Loading...
HomeMy WebLinkAboutPermit 6673 - Andover Executive Park - Building 10 - Reroof6673 91-279 andover executive park 617 industry drive #10 reroof Permit 6673 - Andover Executive Park Building #10 "TYPE OF CONST.: Reroof UBC 515117517 y ear 1988 SETBACKS: N- S - E- W- FIRE PROTECTION: O Sprinklers Detectors N/A (] ® UTILITY PERMITS REQUIRED? 0 Yes No (through © Publio Works) ZONING: BAR/LAND USE CONDITIONS? 0 Yes 0 No CONDITIONS (other than those noted on or attached to •ermiU•Ians SEE ATTACHED REROOF CONDITIONS REGARDING VERIFICATION OF ROOF CLASSIFICATION. ZIP .. . . enI . Hallwood Management Company .vo 575 -6675 ADDRESS 617 Industry Drive, Tukwila, WA ZIP 98188 CONTRACTOR Haight Roofing Company, Inc. PHONE 784 -8414 ADDRESS P.O. Box 70150, Seattle, WA ZIP 98107 WA. ST. CONTRACTOR'S LICENSE # HAIGHRC2694K EXP. DATE 4 -1 -92 PHONE ARCHITECT ADDRESS ZIP CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO C ( T DATE ISSUED: " . lo-q) SITE ADDRESS DESCRIBE WORK TO BE DONE: Reroof to Class "A" roof assembly. • USE:;.` FLOOR SQUARE FEET T APPROVED FOR ISSUANCE BY: SIGNATURE: PRINT NAME: CERTIFICATE OF OCCUPANCY NO. OCC. LOAD 617 Industry Dr SQUARE OCC. FEET LOAD, SQUARE FEET BUILDIN PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) PROJECTNANiElTENANT Andover Executive Park Building 10' ASSESSOR ACCOUNT # 252304- 9008 -03 TYPE OF U New Building U Addition Li Tenant Improvement (commercial) U Demolition (building) L) Grading/Fill WORK: 0 Rack Store x0 Reroof 0 Remodel (residential) 0 Other: CO o E� C O.IVIPLIANCE OCC. LOAD FEES DESCRIPTION BUILDING; PERMIT:: FEE :: P:..tANCH ECK >:FEEi< >; <» :<;:; BUILD.I NG SU RCHARG E OTHER. �.flvest ig: tLOU 330 TOTAL- AMO.UNT:. 330 00 .0249 :. 7 08'<91 :> SUITE SQUARE FEET OCC. LOAD BUILDING OFFICIAL l )'r Thl permit hall become null an• Vord �f ttte work is issuance, orif the work is suspended or abandone 1 r 6 got commenc ;within 180 days from the 'or a penbd;of 18D days from the last inspection I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lav and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. DATE: 'I° in • COMPANY: DATE ISSUED: VALUE OF CONSTRUCTION - $ 36, 837.00 SQUARE FEET OCC. LOAD TOTAL SQUARE FEET DATE: 7_ y TOTAL OCC. LOAD PERMIT NO. CONTACTED b ob DATE READY DATE NOTIFIED (� BY; - i�"l 1 C 1 (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: snit AMOUNT OWING 0 3RD NOTIFICATION BY: (init.) PROJECT NAME Nndo! -er Ex-ecutiv.p 4RVK 66 10 SITE ADDRESS SUITE NO. PLAN CHECK NUMBER BUILDING - initial review (ROUTED) O FIRE O PLANNING O PUBLIC WORKS O OTHER g BUILDING - final review REVIEW COMPLETED INIT: INIT: INIT: INIT: INIT: BUILDING. 'ERMIT APPLICATION TRACKING INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SI~... ............... 1OGiYa SQUARE FE OCC. LOAD SQUARE FEET OCC, LOAD SQUARE FEET OCC. SQUARE LOAD FEET OCC. LOAD SQUARE FEET 000. LOAD TOTAL SQUARE FEET DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. UBC EDITION (year): CONSULTANT: Date Sent - FIRE PROTECTION: Sprinklers FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: 7_7iii •IIREMENTS 1 • Date Approved Detectors N/A INSPECTOR: BAR/LAND USE CONDITIONS? S- E- W- (]Yes (]No TOTAL OCC LOAD Yes 08/17 SI t a ADDRESS SUITE # 617 1,___--„,.__________,__, B_uildinc_�110 VALUE OR CONSTRUCTION - $ $36,837.00 PROJECT NAME/TENANT Re -Roof Andover Executive Park Building #10 ASSESSOR ACCOUNT ft 2, • • - -ppg TYPE OF New Building t JAddition 0 Tenant Improvement (commercial) ■ Demolition (building) WORK: ❑ Rack Storage Q Reroof Remodel (residential) C. Other: DESCRIBE WORK•TO BE DANE: Remove existing roof to plywood deck. Install red rosin sheet, mechanically. fasten 3/4" Perlite Roof Insulation, 3 layers Malarkey Type IV Glass ply sheet & or layer fiberglass mineral surface cap sheet for Class "A" roof assembly BUILDING USE (office, warehouse, etc.) Offices and Warehouse NATURE OF BUSINESS: Several businesses per building _ WILL THERE BE A CHANGE IN USE? (Y] No (...1 Yes if Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE • Building: 13,100 Tenant Space: Area of Construction: WILL THEREPIc,STORAGE OR USE OF FLAMMABLE, COMBU$" OR HAZARDOUS MATERIALS IN THE BUILDING? ❑ No .❑ yes IF YES, EXPLAIN: Not Known PROPERTY OWNER Hallwood Management Company P ( uo) 575 -6675 ADDRESS ' 617 Industry Drive Tukwila, Washington ZIP 98188 CONTRAC Haight Roofing Company, Inc. nnNN P t;ZU6) E 784 -8414 AnnaPSS P.O. Box 70150 Seattle, Washington ZIP 98107 WA. ST. CONTRACTOR'S LICENSE # 223 0•l HA IG HR C269QK EXP, DATE Ca... of .. Go 1 ARCHITECT , None PHONE ADDRESS None ZIP :,: ::J ;HtzRIFBV;`iC`rsR'r'IFY .THAT. „�;1; AY,- ,gCi?D ?.194P. :::RXAM!ilSC�: T.. ;.,,;r?f.L . A►TriON .ANA: ItN..,1N :;: +T1.1 :DA Mr;: ° TO . . � "� PF Tpi1F :�kiry % r► p l H(`T�.,.4,, t;Iilti k*..AIITLI - l'YCrv : i�A. nrnr ;u•IGrin:.�'Nik�!'rI •” . . : BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE tU RE „ ����� - I /. 1,1 ,r, I li. ' /A . DATE Z 1At . ..1 PI NE t leete 4-t4 CI'(Y21P, u .. 4 61,0 PHONE PRINT NAME 4 .. ° ! i tzt ,i, •• ., ADDRESS p 6,0,4 SO CONTACT PERSON E: 4 PLAN CHECK NUMBER DATE APPLICATION ACCEPTED BUILDINT3 PERMIT APPLICATION CITY OF TUKWILA . Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 {,206) 431-3670 ' DESCRIPTION!:• " ; ,• BUILDING :PERM(T4 EE::, PLAN CHEGK'FEE :.",::::•: EUILDING SURCHARGE4 DATE APPLICATION EXPIRE APPI. IC:ATICI N RI IRMITTAI In nrr1Ar to ensure that your application is accepted for pion roviow, ploaoo mak° cur° to fill out tho application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. • Application and plans must be complete In order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431.3670 prior to submitting application. In ail cases, a valuation amount should be entered by the applicant, This figure will be reviewed and Is subject to possible revision by the Building Division to comply with current fee schedules. AUlLDMIC OWJ1Crt 1 AUT1401412=0 A0Cfer If tho applicant to other than the ar+ntr, r;,y�iotu�LJ awl�iiaco'ony moor %di v.mtim.1v1 lioonood by the Etatc of Washington, a notarizcd lotto ftucii ilia ly vvvitoi vii ulIIuItLiny llla dJ III Iv Su1)111RI ll►Is permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days tollowing the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(ti) of th. Uniform Building Code (currant edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. 07/02/91 1302 FAX 206 431 3665 COMMERCIAL . ' : •, • . .." : : •••I • :.. • •,• , ;• • f;;, ; NEW comMEncial. BUILDINGS/ADDITIONS F Conipletod bu,kIir ennit:apOlication (ono fo'reti' ch imuct ri Aisaisor Aocburit NuMber , •.: . . • .. :Two sois(2) Of thofollowing; • • • 11 SpecificatiOns . ' Structural CalculatfOrti tamped bia.WashingtOn Slate !iconica ED site rap art stomp line no eel' an gie,•ar r‘iPiiiii 'it/6 ‘' 1 : '' • ; • • ... ... ; . .. . ntirt'ty itirnpeCrby a•Waihingion Iici • • • • L j .1..e • : .;• . • ... . • .••••:•.• • . . . . ... • Workin drawings. ,tamped 6y.'a..Washirigton Sutte ...„. .. architect, which inbliide: • . • • Architectural draWIngs•,;",,;: •• , dr6u.9 '; • •:•;-',." •.• '• • • Mechanic:ell . . . • • • Elevations . .. • • Civit craWIrIg . .. . ; ••• ••• .... ••• • . . . . : .. , fl Completed Utilit.'parfriii•OpplideliOn•, (Or :entire' project) Six (6) seti Of Civil araWings; . . .... : • . ...... . . . Nt Nan iIhlitY pn,mit PPnlinAtori submittal requiroments. RAC)( STORAGE . . •••••.. •: ".••••••.: . ... •.• : • • ..... . • '''••••• • . •• . • . . •••'•••••:: . • ... Completed bonding Permit •••• ,•••• .• . Two (2) sets 'Of plans, Which includd;•••••• .. • I Building floor 'plan showing: :::: • . • EntireitioCie.Whero racks will belooated • •• :•'.•.• • Exit doors .. ••• . .•••:;?•• :'• ••••! • •• • Dimeneions of all • • . ' . .. •••....•.. • • •.• .... ..... .....,..... • . Tora Space florir"plen shOwing . rick rilOrhga „,. . . • • ...NOTE? .lriclude,ditrienitPiii atiack§ and ion :0 and exit 01 • " D StrUCtural Calculations stampod.bla Washington State li�ns engineer (rack storage. tr.and • • SUBMITTAL CHECKLIST RESIDENTIAL NEW SINGLE•FAMILY COniplotaii buiiiding pOrmii applica (ono tion'(6 ''. kir eaCh GirUeture •:"..... Legal daseii 1 1...." : .'', •••., .,......• ,':',.:,.„..;.., • • . j. :. •• : ...'. •,. :. • : ...;•-•,.....• ..• •;„*...,- :,.....••• .:.::.:•:;:...:;;;•,•••...-,•• .......••;,....::,,:•:?:•:•••'...''...:::':;.".,::.1.-%l • AstiessOr ACCOint Number -::.:: .:: .... ,.......„:: - ...... Two sets (2) Of r 'which " ;•: . . ; ,.;: . . • • • . .............. •. Cid1tiii I hydrtuit •,: • Foundation titan ".' •%•!•:•:. • inc/uoe access to aultrone; • Floor plan::.:: . :•••••'• • : • )vt dip tongth•Olaccilt. • • • • • . . . . .. Roof ..... • Building:eleVitiOnS • ••,'••;;•;•:::••:•::':' ; ••• i' Building Citili-ssetionf.:::T: . . . • :.• •,• •• • .. : Structural framing plans • • Ej Washinalon..Stato,Enorav Code ' .. . , ... • 0 Completed dttlity,perrnit application -..• ph .(6 sots 01,iite:plans showing utilities „ . NOM; 0404*i, •,41 uriht). site Pim; •orritincid..." Co. utility permit application and checklist lor specific submittal tsl•V btlitt■ silo conditions. . TUK PUB WORKS 'COMMERCIAL TENANT-IMPROVEMEN Completed bu ilOng pe)tillt'eppliCAttlen•pne'ler • tenant) • " As*c+stert frit Ntoinher:':'• •constrUcti h1 ch incju " ' !-• .• . .. . Location ottanant apace Plan (if )30Plic:iible:;:r;o;i .se 'r 1:41.••.Y,WI4•:••••■1 f.:.Torisp . . • • • Otoaqi•• tr 417,1! .. ' .• .... ' . m • • .• .• . .. . .. • " •i foo'auan., -.604 . ....... • .Ai, pilin*thu „ . .Oriar.).! $.0:.'onnonf:'; E xit A otien44 • . .... .. . • • r rosksictions'efieWing,'..W roohstruct/O Nittitqtqftiertl'IO(tIOor find 'rad:me Zoos . .S.1 , ..iettirel;,OriiICUlitiOnietempeebkli l .Weitiftitttoni . tate: na . . '" , tioil and' plan;;;;;;;. ... , . 0WORAOLAY1* . ........ . . JO * . tru6itir'il'aiticitlations:stamppd ash ngton. thata . . . , . . •:' .... .... . ..... . t: . 4. 4 4 4 , orte•tot,eii • • • • • . • • • siossor 'Account . Iftiiti,47 2 . :.ikoui : 01:',Wotking drawing UndatIcin. E1Crilding,OrOSC•seCtiOn':4';'.; :Structbral framing . • -; • , , .... 1,. be iubmttcd ... •• CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUXWILA. WASHINGTON 98188 MEMORANDUM TO: FROM: 3hQl DATE: T v t �� 1 qa ) SUBJECT: V:a RQ(oc 151tcktr5 t o 4 0,s3s,. PHONE # (206)433.1800 1c1 Ref 5utchay.. 5 3o. 1 3 0 . . Gary L. l anDascn, Mayor • S uom i:kkJ 4 4) c: yc E3 td�O Pet rni+ 3urchotj.e u T. • . P- ermi -k- SUrckrj_4_ Toka G�P��SD TOTP ac1 5.50 c1 .0 4. 1 . 00 4 .50 (�S roe : Iva u etc.. . / 0 T ype o nspecti . I�t Wei— Address; ( ,7 nu,Spei .02 Date Called; Special Instructions: . 1 Date Wanted: '� - 3o - am. p.m. Requester: Phone No.: 7N- gtiot INSPECTI tNO •ERMIT `0 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 45,1 -3670 ❑ Approved per applicable codes. COMMENTS: Inspector: INSPECTION RECORD Retain a copy with permit ❑ Corrections required,prior to approval. Date: 41 ❑ $30.00 REINSPECTION FEE REQUIRED. • Prior to reinspection, fee must be paid at 6300 Southcenter Blvd:, Suite 100: Call' to schedule reinspection. • • PROJECT: e_di,,,, fi 2- i PERMIT NO. Ci 7 SITE ADDRESS: ,( =u00 ' kDR. - 6.-nGS 10 14 I DATE CALLED: TYPE OF INSPECTION: �F C"�U a.m. D ATE WANTED: a . p.m. . SPECIAL INSTRUCTIONS: Y rt,-1 Pev-Fd r+-wleP if c Oxvn it REQUESTER: PHONE NO.: _ _ INSPECTION RESULTS /COMMENTS: piJ 7/217/ i /Ld-d Per-S werLE dace tAfib t-(0 6 7746 ,4 vE .5l7eS v f o FN tar 6 ■67•9 Tit JG A ItefAsoi PE n rf :' ac 6 HM 614 of 144-(6 N7' em -o Fc t.1(-; wA al i•m4 crev .4 71:1H2 ?0 APPcy Po X- 4 Pe grnr r(s) ``i4A .DA7 o (t NO - Tb4AT1 NenttrJ 0 N - 7 /3/ I. N e Or.opr ; on1 ?($IRI / IT wpv3 J&S e- 7443 T\E (aFS W CAE Pogsumeo Cp p 44rj11 iA1 A c t r t-7 -w° YYtM .t ft's - r b uT- 1 r (3 C)412- 734tY Pty 141 1 ice.Ac3 -61 rP36 5 N'ii'vir TO rz A6 " 'D '51 tz-e 1.11 s T e / - P L 4 c. . vsa —S w8 w rurr d f A r A-1 NZ" me LAO f m o e e ttm w ASS • HMG N T b i 0 c rn g W A >9 PRY 7141' ,tr i gitn0 FeI -S . =;i Sib' v13 AO- , r rt CeS i i Le 6 N6 .948 u vnin9 7144-r TNe P sEn nr73 wru.. a' ►- s'uiP. M .411r1r.:,M 111 ��r+=i..ro- ,mnwm:sv. Tarn+ nxs: nrm vasrawegrxewtit; xx: a..; 5:3 a...; k..+ N. .,^. <n:sv�eoe.s,r..:ru.,. .,rxx po S r CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD =i. 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 • A,tor •Work # CITY OF TUKWILA (D‘ CO 67 BUILDING DIVISION 6300 SOUTHCENTER BLVD. TUKWILA, WASHINGTON 98188 TELEPHONE (206) 431-3670 ALL PERSONS ARE HEREBY ORDERED TO AT ONCE STOP WOR PERTAINING TO CONSTRUCTION, ALTERATIONS OR REPAIRS ON THESE PREMISES AT ; /0 , G , ( -- "? . THIS ORDER IS ISSUED BECAUSE NO / El" /1.. 00F/ AJC, p)1 /7 PI r3ct, 1( a. ) Or 734c (..\ d‹.- . / / BY C ,-_,),.. 1,..,*'4.... I.. r )6, 2 0 err Ai NJ .7) A tbt. , AM m? POSTED ' ( p 19 q I - 1 Name / WARNING: The failure to stop work, the resuming of work without permission from the Building Division, or the removal, mutilation or concealment of this notice is punishable by fine and imprisonment. J Atop Wol* # C CITY OF TUKWILA C BUILDING DIVISION 6300 SOUTHCENTER BLVD. " TUKWILA, WASHINGTON 98188 TELEPHONE (206) 431-3670 ALL PERSONS ARE HEREBY ORDERED TO AT ONCE L (42 5 STOP WORK PERTAINING TO CONSTRUCTION, ALTERATIONS OR REPAIRS ON THESE PREMISES AT 4 1.. D / t IL) 61 1.. g - THIS ORDER IS ISSUED BECAUSE ttl /V r le• &d) I(L) eF fl-t AM POSTED 4 1: 0(,) (pm QtJt y 19' I BY CICS tv Na eiTMe WARNING: The failure to stop work, the resuming of work without permission from the Building Division, or the removal, Mutilation or concealment of this notice is punishable by fine and imprisonment. v' 4-.4-P Worki. 0 CITY OF TUKWILA C 1- cal BUILDING DIVISION 6300 SOUTHCENTER BLVD. TUKWILA, WASHINGTON 98188 TELEPHONE (206) 431 -3670 ALL PERSONS ARE HEREBY ORDERED TO AT ONCE PERTAINING TO CONSTRUCTION, ALTERATIONS OR REPAIRS ON THESE PREMISES AT .U��X� / `7 C,o�l 7 ... . r.''; f;��. i,t`' - 'r k . THIS ORDER IS ISSUED B P,J`:.) f{ -' �t4c 0(7;1r r f l" (" /-4A& szc. . ,� ti ,,:; >..��. ; F 6. C. STOP WOR (( __7 POSTED '.I .. (; C) P111 4i.00, S ^41. 19 q BY h...,. z:;Li .'7 CI Na a / 1 The failure to stop work, the r of work without permission from the Building Division, or the removal, mutilation or concealment of this notice is punishable by fine and imprisonment. "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre - Reroof 431 - 3670 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 617 Industry Dr BUILDIL3 PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO. (0(D DATE ISSUED: PROJECT: Andover Executive Park B1d 10 CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other Inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstnaction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 09/14/90 44 alra BUILT-UP ROOFING SPECIFICATIONS 111 MAL•OM ROOFING ASPHALT PREMIUM 1 FIBERGLASS PLY SHEET NO. 500 RECEIVED CITY OF TUKWILA JUL ti PERMIT CENTER NON•NAILABLE DECK OR OVER APPROVED INSULATION ; APPLICATION/INSTALLATION - O 144 a8I Fngs:` A: d,t4,r, :t.':Shgil:be:appjied as per rnanufacturer's sped- 1 . t'ti� c4.'.flo�tiQ�J.s"1c. ttr:z rte.•.r•is'. t L' t2Cf,pgehd.roofill tgeiebrang 21RCh1's br mote above 11: AttWtr(Ical surfaces shall be . canted: r ;' ►� 4iVail.ot:c�inentta_th>Idec�tR ` i �; art Flasftifigs :j;;:,i;• : t .: irs Pt:; t" 1 f Shall be minlnium,of a inches above insulation or roof membrane. (See SMACNA detail #113). '2. Provide for nailing to the top surfaces of all curbs. 3. Install or mechanically fasten nailing surfaces (treated wood /nailer strips) flush with surface. C. Cants: • • 1. Shall be installed at all vertical roof intersections. 2 . Shall be approximately 4 inches in horizontal and • • , 4 inches in vertical dimension. 3. The face of the cant shall have an incline of not more than 45° with the roof. 4 . Install on top of roof insulation or insulation stop. 5. Install on top of roof deck with nails or screws. D. Projections /Extensions: 1. Install all projections and extensions through the roof deck prior to installation of roof system. 2 . Projections shall be constructed not less than 18 inches from the intersection of the cant and roof deck. E. Metal Flanges /Gravel Stops /Eave Strips: Refer to General Specifications and Requirements. 34" 36" 1 FIBERGLASS PREMIUM CAP SHEET NO. 502 IM4 CLASS "A" Up to 2" slope In 12" ALL ZONES Materials Per 100 Square Feet No. 706 Asphalt Primer (if required) 1 gal. 8 lbs. Approved Roof insulation Premium 1 Fiberglass Ply Sheet No. 500 3 plies 27 Ibs. Fiberglass Premium Cap Sheet No. 502 1 ply 78 Ibs. Asphalt 100 Ibs. General requirements and specifications are applicable as part of this specification. Malarkey recommends the use of its High Performance Premium Polyglasse Cap Sheet No. 601 as a base flashing material. Malarkey recommends the use of its SBS Mineral Walkboard No. 916 for all traffic areas. Malarkey approves No. 506 PIy Sheet to be substituted for No. 500 PIy Sheet. 4.02 PREPARATION & USE OF MATERIALS & EQUIPMENT A. Asphalt Temperatures: 1. The asphalt shall be heated in accordance with EVT (Equiviscous Temperature) standards and applied within the temperature range [EVT ± 25 °F]. • 2 . If using Malarkey SEBS asphalt it shall not be ap- plied at temperatures below 450 °F at point of application. 3. At air temperatures below 36 °F, it is required that supply lines be insulated. 4.03 ROOF INSULATION A. General: 1. Insulation shall be laid parallel with eaves. 2 . Insulation boards shall be laid in an ashlar pat- tern (cross pattern), joints staggered with the joints between the long dimension of the boards continuous. 3. Where recover board is specified, Joints shall be staggered over underlying insulation. 4. Space roof insulation 1 /4 inch from all vertical fleshings. 5. Insulation shall be neatly cut and fit around all roof projections. 6. Secure insulation boards with approved mechan- ical fasteners. 7. No more insulation shall be laid than can be com- pletely covered in a day's work. 241 4.03 ROOF INSULATION (Cont'd) 4.04 EXPANSION JOINTS A. Contact Malarkey for specific application details. 4.05 WATER CUT-OFFS A. Divide roof area into areas as specified. B. At the end of each day's work, provide temporary water cut-offs at the edge of the insulation. Remove cut -offs when work commences. C. Water cut -offs shall be one layer of No. 501 base sheet embedded in a solid uniform mopping of hot steep asphalt applied at a rate of 30 lbs. per 100 square feet. 4.06 WET INSULATION ' 1 A- Remove and replace all wet insulation. 9. Built -up r 0 00f ing shall not be applied over wet insu- Iatiori; ' 4.07 BASE SHEET•APPLICATION L Not applicable for this system. 4:06 PLYSHEET APPLICATION r.. 2.22 B. Wood Nailers Installation: 1. Provide wood nailers on slopes greater than 11/2 inches per foot. The nailer shall be the thickness of the insulation by 4 inches wide. Nailers shall ' - be installed perpendicular to the slope. C. Multiple Layer Application: 1: The roof insulation is to be installed in multiple layers with the joints staggered in one direction. 2.Offset the joints of the top layer a minimum of 24 inches over the underlying insulation layer. 3. The top surface of the first layer shall be coated with steep asphalt using 25 lbs. per 100 sq. ft. 'A. Specified plysheet(s) shall be embedded into afluid, continuous application of asphalt. The plies shall be lapped specific•to system and mopped as shown. The asphalt shall be applied in such a way that in no place will felt touch felt. Light "brooming" is advised to aid adhesion. 1. Ply sheets shall be shingled in, free of wrinkles or fishmouths. 2 . May be applied by a mechanical felt Iayeror rolled into a hand mopping of asphalt. 3. Shall be applied so that the flow of water is over or parallel to, but never against the lap. 4. End laps shall be a minimum of 4 inches and off- set a minimum of 12 inches apart. 5. Embed the full 36 inch width of each ply in hot asphalt applied at the nominal rate of 25 lbs. per 100 square feet. 6. " Brooming in" is recommended for both felt layer and hand mopped applications. 7. When "Rolling in" by hand, the mopping asphalt shall be kept within 5 feet of the roll. 8. Mop shall be kept fulland flow asphalt on the roof. Do not scrub with mop. 9. Do not "glaze in" ply sheet during the interim be- tween surfacing. 'I-104" 'it 4.09 4.10 10, On slopes( Ater than 2" all ply sheets shall be applied parallel with the roof slope. ► Provisions must be made for back nailing of felt. ► Provide wood nailer strips on non - nailable sub - u strates. CAP SHEET APPLICATION A. Roof surface shall be clean, free of dust, dirt or mois- ture when cap sheet is applied. B. Light priming with asphaltic primer is required if any surface oxidation has occurred on the installed base - sheets, C. Shall be applied free of buckles, wrinkles, blisters, fishmouths or voids of any type between the sheet and the mopping asphalt. D. Shall be applied over and parallel to the underlying roofing and lapped, so that the flow of water is over or parallel to, but never against the laps. E. Shall be lapped with 2 inch lap seams and 4 inch end laps. F. End laps shall be broken not less than 3 feet apart. G. It is recommended that cap sheets be "flopped" into place. Tension shall be placed on the ends of cap sheets lengths as they are flopped into place to en- sure that the sheet lays flat in the asphalt. H. " Brooming in" is recommended by the material man- ufacturer to insure adequate bonding of the cap sheet to the asphalt during low temperature application. I. Embed loose granules into over -run of hot asphalt at side and end laps while asphalt is still hot. J. On slopes 2" or greater, the underlying sheet of all cap sheet end laps shall be nailed with two rows of nails, 3 inches apart, on 3 inch centers staggered. VALLEYS AND WATERWAYS A. Shall receive an extra ply of No. 501 base sheet. B. This extra ply shall be at least 36 inches wide and extend at least 12 inches up the inclines out of the valley. C. This extra ply shall be laid prior to the application of the roofing plies. 4.11 ROTARY-DRUM-TYPE FELT LAYER Not recommended by roofing manufacturer. 4.12 MECHANICAL FELT LAYER A. Shall be multiple gate valve type that spread hot asphalt on the roof surface Just ahead of the roof- ing as it is applied. B. Equipment shall be clean, in good operating con- dition and shall hold sufficient asphalt to lay an en- tire roll of ply felts. 4.13 SURFACING Not applicable for this system. 1111 MIL-EM i /p, 2x9 oa. . P44 ' 4∎darNftc4,1,¢: : 210 , r.. A/4#,- Ex', 3'p e44F A 4k.44 C.Noppl6 64tfs CoaL vav Cop &t or , RECEIVED CITY OF.TI IKWILA UL, :` :8 1991 :PERMIT CENTER :.