Loading...
HomeMy WebLinkAboutPermit 6701 - Segale Business Park - Reroof6701 91-313 segale #771 18325 segale park drive b reroof Permit 6701 - Segale PERMIT NO. CONTACTED Ue t 1 S2--- DATE READY DATE NOTIFIED -1 , t I' o�� C ( ,,�Q (init.) ��l} PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING cb 3RD NOTIFICATION BY: (init.) BUILDING C''ERMIT APPLICATION TRACKING PLAN CHECK NUMBER Gl 313 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) F.L crR TO 7 SQUARE FEET PARTMMIEN.T" BUILDING - initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review LOAD PROJECT NAME SITE ADDRESS SQUARE REVIEW COMPLETED INIT: INIT: INIT: INIT: OCC. O D RCM/ ROUTED tc0&S 14L Pk tr "6" SQUARE E OCC. LO _D SQUARE FE OCC. OAD DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. CONSULTANT: Date Sent - FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- TYPE OF CONSTRUCTION: UIREMf~ SQUARE FEET OCC. OAD SUITE NO. ME TOTAL •U .RE FE Date Approved - FIRE PROTECTION: Sprinklers • Detectors N/A INSPECTOR: S- E- UTILITY PERMITS REQUIRED? ( ] Yes ( ) No PUBLIC WORKS LETTER DATED: UBC EDITION (year): TOTAL OCC LOAD JBAR/LAND USE CONDITIONS? ( )Yes (] No SITE ADDRESS SUITE # 18325 Segale Park Drive "B" VALUE OF CONSTRUCTION - $ $101555.00 PROJECT NAME/TENANT SBP 771 Roof ASSESSOR ACCOUNT # 352304 -9119 TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) WORK: O Rack Stora.e ®Neroof U Remodel (residential) O Other DESCRIBE WORK TO BE DONE: Repair existing roofing BUILDING USE (office, warehouse, etc.) Warehouse NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? giNio U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: 247741 Tenant Space: Area of Construction: 247741 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? 2 No O Yes IF YES, EXPLAIN: PROPERTY OWNER Segale Business Park PHONE 575 -3200 ADDRESS 18010 Southcenter Parkway ZIP 98188 CONTRACTOR _aeaale Rns1nPRc Park PHONE 575 -3200 ZIP 98188 ADDRESS 18010 Southcenter Parkway WA. ST. CONTRACTOR'S LICENSE # SEGALBP151M5 EXP. DATE 7 -9 -92 ARCHITECT PHONE ADDRESS ZIP I HEREBY::CERTIF THAT ..I,HAVE READ. AND::EXAMINED. THIS ' AND: >TO BE TRUE: AND CORRECT, AND. I AM AUTHORIZED TO APPLY FOR >:THIS:PERMIT BUILDING OWNER OR AUTHORIZED AGENT � G U C7e-i- c..r,^ DATE PRINT NAME Si. R. Nelson PHONE 575 3_ 200 ADDRESS 18010 Southcenter Parkway CITY /ZIPTukwila 98188 CONTACT PERSON Steve N _1 son PHONE 575 -3200 (206) 433-1849 DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE (D5(-1,0% b 4 - 1 Q10 PLAN CHECK ! NUMBER CI 1 APPLICATION; MUST BE. FILLED bur: COMPLETELY . PLAN CHECK FEE BUILDING SURCHARGE 14 ENERGY SURCHARGE OTHER: TOTAL - L2Ea. S V \,/ CITY OF TUKWILA Department of Community Development - Building Division BUILDIN3 PERMIT APPLICATION FEES (for staff use only) APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES 1-- a(0 - q „ COMMERCIAL iiivit.,000mEni44.' op' Completed budding permit app1lcatlon (one for oach structure Ti sp.cioauons Strucfljrai Topograpl'dcal survey • .61.0 OneiiiVCalcu esctiptJon 4dricieitjjr • i4reoped.!*,E1, Washlngten . Stte Sod SuctureJ drawings Mechanical drawings Completed udflty permit appflcadon SIx (6) sets of civil drawings 14°7E4 •See I .SOmpieted building permit application Eikit. doors •.• Tenant spaca floor plan showing rack storage layout, *lsle and "" ................. Inoludo•diniiinsionf tiliatut;31CalaUl on stamped by.t.Wathingtc*.Stetaliconap., s RESIDENTIAL NEw. .:complated bUflOing permit application'(Ona for:each •strtiCtUre SCZMITTAL CHECKL.IST ..... :::••• . • : . • • . " • Atiseesor Account Number ,:EIT■vo.sets• (2) .drativings;: which: . . • • Foundation 1 pan. • Forplon Roof plan 413itilding.elevations.(ttll 4 ; Building 6:roes-section '• Stmctund framing plan* • : . • • •••• .• • : ••• • ••: • • • Washington State Energy : " • • Completed utility permit application ..• • Six (6) sets of site plans showing utilities ilding site p and - specific autinlitt0inP3(44!ed../M6rnee us en NOTE Bu d utilit site plan may be comb t * permit application and checklist for spec /redo unique • A site dci m iki na i nditi t oon p :g. topog al and soils Information may be . rq, Com pleted building permil .. .................................................................... Two 2) setS of constructlon plans, which Include Site plan e ••.; Overall buildin r •••• * Tenant location , lisa of adlacent (common wall) tenant • Overall dimensions of building or square footage Floor plan of pro • T showIng Wall ' Exit doors egress patterns Cross sections . .. constrijctl and method of • attachment for floor and ceiling - engineer may be required if sfructutal work is to be done (2 sets) application and plans REROOF • • :: • .... . . . .: • ... • • •••-•" perm -•:• for •• • •• • each sbucturo) L11 Assessor Account Number f— Narrative . • . • . a n d . .. 0 : 1 O 00 :••• be ing NOTE A certification lettsr Is required prior to final inspection and sign- • ..•••■••• on of tenant space and proposed parking • . . • , r-i .‘...COMpletecf..hullOng:Perniltf:applicadOnlone:for each • Two (2) se ts of . . ......... wo rking . ......... . . .. . .. . .. . Site ptaii • Foundation plan • Roof plan 'Building elevations tall views) • Building cross-section • :::: • • • : . ......... . „ ... . . . ........... .„ .. ......... • • . . ..... • !trii4;:to.:Ito • • NOTE it ;ry.•4010k.Woik Is to 0:•..clor7.! utility permit application :• and Plena must be submitted . • • . • • . . . roje ti Y• ype o n > ton: I a V g Date anted: 1 D - c- -GO' 45. .m. Requester: 11)3ne . G 52 INSPECTION RECORD Retain a copy with permit 0. `CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 , (206) 431 -3670 ❑ Corrections required prior to approval. COMMENTS: Inspector: 'Approved per applicable codes. Date : / 0 1 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Bivd., Suite 100. Call to schedule reinspection. Dade: COMMENTS: FOX-- Ct WP's-L- AA? IZ•bv PiL. 1) t? (v1 D E W r, ri- - A- rrn.►'c l :.1"'C1-�Y - FF=A -b PI-- !' FA ,•)G . Gee 1-3 - 4 z) A I0'X 30' / •0 �-oF L-ocP 9 0 r1 TWA -- SC uac- tv - 1'1Aie E Rw) C.c` TW O t Amt' cti\ , 14E it? YV ■ � Pry-- - A P P L.% C f' U r.1. ) hi,.1 "6L-- ii—NOW—/0 4E ArD ✓tSe> TO o,' i A� A , s•y -- Gr. bu.I LA „ PILANIS ADD .vet Fy 0 r O (LA -t tom•) Ow), ►J 1 ' • 4-) 1 .r,► -S'rit, LL .5C 2 §- ) p rte-- 0243 1.. F -D ‘ r . r I s-■ P€ (IF 61-1K, • Requester: roe : ype o nspect s n: Address: / y.3 c 7F1,F,k•- g i Date Called: 2 92 Special Instructions: Date Wanted: am. p.m. Requester: C' M Phone No.: 57.5 `3 )Q 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. n INSPECTION RECORD Retain a copy with permit Date: O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (206) 431 -3670 [� Corrections required prior to approval. PROJECT: " . U-$ X111 PERMIT NO. SITE ADDRESS: '. -. • k , ^ 0. ./ . ti i IA ....V DATE CALL -'�q- 9 _,� TYPE OP INSPECTION j .2- '.�XOOt DATE WANTED: '� -3 Q - q f 1 SPECIAL INSTRUCTIONS: ' ♦ I l • u REQUESTER ou_� •:��!��^ lie � � • 66 ' ( /AIN PHONE NO.: L.. �7 INSPECTION RESULTS /COMMENTS: / Q 2-.' 2. ,4. P tv Aw°�m,ofS` ' nektuu / / 1 7 /JIY1 ,e2,44.0 L4 C. % , 0 .. ✓- y '')'1 4...r.�- .., . d �_ p -.j s� kr .„.4g 4s a .,‘.31_,c..... ,-),.. r - , _ INSPECTOR: DATE: 7 /377/ / vi X' i 'v;:�?c {p :.nA ? „i:'IS...:. CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ., :1 v:s•1* n:x2:e:ra;5,i�. r+' x; �f: �iPi:+ 7 »',s'.h•'.. "Y:TS"Su�;Qi� INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 COMMERCIAL INDUSTRIAL ROOFING INC. 17508 BOTHELL WAY NORTHEAST BOTHELL, WASHINGTON 98011 • (208) 387.4011 • 487-2329 February 3, 1992 City of Tukwila Department of Community Development Building Division 6200:Southcenter Boulevard `Tukwila, WA 98188 RE: Building # 771 of Segale Tukwila, Washington Business Park, 18325 Segale Pk. Whom it may Concern: We, as 'Commercial Industrial. Roofing, Inc., installed a roof membrane assembly, which did not include ,insulation, - 'consisting, of Malarkey. Specification :.# NS 3 Heavy Duty, data, sheet:'. enclosed, which, meets or exceeds .the requirements. for or'.Class B roofs. .This r.00f.was installed at above Building #. '771, under City . of Tukwila building permit . number # ,,n It Malarkey BUILT-UP ROOFING SPECIFICATIONS ALL ZONES SLOPE —0 "to3 FIBRATED EMULSION U.L. CLASS "B" — Up to 1 /2" slope CLASS "A" - Up to 1 /2 " slope with ISOCYANARATE SBS PREMIUM 1 BASE SHEET NO. 501 SBS PREMIUM 1 BASE SHEET NO. 501 Per 100 Square Feet 1 ply . 5 lbs. 3 plies 90 lbs. 50 lbs. 15 -25 lbs. 3 gals. 24 lbs. 2 gals. 18 lbs. 2 gals. 18 lbs. Materials Rosin sheet recommended Glass Premium 1 Base Sheet No, 501 Asphalt between piles Asphalt surface or Emulsion and/or Aluminum or Malarkey Rhino -Hide TI -Cote Follow general requirements. APPLICATION: Over wood boards only, lay one ply of rosin sheathing, lap each sheet 2" and nail to hold in place. NS3 HEAVY DUTY ASPHALT, EMULSION, ALUMINUM CERAMIC GRANULES Apply Malarkey Premium 1 SBS Base Sheet so flow of water is over laps. Lap each sheet 2" on sides and 6" on ends. Nail each sheet as required, turn up 2" above cants at verticals. At a uniform rate apply hot asphalt to base sheet per diagram. Sheets shall be applied so flow of water is over laps. End laps shall be at least 4" and adjacent end laps 12" apart or more. Broom each ply gently and turn up 2" above the top of the cant and shall be solid mopped to vertical wall. Coat entire surface with a uniform application of specified hot asphalt, emulsion and /or aluminum coating. Malarkey recommends the use of its SBS Mineral Cap Sheet No. 601 or SBS 3 -Way Type Mineral No. 917 as a base flashing material. Malarkey recommends the use of its SBS Walk Board No. 916 for all traffic areas. "X" REQUIRED INSPECTIONS PHONE APPROVED DATE PROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre Reroof 431 - 3670 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 SITE ADDRESS: 18325 Segale Pk Dr " CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BuILDII:G PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: Segale #771 CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (p70/ PECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are In place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 09,14/90 NORTHWEST 'August; l0, 1990 Segale:Corporation. P.O. Box 88050 Tukwila, WA 98188 Attention: Steve Nelson Reference: 771 Re-roof Steve: I have received your letter specifying the actual measured loads of roofing and insulation. The re-roofing will add 2.1 psf. However, the existing roofing and insulation weight .96 arid .93 psf less than originally calculated. The additional ' load "will only ; add .21 psf " load and `i is not considered significant. Sincerely, ' 1 21990 obert Raichle ice Pr es i dent RECEIVED f:ITV OF TIUKWILP ,. J_U i.y 2; 6 1991 PERMIT CENTER < 1=� FAA z NGINEERS NORTHWEST, INC. P.S CONSULTING E NGINEERS 68 WO AVENUE N.E. SEATTLE, WA 98116 ,` " (206) 626.7660 Ff1X (206)02 6698 . ': July 23, 1991 SEGA L E B US/MESS FIA ! IC Duane Griffin CITY OF TUKWILA 6300 Southcenter Boulevard Tukwila, Washington 98188 Re: Segale Business park Building 771 18300 Southcenter Parkway Dear Duane: The existing roof membrane is a class "B" built -up roof with a smooth cap sheet. The roof ; will be repaired with Malarky : specification #NS3 Heavy Duty system with ceramic granules. Enclosed is a letter from the engineering firm of Engineers Northwest. Inc., P. S. regarding the additional dead load and the existing roof structure. If you need any additional information, please call me at 575-3200. Sincerely SEGALE BUSINESS PARK Steve Miller Enc. RECEIVED CITY QF TI IKWILA JUL 26 }991 PERMIT CENTER TUKWILA, WASHINGTON 98138 R0. BOX 88050 . II TELEPHONE: (206) 5764200 I . FAX: (206) 575.3207 9