Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6542 - Eagle Hardware - Mezzanine
EAGLE ARDwAc (vsL7La feu, Sabey Corporation ~ `�N 281 -8700 ADDRESS 201 Elliott Avenue North, Suite 400, Seattle, WA Z1P 98119 CONTRACTOR Royce Cnstruction, Inc. PHONE 641 -2028 ADDRESS P.O. Box 1012, Woodinville, WA ZIP 98072 WA. ST. CONTRACTOR'S LICENSE # ROYCECI159KW EXP. DATE 10 -08 -91 ARCHITECT Sconzo Associates PHONE 455 -3203 ADDRESS 919 124th Avenue N.E. , Suite 101 Bellevue, WA ZIP 98005 APE OF CONST.: III - UJC EDITFON (year) 1988 SETBACKS: N- S - E- W- FIRE PROTECTION: ®Sprinklers 0 Detectors 0 N/A UTILITY PERMITS REQUIRED? C Yes ®No t E.bIIo worksl BAR/LAND USE CONDITIONS? 0 Yes al No ZONING: CONDITIONS (other than those noted on or attached to •ermit/•lans APPROVED FOR / 1 ,� ISSUANCE BY ll/./ i i' r t i' .. \..',I,, .,_., , BUILDING OFFICIAL DATE: - .; " / '-- // CITY OF TUKWILA Dept. of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA (206) 431 -3670 BUILDING Co PERMIT NO. J 5 1.--( DATE ISSUED: CERTIFICATE OF OCCUPANCY NO. Division 98188 D UI L IN I I (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES DESCRIPTION BUILDING` PERMIT FEE :: PLAN:CHECK:.:FEE ><< BUILDINGSURCHARGE PLAN CHECK NO.: TOTAL: DATE ISSUED: .AMOUNT 902::00 586 <; 00: 91 -121 DATE PROJECT INFORMATION SITE ADDRESS 101 Andover Pk E SUITE # PROJECT NAME/TENANT Eagle Hardware VALUE OF CONSTRUCTION - $ 175,000.00 ASSESSOR ACCOUNT # 022300 - 0030 -05 TYPE OF U New Building U Addition (x) Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Office tenant improvement on existing mezzanine. CODE COMPLIANCE USE i„.4, FLOOR TOTAL O f,> ic e SQUARE FEET 22,197 /. B 2 OCC. LOAD 165 SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. SQUARE OCC, TOTAL LOAD FEET LOAD SQUARE FEET 22,197 22,197 TOTAL OCC. LOAD 165 165 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: PRINT NAME: Cre h < e P') 1 of ee A r r DATE: S /- / COMPANY: 1;F: f �� �L' „ e `C /,« , {rig This permit shall become null . and void if the work is not commenced: within 180 days;_ from the date of issuance, or if the work is suspended or,;abandoned for a period of 180 days from the last inspection. PERMIT NO. CONTACTED DATE NOTIFIED 1--- ThS2 5 . 1-4 n Bn p �� - `"L I (Intl.) --� is DATE READY PERMIT EXPIRES 2nd NOTIFICATION BY: (Intl.) BY: AMOUNT OWING 9 ocp . 0 3RD NOTIFICATION INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE OCC. SQUARE CCC. SQUARE OCC. SQUARE OCC. FEET LOAD FEET LOAD FEET LOAD FEET LOAD 1 FEET SQUARE OCC. TOTAL LOAD SQUARE FEET TOTAL OCC, LOAD DEPARTMENTAL REVIEW "X" in box Indicates which departments need to review the project. BUILDING - initial review 14 FIRE O PLANNING O PUBLIC WORKS O OTHER 'I BUILDING - final review 3 s_ c1 REVIEW COMPLETED INIT: INIT: INIT: (ROU TED) \I\ (A FIRE PROTECTION: (d) Sprinklers ('Detectors O N/A FIRE DEPT. LETTER DATED: e/„ z.3 -4') INSPECTOR: 7.' 3 BUILDING - PERMIT APPLICATION TRACKING CONSULTANT: Date Sent - .UI.R >::;<: >.:<::: Date Approved - ZONING: IBAR/LAND USE CONDITIONS? ( Yes (- REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- W- UTILITY PERMITS REQUIRED? Yes No PUBLIC WORKS LETTER DATED: INIT: 4, " 2 � /'i i TYPE OF CONSTRUCTION: INIT: 1'S /� (1 4. . BC D TIO (year): SiTE ADDRESS SUITE # 101 Andover Park East VALUE OF CONSTRUCTION - $ 175,000.00 PROJECT NAME/TENANT Eagle Hardware & Garden ASSESSOR ACCOUNT # 022300 - 0030 -05 TYPE OF U New Building U Addition (0 Tenant improvement (commercial) Li Demolition (building) WORK: O Rack Storage O Reroof O Remodel (residential) O Other DESCRIBE WORK TO BE DONE: Office tenant improvement on existing 15,200 sf mezzanine BUILDING USE (office, warehouse, etc.) Corporate offices /store managers offices NATURE OF BUSINESS: Retail sales of hardware and Barden su• •lies WILL THERE BE A CHANGE IN USE? al No • Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: 154,633 sf Tenant Space: 132,633 sf Area of Construction: 15,200 sf WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE BUILDING? O No ® Yes IF YES, EXPLAIN: Retail sales of UFC Sec. 79.201 for flammable and comb stible liquids hazardous materials. �� 3u�lptSU.�IT # b 34$ . OR HAZARDOUS MATERIALS IN THE of quantities not exceeding the limits and Sec. 80.302 through 80.315 for PROPERTY OWNER Sabey Corporation PHONE 281 -8700 ADDRESS 201 Elliott Avenue N., Suite 400, Seattle, WA PHONE t ZIP 88119 Li I - Q0,a<6, CONTRACTOR a 02 Co n61--r VL on) inc._ ADDRESS 7' O o l a woo, ' a t ■-Q .. i ZIP Gi , 6 Q WA. ST. CONTRACTOR'S LICENSE # Ray C C---' to EXP, DATE 10- q I PHONE 455 -3203 _b ARCHITECT Sconzo Associates (John Hal 1 Strom) ADDRESS 9 19 - 124th t Avenue IE. Suite 101. Bellevue WA Z IP 93 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK n _ I NUMBER APPLICATION . MUST - BE FILLED OUT COMPLETELY BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON John Ha1l .rnm hn Hallstrnm BUILDII PERMIT APPLICATION 9 -124th Avenue NE, Suite 101 • DESCRIPTION • BUILDING PERMIT. FEE > 902 Q0 PLAN CHECK :FEE 6 0 BUILDING SURCHARGE 4::50' 0 AMOUNT 14;•50 ' RCPT:: # DATE DATE 3/22/gi PHONE 455 -3203 CITY /ZIP Bellevue PHONE 455 -3203 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our processor plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED 4, _ �� I DATE APPLICATION EXPIRES 98005 07/08/90 COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITIONS ••••:: ; • Specifications f calculations stamped by 4.1iYashinglor)".Stetl, •• • ......,,.. • n g lne or ,.,.„.. „..„ Soils report stamped by a Washington State I„. a 1.1 Topog survey • :•• • • " "" ••••••••'•••••••••••••••••••••-• Energy calculations stamped by a:Weshingten:.StiatetiCer)s,' • LegeldeScr ' :'.',":.:: • :::::":: :::: ...... , • Wodting tiraWings, stamped by a Wachington State lic . : archisact,which Include: " '' "" ' • • :" • ." ' " •:::::: . ••'• . "•:.•: ::: Site Pi:: : :: :: •• , :::::,..„,:::„....,•,,,„:..,::::::::::.„„„:.,:.....:::::::::.,„ •::::•••••••••" Architectural drawings : •••• :::, .: . • : ::„.„:::::::::::::::::::,:::::::::::::::::::::::::::::::::::::::::::::::....., :""1."1' ''. Struotural drawings :•::::-: ". : • : ::: ":""""'"'"'"'' drawinge.:::: :"......:: f':" Elevations ". ::::: .. ,:' ....":: ■ Civil : •••.: ! . : : : : : Ii: : ::: : : , ;:„ . : drewings ....... ...... :::::....:,:•••.:::•:,.......,•:::::::,.....:,:.„.........„......,............. " .. - - . . „....... . .......„...............::: ..„:„„.„.....„.,....., ,,.... Completed utility permit ePptication (one* • :: • 7 Six (6) sets of civil drawings NOTE • " " , . See utility permlfapPlIc.atkrit and 00,081 submittal requirements.: (2):*9.ts 'Of Oland; which fl • "' .• .• •••• • Building floor plan showing:' • • Entire space where racits wdl be located doors •'.• • Dimensions of all Tenant space floor plan showing NOTE Include 'dimensions of racks(traightil.:*frftker0 :•:anc tfacit ways pa plan. ," • ".Structural calculations stamped licen :.'ff engineer (reck storage • . . RESIDENTIAL ...... ..... ....... ....... .... . NEW SINGLE-FAMILY in.Completed building permit application (one for each :.•:• • l • • " '':• •• . • r Account Number:„ Two sets (2) of working drawings, which Include • . .. • .., • : • • .: • • • • • • Site plan. (On plan, show ciaseat hydrant lacatIon.:: • . • ,, •... • Foundation plan ."' Indudeaccess bufloIng, showIrrVi' • • Floor pian .„. • Roof plan • • • • .•.• . ••••• • Building elevations (ail views) ... • ..:• : • 1.: ••• •••,'• Building cross-section . • Structural framing plans :• . • ..• •:,. SUIWTTAL CHECKLIST Assessor Account Number ••• ::•••••• Two sots (2) of the following:: • Completed building permit 'application • . Assessor Account Number E Washin State Energy Code data ri Completed utility permit application. \ r --- 1 six (6) sets of site (1 s showing utilities NOTE: Building site plari anclutility site plan may be combined. See. utility permit application and checldist for specific submittal requirements N Additional topographical and soils information may be required if unique site conditions. . • • OMMERIAL TENANT IMPROVEMENTS E Completed buUcng permit application (otto for each structure or A1.3"1$44)r „:;.' • TWo (2) sets of Con OnPiens, which ,•,. 4 LOOSdOn of tenant space I Existing .NoTt,; 011Y lit* W91* Is to be done submit separate utility permit mn location a Use of adjacent (common wail) tenant E Poor plan of proposed tenant space Tenant space plan with use of each ro labelled. • • Structural calculations stamped by a Washington State evit atm ion rice walls, existing wall, end waifs to be demolished .. . •••• • • •• • ••••" , ::•4 arid p roposed . .. . .,„ Nsrative describing existing roof Metetlt0,1?eirjg removed, and f•""••••• : ":":: : • • : • ":" NOTE - .keertiffeatiort letter:ftfreqotnad prior to final iriSpeOtion and s10 oft of the praift . . . ........ . . .. . . .„ . . ...„..... . „ ...• ":"..ANTE!iNA/ DISHES ••• • , • • •••• ; •••• corotiowi building gen op;)!Icaocto 0 Completed •„, ": :; • • 14;i44 apptica on Assessor Account Number ... • . ::'11a3IDENTIAL ;: . : Completed bulking permit.appliOationione. for each structure) „.. Assessor Account ...„ „.:„„„,„.„:::::::„„.„„ . • Two (2) sets of working drawings, which include .• . • ••• Site Plan • • !Foundation plan • Floor plan • " • • Roof plan ..- .• "*Builcing elevations (all views) • • Building croini-sectiorl:...•'" • • • • Structural framing plans NOTE If any utility work Is to be done provide utility permit application an dplansmvstbesubrnitted, • ": REROOFS : , • , •• • : • • • • E Completed building permit application (one for each strUcture) E Assessor Account Number Narrative describing exitltingroofi matodal being removed, and material being installed.'". • • " ' : " I NOTE: A certifkation letter if required prior to final Inspection and sign- • off of the permit. : : PROJECT: ... .... ■0 ..., SITE ADDRESS: O / o/ A /e= PERMIT NO. .......2z7„' DATE CALLED: TYPE OF INSPECTION: : a.m. DATE WANTED: SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: INSPECTION RESULTS/COM, ENTST ,v,--74 A • 7 INSPECTOR: AP DATE: CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 C INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: t PERMIT NO. SITE ADDRESS: /(9124 ,/94 ./2 . 5 / DATE CALLED: ge,,27 . m . DATE WANTED: e 3 - - . - d REQU TYPE OF INSPECTION: SPECIAL INSTRUCTIONS: PHONE NO.: INSPECTION RESULTS/COMMENTS: 4 - A, -- a r?Z I .- INSPECTOR: fl ..4,..4 , DATE: % —IAA CITY OF TUKVVILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: 0 _ ,Q mir u) 1 SITE ADDRESS: 1 KnOn v.R r pK • PERMIT NO. V DATE CALLED: H p@- Cf TYPE OF INSPECTION: ) Q ' i DATE WANTED: p; SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: • L *r INSPECTION RESULTS /COMMENTS: "--‹ e. A/ ,.-4 e e7-/ i 6‘..---4:1" _c7pierive-- /---"vi7-y-4 / /ix ,_ 1 flATC. ...... I C...G i iNCaFr_TnQ. 6 IAA -4_ .4 i._ CITY OF TUKW1L A Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: - '' H" t C - PERMIT NO. & 5 2-- SITE ADDRESS: / 0 I - P• DATE CALLED: 7 - TYPE OF INSPECTION: i /t F: Z'■k� 1'44 N_`.'> - DATE WANTED: 7 —' —c SPECIAL INSTRUCTIONS: 77 f c: LZ.. - CE? L.1 i\i REQUESTER: yeoy PHONE NO.: L-`{3 - 70 j riY4lr/o5c INSPECTION RESULTS /COMMENTS: l ' I p\A ) a - 1,,,..d.$ .A.A.A. J.,1 �1-0^ ok ....-c- cam-- "tt-t - ., -J. ,, ,_ .A,� G t.A.Arti- - /IATC. 7 7797: 97 IMQI]CnTf1n• t "" CITY of TUKWILa Dept. of Community Development - Building Division Phone: (206) 431 -3670 t INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: gIRWWL SITE ADDRESS: I IIIMMLAIIIIAMI TYPE OF INSPECTION: 1 PERMIT NO. DATE CALLED: 7- -.." / DATE WANTED: p.m. SPECIAL INSTRUCTIONS: Li REQUESTER: I PHONE NO.: Q / D5/- INSPECTION RESULTS/COMMENTS: [-I-N.-00._ JIA ' c cv ' s cA St-L ca-rirj it ‘.". (rt7 7=7 . 1 - =77. 5 i CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) V-3670 t INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 CITY OF TUKWILA Building Division 6200 Southcenter Blvd. Tukwila, WA 98188 433.1815 Permit No. (0s 2 Date ' 5 ( Job Address �! O / A -P- ` CORRECTION NOTICE The following items are found to be in violation of Ordinance Gt-/ - and shall be corrected. 1-4 LA Q c€- -, 46 4 /L 5 --- r7 �'Z`z 4 -,.� ► rJ (L.� — z e-vr * i .) A 71 A /' T 9 �vr f t ✓z-- � - sue ` / ►' L - S ert-- Pte+- , 4- rz6 Ft /i-€ G A-u 2.. - rr, - w t'1. Signed Building Official /Inspector PROJECT: g -, c 4 Pr:* -I '1 ( PERMIT NO. ..4. SITE ADDRESS: a DATE CALLED: DATE WANTED: REQUESTER: A ,- -2c--,v — 2_5 l e) TYPE OF INSPECTION: c; c9/-3 SPECIAL INSTRUCTIONS: PHONE NO.: INSPECTION RESULTS/COMMENTS: ..„, - // Jr ..." • ... INSPECTOR:6 Ary ..../..seslike DATE: - -; CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: MAIII,,l / 4 8 / PERMIT NO. , 6' 0-- SITE ADDRESS: Mel= li p,Me TYPE OF INSPECTION: rt.,,„y /„..ji lin DATE CALLED: / --/ ---. q/ _ map DATE WANTED: --49 D ,.._. SPECIAL INSTRUCTIONS: . 6 REQUESTER: i nuAllt• PHONE NO.: 2 di 7 & INSPECTION RESULTS/COMMENTS: /' - e fr lcie• cr. e'-' 7 iNsPEcTo.,.. DATE: 6.— ft.-9/ _ CITY OF TUKIWLA Dept. of Community Development - Building Division Phone: (206) 3 1-3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: • ,1 r /, !mil 4 �,4.47-i,.,i a PERMIT NO. A SITE ADDRESS: 41 J ; ; - _, 4 _, `, , / Z DATE CALLED: (a '-./ ,- TYPE OF INSPECTION: , . ,.,.. ^ DATE WANTED: -- REQUESTER: ,4 /q,�3,09ce PHONE NO.: ' „ ' SPECIAL INSTRUCTIONS: INSPECTION RESULTS /COMMENTS: A _ f „� t .� /I INSPECTOR: it • , I ,. DATE: — ; s CITY OF TUKW1LA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: g Ge /Az, „.L t , fry,/ /,p PERMIT NO. , S �+ Li SITE ADDRESS: / C� / 4,,, ea'a, .,�e =.., r -..: DATE CALLED: 6 �/p ---," TYPE OF INSPECTION: ...,, , . DATE WANTED: /O ��'t. SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: INSPECTION RESULTS /COMMENTS: _ �..,y CFe /j -4 e, r Zr(I-I4.6=,_, A . l L / � � �/ I . IMRPE@TflR! � �. � f4TE■ /-1..-/A/..._49 . CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: ? (_ / ,r wa_ re . PERMIT NO. 5 • — SITE ADDRESS: U/ j l.-( 0 ' f-- ' G L` . DATE CALLED: 9 / TYPE OF INSPECTION: ' 771zf I , DATE WANTED: ..4 `f ( P.M. SPECIAL INSTRUCTIONS: L kke.... -4--r REQUESTER: eau d ° D t.4" an 5- 2.. - . q I . PHONE NO.: c 3 -' 5/7 d _. INSPECTION RESULTS /COMMENTS: F,, ,,,,,, , 7_, , ., • . _ 46, j r J S t .s.- 07�,._,.a( , rah _ .,-o.--t_ -' /.e--, y/ - _ / � INSPECTOR: /�,�, � Ll? DATE: '9 CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 • INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Gary L. VanDusen, Mayor Project Name Address /...; Retain current inspection schedule Needs shift inspection TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Approved without correction notice / Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Authorized Signature Date Control No. Yi Permit No. 5 - Suite # (21 / FINALAPP.FRM T.F.D. Form F.P. 85 "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 X 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 X 10 Wall Board Fastening 431 -3670 11 12 13 x 14 FIRE FINAL lnsp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 SITE ADDRESS: 101 Andover Pk E -411i;:8/116 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 L�4,JIL.Vi�V rc.nlvil l INSPECTk)N RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: Eagle Hardware `1: CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS (05 4a 5 1-q. All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and tons are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab Insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping Is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FiNAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. OW14d . AUG 23 '91 14:33 E TSIDE GLASS a v4/.. c S I D 5ifsehrof AGAUTE Gleam Company, Ina. 17830 Weal Valley Hwy.. Tukwila, WA 8818Q Company N nne ;,. ll Address: Regarding Jobs This is to c rt.fy that the glass supplied to you on our Jo Number '.is tempered and meets the requirement* of Federal = a ft 1201 ' CAT I and II and the safety criteria of Alin Z97'1-1084' stnceraly Hartung Sales • 7 7' ! ed451- 029 P01 (206) Man 0R' No OA • • MO ' 6 •' . • A' oAI.IARO DA t-� � , o "RUSH; — t r -- A(.IN$T. - J 1 — r J.ra� 1 'zt 1 1 .4 • CH. I 1 Lt r F.L. Ara HAMM& GLASS Ca, INC. WHOI.ESALEASOF FLATGLASS'ANP INSULATING GLASS UNITS 17830 West Valley Hwy, YWCwUa, WA 081tIB 200868.2626 1.00.652.2227 FAX: 908.856.2601 1628 Commarao street "(aeons, WA 96409 206.333.0700 or 272 1.800.62P..2215 FAX: 206493.4700 SOLO TO SHIP TO: REMARKS: rimy/ /ANN. O.A, QUANTITY ORD, 8.0, P 1ODUCT NUMBER THICK. NESS COLOR an•mi 11111111111111111 MINN MIMIEMI 111111111111111111 MIME gari m mum imaimmeirm • !0 Feuz L t . � etc VL. nc ;` r 2)C 42' .-_ t2a1Q, 23 K.. • iI E 1. DESCRIPTION SU Q•TQTAL PRICE SALE H f tufloglIP011iblie01110.001.110111•1611e011•0 teams* 8625 Tt rndyko Ave. West 2600 N.W. NI0016I (Wattle, WA 98119 Portlapnd, OR 07210 PAX: 2( 3284.8023 603- 221 .0280 FAX: 609.221.0670 FIt_ REosN {D ABOV! IN 0000 C0N0ITITON 0A72 Hln4n9 Glss,bsar2 no }KQSnss Of Debility for any Consequential damages or danter)as 10 Lnynna , n axcast at th , poorsa pr104 of the r .l BACK VnoER TCUffROt DISCOUNT DELIVERY SALES TAX JOB NUMBEF 71312 CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91 -121: Eagle Hardware 101 Andover Pk E PHONEY (206) 433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME ,P f .�F THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER p? 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 9. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary L. VanDusm Mayor REQUIRED INSPECTIONS Plan Check No.: a l I 1 Project: Y -. PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). . All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof, 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab/Slab Insulation 4. Shear Wail Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney X 7. Framing 8. Insulation 9. Suspended Ceiling /` 10. Wall Board Fastening 11. 12. 13. X 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final REQUIRED INSPECTIONS Plan Check No.: a l I 1 Project: Y -. PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). . All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof, 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. A Certificate of Occupancy will be required for this permit. Re: Eagle Hardware - 101 Andover Park East Dear Sir: City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control #91 -121 (513) Gary L. VanDusen, Mayor April 24, 1991 The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1)) Extinguishers shall be installed on the hangers or in the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.6), and shall be installed so that the top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1 -6.6) (UFC 10,301) Extinguishers shall be located so as to be in plain view (if at all possible), or if not in plain view, they shall be identified with a sign stating, "Fire Extinguisher," with an arrow pointing to the unit. (NFPA 10, 1 -6.3) (UFC 10.301) 2. Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit signs shall be installed at required exit doorways and where otherwise necessary to clearly Page number 2 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Gary L. VanDusen, Mayor indicate the direction of egress. Signs shall be of a contrasting color with the surrounding area and shall have letters not less than six inches high with a minimum letter width of 3/4 ". (UBC 3314) (UFC 12.108) Exits serving more than 50 occupants shall be provided with illuminated exit signs. (UFC 12.108(d)) Exit doors shall swing in the direction of exit travel when serving an occupant load of 50 or more. (UBC 3304(b)) Exits shall be illuminated at any time the building is occupied. An emergency system shall automatically provide exit illumination upon failure of the main power supply. (UFC 12.107(a)(b)) 3. Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) 4. A corridor fire alarm system is required in lieu of one hour construction. (City. Ordinance #1528) All modifications to fire alarm systems shall have the written approval of the Tukwila Fire Department. No work shall commence without approved drawings. (City Ordinance #1327) (UFC 10.301) 5. Your street address must be conspicuously posted on the building and shall be plainly visible and legible from the street. Numbers shall contrast with their background. City of T Kwila Page number 3 FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 (UFC 10.208) All required occupancy separations, area separation walls, and draft -stop partitions shall be maintained and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) Walls and ceilings of corridors serving an occupant load of 30 or more shall be not less than one -hour fire resistive construction. (UBC 3305(g)) (UFC 12.105(a)) All interior wall covering materials shall be fire - resistive or shall be treated to be fire - resistive, so as to result in aflame- spread rating as required by UFC Appendix VI -C tables 42A and 42B. A certificate of the flame spread rating is required to be delivered to the Tukwila. Fire Department. (UBC 4204) (UFC 10.401) Yours truly, The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd Gary L. VanDusen, Mayor SCONZO / ASSOCIATES planning and design, inc. April 19, 1991 Mr. Bob Benedicto CITY OF TUKWILA DEPT. OF COMMUNITY DEVELOPMENT 6300 Southcenter Blvd. Tukwila, WA 98188 RE: Eagle - Tukwila Corporate Office Tenant Improvement 101 Andover Park East Plan Review 91 -121 Dear Bob, 919 -124th AVENUE N.E. BELLEVUE, WA 98005 206/455 -3203 RECEIVED CITY OP TI IKWIIA APR 2 2 1991 PERMIT CENTER I have reviewed your April 12, 1991 plan check additional information request and offer the following responses: 1. Area I has an occupant load of 43.86 (4,386 sf /100). UBC Sec. 3305(g), exception 5 permits the use of smoke detectors in lieu of fire rated corridor walls and ceilings for office spaces with occupant loads less than 100. On Sheet Al2 the limits of the corridor area requiring smoke detectors are identified. 2. Area II has an occupant load of 83.15 (8,315 sf /100). The File Room (224), Break Room (225), Mens (226), Womens (228), Janitor (229), and Supplies (230) are accessory use areas per UBC Sec 3302(a), exception. These accessory use areas have two means of egress. UBC Sec 3301(g), exception 5 applies to Area II as it does for Area I. The limits of the corridor area requiring smoke detectors are identified on Sheet Al2. 3. The responses to items 1 and 2 above have eliminated the need for any new 1 -hour ceilings. Mr. Bob Benedicto April 19, 1991 Page 2 4. Framing Details C and D have been added on Sheet Al2. 5. No response necessary. Two copies of all revised sheets referenced above are enclosed herewith for your review and approval. If you should have any questions, please call me. Sincerely yours, John G. Hallstrom, AIA cc: Dave Heerensperger Tom Sconzo DATE MILL 22 1'91 I * * REVISION SUBMITTAL PROJECT NAME EA6 JL` I4MAQ \VP 6 d, OM ELI ADDRESS IO 1 P .400\i ek. PJl i,L -• CONTACT PERSON J©WU 40 PHONE 35 "31,03 RC i1 OR ENGINEER J 04Q i S 1 I o P1 PERMIT NUMBER (If Previously Issued) PLAN CHECK NUMBER I Z TYPE OF REVISION: 11� Ile.sr04Se. 10 41 t• 1 t fug( Gt4i LLL (41911)0\4L, t.tFoi -'( 10 .. - S . CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 SHEET NUMBER(S) AlZ �C.l.) ' 1`1I l (.& �-(�'1! ) 'Cloud' or highlight all areas of revisions and date revisi suBMrrrED TO: 110f5 BELIE.olun RECEIVED CITY OF TI IKWIIA APR 22 1991 PERMIT CENTER FAX NO. 45'5 3 El IF THIS COMMUNICATION IS NOT 1.1,(3 CLEARLY RECEIVED, PLEASE CALL: DEPARTMENT OF COMMUNITY DEVELOPMENT 6300 Southcenter Boulevard, Tukwila WA 98188 CITY OF TUKWILA : ` ■RMIT CENTER FAX TRANSMITTAL FAX NUMBER: (206) 431 -3665 To: OA/LS-MOM. DATE: 12.P-.9 TITLE: FROM: - 430rSet4 ED(CCO ' TITLE: AiR- DEPARTMENT: DEPARTMENT: C .D. U (LD C D t/. !%{ :; + +:. %'! {i of %;,• /, l /. ; l: ,.Y %Y {. r� r,. ,..... i �.v/.!.Y %: {:.{ { {:i: s :: {: {r.:N / ^'• % %{.Yf.I.: F. ^'1+:+'/l/�Y %ri:Y.tN.:: M ,Y %Y.{ I % ?ry:4: /n•.isl• is n %•Sl %' l.: {.YIr.Y{..v +l. {{. % /l:iJ.� %:. %i' It /F{ {.,v,: { {ei! {rii { {: ri'liY: %1 /. +fi: { -0Y1:4%.:G�: r• ..::{ l.. Y:! +, %J:h; {.i %rl { +�•r:.:+yl /. {{ • {(•Yl YYy {.�44iYr {{y�Y: %4Y /.J fl % /: Jl.•Y /Y:tf'l. .z.:r +•1.4:.'i. {t w.ecw.: .lifii.f { %i:4ir /.v. •• {•;:4)'.w' SSS�•{+,Y.Y +.Y:+�:t:•:'4Yt{r �vNri:r{;i Y:l iJ %)'� NUMBER OF PAGES TRANSMITTED, INCL. THIS COVER SHEET: SENT BY (INITIALS): �. Office: (206) 431 -3670 08/16/00 CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 ADDRESS: 101 cts OEt2- P. E. DATE TRANSMITTED: 1-2 '"p.•_44 ITEM 0 PREPARED BY: 1 as PLAN CHECK NUMBER PLAN CHECI! AIuDITIONAL INFORIvIA i ION REQUEST °118-121 PROJECT: Ez gp - cFic(c THE FOLLOWING CORRECTIONS AND /OR CLARIFICATIONS ARE REQUIRED TO COMPLETE THE PLAN REVIEW. COMMENT « ww02. ..1r wir ,t• • . t1J .•... u :roc. .► . ..t '._yr '. . .,` M. r. .1• . 1. '_ .. III ..Arir".. IPA AI, t.... s. .rte i.:;..6. . 6 •i.,. a I .. '.1.►I 1. • A. • _a I M .ea �aG M rW AWS ff DATE: /2 4i e Qt 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 T AtoE i e)F2- 14 2L E0ER. Tr4E �'bc c� U L i N - c is gam, MyaVE CatMcov..5 MAT ASE t.tor CaM01.30 - r °E.Act4 EgAPCIAtE TeA0e25E. ig 0E .t( / I&$4D Ate. 141 IutitcATeD 4,5 NE- N , v112.E RA1Ej WIT - 92orrcnnt F 12 riDEvinAs Pr '' 5 h. — - Doe lb 1 eXcopdtT' Lc U :• r ' OEiopED ML3 9 # . •', A .. r _ , $DIVIC 0 Il41Z SEUFAL ►r1 241 ! -. 1L. to . .' _4 A 0'_' ►.1'` ■t,. IZI .4 I.A. .. I] ' !, f% :' lI . P%%-,..." : M l- -! fi Ot Mgt- aF tS( LG, 4EGA L AppLi - CoP2 rce CompttANce. DATE RESPONSE RECEIVED: CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: ADDRESS: 101 . DATE TRANSMITTED: r2,4 ITEM 66tt PREPARED BY: r PLAN CHECK( - AbDITIONAL INFOR ° A;'1ION REQUEST MMENT lam ComilLYL S,'Ztb R ' Ecte. A'OOE., 26 �2 PLAN CHECK NUMBER Gll- 12,1 ,...] 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 THE FOLLOWING CORRECTIONS AND /OR CLARIFICATIONS ARE REQUIRED TO COMPLETE THE PLAN REVIEW. • • • i • 1I••2.. 1 Y. "1I i %! "LE I. J!/ • . MI6 .64 d. :• rJ♦ *L&.. r .. . ♦ LL: I i.I E • AN Nat) ONE. 14002. CE LIRCtS TWIT t tic t..WOE . s ED CSALAINiq 'STEM MOST laE NtsIDtCI E 46 A • :r• eta0 6 16 Nor ACCE utIL S C t tei xze ct)a L 'R2E0eDE 'RQAcnItiri 17elAIL6 FoV.'CklE Neu)ercLtLi6tt4T5 DATE: tlz0620 e � DATE RESPONSE RECEIVED: � � DATE TYPE OF REVISION: SHEET NUMBER(S) CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * * REVISION SUBMITTAL * * PROJECT NAME ADDRESS CONTACT PERSON ARCHITECT OR ENGINEER PERMIT NUMBER (If previously issued) PLAN CHECK NUMBER "Cloud" or highlight all areas of revisions and date revisions. PHONE SUBMrPi'ED TO: CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: 5_, L.E 44bl0E cyFFtcs TIC. ADDRESS: I ©, Pt 44C'7VE R. W , DATE: 10 t w8C ` OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HEIGHT /# OF STORIES FLOOR AREA OCCUPANT LOAD 11(- NI d°J'i( - VtAta- ?E.t ZZ% c i 74' T T. a.- MEZZ. LEO • w ' at A OIL. A. . . A:4 • 14'. EXITING REQUIREMENTS / • .1 I L . 'll a..' . .4.!1a 1 !A a. r •■ •. _.t■ • t. / .J .1.1 I .. , _ t !1atiA r . 1 - • :.•� ..r. . • W .. ►. •1 � . I 14... � _ 1•. l !. ' ... . n.. / I I irrimmormap 14 Lail. I 4 :.. !_t. ..k14 ...4 1 1 . . A ! .� • I.�.� . /. •t• 1. :i " h . CAM AJ.LL <» *IL J .. ' a .. 1 _ Jl ...Al! A._ .i f— •* DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION W.S.E.C. PART V, CHAPTER 23, U.B.C. E CHAPTER 51.10, W.A. C. elfL AJ �n�•(/a(;�, y' B NOTES AZ/ L:'. :4••.. ' .4 — .40 • 1:/ Maliggringni a Al A...* . - • i ' i. a O... ..u'.ir' /` .• - : fir... /- Ia' ./i (2 .421Jz4 • Valso 4, PREPARED BY: r PLAN REVIEW SE. L 9 PLAN CHECK NUMBER 12 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 RA“ ge I Z DATE: - RM. use: (% w L jX t4 retzmir G34) G7ec. %A). ?...C3 t 517:N244.G . 10e0 V300 I I 700 + / 300 4- 2. 02. Z03 ii 1200 + / ?00 4 Z0it it IZo04 1300 A. 20 Mtn. EMIT 100 Z. 2O& ELECT; 'MM, X41 SOO 4 Z07 �fofa e. 1 (p00•/50o 5 Z0I5 'j11 5 1be. Ax.. Lvt. 1$G(.. na RM 20 lit Z I / vV. .t 1 Y tits c 7. , • r4,40 17,.: 21iz. MM.-tit, Assts' ?1-3 $I-.8K 4 - ofe. SO /too 4 eizi e2icti.ts `NI./ tbo i zr5 HEccot. tvee. I62../to0 2 Zt49 M 15 DR. 14z/ t O70 I 70144% 92041_00 4 Z IS 8c)/too 1 2 iq Kett �PhhttcJ* 24A-i 1 3 2 o / /� was. .M� 140/ too ` Zee coty . Rm 64/ 100 I 1 ze4 Q� gyp' O ZZ 5 Qil� +EA►K. ' 4 9 z/ Zrz(e_. Mt tIS ZZS WoMe 5 0 0 Z29 i4N � • ■ 1 Zso 21 *4o wilt, 136 I Z3Z C • 4 1( e 6 233. 234 235 OFFICI i si I OZW # to() = 10 Z 3c 237 Z 31 allgoir fie. OE (co Z40 A ut7tr WIZ. 115/1c0 I iii CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PLAN REVIEd Prepared by: PLAN CHECK NUMBER Izt 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: F46,4(.5 gtx0E. OFFI e T. T. ADDRESS: Q 4 l "' t•iv E.ta 'Pk 'a DATE: IC) APIA 1 t tE Z CITY OF TUKWILAA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ADDRESS: 101 AN/700M l' F DATE: I p 4P 2 PLAN REVD. JV PROJECT: ' '4 . t cpI cE -r: S . PLAN CHECK NUMBER 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 Prepared by: 24( vs_...... ! O 2 .4 4 �..1 _ I . ... .,. 10 24 ' _ _ . r . . o - � 4 1 . : .ter r °7 - . , _al_ - dat -. I .. Z Z4 11 24$ 2'' _ g zq oo 4 IL 2f P Z61 ...,. � ... (Oo Z z 17.53 ■ 45" Imo 3 254 1 Z55 1 ' 100 2. ' it i f .4 e.. z60 ir,...JvImmuommum " 49 1 2 a 2&¶ , : 370 4 2<v 10 ': r ' .. ..-44 , I tY « _ V I I t /% � V I b z , ' f�. • '. I ♦' z e 0 I( f...• OCR 272 :• ,, 1 a 213 el'V.* 1 2 Z • • V .. d b' , " 2. -z- I/ / , CITY OF TUKWILAA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ADDRESS: 101 AN/700M l' F DATE: I p 4P 2 PLAN REVD. JV PROJECT: ' '4 . t cpI cE -r: S . PLAN CHECK NUMBER 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 Prepared by: 4,4id PLAN REVIL CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: 6 DATE: & dult - r4. _ c&ptA 4 2.ex ,IATiffeie- demi .t41 a *,lietA 4/11 (va&t Gri.4 Zia) 140 3 a, 4 A 40 F+5' afte&yr 6 -E-ta' bra N a,rt,rl t4.0 5 OmeCTIT 44h4a 64014,3 a*4 L 14 "e /alit 5 Mai i mitt :, At aid, _ " , 4ecadgifri"259 PLAN CHECK NUMBER 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 ADDRESS: I oi is , . , (.) 4 4-4. aryl), ,-9(11,411 fit .Stabu defteu. 4 . , -_ v .../1 . ✓ .. . _ _..1 &L.. _ '. #..� . . . _ . . ...� >100 114214L(t) Of4� n Ceniat ad auk, .tlr ..A .r, /4I .401 i� . 1..: r,t it I A. ....- AL 1 JNIA-- D0kt = ,3O Glau .k' , . 4 (sue 275 6101 z &) C .. Prepared by: ��� GLOBE -WEIS 9 OUT 4 TAKEN BY NUMBER, SUBDIVISION OR NAME ; DATE j TAKEN BY Perry fS -W (a.5 (a &3 and (0511 - 5`7 .)_ --Q.i2n rod-Q. E NUMBER. SUBDIVISION OR NAME DATE TAKEN BY NUMBER, SUBDIVISION OR NAME j DATE ' x' Wiifilif �1 3 1 fli tJTkccc[ I' �'_ I .30 ' x' Wiifilif it Tit E H o I illlii�i I�IIIIICI illiii y I R . IIII Ifill hill! `ol r W�-;IT Lee Iran. rrri . W ? EO . M Er4.76. ss,6ii 1.40 ,XIN l 1gtt1•i t ea lIREI p" M .They. e To Pre ; r °5 "c, pig. G'eu.IN. i NOTE)' DILNiJ �VZ, AIJi.) UTII„ i V (21.,-,44 FOL. exif)TIIJ.I SI?h COLID I TI01.16 AIJ) exTeu r op WOOL Ii k,E>.1/44 A(c ..) rLI I-I i:uILotG Aran i11o1,1 Au) PA;�IL:Iuc. DoT P, • C,okl r iG U0∎710lJ P40JECT NAME: EAGLE -- SOUTHCENTER OWNER: SABEY CORPORATION 210 ELLIOT AVE W. *400 SEATTLE, WA 98119 TENANT: EAGLE HARDWARE AND GARDEN 1911. W. VALLEY HWY. KENT, WA 9803e LEGAL DESCRIPTION: LOT 3 ANDOVER PARK INDUSTRIAL KING COUNTY, WASHINGTON ADDRESS: :0 ANDOVER PARK rAST TUKWILA, WA OCCUPANCY: 8 - 2A OFFICE /RETAIL (CONVERT EXISTING WAREHOUSE TO CONSTRUCTION TYPE: III -N SPRINKLERED RUI�LDING AREA COKING TO 'BE TO TOTAL REMOVED REMAIN . ADDITION TOTAL GROUND FLOOR if UPPER FLOOR ZONING DATA: ZONING: CM INDUSTRIAL PARK „405,836 SQ. FT., 9.08 ACRES BUILDING LOT COVERAGE: 151t5(4 MECHAN I CAL / ELECTRICAL ENGINEER: 132,382 i4, 113AIIIL ENGINEERS N. W. 6869 WOODLAWN AVE �1. E. SEATTLE, WA 98115 CONTACT: RICHARD JANKE 395,836 PARKINS REQUIRED: /P 154,(;si400 = 38f..(o Q PARR INS PROVIDED: 5 '87 CONSULTANTS SCQNZO ASSOCIATES 919 124TH AVE N.E., SUITE 101 BELLEVUE, WA 98005 CONTACT: JOHN HALLSTROM 455 -•3203 DAVID EVANS A ASSOC. 301 116TH AVE S.E., SUITE 170 BELLEVUE, WA 98004 CONTACT: NEIL HACKBARTH 455.3571 TEAM ENGINEERING ' 1107 S.W. ' GRAD) WAY SUITE 210 RENTON, WA '98055 CONTACT: LAMARR WAFTER 226 --7832 RICHARD WARD ASSOCIATES 1906 E. ALOHA STREET SEATTLE, WA 98112 CONTACT: RICHARD WARD 329 - , 2110 I understand That TTY Man Check apf "nvaia are s M rors e et to er a omissions and approval of Plans does not authorize time vibes of an ado cods or ordinance. Receipt of centrec copy of approved plans acknowledged. Mr's LEGAL DE5gRIP1'I�, Tract 3. of the Net of Andover IndUstrial Perk No. 1 , according to the plat record in volume 66 of . plata, page 36 in `King Cdninty, Washington. Except any portion thereof, conveyed to the city of Tukwila: by statutory warranty Deed recorded under Auditor's File No. 72021 RECEIVED r 0� TUkW1L LIAR 2 5.1sw PERMITCENTER ANDOVER PARK EAST .x 5TIu4 • AMA., --- ■ I1I' IiI '�, It h I • 1111111 t I, 4 km/ wiz sibewhU TrI I I ' TP I ,I'i' I 1 � eIIl ' 1 I . 1 No.let �j�- fl 6. Exit doors to awing in the diction of egress. Bi- parting doors to have emergency breakout feature for active and sidelight leaves. 7. Provide fire extinguishers (2A..20 0. ^ ^,� mounted within 75' of travel of all areas of building (including upper floor) . Locations to be' deetersined by Fir* Inspector. General Contractor shell verify all dimensiones end conditions on the building. Do not scale drawings. In the event of field errors or omissions, the Contractor shall notify the Architect and make no repairs without his approval. lo. General Contractor shall coordinate with hie sues all bases, curbs, access openings as required for mechanical and electrical equipment. 1. All work shall conform with applicable codes and regulations. 2. General Contractor shall verify ail dim anaiona and conditions of the building and site end shall be responsible for the joining of his work and others. 3. Utilities eysteas. sizing. connections. etc shall be in accordance with the City of Tukwila Ordinances. 4. Ail doors, including exits *hall be signed and operated in accordance with UBC Section 3303 '(c). 5. All exits to have illuminated exit signs. Power supplied by two separate circuits, one of which shall be separated from all other circuits and independently controlled. li. General Contractor shell Coordinate the work of all trades to avoid interference between diviaiona of the work. 12. Mount sign, with 7 1°' ainiaua letters, next to all exits stating "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS". 13. All stud walls and partitions, including furred spaces, shall be fire stopped per code. 14. All interior materials shall meet flame spread ratings per UBC Section 4201 . 15. Firs Sprinkler ayetegm shall comply with Specifications and be approved by Washington Survey and Rating Bureau and City of Tukwila Fire Marshal prior to installation. 16. Hose stations required per City of Tukwila Ordinance *1528. 17. All reek storage requires a permit and reek storage over 8' high must be designed for Seismic Zone 3. 18. Chamfer all right angle corners on exposed concrete column *, pilasters and walls. except where finish well ablt each other. • SEPARATE PERMIT AND APPROVAL REQUIRED `-�- _ . 6k6 -- E.0gt - i • w• 4 6I 1`VAldh• .. F.w/ 6v4/. -_ 4 x�VL4'tMi N . TO I1:)FJAIA1_K 14 at, I • 'drill dmiliiiiii hiiiiitilifil Go ct+ _: �--_ _� EiItmIfftt iiJfriE i iiiiii MAW . gilkfring be nd. exterior 1ptween a istinq upper i :'. Mier , Slurred al is typical. r• 2; - e t''a6 ; .. } 2 • 4MNP existing .door and install "% wall to Ositch existing. x et. aisr co>act► ` to wall, fu;l typical. I See Detail 14, 44 4 . perimeter FofI t an$ full *040, typical, Bee Details awl 3R, t Ali �i ' t - °tom l cal .o.► u t � �� moved, typic =t.; 7 ° pew interior column, typical,. $. Wi stair st• ucture to rowan. ,. Ave existing w ;Wow system and lower concrete Ni el. I l . .sta a t -= •e. - rt "I'o c spate. Bt doors to,. it wigs UUBC Standard ; 3.l. • i , ctfigew metal can above. il, Li L ; .off mew pro jacting metal o *Or,. at stand store 4401 0 Via. 4: 01 •::. . tod-d KY ~ e 22. Remove existing entry doors and install storefront windows to match existing.. 23. 1/4" glaaing,vith backside painted black in anodised aluminum frame surface mounted on face of concrete panel. See, Detail "D",.Sheet AA. 24. Sidewall of concrota' rasnp. 25 • D potx�c--(-s.e dv�t`,s Liar a w 3!`. 2 F New ategl braced f ram (asee structural). 27 : 20 minute door /frame'' assembly with smoke gaskets and self closers required. RepIac existing doors if necessar 4a 28. Remove existing walls and : a to provide full eoa xa.dor Rubber dock bumpers at 4' -0" o.c. See' Detail 3., Sheet A7. ioimits to roof ` structure above. Garbage compactor location. Area of new aezaa►nine above. New c.4.14 shear wall (see structural). New "Dryvit" finish shadow box. New stair structure. 11 0 L-aNiti Iso.4.44lag atom t s ''` w t ar 1.4 °I 7*. t E• OLIIL [ 1 11 1 1 1 ' < < rp 1 1 1 1 .1 1 '1'1'111'1'1111 111111I111111s i11li1ili1ilippl lip i il 1p �� ZI 3F 41. f ;it "? f No.18 '""! t4v�,G Liwrr � 'I'+wG ut►J rr a LNG I Z.' 1441 I (.r' • 57' 1 I 3 Z I cIJTI�;y 100r .%II,J TO r�MAlla `r /F AT VD) LaAT16i ) t, #: 0 !ittlaik) 4.,.15 t'. o7?'IfJ �r iu5. , NGID I sul..alA) R,E-r (k) O' 1 eer FLAQ \.o LEG WO 1 P Dr L5 or r bEa... ELEVt,T)OLJ fum r FL O UNIT • wl (E) f2 . G'' Gtr1r.. e V,� /4 o rC./�Vs�i.. • �'I ,r-- t + I + a 1 � sicx y Ll art tx+, es .51 -Etni Ga T 1g• . ' ,1 N Y ,-44t " 1"�1 '•-r T • a u?? ''�' 1 ,1449.4./ .. 1x4 HorLizo, I17�I... (swim) - 5r1 - AT VOL. 1 4.41 all" c tvDKT ME P re cuter a N1:0 te�,1J �1 tv en.rr� . �'►N.t� ivt e e - I r3UtkF.: its t 11111111011111101 •ln - ter G o4 UiT•4 � Vt,) UuIT 41-10 Sc.1..e.1J (DUI / �'' 1) 4 G�Dulya uT rFr '' ►Mte?� ° W 4,,,II r N LJTS /417t.., AN erll / P'}eid•ME. C pl�Lb17 wl ..ve ) t#4 - ' T�1 k4 7 L.r) rUt * 1e- t N / J CO r3 u , v :� I� •V/ 4 u 4, b Q L P nT t. $0',( \V/ (D "4 • - - 1( ) ( I �- 1 • I I Mi 1 I ,� x• .. _.. I -4 . _ --- J ,� \ GO 1p1L t i4E-, / • A101O1 --I (U) i vi (," p0.41.4' OUi \v; `tom 1 11' roo. r-11.; , II,E ,,, L -11 ;O Ii.isUL. a 'la' wDont 1 :1 . 47. (71 ( _ l l (� � r \ I� GG G rt,if� I;., 5 ) 9 c `I 9 4 1 1 » - I� 1111r101611111111642111Mmus EXIST. ON EXIT' COR 1 Ear, ammifeinoncomp . � - =e• Li I 'I'1'1 1 i I 6J �� SI �T tr: I 6 ;11111111111111 8 , S T2 i 111111111 t111111 1 1 111111111 III111111111111lII 111111111IlIIIIIIII IIII1111IIIlIIiI! IIIII111! w) IIII1I III 10 1. ew frame curtain wall. ee etails 1 -6. Sheet A3. 2. xisting stair structure emain. 3. . ew stair structure. Lta- af-- ®Xis.tirng -1-hou enclosure. 5. 1 -hour ceiling required. Replace existing suspended acoustical tile ceiling and grid, if necessary, to maintain rating. Urrr) rLOD KEYNQTES ae n_Aid 1 /1c. u . , L o" I'("'6? T : 2d IM'f 1:70mtv 1,. To? T 14/ .o ref Ate' 1-I To . p ;GIB vo L4 r ate. ,a..a i -1,4.-r^ -r SD dTT H Tor'. ?L 1 L ¶ -r c- - 14v 0 NAN! LEs 1~10 e4 ea 4 � M1 �� 8 lee a . • W /.I�, t*. I00 6. 20- minute smoke gas required. if necess 7. New 1 -ho Type "X" 5/8" met • O T itss,C,/sz, f oie- t4c door /frame assembly with ets and self closers Replace existing doors ry, to maintain rating. corridor wall (5/8" on_.ea.ch side_ studs @ 24" o.c. -4 ' 4; IPlaT e-1: e- col*" ,x I 'Tl NC I ac. 64/ V $ r7. "r r it Ta erdf3 ''a edot aNL)O 44.e.1 .A Too I (...", „ �x1s-nN� w.s 1 - 0 . Rama/az> I / I Il�Ob /L AI, gold 40 Ar- .1 .0 jr 1 0 :9 sos,. r--ie.e, �. a tilt Yi4P c,. ISR . ¶3 1•4 • rIN �p�s -fir ( vlt)e, 1/2 .� �1..L. spept-Ocar 1 NI R sxIS 6,f M (ve-te.I DoT dbI" 4, •L�'rie ..,o* Z., NA�L€. � 'ro M ff. To LAY t'm1 - .vr,U . bTaN e I t,1I 0.4 . Mom.. *1 "IEZZ. Ep�aE CITY OF TUKWILA APPROVED AA! �Z_; n +SIC1n` RECEIVED elTvo KW L MAN e - PERANTCE TE►P • �I E II�Ililllllllllllll I IIIIIlIII I I Ilillilii I IIlIIIIII I IIIIIIIii 6 1!11111 II 8 IIIIIIIII�IIIIIIIIIIIlIIIilil A 1 9 I •i! 0 9 ; ,J III!II t £ Z W3 I 11111111111111411111111111111111-111 I P1 L. IL► ;aIIN�t 1-46N3 S P'AG• EIS 6 LA, avalei 4 eae> G il :i'•I a►ML'rs S" P ''TEEL EXIT 27cR ;cAL.Er '' . 11-0‘ I (_ l P .'TtISL Pr2Otge. (TYPe-A1..) I ��e 'rLrA (' MPEItEd) fri- U M� re1 0 `- <- SEE PLAN4 pap. I WALL. 4 4IL E°� 0 PLUMi , OLLovi Sri - PAP:TIFIB! M I�TPL - 4 -12 44 F.N. M. L5. 1 1 rag- -J t7` ..J ( 4 'R JA ►• �} -- --- 6A g•(EL- p ie, 4RvUTEC> < l.Ila re*Tir-16r, Pe✓R- E.C't.1 EPA�I'fCP) STEEV C�c ?R sa.L• TINo P�� vt. 6A1ME R 6TRIPPIIJ4 CPAINIE . ) iztJl`)ER ll. ger, JAMe7 Me?F I! M T L .1-i 5N 4 2e1 IN MAVTie- I I 0 '�--- % + X 2 ° ExPp•Ntilc• A144WoR4 pp-e.- E LcCA'r101J �jTEEL r)0012. TNRESf�LD ��Llg 60P-E) 4 RgeGC)MMe•IV riot4 -- _ �CL�.•• LIP POOR .J E5 -.>6.A L E 114 a1 AtJot7. fro UM. TRAW7e 1 ,1 0 P I TtF STEFRT 'AL7 eLAToME1z.I4 GTA4I T T' P. 1„Ioe� 4 $>OL.It , (01110 0 126 WALL. P,t.r4,e Q ' •' . O S EE eTLFILONT I I I IC - � [7Tf.I L• P2R 4 ,1 M I LA t tJ0 1ex2¢ LOUVER 4 rEEL LOLL L it 14 el2C. e. "1)114 U l L. 6LA1. 1 rJG1 TIIJTLIo 0 ALUM Ir I�AMI� E I.Ah1*(9MEt C TYR ) 1/4 P'L•I ',NE17 ATE ALP. *� t-NfPeoLL'••C> 1 TINTeP TcSFR JAMS sGa.�E %- I' -o' V+ r psi a PLAT T NTt�v T � MPERLLp A* J '2rr. ALUM. PP't1 A ET e Ja2.,►L.4JM. / . �pmz.isdN40 t.b wp '* � ��•• a�Te� I /4 t;xrAr ec,r4 p►NGt• i ''S C' Me.- L, A11''N'$ 4Tsi REO p e:26A4..E i SIDE LITE ePEALA (1'i' ) eSTN datrN P•Nov. ALUM. DAR Pi�AI" 9l Poolz EtEi.,taw IC. 5iGO ORnAML NTfr.t. 644iNeir oirfrie Woor ',TuP c 1O O.6.- (T ) • r - 10 %2 LLCM e: WOOD OR I•-•t . M M. Poat� CPAINTEp 7 ',6 c: Pu6E) Difriet..6149Q A1z•IS N * • -W0 Ff -p1.16 TRIO 1 �TA IrIt:v' �aE�ALI:p �• SEE r�1•�EI7lJL.E Po sr i -, LEI • L ' RATE P1G� f�EQ• 1 I� v I IBS w/ WALL W I ©" W (tee P4.A r15) C:c3I, evGAL e. _ 1 -a° I tjw'ti .1 VA KISS ` 5id!Wl> EA. Ic7e (TYPE 'x' REq �ELt �It.I�tJG>rR� C� JAMe (TV.) \dW WIVr1. C = Ft r9Oea- PLAN) I NT. k-LH F / f c CrWtt) ■1--e- _. � door T'FS I m EA2 t3)ETAIL 4.1 tun . 1:?e TAN L. �AI~I�1Y o epReA04.0)44AY i L.I JANE G ALE r I '�r 4 ,04-.4.6-e 'ATP.14 . SI -iOLf2 15 I - PAKT' ts.1 6f pc Si LL. PT. - ! I - 0 6 2 P'IA;t. 0•,d AAA)4C DerwrogNi evvci5 & •t • F-4=1,.2 Lr+1 I7 I I I 1 1 1 1 1 I I I I I II II I I I I I I I ' II I I I I I I V I I I I I I I I I I I I I 4 11IIIII IIIII1 1 1111111111111 .; I J I . NO.18 ' JAr' •nr1t3 mot). ALUM. pe)cd Pi.AME 01- PAg11tJff aaoga5 •AFET1 Grl -AS46 E31 - PA RT l tJ4 I:n'a 5 ''Pert G{I.i 4"`4 2 C AF ;TY. 60LA55 PSI -PARTI4'r • 1;0011 No 1 2 :PAW 2 C - - 13 _0•:1 -0 -- 3 ; D • 0'X7 -0' -- _ 4D - :3 -0`X7 -0' -- -I • $: D :3'- 0 X7' -0' - -- YOOD :STAIN -__ t: t :PAIR. ALIBI ALUM :F•C1CR7 :3 x1 7 0 :►AIR• sum ALUM :FACTORY :3' .4"2 -" 0 : - C - :3'- 0 -0• • - : M.N. :PAINT t: C :3•_0 UMW M.Y. :PAINT 10 Y 'PAIR --" ALUM ALUM :rACTORT 3• t'XT' - 0' 11 A .PAIR ALW :FACTORY :3'- 0 -o 1: A :PAIR "-- ALW :►ACTORY :3' -0 ' X7 -0 13 G • :PAIR -•- A. :PAINT :10 -0' YITAL 14 C :3 - 0'X7' -0' ALUM -- " k.Y. :PAINT IS F :IC• -0 - xis -O' -_- STEEL :PAINT - - IC r :20 = 0'X1!'••9 --- :SIM :PAINT • 37 r :IS'- 0 X1 :'- 0': " - -•. :STEEL :PAINT - IS C :1'- 0 X7' -0' ALUM : M.Y. :PAINT IS F :1 :'- 0•X11 -O - ' --• : STEIL :PAINT 20 D :3 - 0 ___ :4000 :STAIN 21 - D :3'- 0'X7' -0 - -• :14000 ':STAIN • 23 D :3•- 0'X7' -0' - -- WOOD :STAIN ,4: C :3'•0'X7• -0' 21 [ :3'- 0'X7' -0' -- Z1 t 3'- O XT' -O •- 2T C 28 • 20 30 .31 32 33 34 3$ 34 37 31 30 40 41 42: M PAIR al-TOLD WOOD :STAIN 1' -0 ° X7'•0^ 43: C 44: C 42 C 441• C - - 47 42 32: C - " $3: C 34: N :PAIR 8I-FOLD - S6 : - N " :PAIR 11 -POLO $4: C :3 0'27'.0' ST: C St: C :3•-0'X7 St: C :PAIR 13'- 0_X7 -0 40: - C :3' -0 X ti 42 C3 t4 t3 tt 27 CO 69 70 1I 12 72 74 17 01 Of 300 101 C C TYPC:SIZC :NCN 3'- 0 X7'.0' C :3•.0 27 -0 C :3' - 0 - X7'.0• C ;3.- 0:X7 " C - - :PAIR " C - :3'-0 - X7 -0 - C - :3' -0 X7 -0' C U - 0 +Q• C 3'- 0 X'r':0• C - " N • rat,. 111 -FOLD 1'.0'X7' -0' -- - PAIR'tt - POLD I :1•-9-XT•-0- C 7S: C 7t: C :7'•0_7(7• -0" 77: C :3'- 0 -0 - • 11 : C :3' -0 X7•.0' TO: C :3 -0' X7••0' 00: C :3•- P•XT' -0' at: " C " :3 ' " - •_ et: r - :3'- 0 -0' " - " N2 : C :3'- C X7'.0' "" - 81: C :3'- O 17 -0 84: C 13 -a - X7 2 -0 -- 07: C :3•- 0 X7'-0' • 88 : " C :3•-0 X -- 00: C. :3 -0 -0 00: C :3•- 09 27•.0 - "• Ol: C :3•- 0 -0' 02 C :3* -0 --- -1--.-t-- ----- 53* C SPAIN :3'- 0 -0' "" O4: Y :PAIR 111-POLO '1•- 71'117• -0' el: 11 ft C PAIR I1 -FOLD 3 O XT• -6 `•- - M - - .PAIR NI-FOLD :2' -4 X7'.0' II :PA1P. 111 -POLO C :3'- 0`X7 -0' C :3 "- 0 X7••0' N :PAIk NI -FOLD •- I- zT'.o• 1C:: :PAM xl -FOLD . :2 -C 103: C :3'- 0 X7• -0' - 104: • C • I3'- 0`X1 - 103 • h !!PAIR N 1 -PTILD 101: x :PAIR NI -►`OLD 107: C - :3'- 0'X7• -Q• 301: C :3'••O•X ? -0' 141 - C - :3 •0`27' -0' - 110 C .3•_0"x7• -0 ALUM ALUM :MOOD - -- :WOOD :STAIN 3' -0' 27 -0' • C .2 * - 0 Xi' -0' - -- : N.N. :PAINT D :3'- 0 X7 -0• • - -- :N000 :STA19 C :3• -0 X7 -0 : N.M. :►AIM • a :3 •- 0•X7 -0' N.M. :STAIN - C -0 X7'.0• _ -_ N.M. :PAINT " 0 - PAIR I ALUM ALUM :PACTORT S :3'- 9'X7' -0• ALM : N.N. :PAINT C • ,3'- 0 X7• -0' ALCM : N.M. :PAINT " C - -1 -0 - -- Nag. :PAINT C :2•- O- XT' -0' : N.M. :PAINT - C :3'- 0•41'.0 - -- : N.M. :PAINT C .....112:::!:.. : -- : N.M. :PAINT " R PAIR it -POLO ...:::-.1 IM 00 :STAIN 1 0 x7 -0 . X PAIR 01 -POLO . - -- POOP :STAIN 1'- 9 X7 -0• 3 ' ■t' X7 ■0' I - 3'- 0'X7• -0 : - -- N.M. :PAINT `^' t • - _---- " • - - .. t._ .. 3 -.• - N.M - :PAINT M.Y. :PAINT I :4 SIM 1.- - -- -.. .r .-- .........:44......o......! - 3'- 0'X7' -0' -- ,. N.Y. :rater ; M.M.j►AINT 4 4 SIM : 3'- 0 -0' - -- : N.M. :PAINT N.M. :PAINT 4 4 SIM PAINT 4 24 SIM 5'•0'X1' -0' - -- : N.M. 3'- 0 X7' -0' : ALM .. 11.M. ___..__.- - - ALUM - PAIR : N.M. 3•- 0•X7•-0 3 X7•.0• - -- 3 -0 X7•.0' C :3'- 0 X7' -0 -- C ............. = -_. N.M. :PAIN? WOOD :STAIN :STAIN M.Y. :PAINT M.Y. :PAINT M.M. PAIKI N.M. w0D0 W000 N.M. WOOD MOOD N.M. PAINT STAIN STAIN PAINT PAINT N.Y. PAINT N.N. :PAINT N.M. :PAINT "N.M. :PAINT N.N. :PAINT N.M. :PAIN N.M. :PAINT N.M. : N.M. :PAINT N.Y. :PAINT " N.Y. :PAINT N.M. :PAINT N.x. PAIN? P.M. PAINT STAIN STAIN PAINT N.N. .PAINT M.Y. :PAINT • -- N.M. :PAINT N.M. :PAINT N.M. •►AtxT N.Y.. :PAINT M.N. :PAINT : - N.M. :F41111 K.Y. :PAINT R.Y. :PAINT ALUM : Y.M. :PAINT • - -- • M.M. :PAINT R.Y. :PAINT R.K. :PAINT - -- : 0.14. :PAINT """" : N.M. :PAIN --- N.M. :PAINT -"" -- : Y.M. :PAINT • -• -- :f000 :STAIN - -- :WOOD :STAIN • : N.M. :TAINT - DOOR PRAYI MAT : FIN MATE FIN ALUM :PAC+ORY ALUM ?ACTokn Y.M. :PAINT M.N. PAINT WOOD :STAIN N.M. WOOD :STAIN M.N. : N.Y. :PAINT • - -- :WOOS '.STAIN - -- !Km :17Al1' DOOR SCMXDULP• N.41. ALgM AI.U1 N.M. M.M. ALUM ALM ALUM ORMA. .PAINT METAL M.M. -- :PAINT STEEL STEEL - -- ° ° - S • ST EIL - -- • -- S N.N. :PAINT .A SIM • STEEL ___ S N.Y. : PAINT 4 4 4 SIM N.M. :PAINT 14 SIN:4 SIM N.Y. :PAINT M.M. :PAINT N.K. :PAINT N.M. :PAINT N.M. :PAINT N.M. :PAINT N.M. :PAINT M.N. PAINT 4 :4 SIM 4 :4 SIM N.M. :PAINT 4 :4 s1M• - -- M.Y. :PAINT ALIM M.M. :PAINT I :1 SIM. 2 N.M. :PAINT 1 :I SIM: 2 M.M. :PAINT 4 :4 $1K: -- M.N. :PAINT 4 :4 $IK: - -- N.M. :PAINT I :1 SIN X.N. :PAINT 4 :4 SIM ALIM : ?AC:ORY - -- - -- ALUM :rACro&T ALUM :FACTORY - -- - -- M.M. :PAINT 4 :4 SIN N.M. :PAINT : 4 :4 SIN PAINT M.N. PAINT N.M. .PAINT 4 "- PAINT N.Y. :PAINT 4 M.M. l PAINT 4 M.M. 'PAINT 4 M.M. :PAINT ALUM :rACTORT ALUM :raCTORT N.N. :PAI• N.M. :PAINT N.K. • PAINT A :4 SIM :4 SIM TAINT 4 1 4 SIM r 9 • 10 • ►ACTORY ► 10 PAINT 4 14 SIM PAINT I 1 SIN 1 ►. tstross PACTORT PAINT 4 :r "CTORY: 0 . 30 12 :PAINT H.Y. :MINT M.M. :PAINT M.M. :PAINT N.Y. -• :MINT N.M. :PAINT ALUM :FACTORY ALM :F•CTORY N.Y. :PAINT N.M. :PAINT N.M. ' :PAINT N.M. :TAINT N.M. :PAIN 11.11. :PAINT N.M. :PAINT 11.44. N.M. :PAINT N.M. ;MINT M.M. :PAINT N.Y. :PAINT M.M. :PAINT M.M. :PAINT M.N. M.N. :PAINT N.M. :PAINT N.M. • :PAINT N.M. :PAINT N.M. :PAINT •• U.N. •• :PAINT N.M. -• :PAINT • : N.M. :PAINT N.Y. :PAINT : N.M. :PAINT N.M. :PAINT - -- : N.M. :PAINT N.M. :TAINT "- " -- N.M. : N.M. :PAINT :PA:YT • 4 :4 SIM 4 :4 SIN 4 14 SIM 4 '1 SIM 4 :4 SIM 4 M.M. :PAINT 4 N. 4. :PAINT 4 M.M. :PAINT 4 N.Y. :PAINT 4 M.Y. :PAINT 4 K.N. :PAINT - - =" 4 - " ___ . N.M. :PAINT 4 N.Y. :PAINT 4 4 4 4 4 4 XIII 4 4 SIN .1 4 4 4 4 4 4 4 4 . 4 4 4 4 - -.5 : M.M. :PAINT a.m..:iam.: 4 WOOD :STAIN : 4WD :PACTORY - ° - --- :MOOD :STAIN ALUM 1PACTORY N.M. *Wu : PACTORY Aug :FACTORY N.M. :PAINT N.N. :PAINT ALOM : rACTO.7Y AL3NI :FACTORY • -• : N.M. :PAINT N.M. :PAINT N.M. 'PAINT N.N. 'PAINT :WOOD STAIN AWN :FACTOCT !WOOD - • .STAIN ALUM :FACTOR? • OSTAILS NLAO: .I AYR SILL: /OMI RIYARXS 1CRP. MI /C4CRCLIICY MTt l• • 4"- AWAY SID5Il 3 :I SIY 2 - S - F12W VERITY I3CIST4il 0 t t 4 4.. 4 1 10 4 " SIM C SIN 1-- I 3 SIN 4 14 SIN 4 4 SIM 4 SIN 4 SIM 4 SIM I SIN 4 114 4 SIN 4 SIM 4 SIN ° 4 SIM 4 SIM 4 SIM 4 SIM 4 SIM SIM 4 SIN 4 SIM 4 SIM 4 SIM 4 :IM 4 SIN 4 SM. 4 SIN 4 SIN 4 :4 SIM 4 :4 SIM 4 SIN I 5311 4 SIN 2 2 10 2 3 3 :AWAY SIDILICNTS Deus SiDtsIGsrS • 10 MIND'S( • 3 20 MINUTE NITN 0101M GASKETS/SW Csosza • 001.1812 ACTING 12' NO? 02E0 10 20 MINUTE :20 MINUTE 20 MINUTE WITN SNORE 20 MINUTE WITR smcgz CssfaTS/Sgsr CLOSER 7 :20 MINUT2 41711 SWIM :casein/star CLOSER MASI:ITS/SW CUM 20 MINUT1 11711 411042 GASKET3/6SL? CLOSER 20 MINVT1 ROM utast • • • CITY OF TUKWILA APPROVED BUILDING DIVISION . RECENED MAR 2 5 19S1 PERMITCCNTER • IIIIIIIII I(IIgaII1(III II II1III1{IIII1I111 III (I I�III I 1 I ��I�il�l Ilillli(I IIII�IIII IIIIIIIII 111 IIII IIIIIIIII Ilil'lll(Il'IIIi,I ' ' coe. 62.1 DXe. 1.0At t6 MUST EXT+1D Tb ROOF oaGC MOE OR A "L•t o 'wee cotze tc 2. OF .664E CowsTvtc 014 M W MLY 8e. liZ OIDED. Pwi 4o'- o' flearsi trv�, a 21 I .9 l! o l r A FAN t4&1..L. To e.01- :. . 'kibosh's l4!/ No, 12. W t R5. .e 8 -0 " % /;. , I Ta9 T c'i l' , TO I I Ni f-u IJ N OF- Gri‘oc•Dc T EZ 6 EA. . 1k I wT a•F I Nt e. Lc : rr i o N kV <s) TYPE 'c*' . t`f'I e T" L dga"rt 1; C 2A•'" a Co. W/ 5 /5 6,1 D ice/ TY1d `S I amz-e-Wcv e S' c a P0*-N 12.." ,,, e.. l s E L. p. 0- AW '4. Adir .................. 40 -r told a lomat r��t.. IQ Noll - r.,P*et`1atz► mi,,,J', We: Ti I . . Gis1.M �a.lt S'I`T_+ rag. '{ 'cS?0 411 cew1.. 0 Hositri.viv ►�vLl . G tr • Mich txe, ..'e' 3 V .4 4d-d TYP .L wAw., - ..cpJctor-. 'Peg. 1 YPE - T'I2s t"1 ,Pi E E 7o MootTc..I.1 cores fig•E -Pfacn 1T G KJ '2- - - P"GeQ 5�,o.L..a►NT Te•F i� Itr1 e-,"( NT Lcki%L� TEFNf I VAS - 4Pdl.rAkti .I le "*. 4, 246U41"04, GN 1 404' `vto`f Ib , ------ f-lxv. aesc 4Ir eg tr .w mss. ' 4) -0. 0.4. (I N Tbt ) � le fit di' flemiger Solke44 tar t — 4 wort To I AA-to Park in I tqapL. g 4ThH iePl "�NGI� ► Brut' 449%44141 -n fell 0.d., deem kt' LL Tyr c, retaLare.o t r,441. EXIT h ICN. N0.18 "*."""^^^ CSTJJ 'ON x 2 l LL TO UNicNA sit .)< is r I N eel I •the. WALL To I4 MOs/ ...E. P ^strrt7ti1 MP H eJc g+d!f V - al r He 1a1r...°■41e. Isie'LL. .►-45 � m N4 1- -14t.. EsecriA4godhqpialosl I ..t..�,... (60 u 4o d LIMIT Or CDP1l.IDDL f0-16 T FUGTIOLI I I•J3TALL 6MOIce, Derr C,To1l,,VI u F\4401 \v1 'MEAL L TIISJ rer., U f3G 6E4. 3305 t . 3) I E.X6terio1.4 5. .* moist t' teeD �, `mil �� t5101V NOTE: - - Exit I LLUt'At4AT(Otsa ::J�� EME 2 t4ai 'F ci)S2. 'Wp • ".,� rExter t U.uMCtutTt0N I . RrcQISt tz ECG Iftta t I Q tG, 13 () . *0c u)L\u. sNGLo 't I.IC .E:CErpT• 259 AtAt: trAte 6•- OZ t/1 L ST CTE% t TO - 12co � I oI_ 6211 totj 1/40 bETA 0'4 i& - S <EYNc:Posi �• arc - c. s4 davdt.%pm favy guit4ser. ( , c *) • a 1 1' MIi to 14/ vr°,,,; N Ir4PI1-1. ext ''TIi pewfm. cyper 4. EXI'TItJat It,r.=r>F' ra R/t-IN L .XI'TINcr . z. epep•- Co exI 4'1IN61 fr '. DAP. 1, XISTINc • x Gi 171P'••olJPL f■4 8• Net,;l M N,.NI6,0t. nuc.-r 1. I:.L -eG. '0 N Fe2FarMM e FF- C' P. EA-E.G. f f . NeW 12. Nei yL I 4- r• eclr 61414 R 19 ep4? 114 4 . 6I Pe � vw 4U4PI t PG l fif r 'JAW • »Dp ;cn IA, r 1 J r 1_ :! ' Iii" - IS;!!!i.3t..;(.; t)'!'nnM Nom - >aTe 2 456 G L I 1i e-9491) Nc> e>frs 7 I N4I)L,Q-'f I 1 We:0 VIM 1 )( e? P. ! fr rTfr -H PER 1fra I t-.. D 1 13N S PUP% Pirrieq L. 0 RECEIVED GITY OF T! IKWILA APR 2 2 19th PERMIT CENTER AA .J51-.I I -f4P ‘,1-1SPahIDE1,2 GPI L.INC e.)(la'TIt CZIut4C c) 247' 4 4o'- o zd -p zo' -© a SEcoD (1 eS IP vi. 11,1 ; io1_ 1" i Int ETC ENVILiar * J � ..� I , y�►,� '� /w�1�,.�' t 1. .;nw,• i m. ILL' 1 ��yraw�aarw ,�..,,._ : �..+r� , wwwwr�.�w�4w ar� ��►�►. �► �. 1111 iaAr ViS 01111111M11111111 t =iiiiiw • = Ewa �+�m i�rir ■r�,�I��t AI '��•1i1� ►: ►1 \ ►1��' L ■frI go 04%. 41V i��i Mil Mil ��I�II i � ;r!■ ! 012 .' _i.i1 1��1'�t #�T' ' �a�1 ' 1'/''I► ' 111P - iv varrr.tiffivair IT. Ill I 1111 0 ' til : I F _ • s. A►,,, �/, t11' '�"V lla I mom ♦ n - III�! •. r.__iiAm ME LifiT" - 4 I ii : ii = PEE p .. ....m.. .�. — AO 11111 CSI : li i I_ � I r �1 I man L u 1 s......... s l s im mino m z.wnwrerj,..m:art■rAis was e��j►7ttraet ...._ waismot valmo y� �� in Imospaume triune ceaM Imunimm 4Pik r6P.alit " � _,�1 ! ��!� � _ p4 , : e tik i o SW. r kd Ell re wools I i's 111111111111MMrA. 111111111inisui i . ._ '! ►�i: t4I 11111 ►' II r � I fir 1 .. --- II MB Mint tea_ WI Mi maliummE101 IIIMIIIIIMIINIIIIIII or '' U al I i iIIIIIIIIININIr =IA 1111111111111111111111111111111ME Wm I 1._i =' UM =---- -a- illIllIllIllgfillIllilNIIIIIM EMU,' I a�_ SMN 1�►`� 1•Ini r 6.-1 _ No rIII 1� — II ifi`i PAIIIIIIIIIIIIIIIII 11 ... ICI 11•11 '''Ir' ■III.�� I � _1i 1111111111=11111111 it ■ II■ _ �I Mil IMMO mg momiali I: �I " . } / ° T1 � �C7 NL/ -- R .XI4,'TI NCI I - 1.11'1. taus (rye �IIIIII 1 11111 lJ I I I IIIIII�L'IIIIIIIIIIII� � IIII�II 116 5 No.18 �' �°'•" T E T T I T T ( 6 11'1111111 G 3 S I5 E 7, IIIilllil IIIIIIIII IIIIIIIII IIIIIIIIi11111111111111111111 IIIIIIIII 111111111 li1111111 IIIIIIIII 111111111 rill 1111 III111IIiil I►IIId 1:;LA `I :lk PAl1IITION WALL 10 141014 6E PMATIoU \Vlti L HE.,647 P 'AIM Tart.. \V►... f4g441 Ion ca 10 41614 sOULJD 1u ULAND \I 50UI 6001,1b b -o EA SID d Ca! r I uucUS • 40 1. 0 " Next/ I- 1-12.6US(iJnesb C.OI..INGt ECISTIIJG 1-14k 41JSP'. C,esILIIJG ENA15T11' -16 kJOU ItAI D GE,ILING poop 11 0 P../ PLY MeM -f-wi tt:1Ntr fr PH ' 1Ve NAT -,�1R L4 - yaPM axLLv- PPIl�_ ?m J��r► INTO Exi ItJ t�EO1 et I • a0 riJJJ "tJ WEA114ala- A \iXitl'Or I = tr+ C? /;1G I N �m J!! 1=1 .I.. C I T Y OF T ti ►KVv J t_M APPROVED J-3tl i.D NG D IVISIO N ‘2.- 64JFka P‘S RECEIVED • CITY OF TI IKWII_A APR 2 2 WWII • • - I , c1 x = AL11Mh -4j 1- /ANN[AL.0 GtA1..VINtZW brr-ZA -• IM IN rA' rrt-i TO 'MGM AT RANT `A- OP TeNte. HIC tiT • — Grr.N ►'..A1 fr&' T U T t� VOL-2 PACK_ ht•LP He. Y ctrry tom' TiT't . ; c l..\1 1.4 MU? 1W4:-4 ...)u n- Z•,c2 4" !'If's t Ua mai l e . t.00/ ►1 r � Ar At_. , IriW1vm "� tY CL4- s . `Ned 5r A MIN I lµ t)U Ti11Gy- t L. ' ..._PL.• 7ttar MIX �r.Lt - A H T I N C I MIX ; SI~E M K .gtb!"5 AN7 A LOW K O r r '• tr- le:TTCATIO' M. • 3 4 1•11=1•••••••Ii l anclovw pwk Gnat • • sly ALL E ?/5T /A1 / L.4 /T MAT Sl.41.. ox> i Cx1No CD VE'rtK /rs,/ 77-145 AtacEogi ro I /Z, .m /4/ .• Xcgp r A c,7 ' A/ 61--1557 4 7A/D//-4 TO : /J !.J 2' C' 4-' /5ZZ 44>1UE c::./44 J • Y • 1 111111111101•1111111111111111110 11111,111.41.111111••••• INNI111011111111.111151 G- Q(Ji U :c� ✓;E1 .:r rf:• �J /Af OE7'A14. 4 th.1 5 o � � !''' 1 I'' 1''' 1' 1( 1''' x''' 11 1''' ''' 1' I I I `' 1''' 1 1' 1 .�' l l i i l l i l l ig I,: 11, 1 1 1; 1, 14 No.'O z^.: { X EI i it i (111'1111111 8 L J9 ii vii 9 p L' 7 w> iiiil��i� i���l�lii iii�liiiili�i�.�iii iiiili�ii iii�iii►� 11 � l i liiiil��iiii�l� vii iiii(i�ii iiiil�iii uiili�ii iiii(�i.iliiiiIii1i 111111•MilliMINIED 0.11•1101,11111111•1•1 _. TEL.) •R ro 4 15 [1 In 1 4 X/5T /Nc /4I4 rb /14 /N (p) eA•/67 - 1A1 f/N,E gerttdi/4 /6TiW OD re) f'r4G4 /i ,gat cA , 2a6:77' /x' f'14 (3) 'L4cA7' I,. T/, i / me 03) R6L iecA ' .7 avtsr /NJ V /AJe. /vAericce 02,) AcC PL T'WaL vc1-1w /' ( /o9 3 E P p /m. 5 ,vi / . . , . pyme 'EJ ' I0 h7 /34 GE.c /o/P YGJiJ +..l,4 .x// an// r.51#4Q (15) 1 =/d 44 61 8 0 PlA704N16 .4Gae✓icOUffALoNGeW A (00 64446 fiAlJ.WS GEK,•j6/,ER4 Aerrapoz/criA44 2 2 :: C17 ,'1NUz GUS/ T4AJfC4/Pe'. 7 L4O C. `do) s° r r , • ,, . coo A- cat,A5 ixia) cAIsTbf45 c (/8) /6 4 l'�li'`?!' (2& 16 - 34 c- /ems►. MBA,+ /8 4 it i ILLI c //rr Div s/ e (55) /-44te, e ca e /e.o ewecri s/ csAkho 67 ,044093, Y/ ) -Iir z# "o c `04 ;/44G77C of i) 2+ "4. C. /444. V /3cr,etcl/o,'( 0c'I (96 o) 14,,44. e 24" a. c. 6c' • (274,05.-K9 f G 4i/, 4 : yP.e,'Ii NCO7:d 7-, A/sis/, 'c,4 ' Y1a��GC.G car,. (3) e ,f6 -f . -.'/ A ate / v y O' & =-E::: ?7hl& /NTu. ,Si, Aki v _ 7/ , , . , . , 7e" i l STATE OF WASHINGTON: REGISTERED LANOSLAPE ARCHITECT. CERT iPICA tF NO.2 t) rno i81tS rfg • M nc= (0z) 4 ECEIVED rt: T' IlKWILA AUG 2 6 1991 PERMIT CENTER