • • •• • • • • • • . • . . . fl Assessor Account Number Two sets (2) of working drawings, which • Site plan (o pka;, g ii;y0; dos�sth ant location...: • Foundation plan indurk access to bulldog, shoe/Mg' 4 FIcx)r plan . : : widrhsnlnprh • Roof plan • . : '• . • Building elevations (all views) • Building cross-section : • . • Structural framing plans • ." : : Washington State Energy Code data E" Completed utility permit application • . . Ell Six (6) sets of site plans showing utilities • NOTE: Building site plan and utility site plan may be combined. see utility permit application and checklist for specific SpbMittill requimments. Additional topographical and soils information may be required if unique site conditions. Eit4tiit.: • • I M PROV EMENTS .„„... c°1"61 E — ' Com p leted bUIkII� permit applicati (one Two (2) Seta of construction plans which Include """ .• " . ,..,. ... : .. a. . 11.',. 1!.::: t; a" n.,a: . :: . :.:..'. 1:.':11is.: ::'..T::.::::::........:..::.:.....:: Ex isting ... !. !. 1. Qverag . . . • ' ' iiii i !0# P : : ...• ': : : w ii ) ti. r,'Pii hi, : - - - . ....,..,,....:::.„,,,..... . . .. . . ... • . - ....:: •.'..-.::.: footage piaorilii4. r"9:.•P'(:e9s:C4t.:...::::•':'•:'I::'•i".'''77„.,7:::.'.''!.:::::........' - : . . „. ... • .iiiiiot,,, `1:traiii40t•:7!!";;r;;;;?1!.:i...v.,.'x:',::::61:::-....•,i:;:.;::,..:.':.„'„':]:.i. .. ,Iliii:9" - ..,..819!.....---oe..,',::::':::''' "•-•'•":<4.:- Ctr"....!•rt #F104h''.::''''''iii.Oftl.::::..:::-.-.......--.. .......,.,,--...,.;.....,.......::::,."..".:.:ed :iii.e7.:..::::.:,...•..d.wii.,..7.....:;,!iiiieti 0O .:• •-•:, . , . * • • iiiisr4.:: ... ;:,01,et and w m eth o d ::........:::„.„...:.,.,,,,6!..::::::,..;:',......:::,:', ,,.iesittliisa.:,,e..r!r!!..,:::::::.:i.::'•:::•i•,...:-.. iiiid..:::.::::,,,..,:,,,,,,,,... :.-.000!!!!).„::.:••••••':'''''::: '. • s'str:':... and •..1%,,!,!!,:../...„-:::::•..."!laiiiiitn:f"Od'4(‘:r.:!.!:.,,:"::::: ::::::::::::•:1..:aiiiii0':"?...rm.;;!1)'f;clr.".•*,,,,""71>isivi; i,.....,..........:,...,,:.,:iiiiiia1/T!Iif. 40....,i.::!r..-...,..•::,:••••• • ..."..." ;',..,;1f atly ,t14°.' s:',':",..i'"'...„'''' NOTE .• ... • and pla '::''..:.-.......'::':':':.: . . .... ..• . ....''''''''''''''"*"..::::::::.:'•••••••:• :. .... ..'...(teP being . sig n- nsed 'i.:•..i;iii: ii 8 . 1.1r: 114.t':. •:: ...: .:.• '..':'. ! :!•::!7:: ....: . . : iib:::)° ::::1...::::;•fi .... na! ....::7:! ii ,.. . !:: ' 7....:;:' :': ''. ;:'..:are) n.„....,....... .. ... . .. .,... , . . • . .. • •.... ..':oi.•:::•"•:"'•':'' ".•:•::'''..feieac4i1 .. . ' ...... ' ... :and:,:..:••• ... .. ... ......... . ,.........„ .•,,,,,.., ,, , ... .:'•'iiCiiiiaP!!..„.Ti...,,•,....-,.•.::!;,....,.::.,.,.(16rial , scono ans! orill)."' r:1,-...,.,...: ......,"...-4xis:.. ‘ , .,, : to . . ‘ , i.......,..107.....f:ASN::,.....7e40...is:........,..,...::ii..s. 8131,..fitr.....:,....:t.::139inr':.i.....:.:1,..ton...,.;:......:,..!..,,,..noi,...,,.:itri3itt,i.,...:i.,i4....:1,..1..:.sat....:....i.,; ; .................,:;,.......,...r.:...,.........7 i.iii),......i...,':..,:eq.:.,...':.!::,r°r metho 7:......11.7...1.....i,.:..:i,•......::'0:::,:::.....,...:,..,......::,....,,,,,,,:ii. .. :.........,..........,..,. .............................. :- ...ith.:,AcciakE!,.,,,,,..... HES.. ...,..:.....• . . .. ''''" ''" T........i:'..'i......116.....: p....%.,,........,...a.,::-.''''1.::::::,..:•.• n... •,....6,.,....:,;:oreni0"...nased 4 dish) 4Nbij*4)..1,„,.:,..:,i,,,,,,:,..„,,,.„......,„...ii„,.:. ............................................ •••••::ANT.:....::,...,teted„,......... A of ente!I ... a ttachment . . ..:materi'''''....fic411/?•-•,:-.:,:;';;,,,':..:":::::'•>.,..:::.....' . ',• .......,,,,..,, ,....: .. .. .. . . 'Al teif....P.iiii. , .....„...... .. ton . :, . .. tiiii..'"'"',:':":'.•..i..30i,i,1„...,.. .,..,,:,.„.... . ,......ii..::.!11,!.;...:- . . .rio::.7:7-._ ,... ...-0 , may ... . . „ .. , . .. RESIDENTIAL REMODELS • Completed building permit 0006.00i:(o10.for each structure),,..- • "Aesesser:Atcpuet ;,. Two (2) Sets'of working drawings, which iriclude...- . . . • Site plan. • Foundation plan • . . ** 17tU f di i Ctg elevations (all views) Bulding croisseotion •• • Floor pl plan ; Structural frantirtfl u permit application • i- NOTE: any utility work isftbe done provide tutor p and plans must be s ubm itted FIEBOOFS Completed building per mit application (one for each structure) Assessor Number: ............ ... . Narrative describing existing roof, material being removed, and materiel being installed NOTE: A certification letter is required prior to final inspection and sign- off of the permit. • ro : . --. _ I.� / / Ype rrs • : " Y• n. — I� 1 , ••Tess. / 74 / /� '�''' / .4 • t.le1 :• �._._- Special Ins ructions: J w Jam.- { Date Wanted: `S 17 9..2 . p.m. Requester: Phone No,: INSPECTION RECORD Retain a copy with permit 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable cod COMMENTS: ❑ Corrections required pr or'toapRroval. ozc__ 04, _,4) 5 / � Inspector: (206) 431 -3670 YJ iv C,2 t'.LAe-mot.. -ggorit--- ��� - c� 7 7 s, q. Date: ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter. Blvd., Suite 100. Call to schedule reinspection. 1, ecept , { 4.IIY77', • .1 , ., arc . `� 'k Frt. . «. . Address City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 TURWILA FIRE, DEPARTMENT FINAL APPROVAL FORM Project Nam I Y t a •�— /"'Y V !Retain current inspection schedule Needs shift inspection 'Approved without correction notice Approved with correction notice'issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authctri ed ignature Gary L. VanDusen, Mayor iJ c 0 Control No. /- Permit No Suite Date 9/ FINALAPP.FRM T.F.D. Form. F.P. 85 1 $ r "X" REQUIRED INSPECTIONS PHONE APP ARO IN T(411 -S CORRECTION NOTICE ISSUED 1 Footings 431-3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 — � 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431-3670 6 Masonry Chimney 431 -3670 7 Framing 431-3670 8 Insulation 431 -3670 9 Suspended Ceiling 431.3670 10 Wall Board Fastening 431-3670 11 12 13 14.;2FIRESFINAL:,Insp: . .575.4407 X 15 PLANNING FINAL 431 -3670 CITY OF TUKWiLA Department of Community Development • Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 12115 E Marginal W S 16 PUBLIC WORKS FINAL X 17 BUILDING FINAL 431 -3670 431 -3670 tSUILUIIMU rcrum INSPECTON RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING ,, q PERMIT NO. lL `t I DATE ISSUED: PROJECT: Sam's Tire Service CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar Is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - ii structural slab or If undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately mklpolnt. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before Installation of wallboard. Baffles must be installed to keep attic ventilation points dear. 9. SUSPENDED CEILING • Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). N . 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. ,FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although riot required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. `-J11.• 1. • understand that the Plan check approvals are ublect So errors and oniissions and approval of plans does r authorize the violation of any adopted code • ordinance. Receipt of contractor's copy of a 7 Perrnit:Nci FILE COPY v. F fi2.)°cPE-k • SHINGTe_.. Tait '824-C South W 5t Tacoma, WA 98:4 (266)572-8237 - -5:00 • OF TUKWILA 442COMP Le-N.1EL APPROVED 2 i2 Ci I BUILDINGd,DIVISJO Ciats _qi Job No. te; REC8VED rITYOFTIJICINILA 11AR? .61991 ffT - Pan — 24-C South •K' St Tacoma, WA 98405 RC206) 572 -8257 NOTE: CITY OF TUUKWILA . APPROVED ,c.21012_ \A1G t2K �•• = s �. .c/.95 WALL Lx Job No.. -. Au, l U1 EZro2 F tv1/4JOK uc J ss. RECSVED CITY OFTOKWILA 1NGT `- ?824 -C South 1 K' Sr.= Tocorno, WA 98405 ; (206) 572 -8237 eiTYOFTThKWLA CITY OF TUKWILA APPROVED. MAP ° n 7 919! 4Li O ?c 1" - rFIRE.it - D r kIf_7 TEC. S UC .3/11,d' 4 1" z- 0I2Ac e* eVERY 32- O. C. ` - 7'c2 - Srr& 5 AtA 12.e_ _12115_*E. vtiletrimAL v.J.A‘F _SE.ATILE_,\AJA qt)1102) cx_ie s Dap e2011,DILIt 01.)J E.-12 Si 6L1. told itoq 1 6. : So. FT. 51-#1,E Yuo 1 W LEA4LL MrEs act— e a 3 , :: 6, eel" W - (5 ± 7'00 " ! ° �• ,�,. t herly hovrr -Gbf .R erion;i.: L "( lve 5k-le /r terut t an 7rcic ) C ED L'j8Ctil PTION , A11D1 TO O S FI.LH 6061110 That portion of Government lot 15,' section 10. town8hi. 23 north, range 4 eat, W.M., in Xing Ca:inty, „ nsls i.tcs-tdn. - d.scribc1 r(s zrilowt: B. 'incltsj at the crest quartar corner of said section � 1C,, and r.,r..tin;, thcc;ce sGUth hdcur. the rest line thereof 1which: line Is the meridian for all TF�.fil7t!S of :'f�13 �iC'.5'ii'L t�izt.i ......•. P•:hL to the south margin 02' a.. !]:1Stsrtari% �rrntP(: t.a7 �+ O. Vincent dated hu(ust and mcarded i i i lor.e ni deeds, p114e 411, under . auditor's f bOL1Z8 ;. tfr�nca oust along saia south a_ =tr €in 820 f =:at; thence south 421.15 feat to the tra. point. or bc.rinn nK of the tract heroin ,iascribedt thence east 474.74 f4-et,, more or toga, tv tt,i w. :stye'._; margin or tar - ;'agile filrhwayj thence S 13-'05'OO” G, alctiv said westerly ,n.tr&in of the plcific Highway, 90.b:S feet, sera or loss, to . the see .:erl_i •bcund.ry of the seed Govtrrcvaan:. lot 11 tilencc S O0°0411O.?" g, alone' the aastPrly rouridczy of said Gor'rn— mss ;t lot, 285,71 feet, more or less, to the northerly boundary of the plat of Ri vnrside: Intcrirbau 1rrccta, as d. by this atone :• �Ittukent-s iixisttn :. in 1MG7; thence fiT. i 104'' iY �, n Trsicts 495.6b le:r r nu:. or less, ltit..r(f Utt :Stti.i ri rF.ri b:,u1c.1 r/ of tile _•:P�': 3IC1O i llt..i"sa ..1:li t.; ;t line i•f.rell - 1 to end 820 feet from the west boundary of thP said suction 1UU; thence north n1onf; grid 11',r•t11'si line 3/6.01 feet to the true pointer bcginninrr. RECEIVED rny( peel IKWILP MAR 61991 PERMITCENTER frcn 0 a C.4 w CITY OF TUKWILA r;3un SOUTNCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91 -093: Sam's Tire Service 12115 E Marginal Wy S PRONE 111206 433. 1809 THE FOLLOWING COMMENTS APPLY TO AND BECOME OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER (o 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at.the job site prior to the start of any construction. 4. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition). 6. Awning material shall provide for a Class -A Flame Spread Classification. 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary I VanDwun, Mayor ' 1 AN REVIEW COMMEIVS Plan Check No.; "i 1 ° 0 Project: REQUIRED INSPECTIONS 0 No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. All structural concrete to be special inspected (Sec. 306, UBC). All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 14. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), . Hart); s ti��rFrn`FaeiHF ity (1990 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working kkt days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency k having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, 3 shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 • (a) 7. gt Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, cj or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final X.17. Building Final ' 1 AN REVIEW COMMEIVS Plan Check No.; "i 1 ° 0 Project: REQUIRED INSPECTIONS 0 No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. All structural concrete to be special inspected (Sec. 306, UBC). All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 14. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), . Hart); s ti��rFrn`FaeiHF ity (1990 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working kkt days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency k having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, 3 shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 • (a) 7. gt Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, cj or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. AliCONVERSATION RECORD DATE: 5 / !! TYPE: ❑ Visit ❑ Conference Name of per (s) co d� ct y in con � cte 4!G�iS � Organ! ation � ice, dept., bureau, etc.) Location of Visit/Conference: SUMMARY: AikAgliddi f-ece J4 5 ()eli . (9.fro- 7'wteee cae. Signature: {����... --�•. MON TUE WED THU FR SAT SUN with y 57%;; z-6 Telephone - 0 Incoming 0 Outgoing TIME: 42 A.M. z ��i,�/S72 9'77 ,p7 `� 7//r See // -=- ..�r�, ' o 4., /7h c' ,f 7 l / / �? - • • a' P LI FOR OFFICE USE ONLY Telep one No.: -- -c - 5 7 .3 7 s )za 33-8'/33 Date: is cede_ S /.5 i/74/:( /:.— -e- �1�)xi7 ()' z;„,„ 15 ZCP , t'4 /,r17G- /i .7,e)k -- Gc�-P" y/ �' / dL1� /L..I /. ,Aa i` f4,+ /..t,I d /A' r TELq HOIVEli : , . . . . p s A • CAM . ' WANTS 70 rip:;' ,, .. l' RETURNED YOUR CALL :- -. ::EiF F OR DATE I■A • OF PHON MESSAGE E AREA CO /171 SIGNED LITHO IN U.SA. N1:4 -4 TOPS 1-0Finn 3 .128 4•••••••••••• Ye r .1.-.-1161411102h • r g3 >' (5 / ae./6n 51 4-0 deoz,ei / vdr c.57/vc& 6764 "pzie -z) zozel (te —C"%o7 (y )iie x25 8 /?12' etlea /69. . 4 114 3)/574 e6/ 3/ „ „•." , • ; 9x- 1 (l 7 . . . . . • • • . . • • • • . . . . • • • • • • . • • . . . . . . • • • • • •• • • • • • • • . . . . . . „ . . .. • ' • • . • „ . , .. , - • - • . , • • . , 1 , ■ • • . . ■ . , ' ■ . , 1 , • .. • . , . . , . , . . . , . • • . , . . . • . • . . . • . ■ • • • . ,, . , • • • , . , . , , • , 1 . , . • • , . , • . • , • , , • , • • . • , • , . . , • , , • , , , . . , • . , ■ . , . • . . ■ • , . . , . . , . . • , . , • • •, • , • •, • „ • • • 1 • ■ • • • • • • • • 1 • • • • , • • , • , • •, • I, • • • • .• . . . • : . City of Tukwila W% A Fire Department. Review Control 091 -093 Re: Sam's Tire Service - 12115 East Marginal Way South Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1: Sprinklers shall be installed under exterior combustible roofs or canopies exceeding 4 "feet in width. (NFPA 13,.4 - 4.9.2) 2. Provide documentation that the materials being used for the awning are noncombustible or provide sprinkler protection under the awning. Yours truly, lx FORE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 The Tukwila Fire Prevention Bureau file ncd Gary L. VanDusen, Mayor. March 13, 1991 PLAN CHECK NUMBER 095 J. 1t• PLAN REVIEW CITY OF TUKWILrA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: '4M 16 Tim 6532ace ADDRESS: 12, • ViAeolga tAki 6 DATE: IZ tviAv q OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HEIGHT /# OF STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. h CHAPTER 51 -10, W.A.C. NOTES PREPARED BY: S �XIS�TIt 8L 4 Gt = 2.5 1IL-1.1 am; B 1 1 '$ASiO e.p 2. Mx 5b7o 5ua. 1 t�lGrR� edit. F E. D S1E 44 w -I pf' Wf Lb efAlk 5A21NKt. P% A&NtrAc 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 21 12,hc 4 to ono 47 tt Blo OW 11 W./x.0 4.A . Pt OnunoN Co "C q8 555 4 AVINTIoN azio. e,c,166, 4,07, oft Aurxil) mrz AWN CoN1EUsTLI off. $ a G..XQ tO11 OF Aot4111c ' EC"(1 is uii .4 9Al20 1.014ettee Opet411445 4104 e, ()MD • • • s• . S 12 w C� arc4..cfcrg of (pt P : = C ONC.T1 e r— L p Lo/ tiaoc Vt2AKE. (ZooF, Ttipe tit' N, wt51RINK $712 /T/O' 4d 72/ /S tekow l' wli!i /.te7 C441.1Z 77)6 AllOtt-4 t raLvi I '70 DATE: /2 1 7/