Loading...
HomeMy WebLinkAboutPermit 6711 - Swift Residence - Reroof6711 91-327 swift elton 4526 south 136th street reroof Permit 6711 - Swift Reroof CITY OF T UKWILA 6200 SOUTHCENTKH BOULEVARD, TUKWILA, WASHINGTON 98188 TO:. Kim Hart, Finance FROM: Shellie Bates, Permit Center. DATE: August 13, 1991 SUBJECT: Refund Please refund $58.50 to Tedrick's Roofing, Inc. The permit was cancelled and the building official is authorizing a refund of 100t . percent of the building permit fee and the State surcharge. The original transaction was August 5, 1991, Receipt #1031 for $58.50. Please mail the check to the applicant Jim Tedrick Tedrick's Roofing Inc. 29211 158th Avenue.S.E. Kent, ;WA .98042, Thaik Youl PHONE II (206) 433.1800 at the following address: Gary L. VanDuseu, Mayor tedrick's roofing jim tedrick SPECIAL! NG IN RE- ROOFING COMPOSITION • SHAKE TYPE OF CONST.: ReroofUBC EDITION (year) 1988 I hereby certify that I have read and and ordinances governing this work does not presume to give authority construction or the performance o examined this permit and know the same to be true and co rrect. All provisions of lay will be complies with, whether specified herein or not. The granting of this permit to violate or c. cel th provisions of any other state or local laws regulating ork. I a I .•ttiz to sign for and obtain this building permit. SI ' ,� w DATE: �" 9/ 4 ATURE: �,!'/, 14 - PRI t.: , E: 7iNF[ ./:.7. ic ' COMPANY: jXiC, , A /C TYPE OF CONST.: ReroofUBC EDITION (year) 1988 SETBACKS: N - S - E- W - FIREPROTECTION: Sprinklers 0 Detectors ® N/A UTILITY PERMITS REQUIRED? 0 Yes ® No ( public ■Works) ZONING: BAR /LAND USE CONDITIONS? C) Yes [j No CONDITIONS (other than those noted on or attached to permit/plans) ARCHITECT PHONE ADDRESS • ZIP PREP ' •" ER Elton Swift PH•N 846 -9499 ADDRESS 25911 57th Avenue East, Graham, WA ZJP 98338 CONTRACTOR Tedrick's Roofing PHONE 824 -3440 ADDRESS 29211 158th Avenue S.E. , Kent, WA ZIP 98042 WA. ST. CONTRACTOR'S LICENSE # TEDRIRI121NC EXP. DATE 7-07-92 ARCHITECT PHONE ADDRESS • ZIP BUILDINU PERMIT 0/+ (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 FEES DESCRIPTION BUILDING PERMIT::FEE:<: . PL'A N';CHECKFEE:<'' is BUILD.ING`SURCHARGE OTHER><>i < > <<<';:;;; AMOUNT :54:00 ;'; 4::50;.:: 158.50 RCPT. #:: BUILDING CO1 I PERMIT NO. DATE ISSUED: 5-11 SITE ADDRESS 4526 S 136 St PROJECT NAME/TENANT Swift, Elton TYPE OF L) New Building Li Addition WORK: 0 Rack Storage Q Reroof PLAN CHECK NO.: 91 -327 SUITE # TQTAL. VALUE OF CONSTRUCTION - $ 3,175.00 ASSESSOR ACCOUNT # 261320- 0181 -02 Li Tenant Improvement (commercial) Li Demolition (building) LI Grading/Fill 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Remove existing composition roof, replace rotten wood and recover with compostion roof and add attic vents. DATE C ODE COMPLIANC USE ..� FLOOR t _ SQUARE `Y FEET TO /. OCC. SQUARE OCC. SQUARE OCC. SQUARE LOAD FEET LOAD FEET LOAD FEET OCC. LOAD SQUARE OCC, TOTAL TOTAL FEET LOAD SQUARE FEET OCC, LOAD is permit "cecome null and void if t issuance;`: or if the' work ;is suspended or;a CERTIFICATE OF OCCUPANCY NO. ie work is not commen within 180 days from the date of andoned for a'perod of :1:80 daysfrom thelast inspection. DATE ISSUED: PERMIT NO. CONTACTED DATE READY DATE NOTIFIED BY: (init.L PERMIT EXPIRES 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) BY: (init.L AMOUNT OWING n PLAN CHECK NUMBER PROJECT NAME SITE ADDRESS INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) FEET FEET SQUARE OCC. SQUARE FEET LOAD FEET FL CCC. LOAD OCC. LOAD SQUARE OCC. LOAD SQUARE FEET OCC. LOAD SQUARE TOTAL SQUARE FEET DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. O FIRE PAFTIVIE .i BUILDING - initial review O PLANNING O PUBLIC WORKS INIT: INIT: REFERENCE FILE NOS.: PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: UIREME INIT: MINIMUM SETBACKS: N- S- UTILITY PERMITS REQUIRED? Yes UBC EDITION (year): O OTHER IcX BUILDING - final review REVIEW COMPLETED. INIT: INI (ROUTED) BUILDINGC'ERMIT APPLICATION TRACKING Lis S In _17 SUITE NO. MEN. CONSULTANT: Date Sent - Date Approved - FIRE PROTECTION: ( ) Sprinklers Detectors N/A FIRE DEPT. LETTER DATED: INSPECTOR: ZONING: 1BAR/LAND USE CONDITIONS? Yes o re SS TOTAL OCC. LOAD PROPERTY OWNER,,,k i'e,ei_cplT4r6- j- UJ,/�% P ONi e i 7 (_.= / 7_ / ADDRESS `� '.�J �i�. � 3.3Q ZIP CONTRACTOR, e� � -3 WO T i 0 " ■ < ' '� 7` ADDRESS /5 X.��/F•. /.G, f(�L,v? L EXP. DATE 9 PHONE ZIP �4Y 2 WA. ST. CONTRACTOR'S LICENSE # f t,, / / j �� k. ARCHITECT ADDRESS ZIP CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 DESCRIPTION (206) 431 - 3670 BUILDING PERMIT FEE PLAN CHECK ('Th r PLAN CHECK FEE :: ; ;< ; ; NUMBER BUILDING SURCHARGE APPLICATION MUST BE FILLED OUT COMPLETELY SITE ADDRESS BUILDING USE (office, warehouse, etc.) R CP- NATURE OF BUSINESS: SUITE # SQUARE FOOTAGE - Building: m.,2_ Tenant Space: �9Y C�.RTlFY : THAT 1 HAVE REAQ ItdNp EXi�lWfff�fl*t3 7 UE AND;CORRECT A N> ?..I ' - Aiitlitk't..A? • CONTACT PERSON DATE APPLICATION ACCEPTED BUILDIN PERMIT APPLICATION OTHER: PROJECT NAME/TENANT ASSESSOR ACCOUNT # n - oa TYPE OF U New Building (i Addition 0Tenant Improvement (commercial) Li Demolition (building) WORK: 0 Rack Storage Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: (Qy„r4Te "4" -A;ot' orb 4 /r,&r1 - /AV J)ak/i)- A)h "l 02 y? C 2?It? Woof - ,27770 11/=,)77 WILL THERE BE A CHANGE IN USE? No 0 Yes If Yes, new building requirements may need to be met. Please explain: VALUE OF CONSTRUCTION - $ -3'/75;7 co Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? ( 1 No 0 Yes IF YES, EXPLAIN: DA BUILDING OWNER OR AUTHORIZED AGENT PHONE � DATE APPLICATION EXPIRES - 5-�f CITY/Z19,2 a/ APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. in all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT if the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. 03/16/91 COMMERCIAL ..„ Energy calculations stamped by.'icWashington State licensed ••• engineer orarchiteat ] Legal „„. • 0000000 Wericing,draWings, Washington State licensed arChitect, which include: , • • • , • --:•.•• •••• • • •••••,•••••••••::::•••.,:: • L • . • • , • • • • • ,,,,•• • • "." Architectural drawings" •••••••:::■ 'drawings .• '' • ' • Mechanical drawings drawings 'Landsoape plan Completed utility perinitlappliOationlone '''''''''' pro • ..... 'CireWirigs.' • NOTE See OP.001#4 submittal roc; . ....... Soils report stamped by .aWashington•tele. licensed engineer....:,:::„:„:„.„.. • ", • • -, • -.L. , • . . . .. . ST ORAGE ''' [ Completed building permit appllcat3or' [J Assessor Account Number Two (2) • . .. . se of plans • • fl Building floor plan thowing . • Exit .......................................... • aisles •.•:: . 6)1 of RESIDENTIAL — SUBMITTAL CHECKLIST J Tenant space tkxw plan showing rack storage iayaut aIsle and exits ................................................................................ • • • ht.i..**.°1•Fla . . . .. ...... , , r),,‘• :,'NOT.E. Liovaya.. 7.7 . IIG•r/Ltb (raci"b3rage . . On . 8. cieg'ovo "".• NEW SINGLE-FAMILY,"DWELL1f4GS/ADDI`flONS"":".":":":":""":'.":":::".":":".„:: ,.....,r building permit application (one. for each structure) • ••••••• •••• . • ... . ••• . -••••••• . . • • ...„. „.... Aesesser,ACCOunt Two sets (2) of working drawings, which include • • • • :.• r ofrokitn giro plan „ — .•:•••••• Foundation plan •••: ozne si •••••••• • Floor plan' '," •-•::.•••••••::•:,. width en le_ • • Roof plan • ••••'•' • • " • •• • •-• ••••••••••• ••••••'••••• •••••:••••,:..•••••••.:".:::•::••,•••••••:::•::•••••••• • • Building elevations (all vie;S)" • cross suctio rant ng • . •-"-",".• • •• ••••• • •• ..•• : • •.Washington State Energy Code data . .„....• .........„ • Completed utility permit "application •••••••••:"'":":::::::•"'":::"."": . . . Li Six (6) sets of site plans showing utilities . . • • NOTE:. Building site plan and utility site plan may be combined. See:. • utility permit application and checklist for specific submittal requlrementi . . . Additional topographical and soils information may be required if unique site conditions. . .• • • . . ... . "tanipleted ........... . .......... •••••'•••••••'•:""•''':::":•":".;••••••••••••''''' "" L: Mseer Account Number Two 2) iet$ ofoontwction plans Which include oe 4 Location of tenant space 0 Existing and proposed parIdrg • . SltGplen 0 change of use ,. chatreji . §96dinclP44". • t Use it of ..iocatIPP.:*,.;Y:''.:.•••rn '■46t!)•;i. square footage • E Floor plan of proposed tenant space • • • Exit • New wails, .ti e pattern 1 tru. n and patterniind W alls demolished 0 fished ConstrUction I • Cross sections . . cons details s attachment for floor arid coiling stra etUral cal culations statriP state gconsed engineer , :er.0• ebb414°**ekLiate be 621*(2 sets) NOTE y ti sq.P*arate 14114' Pernlit RESIDENTIAL: fiEMODE Completed *Ailooji Permit"aPpliCatien (one for each structure) . . . AsSeSepr•Account 1■06:(2) ""Seti:".al*IpikE00 drawl i*to(*(iitioude: o Structural framing plans NOTE If any utlitY work Is to be done prode .,.100/yyp permit application . . elevations . cross-section „ . am, plans must be submitted •::: : . Completed building permit application (one: each structure) Assessor Account Number : .• Narrative describing existing roof, material being removed, and material being • " • . , . . . NOTE A certification letter Is requi prior to finaiinspeetion.endsign7„ off of the permit: • • •• • . "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 11 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 x 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 4526 S 136 St BUILDII'C PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO DATE ISSUED: PROJECT: Swift, Elton CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE' (0 - qI (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before Installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. o,w4,03