HomeMy WebLinkAboutPermit 6612 - A America - Tenant ImprovementPermit 6612 - A America
17600 west valley road
AT/M IC,
1
BP#CD(oI\
... .:- ..ft,' -
North Valley Business Park
:N -
467 -5544
ADDRESS
401 Second Avenue South, Suite 200, Seattle, WA
ZIP
98104
CONTRACTOR
TSB Construction Inc.
PHONE
622 - 6212
ADDRESS
2454 Occidental Avenue South, Seattle, WA
ZIP
98134
WA. ST. CONTRACTOR'S LICENSE #
TSBCOI*122BE
EXP. DATE
12 - 31 - 91
ARCHITECT
Marvin Stein & Associates
PHONE
441 - 1449
ADDRESS
2221 Fifth Avenue Seattle WA
ZIP
98121
171 V _ N ABC EDITION (year$ 1988
SETBACKS: N_ S - E-
W-
FIRE PROTECTION: ®Sprinklers 0 Detectors O N/A
UTILITY PERMITS REQUIRED? O Yes ® No
_
(P bUo works)
ZONING:
BAR/LAND USE CONDITIONS?
. 0 Yes
a) No
CONDITIONS (other than those noted on or attached to permit/plans)
BU1LDIN' PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept. of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING � �
PERMIT NO.
DATE ISSUED:
PROJECT I■FORMATIdN.
SITE ADDRESS
PROJECT NAME/TENANT
A- America
TYPE OF U New Building L) Addition U Tenant Improvement (commercial) L) Demolition (building) Li Grading/Fill
WORK: 0 Rack Stora•e 0 Reroof 0 Remodel residential O Other:
D ESCRIBE WORK TO BE DONE:
Interior tenant improvement.
SQUARE OCC. SQUARE OCC. SQUARE OCC.
FEET LOAD FEET LOAD FEET LOAD
OCC. SQUARE OCC.
LOAD FEET LOAD
TOTAL
SQUARE FEET
SQUARE
FEET
TOTAL
OCC. LOAD
TOTAL
APPROVED FOR
ISSUANCE BY:
SIGNATURE:
CERTIFICATE OF
OCCUPANCY NO.
17600 W Valley Hy
t
1.
£ VOA
DESCRIPTION
BUILDING.PERMIT;FEE
PLAN;CHECK <FEE
BUILDING'SURCHARGE.
OTHER
><?
PLAN CHECK NO.:
SUITE #
BUILDING
OFFICIAL
DATE ISSUED:
DATE: 6 f (T/
91 -073
DATE: 3_2 p/
.00 5942 2-1:5 .9
VALUE OF CONSTRUCTION - $
5,000.00
ASSESSOR ACCOUNT # 252304 9017 - 02
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lav
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
1
PRINT NAME: 1./.4 ' = "� . flu 1 N1_ v.ti--
This permit: shall; become null and: void rf the work is :not commenced within 180 days from the date of
ssuance, or if the work ie suspended of abandoned for a.petio of .180 days: from the <last inapoctloi
COMPANY: .
•
SIGNED
WANTS TO ❑
SEE YOU
WILL
IN CALL El
PERMIT NO.
CONTACTED
I ,.
DATE READY
DATE NOTIFIED
_
•, - t 1
q
`
(init.)
BY:
,�,
jam'
PERMIT EXPIRES .
_
2nd NOTIFICATION
\ t,}C
AMOUNT OWING
0
��p► �J
3RD NOTIFICA
- .
1 —I— )S-
BY:
(intt.).
PLAN CHECK
NUMBER
:S4--c(0
(ROUTED)
3 -6 p ry
INIT:
3 X11
REVIEW COMPLETED
IN
INIT:
L_Jak -k m ks m try-3- oo
BUILDING PERMIT
APPLICATION TRACKING
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGEJOCCUPANCY INFORMATION
(to be filled out by Plan Checker)
FIRE
PUBLIC
WORKS
0 OTHER
1 BUILDING -
initial review
PLANNING
BUILDING -
final review
ZONING: V
REFERENCE FILE NOS.:
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
CONS LTANT: Date Sent
FIRE PROTECTION Sprinklers (JDetectors
FIRE DEPT. LETTER DATED: �� // /9/ INSPECTOR: _,�-72__-
E • • STRIC
5c,
Date Approved -
BAR/LAND USE CONDITIONS? Yes 357
MINIMUM SETBACKS: N- 5' S- W
UTILITY PERMITS REQUIRED? (j Yes_ [kris e.
PUBLIC WORKS LETTER DATED:
ON (year):
t,e t__ m . SS. 24"9- >c -� -at
VVV VVV•IIVVIIVI ✓VMIV lNI V) IN IM III VV IVV
(206) 431 -3670
DE - CRIPT ON
A v OU T
RCP #
; D E
BUILDING PERMIT FEE,
O
PLAN CHECK �_ II _ r _
NUMBER ( 1 C-7
APPLICATION, MUST BE
FILLED OUT COMPLETELY ,
PLAN CHECK .FEE
<;
ES2 e
•
BUILDING SURCHARGE
"",,�►�
•T :': ' :
HER.
IIIMMISIMM
TOTAL - ;
ff§ MEE
SITE ADDRESS SUITE #
N. VALLEY BUSINESS PK. 17600 W. VALLEY ROAD
VALUE OF CONSTRUCTION - $
5,000
PROJECT NAME/TENANT
A AMERICA FURNITURE
ASSESSOR ACCOUNT #
252304 - 9017 - 02
TYPE OF ❑ New Building U Addition ( CTenant Improvement (commercial) Li Demolition (building)
WORK: 0 Rack Storage ❑ Reroof 0 Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
TENANT IMPROVEMENT
BUILDING USE (office, warehouse, etc.)
OFFICE AND WAREHOUSE
NATURE OF BUSINESS: FURNITURE WHOLSALER
WILL THERE BE A CHANGE IN USE? 2 No Li Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 110,049 Tenant Space: 30,000 Area of Construction:1,000
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 6l No O Yes IF YES, EXPLAIN:
PROPERTY OWNER NORTH VALLEY BUSINESS PARK ,().Q. ,iq_pc;-i j
PHONE 467 - 5544
ADDRESS 401 second ave so. 4/200 �IP 98104
CONTRACTOR TSB CONSTRUCTION INC.
PHONE 622 -6212
ADDRESS 2454 OCCIDENTAL AVE. SOUTH
ZIP 98134
WA. ST. CONTRACTOR'S LICENSE # TSBCOI *122BE
EXP. DATE 12/31/91
ARCHITECT MARVIN STEIN & ASSOCIATES
PHONE 441 - 1449
ADDRESS 2221 5th AVE. SEATTLE WN.
ZIP 98121
CiTY OF TUKWILA
Department of Community Development - Building Division
BUILDING OWNER
OR
AUTHORIZED
AGENT
I";HEREBY CERTIFY THAT<I HAVE READ AND EXAMINED THIS APPLICATION AND KN
TRUE AND:+CORRFCt, AND i AM AUTHORIZED TO APPLY FOR THIS::PERMrr.
SIGN URE k DATE
`...r- •--_ ____ w___ 0 ).P 2/15/91
PR lki i NAM JOSEPH D. HITTER PHONE 389 -0575
ADDESS CITY /ZIP
206 1st. AVE. SEATTLE 98134
CONTACT PERSON TOM SHEPHERD C sick 7Y1rbhi 1111____ PHONE 622 -6212
BUILDIk PERMIT
APPLICATION
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES
E Legal description • ,:: • . • ••• •••••••
Working drawings, stamped by a Washington Sate licensed
architect, which include::. :: • , . , • , ,
•,, • Site plan • . • • • , ,
• • .:: • Architectural drawings
,•• • Structural drawings . •
.
• Mechanical drawings • :••••• •
• Elevations : •••••:,:
••: • Civil drawings •• .
• • Landscape plan ••
••
- 1 completed utility permit application (onefo entire p
E • Six (6) sets of civil drawings
NOTE: . See utility permit application and checktistlor7.4PeeitIOU
• submittalrequirements:: •• • • "• •" "
„ . •
" • • •
[] Completed building permit
.......
. ............................
" • • ,• •
Assessor: Account Number
•::.•• Two (2) sets of plans, which ..............
ri Building floor plan showing.:
:.•
• Entire space where racks will be located
• • Exit doors „ " : • .
• ,Dimensions of all 'aisles
Tenant space floor plan showing repft end
• exits. :••••,.., ..•-•
NOTE: Include dimensions of racks (height width and length), alsks
and exit ways on plan. .. . •.•
L Structural calculations stamped by a Washington Spite licensed
engineer (rack storage 8' and over),
. ....... . .
RESIDENTIAL
NEW SINGLE-FAMILY
ri . ..,• . .,„.
Completed building permit application (one for owl!
JBMITTAL CHECKLIST
imm.■••■•■■
REROOF
Completed 1:!O ilding permit application (one for each etrectere)
..• : .„.......
'Assessor : Account Nember.:
Nanutive
material being installed. , .
NOTE: A . certification letter le required prior to 'final . inSpeclien . and sign-
off of thaparrn1(•,: .;
" """" " • ". ' ' '' ' • ' . ' ' ' ' ' ' . .
ANTENNAISATEWTE DISHES
Completed building permit application
' •••• ' ' ' '
RESIDENTIAL REMODELS
Completed poroixtoofotapp4e440p1„(9no for each structure)
Assessor Account Number
•:•!•H:
Assessor AOCount Number .:'•;; :';': •
•
Two (2) sets of plans, which
Site Flan. (shOWing. building and location of antenna/satellite dish)
Details antenna/satellite dish and method of attachment • :
• :: . :
Structural calculations stamped by a Washington State licensed
„ required
. :
Two (2) sets of working drawings, which include:'
• Site plan
• Foundation plan
• Floor plan
• Roof plan
••••:.:?.• Builckng eleVations.(0!: v iews)ji : ........„...
• Building cr9.0.ifipotion::'; .
•• framing plans
"•••• • • • • ••• ....• • • • .
N If • anYutOty, watIc fs to be done prov0e ut permit japplicahon„. :::•
and Plant • must be submitted.
REROOFS
Completed oumpa application (one for each structure)
Assessor Account Number
Narrative describing existing roof, material being removed, and
- material being Installed.
NOTE: A cerbYkatkin letter Is n,quiredpnor to final kispaction and sign-
: eft of the
May 11, 1992
Mr. Gary Schenk
Building Department
City of Tukwila
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Re: North Valley Business Park
A- America space
Dear Mr. Schenk:
Per our conversation last week, you are holding a permit for construction of a
demising wall in the space currently occupied by A- America. We have been
involved in a protracted negotiation, and would appreciate keeping the permit
open for a short additional period of time.
Therefore, please hold the permit open until September 1, 1992. If we do not
take action to obtain the permit prior to that date, then we understand it will lapse
at that time
Thank you for your consideration. Please do not hesitate to call me if you have
any questions.
Sincerely yours,
KALANI CORPORATION
)%k . 6) 0takez=%-
eph y . Mitter, President
8c South Jackson, #408
Seattle, WA 98104
389 -0575
'roe ; 4
ype o nspe ion:
Address; f „? 0 CO
NJ/di
Date Called:
Special Instructions:
Date Wanted: 6) ' 14 qi y
am. pm.
Requester:
Phone No.:
SPECTION NO.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
❑ Approved per applicable codes.
PER
(206) 431 -3670
❑ Corrections required prior to approval.
COMMENTS: '
u - rn , Troc, 3S1- 0575
Tr�tr PC- Lill 1 /5 dJ cfrniCe C.LI — �.
f Inspector:
Date 7.442_,
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No,:
Uate:
CITY OF TUKWILA
0200 SOUTNCENTER BOULEVARD. TUKWILA, WASHINGTON 98188
Plan Check #91 -073: A- America
17600 W Valley Hy
PHONE I (2061 433.180(1 Gary L. VanI)usen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME A T OF THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER .
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
/ construction.
3. Partition walls attached to ceiling grid must be
laterally braced if over eight (8) feet in length.
4. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
5. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
6. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
'X'
REQUIRED INSPECTIONS
PHONE
APPROVED
INITIALS
CORRECTION NOTICE ISSUED
r
1 Footings
431.3670
2 Foundation
431.3670
3 Slab and/or Slab Insulation
431-3670
431 -3670
4 Shear Wall Nailing
5 Roof Sheathing Nailing
431.3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
-
13 Insulation
431 -3670
.
9 Suspended Ceiling
431 -3670
X
10 Walt Board Fastening
431 -3670
11
._,13
12
_
_
.
X
14 FiRE FINAL Imp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL .
431.3670
X
17 BUILDING FINAL
431.3670
(INSPECTOR COMMENT SECTION ON REVERSE)
k'
r U I LUI i�U I- KMI
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
CiTY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
ITE ADDRESS:
17600 W Valley Hy
SUITE NO.:
BUILDING
PERMIT NO
DATE ISSUED:
PROJECT:
A- America
5-91
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION • When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING • Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING • After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
EL INSULATION • After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points dear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see 1)BC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all worts, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington .State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although nbt
required, a meeting of this type r.- often eliminate problems, delays and misunderstandings as the
project progresses.
WWI
( �
PLAN REVIEW COMMENTS '
PLAN CHECK 0 073 PROJECT ,A . M f Cl
REQUIRED INSPECTIONS
No changes will be made to the plane unless approved by the Architect and the
Tukwila Building Division,
O Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, including all gas piping (298-
4722).
O Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be Inspected by that agency (277- 7272).
0 All structural concrete to be special inspected (Sec. 308, UBC).
O All structural welding to be done by W.AB.O. certified welder and special
Inspected (Sec. 308, UBC).
O All high - strength bolting to be special inspected (Sec. 308, UBC).
0 Any now ceiling grid and light fixture Installation Is required to meet lateral bracing
requirements for Seismic Zono 3.
Partition walls attached to ceiling grid must be laterally braced H over eight (8) feet
in length.
15.
18,
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, and approved plane shall be posted at the job site
prior to the start of any construction.
When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Readily accessible access to roof mounted equipment Is required.
Engineereed truss drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
lees, and material shall bear Identification showing the fire performance rating
thereof.
Subgrado preparation including drainage, excavation, compaction, and fill
requirements shell conform strictly with recommendations given in the sells report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying lire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition),
All food preparation establishments must have King County Health Department
sign•off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 298 -4787, at least three working days prior to desire Inspection date.
On work requiring Health Department approval, It is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
inspection at the factory.
O Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special Inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
O All wood to remain in placed concrete shall be treated wood.
0 All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
1 Footings
2 Foundation
3 Slab /Slab Ineulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
X 7
Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11
12
13
14 FIRE FINN,
[15 PLANNING FINN,
16 PUBLIC WORKS FINAL
17 BUILDING FINN,
( �
PLAN REVIEW COMMENTS '
PLAN CHECK 0 073 PROJECT ,A . M f Cl
REQUIRED INSPECTIONS
No changes will be made to the plane unless approved by the Architect and the
Tukwila Building Division,
O Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, including all gas piping (298-
4722).
O Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be Inspected by that agency (277- 7272).
0 All structural concrete to be special inspected (Sec. 308, UBC).
O All structural welding to be done by W.AB.O. certified welder and special
Inspected (Sec. 308, UBC).
O All high - strength bolting to be special inspected (Sec. 308, UBC).
0 Any now ceiling grid and light fixture Installation Is required to meet lateral bracing
requirements for Seismic Zono 3.
Partition walls attached to ceiling grid must be laterally braced H over eight (8) feet
in length.
15.
18,
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, and approved plane shall be posted at the job site
prior to the start of any construction.
When special inspection is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being Inspected.
Readily accessible access to roof mounted equipment Is required.
Engineereed truss drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
lees, and material shall bear Identification showing the fire performance rating
thereof.
Subgrado preparation including drainage, excavation, compaction, and fill
requirements shell conform strictly with recommendations given in the sells report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying lire retardancy of roof will be
required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition),
All food preparation establishments must have King County Health Department
sign•off prior to opening or doing any food processing. Arrangements for final
Health Department inspection should be made by calling King County Health
Department, 298 -4787, at least three working days prior to desire Inspection date.
On work requiring Health Department approval, It is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
inspection at the factory.
O Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure is In addition to any requirements for special Inspection.
0 All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special inspected.
O All wood to remain in placed concrete shall be treated wood.
0 All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit for , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or cancel the
provisions of this code shall be valid.
Fire Department Review
Control #91 -073
(512)
Dear Sir:
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Re: A- America - 17600 West Valley Highway
March 11, 1991
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. The total number of fire extinguishers required for
your establishment is calculated at one extinguisher for
each 3000 sq. ft. of area. The extinguisher(s) should be
of the "All Purpose" (2A, 10 B:C) dry chemical type.
Travel distance to any fire extinguisher must be 75' or
less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1))
Extinguishers shall be installed on the hangers or in
the brackets supplied, mounted in cabinets, or set on
shelves (NFPA 10, 1 -6.6), and shall be installed so
that the top of the extinguisher is not more than 5
feet above the floor. (NFPA 10, 1 -6.6) (UFC 10.301)
Extinguishers shall be located so as to be in plain
view (if at all possible), or if not in plain view,
they shall be identified with a sign stating, "Fire
Extinguisher," with an arrow pointing to the unit.
(NFPA 10, 1 -6.3) (UFC 10.301)
2. No point in a sprinklered building may be more than
200 feet from an exit, measured along the path of travel.
(UBC 3302(d))
Exit doors shall be openable from the inside without
the use of a key or any special knowledge or effort.
(UFC 12.104b)
There shall be no enclosed usable space under
Gary L. VanDusen, Mayor
City of Tukwila
O
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Page number 2
Gary L. VanDusen, Mayor
stairways in an exit enclosure, nor shall the open
space under such stairways be used for any purpose.
(UFC 12,106(c))
Exit hardware and marking must meet the requirements
of Uniform Fire Code Sections 12.104 & 10.402(a).
Exit signs shall be installed at required exit
doorways and where otherwise necessary to clearly
indicate the direction of egress. Signs shall be of a
contrasting color with the surrounding area and shall
have letters not less than six inches high with a
minimum letter width of 3/4 ". (UBC 3314) (UFC 12.108)
Exits shall be illuminated at any time the building is
occupied. An emergency system shall automatically
provide exit illumination upon failure of the main
power supply. (UFC 12.107(a)(b))
3. All modifications to sprinkler systems shall have the
written approval of the Washington Survey & Rating Bureau,
Factory Mutual Engineering or Industrial Risk Insurers,
then by the Fire Department. No sprinkler work shall
commence without approved drawings. (City Ordinance #1528)
(NFPA 13, 1 -9.1) (UFC 10.307)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
Contact the Tukwila Fire Department, Fire Prevention
Bureau to witness all required inspections and tests.
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Page number 3
(NFPA 13, 1 -10.2) (UFC 10.305(b))
Gary L. VanDusen, Mayor
4. All electrical work and equipment shall conform
strictly to the standards of the National Electrical Code.
(NEC 70) (UFC 85.101)
All electrical wiring is to be inspected by the State
Electrical Inspector, Washington State Department of
Labor & Industries. (NEC 70)
5. If the building is to be used for the storage of
high -piled combustible material (as defined in UFC, Sec.
9.110); automatic fire - extinguishing systems, smoke- removal
systems, fire protection and fire separations are required
per Uniform Fire Code - Article 81.
When fire dampers are required to maintain fire
resistance of construction, fire dampers shall comply
with the requirements of UBC Standard 43 -7. (UFC
10.401)
All required occupancy separations, area separation
walls, and draft -stop partitions shall be maintained
and shall be properly repaired, restored or replaced
when damaged, altered, breached, penetrated, removed
or improperly installed. (UFC 10.401)
This review limited to speculative tenant space only -
special fire permits may be necessary depending on
detailed description of intended use.
6. Warehouses designed for high -piled stock shall
establish and maintain aisleways of not less than 44 inches
to provide access to all exits and fire department access
doors. (UFC 81.108)
Any overlooked hazardous condition and /or violation of the
adopted Fire or Building Codes does not imply approval of
such condition or violation.
CITY OF TUKWILA
Department of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT: _ ( � ► McRtc
ADDRESS: 7 J • t U-
DATE:
OCCUPANCY GROUP
BUILDING HEIGHT /# OF STORIES
FLOOR AREA
OCCUPANT LOAD
EXITING REQUIREMENTS
SCoPe
' ews 11..16
"PAS .
DETAILED REQUIREMENTS
OCCUPANCY
NOTES
PREPARED BY:
PLAN REVIEW
- 2. LA).AR.e I4ca o s
TYPE OF CONSTRUCTION nr S
LOCATION ON PRO PERTY � �" b a U _
- Te kS A 1(/ t ,. '+ 30 teat ( Cs5
`
PLAN CHECK
NUMBER
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
OF L302k - rG cc \S• yi 1 _ W
x «Z () 76. totWt
TYPE OF CONSTRUCTION
PART V, CHAPTER 23, U.B.C.
W.S.E.C.
CHAPTER 51 -10, W.A.C.
\z (/
0
DATE:
PLAN REVIEW
CITY OF T UKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT: 44- AMZC4
ADDRESS:
DATE:
•
•
"NC S Tr) 1;i_ .N 'R..1eti)
2 TIN RR: SXIT1 NCB V-D 8Q. to tz pc.414
1.00K 41 Moli.e. C 43 Q tA% NS
9i -O73
PLAN CHECK
NUMBER
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
Prepared by:
SCHEDULE B
THE ASSURANCES REFERRED TO ON THE FACE PAGE ARE:
ORDER NO. 198226 -6G
RECEIVED
CITY OF TUKWILA
FEB 1 5 1991
PERMIT CENTER
THAT, ACCORDING TO THE COMPANY'S PROPERTY RECORDS RELATIVE TO THE
FOLLOWING DESCRIBED REAL PROPERTY (BUT WITHOUT EXAMINATION OF
THOSE COMPANY RECORDS MAINTAINED AND INDEXED BY NAME):
THE SOUTH 329.85 FEET OF THAT PORTION OF GOVERNMENT LOT 7 IN
SECTION 25, TOWNSHIP 23 NORTH, RANGE 4 EAST, W. M., IN KING
COUNTY, WASHINGTON, LYING WEST OF PUGET SOUND TRACTION LIGHT
AND POWER RIIGHT -OF -WAY AND SOUTHEASTERLY OF THE EAST LINE
OF STATE HIGHWAY S. R. 181 AS CONVEYED TO THE STATE OF
WASHINGTON BY WARRANTY DEED RECORDED UNDER RECORDING NO.
6427163;
ALSO KNOWN AS LOTS 1 AND 2 OF LOT LINE ADJUSTMENT NO. 011-
80, RECORDED UNDER RECORDING NO. 8005090720.
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
A. THE LAST RECORDED INSTRUMENT PURPORTING TO TRANSFER TITLE TO
SAID REAL PROPERTY IS:
QUIT CLAIM DEED RECORDED UNDER RECORDING NO. 8505031060,
RECORDS OF KING COUNTY, WASHINGTON, WHEREIN THE GRANTEE IS
NORTH VALLEY PARTNERSHIP, A WASHINGTON GENERAL PARTNERSHIP.
B. THERE ARE NO MORTGAGES OR DEEDS OF TRUST WHICH PURPORT TO
AFFECT SAID REAL PROPERTY, OTHER THAN THOSE SHOWN BELOW
UNDER EXCEPTIONS.
NO GUARANTEE IS MADE REGARDING (A) MATTERS AFFECTING THE
BENEFICIAL INTEREST OF ANY MORTGAGE OR DEED OF TRUST WHICH
MAY BE SHOWN HEREIN AS AN EXCEPTION, OR (B) OTHER MATTERS
WHICH MAY EFFECT ANY SUCH MORTGAGE OR DEED OF TRUST.
NO GUARANTEE IS MADE REGARDING ANY LIENS, CLAIMS OF LIEN,
DEFECTS OR ENCUMBRANCES OTHER THAN THOSE SPECIFICALLY
PROVIDED FOR ABOVE, AND, IF INFORMATION WAS REQUESTED BY
REFERENCE TO A STREET ADDRESS, NO GUARANTEE IS MADE THAT
SAID REAL PROPERTY IS THE SAME AS SAID ADDRESS.
EXCEPTIONS:
(SEE NEXT PAGE)