Loading...
HomeMy WebLinkAboutPermit 6770 - Pool Building - ReroofJr ( k1 Q Permit 6770 - Pool Reroof - 'P •F •' - Reroof 1B ID • year 1988 SETBACKS: N- S- E- W- FIRE PROTECTION: ❑ Sprinklers ❑Detectors X WA UT PERMITS R EQUIRED? Yes X (through ❑ No Pubic Works) ZONING: BAR /LAND USE CONDITIONS? O Yes x❑ No CONDITIONS (other than those noted on or attached to permit/plans) PLEASE SEE ATTACHED "REROOF CONDITIONS" REGARDING VERIFICATION OF ROOF CLASSIFICATION. A MTNTMUM_CLASS "B" ROOF TS REQUIRED. WA. ST. CONTRACTOR'S LICENSE # ROOFICNO99JJ - RAP -- -' • ER Jonathan Pool PH•N 543- 7962 ADDRESS 1342 N.E. 43rd #710, Seattle, WA Z1P 98105 CONTRACTOR Roofing_ Corp. Northwest PHONE 365 -2920 ZIP 98133 ADDRESS 14328 Linden Avenue North, Seattle, WA WA. ST. CONTRACTOR'S LICENSE # ROOFICNO99JJ EXP. DATE 4_11 - 92 ARCHITECT PHONE ADDRESS ZIP BUILDING PERMIT NO. DATE ISSUED: CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS 6000 Southcenter B1 PROJECT NAME/TENANT Pool, Jonathan BUILDIN3 PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) DESC.RIP.TION AMOUNT RCPT # DATE BUILDING. PERMIT FEE PLAN;.CHECKFEE; <:;:: .:. 441149.13 OTHER. SUITE # VALUE OF CONSTRUCTION - $ 7,842.00 ASSESSOR ACCOUNT # 359700- 0220 -49 PLAN CHECK NO.: 91 - 391 TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: ❑ Rack Storage © Reroof ❑ Remodel (residential) ❑ Other: DESCRIBE WORK TO BE DONE: Prime existing granular surface roofing, apply modified bitumen roof. FLOOR 11 SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE FEET LOAD FEET LOAD FEET LOAD FEET OCC. SQUARE OCC. TOTAL LOAD FEET LOAD SQUARE FEET TOTAL OCC, LOAD APPROVED FOR ISSUANCE BY: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or thy performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: CERTIFICATE OF OCCUPANCY NO. PRINT NAME: Lt .4 - Thlspermi shall:become:'null and vo +d if the Wo issuance, or if the work is suspended or. abaadone C• BUILDING OFFICIAL DATE: c - / / COMPANY of commenced within 80 days from tfte date or a period of 1 80 days from the last inspection DATE ISSUED: DATE: ei (Z Vf PERMIT NO. CONTACTED ) ,., y LQ=f I (:( .Q... DATE READY DATE NOTIFIED lq — (a 1 B .�/� (init ..-.- PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) BY: (snit.) AMOUNT OWING 3RD NOTIFICATION PLAN CHECK NUMBER qt - n INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) PLo SQUARE FEET OCC. LOAD AL OCC. LOA SQUARE FEET SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET SQUARE FEET OCC. LOAD TOTAL OCC, LOAD DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. PARTM Y13-1.-TILING - initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER k BUILDING - final review REVIEW COMPLETED PROJECT NAME SITE ADDRESS C111 ROUTED INIT: INIT: INIT: INIT: INIT: BUILDING( :'ERMIT APPLICATION TRACKING CONSULTANT: Date Sent FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- TYPE OF CONSTRUCTION: erff FIRE PROTECTION: • Sprinklers PUBLIC WORKS LETTER DATED: s- UTILITY PERMITS REQUIRED? ( ) Yes ( ) No SUITE NO. ME . Date Approved INSPECTOR: N/A BAR/LAND USE CONDITIONS? MEM1111 UBC EDITION (year): 08/17/00 SITE ADDRESS SUITE # 6,Y�r -. c 7.:: c .(..7 Hct. t7.-. _. I) (.. - 0 D VALUE OF CONSTRUCTION - $ 1 7 (�� 1 -1 2,. c,o PROJECT NAME/TE e.... EOM/ 6 ? v cr t ASSESSOR ACCOUNT # 5 `JT1L90 -(-� _ ;,4 c) '- Li °, TYPE OF New Building Li Addition Li Tenant Improvement (commercial) ( Demolition (building) WORK: 0 Rack Storage (! Reroof 0 Remodel (residential) 0 Other ) 7' DESCRIBE WORK TO BE DONE: i 1)ZE /` i I� la l (vl lAtC_ i Ut a L»4 5 it i2t'- ..k .r' =r)rC//LC_ qp 1. l o)iezt &) B mi rat t l Pe C / BUILDING USE (office, warehouse, etc.) r5F (& L NATURE OF BUSINESS: � 1 ` � Ji�fC, requirements may need to be met. Please explain: WILL THERE BE A CHANGE IN USE? I No 0 Yes If Yes, new building SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: S'?D 5F WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? E. No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER }r���ttll�l l�>s'no�, .4 (6 3 e- Al -r(l_. C PHONE n�c1� ZIP�-� re I a ADDRESS 13 , j . t::.. L.( t'a ' CONTRACTOR - . �-t:a - �.�m(C co r2 ) ,> C - -ho 1 r (IN - 5 L``l�'t CL L� ( o c `j PHONE 3(a 5 EXP. DATE //// PHONE - off` I 0 ZIP el 33 I /q a ADDRESS R .3 r), G �, xl o - r WA. ST. CONTRACTOR'S LICENSE #p ARCHITECT ADDRESS _ ZIP CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON HEREBY THAT:::I_ ':TRUE :AND; :CORRECT, SIGNATUR DATE APPLICATION ACCEPTED BUILDIN PERMIT APPLICATION DESCRIPTION BUILDING. PERMIT FEE PLAN CH ECK FEE BUILDING SURCHARGE AMOUNT:'' RCPT :# iaft DATE WA' SAME:: HAVE READ "AND !EXAMINED :THIS APPLiCATION::`AND KN i AM ; AUTHO; iZED TO;APPL F,OR THIS:'PERMIT. DATE APPLICATION EXPIRES PHONE 6 _ 7 CITY215 04:171-: q g'l 33 PHONE APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITIONS: Completed building permit application (oge for each structure) Assessor Account Number Two sets (2) of the following : . . ; Specifications Structural calculations stamped by a Washington State licensed engineer Soils report stamped by a Washington State licensed engineer Energy calculations stamped by a Washington State licensed , ••• engineer•or architect:: Legal description Working drawings ,' stamped by a Washington State . licensed architect; which Include: • Site plan •• drawings ::::•.Structural draWings:.: . . • Mechanical drawings Landscape plan Completed utility permit application (one for entire project) Six (6) sets of civil drawings NOTE::::•See.. permit application and checklist for specific utility • RACK STORAGE , , • ......................... . . . .. . ;,. . . . . . .. . . ; . . . .... .. . ....... . . . . . • •... ••••• [] Completed building permit application • : • • • ••••• Two (2) sets of plans which include [ Building floor plan showing Entire space where racks will be located Exit doors of all al slea •••••:. , ; SPaCe•ficOr. plan,: showing rack storage layout, aisles and "77 •: • • • • . • • ivotE±:•:Inc/tide dimensions of arid exit ways on plan Structural CaldulatiOns stamped by a Washington State licensed :••••• Onginee4iCli storage ft... RESIDENTIAL SUFSIVIITTAL CHECKLiST NEW SINGLE-FAMILY DWELLINGS/ADDITIONS E Completed building permit application for each structure) . : Legal doscriptiori: • : :•• • Asses6or AcCouni Nuri)bir ; ri • : ,• • • ; ::.• Two sets (2) of working drawings whiCh•include: • .• Foundation :plan access to building showing Floor plan width and length of Roof .Plan >. • • • ........ cross!:Sectirin.„ Strt framing plans . . ... . . ::.WEistiingiOn,.:Stata.:Eriergypocle'data Completed utility permit application six ';(6) .pot of site plans showing utilities NOTE: Building site plan and utility silo plan may be combined. See utility permit application and checklist for specific submittal requirements Additional topographical and soils information maybe required if unique site conditions.' COMMERCIAL TENANT IMPROVEMD4TS I-1 Completed buIlding permit applicaari (one for - Site plan Locat rib • an : • each structu .•• ri ...." se ts of . . , or Assessor Account Number Two (2) 9- •:••••iiantP proposed .. . „,.. . Landscape plan (if applicable, ie , change of use) Overall building plan Tenant location 'Use of adjacent (common wall) tenant loor plan of proposed tena :''::Tohant space plan .. wlth:use'oI each roam Exit doors egress . . Now walls existing wall, patterns , i4 walls to be demolished onstruction details Cross sections showing wall construction and method of attachment for floor and ceiling .. . ...... .. ......... ... ••• : -arca m ••• . ... . , , ".,...k•is to:RP. 1110■11111••■■• /NM RESIDENTIAL REMODELS [ Completed building permit application (one for each structure [1 Assessor Account Number Eli Two (2) sets of working drawings, which include • .. : .. • •••• • • • Site plan Foundation #E!r1 Floor plan Roof plan Building elevations (ill views) d :: • Completed building permit application (one for each structure) .L ,m'atal;beingre rn �d, matenal being installed NOTE A .... c ertification letter is required prior to final inspection and sign .... ... . . off of the permit • r4Niy • . it app [1 Assessor Account Wumbe Two (2) sets of plans which include , . a . DetaIls antenna/satellite dish and method of attachment 1 Structural calculations stamped by a Washington State ,,•,,., ...... .. .. .. ...-....:•,:. . ., •:::• ,:.:......,:. If any uti/fty work Is to b •:'!...... :::::: . : , •:::• , :.:::• ... ..•'•h , ':: , • , •: . '''''' , ' , : - ":"" .t i i i. /. . i ii • .,.../ E...- O d T piaa.: . i:ttii4! . .P;:. ; ...., ...fr,!.. . :•:-..,•.:::'i.:••••.::::;.,;•.::$:•.::::,....:••.:,..... ;IC°..'.:.:1./.1:E4?;:.fi°i°11::.1°4°f PI ?::.:'''''' ... .,......... • - .., i'•:•.' : ..'.;: ...,' ,.-..• • • , . - 9OOFS -1 :cqmp l a te ct.:O ui to i ng . p or mlt •a pplicatton(9fi!'!f9...r!PP:!!!!'r.: ::::::::::::,,,-:::::::.::::::';':::':::::::::',.::"- ::•::',.•:•:::'::::::: . :••••••••.::::::::.:'::::...::::'::::::::.:••:::::•::::::'::•:::::::::::::::.:::::::::::::;::::':::::::::::::•;:-:' ...:AssaiSei...ACCotr(NUMber.::: . :::.:,;:::::::::.::::::::::::::;::::::.,:::::::,:: . ••," ......... . ......,- . ,: '. titaterial..bing ,.. NOTB; A '.. certification letter Is required prior fe final . in SpeCtid*andSign •.... off of the permit.:1 .: ...:::.):::."-:,:......i...,..;'::-•:.:":::::•':,•:'••••.:.;',::::::"...".":%,::::::::',.:*;<•%:,N.....':•:;'..:..,..,.*:::::::-::::.::;;,:::..'-..• Project: ype 0 nspect on: . .. . ...., ress: 0 ,..sr.c .., 1te ale.: 4 .....,/ Special Instructions: .// c'9 2 /444 Date Wanted: //...--/Y-1"/ ar a. . Requester: 1 Phone No.: 7. r-,-",-;-.' ,-...,,,..... ,, . . • • . . • • . . . . . . • • • . . , ., , • . . •. . . • . • . . .. . • , . . • . . , : • • . • , .• . , (. INSPECTION RECORD Retain a copy with permit o. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 <Approved per applicable codes. COMMENTS: Inspector: C , (206) 431 670 0 Corrections required prior to approval. Dale: 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspectIon, fee must be paid at 6300 Southcenter Blvd., Sulte 100. Call to schedule reinspection. • Receipt ri(5777 C770 PERMIT NO. ROOFING C3RPORATIaN NORTI-IC 14328 Linden Avenue North Seattle,Washington 98133 Phone: (206)365- 292O/Fax:(206)365 -1668 CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION 6300 Southcenter Boulevard, Tukwila, Wa 98188 (206) 431 -3670 ROOFING CORPORATION NORTHWEST HAS INSTALLED A. ROOF MEMBRANE ASSEMBLY'. CONSISTING OF TARMAC.ROOFING SYSTEMS, INC. SPECIFICATION# T -5 WHICH MEETS OR EXCEEDS .THE REQUIREMENTS FOR CLASS C ROOF. DATA SHEET ENCLOSED. .THIS.ROOF WAS INSTALLED AT 6000 SOUTHCENTER:BOULEVARD UNDER CITY OF 'TUKWILA BUILDING PERMIT NUMBER:6770.. D SHUNWAY, Authorized Signer r 22 Specifications T -5 ROOF RETROFIT — SMOOTH OR GRANULATED EXISTING SURFACE (WITH NO NEW /ADDITIONAL INSULATION) Specification T-5 Deck (Slope: Water must drain within 48 hours.): Base Membrane: Tarmac SBS Base, Stormshield, SBS Torch Base, Poly Base, any 25 -28 lb. fiberglass - reinforced base sheet meeting ASTM D -2178 Type V; or any 43 lb. coated organic felt base sheet meeting ASTM D -2626, Base Membrane Attachment Methods: 1. Above base membrane or vented base sheet attached by spot - applied hot asphalt or mechanical attachment. 2. Above base membrane fully bonded with hot asphalt. 3. If existing roof surface is well attached to the substrate, no base sheet is required. Finish Membrane: Select finish membrane from Tarmac product line and solid -bond to base membrane. Application (starting at low point of roof): 1. Remove all dirt and debris; then repair blisters /splits in existing membrane. Replace damp /rotted components, including cants and decking, nailers, etc. 2. Prime existing surface with asphalt primer meeting ASTM D41 -78 at the rate of 1 to 1' /2 gals, per 100 sq. ft. 3. If base membrane is to be used, it must be mechanically fastened; priming eliminated. 4. Install Tarmac finish membrane with correct bonding method. 5. Complete flashing details per specification and top -dress finish surface where required. When used In the shaded area, Tarmac APP 4S requires protective coating for warranty purposes. • UNDERWRITERS LABORATORIE INC. TESTING FOR PUBLIC SAFETY BUILDING MATERIALS DIRECTORY Contains Listings and Classifications in effect as of December 16, 1988 NOTE: Special attention is directed to the information contained in the second paragraph on Page 3. TARCO OF TEXAS INC, BELTON TX 76513 R13228 (N) ASPHALT FELT SYSTEMS WITH HOT ROOFING ASPHALT Asphalt organic felt for use in construction of Class A. B and C roofing systama. Asphalt glass fiber felt (or use in construction of Class A. B and C roofing systems, TARMAC ROOFING SYSTEMS INC, WILMINGTON DE R11715 (N) 19810 SINGLE PLY MEMBRANE SYSTEMS Deck NC Class A— Ballasted Incline 2 Membrane, "Tarmac APP45 ",'Tarmac APP Black Diamond" or 'Tarmac APP4M' with seams torched, laid loosely. Surfacing: River bottom stone (3/4 to 1.1/2 in. diem), 1003 lbs/sq. 2. Deck: C -15/32 Incline: 1/4 Insulation: Glass fiber, panne or wood fib., board 6 in. offset joints, 3/4 to 2.1/4 in. max. Ply Sheet Type 15 sspheit saturated organic felt. Membrane, "Tarmac APP4S ",'Tarmac APP Black. Diamond" or "Tarmac, fused. APP4M", heat fuse Surfacing: Roofing grovel, 400 Ibil/sid. 3. Deck: NC Incline 1/4 Base shut (0ptionslk Type 1S organic felt. mechanically fastened. Insulation (OpUonalk Glass fiber, portite or wood fiber, 2 -1/2 in. mu. Ply sheet Typo G2, adhered with hot roofing asphalt. Membrane: 'Tarmac APP4S ", 'Tarmac APP Black Diamond" or "Tarmac APP4hC', haat fused, Surfacing: River bottom atone (3/4 to 1.1/2 in. diameter) 1000 lbsJsq. 4. Deck C•15/32 Incline 1/4 •All joints blocked with 2 x 4's, Insulation: One or more layers of one of the following insulation mechanically fastened, 1.0 in, minimum - no maximum, Fiberboard Perlita Cslotex Corp's "Thermos Hy -Tic" Chooses Corp's "Thermos Hy'Tec Plus 2" Base Sheet Cetotex Corp's "Vaporber GB", 'Type G1, hot mopped to the insulation. Membrane: 'Tarmac SBS•170 ", 'Tarmac SBS -4M" or 'Tarmac SBS Black Diamond ", (modi- fied bitumen), hot mopped 10 the base sheet Surfacing: Gravel at 400 lbs/sq in hot roofing asphalt at 60 Ibs/sq, S. Deck NC Incline 1 Insulation: One or more layers of one of the following insulation mechanically fastened, 1.0 In, minimum - no maximum, Fiberboard Penile Cables Corp's 'Therms Hy -Tic" Cslotus Corp's 'Thermos My-Tic Plus 2" Bain Sheet Calcites Corp's. Type 0.1. "Veporoar GB" hot mopped to the insulation, Membrane: 'Tarmac S85.170". 'Tarmac SBS -4M" or "Tarmac SBS Black Diamond" (modified bitumen!, hot mopped to the base sheet. Surfacing: Gravel at 400 lbs/sq in hot roofing asphalt at 60 lbs/sq. 6. Deck: NC Incline: 1 Insulation: Polyisocyanurata, glass fiber, penne, wood fiber, msehenicaily fastened or adhered with hot roofing asphalt any thickness. Bees Shut Type G2, mechanically fastened or adhered with hot roofing asphalt Membrane Tarmac 5135-170". "Tarmac 5B5-4M" or 'Tarmac SBS Black Diamond ", adhered with hot roofing asphalt Surfacing: Gravel, 7, Deck: C•15/32 Incline 1 •All joints blocked with 2 x 4's. Insulation: Glass fiber, penile, 3/4 in, minimum, joints in insulanon must be offset 6 in. from joints in oeck, mechanically fastened. Bawl Sheet Type G2, mechanically fastened or adhered with hot roofing asphalt Membrane. 'Tarmac SBS -170 ", 'Tarmac SBS -4M" or "Tarmac SBS Black Diamond" adhered with hot rooting asphalt. Surfacing: Grovel, S. Deck: NC Incline•, 1/2 Insulation: Polyisocyinurate, glass fiber, perlite, wood fiber, mechanically fastened or adhered `with hot roofing asphalt any thickness. Save Sheet Type 02, mechanically fastened or adhered with hot roofing asphalt LOOK FOR MARK ON PRODUCT e ,48 '. ROOF COVERING MATERIALS (TEVT) ROOFING SYSTEMS (TGFU)— Continued Membrane: 'Tarmac APP'4S ", "Tarmac APP.4M" or 'Tarmac Black Diamond ", hot fused in place. Surfacing: Gravel. 9. Deck: NC Incline: 1/4 Insulation: Polyisocyanurate, glass fiber, panne, wood fiber, 3 in. maximum, mechanically fas. toned. Bass Sheet "Tarmac Polybase ", mechanically fastened or adhered with hot roofing asphalt. Pty Sheet "Tarmac Polybase ", adhered with hot roofing asphalt Membrane: 'Tarmac SBS -4M" adhered with hot roofing asphalt Surfacing: Gravel. Class B— Ballaned 1. Deck: NC Incliner 2 Insulation: Glass fiber, partite, wood fiber, 2.1/2 in. maximum, mechanically fastened or ad- hered with hot roofing asphalt. Base Sheet Type G2, mechanically fastened or adhered with hot roofing asphalt Membrane 'Tarmac SBS.170 ", "Tarmac SBS.4M" or "Tarmac SBS Black Diamond ", adhered with hot roofing asphalt Surfacing: Gravel. 2. Deck: C -15/32 Incline: 1/2 'All joints blocked with 2 x 4's. Insulation: Glass fiber, perlits. wood fiber, 3/4 to 2.1/2 in., joints In insulation must be offset 6 in. from joints in deck, mecnanically fastened. Baser Sheet Type G2. mechanically fastened or adhered with hot roofing asphalt Membrane. 'Tarmac AAP -4S ", "Tarmac APP.4M" or "Tarmac Black Diamond ", heat fused. Surfacing: Gravel. 3. Deck: C -15/32 Incline 1/4 'All joints blocked with 2 x 4's, Base Sheet Typo G2, mechanically fastened. Membrane: 'Tarmac AAP-4S", 'Tarmac APP -4M" or 'Tarmac Black Diamond ", heat fused. Surfacing: Gravel. 4. Deck: C•15/32 Incline 1 'All joints blocked with 2 x 4's. Base Sheet Type G2. nailed. Membrane "Tarmac S8$ -170", 'Tarmac SBS -4M" or 'Tarmac 588 Black Diamond ", adhered with hot roofing asphalt Surfacing: Gravel. 5. Deck: C•15/32 Incline 1/2 'All joints blocked with 2 x 4's. Ineulatlore Celotex "14y.Tec ", 2 in, minimum, joints in insulation must be offset 6 in. from joints in deck, mechanically fastened Bass Sheet Type 02, mechanically fastened or adhered with hot roofing asphalt. Membrane 'Tarmac SBS -170 ", 'Tarmac S8S -4M" or 'Tarmac 588 Black Diamond ", adhered with hot roofing asphalt. Surfacing: Gravel. 6. Deck: C -15/32 Incline: 1/2 'All joints blocked with 2 x 4's. Insulation: Calotex "HyTec ", 2 In. minimum, joints in insulation must be offset 6 in. from joints in deck, mechanically fastened. Bass Sheet Type 02, mechanically fastened or adhered with hot roofing asphalt Membrane: "Tarmac APP-45", 'Tarmac APP -4M" or – Tarmac Black Diamond ". heat fused. Surfacing: Gravel, Class A —Fully Adhered 1. Deck: NC „, _ _ Incline 1/4 Insulation: (Optional) Glen fi ber, gonna or wood fiber board. Ply Sheet Type 0.2, mech anically fastened. Membrane: 'Tarmac APP-4S ", 'Tarmac APP Black Diamond" or "Tarmac APP -4M”, heat- fused. Surfacing: "Karnak 597 ", 1 ga 2. Deeia NC Incline 1 Insulation: Polyisocvanurate, glass fiber, penile, wood fiber, mechanically fastened of adhered with hot roofing asphalt. any thickness. Bass Sheet Type G'2, mechanically fastened or adhered with hot roofing asphalt Memnbrare'Tarmac SBS•170 ",'Tarmac SBS.4M" or 'Tarmac SBS Black Diamond ", adhered with hot roofing asphalt Surfacing: Karnak Chemical Corp., "Karnak :Oe97 Fibrated Aluminum Asphalt Roof Coating ", 2- 1/2 gal /w. 3. Dacia C.15/32 Incline 1 • 'All joints blocked with 2 x 4's. Insulation: Glass fiber. penile, 3/4 In. minimum, joints In insulation must be offset B in. from joints in deck, mechanically fastened, Bass Shoat Type G•2, mechanically fastened or adhered with hot roofing asphalt Membrane: 'Tarmac S8S -4M ". adhered with hot roofing asphalt. Surfacing: Karnak Chemical Corp., "Karnak :97 Fibrated Aluminum Asphalt Roof Coating ", 2' 1/2 gal/sq. 4. Deck: NC Incline 1/2 Insulation: Polyrsocyanurata, glass fiber. penile, wood fiber, mechanically fastened or adhered with hot roofing asphalt, any thickness. Bess Shoat Type G•2, mechanically fastened or adhered with hot roofing asphalt. Membrane, 'Tarmac APP.4S ". 'Tarmac APP.4M" or 'Tarmac Black Diamond ", heat fused in placa. Surfacing: Karnak Chemical Corp., "Karnak =97 Fibrated Aluminum Asphalt Roof Coating ", 3 gaVsq. 5. Deck: NC Incline 1 Insulation: IOptronall Penile glass fiber, polyurethane, nocyanurete, phenolic combination iso- cyanurate /Doane, polyurethane /Donne or wood fiber. any thickness. hot mopped or nailed. LOOK FOR MARK ON PRODUCT , ROOF COVERING . MAZE • LS •ITEVT1` •',;'.r • RO FIND ,,YSTEMS (TGFU)- Continued " • .:_,. p4embrank 'Tarmac APP 45 ", "Tarmac APP Black Diamond" or 'Tarmac APP 4M", "SBS• 41.1", "S5S.5M ", "S8S -170" or SOS double coverage heat fused or hot mopped in place. gurfecina Grundy Industries, Inc. "al 1.18 Aluminum Roof Coating" at 1.2 gaVso. Clads 11—Fulty Adhered Deck: NC Inclines 2 inauiacion: Glass fiber. perlite, wood fiber, 2.1/2 in. miuu hum, mechanically fastened or ad- he ad with hot roofing asphalt. Haw Sheet Typo G-2. mechanically fastened or adhered with hot roofing esphelt Membrane' "Tarmac 59$- 170", "Tarmac SBS.4M' or "Tarmac SBS 81ack Diamond', adhered with hot, roofing asphalt Surfecina Karnak Chemical Corp" "Karnak *97 Fibratad Aluminum Asphalt Roof Coating ", 2• 1/2 gayso. Oack GiS /32,` !glints 1/2 'Ali Joints blocked with 2 x 4's. • Insuiatiosa Glass fiber, penile. 3/4 to 2.1/2 In" joints in insulation must be offset 8 in. from . joints in deck, mecnenicaily fastened.. • • Heat Sheet Type 0.2. mechanically fastened or adhered with hot roofing asphalt.- Membranes 'Tarmac APP - 4S ", 'Tarmac APP -4M" or "Tarmac Black Diamond ", heat fused. Surfacing: Kernel( Chemical Corp" "Karnak *97 Fibreted Aluminum Asphalt Roof.Coadng ", 1• • 1 /2•gaVso. Oeck:,C• /32': • lrmelinrr t/,4' ;; " ' •Ali joints blocked with 2 a 4's. glee' Sheet s.rypi G-2 m'echanically fastened.. • r,Membran i 'Tarmac APP.45 ", "Termed APP - 4M" or. Tarr»se :Blacli •Olarnond", heat fused. Surfacing: Karnak Chemical Corp ": "KSmak,#97;Rbratad;Aluminum Asphalt ° Roof;Cossing " • 1/2 gai/sq' 4, Dick C- 15/32. Incline 1/2 'All joints blocked with 2 x 4's. • Base Sheet Type 0.2, nailed. Membranes.' Tarmac SBS -4M adhered with hot roofing asphalt Surfacing: Karnak Chemical:Corp.. "Karnak ,g97 fibrated Aluminum Asphalt Roof Coating ", 2• 1/2 gaVsq. 'Mick: C•15/32 Inclinot 1/2 'All joints blocked with 2 x 4's. • • • • • . lnsulatlaa Celotex "Hy.Tec ", 2 in, minimum, joints in Insulation must be offset 8 in. from' . • joints In deck, mechanically tenoned.. • . aces Shoot Type G-2. mechanically fastened or adhered with hot roofing asphalt. • Membranes 'Tarmac SHS -4M', adhered with hot holing asphalt .: Surfacing Karnak Chemical Corp..:"Karnak *97 Fibrated Aluminum Asphalt Roof Coating ", •1/2 gaVao.. , . . • .flack: C•15/32 Inclines 1/2 'All joints blocked with 2 a 4's. Insulation: Celotex "Hy.Tec ", 2 in. minimum, joints in insulation must be offset 8 in. from joints in deck. mechanically fastened Rwww AMwr,- Tvnw C «7 mwchan.esily fastened or adhered with hot roofing asphalt • 'ro ect: j . Po_rj L_ ype o nspe :.,.. , . ress: op oo .5 , c. 6 4vo t o Special Instructions:: " d `� 6 I f)v 5. C. CSw.n, Date Wanted: (0-2.4- `fi 1 am. p.m.. R equester: r- C. d-A Phone No,: ry 2. 2-0 SPECT a. 1.,: a 0 Approved per applicable codes. • INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Corrections required prior to approval. COMMENTS: rr, ? ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: / ,q, ) SITE ADDRESS: TYPE OF INSPECTION: SPECIAL INSTRUCTIONS: INSPECTION RESULTS /COMMENTS: INSPECTOR: PERMIT NO. 7 7 7 INSPECTION RECORD DATE CALLED: DATE WANTED: REQUESTER: PHONE NO.: 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 CITY OF TUKWILA Building Division 6200 Soulhcenlor Blvd. Tukwila, WA 98188 433 -1845 Permit No 67b Date 9"" °-' Job Address J 000 c / C.77? /3/ . CORRECTION NOTICE The following items are found to be in violation of Ordinance UDC and shall be corrected. ---- 641, ca 4 - 4.4-44-j c C, Signe Bu ding "fiola /Inspector PROJECT: fE PERMIT NO. - SITE ADDRESS: 0 4 4 44 c- & . At p1( j DATE CALLED: c M - q i� � • DATE WANTED: I -) / 1 TYPE OF INSPECTION: :����.��„ �:�..� ti r_ .Q - • SPECIAL INSTRUCTIONS: REQUESTER: ,@y Lar . a �_ 4 PHONE NO.: , INSPECTION RESULTS /COMMENTS: Ag -- 0 N ..s.crE ,q,.na F.b wri.0 71,1M 11/K a) (.- E P d v a c - e r v t e " &lc/Sp 106 8 In I t-'i - (4r "rc, a.ctA --4.43 w rJ r„ - r ► $ / L A - n � C 4 " HA-D A G ,1 ! 3 - rJ APP ✓ f i C . 'Ti9E'' TdW1b INN PicereS 01-4 1 ,,C)1.v" /Lr.dn W vi 1Z J 774E P i sr W13 OttAX Slit3e �c� ` i An"' / r vvr48 W Cril TH A RAano1 . W Ko L MT y q g E . Talig- Pia c v-s3 T"64 uA pi - .as ins 0-61— dzr74 FoY.ti. W I"I'iA APpc...32- of i btu' (ABC. Fa R- r - 7 rS. ._ (. -- ,A v8- ge n.6 rnA�rm ce �i " fry . l R 4: 7' / 7-Q I w to k '90- '�.. ' ' K • 14 E 1/ — ca ! 'a . INSPECTOR: 7:::S 3 M -------- -- DATE: q—(6- `t' I CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre — Reroof 431 - 3670 12 • 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 • X 17 BUILDING FINAL . 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 6000 Southcenter Bl BUILDIPG PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO DATE ISSUED: PROJECT: Pool, Jonathan CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 (b Q I a-aJ (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUII1 DATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. OW„IOC