HomeMy WebLinkAboutPermit 6495 - Kenworth - Building Demolition��
KENWORTH
February 3rd, 1992
CITY OF TUKWILA
attn. Shellie Bates
6300 South Center Blvd.
Suite 100
Tukwila, WA 98188
Sincerely,
9 y)c 1 gv-e/Lta
Mathew Fivers
Facilities Engineer
(206)..767 -8675
Ke rth Truck Company
P. x 80222
Se Washington 98108
(206)764.5400
A DIVISION OF PACCAR
FED 0 4 1992
CITY , (.
PLANNING DEPT.
Hello Ms. Shellie Bates,
This letter is to confirm our phone conversation on 1/31/92 that
Kenworth Truck Company will not pursue the demolition work
described under Building. Permits %, #;649 * and #6496. As the
representing project engineer I would like to have your office
cancel these two permits.
To .date no site work has been started on these permits and Kenworth
,will not initiate any of the activity pertaining to these permits
unless new permits. are applied for at a latter date. Thank you
,very much for your assistance in this matter:
• • • • ` I LT • • I year
" Demo 1988
SETBACKS:
N- S-- E-• W-
FIRE PROTECTION: rn Sprinklers 0 Detectors Q N/A
UTILITY PERMITS REQUIRED? Q Yes an (PublatWolito
ZONING:
BAR/LAND USE CONDITIONS?
Yes ®No
'a0� TEO (o ther than those not on or attached to permit/p ans
— 7
-`
SRO
T ,1
SsUANCE BY: (4t -_ t , L ./
BUILDING
OFFICIAL.
DATE: .2 Y _ /
,__
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
SIGNATURE:
DATE: 3-26.- `l/
PRINT NAME: /N1/ clef e A / Prka it h
COMPANY: ,ee.... , 4-4 - 1 - 4 Jt Ca ,
Kenworth Truck Co.
FEES
PLAN CHECK FEE > « >
BUILDING SURCHARGE
TOTAL
N TRICT •N
2,000.00
ASSESSOR ACCOUNT 0 542260 - 0060 -03
PHONE
764 -5400
ZJP 98108
aP 98354
EXP. DATE
11/91
PHONE 827 -2950
ZIP 98004
.ITV OF TUKWILA
lept. of Community Development - Building Division
300 Southcenter Boulevard, Tukwila WA 98188
?06) 431 -3670
WILDING
3 ERMIT Nev Lo ��
)ATE ISSUED:
,ROJECTNAME/TENANT Kenworth
1 ROPERTY OWNER
\DDRESS
:ONTRACTOR
kODRES
NA. ST. CONTRACTOR'S
ARCHITECT
ADDRESS
'SE. :.
OTAL
EUILUING PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PROJECT INFORMATION
I A DR SS 8801 E Marginal Wy S
TYPE OF • New Building • Addition i• Tenant Improvement (commercial) t7 Demolition (building) t1 Grading/Fill
WORK: 0 Rack Storage 0 Reroof Q Remodel (residential) 0 Other:
)ESCRIBE WORK TO BE DONE:
Demolition of one 100 square foot building.
8801 East Marginal Way South, Tukwila, WA
Washin_ ton Coast Construction
601 25th Avenue Court East, Milton, WA
LICENSE # WASHII21600
SSOE, Inc. (Engineer)
3015 112th Avenue N.E., Suite 101, Bellevue, WA
CODE COMPLIANCE.
SQUARE OCC. SQUARE 000.
Thi& permit sh8i1 become null and vafd If the wo* is n oP commenced.within:..180 f otn the
issuance, or If the work Is ;suspended or abandoned ; for a period : of .180 days from the . Issf lnspectlbn.`
CERTIFICATIE OF ATE ISSUED: —1---
OCCUIPANOY NO.
PERMIT NO.
CONTACTED
L-27---k- rr
` e
DATE READY
DATE NOTIFIED
D.- a� ! � 1
(Init.) — A 3
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
BY:
snit.
AMOUNT OWING
3RD NOTIFICATION
BUILDINd PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
TOTAi
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
BUILDING -
initial review
0 FIRE
,4 PLANNING
PUBLIC
WORKS
0 OTHER
SITE ADDRESS
b4o F ma
PROJECT NAME
K- nw ortr\
!UIREME#'if' ►MME
2.5.--1 CONSU TANT: Date Sent - Date roved -
' / �� ra (ROUTED
N I-\
BUILDING -
final review � " Z7` 1(
REVIEW COMPLETED
INIT:
INIT•
INIT:
INIT:
FIRE PROTECTION: Sprinklers
FIRE DEPT. LETTER DATED:
ZONING:
�1-- REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
2- 27-x11 TYPE STR C
UTILITY PERMITS REQUIRED? Yes
PUBLIC WORKS LETTER DATED: / .) //;
S-
SUITE NO.
TOTAL
'TOTAL
OCC. LOAD
Detectors N/A
INSPECTOR:
BARMND USE CONDITIONS?
BJ ED (year):
SITE ADDRESS SUITE #
/ .. rl /mac_ GO6 y 5. - 0.2,
VALUE OF CONSTRUCTION - $
e2'0 •°
PROJECT NAME/TENANT
,ee/Vl c i27 `71 d0
ASSESSOR ACCOUNT #
- 42� -Q Coc -D
TYPE OF Li New Building Li Addition Li Tenant Improvement (commercial) ,e5 Demolition (building)
WORK: 0 Rack Storaoe 0 Reroof 0 Remodel (residential) 0 Other*
DESCRIBE WORK TO BE DONE:
. rt'la0i 77 CAI ,,x/s T c o .
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS: 7k_, ,-lf
WILL THERE BE A CHANGE IN USE? W., No Li Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 4 - /1),-- Tenant Space: ___ _ -- Area of Construction: _ __ - --
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? A No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER Q 7 y ) re g_ Co
PHONEZ06 -7 _ J cc� 0
ADDRESS , Pa e. FlAre i N,AL, w .bq �-
ZI Pi21O�
CONTRACTOR . [ 11 h[X)e5
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITEC A/!) //q
PHONE 2OCO. -295e,
, SA
ADDRESS .30/G- / /22 At/V /l/A' X7,2 /Q/ 173eL(.ey(J ‘A. JA
ZIPc8
CERTIFY > >T ..: ::
I.
,.....:.. ,..: ::......... : < ...................................................................... �? EXAMlN. E.:TMl
.........U......... E �? APP ..: >:(Ftr3 .. : .
R �AN p:.C:ORREG CORRECT, �' '�
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE „ / '
DATE
PRINT NAME
14Le. spe:70e-
PHONE Zezo, 627.29
ADDRESS ..,6 / 1/27 Ave Ng: '.*. /O/
CITY/ZIP Ae .
CONTACT PERSON e761,C- - &y
PHONE 2z . 627 . 2g50
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
APPLICATION MUST BE
FILLED. OUT COMPLETELY,
BUILDIN PERMIT
APPLICATION
:: DESCRIPTION:
BUILDING!: PERMIT "FEE ::
PLAN :::CHECK ` PEE::;
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations: The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our processor plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
COMMERCIAL
.„.: NEW COMMERCIAL BUILDNG8/AODfl1ONB
. . . . . .. . . . .
Completed building perrnita0PlicatiOn each stnictur�)
•Aitessor. Account Number
Two sats:(2).of the foflowing
Specifications
StrUcturataalCulatiOrtrt.
engineer
Soils report stamped by a Was
.:•,, State
legal des�lptlon
Assessor Account Number
. . . . • .
S41:3MITTAL CHECKLIST
0 Energy calculations stamped by a Washirtgtort:Staiii
.
engineer or architect
EVCSINGLEfAMILY:.D.WELLIKWASDMONSZ:::::::
Completed building petr1*.Fippl.icOon (one for eachabbOtata),..
Nang litiraWingli, itarOnaci, by:a WathingtortiStato'licen •';':::::.::::::]•:.:':.:'::::::?::
' "
...............itec a
,. :.i. ,, ,::• l iti 00 .i....::::....: : : !. ; i! . :: , : • :: .! : : :...: ,, : : :;: ..., :g: ; :: ? , ,... . - i 'l i , : l ' i l ., 11 ,: l1 ., :.' ,.,. ..;:;: i . •: : : ,. .....:: : : ! : . • i ::: ; ::: : , i ... ; •,...,...
plan at6 drawi ..... ,...i.,,,, ,.. . .
.::- ..,..,.. ...
• 1b3 Suctu drawlng
I .
S Mechanical drawi
' Ele vations Cl • drawirtg ......,.., tiori toir.: ....... i i. . ..
'...',..- ..
Completed 4 ........ . 1i! obng . .. . . . .. c1000,48,. .... , .
utility .. ---s
NC . ‘ , ....
Comp.......... .i;ivii lion an........
6): pets ...... ... appit.y..‘ ‘ . ..... . .. .....,,, , ,
Si X , (,..... : ..:.,, ,,,•,..,.., ,. nit
. re . . .
' .. en .. ‘ . .... : . . . ,. .
::-..:::.-:::?,-:.:.::•:::::::::.:,::::::,:.:•::"::::•::::::::.:,.';::!:::::::::::.,:,:;:::::::::.:•:..:..„.....,.
.:'. .:]::::•
1E :" . • e
RACK STORAOE
s .
0 . Completed pui150g permit app,..,.11CatiOn....;;;,....:::;:::::::::.:.:.::::::::::.,::,:,:...:,:::::::.::::‘..
'..'1' Account Num ••• • :••••••••::'.:-::•....•:......,-",...,..'...,!:,•:,...,....:.•:.:........:•.•:::::::::::::::::::::::::::::::::::::.:!,:.1:.:::::.'...
• su ..H. ,.‘ re spatxt.. ..: . iissie" 4 ‘ ‘‘
din il g :... .... yi11
.. • ianant , floor
. ... .........,..........,..,...::
• Nci I0Clude .:.4:,,,t3 dimenelone:olrisctuf.„.1fig119%.',.,r!r,....,:!:104..,,.:.,,,,-:.:.,
.;:.417000.Vt.,0190 r440.:,...Y:':::',,,:"'''''''''''''':::.::'''''
s
.. ., . ,
.. ‘. , . . , . . .......,:::.,,,,,,.:..
[ 1
.,T floor . : .. rr; ■kfh in ., t4 .... 40.,..... ,... ; . :: . : , :::.:: , :•::::::::'.i.]:::::: : '.::.!:. : „ .
„ :.: , ..(tadc•storage . 0 , .and'over);:::.:.: 1 :::'... , :::.::'::• , :::::,.::::':::::':::::::':::::::::;:'.:::':':::::::::::.''''"'''''
■ Enti.., of all .., no itic4, ,. .
StructUral calculations stamped py:0,.Weihiagtati afO
Ongineer
. Dime .. s.
'Exit_ ‘ tuuti
2Yse4!!ti11.6.■ j i *.....j ,„ :„:: : :::::::,:.,.,: : „..,,,,,, , ,: . ....,,,.... :: ,,,,.,...,,.., : ,...,„,.,.,., : , :.:. ,..
• • * ........,,:,.,..
" A!....10 : *4 : 1 7:k.:::..::• , ..
ittk
. ... ....•
RESIDENTIAL
Two sets of working
d raw ing a,.whichl nc1d.:::
....
Site plan
Foundation plan include ifi:Ceeein
Floor plan '.•:•:•••• • width. and kropth ol30019414,::
Root plan' • •
Building elevations (all
Building cross-section
Stwctural framing plans ..•
Washington State Energy Code data , : • .. •
1:::Complated.Utility. permit application
Six, (6) sets of site plans showing utilitios
NOTE; Building site plan and utility site plan maY combloock.: $0
utility pennit application and checklist for specitioac!ixatttotrocidiromortfe,
. ; . •
Additional topographical and soils information r
: :
C0/ each structure or
.........., ..:,,,,.....:.•:.i..:,.•:,•:,,,':',"."••:••:::':::..--•'-- — ,,.,..,:.........„..,,...,......,„.,,:::,..,.i:::..:...,....,...:::,:„::..::.,..i.,::,:::,::::.:,:::::.iii:::::.:1....:,,,:i::,,:.:;::::.;i1
. .. „....
•''..
:...::::::..).:1:',...:.,..'.! con
.....,.....,..::
.....:...."....."..,....,..°.....,,,,,.....,,,,::,
74 Sit : 0 (!:): plan 61 7::: ::::;.:
...: .9
ti..J
l . :7.:!:!..7.. : ii . ... t •,::: : :: ...' 7 1. , : . :" .. : .. .:,...:: .. ..: , .i ' i .. .:.: :. :: ••• : ' : ::...
•:.;;•.;:....,..,............:.:. .. . .. . . ...:......:.......,.....:......
l'.1anantlireation.' ; . ; .,......,..... i ..
U 9 ...,..... .
'." t iidiaCent,(uniindttVi111.4..:049........:.••••:::.•:.:.......
j:'..<..o).* S o.i * 044 : 4 ! — ! 0 : .., .;,f7...:.! b° 1!°..:!:(;.. : ,.. : .
. .
Completed building pomilt application ( one for each atTucturey:::•...V:
•
,*e:(2} •
„ • . ••... • •-•••.•
• ..•
•.
•••.•. • . .: ••••••• . '').:::.•.....:;iiiiii.011ik°:.."11:::::::.,::::;i.1;1;::'....:::::.:::!:::::::::.•'•.!....''.:.E...i'.1!::::.::':.;'....::'!'.!.'.....!:::.1.'::.::.:::''..::::::.::::.
''' •
Site platt.:.
. ::• ..
.....•
•• ....•...•'..•. Building .creatifattctott............. ••••••'...:•:::::::
...I '..:.'''..'...i.:•'..".•.'..:•:.............Struc .....,..,...!!!.....•:‘°'")...,./ p
..::::::',.. . .
,.. ......... •" • • .
NOTE; utility walk is to .b01..dono•PrOvidfri.etiliOr pemtit application
•••:*ilci..0.101.0:mu:s0f i!pp07.1.toc4...:.::::::::......•.:: . •• • . . • - • ':
." .
• compietect bulidirtipeir■t aii;itiOt#on (ona tor each structure)
Assessor A ccount Number • •
;... .
Narrative describing:existing:roofimaterial being removed, and
: •
NOTE:A certification letter is required priori() final Inspection and sign-
oft of the ptirmlt. , • • •
../.." c.f.'', - 2—re-,
ype o n spection:
Address: c r i ) ,,„,
I - Alt-e,
Date Called:
Spedal Instructions;
Date Wanted:
p.m.
Requester:
Phone No.:
rr •+' tt ,„
( INSPECTION RECORD C
Retain a copy with permit
0 Approved per applicable codes.
Inspector; A)
• CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
4vps
PERMIT NO.
(206) 431-3670
0. Corrections required prior to approval.
COMMENTS:
eff-t "4 e
-0 1
4
Date:
ED pap REINSPECTION FEE RECRJIRED., Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite lop. Call to schedule relnspection.
floce N o.:
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wan Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3870
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre - Demo
431 - 3670
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
x
17 BUILDING FINAL
431 -3870
(INSPECTOR COMMENT SECTION ON REVERSE)
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
8801 E Marginal Wy S
t3UILUIN(a YtFiMll
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SUITE NO.:
BUILDING n L4 qc_5.
PERMIT NO.
DATE ISSUED:
PROJECT:
Kenworth
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION • After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points dear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING • Prior to taping (see UBC Chap. 47 and Table 47G).
11
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical -- Washington State Department of Labor and Industries -- 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often ^!iminate problems, delays and misunderstandings as the
project progresses, MANN
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASIIINGTON 98188
Plan Check #91 -034: Kenworth
8801 E Marginal Wy S
PHONE N (206)433.1800
THE FOLLOWING COMMENTS APPLY TO AND BECOME / P cli THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER •
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (19 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
5. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Gary L. VanDusen, Mayor
( PLAN REVIEW COMMEN S
PLAN CHECK # c le PROJECT
REQUIRED INSPECTIONS
(..(re No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Q Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, Including all gas piping (298-
4722).
O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 308, UBC).
O All high•strength bolting to be special inspected (Sec. 308, UBC).
0 Any new ceiling grid and light fixture Installation le required to meet lateral bracing
requirements for Seismic Zone 3.
0 Partition walla attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
15.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plane and requirements
of the Uniform Building Code (1958 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
18. All food preparation establishments must have King County Health Department
sign -off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 298.4787, at least three working days prior to desire Inspection date.
On work requiring Health Department approval, it Is the contractor's responsibility
to have a eat of plans approved by that agency on the job site.
19.
Electrical permit shall be obtained through the Washington State Division of Labor
and industries and all electrical work will be inspected by that agency (277-7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, Inspection records, and approved plans shall be posted at the lob site
prior to the start of any construction,
When special Inspection Is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Readily accessible access to roof mounted equipment is required.
Englneereod truss drawings and calculations shall be on site and available to the
building Inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear Identification showing the fire performance rating
thereof.
Fire retardant treated wood shell have a flame spread of not over 25. All materials
shall bear identification showing the fire performance rating thereof. Such
Identification shall be Issued by an approved agency having a service for
Inspection at the factory,
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7.
Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction, No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid,
i Footings
2 Foundation
3 Slab /Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
.�
`
12
13
14 FIRE FINAL
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
17 BUILDING FINAL
( PLAN REVIEW COMMEN S
PLAN CHECK # c le PROJECT
REQUIRED INSPECTIONS
(..(re No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Q Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, Including all gas piping (298-
4722).
O All structural concrete to be special Inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 308, UBC).
O All high•strength bolting to be special inspected (Sec. 308, UBC).
0 Any new ceiling grid and light fixture Installation le required to meet lateral bracing
requirements for Seismic Zone 3.
0 Partition walla attached to ceiling grid must be laterally braced if over eight (8) feet
In length.
15.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
0 A statement from the roofing contractor verifying fire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plane and requirements
of the Uniform Building Code (1958 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
18. All food preparation establishments must have King County Health Department
sign -off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 298.4787, at least three working days prior to desire Inspection date.
On work requiring Health Department approval, it Is the contractor's responsibility
to have a eat of plans approved by that agency on the job site.
19.
Electrical permit shall be obtained through the Washington State Division of Labor
and industries and all electrical work will be inspected by that agency (277-7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, Inspection records, and approved plans shall be posted at the lob site
prior to the start of any construction,
When special Inspection Is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division In a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Readily accessible access to roof mounted equipment is required.
Englneereod truss drawings and calculations shall be on site and available to the
building Inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear Identification showing the fire performance rating
thereof.
Fire retardant treated wood shell have a flame spread of not over 25. All materials
shall bear identification showing the fire performance rating thereof. Such
Identification shall be Issued by an approved agency having a service for
Inspection at the factory,
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 306 (a) 7.
Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction, No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid,
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT: Es N Lobrzztvt
ADDRESS: g g O1 E M4 R.61 N A. L
DATE: 'A v.1 , 4. 2.5 t c i 4 1 ,
loo 42.
PLAN REVI
\rJ Le S.
5"toreAcf.6. 5ke.c>
PLAN CHECK
NUMBER
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
6k
Prepared by: �/ \