HomeMy WebLinkAboutPermit 6611 - Johnstone Supply - Storage RacksPermit 6611 - Johnstone Supply
18205 andover park west rack storage
�o
FIQSTONE
Su PPLy
BP#CoCo/ I
�� •�
-' . • • � is year)
Racks 1988
SETBACKS :
N- S- E-
W-
FIRE PROTECTION: OSprinklers 0 Detectors J NA
UTILITY PERMITS REQUIRED? 0 Yes ®No
t: bi a , .
`
ZONING:
BAR/LAND USE CONDITIONS?
O Yes
xQ No
CONDITIONS (other than those noted on or attached to permit/plans)
-4111111116
CITY OF TUKWILA
Dept. of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO.
DATE ISSUED:
SITE ADDRESS
PROJECT NAME/TENANT Johnstone Supply
ADDRESS
CONTRACTOR
ADDRESS
WA. ST. CONTRACTOR'S LICENSE # SEGALMA372N0
ARCHITECT
ADDRESS
TOT
APPROVED FOR
ISSUANCE BY:
SIGNATURE:
CERTIFICATE OF
OCCUPANCY NO.
1 i A
f)(oi 1
18205 Andover Pk W
Add racks in warehouse.
Segale Business Park
PRINT NAME: �c.) L H : tv. ;; ; J
18010 Southcenter Parkway, Tukwila, WA
Segale Business Park
18010 Southcenter Parkway, Tukwila, WA
BUILDING PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
DESCRIPTION;;:
BUILDING PERMIT FEE .
PLAN:' CHECK: FEE: >> <;
BUILDING SURCHARGE: ><:>
FEES
•. AMOUNT
RCPT # :
IMMO
MEI
BEEMM
PROJECT
INFORM ATION
SUITE #
VALU OF CONSTRUCTION - $
5,000.00
ASSESSOR ACCOUNT# 352304 - 9119
TYPE OF New Building Addition Tenant Improvement (commercial) 0 Demolition (building) 0 Grading/Fill
WORK: Ox Rack Storage 0 Reroof Q Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
FLOOR:
SQUARE
SQUARE
OCC.
L.:D
SQUARE
OCC.
OA !
OCC.
O
SQUARE
OCC.
SQUARE
F
OCC.
LOAD
TOTAL
SQUARE FEET
BUILDING
OFFICIAL
DATE:
PHONE 575 -3200
ZIP 98188
EXP. DATE
PHONE
. -L
I 9 8188
575 -3200
ZIP
10 -01 -91
TOTAL
OCC. LOAD
I hereby certify that I have read and e�Yamined this permit and know the same to be true and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
DATE: 6 -5-7 (
COMPANY:3 I^N,; {r, S
This permit shall become null and void if the work is not commenced within 180 days fro the :date.
issuance, or if the work is suspendedor abandoned for a period of 180'daysfrom the last inspectlo
DATE ISSUED:
PERMIT NO.
CONTACTED
ph r1
DATE READY
DATE NOTIFIED
1 q 1
BYt)
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
0(0,5
3RD NOTIFICATION
BY:
( BUILDING( .'ERMIT
APPLICATION TRACKING
PROJECT NAME
. iii r1S »_ J (� / a G l _ 6
SITE ADDRES SUITE NO.
acs 5 An)oe
PLAN CHECK
UMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
F1OaA:S SQUARE
FEET
LOAD
SQUARE OCC.
FEET LOAD
SQUARE
FEET
SQUARE
FEET
OCC.
LOAD
OCC.
LOAD
SQUARE
FEET
TOTAL
MC, LOAD
TOTAL
SQUARE FEET
OCC.
LOAD
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
I~
BUILDING -
initial review
FIRE
O PLANNING
O PUBLIC (0
WORKS i..*
O OTHER
BUILDING -
final review
5 a
6 /3 /`l/
REVIEW COMPLETED
DAIt
A6?IR
INIT:
INIT:
INIT:
INIT:
CONSULTANT: Date Sent -
(ROUTEDj_
,e.. FIRE PROTECTION: Sprinklers
FIRE DEPT. LETTER DATED:
INIT' p3 'le- 4-•f.2 rr� ,-,
ZONING:
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
TYPE OF CONSTIRUCTION:
UIREME
PUBLIC WORKS LETTER DATED:
S_
Yes
MEN
Date Approved -
Cl Detectors — 7 N/A
INSPECTOR:
BAR/LAND USE CONDITIONS? Man
UBC EDITION (year):
I q b8
I HEREBY;CERTiFY THAT I HAVE READA.ND!EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE
TRUE AND CORRECT; AND.. I: AM' AUTHORIZED TO'APP. LY FOR THIS •PERMIT.
BUILDING OWNER
OR
AUTHORIZED
AGENT
SI N TUBE
,/
�
DAB
/U — ,/
a ��
PRINT NAME
PHONE
575
CITY /ZIP Tukwila, WA
ADDRESS 18010 Southcenter Parkway
CONTACT PERSON .,. EC
PHONE `51E3_0 ..�
DESCRIPTION
AMOUNT
31.`&
RCPT #
DATE
BUILDING PERMIT FEE.
PLAN CHECK FEE
BUILDING: SURCHARGE
NATURE OF BUSINESS: Wholesal
WILL THERE BE A CHANGE IN USE? id No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 96768 Tenant Space: 20736 Area of Construction: 10816
ENERGY SURCHARGE
PROPERTY OWNER regale Business Park
PHONE 575 -3200
OTHER:
ZIP98188
CONTRACTOR r t 1,
PHONE
TOTAL -
ja
EXP. DATE
SITE ADDRESS SUITE #
18205 Andover Parkwest
VALUE OF CONSTRUCTION - $
I - 0 OO.. Oc
PROJECT NAME/TENANT
Johnstone Supply Racks
ASSESSOR ACCOUNT #
352304 - 9119
TYPE OF Li New Building U Addition U Tenant Improvement (commercial) Li Demolition (building)
WORK: ® Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE:
Add racks in warehouse.
BUILDING USE (office, warehouse, etc.)
Warehouse
NATURE OF BUSINESS: Wholesal
WILL THERE BE A CHANGE IN USE? id No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 96768 Tenant Space: 20736 Area of Construction: 10816
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ® No ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER regale Business Park
PHONE 575 -3200
ADDRESS 18010 Southcenter Parkway
ZIP98188
CONTRACTOR r t 1,
PHONE
ADDRESS LJ , ) 0}Q,{/
EXP. DATE
ZIP
WA. ST. CONTRACTOR'S LICENSE
ARCHITECT
PHONE
ADDRESS
ZIP
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
APPLICATION MUST: BE
FILLED our ..COMPLETELY
PLAN CHECK
NUMBER
DATE APPLICATION ACCEPTED
BUILDIN "a PERMIT
APPIJCATION
FEES (for staff use only)
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once,
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION EXPIRES
0
COMMERCIAL —
................................................ ...............................
NEW COMMERCIAL BUILDINCGS/ADDIT
Ej Completed budding permit application
AesassorAccount Num
NOTE See utW peimlt application and the k
li
submttal teg itentents
RACK STORAGE
Complet build permit applipat
n Asse Adnt Number
S6,13MITTAL CHECLJST
�-' 6rrgltwef
Soils report stamped by a •Washington State licensed engine.
Topographical survey
Energy calculations stamped by a Washington State licen
engineer or architect
l agsl description
Working drawings; stamped by a Washington State licensed
arch . which include;
7Wa :(2)'sete of p�ans; :which :melt
rl Building boor plan showing
Entire' `spaoo :where mails will
4 Exit doors
:Dimensions cf all dates..::.:
Tenant space floor plan, showing roc
exits
NOTE lnckrab dlnt�nslons Of racks {hell
!:and exit ways on plan •
Stntoturat calculations stamped by a Washington State licensed
engineer (rack storage 8` and over)
RESIDENTIAL
NEW SINGLE•FAMILY D■Et.y
C Completed building permit application (one far each structure)
Two sets. (2) of drawings, which include •
Site. ...Foundation,
Floor plan:.
Floor plan
Roof plan
Building•elevations (all. views)
• •.:Building cross- section .:
• Sttuctural.framing plans:::
Washington State Energy Code data
width arts lengthI: aisle
Completed utility permit application
Six (6) sets of site plans showing utilities
NOTE: Building site plan and utility site plan maybe combined See
utility permit application and checklist for specific submittal requirements:
ito►tai topographical and soils
Adc� Information may be required tf unique •
site conditions : ;..
COIIMMERCiAL TENANT IMPROVEMENTS
• Completed buildng permit application (ono far •each structure
tenant)
Assessor Account Number
Two (2) sets of aortstruotion plans, which includes
f Sit plan .
• Looatian af:tenantspaoe
• Existing and proposed parking
C Overall building plan
• Tenant locatlorl
• Use of ad (co mmon wall) tenant
• OveraA dimensions of building or sq
uare: tootape
E Floor plan c proposed tenant space
• remit epee'' plan with use of :each room labelled
• Exit doors. egress patterns
+ NeW:walls, existing wall, and walls to 6e demolished
Consttuction:detaila
• Cross sections: showing wall construction and method of
attachment for floor and ceiUng >; ; ;
Str calculations sta mped 6.Y . a Washington State fl�nsed
•
engineer may be required if structural work is to be done (2 sats�
NOTE`f If any utili worm[ Is to be dorfe, submit separate u dil
;;application and plans ty permit
Assessor Account Nu mber
Narrativu describing existing roof, materiel being removed, an
material bettig,installed
NOTE' A certif cation letter le required prior to final inspection and si
off of the peril.
•
ANTENNA/SATEWTE DISHE
r l Completed building permitapplIcadon
Assessor Accoun Number
Two (a) sets of plans, which in
n Site Plan (showing building and location of ankennalsatellite dish
Detalfs antenna/satellite dish and method of attachment
1....._ Structural caiculations stamped b a Washington State licensed
engineer may be requlr°''
material. being :removed, an
RESIDENTIAL: REMODEL
Completed building permit application:
Assessor :Account Number
E.Tw working drawings, which include
• Site plan
Foundation plan;
■ Floor plan
• Roof plan
• Building :elevatons;(ali :views
• Building cress- secpan ;
• Structural framing •plans
•
NOTE; if any .utllity work is to be : clone . provide utility permit application
and plans must be submitted
REROOFS
rI Completed building permit application (one for each structure) ..
Assessor :Account Number
Narrative describing existing: roof,
material being Installed
NOTE: A certification letter is required prior to final Inspection and sign-
off of the permit:; .
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
MEMORANDUM
PHONE 11 (2061433.1800
TO: fta
FROM:
DATE: aG , ( q c u
SUBJECT: R F- C1 C
Li r a f Ft I X # - r
u x 5 = a (Do
,ICI
1 % (too = 3( . %(-I
-r t-V . 50
31o•3
Gary L. VanDusen, Mayor
PROJECT: ..,i'' LA
A,
Ai '■
PERMIT NO. (0 (0 / I
SITE ADDRESS: I >.&( WV •,w,
pw ti f
DATE CALLED: 7 —g /
TYPE OF INSPECTION: '
DATE WANTED:
a . .
g
7- q 1
SPECIAL INSTRUCTIONS:
REQUESTER:
)
1&_,
....010111■
PHONE NO.: '7' - 1
INSPECTION RESULTS/COMMENT: .
O c--
-
O
INSPECTOR: N k .--------
DATE:
7 -?-- c l •
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 4.1 -3670
INSPECTION RECORD v J
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91 -217: Johnstone Supply
18205 Andover Pk W
PHONE # (206) 4331800
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER ()lQ(1
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
3. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition).
4. Validity-of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Gary L. VanDusen, Mayor
"X"
REQUIRED INSPECTIONS
PHONE
AP DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
18205 Andover Pk W
BUILDW PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
BUILDING (OLD(
PERMIT N0.
SUITE NO.:
DATE ISSUED:
PROJECT:
Johnstone Supply
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation Is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in Inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - Atter framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 09,14/90
PLAN REVIEW COMMENTS
Plan Check No.: q t " Project: 3
REQUIRED INSPECTIONS
2.
1. No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
3. Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition),4 tiforrn
- Meehanica
Editien) end- Weehingten- State-Rect tkme -f
-- Eelitiert}: --
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired Inspection date. On work requiring Health
Department approval, It is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof, Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure Is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab /Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
11.
12.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
X 17. Building Final
PLAN REVIEW COMMENTS
Plan Check No.: q t " Project: 3
REQUIRED INSPECTIONS
2.
1. No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
3. Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition),4 tiforrn
- Meehanica
Editien) end- Weehingten- State-Rect tkme -f
-- Eelitiert}: --
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired Inspection date. On work requiring Health
Department approval, It is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof, Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure Is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
LOCATION ON PROPERTY .
BUILDING HEIGHT /# OF STORIES
FLOOR AREA
OCCUPANT LOAD
CITY OF TUKWILA
Department of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT:PROJECT: . G � Cpp _
ADDRESS: te■ZO 5 4 ' PARK ti)1
t
DATE:
V .
OCCUPANCY GROUP
TYPE OF CONSTRUCTION r,S/A
EXITING REQUIREMENTS
I usTau- aTIot4 < 1 '
DETAILED REQUIREMENTS
OCCUPANCY
TYPE OF CONSTRUCTION
!*
PART V, CHAPTER 23, U.B.C. E
W.S. E. C.
CHAPTER 51-10, W.A.C.
NOTES
PLAN REVIEW
LA
PLAN CHECK
NUMBER
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
lac roiessre
DATE:
PREPARED BY: &xis
itu?..r<sa'te.s
•
FOUND
LEAD D TACK
FOUND , CONC.MuN.
IN WALK
SET, BRASS CAP
IN ASPHALT
Water Valve
0
C.)
0
CO
FOUND , CONC. MON.
Elec. Out/et Box `
N 3O °55'15"W
52.59 -
--
Sprinkler I/eod
°
°
• PLANTER
G R A SS
.Sprinkler Heads
SAN. M.H.
'TACK IN RR. TIE
i
s�
i
Catch Basin
i Irovd 'Tracks f i
( - Real ' Vrht
j
/
7
_�►
Roof Drain
Roof Drain
( Water Valve
Roof Drain,
/.
Gas Meter
- -:. -
CONC. GUTTER
d = 05° 22' 20" R.- 2470.00 L 23/. 59
N 07 °44'56" E 213.72
SCAM; I °s 2o
GATE JULY •3, 1975
DRAWN IT W W S.
Automatic , Sprinkler .Vo/ves
Transformer
i
1s =aci'attl�k"Y':ws. '' r ✓ .: r r _
�t±r rase: �" sG3^ ��f+". i€ c� adJ'k%"�9 '
1
4a J/ 0 40 ' 00 "
Rai 477.46
- TACK IN R.R. TIE L a 577.22
---
G RAVEL
SINGLE STORY OFFICE- WAR HOUSE
(CONCRETE)
336. 0
Roof Droin
// /
prink /er Heads mama-
-
AN
i
CONC. MON., FND.
•
Gas Meter
mama- •� -•-- mama - _
Light
4
Electric Meter
- PARK WEST
----- . -..: ----` °• S TAC K IN R R. TIE
- =.�= _ mama,_, 9 y �`
Roof Dra/n
Roof Drains
+9 STALLS NOTE
't1 49 SHOWN
ST. 6" CONC.
'' .,,J. `�� .�• . ,4�,y�� p s i{ ; �,l i t,.�� *,�
PER i I .. i�, `.
m ate'
pprioxiair LOCATION Of OAS AWN
GRASS /
' ._ : .CONC. GUTTER .
s 07° 44'56" W- /91.25- Fire- Hydrant
r..�, ..o43 - = 13044.3 mama=
1111111111111111111111111111111111111111111411 11rj11111111111 11111111111111I111I1111111 1111111111 1111111111111111111111IJli1 . 11 . 111111I1 . 111'11 . 11 1111 11 I' I111 1I1I 11 111I1I1 111i1
0 16 THS INCH 1 2 3 4 5 6 7 8 9 10 11 t ''' IN GERM 12
NOTE: If the microfilmed document is less clear than this
notice, it is due to the quality of the priginal document.
•
0l 6Z Se Le 9E GZ 1 7Z CZ ZZ LZ O 6t et LL 91 GL t'L CL ZL LL CL 6 B L 9 G 7 C Z L r. 0
IIIIICIIIIIII1111! 11l 1111111111111i1IIIIIIl1Ihillllill i11111111II1 AIi1 lili111I11IIlIdIlii11111111111111lllilliilill1111111111 111 111111 11111111111I111!1IIi11111111111 1111ii
30./0
Roof Drain
1 SET, CONC. MON.
�➢ C.B.
Roo
CONCRETE,, ∎ ••
t_OAOIyG,' ' DOCK .1
kW
Roof Drain l:
• �. • " C.s.
electric Meter 10.10
Gas Meter Raofcra /n
1/ of
SAN. .H. n
TACK IN RR. TIE
1
•
•
•
•
.,
SET
a
ATTACHMENT #1
SBP /MAS BUILDING 731
20 Encroachmoht
(wIDErr PWNT)
0.7 Encroachment
( WIDEST PO /NT)
• Utd r Ac se men t"
•
GRASS ; l LEAD E{ TACK IN WALK
`,.
765.42
507° 44'56"W
CONC. MON , FND
eriwet er
SURVEYORS
Le achmao
ENGINEERS
LEGAL DESCRIPTION:
That portion of the Southwest Quarter of the Northeast Quarter of
Section 35, Township 23 North, Range 4 East, W.M., in King County,
Washington, described as follows:
BEGINNING at a monument at the Northeast corner df the said South-
west Quarter of the Northeast Quarter; thence South 07 °44'56" West
765.42 feet; thence North 82 °15'04" West 30.00 feet to Point "A"
and the TRUE POINT OF BEGINNING; thence South 07 °44'56" West 191.25
feet to a Point of Curve; thence along a curve to the right having
a radius of 2,470.00 feet thru a central angle of 05 °22'20" an arc
distance of'231.59 feet; thence North 69 °15'04" West 55.31 feet;
thence North 30 °55'15" West 52.59 feet; thence North 82 °15'04"
West 187.64Ifeet; thence North 07 °44'56" East 213.72 feet to a
Point of Curve; thence along a curve to the right having a radius
of 477.465 feet thru a central angle of 11 °40'00" an arc distance
of 97.22 feet; thence North 19 °24'56" East 59.97 feet; thence
South 82 °15'04" East 263.25 feet to the TRUE POINT OF BEGINNING.
SUBJECT TO AND INCLUDING an easement for sidewalk and utilities
purposes over the Easterly 15.00 feet thereof.
SUBJECT TO AND INCLUDING an easement for railroad purposes, in-
cluding but not limited to, main track, lead track and .spur tracks,
over that portion thereof lying Westerly of the Westerly building
line produced.
RESERVING to lessor the right of ingress and egress to maintain,
install, improve and extend utilities. _
TOGETHER WITH AND SUBJECT TO an easement for building setback
purposes over a 60 foot wide strip of land surrounding and ad-
jacent to the main building line, which is,described as follows:
BEGINNING at the said Point "A "; thence North 82 °15'04" West 1.00.00
feet; thence South 07°44'56" West 30.00 feet to the TRUE POINT OF
BEGINNING; thence continuing South 07 °44'56" West 336.00 feet;
thence North 82 °15'04" West 144.00•feet; thence North 07 °44'56"
East'336.00 feet; thence South 82 °15'04" West 144.00 feet to the
TRUE POINT OF BEGINNING.
.LEGEND►
......- Jr
t
r
•. °
Existing Tree
C.B. Catch Basin
M.H....._ Mon /s(o /e
SAN............ Sanitary
ST Storm
CONC.. _ _...... Concrete
Sanitary Sewer
Storm Sewer CITY OF TUKW L4
Water APPROVED
Gas
Telephone JUN 3 IT.1
E Electric
SURVE VORS CERTIFICATE
1 hereby certify this map correctly represents a survey
made by me or under my direction.
This 30 Day of Jul 19 75
f ! i
REGISTERED LAND SURVEYOR
NE CC s? SW 4 , NE /4, .SEC. 35 - T23N °R4E
FILE COPY
•
Permit NO
DRAWING Ne. REVISED
2354
13U.LD!NG DIVISInN
1 understand that the Plan Check approvals are
3u+;Ie:.i to errors and omissions and approval of
plans does not authorize the violation of any
adopted code or ordinance. Receipt of contractor's
copy of apprcv • plans ack wledaed.
Date / _ ''`�
00g5 175-1---1
iUL 2 199U
\ Cii Y - 7. ; :• - s ... -' ecElvt~D
1,.........1.1/4 mama �'' __.L M 2 8 19
PERMITCENTER
F., L
TUBE ;gin,
SITE ADDRESS: 182W-182 El Andover Park 1N e�=
A. T A. Survey for M.A. Segale, Inc.
SEGALE INDUSTRIAL FMK
TUKVJILA WASHINGTON
APPROVED
R.E.M.
9
9
■■•••••*
111■•■■••111•111■Wy0010 /NM> •■••■••••••■••••••■••• IMP& 11111■.11.0■•■••■••11101
111.1•M■••■••••■•••4111•
1111/1110.1.1••••••14111■111. .111.101■11.1.40•11.1.11■11110
*MO •■••••••■•■••■•■•••11 C•40. Ni••••••■■*•11
ROTARY OFFSET PRINTING
01.0•007••
.111111Y•WrAliv.1.1•10 OM* •••■•■
a...yarcts.a.atallacaffataliegasairoasi
. •
• • •
•
• :".7.1.
--
4 ------
J
f
am a. marg. MUDS
10.0■11.1...1.00.111••■••
e
Emma
MILO
JOHNSTONE SUPPLY RACK STORAGE
SCALE 1/16"
irl■••••■••••■•••••■•
WXV DOXIIIKI V
=t
ILXV INN MIX
b
N
;••
If
TOt j
P
.rL-+-
Li Uu
peessoor
— I — RO' ingl OVILIIRIAD
DOCRIS irn IgrOWEPROXY
" •`• *** * ' * 4& * ' . 0 : • *.• f*
'* • '
I
1 I ill I I 1 it I 1 111 1 1111111 1 1111111111 1E11 /1 WI II
0 le THS INCH 2 3• 4 6 7 8
NOTE: If the microfilmed document is less clear than this
•
notice, it is due to the quality of the original document.
oc 6Z 9(: LZ 9Z G 4 7Z C 3 13 Q 6 L QL Lt 9t 9L ti EL It tt 0 L ? 8 9 G C HY+ 0
iiiiii11
1 ' I
r fl flhl
1-1 V7
fa I Ile Ba
I J r
121:1:S=.11.W4EILLICII 10411=30.2CWItglialiMRSICIMINCL2SIS)
co
—
liCILLOCM fltflQ
BAUM OCI UNTO.
VAIL
Asatuaantoucrw '' . " ....—s sakmasiairowearmokmaio.:advaletasesa . ..ammaszwoomsio.tawdz"L""""" adammumul "N;asocatanasnse.ma
— 1
4•* Hi N.
L L
-
II
1
VARIMOUVX
•■••••■••■■■•■ .1■•■•• lim....•••••■••••■•■
I (
L.) 1 1 \I
9 10 11 FAAIDEIN 12
NOTE: ALL NEW RACKING SHALL rtc) .r-Crfritht--90 IN HEI•Hri.
4-61 Yic"
IT I
SEGALE BUSINESS PARK
18205 ANDOVER PARK WE
- .MAIIINCIIMOSiSSAIMILVIGNAelfeSI.,6,11.11161etbiaat204daMMUILWIostiaLIAVA1792alt.41
CITY OF TUKVKA
APPROVED
JLUI
. 1 ; 6,4
.411
BUILDING DIVISInN
RECEIVED
CITY OF TUKWILA
MAY 2 8 -
PERMIT CENTER
(206) 575-3200
TUKWILA, WASHINGTON
TENANT SPACE IMPROVEMENT T mnoo B1
FOR
JOHNSTONE SUPPLY
As SHOWN
5
i
trane4.-zamowlara94-.,,,gnamenummaAnussamsEramkomatearahatanameadsimEattramerstasusvascac.a4,s.g-tudm.watz-masawshonzemaioasu—'14,s+tauwa-2a9a•AaPaeloks"6,".*"."-'"woo*.4464•82.144"•Y-4"*.‘""''"'"""1”