Loading...
HomeMy WebLinkAboutPermit 6496 - Kenworth - Building DemolitionKEG U)DITH BP# Coq 9 February 3rd, 1992 CITY OF TUKWILA attn. Shellie Bates 6300 South Center Blvd. Suite 100 Tukwila, WA 98188 Keniuorth Truck Company R 1x 80222 Se Washington 98108 (208) 784.5400 A DIVISION OF PACCAR 700107Jo FEB . 0 4 1992 PLANNING DCPT: Hello Ms. Shellie Bates, This letter is to confirm our phone conversation on 1 /31/92 that Kenworth Truck Company will not pursue the demolition work described under Building Permits #6495 and 4;649,6 "t, As the representing project engineer I would like to have your office cancel these two permits. To date no site work has been started on these permits. and Kenworth will not initiate any of the activity pertaining to these permits unless new permits are applied for at a latter date. Thank you very much for your assistance in this matter. Kenworth Truck Co. 764 -5400 ADDRESS 8801 East Mar:inal Wa South, Tukwila, WA Z1P 98108 CONTRACTOR WashingLton Coast Construction PHONE 838 -9599 ADDRESS 601 25th Avenue Court East, Milton, WA ZIP 98354 WA. ST. CONTRACTOR'S LIC SE # WASHI 121600 EXP 'ATE 11/91 ARCHITECT SSOE, Inc. (Engineer) PHONE 827 -2950 ADDRESS 112th Avenue N.E., Suite 101, Bellevue, WA 98004 "Demo y ear 1988 SETBACKS: N _ e - E- W FIRE PROTECTION: Sprinklers 0 Detectors ( N/A UTILITY PERMITS REQUIRED? Q Yes Q No P u Worker ZONING:. BAR/LAND USE CONDITIONS? O Yes C No :OND ' l• NS of art an those noted on or attached to •erm t/•Iane i \PPRO SSUANCE BY: BUILDING 1 , , . '. OFFICIAL DATE: 1 - ,,7 ?f_2 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: . t /....1 DATE: el - 6 " l PRINT NAME: a 4f . .IC.„ e/ / . km kt h eN. COMPANY: /6 „. 4 TA,A 4 CITY OF TUKWILA Dept. of Community Development - Building Division 3300 Southcenter Boulevard, Tukwila WA 98188 '206) 431-3670 BUILDING � L j qPERMIT NGe 0 SI A SS 8801 E Marginal PROJECT NAME/TENANT Kenworth TYPE OF Li New Building Li Addition 0 WORK: 0 Rack Storage 0 Reroof 0 DESCRIBE WORK TO BE DONE: CODE '.COMPL•IANCE . SQUARE OCC. SQUARE OCC. SQUARE OGC. SQUARE OCC. SQUARE OCC. O TOTAL TOTAL JSE ' LOOR TOTAL Wy S Demolition of one 800 square foot building. BUILDING PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) A OUNT DESCRIPTION: BUILDING PERMIT FEE PLAN CHECK FEE?: BUILDINGSURCHARGE :> W TOTAL FEES WWI I LAN CHECK NO.: 91 -035 S IT # Tenant Improvement (commercial) Us) Demolition (building) U Grading/Fill Remodel (residential) 0 Other: Thi perrnir, hall ta scome. null an . void if h0 °wo rk is not commenced within 80 alaXs;frvltt he date issuance, or if the. work fs:.suspended or: fora period of:180.: days from the la inspe ctlorr. CERTIFICATE OF OCCUPANCY NO. DATE ISSUED: A 0 CO TR C 10 • $ 5,000.00 ASSESSOR ACCOUNT # 542260 - 0060 -03 PERMIT NO. CONTACTED � l �_ I r DATE READY DATE NOTIFIED r - oZ "� ` ' Y: �, (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: (Init.) AMOUNT OWING ..— �0 3RD NOTIFICATION BY: Init. C BUILDINGS PERMIT APPLICATION TRACKING PROJECT NAME k- Qnwor -k-n P CHECK NUMBER q 1 03 J BUILDING - initial review 0 FIRE PLANNING 04 PUBLIC WORKS 0 OTHER 0 BUILDING - final review REVIEW COMPLETED SITE ADDRESS I. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) ................ TOTAL DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. INIT: 2 INIT: TYPE OF CONSTRUCTION PUBLIC WORKS LETTER DATED: REFERENCE FILE NOS.: FIRE PROTECTION: • S • rinklers Date Sent - Datepprov Detectors FIRE DEPT. LETTER DATED: INSPECTOR: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? (1 Yes 7) No ZONING: BAR/LAND USE CONDITIONS? Yes UBC EDITION (year): 2.-17-`1( 'CS OI -YY1 1 SUITE NO. CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION IV1UST BE FILLED. OUT . COMPLETELY PLAN CHECK NUMBER C SITE ADDRESS SUITE # viol oAr2 /NFL. lugs'/ z. PROJECT NAME/TENANT uOOP* - ,ceit46 BUILDING USE (office, warehouse, etc.) H 2tO NATURE OF BUSINESS: 7pVCK A1&, WILL THERE BE A CHANGE IN USE? lg No Li Yes IF YES, EXPLAIN: ADDRESS CONTRACTOR ADDRESS WA. ST. CONTRACTOR'S LICENSE # ARCHITEC�VLiJ /AG hftic icl ,L: � iol BUILDING OWNER SIGNATURE OR AUTHORIZED PRINT NAME -F /,w cie_eq ADDRESS „c e5,— //27`x`1 Gig, /�• �1�/ AGENT CONTACT PERSON ) - L4 CU BUILD1ha PERMIT APPLICATION Division C=I.. 0 A'0. =C BUILDING` PERMIT! FEE PLAN CHECK': FEE'< BUILDINQSURCHARGE. OTHER :! " >. TOTAL VALUE OF CONSTRUCTION - $ ASSESSOR ACCOUNT # TYPE OF Li New Building U Addition U Tenant Improvement (commercial) X Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: 8/1/ 29// ) o &c,i r' /.) SQUARE FOOTAGE - Building: Tenant Space: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? ❑ No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER / 4.4.77 N 6 o nl oot - PHONE 7 , _ 00 of y' g6 // AL- /-J4G/ S -To t � N E � P 1zIg8 /ne, Area of Construction: EXP. DATE eu ei/ve. G()4. PHON E2ap - .ge7 - DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES c 1 DATE /, ZIP PHONE Z ..ej_ivi -- "O APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations: The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. COMMERCIAL- .•*40:#1.0„:„ -' engineer : Topographical survey L•Enirg stamped. by a Washlngten State II ...,•ogippet,ar:prChitect - Legal description Working *awings, stamped . . • •••• by a Washington State I •., • • :arctiftect, 'Site plan • .• .. .. . .......... ' Architectural drawings • rat drawing ‘,‘ • Elevations Completed utility Six (8) sets of civil drawings s p : !4applica tion . NOTE: See utffltj' peimit application w7dthocklist for submittal requirements. RACK STORAGE ... . ...; . ,; ..,. ri Comple building permit application ;';''' . '''''''''.:: ''"•':•.L.'':::.•'••••'''.:":''''..'''.?"•: . :,,risestor. ■0o0Unt Number .; ... , exit ways - of p ,..... where ...,. ... i‘ .. , Tlii9:4).•:"! be 1:3 030,4,... a isles ,... , . . '''" -... i .. ......... ;, Exit doors Entire space 8 . , o "... .... :.1101oi ,. .' ....... . •••••••:•.:...: i.:Dirnonsion ,., ...ono showi f;Iti ; :..ieneni..,eiir!;,...,...:.„„.•,..,....:;„.;;..;....,.....ckt oeight, w11 Ct'TE de . .gimarirrioneO/..., 7 ... ‘.. , . leq and t/.. ... x .kwpy 0 : 9000:: '''''''''"''''''''''''''''''' . °- ' • . • ".- Structural calculations etemPed by ::44 . Washingtert.StataliOnn .. englnoet,(recisatorage,6`.. • • • SiiBMITTAL CHECKLIST RESIDENTIAL NEW siNeu,.p • Completed building permit applifOldn•tppe.fdtefpb.•09 p - Legal description . . . . Assessor Accoun Two sets (2) of working drawings, which !PF494?!... • stip plan (On plan,. s1sr# "■.:Foundation plan toducie.a Floor pfar E Washington State Energy Code data [ Completed utility permit application • •.:. . . . Six (6) sets of site plans showing utiliti!ts • Building .elevations (all • Building oross-section, • Structural framing plans • --••• • •-• • , ••••'' ••••••••'•:.:'/••••",•',:•••••'• • site plan and utility site plan may. be combhiod. See utility application and checklist for specific 4uomigarip4ukornenli • :.•• .•,- .• „.: ... • . . . Addlional topographical and soils information may be required if unique •• site . • • .:„: • . • .1', • . • • • .. • • . • • ••••• . • ••• ....• ••••• .•.• ...•.• .• . • .• • • • . 1:.RE " on of tenants Mng and proposed Ovarail building plan squ • Use of adlacent (common wall) tenant • Overall dimenslons of budding or N° Floor plan of proposed tenant space •" To • tiLe*„*011*; wall, pps0•*01101*:§sideiifoll • :!; ot4.1:: , P!)!!"#m1 0(.190 ' .. '',.: i0 ,.......... 11 !).-.... 9 'iltiii : ,....,, ••••''''.':• jwii':•4ii44:' . may '....•*###ditMMiltirrWO0i:...!# done .. en g in eer .....:••••'...-: ,i'ii4ii:* :: .ii*:'..*:: -..- 1 :;*#.0:*t'#6 .....:...:, :.:: ga be ; •• •: NOTE.. —s i l• #0#/:7 41 tiliti,.. , ...,.*O„......ik..„.........,...,.... . ...., pam ' • ....... application . :4 . y . o. plans.. • ...:„..... . ...„ 100 buIldi permIt application took. foi....0cty structure) Assessor Account Numbe Narrative describing exis , •tO0f;i:rnitietial being removed, and material • being NOTE: A certification lettor is required prior to final inspection and of the permiL . ................. .. . , . • , , 1 • • • • . " • " • • • • ACTIVIC LOG ed: 1 _,„ e., kit, on: T ype o I Address : T re)/ Alef Date Called: y- i ..-1- Specia l Instruct ow, Date Wanted: // m. p.m . Requester: Phone No.: INSPECTION RECORD Retain a copy with permit 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. td (206) 431-3670 0 Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: A-7 e_nf.-7 / a. t • 1 ID $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Dale: "X " REQUIRED INSPECTIONS PHONE DATE AP APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wail Board Fastening 431 -3670 X 11 Pre -Demo -. 431-5610 12 13 14 FIRE FINAL .Imp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING ANAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 8801 E Mar anal W S esuiLuirvu rercmi I INSPECTION RECORD (Post with Building Permit in conspicuous place) BUILDING ( PERMIT NO. l L "l DATE ISSUED: vamm SUITE NO.: PROJECT: Kenworth CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied In place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping Is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points dear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often elir inate problems, delays and misunderstandings as the project progresses. ana CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 91}188 4 Plan Check #91 -035: Kenworth 8801 E Marginal Wy S PHONE N (206) 433.1 800 THE FOLLOWING COMMENTS APPLY TO AND BECOME T F THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition) Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 5. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary L. VanDusen, Mayor PLAN CHECK #"� 1 - ( PROJECT REQUIRED INSPECTIONS PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (296- 4722). 1-12Y Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 7O All structural concrete to be special Inspected (Sec. 308, UBC). O All structural welding to be done by W.A.B.O. certified welder end special inspected (Sea. 308, UBC). O All hlgh.strength bolting to be special Inspected (Sec. 308, UBC). 0 Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3, 0 Partition walls attached to calling grid must be laterally braced if over eight (8) feet in length. 14. 16. Subgrade preparation Including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to bo done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building Inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being Inspected. Readily accessible access to roof mounted equipment Is required. Engineoreod truss drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or leas, and material shall bear Identification showing the fire performance rating thereof. All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least throe working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a sot of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such Identification shall be issued by an approved agency having a service for Inspection at the factory, All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 300 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 n , ` )EN\c 12 13 14 FIRE FINN, 15 PLANNING FINN, b i17 16 PUBLIC WORKS FIRM, BUILDING FINAL PLAN CHECK #"� 1 - ( PROJECT REQUIRED INSPECTIONS PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (296- 4722). 1-12Y Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). O All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 7O All structural concrete to be special Inspected (Sec. 308, UBC). O All structural welding to be done by W.A.B.O. certified welder end special inspected (Sea. 308, UBC). O All hlgh.strength bolting to be special Inspected (Sec. 308, UBC). 0 Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3, 0 Partition walls attached to calling grid must be laterally braced if over eight (8) feet in length. 14. 16. Subgrade preparation Including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to bo done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building Inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being Inspected. Readily accessible access to roof mounted equipment Is required. Engineoreod truss drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or leas, and material shall bear Identification showing the fire performance rating thereof. All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least throe working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a sot of plans approved by that agency on the job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such Identification shall be issued by an approved agency having a service for Inspection at the factory, All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 300 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. CITY OF TUKW1LA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: ADDRESS: DATE: PLAN REVIEW 88c1 MAQezt • NkeCU A q�I r AL P -tG �a PLAN CHECK NUMBER RI .O 3s 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 Prepared by: July 17, 1973 Dear Kr. Sand: Sincerely, RLP :11 Kr. Edward S. Sand, Director Xing County Department of Planning Kiag County Court Souse Seattle, Washington 98104 R. LIIONTON PRATT Authorisation Control and Compliance Section cote: Ramworth Motor Truth Company P.O. fox $0222 Seattle, Washington $$1oa Northwest Regional Office, 15345 N.E. 36th Street,' Redmond, Washington 98052 Telephone :. (206) . 885 -1900 RECEIVED CITY OF TIiKWILA JAN 2 4 1bst PERMITCENTER SUBJECT: XING COUNTY APPLICANT: RENWORTB MOTOR TRUCE COMPANY ' SHORELINE MANAGEMENT PERMIT t#NV177 -17 -1 (026-- 73-SB) (CONSTRUCT ADDITIONS TO SE/STING PLASTIC SHOP) The 45-day review period by the Department of Zoology and Attorney Densral'a Office for the above Shoreline Management Permit terminated as July 12, 1973. If no notice of appeal has been received by the above date, construc- tion pursuant to the permit may then commence provided. however, all other local, state, and federal laws regulating such construction have been implied with. State of Washington Department of Ecology ' JOHN D, SPELLMAN COUNTY EXECUTIVE May 25, 1973 Dear Mr. Pigott: Mr. James C. Pigott, Ass't Gen. Mgr. Kenworth Motor Truck Company P.O. Box 80222 Seattle, Washington 98108 DEPARTMENT OF PLANNING KING COUNTY, STATE OF WASHINGTON KING COUNTY COURT HOUSE - SEATTLE, WASHINGTON 98104 Regarding: Shoreline Permit Application 026 -73 -SH (No Corps Notice pending EDWARD B. SAND DIRECTOR This is ItO you that the subject Substantial Development Permit. application has been APPROVED' Copies ,of the application have been for.warded the State Department ' of Ecology and Attorney :General for review 'Very truly yours, EDWARD . B . SAND Director. EBS :ST :jk ,, 'U. ' t '�1'1'IU�S: Uuvelopment pursuant ':his permit shall be undertaken 1. Nothing in this permit shall be construed as excusing the applicant from compliance with any federal, state or local statues, ordinances, or regulations' applicable to this pro- ject other than the permit requirements of the Shoreline Management Act of 1971. 2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in the event the permittee fails to comply with any condition hereof. 3. Construction pursuant to this permit will not begin or be authorized until forty -five (45) days from the date of filing the final order of King • County with the Department of Ecology or Attorney General whichever comes first; or .until all review proceedings initiated within forty -five days from the date of final approval by local government have been terminated. 4. The following time requirements shall apply to this permit: Construction or substantial progress toward construc- tion'of this project must be undertaken within two years from this date or the permit shall If such progress has not been made, a new permit will be necessary. b. If this project has.not been completed within five years from this date, the permit will be reviewed at the expiration of the five year period and, upon a showing of good cause shall be either extended for one year or shall be terminated; PROVIDED, that such review shall be requested by the permittee prior to the expiration date. (U TE) • EDWARD D. BAND, Director Division of Land Use Management Dept.:of. Community and Environmental Development,. C 0 , 0 bI IUItL' U I1L' MANAbLMLNI ( UI- 1911 APPLICATION FOR SUBSTANTIAL DEVELOPMENT PERMIT KING COUNTY, WASHINGTON 8 -T -It "33434 - a4 - 47 Application No. / Kroll 7 / Application Name etwee/ 1 14,04. — Water Dody 7,t,t,l 171A, / the Cu. Zoning l44 _ APPROVED: X t � DENIED: Date Rec. /__Z GX1 ��121 Date of Action 2 T , /973 Pub. Dates / Z C) - 4 120-, /? 73 DO NOT WRITE ABOVE THIS LINE 1. Name of Applicant: Kenworth Motor Truck Company 2. Mailing Address (Include Zip): P. 0. Box 80222 Seattle, Washington 98108 3. Telephone Number: 764 -5553 4. Relation of Applicant to Property: Owner Owner Lessee Contract Purchaser Other (specify): 5. Name and address'of Amer, if other than Applicant: 6. General location of proposed project (give street address if known, city or town, and county; otherwise give distance and direction to nearest town): 8801 East Marginal Way South Seattle, Washington 98108 7. Name of• adjacent, water area or wetlands: Duwamish Waterway 8. Proposed use of property; purpose of the proposed development: Construct additions to the existing Plastic Shop. The additions will be a maximum 18T4" high. This facilit is utilized for the manufacture of fiberglass truck components. , 9. Generally describe the property, its present use, and inprovenents currently thereon: The ro osed construction site is currently utilized as an open storage area and const tutee • or port on o t e property w c s occup e• 'y e arge Kenworth heavy -duty truck manufacturing plant. The properties adjacent to the North and South are occupied by large manufacturing and industrial facilities of The Boeing pang and Monsanto Co., res•ectivel . Pro erties on the Westerly aide of the Water- way are n uetr a , as are areas to t e et o '•rg a 'ay out . 10. Nature of the shoreline (0.scribe type, such as beach bank, or dike; material such as sand, gravel, mud, clay, rock, rip -rap; and extent of bundleuding, if nny): The shoreline along the ad scent portion of the industrialized Duwamish Waterway consists of an existing'sheet pile bulkhead, backed by fill and now paved. There will be no change to the existing bulkhead line. 7-33°1 �iH - -= S. REASONS: 0 ( unt.inued) 11. Lint any other permits for this project from state, federal or local governmental agencies for which you have applied or will apply, in- cluding the name of the issuing agency, whether the permit has been applied for, and if so, the date of the' application, whether the application was approved or denied and the date of same, and the number of the application or permit: gill apply for•King County Buildin j'erait and Puget Sound Air Pollution Control enc Notice of construction and application for approval). 12. Estimated total project cost ILVXXKIVXIIIUEXIAXXXOAIIXKX $100,000.00 STATE OF WASHINGTON ) COUNTY OF KING ) (VOTARY SEAL) as I, James C. Pigott , being duly sworn, depose and say that I am t e*a eve -named applicant for a permit to construct a substantial development pursuant to the Shoreline Management Act of 1971, and that the foregoing statements, .answers, and information are in all respects true and correct to the best of my knowledge and belief. •Assistant General Manager of Kenworth Motor Truck Compan I. /4/01.14 t, r tant Gene al r� agcy Subscribed and sworn to me this Ass day of ti��f , 19,713.. j otafy Public in and for the State of Washington, residing at: DO HOT 1112ITE BELOW THIS LINE PERMIT FOR : SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT . A. Pursuant to Section 14, Chapter 286, Laws of 1971, Ex.' Sess., the King County Division of Land Use Management approves the above application. The proposed development is consistent with Section 2 of the S reline Management Act of 1971 and with all applicable state guidelindb. AJF:hg Enclosures cc: 2.. Kemp, Kenworth Very truly yours, PAZ inc Law Department P.O. Box 1518, Bellevue, Wa. 98009 Telephone 2013 455.0520 April 30, 1973 Mr. Stan Titus King County Department of Planning 309 King County Court House Seattle, Washington 98104 RE: Proposed Addition to Kenworth Plastics Shop Job No. IC -2903 Dear Mr. Titus: As required, please find:enclosed in duplicate the Affidavits of Publication, "of Notice of Application for a Permit under' Shoreline Management Act, executed by the Seattle Times in connection with the notices that appeared on April 13. and Apri1,20, 1973. Please acknowledge receipt of the enclosures by signed the copy of this letter in the place provided and then returning . it to Austin J. Farrell Assistant General Counsel Form $1 840 Legal Notices fJ�TICE'�F' t7N FCN A PEP:: U•Y..c•a, SNO.:F1.m17E ' NOhcs Is hercrse ar.e't Ihat I•tj.• , rtn 1.101.•. Tuck C:ntnp•ti hos 'et:p'11cnt Pi•M't for the con. :teen o• d••tc's'a••e "' e' rn ui' lion t0 Its Pic,' :, '•r,;. as b : I .E t Notlonat '1'.'.', South, within iSccttons 33 and 74 of To,lnsn'p 21 N Ranee A E. t;, M., In King County, 1:'ashtnplon, SoId devcto'I• meta Is a•oCs'oscd v. ?Iri,: $ feel of the 'cistern/ bu'frnead on the rr•slot. IV side of The O.won'Si t'.ater Y:Oy old-ar Its associated wcl'csds. The 'orc'.:frly Is tenc'b.ly lecatdd et ails n:rinvcclarty cc•r:r of the Kon• worth r; oto • Truci. Coanoar'v's Pool prcnerly, Iv''la bctv;,t:n root Mar. gnat ;:ay cuts 0 d Tte Duwovllsh ,'alerv,oe end south of the rroocrlV of The EosIng Con•o:tny, knorm as I ho '737 Final At'c''^bly temples," . n Seattle, K'ne Cn■riv, Wastlnalon. Comments or to ;i'. tfb 'or r 0f l'c0• Pon of °clad" i.,,tn :nest be sl'b'lt,t• De d in wrItIsg to the Kinnp Count. '•eclor of PIC "•" ^ within 1ltt'ty it t o ul h.r 'w, po.itud ny v4 ti..s nC t'C0 ifro,.414 for a eve "c ••,iri:.T, Y11111 a stctement o; tt•tc m. !•! , se;d rcq:'cst. must de svo 11 "ted .II r<rr'IInQ to the Otrtclor Cf Plenntng within fifteen days of the lost Pupil' cotton 01 Ihis ranci. C1' ' verSr;ts Interest In •!':s o7. •tspressi o rtrtnp 07.0. 'the hearing owning Ifntp ,'f b req,lrede The •Cublloolton dotes at this nonce are rpr 1 13, 1i73 and April Z0 h, 1973. • Affidavit of Publication STATE OF WASHINGTON, i ' COUNTY OF KING, M L. G. FINLAYSON being duly sworn, says that he is the principal Clerk of Seattle Times Company, publisher of THE SEATTLE TIMES, a daily newspaper, printed and published in Seattle, King County, State of Washington; that it is a newspaper of general circulation in said County and State; that it has been approved as a legal newspaper by order of the Superior Court of King County; that the annexed, being___B._.cl4s Z &.�,.d _.. , was published in said news- paper, and not in a supplement thereof, and is a true copy of the notice as it was printed in the regular and entire issue of said paper on the following day ,or days Apri1 13 and 20, 1973 nd thltt_.the.s,^.id newspaper was regularly distributcd its subscribers • during--a Subscribed and sworn to before me this of A»rgi. 19 twenty -sixth of said period. clay Notary Public In and for the Vote of Washington • roasting at Seattle President Gen. Ma. Treasurer Credit Dept. • Cen. Aalp. Dept, Sales Dept. Name: Engineering Mime: Field Senlee Name: Personnel Dept. e--Ice Puts Plant Mgr. Materials Dept, Name: Prod. Puts Name: Repair Shop & Test Dept. Name: Sheet Metal Name: Assemilr Name: Plant Enpe. Name: V Route as Noted Below INITIAL AND DATE This Copy Must Of Returned to Flle April 27, 1973 fer. i r �' Mr. C. C. Myrick King County Department of Building King County Administration Building Seattle, Washington 98104 Reference: Building Permit Application Jab No. IC-2903 (Plastic Shop Extension) Follow•up Date.. „ Dear Mr. Myrick: Per your telephone request of April 24, 1973, the following infor- mation is submitted to aid in the evaluation of the subject Building Permit. The make up air unit to be installed under this project is a gas fired Dravo directf low model L124 rated at 1,100,000 Btu /Hr. This unit was manufactured to the approval of Factory mutual and Factory Laurance Association. Very truly yours, KENWORTB MOTOR TRUCK COMPANY Fred Fieifstchmann Plant Facilities Engineer FF :eg rotiw an AGENCY USE ONLY FILE NO. GRID NO. SIC NO. BEC NO. APP. NO. 410 W. HARRISON STREET ' i.: SEATTLE, WASHINGTON 98119 TELEPHONE (206) AT 4.2050 - ° SOUND Airy F!: LLU T :ON CONTROL A^G:NOY Notice of Construction and Application for Approval THIS APPLICATION MUST BE FILLED OUT AND FILED IN DUPLICATE. CONTINUATION FORM(S) MUST BE ATTACHED FOR INCINERATOR & BOILER APPLICATIONS. 1. BUSINESS NAME: 2. MAILINt• ADDRESS: 3. NATURE OF BUSINESS: 4. TYPE OF PROCESS, EQUIPMENT OR APPARATUS: Fiberglass Truck Components Hood Gel Coat Booth and Sanding Booth 5. LIST AIR CONTAMINANT(S)WHICH WILL BE PRODUCED AND /OR CONTROLLED: Mono styrene and dust from sanding 6, ESTIMATED COST: OF BASIC SOURCE EQUIPMENT $ 7. ESTIMATED STARTING July 15, 1973 DATE: 8, ADDRESS WHERE EQUIP. MENT WILL BE LOCATED: I HEREBY CERTIFY THAT THE IM FORMATION CONTAINED IN THIS APPLICATION, INCLUDING SUPPLEMENTAL FORMS AND DATA, WHEN REQUIRED, IS, TO THE BEST OF MY KNOWLEDGE, COMPLETE AND CORRECT. 9. SIGNATURE: 10. NAME: Dennis Howard II. TITLE: Industrial Engineering Manager Form No, 80.118 (9.70) PUGET SOLD AIR POLLUTION CONTRL ANDY l I V it UNDER ARTICLE 6, REGULATION I, OF AIR CONTAMINANT SOURCE AND /OR CONTROL FACILITY Kenworth Motor Truck Co. P. 0. Box 80222 Seattle, Washington Manufacture of Trucks • None 8801 East Marginal Way South Seattle, Washington ZIP 98108 CODE ESTIMATED COMPLETION DATE: DATE 6 -12 -73 PHONE Na 764 -5488 OF CONTAMINANT CONTROL APPARATUS $ 96,000 Jan. 1, 1974 AGENCY USE ONLY 11 1 Puget Sound Air Pollution Control Agency Tacoma Branch Office ENGINEERING DIVISION Everett Branch Office The Hess Building, Room 213 Plan Review Section 703 Medical Dental Building 901 Tacoma Ave. S. 410 W. Harrison 2730 Colby Avenue Tacoma, Washington 98402 Seattle, Washington 98119 Everett, Washington 98201 Telephone (206) 383-5851 Telephone (206) 344 -7334 Telephone (206).259 -0288 Notice: All applicable application forms must be completed to be accepted for review. NOTICE OF CONSTRUCTION AND APPLiCTION FOR APPROVAL INFORMATION AND INSTRUCTIONS 1. WHEN IS A "NOTICE OF CONSTRUCTION AND APPLICATION FOR APPROVAL" REQUIRED? Section 6.03 of Regulation I requires that a Notice of Construction be submitted and approved to CONSTRUCT, ERECT, INSTALL, ALTER, RECONSTRUCT, or REPLACE certain classes of equipment anywhere in the four counties of King, Kitsap, Pierce, and Snohomish. Equipment is defined as any stationary or portable device or any part thereof capable of causing the emission of any air contaminant into the atmosphere. 2. WHAT CLASSES OF EQUIPMENT REQUIRE A NOTICE OF CONSTRUCTION AND APPLICATION FOR APPROVAL? A Notice of Construction is required for four general classes of equipment as follows: a. FUEL - BURNING EQUIPMENT. Equipment other than internal combustion engines and marine installa- tions, the principal purpose of which is the production of hot air, hot water or steam, except such equip- ment either used solely for a private dwelling serving less than five families or having 1,000,000 BTU or less per hour input. (Form P and Form S -A) b. REFUSE - BURNING EQUIPMENT. Equipment designed to burn waste material, scrap, or combustible remains. Incinerator Guidelines which give more detailed information are available from the Agency on request. (Form P and Form S -B) c. PROCESS AND MATERIAL HANDLING EQUIPMENT. Equipment used in a manufacturing process means equipment in which some air contaminant is caused by a manufacturing process. A list of such equipment which does not require a Notice of Construction is available from the Agency on request. " d. CONTROL APPARATUS. Control Apparatus is any device which prevents or controls the emission of any air contaminant. (For Process Equipment and Control Apparatus, only one Form P is necessary for each process, and the appropriate Form R or Form S for each control or process equipment component.) In general, a separate Notice must be filed for each separate process. Exhibit "A ", page 10, Regulation I, lists certain types of equipment not requiring the submission of a Notice of Construction. If there is any doubt as to whether a piece of equipment requires a Notice, please call 344-7334 or write the Design Review Section for clarification. 3. WHAT INFORMATION MUST BE SUBMITTED WITH AN APPLICATION? a. Each Notice of Construction and Application for Approval for the construction, Installation or establish- ment of a new air contaminant source, as above described, shall be accompanied by a set of plans which show and describe in detail the following: 1. The equipment or control apparatus covered by the Notice and Application; 2. Any equipment connected, attached to, serving or served by the unit of equip- ment or control apparatus covered by the Notice and Application; y _ ' 3. A plat plan, including the distance and height of buildings within a reasonable distance from the place where the equipment is or will be installed; 4. The proposed means for the prevention or control of the emissions of air contaminant; 5. Any additional information, evidence or documentation required by the Board • or the Control Officer to show that the proposed equipment or control apparatus will meet the emission standards as now or hereinafter set by the Board. 6. Each Notice of Construction and Application for Approval shall be signed by the applicant or owner, who may be required to submit evidence of his authority. Form 50.118 A (3/73) . 0 . . NGET 50 111440 AIR POLLUTION CO fl OL AGENCY P ENGINEERING DIVISION F C'... 1j • :c: f I W. HAItI21,U\ STREET SEATTLE, WASHINGTON 98119 (206) 344 -7334 'Notice df Construction and A pplication for Approve! F01141 SILL 1 S A SHEET. GIVE 1)LABLE REVIEW MAIESNS IFORMATION PPLI• CATION SO T.HAT FORMS FOR EACH NON- IDENTICAL BE SENT OR CONTACT AGENCY'S ENGINEERING DIVISION FORT 144 -7334. DATE REG. SIC. GRID (AGENCY USE) N/C UMBER NO • UNIT LISTED BELOW MAY TO OBTAIN APPROPRIATE NO NO. UTM j J I. TYPE OF BUILDING (Check) KNew X Existing .. STATUS OF EQUIPMENT (Chock) K New 0 Existing 0 Altered 7. APPLICANT Kenworth Motor Truck Company 3. COMPANY (OR OWNER) NAME Kenworth Motor Truck Company 8, APPLICANT ADDRESS 8801 East Marginal Way South 4. COMPANY TOR OWNER) MAILING SS P. 0. Box 80222 98108 9. INSTALLATION ADDRESS 8801 East Marginal Wray South 5. NATURE OF DOPINESS Manufacturer of trucks 1C. TYPE OF PROCESS Fiberglass fabrication EQUIPMENT (COMPLETE INDICATED REGISTRATION FORM(S) FOR EACH OF THE FOLLOWING) 11. NO. OF UNITS BOILERS (Form A) 14. NO. OF UNITS OVENS (Form DI 15. NO. OF UNITS MECHANICAL EQUIP. (Form E) 18. NO. OF UNITS MELTING FURNACES (Form C) la) I C a U v 0— a r- CORE BAKING OVEN PAINT BAKING PLASTIC CURING LITHO COATING OVEN DRYER ROASTER KILN HFAT•TREATING OTHER la) . (b) (c) Id) . le) ... .. (f) .. (g) (h) . (I I -_ _.. _ (I) AREAS BULK CONVEYOR CLASSIFIER STORAGE BIN BAGGING OUTSIDE BULK STORAGE LOADING OR UNLOADING BATCHING MIXER (SOLIDS) OTHER (a) ....... (b) ..._ Ic) .. _._.... Id) ._. . le) IO (g) (h) 1i l .•• •. If I POT REVERBER.ATOn1' ELECTRIC INOLIC /RESIST CRUCIBLE CUPOLA ELECTRIC ARC EViEAT OTHER METALMC GLASS OTHER NON I.IETAL'.Ir_ 12, NO. OF UNITS INCINERATORS (Form BI (a) 13, NO. OF UNITS OTHER SYSTEMS (Forms H, 1, 01 ail (c). . WI . , , DEGR&ASING, SOLVENT IHI SHOT BLASTING (L) SAND BLASTING (L) OTHER - SYSTEM 101 17, NO. OF UNITS GENERAL OPER. EQUIP. (Form J) 17. NO, OF UNITS GENERAL OPER. EQUIP. (Form JI 17. NO. OF UNITS GENERAL OPER. EQUIP. (Forms J, K, I) 18. NO. OF UNITG Ir/.Y!►.1.MI■MIMrW11.r$al I, OTHER t•OUIPMENT IForm GI (al,.,_ ...... (b).._ _^_ lc) . _ _ (d) lb/ CHEMICAL M'LLIHG PLATING • ..._ . .. DIGESTER DRY CLEANING FOF:MI :1i1 OR MGLDING m > U _ C 1 GALVANIZING IMPREGNATING MIXING OR FORMULATING REACTOR STILL 1. .... (b) . . (c) . (d) tot . ASPHALT BLOWING (J) CHEMICAL COATING (J1 COFFEE ROASTER (K) DEEP FAT FRYER (K) STORAGE YANK II) la) . Ibl . (c) Id1 tel SPRAY PA)NTi,du GUN SPRAY 80( OH (;OUSM FLOW COATIW J ;IBEFG(AS;INE• DIP CC)AT'NC, C ON1 F(L)T- D�•VI CONTROL AIR WASHER 3Cr0J8CER VFHTUPI GO (COMPLETE roam DEVICE P FOIb 21,ND. OF UNITS EACH OF lI•IF FOLLOWING) F NG �� ROL. DEVICE -« _ -_! 19. N`1' OF UNITE CONTROL F EV ICr 20. ICO. OF UNITS' 141 dbl )c' tit V. CONT;tiOL DEVICE 2 . NO OF UNITS ^,trI- In) fit) Ir1 ( d l SPRAY CURTAIN CYCLO')E MULTIPLE C1CLONE INERTIAL CClt.t., - OT'tt.n SCRUBBER la) all lc: (dl ABSORBER ADSORBFR FILTER PADS AFTERBURNER In) (b) (Cl (d) - DEMISTER BAGHOUSE ELEC. PHLCIPITATOF. OTHER 23. BASIC t uIWMEN i CDC.' (Est'nmtk) None 14• ;,U:J 1 i'::: cOU:t .11 NI t.LS1 IF: ti•":14JI .796,000 . ".b. L,AII F ROM--7.4- •, r,UW■S :i A.'tc 3 :5 PM 2ti. DAYS OF 01 tHAl lot-. IL II III S M T Y• T F G 2i. LSTIMAFFI) STAVING Ju]y 15, DATE OF 1073 -r :� CrUIro I. font: Qn•It CONWIJULIIONt tI 28. ESTIM. 1F.D Co' /.PIFNUN !nirTF OF CONSTRUCTION: January 1, 7979 s . s r 7 __,- 2 ' H. \11' 'Al .Al R r,lG lLI''1 ul equip„ •o,t including ItY I ui,r1 It./Ills rr rr , .rte- nn l r �•uJ in t'rar. op . ) H t'1,rd• ; Ili ( I 1,0d0,000 nf•r•.tl 1 '1(1.000 ') t:(U 1 , : ..- , .. . . .. \tJNU /.L AM • ' 3U. PRt11' (Url L'w I', I „ rt cl*;I Omit it Lol,t,l.•t•d v" Iun'4trutwn forma I. •.*. .n,^r. ilOr 4N7;t.':. PiIUC, LIMIT; Polyester resin i 11 ^1.rf.,:4'1-Nr ra. :1+ r'.•--- I IC 1 (';./.71:3n f i br L. n..l : t ,I 01 lbs. a , 000 " 1., •Tll(T II '. Fiberglass hoods & render, s , I• II cal) tops , . I II s:L '.l er top: :f, 6, 000 i 6,0(11 . , hut, I 1 .. Ia . .wO 4000.M•1I4110 0 .110• 0 1a10 0 0r0,0 0 a01 . NMI.... M .M. mull , •.•r III. ". „ ,;. 1 . •I 1 ! ,i I'1 .•■MY.•M. Y1..H.N .1...4 aYa1.I,. +•■ a...• YaMI...UM.I.a,..v Y.l..,% a..•..... or Notice of Construction Application FORM P SIDE 2 . STACKS OR VENTS (LIST NUMBER, TYPE, AND SIZE OF VENT) NO. r UNITS DESCRIPTION • OF OPENING 32. HEIGHT ABOVE GRADE (FT.( 33. VOLUME EXHAUSTED DIMENSIONS (INCHES) • 34, LENGTH (OR DIAMI 35, WIDTH (e) . STACKS (b) FLUES ICI 8 PROCESS OR GENERAL EXHAUST 26 ft. 5 @ 42" dia. & 3 @ 3a" dia. (d) PROCESS OR GENERAL VENTS ( 01 SKYLIGHT OR WINDOW III EXHAUST HOOD (o) OTHER FLOW DIAGRAM 36. FLOW DIAGRAM INSTRUCTIONS: (o) FLOW DIAGRAM MAY BE SCHEMATIC. ALL EQUIPMENT SHOULD BE SHOWN. lb) SHOW FLOW DIAGRAM OF PROCESS STARTING WITH RAW MATERIALS USED AND ENDING WITH FINISHED PRODUCT. lc) IF MORE THAN ONE PROCESS IS INVOLVED TO MAKE FINISHED PRODUCT, SHOW EACH PROCESS AND WHERE THEY MERGE. (d) USE NUMBERING ON FORM P TO INDICATE EQUIPMENT, IF DESIRED. (21 EXAMPLE: TWO IDENTICAL REVERBERATORY FURNACES IN PROCESS COULD BE SHOWN AS �JIa1 161b1 JAn• (o) INDICATE ALL POINTS IN PROCESS WHERE GASEOUS OR PARTICULATE POLLUTANTS ARE EMITTED, (II FLOW CHART CAN BE ATTACHED SEPARATELY IF NECESSARY. I 1 _ -..... ....... - ...- - -�- -- _ j j j — -1 -1 l tsT VR�N )._ j �' —, , i-4-.-- 1_ —._ -- - , Resit.' PNwtPS 1 • ._.. _.. _ n I j ._._� I .._.. : .__..__.. .. -.._1_ .. I _ __ I. ' '� I I . P .e t_. _. Cea A o aT K. GA L_ .Co 0., PM .w, s1..�.._ -1 -- • , ( A) _._ 1. • ... _ . _ _..._.__._ . _ Rervloy . QYEN I ' _ .. C c 1a s-r..) ... .... . _ � .._.._ -.. ...Coos -c) _ , _' _._ . _.._.... ! .... . .. ... .._.j _ I�R a,u v H . .__....... o._ ..:_ � 0. ti. _. Sa!d ra I — -• -- ._ ... ..... ./...__ , .__. i . ... .. _ L _ . ...,.. - .(bMLT )— .. , II s _ SA^‘p14C, r 3 (› c : ∎ = ...,.( .. .. . F1 N I CIA .J,4. J 1 'tiLSC). I . _........ ...., , 1.___:.......:____i__.4 _ .. _ _.,_ -_... : Y..._ ; i r—r- -t. 1 1 i 37. LIST OF ATTACHMENTS AND ACCOMPANYING DATA OR COMMENTS: ° . CERTIFICATION: I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT THE INFORMATION CONTAINED IN THIS APPLICATION AND THE ACCOMPANYING FORMS, PLANS, AND SUPPLE1,IEN: Al. DATA DESCRIBED HERO: :: IC, TO T11L CLSI Of MY 1 0401'1LLDGE, ACCU441f 4.4 :1 (-f TI. 39. SIGNATURE � 0...1 I . 100...1 " 4 ' I I . 11f E OR PRINT NAME Dennis Howard 142. TITLE Industra-a1 J :ncjinl. r!11•! ;.I ,r.,, 43 . PHUNE ), 764- 5.1■- ,, I 111,1.1 /dl_,, , -. .. n . SavuMVlc 31 L ' •1, UGET SO ,e7)...-). , `., �'ut � % 410 W. HARRISON Notice of Construction • * Note: Information required ND AIR POLLUTION CONTROL AAGENCY ENGINEERING DIVISION STREET SEATTLE, WASHINGTON 98119 (206) 344.7334 and lication for Approval pp pp by Section la must be•completed, for this form to be accepted for review. FOR AIR POLLUTION CONTROL EQUIPMENT ONLY FORM R OWNER) INSTALLATION Marginal Way DATE N/C It PLEASE CONSULT INSTRUCTION SHEETS BEFORE FORWARDING ED 3 04 05 Me 08 01001115112 b. COMPANY IOR 8801 E. ADDRESS South . a. COMPLETE THE 0 1 2 SECTIONS INDICATED 07 � 8 C. COMPANY TOR OWNER) NAME Kenworth Motor Truck Co. d. APPLICANT Kenworth Motor Truck Company a. PREPARED BY: (Name and Title) Fred Fleischmann, Facilities Engr. f. PREPARED BY: (Signature) � / a ,___. e. MAKE AND MODEL Binks g. PHONE 764 -5554 Z a ' AIR POLLUTION CONTROL - OUIPMENT DATA b. TYPE OF EQUIPMENT Sanding Booth d. DIMENSIONS (L x W x HI 75' x 24' x 11' a. NUMBER OF UNITS CAPACITY 7 - 114,700 CFM Total f. EFFICIENCY COLLECTION 90% b. NUMBER OF BAGS g. AUXILIARY EQUIPMENT None c. SHAKING CYCLE (auto or manual rapping or reverse air) h. CONNECTED TO: d. CLOTH AREA 3 o, BAG HOUSE a. MATERIAL USED f. g. LENGTH OF SETTLING PATH . h. CONNECTED TO: 4 a . ELECTROSTATIC PRECIP. b. ELECTRODE SEPARATION (FT) c. COLL. ELECTRODE DIMENSIONS: W x L (Feet) d. MEAN VELOCITY OF GAS (FPS( a. AREA (Sq Ft) f. VOLTAGE 0. COIL. ELECTRODE OR PLATE AREA ISq Ft) h. CONNECTED TO: a . BURNER DATA b. TYPE OF BURNER, FUEL C. MAKE AND MODEL d. RATING . NUMBER OF j1NITS /IGNITION f. TYPE OF VENT Vertical Exhaust f• O. CFM EXHAUSTED (Tome) c.3DIk1Er S)OONS -. 11 ft. h1j11 ( „ U 0 42 4 (a 42" di a. 10 ft. high g. CFM EXHAUSTED (Temp) 114,700 @ 70 F. h. CONNECTED TO: ° W €vatic damper t. weather hood h. CONNECTED TO: Sanding Booth �� s b. STACKS, VENTS e, NUMBER OF VENTS, MAT'L USED 7 - Sheet Metal 7 a. — SCRUBBER DATA b. TYPE OF FLOW (Spray. Bubbler) c. PACKING TYPE d. PACKING SIZE e. COMPOSITION OF SOLUTION f. g. FLOW RATE MPH) h. MAKE UP (GPII) 8 a . FAN DATA b. YPE O F (D,eaig nate Blade) — Bia _ „ f. 4 8 C. M KE in ( NO M ) L � -760 0. CFM EXHAUST I Te 0) SP) 114,700 @ 70 ° F. ... d. MOTOR DATA 3 1750 RPM Al 5 1-/P h. CONNECTED 10: Sanding booth e. NUMBER OF FANS, MAT'L USED 7 - Aluminum 9 a . CYCLONE DATA b. TYPE OF CYCLONE 0 Common 0 Split Duct 0 Multiclone C. MAKE AND MODEL d. INLET AREA So Ft e. NUMBER OF UNITS, MAT'L USED f. BODY DIA. OUTLET DIA. INCH INCH 0. BODY HEIGHT ' INCH EFFICIENCY h. CONNECTED 10: 10 • COLLECTION DATA b. DESC IPTION OF COLLECTED c. AMOUNT COLLECTED POUNDS /DAY d. PARTICLE Sl.'F • _ I.' l!�UNS e . TYPES OF POLUTANTS 0 Particulate 0 Gas C Odor V. 9. COLLECTION h. DISPOSITION 01 COLLLCIIa:J WASTE � ,� 4 a. b. c. d. e . f. g. h. _...r . ----. -1 _. * i'�_ 1 . , ___` F 1 . k. I. . 12 + a. GAS FLOW b. ACTUAL CF ( 120,000 CFM C. . 1 'hvg 1 5l.tdard) d. 11mrerr `1 ■ .•t 40 _..1'. r,,-----...--- c. PRESSURE 13t1QP No Data 't. F VI Il 1 No irI.';.'1 Vata 0, It ET AND 61 POLLI'TANT CONl.EN1 HAT IONS NO data SavuMVlc 31 L t ' ') PUGET SOUND AIR POLLUTION CO11TOOL AGENCY et( ENGINEERING DIVISION 410 W. HARRISON STREET SEATTLE, \1'ASFIINGTON 98119 (206) 344.7334 Notice . of Construction and Application for Approval . * Note: Information required by Section la must be completed, for this form to be accepted for review. FOR AIR POLLUTION CONTROL EQUIPMENT ONLY �` ®fl � B� D DATE N/C N PLEASE CONSULT INSTRUCTION SHEETS BEFORE FORWARDING r .. COMPLETE THE CKI 1 Z2 Q 3 04 EJ 5 (i-s *a. SECTIONS INDICATED 0 7 t g 0 g 0 1010 11 W 12 — b. COMPANY 1OR OWNER) INSTALLATION ADDRESS 8801 E. Marginal Way South C. COMPANY TOR OWNER) NAME Kenworth Motor Truck Company d. APPLICANT Kenworth Motor Truck Company e. PREPARED BY: (Name and Title) Fred Fleischmann, Facilities Engr. f. PREPARED BY: (Signature) ���,/ >� >� ;��,_ p, PHONE 764 -5554 """ 3 a 'AIR POLLUTION CONTROL — €W01PMENT DATA b. TYPE OF EQUIPMENT Gel Coat Booth c. MAKE AND MODEL Binks d. DIMENSIONS IL x W x HI 24' x 2.4' x 12' e. NUMBER F UNITS CAPACITY 1 - 19,300 CFM I. EFFICIENCY COLLECTION 90% g• AUXILIARY EQUIPMENT None h. CONNECTED TO: Gel Coat Booth • BAG HOUSE b. NUMBER OF BAGS c. SHAKING CYCLE (auto or manual rapping or reverse air) d, CLOTH AREA a. MATERIAL USED f. g. LENGTH OF SETTLING PATH h. CONNECTED TO: 4 • ELECTROSTATIC PRECIP. b. ELECTRODE SEPARATION (FT) c. COLL. ELECTRODE DIMENSIONS: W x L (Feet) d. MEAN VELOCITY OF GAS (FPSI e. AREA (Sp Ft) 1. VOLTAGE g. COLL. ELECTRODE OR PLATE AREA (Sq F1) h. CONNECTED TO: ri a. BURNER DATA b. TYPE OF BURNER, FUEL c. MAKE AND MODEL d. RATING NUMUFR OF UNITS /IGNITION f. g. CFM EXHAUSTED (Tamp) h. CONNECTED 10: s • STACKS, VENTS b. TYPE OF VENT Vertical Exhaust e. DIMENSIONS IL x H x WI 42" Dia. loft, high d, D 11PER9 Au Damper & weather hood e. NUMBER OF VENTS, MAT'L USED 1 - Sheet Metal I• g. CFM EXHAUSTED (Temp) 19,300 CFM 70 ° F. h. CONNECTED TO: Gel Coat Booth • SCRUBBER DATA b, TYPE OF FLOW (Spray, Bubbler) C. PACKING TYPE d. PACKING SIZE 7 a. COMPOSITION OF SOLUTION f. g. FLOW RATE IGPH) h. MAKE UP (GPH) a FAN DATA b. TYPE OF FAN (Desipnato Blade) 6 - Blade c. MAKE AND MODEL Binks 30 -760 d. MOFOR DATA 1750 RPM 3 HP I a, NUMBER OF FANS, MAT'L USED 1 - Aluminum L P. CFM EXHAUSTED I Temp c9 SP) 19,300 CFM ia" SP h. CONNECTED TO: Gel Coat Booth e , CYCLONE DATA b. TYPE OF CYCLONE a Common 0 Spilt Duct 0 MultIclonn c. MAKE AND MODEL d. INLET AREA Sq rt e. NUMBER OF UNITS, MAT'L USED I. BODY DIA. OUTLET DIA. INCH INCH 9. BODY HEIGHT ' INCH EFFICIENCY h. CONNECTED TO: , IU . COLLECTION DATA ' b' DESCRIPTION OF COLLECTED c. AMOUNT COLLECTED POUNDS /DAY d. PARTICLE SIZE (Avein(le) MICRONS o. TYPES OF POLUTANTS a Particulate A Gas c Odor 1. g• COLLECTION h. DISPOSITION OF COLLECTION WASTE a• b. c, d. 11 i • 1. p. h. I. k. I, - -~ ' i th n. GAS FLOW b. ACTU.1t CT 19 r 000 I.. SCF )Reg I Standard) J. h. 1 CMPUTATI Ilf ;•I'% .rte., •�•� f 40 75 • IN. — t•I.'1 _-.__ - PRI.SS4RE DROP No Data I, EFFICIENCY NO Data p, INLET AND OUTLET POI.11)1AN1 CONCENTRATIONS No Data ` 1 I "n, :•• :.. 1•:'1.1 I Gel Coo+ �cs� SERVING: KING COUNTY 410 West Harrison St. Seattle, 98119 (206) 344.7330 KITSAP COUNTY Dial Operator for Toll Free Number Zenith 8385 Bainbridge Island, Dial 344.7330 PIERCE COUNTY 213 Hess Building Tacoma, 98401 (206) 383.5851 SNOHOMISH COUNTY 703 Medical-Dental Bldg. Everett, 98201 1 6) 259.0288 P.UGET. SOUND `AIR POLLUTION CONTROL AGENCY Mr. Dennis Howard, Industrial Engineering Manager Kenworth Motor Truck Company 8801 East Marginal Way South P. 0. Box 80222 Seattle, Washington 98108 Subject: HAW: JKA: j n Enclosures 410 West Harrison Street, Seattle, Washington 98119 (208) 344.7330 June 18', 1973 Notice of Construction. Application for Fiberglass Truck Components Manufacturing Control Dear Mr. Howard: We have received your application of June 12, 1973 for a Hood Gel Coat Booth and Sanding Booth. The forms you used ar lete and the Noti s incomplete e due to ac of require accompany ng ata. Please complete the necessary information on the enclosed current forms and include plans, plot plan and other re :quired items specified on the instruction sheet. Thank you for your cooperation in this matter and if you have any questions, please contact us. Yours truly, V / atters Engineering . BOARD OF DIRECTORS CHAIRMAN2. Gene Lobe, Commissioner KItsap County; • • CHAIRMAN; .Robert C. Anderson, Mayor Emetic' N. Richard Forsgren, Commissioner Snohomish County; Patrick J. Gallagher, Commissioner Pierce County; Glenn K. Jarsted, Mayor Bremerton; Gordon N, Johnston, Mayor Tacoma; • .Harvey S. Poll, Member at Large; John D. Spellman, King County. Executive; •. Was Uhlman, Mayor Seattle; • 'A, R, Dammkoehler, Air Pollution Control Officer,.. c 8801 E . M ((1* ) Way Permission is hereby granted as provided in Article 6 of Regulation I of the PSAPCA to the APPLICANT to install, alter, or establish the equipment, device, or process described hereon at the INSTALLATION ADDRESS in accordance with the plans and specifications on file in the ENGINEERING DIVISION of PSAPCA. This approval Is not a waiver of liability for the Infraction of Regulation I nor does It relieve the APPLICANT or OWNER of any requirements of other ernmental agencies. Reviewing Engineer Form 50.118 Approved 10/69 jn Puget Sound Air Pollution Control Agency HEREBY GRANTS PERMISSION TO CONSTRUCT, INSTALL, OR ESTABLISH Gel Coat Booth and Sanding Booth SUBJECT TO THE FOLLOWING RESTRICTIONS GENERAL: SPECIFIC: SPxlrr1 P Q$1DR (CITY) (ZIP) Notice of Construction No, 1010 Date July 19, 1973 APPLICANT: D. Howard, Ind. Engr. Mgr. OWNER: Kenworth Motor True _Comp y LOCATED AT A. R. Dammkoehler Air Pollution Control Officer