Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6774 - Drug Emporium - Remodel
6774 91-130 drug emporium 17348 southcenter parkway Permit 6774 - Drug Emporium P • • VN UB DI I* year 1988 SETBACKS: N- S- E- Seattle, WA W- FIRE PROTECTION: ®Sprinklers Q Detectors O wA UTILITY PERMITS REQUIRED? Yes O No (through Public Works) ZONING: C M BAR /LAND USE CONDITIONS? Yes ®No CONDITIONS (other than those noted on or attached to permit/plans) EXP. DATE 8_91 ARCHITECT Robert.Wells And Associates PHONE 822 -0760 ADDRESS 11416 Slater AV NE #100 ADDRESS 5601 6th AV S Seattle, WA ZAP 98108 CONTRACTOR Foushee & Associates PHONE 746 -1000 ADDRESS 3260 118th AV S Ste 1000 Bellevue WA ZIP98009 WA. ST. CONTRACTOR'S LICENSE # C C 01 - F O U S H A C 15 8 0 D EXP. DATE 8_91 ARCHITECT Robert.Wells And Associates PHONE 822 -0760 ADDRESS 11416 Slater AV NE #100 Kirkland, WA ZIP 98033 CITY OF TUKWILA Dept. of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PROJECT {:INFORMATION BUILDING PERMIT NO. DATE ISSUED: SITE ADDRESS 17348 Southcenter PY PROJECT NAME/TENANT Drug E m p o r i u m TYPE OF U New Building U Addition Ll Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage Q Reroof Q Remodel (residential) O Other: DESCRIBE WORK TO BE DONE: Interior Tenant Improvement /Remodel FLOOR SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD •CODE CO PLIANCE. SQUARE FEET OCC. LOAD SQUARE OCC. FEET LOAD SQUARE OCC. FEET LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD USE APPROVED FOR ISSUANCE BY: SIGNATURE PRINT NAME: 2 9 Len Trammell I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of Iav and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the erformance of work. I am authorized to sign for and obtain this building permit. SUITE # of commen e d within 1 O days from the date a issuance, or if the work is suspended or abandoned far a per /od of 1 .80 days from: the::last inspection is permit sh become null and void rf`the work is , CERTIFICATE OF OCCUPANCY NO. ctg-015 B (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES DESCRIPTION BUILDING PERMIT:FEE: PLAN;CHECK FEE:: BUILDING: SURCHARGE `' OTHER ..... AMOUNT :` RCPT.: • 1 :;D..O..Z .aca r,55 00 7470 4 • 5U t� 666.50 BUILDING OFFICIAL DATE: COMPANY: VALUE OF CONSTRUCTION - $ 204,800 ASSESSOR ACCOUNT # 262304907906 f DATE ISSUED: PERMIT PH •N DATE: c3- urradvu PERMIT NO. CONTACTED ''^ y�,,,� - • L I I 1 F"2- DATE READY DATE NOTIFIED Gam_ B .~ ✓� n. In .4.._ PERMIT EXPIRES 2nd NOTIFICATION BY: init. AMOUNT OWING ( 4 5O 3RD NOTIFICATION BY: PLAN CHECK NUMBER PROJECT NAME SITE ADDRESS 13� u�1tc� -r-� r Py INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. BUILDING - 4 s - 1 1 -1-y I initial review ROUTED NI FIRE 0 OTHER 2 BUILDING - 9/ final review REVIEW COMPLETED 5-1 �1 ( yj l(o of INIT: ►d PLANNI �� c`e-r INIT: PUBLIC 4, WORKS g p©n) 1 iRU BUILDING ')ERMIT APPLICATION' TRACKING . oc u r� Y'ium CONSULTANT: Date Sent - ZONING: UIREM EfTS FIRE PROTECTION: G FIRE DEPT. LETTER DATED: INSPECTOR: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- 5 S- UTILITY PERMITS REQUIRED? ( ) Yes PUBLIC WORKS LETTER DATED: SUITE NO. Date Approved Detectors N/A - IBAR/LAND USE CONDITIONS? Yes o (! TYPE 0 CONSTRUCTION: ii BC EDITION (year): INIT � (sPR-v-) l C(. W- 50 SITE ADDRESS SUITE # I jj't-Ic H ° PAg -ckf VALUE OF CONSTRUCTION - $24S PROJECT NAME/TENANT G Ftrl (bRLOfiI ASSESSOR ACCOUNT # 2'2 '347 9 (77 g - c Co TYPE OF U New Building U Addition f29.Tenant Improvement (commercial) U Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: Moc - l IC Z 1 -(t-f IM ►Yf'77" / RE BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: . pot, WILL THERE BE A CHANGE IN USE? No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: 1 5r5 WI.O Tenant Space: 2( , Area of Construction: 2(0) 2,96.0 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? g No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER —C r^1p � P I , M PHONE 76,2 _ .4 jSp ADDRESS 56,pl A A 6 d . _i r PHONE 7 ZIPcj f ( — CONTRACTOR FpUt -{ 6F' / X4 0 4 , e:1 -�..,' ADDRESS / 32620 — t-3 A S' , �v c)r• i3RL.61y.uE \/A, EXP. DATE PHONE : WA. ST. CONTRACTOR'S LICENSE # c.o i — ro,,.u_ HA - 1 sco r ci ` 2 .-- 0-7Co0 ARCHITECT F � F-L�.. , .i.0 . Ids -C�,, ADDRESS l 141 4 1-"Tpg. A , •160 I u3n0 ,221 -. ZIP Q'`t033 PLAN CHECK C; NUMBER ARPL!CATION MUST BE FILLED O COMPLETEL V. DATE APPLICATION ACCEPTED BUILDIh PERMIT APPLICATION CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 : DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING :•SURCHARGE OTHER: I q TOTAL - BUILDING OWNE OR PRI NAME AUTHORIZED rr,a `,9 iN rtv ,r-r— AGENT ADDRESS ,25 1 J r- _ 1 I tp'Tk CONTACT PERSON J I vin APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architecVengineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION EXPIRES 07/06100 RESIDENTIAL ocimpliited building permit application E Lagal•descdption • : ••• E Assessor Account Number • . Two sets (2) of working drawinge,•vittich • • ••• Site plan (on plan, rihsv•iclos.c!ithycfranrpcsrion..::..... . F FI °L;r14 :1 6°11. : P1 :7 ••• . • • Roo plan • . • • Building elevations (all • Building cross-sectioil' : .•• • •• • • .Structural framing plans ' .. • Washington State Energy.Code data SbEIMITTAL CHECKLIST E Completed utility permit application • •••• Ell Six (6) sets of site plans showing • • :. . NOTE: Building site plan and utility site plan may be combkied.::Sea:.;..... ; utility permit application and checklist for spocitio subnyittaf mquIrpments.:, Additional topographical and soils information may be required if unique site conditions. on of nant spaoe sdng :and . . .... . 1•Cerhplete.d. buffdng Ornit for each:'strycitUe. or ..,:" . :1 ..... '! ....:..... 11:1* ..:::..'..,:i l . i, : itfien g .:::::::.:•:.:1::•":" '' 'Wall> 4?Pan ': ........:- :..,...,;rp..7-.....,:`:`!:::::::•:.,.....-.,.:iit:10.41. and ....,:: : : . wa :i i ..6 .be Fl .. 61,4 '1••• ...-"::iiiiii:IPPf,!.77,74.0f,... .:..,::::„.,:„:..„.....cierpoi .. . *:;:':1'utNI"iii.:.0.1,'''')...11:„.......:...•>„.,,..,.,:,..."..,...6,...,...,_,..„t (c7......,:..:°;.....-„,‘.,.. :4.„....0...:::q. .:m.: ::.... ................................................. ...:,.., foo •:::::....::::„.....: .-...••0:-:,...„,..,..,,,„„,,,,,,..:.,,....„......•..... .,..,.::..:..dof.:.,.,... paftam • sW..... • il ...L. --- ................... • - ":":':1•10iiiii Offt,!/!:::.„':::.1...::::: :....":•,..iiii Wallun7:::::@•:".•::•,:.:i'igg..:.:::::-.iii.4iiiiiiils LJ :„. ,;;i....;:mert:i.t...:. 1s.:;'fsi::,,:f. ..,7;:;. :..,,i,L...;:..]:,4441;,.,::ii,i:....',!;;I::;. :pir....,,7":":",1.?,0 ••:::::::.,:„.....:„„„„...,]:„...,!..:.,...,,„„,.„:,....:„...,„:,„,,,,•„::,„,„: .. ............................. . ::::::....... .. . .. . . ..:....,...- . . - . - ... ... .. ,.:,,.,....,.:,:,.....„:.,:.,........„.....:...... .: a .,...,.,:ei$p,,Y.!! • • • . ivicrrE')iiiiii./Lq.11•riini lr8,...:::::'2;:::;.•:;:,:iil."...;:1;:;::::"-k•';::::'i•••'''''.....‘. . . . . . .....,,........;:•.:•:........:. , ... • ' t iiITI..i.•"'"'":„.".•:'":"":••••••••":"%'::-.0PIF:::::::::1:':"I•'•:•::'''•.:•.":::.,i'l•;•:::•.;q::;:::::::•::.,•••••••••••••••• .. . ...'.•-•:.,.. z.....7-•:::::.".:,.::•!.,:;!.i.:.::"..::"...!.:::: ;i:ii"::7: ....:'aiiki44*1!..:C: 7: 1:rnnibe.1.:.......4r.:7:1'..:11•:••••••• and . • .. is-::i'... •1::::••••••1•1•Iii ...:* 99.i.iiii...'„:„............„.........";',...",',":..41:::::„. ...,...„.,.......„:„.„....„...„,:„...„............. . . ., ,.. , . . .1.617 ..-:••••••••'•;••1•••••••••:•-•••:1•1...1"1:":•".:::..,„.....,„:„.......„..,........... 11 :::..........,::„....:::::•:.:,..."•::::::"..:":"•:::::::..,.... , '1•1 i iTr " •11• " :1 ".," :• iiiiii400...:.„ : „.„,,,.,.,....,. ‘ .. . • : .. it'itt11...••••,•••••••••.,,,,.•••••••„...• ••••••••••,...-•••'''''iiit!•"1P.:...;•••••,....,..i.:•:',•••••••:•••••••'• A T .•.... ::.. .........,,,....,°.........:.........t....,7.!...,.L......itd...77ingp.........,.:..i..:::::::::..........-:".....•...iipa... .. • . . ....... ..-......„........,::.......,...,,,........- L.,.......,.....,:.....•..........•::.i.,..i...).":•:...:::1:.:•:::,::,.„....i.:. i: • ...:.-. . •••••••Iii*PY,•••••••••••••:...."-• •••• ...',....:•:,":•:•:."::::::•:,•••::::',:i:: 9PP1P:i.•.•::ls::::::.„,':':::L••••''...•.'''Iiiiiii.OP .., •• ,•'•!•",•••"•,:•:'..:iricOr!!,..,.,•••:,...::::..i...:::::.:',::::•-•'''''''....• '.:";•••••••:-:..'::,(••••. .,..:, i•,..iiiiii*....4!!...:.....L.: ,.....:A4ei...r„...:::.....•,.....„„'....::::',...-:::":::::::,..4iii...i .................... . .,.......,•••• • ''..iiiii*f.1•: • ..).,•,„ •:.. , : „ :' , '•••:::•' - '":•••:'.. and Iocatlon 01 Two (2) sets of pans .....,......,oi:•.i:•,..:•:::::':'-..,••••• •-•• • iiW!4%,:,....,...Y...„'...:],:',,,...:.-••••-•'.•••::••• OU4t45;!...!..i:...!............'i''''''.:„...... . . ...:,......'':.::::. :liiI7p*!...!?.....,::::::':::i:i..::1.'. - ... s . i :mp!5 : .t ).::,„„,:.:,,,,...., - ,:.:....t.t....,...•::,......,i6600., ...... 004,::;!!!"..:::::•,','...-:::,:'::::::::',,,t'...-,i:',:iiii4:::i*.!i•....„„:::: ' ,:•..:; ' ,:::: •."" : :•":•"'";:'.;''iiiiif i 4 . 0 ..77.7;:•0.•:...... q14::;1?'1i0.•;,:`-.L...;... 1.-k::::::::::: •::••••••••••tui'•:::iiiiiiii*I.),(......7.77.1:::::::'0'''''1:"::::::::)..;i*,.cY„;..,......:.,,..„•: 9".:4:.,..;:4":•:;•.::i:•':::::,:i:Iiiiiii.ii!ii..'7,ettr..f!...:1::::•:::,•::::':::::.:•:::„:'„...:'::''''''' - .... engineer .......„...,,y, - - • .. ... . .. .„ . .. ,.„ . .. • • :.„ (one for each Two (2) sets 01 working drawIngs whlch tncludo . • . . . Rf pien . . : . •••••:••••• • .1.. • .Strtictural .frarning plans • L.... • „... L.... . ....„.........: .............. . „ • • • • • ,..:•••••:-...• .• :••• • NCITE: if any utility work is to be done provide permit application and plans must be submitted : • . • . . . . . : flEROOFS • • . . Complet.;id building permit application (one for each structure) Assessor'AccoUnt Number : . • .. • .: • . . • . NatratiVe describing existing roof, material being removed, and material being installed ..• • . • ..” • NOTE: A certification letter Is required prior to final inspection and sign- off of the permit.. • • ro Mi ype o nspe ■ . � � k .C,r; 11 , C1 �/ I � e•: 2'9 Sp: . a Instruct ons: Date anted: — r l! r Requester: '- Phone o.:. /► ♦ Z .�� CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. l inspector; Receipt No.: INSPECTION RECORD Retain a copy with permit 0 Corrections required prior to approval. Date; 7 431 -3'S7 0 $30.00 REINSPECTI0N FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • • :.. ._d! ,&CO .. 1 lypeoflnspectio. r1.. Mil Date Wanted: ---iv-el eilm. .�r, J i r r i l l - MINiiiiiiiiIIIIMMIIII . eda nstruct on: Requester: Phone No.. N/ CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 O Approved per applicable codes. KCorrectlons required prior to approval. C rt J_ 4 �N/? 0 a�p S'7V T .9 Al �'' C-1/2//4 5 O $30.00 REINSPECTION FEE REQUIRED. Prior to relnspection, fee must be paid at 6300 Southcenter Blvd., Suito 100. CaII to schedule relnspection. INSPECTION RECORD Retain a copy with permit nt (206) 431- 7 611 ?1....- s - '212,4/ P Date:. react: 1' A r. .Ul.• .IA : �t1 �:N• itf �I�:�. t IL f 1 .. • ress: / ,7� 0 5 , IGYu ip e . e:: MIN , ' . Special Instructions: m . •.. I . to Wanted: f (' — °)° am, p.m. Requester: Phone No.: (at Ct „.... s. 0 .. CITY OF TUKWILA BUILDING. DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 0 Approved per applicable codes. COMMENTS: eceipt N o.: INSPECTION RECORD Retain a copy with permit Corrections required prior to approval. (2_06) _431 -3b70 0 : $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection; fee must be paid at 6300 Southcenter Blvd., Suite. 100 Call to schedule reinspection: ''"bate: 'ro e ype o nspe on tor: SS: :: • . : MIMI Sp: . al In ructions: Date Wanted; — am Requester: Phone 1 o:. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. COMMENTS: scup (206) 431 -670 0 Corrections required prior to approval. ❑ . $30.00 RENSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project: .. !& ■ • e of Inspection: / ills,, l ., 4 _ 44 • less: Alp, p, C.� pe ' to Ca l e : in ivr ir. Sp: al I struct on: Date Wanted: Requester: Phone No,: q .2.- .�. s_.7 q D V Co 7 $30,00, REINSPEC ION FEE REQUIRED. Prior to relnspectlon, fee must be paid at 6300 Southcenter Blvd:, Suite 100. Call to schedule reinspection. 0. i4. o. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PER IT (206) 431 -3 tf Approved per appiloable codes. ❑ Corrections required prior to approval. COMMENTS: 0 "�7 7 1�dc -y C6�� 44f tekszoo i2 t: i' r t' ! 1' 1 ProjectTy ly) yp eo nspe • n Address: ( ..� �' . !t 1) tt I . to ale' : f 2 (Y — � i ? Y am. p.m. Special Instructions; Date Wanted: Requester: E. Phone No.: p 1 CD Inspector: -- Approved per applicable codes. r. 1 r•?rr..p^.c. Zr:' .n ()INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter. Blvd., #100, Tukwila, WA 98188 ❑ Corrections required prior to approval. COMMENTS: Date: . ❑ $30,00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ' ro ect: I 1.l At i.• ype o nspe on • ottl Alil Special Instructions: Date Wanted: D.- -g :m. ' .m. Requester: Phon= No.: • - .i ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule relnspection. Receipt No.: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 .INSPECTION RECORD Retain a copy with permit (in PERMIT NO. (206) 431 -3870 ❑ Approved per applicable codes. Corrections required prior to approval. roe : _., ype o ns lon• � 2 { 7 Date Wanted: s /2. --r a —f -,./ am. fpm Special lnsir ; . Requester: Phone No,: SP r• '0. COMMENTS: Inspector: :"mT. °INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, .Tukwila, WA 98188 Approved per applicable codes. Pei S e (206) 431 -3 "670. 0 Corrections required prior to approval. 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reirispection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project type of Inspection; ...re 6.1e .:. ; Specie Instructions: Date Wanted: h ) Requester. V FJ Phone No.; Q�- (� V r ??.....i0 NSPECTION RECORD Retain a copy with permit CITY OF. TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. COMMENTS: nspoctor: Corrections required prior to approval. �''�'►�, c: ►", �R. Q t ip di t A 0" ,.s:. ±Cts -. Date: (206) 431 -3670 $30.00 REINSPECTION FEE REQUIRED.' Prior to reinspection, fee mu t be paid at 00 Southcenter Blvd., Suite 100. Call to schedule relnspection.:. p �• ` CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ,. ro e Addre Specie( Instructions: Approved per applicable codes. COMMENTS: nspector: s.;.f.!;? '.2. .cwr,� `ir.:,tY>re '''.',j7' ' .%•. «•:.4"v,' NSPECTIO 9 RECORD' Retain a copy with permit F:.'�1A 'wag ad o nspedwn: Requester: Phone No,: $30,00. REINSPECTI' QUIRED. Prior to reinspectior 6300 Southcent : vd, Suite 1 r r. Call to schedule reinspectio Date Wanted: n Corrections required prior to approval: roe . 1 ra i1 t� �-- . I b Type of Inspect /A: E I, e a :•: ' /� '''.. Address: P' Sp: *al instruct .ns: Date Wanted: ,, II ,p . . Requester: Phone No.: % 1S „ '-' /\ 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter. Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. COMMENTS: ' - rs't:. p e,�;;•, -- - nc. 477 D (206) 431 -3670 Corrections required prior to approval. ;;IGiLA r s 2- ourdy- nspector: .. e; ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee ust be "paid at 6300 Southcenter Blvd., Suite 100. CaII to,schedule reinspection iriga ,wI 4114arK1 tYNA ction: • 14. Addresi. 4 12mi v 0 rxt i r—r- ‘ dli tVi Date I : 1 / el 1 ;tll Instructions .,.... ' Date Wanted: t 1 zio 9 ( 40. Re Phone No.: PletAt f qS2,-q SP Inspector: 0. • CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 0 Approved per applicable codes. COMMENTS: INSPECTION RECORD Retain a copy with permit // , ,,I- 4. e , .17 /7.7 c4e -Ott' s tz-z3 Date: \ & 7 7 PERMIT NO. (206) 431-3670 Cor rections required prior to approval. 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at • 6300 Southcenter Blvd., Suite 100. Call to schedule relnspection. Receipt No.: Date: 1 ti Approved per applicable codes. ❑ Corrections required prior to approval. nspector: $30.00 REINSPECTION FEE REQUIRED. Prior to reinsPection; fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule'reinspection: INSPECTION RECORD Retain a copy. with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 ro ect; , Type npection T>r NMc'o(i T of Is u i I t1 ,�, Address : Date Called: - � S: .Pei to- -o► Special In ruct ons: _ Date Wanted: \\ Requester:. V � V Phone No.: Q ECTIONN CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Project: ` i E Address: Sp a nstructlons :. P Date Called: Date Wanted: am. p.m. Requester: Phone No.; Phone G S79 Approved per, applicable codes. nspector: ` INSPECTION RECORD Retain a copy with permit 0 Corrections required prior to approval. 677 PERMIT NO. (206) 431 -3670 $30.00 REINSPECTION FEE REQUIRED: Prior to reinspection, fee must be paid at 6300 Southcenter.Blvd:, Suite 100. Call to schedule reinspection. Project R 1 ? illy /D 1 K. 1 Ype of 'TOW W Pl.i� Addre• 34 ' on V . 66 Y V ' 1' `I ( Date Called: I( ,. 1 - c ) ) Speda(lnstructions: Date Wanted: 1( 13 6 i ° -' a p.m. Requester: ,- J `e „o � Phone No.: p� 'f � C ( /Y a INSPECTION RECORD C Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 0 Approved per applicable codes. eCe C9174- PERMIT NO. (206) 431 -3670 l4l Corrections required prior to approval. 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection: Project: „,-� , C �� : ` yp e o nspedion: � ll� Address: I. I Date Called: - —' Special In tructlons: ep v1/4)6 Date Wanted: ! q � Requester: ,! e. Phone No.: / +, SP io 0. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Approved per applicable codes. COMMENTS: ❑ Corrections required prior to approval. nspector: Date: ❑ , $30.00 REINSPECTION FEE REQUIRED. Prior to reinspectlon, fee must be paid at 6300 Southcenter Blvd., Suite 100, can to schedulereinspection. • roe . �wY I , ype o nspe. ion:r�/kir1/0 l Address: 1 ' , Q to Called: IN S ....q 1 Special Instructions: Date Wanted: 11 LP ' I • l 4 p.m: Requester: Phone No.: 7— s i 9 b CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter. Blvd., #100, Tukwila, WA 98188 COMMENTS: 0 . Inspector l � INSPECTION RECORD Retain a copy with permit 7 8 c ❑ Approved per applicable codes. Corrections required prior to approval. Date: /I ❑ $30.00 REINSPC CTION FEE REQUIRED.- Prior to reinspection, fee must be paid at : 6300 Southcenter Blvd., Suite 100, Cali to schedule reinspection. Project Name , � i L� tin Address / 7 3 rig 5 d /9 Suite # X Retain current inspection schedule Needs shift inspection Sprinklers: Fire Alarm : Hood & "Duct: Halon: Monitor: Pre -Fire: Permits: FINALAPP.FRM: • City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM .. iibi'Q "., " "k0 J °` 7?rrir Approved without correction notice Approved with correction notice issued Gary L. VanDusen, Mayor Control No. Permit No. zed gnature D to .F.D. Form F.P. 85 City of Tukwila Project Name ..Address FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 /73 TURWILA FIRE DEPARTMENT FINAL APPROVAL FORM lI'j7l - .° -..-( /k , Retain current inspection schedule Needs shift inspection Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Approved without correction notice Approved with correction notice issued Gary L. VanDusen, Mayor Control No. Permit No. Suite ENGII'TEERS- NORTHWEST INC. P.S. W000LAWN AVE. N.E. • SUITE 205 - SEATTLE, WA 98115 • (206)525.7560 - FAX # (206) 522 -6699 JOB NO. CITY OF RECEIVED DEC 3 1 9991 PERMIT CENTER detaqil at grille soffit structural details and calculations ENGIN ERS- NORTHWEST !NC. F.S. 6869 WOODLAWN AVE, N. E. • SUITE 205 • SEATTLE, WA 98115 • (206)525.7660 • FAX # (208) 522.8698 JOB NO RECEIVED CITY OF TUKWILA DEC 3 1 1991 PERMIT CENTER detail at grille soffit glb ENGI 'EERS- NQRTHWEs INC. P.S. 6869 W000LAWN AVE, N. E, • SUITE 206 - SEATTLE, WA 98115 • (206) 525.7560 • FAX # (206) 522.6698 Joe No. JOB NAME _ _ l )r EmPbfz.I um DATE 0.•1 - "YI SUBJECT RECEIVED CITY OF TUKWILA DEC 311991 PERMIT CENTER gwb purlins MEMO TO: FILE, PERMIT NO. 6774 FROM: R.S.B. DATE: November 14, 1991 SUBJECT: REVISIONS TO APPROVED PLANS. REVISIONS TO THE APPROVED PLANS WERE SUBMITTED 12NOV91 AND CONSISTED OF A CHANGE TO THE TYPE OF CEILING IN THE OFFICE AREAS. A GYPSUM WALLBOARD'CEILING.WAS REPLACED BY A COMMON SUSPENDED ACOUSTIC TILE AND METAL 7-BAR GRID.TYPE CEILING. THE GWB TYPE CEILING WAS MAINTAINED IN THE ONE HOUR CORRIDOR AREA. . IN, ADDITION THE OF METAL CEILING JOISTS: WAS REDUCED TO 6" FOR SPANS < 9', REVISIONS PROPOSED BY APPLICANT CHARGE MIN. $15. revised drawings clearing plan joist detail ROBERT WELLS & ASSOCIATES . ARCHITECTS 114Id KLAUS AVE N6. • KIRK LAND • WASHINGTON • WI0413 . • MK) 441431E0 DATE: PROJECT: -TO: FROM MESSAGE: TRANSMITTA,.L re� stet 1 1 5 CS PROJECT : NO.: `� (Y pa/16-2 Neminv (07 RECEIVED CITYOFTUKWILA NOV 2 1991 PERMIT CENTER ENCLOSURE: 6f/15 r tcb a-PI. at pi l - a a y n (Jl d 1r r fry NOV 1:21991 GIT.Y 01 TuKvvi0 PLANNING DEPT. CITY OF TUKWILA 6200 SOUTl10ENTCR BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91 -130: Drug Emporium 17348 Southcenter Py PIIONE N (206) 4331800 THE FOLLOWING COMMENTS APPLY TO AND BECOME P T THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER (671 F 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 4. All mechanical work shall be under separate permit through the City of Tukwila. 5. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 7. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 8. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and 'material shall bear identification showing the fire performance rating thereof. 9. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition)., Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). Gary L. VanDu cn, Mayor Drug Emporium Page 2 10.. Validity of Permit. The issuance of a permit or approval of plans, specifications and ` computations shall not be construed to be .a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of . this code shall be valid. "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 X 7 Framing 431 -3670 X 8 Insulation 431 -3670 X 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 11 12 13 X 14 FIRE FINAL lnsp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 17348 Southcenter PY if BUILDItG PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO. CD - 17u DATE ISSUED: PROJECT: Drug Emporium CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE NSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -In inspections such as mechanical, plumbing, gas piping, electrical and l ire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must bo installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. aa1uaa PAN REVIEW COMME fS Plan Check No.: e l l " � 1 30 P r o j e c t : _ REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). X All mechanical work shall be under separate permit through the City of Tukwila. X All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high- strength bolting to be special inspected (Sec. 306, UBC). W Any new ceiling grid and Tight fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 1 . Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). . All construction to be done in conformance with approved plans and 4 X 1 requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. '`1;{Ei. A Certificate of Occupancy will be required for this permit. 1%1C -le A'C3bt i i OM ` ? 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing X ' 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. 12. 13. Y 14. Fire Final 15. Planning Final 1 6. Public Works Final X 17. Building Final PAN REVIEW COMME fS Plan Check No.: e l l " � 1 30 P r o j e c t : _ REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). X All mechanical work shall be under separate permit through the City of Tukwila. X All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high- strength bolting to be special inspected (Sec. 306, UBC). W Any new ceiling grid and Tight fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 1 . Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). . All construction to be done in conformance with approved plans and 4 X 1 requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. '`1;{Ei. A Certificate of Occupancy will be required for this permit. 1%1C -le A'C3bt i i OM ` ? ROBERT WELLS & ASSOCIATES ARCHITECTS 11418 SLATER AVE. NE • KIRKLAND • WASHINGTON • 98033 • (206) 822 -0780 23 May, 1991 Mr Ken,Nelson Pians'. Examiner City of Tukwila 6200 Southcenter.Blvd. Tukwila, Washington 98188 Subject Drug Emporium, 17348 Southcenter.Parkway Plan Check Number 91 -130 •Dear Ken, This is i.n response to your letter.dated:May 13, 1991, regarding revised plans submitted to you. 1 The stockroom willbe an "unheated '.'space but will have a susp : ended heater 0:maintain. the minimum allowable temperature however, the offices:and . lunchr:oom_wi.thin . :,the stockroom will heated w.th wall . mounted :space heaters and insulated Anchorage for :'the gondolas.. is called out on detail. 5:on sheet ` A-11 : Anchor. age :for the .rac.k in : ;th stockroom will be by separate permit 3: Safety glazing will be installed'in all.;locatio.ns human impact. If you have any questions, please contact me on 822 -0760 erely, ;iPsal 7� mes Sabine Project Manager if/ ( M AY28 1991 copy: John Reinholt Drug Emporium (t'i r .. Erin : DeVoto , ; Foushee` and Asso e ;411LA City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control #91 -130. (512) May 16, 1991 Gary L. VanDusen, Mayor Re: Drug Emporium - 11348 Southcenter Parkway Dear Sir: The attached set of building plans have been reviewed by The:Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of. fire extinguishers required.for your establishment'is calculated at one'extinguisher..for. each 3000 sq. ft. of area. The extinguishers) :should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel:distance to any fire extinguisher must be 75' or less. (NFPA 3-1,1) (UFC 10 -1 (3 -1)) Extinguishers shall be installed on the hangers or it the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.6), and shall be installed so: that the.top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1-6.6) ,(UFC. 10.301) Extinguishers shall be located so as to be in plain. view (if at all possible), or Af not in plain view, . they shall be identified with a sign stating, "Fire Extinguisher," with an. arrow pointing to :the unit. (NFPA 10, 1-6..3) (UFC 10.301) 2, No point in a sprinklered .building may; be more than 200 feet from. an exit; measured along the path of travel,. (UBC 3302(d)) Exit doors shall swing in the when serving' an occupant load 3304(b)) Exit ,doors shall be openable from the inside without City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 Page number 2 Gary L. VanDusen, Mayor the use of a key or'any special knowledge or effort. (UFC 12.104b) Exit hardware and, marking must meet the requirements of Uniform Fire Code Sections 12,104 & 10.402(a). Exit signs shall be installed at required exit doorways and where otherwise necessary to clearly indicate direction of egress. Signs shall be of a contrasting color with the surrounding. area and shall have letters not less than six inches high with a minimum letter width of 3/.4". (UBC 3314). (UFC 12.108) Exits shall be illuminated at any time. the bulid.ing is occupied. An emergency system shall automatically provide exit illumination: upon.fallure of the main power supply. (UFC 12.1.07(a)(b)) 3'. All modifications to sprinkler systems shall have the written approval of the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Fire Department, No sprinkler work.shall Commence without approved drawings. (City Ordinance #1528) (NFPA 13, 1 -9.1) (UFC 10.307) All sprinkler drawings shall.be prepared by companies licensed to perform this type of work... Drawings :shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering. or Industrial Risk insurers, then by the Tukw.ila'.Eire Department. No sprinkler work shall: commence without approved drawings. (c)ty :Ordin'ance #1528:4 NFPA : 13 1 -9. 1 ) (UFC 10 hla'i nta i n spr i nk t er (NFPA 13, 4-10 Contact 'the Tukwila Fire Department, Fire .Prevention 'Bureau to witness all required •inspectiohs'and teats (NFPA 13. 1 -10.2) (UFC 10.305(b)) City of Tukwila Page number FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 4. All electrical work and equipment shall conform strictly to .the standards of the National Electrical Code. (NEC 70) (UFC 85.101) All electrical wiring is to be inspected by the State Electrical Inspector, Washington State Department of Labor & Industries. (NEC 70) 5. All required occupancy. separations, area separation walls, .and draft - stop partitions shall be maintained and shall be,properly.repaired, restored or when damaged,, "altered, breached, penetrated, .removed or improperly installed: (UFC 10.401) cc: T.F.D.:fle nod' Gary L. VanDusen, Mayor A1.1° interior wall covering .materials steal 1 be fire- resistive or shall.be treated to be fire- resistive, so as to result iri, a flame- spread rating as required by UFC Appendix Vt-C tables 42A an 42B. A. certificate of the flame spread rating .is. required to be delivered to the Tukwila Fire Department, (UBC 4204) (UFC 10.401) This review limited to speculative tenant' space. only special fire permits may be necessary depending'on detailed description of intended -'use. Any hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Prevention Bureau. CITY OF TUKW1L A Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: fDROC. ADDRESS: DATE: LOCATION ON PROPERTY BUILDING HEIGHT /# OF STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S. E.C. NOTES CHAPTER 51 -10, W.A.C. PREPARED BY: PLAN REVIEW PLAN CHECK NUMBER 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 1`1346 5oo7Hcara' R P? MA OCCUPANCY GROUP - aE TYPE OF CONSTRUCTION SPRimV FAL,L.oa1 — u #� OccuPAMcy 1..04t) 'Re — TAIL I; (50 eloce. 12M 11,4 CraVt .e. 20 " TW 1 'QO 14 LF Foog al 7S PR..0V k R r ' coax C1.a &c ti'�R,.. 1:�B �1 '�I ✓'TAI Ac12.E:i4c �3C17 kA 13 LE-17 t1 on. u e Z. Got.ILAS AILCAO2r 6E 00 . 5A-Per le 6 L.A` I N16 mrrcl tion. 040;01.40 DA3 Al Waif CITY OF TUKWILA 6200 SOUTUCKNTBR BOULEVARD, TUKII'ILA, WA SUING TON 98188 May 13, 1991 Dear Mr. Sabine: 1910NE N (2061433-18M Jim Babine 12515 116th Ave. N.E. Kirkland, WA 98034 RE: Drug Emporium, 17348 Southcenter Parkway Plan check number 91 -130 This department has received your revised drawings as requested in my previous letter. After a review of revisions three items have been identified to be of concern, two of these are from my original letter. To avoid delays, I will forward this project file to all other departments for review while we address these comments. 1. From pervious letter comment number 4, subject on heated or unheated spaces. The revised drawing identifies the stock room be provided with. "heaters per mechanical plans ". It must be clarified to what extent this space will be heated per the energy code. Provide insulation per code to the new . space or between it and the existing space as applicable. From pervious letter comment number 8, information has not been provided on anchorage of the gondolas. If they are proposed to be installed under a separate permit please state so. 3. Safety glazing will be required in all locations to human impact UBC 5406. Contact me if there are any questions on these comments, 8:30 a.m. to 4:30 p.m. at 431 -3670. Sincerely, 17)41 Ken Nelsen Plans Examiner air L, 1 ilousen. map,' It. a me row v.,ompan , May 10, 1991 Mr. Ken Nelson Plans Examiner City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Re: Drug Emporium, 17348 Southcenter Parkway Plan Check Number 91 -130 Dear Ken: This letter transmits the response to your letter dated April 12, 1991 availability of parking at Parkway Plaza. The enclosed detail shows that, including the proposed change, there available to fulfill the City's requirements. Should you have further questions, please do not hesitate to call. Sincerely, MELL CROW COMPANY John O'Neil Construction Manager cc: Jim Barbine Jim Alexander Margaret Day Sylvia Otani 5601 Sixth Avenue South P.O. Box 80326 Seattle, Washington 98108 206/762 -4750 Fax: 206/763 -9871 concerning the will be ample parking H: \users \riggs \wp\john \corr91 :130 ( MAY14 1991 CITY OF PLANNING DEPT. parkway plaza parking CITY OF TUKWILA 62(10 SOUTUUCI NTER BOULEVARD, TUKWILrt, WASHINGTON 98188 April 12, 1991 PHONE # (201;) 433.1800 Jim Sabine 12515 116th Ave. N.E. Kirkland, WA 98034 RE: Drug Emporium, 17348 Southcenter Parkway Plan check number 91 -130 Dear Mr. Sabine: Gary 1., Vanl)usrn, Al"yur After an initial review of subject project; it has been determined that additional information typical and /or corrections be submitted to complete the plan review. Please address the following comments. 1. Provide General Notes to reflect conformance to 1988 U.B.C., 1988 U.M.C., Washington State Energy Code, Washington State Barrier Free Code, and provisions of applicable Local Codes. 2. Cover sheet A -1 under Project Notes lists construction type for Storage to be 5 -N sprinklered and Retail 5 -1 sprinklered. Is the existing retail proposed to be 5 -1 Hour and if so the two types of construction will require area separation. • 3. Proposed new offices and lunch room in new addition may not exit through stock room per U.B.C. 3303(e). Provide an alternate exit plan per code. New addition to this tenant space, under a separate permit, application is proposed to be unheated warehouse space. As a result the proposed new offices, lunch room, and other related spaces are assumed to be heated and must meet all requirements of the Washington State Energy Code. Provide detail and information for such. 5. Provide the lighting budget for all new ceiling light fixtures per Washington State Energy Code, (watts per square foot, allowed and provided). 6. Toilet rooms floor base is proposed to be 4" rubber, U.B.C. Section 510 requires the floor material to be coved up the wall a minimum of 5 ". Page 2 7. What is the proposed weight of the cosmetic cloud frame on sheet A -8 detail #9 7 Provide details of its support from the existing roof and provide engineering if applicable. 8. Provide anchoring details for retail area gondolas and similar partitions over 5'9" in height, also for any rack storage, U.B.C. Sec. 2309 and 2312(g). Any rack storage in the new stock room over 8 feet is required to be engineered and stamped by a Washington State license engineer. All rack storage will involve additional fees and a separate rack storage permit may be applied for if desired. Note: This proposed project, changes the use of 4,900 sq.ft. of storage and office space to retail use. This may have some impact on the city parking requirements. Approximate changes as follows. (a) Existing stock room = 3,500 sq.ft., change to retail (b) Existing office = 1,000 sq.ft., change to retail (c) Existing Pharmacy = `minimal change N/A (d) New warehouse = 400 change to office (New warehouse area permitted separately as warehouse) --- 4 q �,S --� re Please contact our planning department on this change of use concern. ontact me if there are any questions on these comments, 8:30 a.m. to 4:30 p.m. at 431 -3670. Sincerely, Ken Nelsen Plans Examiner Oil SUBMIT1D TO: CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * * REVISION SUBMITTAL DATE J` �v / ( I PROJECT NAME 0 ru l E>m ADDRESS 4 S� e c1. CONTACT PERSON -.1 1 YYl t h 1 r E PHONE Z-2 d7C j ARCHITECT 1 2-V L c . 1� 6.(A4 1�1 1 PERMIT NUMBER Gt PLAN CHECK NUMBER ` I p TYPE OF REVISION: CACCe SHEET NUMBER(S) o.AA t Um "Cloud" or highlight all areas of revisions and date revisions. (If previously issued) ) Ail A41 I♦ Ir.. e. V\\ \ ..0 'MU, — "�ttc�ivru rITY OF Tl1KWILA MAY 6 1991 PERMIT CENTER Component Gross Floor Area G5.4.) Allowable Watts /Ft (Table J4 -15) Allowable Wattage 2Pr*I 1..) Occupancy Group X -2 2 7 59e. ''� 5; 3 0O 2 0 7 O , 7 e l - f) ) o 6 ' 3710, J Occupancy � ) Group CgliMitaoup g'2 Occupancy Group 7.5 XXXXXXXX ALLOWABLE INTERIOR TOTAL G j 9% ACTUAL INTERIOR LIGHTING POWER BUDGET Space Identification Floor Area cs. Fixture Wattage x No. Fixtures Wattage 1. 1 .el- a-u._. 3. 4, 5. — 6. 7. ' 8, 9. 10. zv, 5,erb , n 4 1-0or0 z /300 % 0 4ao \,u x 4 1 9 40 Le c 1 0 IC x ,.9 S0 w X 11 37, : 1-00. 1,441. 1 5 ACTUAL (DESIGN) INTERIOR TOTAL 40 J 50. Component - - - Area Lineal Feet Allowable Watts /Ft Allowable Walls Lf Allowable Wattage Gross Building Perimeter Gross Parking Area XXXXXXX - _ _ XXXXXXX XXXXXXXXX 0.05 7.5 XXXXXXXX ,_ . ALLOWABLE EXTERIOR TOTAL ACTUAL EXTERIOR LIGHTING POWER BUDGET Component Fixture Wattage x No, Fixtures Wattage Building Perimeter Lights Parking Area Lights • , a IVED , ACTUAI. (DESIGN) EXTERIOR TO \(.F i �l RR 01991 0 kdc Pag T I urn - �' -3. - - 1 L/4 A ° ALLOWA I AOR LIGH ING POWER BUDGET C,,CS Sec. 424 T ) ALLOWABLE EXTERIOR LIGHTING POWER BUDGET (MCS Sec. 424C) oA w2 (00/88) PERMIT CENTER 71 o o oc CT 2. ttm I G , CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 08188 April 12, 1991 Jim Babine 12515 116th Ave. N.E. Kirkland, WA 98034 RE: Drug Emporium, 17348 Southcenter Parkway Plan check number Q1 -130 Dear Mr. Sabine: PHONE #12061 433.1800 RECEIVED APR 2 3 1991 RWA Gary G. VanDkstn, Mayor After an initial review gf subject project; it has been determined that additional information typical and /or corrections be submitted to complete the plan review. Please address the following comments. 1. Provide General No to reflect conformance to 1988 U.B.C., 1988 U.M.C., Washington State Energy Code, Washington State Barrier Free Code, And provisions of applicable Local Codes. Cover sheet A -1 under Project Notes lists construction type for Storage to be 544 sprinklered and Retail 5.-1 sprinklered. Is the existing retail proposed to be 5 -1 Hour and if so the two types of construction will require area separation. 3. Proposed new offices and lunch room in new addition may not exit through stock room per U.B.C. 3303(e). Provide an alternate exit plan per code, New addition to this tenant space, under a separate permit application is proposed to be unheated warehouse space. As a result the proposed new offices, lunch room, and other related spaces are Assumed to be heated and must meet all requirements of the Washington State Energy Code. Provide detail and informattpn for such. Provide the lighting budget for all new ceiling light fixtures per Washington State Energy Code, (watts per square foot, allowed and pgpvided). Toilet rooms floor is proposed to be 4" rubber, U.B.C. Section 510 requires the flops material to be coved up the wall a minimum of 4 *, (n v RECEIVED TUKWILA MAY 6 )S1 PERMIT CENTER • Page 2 nu.) nev n -°- $2..2° 20C C.4 A tzaSTt *t T ►r71 What is the proposed weight of the cosmetic cloud frame on I ..r sheet A -8 detail #9 7 Provide details of its support from the existing roof arl4 provide engineering if applicable. Provide anchoring de0ails for retail area gondolas and similar partitions ever 5 °9" in height, also for any rack storage, U.B.C. Sec, ;309 and 2312(g). Any rack storage in the new stock room over 8 feet is required to be engineered and stamped by a Washington State license engineer. All rack storage will involve additional fees and a separate rack storage permit may be applied for if desired. Note: This proposed pro3ot, changes the use of 4,900 sq.ft. of storage and office space co retail use. This may have some impact on the city parking requirements. Approximate changes as follows. (a) Existing stock room = 3,500 sq.ft., change to retail (b) Existing office = 1,g00 sq.ft., change to retail (o) Existing Pharm4py = m4,pimal change N/A (d) New warehouse = 400 sq.ft., change to office (New warehouse Area permitted separately as warehouse) Please contact our plannipg department on this change of use concern. Contact me if there are any questions on. these comments, 8 :30 a.m. to 4:30 p.m. at 431,3670. Sincerely, l� 1 M Ken Nelsen Plans Examiner t14r sKw, 4,R w 1 CITY OF T UK WILA April 12, 1991 E 6200 SOUTIICE,VTEil IROUI.EVARI). TUKWILA, WASHINGTON nN 9818 Jim Babine 12515 116th Ave. N.E. Kirkland, WA 98034 RE: Drug Emporium, 17348 Southcenter Parkway Plan check number 91 -130 Dear Mr. Babine: /' OSE. a CO; After an initial review of subject project, it has been determined that additional information typical and /or corrections be submitted to complete the plan review. Please address the following comments. (;art 1. lin!/ U'ef. i1�r 1. Provide General Notes to reflect conformance to 1988 U.B.C., 1988 U.M.C., Washington State Energy Code, Washington State Barrier Free Code, and provisions of applicable Local Codes. 2. Cover sheet A -1 under Project Notes lists construction type for Storage to be 5 -N sprinklered and Retail 5 -1 sprinklered. Is the existing retail proposed to be 5 -1 Hour and if so the two types of construction will require area separation. 3. Proposed new offices and lunch room in new addition may not exit through stock room per U.S.C. 3303(e). Provide an alternate exit plan per code. 4. New addition to this tenant space, under a separate permit application is proposed to be unheated warehouse space. As a result the proposed new offices, lunch room, and other related spaces are assumed to be heated and must meet all requirements of the Washington State Energy Code. Provide detail and information for such. 5. Provide the lighting budget for all new ceiling light fixtures per Washington State Energy Code, (watts per square foot, allowed and provided). 6. Toilet rooms floor base is proposed to be 4" rubber, U.B.C. Section 510 requires the floor material to be coved up the wall a minimum of 5 ". 7. What is the proposed weight of the cosmetic cloud frame on sheet A -8 detail #9 ? Provide details of its support from the existing roof and provide engineering if applicable. Provide anchoring details for retail area gondolas and similar partitions over 5'9" in height, also for any rack storage, U.B.C. Sec. 2309 and 2312(g). Any rack storage in the new stock room over 8 feet is required to be engineered and stamped by a Washington State license engineer. All rack storage will involve additional fees and a separate rack storage permit may be applied for if desired. Note: This proposed project, changes the use of 4,900 sq.ft. of storage and office space to retail use. This may have some impact on the city parking requirements. Approximate changes as follows. (a) Existing stock room = 3,500 sq.ft., change to retail (b) Existing office = 1,000 sq.ft., change to retail (c) Existing Pharmacy = minimal change N/A (d) New warehouse = 400 sq.ft., change to office (New warehouse area permitted separately as warehouse) Please contact our planning department on this change of use concern. Contact me it there are any questions on these comments, 8 :3 a.m. to 4:30 p.m. at 431 -3670. A '1 . COVER: S1iEEE;' SITE PLAN. 'PROJECT NOTES' A 2 , DENOLIT XON DLAN FLOOR' F t,OORING PAT -E PL AN A -5 REFLECTED CEYI:ING PLAN P ,b t3RAPHTCS LOCATIONS PLAN: a A-7 INTERIOR ` COSMETICS PLAN & FI EVATTONS DETAILS" A -9 ,PH CY;sPLAN & EI: VAT DETA A 10 INTERIOR ELEVATIONS DETAILti 641 DETAIL'S ORIOIt1At PEA$XTa NO. Pt ,1 ECTi App)tES5 TENAJ x � • ASSE$$ER ACCour'. MO = 62 907 / 2 30A W6RARL'B4'ELtlINt3'AREA= I0,04:0'1;; c:7713 QPOSR T: S)7dt3. ConrOnn *vim* 00.-1? UMC NASMINBT ENERGY CODE ANO ALL APPCICABLE ° : LOCAL COOES P ROJECT. NOTES R61AIL AREA= .- 20.69a a 8. STORAGE AREA S ;0 S.F. OFFICE AREA: 404.0 5 F,. TOTAL AREA: 26 S F. , - YES FIRE ALARM SYSTEM= YES OCC WARY: ' 8-2 COiFS TRUCTXON TYPE:, l V -N SPRINKLEREO (STORAGE) SPRIN KLEREO(RETAXL) C -2 30'S F /OCC. '(RETAIII) 300 S.F./04C. '(STOkSE) 100 S.F /OCC.'(OFFICE), 686.6 ;(RETA2L) 17.6 ($(GRADE) 4.0 (OFFICE) 4! •. -' 17345 SOUTHCENTER P 4 understand that the Plan Check approvals ar'e o to errors and om�ssISnsandapproval of uns does,no authorizeithe'violatro »'of any Cop c0. or ordin R con- ;actorsco otap rover IansaeknoJ+rledged. Permit SEPARATE F___ LE -CT12 CP& PERMIT A ND Pc u CL.f Nb APPROVAL k REouIRED ri\scvk t ke AL; c YQFTTUKWI demolition robert wells & associates floor plan flooring pattern plan floor tile legend seismic bracing detail reflected ceiling plan graphics location plan elevations lighting section elevations partial elevation at cloud pharmacy plan elevations display plan elevations revised door schedule section cosmetic light valance elevations reflected ceiling plan seismic bracing detail revisions door schedule window schedule elevations glass block detail