Loading...
HomeMy WebLinkAboutPermit 6584 - Boardman - ReroofI� .,' Thank You! City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433 -1800 Gary L. VanDusen, Mayor TO: Kim Hart, Finance FROM: Shellie Bates, Permit Center DATE: June 4, 1991 SUBJECT: Refund Please refund $43.20 to Success Roofing Inc. The permit was canceled and the building official is authorizing a refund of 80 percent of'the building permit fee.. The original transaction was May 15, 1991, Receipt #8772 for $58.50. Please mail the check to the applicant at the following addresss: Success Roofing Inc. 23605 156th Avenue S.E. Kent, WA 98042 C&-'""c S -C319 F ! � j /t/EE 5 'T - © A1 Get, � s � crt" , o •�-- rbt) Y ucC. ti s$ 2. a o ! 14- C C., o S 1Sa 6 t VC._ e /// s"" 6 3f —(4/ao /ft) 0 RECEIVED CITY OFTUKWI A JON 0 ' 1991 PERMIT CENTER =.- - • .rry - Tom Boardman -•., 244 -2067 ADDRESS 11926 Interurban Avenue South, Tilkwila, WA i 98168 :ONTRACTOR Success Roofing, Inc. 'PHONE 631 -1400 ADDRESS 23605 156th Avenue S . E. , Kent, WA ZIP 98042 NA. ST. CONTRACTOR'S LICENSE # SUCCERI153L7 EXP. DATE 4 -01 -92 ARCHITECT PHONE liDDRESS ZIP ►SE / / CODE COMPLIANCE / > / .DoR SQUARE 4 OCC. • •. 8 SQUARE FE i OCC. LOAD SQUARE . a OCC. • : • SQUARE 14 OCC. 0 D SQUARE % OCC. LO: ! TOTAL ! A: . i TOTAL • • • D 'OTAL 'ITV OF TUKWILA lept. of Community Development - Building Division 300 Southcenter Boulevard, Tukwila WA 98188 ?06) 431 -3670 • WILDING 9 ERMIT NO. )ATE ISSUED: PROJECT INFORMATION SITE ADDR SS ZONING: 1PPR•V ' •R SSUANCE BY: SIGNATURE: fir! vi-a 11926 Interurban Av S 'ROJECT NAME/TENANT Boardman, Tom TYPE OF • New Building • Addition WORK: 0 Rack Storage © Reroof 0 )ESCRIBE WORK TO BE DONE: Tear off bitumen) over base sheet. Improve drain boxes. BUILDIN a PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) I PLAN CHECK NO.: SUITE # ASSESSOR ACCOUNT # 734060 -0022 Tenant Improvement (commercial) • Demolition (building) • Grading/Fill Remodel (residential) 0 Other: existing hot tar roof. Install torch down (modified drainage on NE side with build -up board and install new r YP OF OW.: Re roo f UBC EDITION (year 1988 SETBACKS: N _ =IRE PROTECTION: rn Sprinklers 0 Detectors Q N/A 1-e,- - ' ,OUza4 elokie DESCRIPTION AMOUN RCP :.# DATE:' BUILDING PERMIT FEE 4.00 877 5 15�» i PLAN CHECK BUILDING SURCHARGE OTHER :.. TOTAL 58'.50 VA 0 CONSTRI • $ 2,886.00 S- 91 -196 E- UTILITY PERMITS REQUIRED? 0 Yes x No (through 0 Public Works) BAR/LAND USE CONDITIONS? 0 Yes Dx No :ONDITIONS (other than those noted on or attached to permivplans) BUILDING DATE: y OFFICIAL ,) y I hereby certify that I have read and exami ed this permit and know the same to be true and correct. All provisions of lav and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the erformance of work. I am authorized t ign for and obtain this building permit. DATE: ,/ 7 -- /6 W- COMPANY: '(i0'1/ This permit shall become null and void If the work is not commenced within 180 . days f e issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection; CERTIFICATE OF DATE ISSUED: OCCUPANCY NO. PERMIT NO. CONTACTED r � � 1J� _ I p �- '—" DATE READY DATE NOTIFIED � Q �" - 1. ) init . Vt. PERMIT EXPIRES 2nd NOTIFICATION BY: ( Init.) AMOUNT OWING 3RD NOTIFICATION BY: BUILDING PERMIT APPLICATION TRACKING PLAN CHECK NUMBER C IHRCO INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) • SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. BUILDING - initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review ATE Ilx° REVIEW COMPLETED PROJECT NAME SITE ADDRESS SUITE NO. g 15 l (ROUTED) INIT: INIT: INIT: INIT: Icx.r - TO►'\ CONSULTANT: FIRE PROTECTION: FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: INIT: Y TYPE OF CONSTR Date Sent - CT O Sprinklers Date Appr�ov�e - ( ) Detectors INSPECTOR: MINIMUM SETBACKS: N- S- F- UTILITY PERMITS REQUIRE Yes No PUBLIC WORKS LETTER DATED: ( N/A BAR/LAND USE CONDITIONS? KM. BC EDITIO (year): W- TOTAL OCC LOAD o f 08/17/00 va7VV i UUlll(1Clliell DVUI[iVQIU I LJ Wlla VV/1 aO 100 ' (206) 431 -3670 owltt:+tu 0 � ; y,t.29. pCn,: < :;:::.; > DATE : :: ' : UILDING'PERMIT FEE 111.4.#101EINNaNa= PLAN CHECK q ( �b NUMBER l ~ (l • APPLICA . MUST BE.- • FILLED, OUT. .COMPLETEL , Y- PLAN CHECK'FEE BUILDING: SURCHARGE. L eat BE MEIMIN I O THER. TOTAL • " rejlikir SITE ADDRESS , SUITE # // 9 (6 Tti'fc'�'t,/eG' %4 4 V 3 &u // VALUE OF CONSTRUCTI9- $ .:1 &f6 `"- PROJECT NAME/TENANT 7A'f a if. 4/41V ASSESSOR ACCOUNT # 7.3Y069() 00, c2, TYPE OF O New Building • Addition • Tenant Improvement (commercial) • Demolition (building) ' WORK: 0 Rack Storage 'caReroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: - 7 - - ,i' VFF ..'n iS/i //a `, f' i o of. 2,u,S /N // lo.'CH- Daum.) ' (p;&i a `ir r. n ' 1hi R1) vvc' /C : 4Se. a,/ee ..7.1yA - pve- /"fA,'.)4j &C) Al--. Al--. ';/ ( -- ( ' 1 14h 3 ° ; 4° -LIP /v/1.e, ...y.us / // AA j TV. xdS. BUILDING USE (office, warehouse; etc.) eS %G‘?,(_) /A /` NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? 0 Yes If Yes, new building requirements may need tobe met. Please explain: SQUARE FOOTAGE - Building: , Tenant Space: Area of Construction: ,� /roof WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER -� PHONE tok ?4« -y' °V ADDRESS //1 _Z/VIP�: u n'L3 A R i ve So • "T,etu /A ZiP 9 CONTRACTOR v4C'C r." S b ra n { % � )i i ii g. • PHONE 6` / - /5 U ADDRESS ,..,1,-:560.'., - /3-6/.1 -f � � ZIP < ' WA. ST. CONTRACTOR'S LICENSE # \S eil_T /634. EXP. DATE / _ 9 PHONE ARCHITECT X1 S,i /� /ro a I ADDRESS ZIP -- --- CITY OF TUKWILA Department of Community Development - Building Division • BUILDING OWNER OR AUTHORIZED AGENT DATE APPLICATION ACCEPTED BUILDINh PERMIT APPLICATION HEREBY CERTIFY: THAT: f HAVE REAR AND: EXAMINED THIS APPLICATION A te k.: TRUE AND` CORRECT AND;;l AM AUThO iIZED TQ'• RPLY<FOp HIS PERMIT SIGNATURE .! . DATE �, �✓ PHONE PRINT NAME A, D x) k AS l( PrF'SS' i/< � ADDRESS CONTACT PERSON1 rf) PHONE 6 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT if the applicant is other than the owner, registered archftectengineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 160 days upon written request by the applicant as defined In Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION EXPIRES CITY/ZIP COMMERCIAL NEW COMMERCIAL BUILDIriosiaOOrpoNS Completed building permit application (one for each structure Assessor Account Number Two sets (2) of. the following Specifications. �n Structural calculations stamped by.k.WashIngtOrt State licensed.: engineer C Soi report stamped, by a Washington State Ucensed engineer Topographical survey Energy calculations stamped by a Washington State itoensed engineer or architect Legal description (l Working drawings, stamped by a Washington State licensed ' `: architect, Which:indude: Site :plan • Architectural drawings • Structural drawings •,Mechanical drawings • Elevations : Civil ; drawings • Landscape plan Completed utility permit application (one tar entire pro ject} Six (6) sets of civil drawings NOTE: ; See utility permit application and checklist for specific udhty:.: submittal requirements RACK STORAGE Ej Completed building permit application Assessor Account Number Two (2) sets of plans, which include n Building floor plan showing: • Entire space where racks will be !pea • Exit doors • Dimensions of all aisles Tenant space floor plan showing rack storage layout, aisles and exits. NOTE Inciude dimensions of racks (height, width avid / ength), aisles and exit ways on plan Structural calculations stamped by a Washington Stateiloensed engineer (rack storage 8' and over) RESIDENTIAL : NEW .SINGLE•FAMILY DWELLINGS/ADDITIONS ❑ Completed building permit application (one for each structure) al description Assessor Account Number E Two sets (2) of working drawings, which Intl • S ite plan - (On plan shawcosesthydrantbcation. : • Foundation plan include access to showing • Floor plan width and length of access) ::: • Roof plan • Building elevations (all views) • Building cross- section • Structural framing plans Washington State Energy Code data E Completed utility permit application SU13MITTAL CHECKLIST C Six (6) sets of site plans showing utilities:. NOTE: Building site plan and utility site plan may be combined. Soe utility permit application and checklist for specific submittal. requirements. Additional topographical and soils information may be required if unique site conditions. COIIRMERCfAL TENAfi ' f ..IMPROVEMEN 1S Completsd building permit appltc n (otw tar aach ant s seuar accoun Num Two:(2) sets of cdnetrtio onptans, which fncld Site pin on of tenant spans • Exalting and'proposed parking Landscape plan (lf applicable, e , change.of u se t;)veraif buildin plan ..Tenant location • Use:of adjacent (c omm on W tenant •.OveraU t spa di mensions of bu or square footage Floor planof pro t spa •.Tenan plan with use o each roofs labelled • Tenan ors, egress pattams. • New wall existing welt an waits to b e demolis Construction details • Cross sections showing Wall constntction and method of: attachment for Hoar and ceiling :;: Ej Structural calculations stamped by .'Washington • State licensed engineer may be requrrod if structural work is: to bo :done, (2 sets) NOTE : N any udkry wpr* is to be: dons, submit separate utipty permit application erd plans RESIDENTIAL REMODELS :.:.; REROOF. • Completed building permit appbtatlon (one. for each structure) Assessor: Account. Number n Narrative describing existing roof, material being removed, and material being installed NOTE: A certiflcatlan letter is required prior to final inspection and sign off of the permit ANTENNAISATELUTE DISHES H Completed buifdingpermit appllcatlen E Assessor Account Number Two (2) sets, of plans, which include Site Plan (showing . building and location of antennalsatellite dish), • Detaiis orrtenna/satellito dish and method;01 attaofunent structural aicufations stamped by,e Washington State ponied engineer may be inquired ;; n Completed building permit :application one for each structure) E Assessor Account Number C Two (2) sets of working drawings, which include: : site plan::: Foundation • : Fioor plan Roof plait • Blinding elevations (all views • Building cross • Structural framing plans' NOTE: If any utility work is to be done provide; utility permit application and plans must be submitted REROOFS building permit application (one for each structure) E Assessor Account Number Q Narrative describing existing roof, material being removed, .a material being installed,': :: NOTE: A certification tetter I; mu ired prior to final inspection acid sign- off of the permit ' "X' REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NG i ICE iSSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431-3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 . 11 12 13 14 FIRE FINAL Insp: 575-4407 15 PLANNING FINAL 431-3670 16 PUBLIC WORKS FINAL 431 -3670 x 17 BUILDING FINAL 431 -3670 'INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 11926 Interurban Av S rerudsi INSPECTON RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO DATE ISSUED: PROJECT: Boardman, Tom CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS p5<6 511 91 All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - Ater rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 001144