Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6625 - Canyon Estates Condominiums - Wall Damage Repair
6625 91-236 canyon estates condiminiums 15140 65th avenue south repair Permit 6625 - Canyon Estates Condominiums . -ice - • orrl . Canyon Estates Condominium Association .u. 242 -1520 ADDRESS 15140 65th Avenue South, Tukwila, WA ZIP 98188 CONTRACTOR R & B Construction PHONE 243 -7572 ADDRESS 14424 50th Avenue South, Tukwila, WA ZIP 98188 WA. ST. CONTRACTOR'S LICENSE # RBCONC *189JT EXP DATE 4 - 12 - 92 ARCHITECT PHONE ADDRESS ZIP TYPE OF CCTNST.: UBC EDITION (year) 1988 SETBACKS: N - S - E W- FIRE PROTECTION: OSprinklers O Detectors ©WA UTILITY PERMITS REQUIRED? 0 Yes 0 No (through Publio Works) ZONING: BAR/LAND USE CONDITIONS? (] Yes a) No CONDITIONS (other than those noted on or attached to permit/plans) SUBJECT TO FIELD INSPECTION. APPROVED FOR ISSUANCE BY: BUILDING /- i ;_-. OFFICIAL , - DATE: 6 •_z__ Ay I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: _,,(2,..„.) �-�, „ DATE: 7 SUNG : ' I PRINT NAME: 7 tct-AAR • <ic4-1`,nn 1114 COMPANY: -- 7-,� Z c-aN 2JGT( CITY OF TUKWILA Dept. of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. (ava-s DATE ISSUED: SITE ADDRESS PROJECT NAME/TENANT Canyon Estates Condominiums 15140 65 Av S TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) CJ Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Q Other: Repair DESCRIBE WORK TO BE DONE: Repair cabana wall section where car ran through. •CQDE COMPLIANCE • USE ..� FLOOR4 SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE OCC. FEET LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TO CERTIFICATE OF OCCUPANCY NO. h BUILDIN1 PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES BUILDING >PERMITFEE; <. PLAN CHECK;:FEE . BUILDINGSURCHARGE AMOUNT: ACP.T: #: 93.69 6.- 06--91 =TOTAL::; PLAN CHECK NO.: 91 -236 Th is permit shall become Holt and void if the work fs not commence within :180 days from ttie date issuance, or if. the;:work:is suspended orabandoned fora period •of 180 days`from the: last In pectlo DATE ISSUED: VALUE OF CONSTRUCTION - $ 3,700.00 ASSESSOR ACCOUNT # 133250-0300-03 TOTAL OCC LOAD photo PERMIT NO. CONTACTED e I___-&—v" cz_ DATE READY DATE NOTIFIED � C O (0 Y: (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: init. AMOUNT OWING 3RD NOTIFICATION BY: (snit.) PLAN CHECK NUMBER O FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review REVIEW COMPLETED PROJECT NAME INIT: INIT: INIT: INIT: INIT: BUILDING 3ERMIT APPLICATION TRACKING SITE ADDRESS tSi (OF:7 Psi S INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE OCC. FEET LOAD SQUARE OCC. FEET LOAD SQUARE OCC. FEET LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. PART1144N` lVeSP�x: CONSULTANT: Date Sent - BUILDING - ( initial review (ROUTED) FIRE PROTECTION: Sprinklers Detectors N/A FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? UIR 1 EN.T PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: S- Yes SUITE NO. Date Approved - INSPECTOR: BAR/LAND USE CONDITIONS? Yes () No UBC EDITION (year): w- PROPERTY OWNER . C ,G , A PHONE Z.-(7- ADDRESS SAme- AS tvuAl'22 ZIP CONTRACTOR -K 6 cor - '2..)c:F /O,\l PHONE z ,-(3 7 S7Z ADDRESS 1x424 - ''56"' m6 S, `rvkw 1LA , WA. ZIP 16 5 WA. ST. CONTRACTOR'S LICENSE # R ar * ‘e . EXP. DATE /07 /qz ARCHITECT � A PHONE ADDRESS ZIP D IJU DUUUIGdtI(&f DUU/WVdIU, / UrcWlyd vv/1 y0 / 00 206 431 -3670 DESCRIPTION > AMOU RCPT' DATE ' > MIUMMENGOMPOMMI BUILDING PERMIT FEE PLAN CHECK C _ NUMBER tD_ APPLICATION: MUST BE ,FILLED. .OUT .COMPLETELY . ; PLAN CHECK FEE :pt) BUILDING SURCHARGE O ' S IIII OTHER: SEIM IIMNiainnialiniiiiii TOTAL - SITE ADDRESS SUITE # X - , VALUE OF CONSTRUCTION - $ 37c0 co PROJECT NAME/TENANT -- " c . r- '. i4 ' ASSESSOR ACCOUNT # "c /•' ; 5-f? C)::;e70 . -.- t �) TYPE OF • New Building • Addition • Tenant Improvement (commercial) U Demolition (building) - WORK: O Rack Storage 0 Reroof ❑ Remodel (residential) -K) Other :P4( DESCRIBE WORK TO BE DONE: 7<ePAIiZ. GgCANA w/11. Sc'j wN- 1C-.rtG- cArz ('2.A N 71-11zoA.614 BUILDING USE (office, warehouse, etc.) c.-A1 -ANA — SwirnMLNG ¥oot- NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? N No O Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: zct° , ( 7.; Tenant Space: Area of Construction: , , F; . WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? a No 0 Yes IF YES, EXPLAIN: CITY OF TUKWILA Department of Community Development - Building Division • AP P4UCA11QN A ;: TRUE.<ANQ;:; f ; l RRf:.CT,.: 1ND 1 AM A UTHQI IZED TO APPt Y'..FOR THIS lH1E .CERTIFY THAT 1' HAVE REAP AND :EXA T BUILDING OWNER OR AUTHORIZED AGENT SIGNATU PRINT NAME ADDRESS CONTACT PERSON 42 C ho.r APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT if the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATI N ACCEPTED 0 (0 BUILDING PERMIT APPLICATION DATE DATE APPLICATION EXPIRES (0-11 KNOW TH SAMiE T PHONE CITY/ZIP 5 JA6.- i 03/16/91 COMMERCIAL NEW COMMERCIAL • -:;•':••••:.'••••:::'.• •• • - . . • Ej CoMpleted building .permitapplication(One for each stnicture) •••• •• ...::.••••••••••• .. • Assessor .AcCUnt Ntrrnber.:: ....... . • . Two •••: • .:::.:.•••••••••:•:. .. .. . . . . :„ seti(2)•oliiiii to E Specificabons ....... . . . . .. Structural calcu lations stamped by a WashingtonStateliCensed..• Inver :•:••••••••• .•• •• • engineer report'stamped by a Washington.State liceneed englneer ::...:, . . . :•[ •:•••• ••:.• • E•Ene stamped by a Washington Statailic:ansed '.• engineer or architect •• ...• ] :Legal ••:••• . : . •:.: .•:•• ••• . • • .F1 Working drawings, staniped.bya Washington State licensed 1---/ architect, which include: : • : • •'•••'- • • •• • •• •••• :••::::' :•••••• • • Mechanical drawings Elevatlons .•• 1 ;1108tenddePcaPetilllY en Six (6) sets Of :civil drawings • NOTEi, 'See iitillty ;r appiloatian and Obtickbst 0 subm .1. taco gremen • • •••■■■••• .RACK STORAGE j Completed buliding permit application •• • . • • " • .•.. . Assesser .• • • ....• • • •• • •••• 2.•••:••• . • . • ......... • • Two (2) sets of " • • ..•..'••••••<.• • :••••••• ••• • • • . n• Building floor plan .... ..... • • ::::•••• Entire: Space what mks . ..... :•-••••• •-• Exit 1)Imenskiiis of 'air •••••• • • . • :••••••••-••• ••••'.;.••••••".;••••,':',•••••••••••... -••-••••:.•••••••:••••:•••••:•••• • : • . :•. Tenant space floor plan showing rack storage layout, aisles and: . exits, • • • • • • NOTE:lnelUde dimensions of racks (height, and length)1 ' aisles anc I exit Ways 9n plan, . • •• . StrunturEd calculations stamped by :a Washington State licensed engineer (nick storage 8' and over); •,.:**, . • RESIDENTIAL NEW SINGLE-FAIIIILY Completed building permit appilcation (one foreaChi:StructUre) • • • •-• ••••••••:' "'. ..'•••• "••• •••: r—iAsse • • • • •••-•::- • •••• • -":::•• SiteP411•:•......,•••!• (on plan 81.10wOrAteat , ■ Foundation plan •.•: :••••••::''••••••: : robe/ft/IA.2,f • Floor plan : • : • •••:•••• vi1011899f..19n7p!...?!.. ... • Roof plan • • " • .• • "•-• •••'.' ••• .. • Building elevations (ail • • • :.• • • •-•••.:::'••••••• ••: • Building Onosa-section:..: •• : • : • • • • • Structural framing plans • • ..... . D Washington State Energy Code - 1 :Completed utility permit application ::•• • 17 Six (6) sets of site plans showing utilities • .•••••••:. NOTE:. Building site plan and utility site plan may be combined. See • • utility permit application and checklist for specific submittal requIrementS....: Additional topographical and soils information may be required if unique site conditions. SUBMITTAL CHECKLIST Legal description . , plan ,fruce Ot" ' ..:,:,::.....i.:i.„,:.,.,...,..„.... . ‘ nt Nu...8,0 , ,,iiiiii61ki.....,.::...,,•,.... ,,u11:....:....,...-.,,,'":'.4ENAtfr'. .1P11,?Y. 7.!#.1'...:::'-1.•,..,:-..ii::t0...43441:--- H:::•,...:::::::::::;:ii.:q•:::::::::,..li:::::d ,.....,.-.:.-••'' .,., ...,.. 7,...77::.:,i.:....:,...:...:•:.....t..,;:6::o:,.....i.j4...:..:...::,i,::......,..,-.,.!.*.:!. ... ::::..i.:::::::,:::::::iiii::::::::::::!':::11::q:::''::::ligi'si•• :. ...,ii4!.r!,,.7.li:..:.ii.:,:.;.d;,.:6.::...i;4;..i.stf..;:..,:... !10...,771‘9.•,:riiia.::,...i....:..0;68.0)i,.,...:,... ... tr;:ti)::.* .!slios,...1411,........,..„.:.:.40t.ilteinItotioz,174b .........,...•..<.......::.::::::•:::::::,..';:::.:::: • .''1..:....'....:..: .„...........thit.t.;,...,...41ii. rig...,.:.:,:i.,:.,;...::::::..:....:.:.....:• :::... • •• .... ..-.....,:41;1100,4). oli0.......191 ...::,4i.....,.....:J:!..,..,....;.,,..„.::.,.. .‘ :..,i,::,,,:,,,:„:,.,.,..: .., ....,.....:.:.:: .. .,.. . .,:.:,,::,„......,,,.... ..,......,....Esiiiisoripe . ....„;.:::„....„.::..,...iit.:,:i.:.,::::!:::.,.... ........ t footatie.,.... . , . ..... ... . : •••• ..1...-:............‘,........ .. :: .. .: .... • .................... ................ (common .. ................... .......... .................................................................................................................................................... ....:....:,..1.. ,LIII:pciTf ..;t..1aile;i:!7",:.:•••:....',.:i.....:':•iiii4.- co li):::::,:.,„.•:kiii:Ity.'1.-it. i' iici..il . ,.•,..•..:.::,: -''.:",:•,:::•::'CrOei41!.71.::.p(;;e-sii:*.i.)...1.i.i.iati*...1!:•••••::;::::'beq..:..:i.CiiOC))!!:„ • ":••••.);kii;•Of:1)!:?:piiiiiY1A- .. i.ii;•,:i!!?.....,.:',....1...,,•::...T.:::::::::::::•-..,....ii.::::::::::.....-.. (11i7:1.6ii*RI:all;470. '.....!..::,ii#!rf,.-:::::.0...:::::„..1 ...::,.......:A.....m.9!" ..-• ....:....9-sting . ., .,.:::,;..::,.,:.,,::,........,;.iiii•al:id ......: , , . . .... ...Exit walls,f)xi. .: . . .......:.:.....:,..........,...,.. stni........,.,...:,... . . ...:, •...N6.7-...•:.':::••:.de....,:...•.::::Ir'Ii......,.".::1.,..i.i:witiit i3eilliinp. . . ..:...,.:......„.............:...,0•,,iir icens .6...- ,(2,..::..80...71.....t,)....• •.•• ...••:::iiii,iictio7..ftecdon:-.... ::••••••••.0..s. and .........,:„.. . Washi k. , . .,..„. , er '•ec`f)'.-::...'.'•"'"i:::---f6,119?r.,••,biy, 'a.:. •....14 ta !,„.,..:.:.7.:......inty .. .. ..„„..,..,...:„...,i::„.„,„. ..-,,..•" Cro , , n :. h.,,..........p,.., • • .,„,,, ..„.,.... t„ • . hMP: .i.......:.,•.tam ri etti..0.1 , ,,,...,..pta . • it"9:•':".:‘:". iltillP:.•: :14.!!1•!:::::::::::::.*::,-linikt! ,.. siiii*F,Imay'(*...,....g:''''''''''''' ':':•••:., . . .. • . . ., .. ...::..:rsi..:...!:•;...:.::::.iiooi'iltik;4c ::ea•:•.•:.::::.:::$::::.•i;.:•W. ie):::1.::::::•:.:•„'.' 149 icaliPP...:...- 1!‘ ..................ii..(on, . ..:,,, ,...,,:,...... ,. an d ......„....::::.: ... . ................,.:::::.::::::::::::•;..;•:......... ..::..:,...,... . . .. ..: ii!! Infi ::.r°•:rf!:•1.:';......'.:•':'•„.:•:'-' iiiii0OFti:b6117:::::'.:;;:ii::•.j..i..ir::;..:.!:::.'i.::.::::::::::::::::::::•:::::..6iel i7i:::::•.1.:::•:::-.;:::.:•;:•.O;•.ni.:.iiFt ...-:: . ' . Se:, F'4:!j••:1::noi:„::•'"".i3x1!:.,.:.::::•:•::::•••:-.."."..:•:..„--:.:.::::::::::,.:6:•flp.o(,...:...••• .......................................... ..................... . ................................... ............................................... ins1;;ectb? :.,.. tan :....... - iE A ..iii.7.,.,....,:...::...,:., . ..... .. .".:...7..z.a thi% ■77::::,;,:i::',''''' iialt4iiiik , 'ieiPril:tillec!.....:••••;:!'i.......N:-..'•':::::;',....P...1..!::::•:'::::::',.••• . .:•:•:- . ••• • Tito. (2) tatit•of.plans inciude . .•• . . Structural.. .* engnee may be raqulmd.....; • • ........... • ... 99illP(Ptps4. Assessor ■e■CCiitint !1(4c41ieti•i.:.•. • ....... pien •;•••••••:''• Building .• • • : •.• Structural framing 'plans.... E.:••••• • • •• :•.•-• •.: . • . : . • • . • .. • : • • NOTE:: If any utilitywork:Is to be dopePtlovide:utility.P9i0tappflcatI9n 6170 Pi817# must be submilted.::::•••••:•:••••::::....:,•::::••••• • E. Completed building eeratitappliettitert::(eati: for each tittleture) ri : A ssessor*copunt F Narrative describing eXiatingroot,:etab4iiiti:tpirig.ietrieveci,tnd:1 • material being installed: :". • :". • NOTE: A• oertifioation letter ltreqUired prior to 114 Inspection and . 'off of the permit. • :. • • . • (....., A 1 . 4 y6 t\1 e--S PsT■Z'S Type Art..- Address: (e) Ay S. Date Cal edr Special Instructions: p L.... c3.L.9 (-7 ,. / le-- Date Wanted: i / i / am. p.m. Requester: / I Phone No.: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ( Approved per applicable codes. ( INSPECTION RECORD 4 Retain a copy with permit 1:1 Corrections required prior to approval. COMMENTS: :1 • r O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Receipt No.: Date: 1 PROJECT: C �C,Z. _ E s t PERMIT NO. , i SITE ADDRESS: / 5 �, 7 DATE CALLED: 6, q �1 1 TYPE OF INSPECTION: 1 , _ « ,; DATE WANTED: & -/ j '' ,__ REQUESTER: al SPE CIAL INSTRUCTIONS: PHONE NO.: INSPECTION RESULTS /COMMENTS: fir f pp GLt.t,.- . W .24 C .� t �Q c�.,p w-c.tA. '-.-o 1 vol., _ Ov. 4..as„ . G crv-Q / p /.4�. In - �1 r c,A.-�4-4 . / a ' ai y , - .. , .( , „ c-- v -Z49 -e-c\ G..4..G -4. ,..0 . W 6 - h- umeoer■Tn12. / -- _. DATE! rn -• /1-11 CITY OF TUKW1LA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 PROJECT: t A • 41.• AO wit- - RMIT NO. (i yr 1 ., __... ARIA SITE ADDRESS: 16 44D jl' 4 ' DATE CALLED: 6 - /1 - q 1 TYPE OF INSPECTION: ImA,,Ai DATE WANTED: 69 .--- 0- 1 / adn. 41 411 , SPECIAL INSTRUCTIONS REQUESTER: PHONE NO.: 2- 7 INSPECTION RESULTS/COMMENTS: a ' .61.-0-CA.19 -612 k -4 P-A- A , (6---C ILA._ v ■ 1 - ■4... , ,, -o---). "--, nave. (1 , )2 — c-7 1 oktesiererAin. C / ..), CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 • INSPECTION RECORD 0%. 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 • 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 X 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 11 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 x 17 BUILDING FINAL 431 -3670 a BUILDlII PERMIT INSPECTION RECORD CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 15140 65 Av S (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING (p(D'S PERMIT NO. DATE ISSUED: PROJECT: Canyon Estates Condominiums CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVER INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. OW14 /90