Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6791 - Boeing #9-08.3 - Phase III Rooms and Corridors
6791 91-353 boeing #9-08.3 9303 east marginal way south phase 3 Permit 6791 - Boeing #9-08.3 TYPE NST.: I I F R U B C EDITION (year) 1988 SETBACKS: N._ S - E- W— FIRE PROTECTION: °Sprinklers ® Detectors ❑ N/A UTILITY PERMITS REQUIRED? ❑ Yes ®No (throug Public Worksl_ ZONING: BAR /LAND USE CONDITIONS? ❑ Yes ❑X No CONDITIONS (other than those noted on or attached to permit/plans) Seattle, WA ZIP 98124 -2207 WA. ST. CONTRACTOR'S LICENSE # BOEINC294ML EXP. DATE 1 ARCHITECT Boeing PHONE PROPERTY OWNER Boeing PH•N 544 -2975 ADDRESS P.O. Box 3707, M/S 46 -87, Seattle, WA ZIP 98124 -2207 CONTRACTOR Boein: PHONE 544 -2975 ADDRESS P.O. Box 3707, M/S 46 -87, Seattle, WA ZIP 98124 -2207 WA. ST. CONTRACTOR'S LICENSE # BOEINC294ML EXP. DATE ARCHITECT Boeing PHONE 544 - 2975 ADDRESS P.O. Box 3707, M/S 46 -87, Seattle, WA ZIP 98124 -2207 CITY OF TUKWILA Dept. of Community Development- Building 6300 Southcenter Boulevard, Tukwila WA (206) 431 -3670 BUILDING PERMIT NO. DATE ISSUED: co - ) q Q -(D 5 I Division 98188 ilkUILUI PERM if (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) °:::DESCRIPTION ;::; BUILDING:PERMITTEE" PLAN:.GHEGK;FEE >::`.': BUILD.ING:SURCHARGE OTHER SITE ADDRESS (1 3 SUITE # 9 . 5 E M ar ginal Wy S ;��TOTAL= AMOUNT: 113000.< <1555. RCPT: # mum PLAN CHECK NO.: 91 -353 PROJECT NAMEJTENANT ASSESSOR ACCOUNT # 562420 -1032 Boeing //9 -08.3 TYPE OF U New Building U Addition ( Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other: VALUE OF CONSTRUCTION - $ 240,000.00 DESCRIBE WORK TO BE DONE: Install rooms .and corridors in an existing open office area (phase 3). C ODE CO.NIP SQUARE FEET OCC, LOAD SQUARE FEET SQUAR SQUAB FEET E OCC, SQUARE LOAD FEET OCC. LOAD OC C. LOAD SQUARE FEET OCC, LOAD TOTAL SQUARE FEET TOTAL OCC, LOAD APPROVED FOR ISSUANCE BY: BUILDING OFFICIAL DATE: I hereby certify that I have read and e amined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: PRINT NAME: is permit shall b ome null and voidrf the work is not commenced..w�thin 1 8 days from the dat of issuance, ; rf the work. i suspended or abandoned for a penQd of 1 days rom the last inspection. DATE ISSUED: CERTIFICATE OF OCCUPANCY NO. DATE: COMPANY: tabluu PERMIT NO. CONTACTED Lt < <.: Q_. CRP-C-) DATE READY DATE NOTIFIED C1 as - � ) rinit.) PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING • 3RD NOTIFICATION BY: - (init.) BUILDING - 3 ERMIT APPLICATION TRACKING PLAN CHECK NUMBER q1 - 353 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. ® Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. O Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) OCC. LOAD TOTAL SQUARE FEET 000. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET • DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. PAaTi111f FIRE O PUBLIC WORKS O OTHER LATE ,i 0 BUILDING - initial review O PLANNING X BUILDING - final review PROJECT NAME C) -elfl q " 0¶ . - 3 6 - 10.- - SITE ADDRESS q3 SUITE NO. Gt „ 5 ►k , 1 ,,' to S ci/t4DAz N�A REVIEW COMPLETED 1 INIT: INIT: INIT: : DA ! PROV E ci (? CONSULTANT: ROUTED FIRE PROTECTION: �UIISEIIN1 Date Sent Date Approved Detectors ■ N/A FIRE DEPT. LETTER DATED: ,9 - r 7 —`W INSPECTOR: sj ZONING: IBAR/LAND USE CONDITIONS? REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? Yes PUBLIC WORKS LETTER DATED: INIT: 5 C,( INIT: — Fe_, CiRK TYPE OF CONSTRUCTION: S- UBC EDITION (year): TOTAL OCC LOAD lYes No c S ITE ADDRESS SUITE # Q- -2E. MARGINAL WAY SO, BLDG. 119 -08.3 VALUE OF CONSTRUCTION - $ 240, 000.00 PROJECT NAME/TENANT BOEING MILITARY ASSESSOR ACCOUNT # 562420 -1032 TYPE OF U New Building IJ Addition LX] Tenant Improvemen (commercial) U Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: INSTALL ROOMS AND CORRIDORS IN AN EXISTING OPEN OFFICE AREA f' ti 3 BUILDING USE (office, warehouse, etc.) OFFICE NATURE OF BUSINESS: MANAGEMENT WILL THERE BE A CHANGE IN USE? ® No ❑ Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: 254,000 Tenant Space: 16,000 Area of Construction: 16,000 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? a No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER BOEING MILITARY AIRPLANES PHONE � (206) 544 -2975 ADDRESS P.O. BOX 3707, M/S 46 -87, SEATTLE WA. ZIP 98124 -2207 CONTRACTOR BOEING MILITARY AIRPLANES PHONE (206 544 -2975 ADDRESS . P.O Rf1X 3707, M/S 4fi - 87, SFATTI F, WA ZIP 98124 - 2207 WA. ST, CONTRACTOR'S LICENSE # BOEING - 294ML EXP. DATE ARCHITECT ROFTNG MTI TTARY AiRPI ANFS PHONE (206) 544 - 2975 ADDRESS P,G_. BOX 3707, M/S Z, 46 -8 SEATTLE, WA. ZIP 98124 -220Z_ >< .. R B;Y.. IF T . A. .E :' EAD' >A w' ..l..hLE .,.>✓ >*R: Y, . T <1 ..1! . R ND EXAMINED :; THIS APP., LIC A W =<TWE M •','. .. + ::: r ;;t31~:`TRUE ND.;GO iI ECT: >:AND f AM'. AUTHORI • ' T PLY >I . OR'THIS PE R MI T } „ "II: ;•r f f t j' f.l... ; Y BUILDING OWNER OR AUTHORIZED AGENT SIGNATU R ...-e44.7 -oeie DATE 08 -21 -91 PHONE (206) 544 -2975 PRINT �I TERRY BENNETT ADDRFpS BOX 3707, M/S 46 -87, SEATTLE WA. CITY21P -2207 PHONE (206) 544 -2975 CONTACT PERSON TERRY BENNETT CiTY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 SEPTALKA JOB 0910583 -02 PLAN CHECK NUMBER BUILDIIG PERMIT APPLICATION >AMOUNT... DESCRIPTION' »` BUILDING P. ERMIT FEE' -' Y<: PLAN CHECK BUILDING SURCHARGE::::° OTHER:• TOTAL: }1.`Q.it� APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases; a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES ATE :. '166251 '''SZILta 93t1ev9 irgor.i0 ot o. w i j d Pao • JO • .. '9814IMe uoji�aftdd '' i0:10fr4 • F. .. ; ', . . . ., : : ;.,;„:„;:•i .: ::;'.. . ': ,. . ' , . . ;: , ;* . f.' , , , . ., ';'' ' '.: ; : ' : , :' " ntto114.0P.:10)00.10.c)10.1.(n§ P 9P .. .....,,,, ./. , .... •... .... ... .. ,..„ . . ...-. .... . .- ....... ........., • • •• •• ..• •-' '04i1.10447 ..:':■' i s: Wi .: ..': ', . '. . 1 ::': : ..??. :: :: : ■:'..•: : : , ::::::;..:'. i.'i ................................................ ,,,, : ......... 11tY4ed.:1.N130.119.::.; 04s1 *)..eiiie.00..110.*V:::::0:(0iyi:!,:: i)e li* 61.. P u l E . ) 9'. 117 .1 1 .9;*,,Iii . .,....: - • ' . — • 4)0';':i161Pi-'1! 'q....;.PT...1„?..?,...RI91...??PP(T3'!‘;'...i.; ,.....;,..,; • oiiii.j6t4.14ri:OV:.4.0.;06;.;',.: Optgidwap;;, .;,:.: . . . .,.....,..........,;,.::::::::n:t ‘ ....„.....,,,. P iTi7;■i1ii.:111.i.1?Pll!';. 0 ... • .::.'!‘C;xliflii0;;0?!QV?;.:,;:;;::::!: 0 ,.!qn mp."•.; i.4,310T1...i- ..-'171-i:isp0099,,,:,::.:.;:i-i:::::, • • . .:,.. ...,. 11 .,!1i.p044irop... ii46.:0.:..1..F.::::...: r?;qP.., ,.....:;:i.i.w.1'...'• st .i:•iicii',91-41.''''.n. .. 6.tiS' .. ./.91$), :,„.,.:.:•,g;.:, i,.....q.:•.':. ''. : ,..;.:;:,.:.:. ... 5' „:'ii'i e,„ ti 4 '....P..fk 1 ,.„''' ...i:'::' . ''. ? 945 . ou • .... ' ........ ''''fil .; ''. 4,),1,7':-..661P.PJAr ,;,..•fi,g,:::::::::04,.3ii:::iiii 'iu.1.1,19P.I.,;.,:.... 1666 :.9.0;,.„,i.:i:::::::.,,,:;:::,!... ifi ...'0 0 u ,' uoilbf3s.;.;?;;;::-...:''.!•';':';',',:'• ti: ..:., !liq s oc491? 6 .9 '-• .W*0.:.97,:,,,.:. .:,Ci.:..iO.!61.A.l'. Thii . :(3)f lit:.." u1/jaiiEit sw ''-d9:1u0e ..,„,..„:.. . • 13'.?"4; 4YII. Ig:i;n1uOcil.:0.- . ;ici.'iisflt'68010..i'ii:q71.':,-.:::::: e ji e q u ''4049 I.iiiiiiji: ?01:„..::.,..::'. .:,,.*'... ...::::::::......:. .,... '.. lauolP P .t4'...• °° ' • . .inje3111/.?.,Y., im .,...s..:,' iianeool lu7T ..., ....,... ..' 0. (50iP119..q m.e. sr . ' . .i`: ci BiiiriM9 1 ..:„.., ......:.. '....13; ,.::.-', ..:::',.....:!..,:i•:,:,:',:::;::;.]:;::;:::::...i'i,':;:.i.:',.:•:%:.:.:;::, ei"ii°51.*IL 6t i:IPO4'':44v;;,..;0;!)..)tif96 ,:.....„..::::„...:,....... 900brod81i,: ........ • iiir jiiiio ;,...(iii,itiol;:•:'''i- upptpiiCidp ipipci:BiTitn iip0(■Pkcill'il ;,:. . , ... : ...... :::::;:;• ......... ...;;....: : „,.. .0...i1 1. 3t 5 i?J . ,°C1 . . ................................... ISI1N33H3 TVIIIIAREMS 5 • .: :abinnojjo) Olii Joqwn tuncioaV Jossp'0V• Jo•Joeui6uo. • ri su • .• . podwus : odoi [1 . .•:, POSUO o1 • . . . ( oJnorus qoue . 4911001Idde MN : : • . 1V191:1B1/41140C • ro ect ype o nspe i filEMIXO A e ; . l . + n Date Called: Sp A etrik,00t cia Instructions; I Date Wanted: it, - �l 1 ` am. f, Requester: Phone No.: �. j10 14►Ze 4' INSPECTION RECORD C Retain a copy with permit INSPECTION NO A CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 ❑ Approved per applicable codes, COMMENTS: Inspector: Date: "34 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. . !ItrWR . ... TK. ^h^•.'f, •.r?.. 1. ling 1 PERMIT NO. 1 -3670 ❑ Corrections required prior to approval. r ecetWo,: Date: • ro � � /� / -O - ? (� /vito � al ype o nspect on: Date Called: n v i a nte, /c9 _ Add 0 Special Instructions W 61 -0i,e-- Vu l4l -' o /'r t Nato' Date Wanted: �ri 1 � — � ' 1 am. .m. Requester: --- -pnone No.: - 2!/i'' 77" / row" ,nr !-: .. •t P"w p�f.., M, •"Fii� 7* �T . - ' . '� n' } J. ' r v' ;C77 .`, e �" w ` ` r) _INSPECTION RECORD CD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Inspector: eceipt No.: . C4. - ' G'79 (206) 431 -3670 ❑ Corrections required prior to approval. ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project - z � el _ c .3 Type of Inspectio F4 .5 1 6 0 Akr Add e ......... : ? /� � 2 1 r Stu, S . Date Called: / P -iqj -ql Date Wanted: 1 1 2 -16)- 6 )v q i am p.m, Special Instructions Requester: /Lia...�i ` Phone No.: 7 , 71/1 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter. Blvd., #100, Tukwila, WA 98188 0. &INSPECTION RECORD Retain a copy with permit (206) 431 -3670 Inspector: Date: , Approved per applicable codes. ❑ Corrections required prior to approval. O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project iip t • b o wi . ,. Sp: •a Instructlo s: " Date Wanted: - -- /(P q l am. p . Requester: Phone No.: 7k I - 703- CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188- 41 Approved per applicable codes. COMMENTS: r w� G YL 2 t i h I /A— 't--t) ( ?U I S P ece t No,: 0. INSPECTION RECORD Retain a copy with permit ❑ Corrections required prior to approval. C :-t L. t ky : , I n1 1'1A< geed m ❑ $30.00 REINSPECTION FEE REQUIRED, Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. /7q PERMIT No. (206) 431 -3670 nspector: COMMENTS: ' Type oflnspectTon :c Date Called: /2,_ /0 //A ,/ r - : 11 h/b 4-72G F i ' A-Ti) C.. 4.1 Ng" 13 Td 17 is eg,z, ,-.9 t E d R-- CO c�� 1`Z.— 1 ,2 4 v, O �c' ? — (1.1 A'i 1"r .:om:...._ ..:...........___. ` - t .r- -tc-i p v�.. c c6 R-- L( ( a i .S l A cic— � . W I g r A rJ Q 1 Pc-cr. Set—. 0-) S t a D.) J L Tbt e 4 2c A tb �Tta -� C aA p 3 1.3 - t. IL( Project: f. 9 q -a Type oflnspectTon :c Date Called: /2,_ /0 //A ,/ l r -7L44/1 c Sped Instructions: Date Wanted: J 724' 17 m. .m. Requester: Phone No.: nspector: S 10 1 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. INSPECTION RECORD C Retain a copy with permit ❑ Corrections required prior to approval. ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. F T0c9 N 0 .: p t PERMIT No. � (206) 431 -3670 Y ro act; • . . I — f ype o nspect on: I•� 7r� e96 C- . "Rffirilinn Date anted: Mr. �I Sp: «al nstructions; y Requester: Phone No.: z. , J 1 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 1:01cproved per applicable codes. INSPECTION RECORD 0 Retain a copy with permit (07q PERMIT NO. (206) 431 -3670 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ❑ Corrections required prior to approval. COMMENTS: I Inspector: Date: -P roject: --t'7 �� g Type of Inspe �� 3 Address: ? ? 2 /t?.. Dale Called: // — 9/ Special Instructions; Date Wanted: / /--, S — V am p.m. Requester: Phone No.: � � a ...•.- x :4 1• '... 0 INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Of (206) 431 -3670 O Corrections required prior to approval. il 3 / / ••-r r� ,./5e �P nspector: Atai O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. COMMENTS:" .. A. , . ■ � _ .,:�':.. . • . a '- ' _ .r ,P • . . ress: n Sp: al nstructlons: D I .- a Date Wanted: _ _ , , Request ©r: / / P ene No,: t to / / '?.... -" I-' . 'roe • ���,JJ�� � ,J ill ype o nspe o . , , i Mill • . . ress: n Sp: al nstructlons: D I .- a Date Wanted: _ _ , , Request ©r: / / P ene No,: t to / / '?.... -" r" E • `0. Approved per applicable codes. .vwT-..- r•- •- .x^••c•- z,- r..•.. � n. r- e• ^:•^TVCCrcGr�+.Mars+:ws;^s+rrc ICI:4/+c ^*anrAceh, ^a. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (el' PERMIT NO. (206) 431 -3670 ❑ Corrections required prior to approval. ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: f I 1 Date: "Fro ec -- _ S\ Type of Inspection: R . . � _ rn Address: cii &5' mQ 1 r1ff, lit Date Called: , Q _ ), = Special Instructions: Pho -e 3 f :EOr-2 3 ?JO Date Wanted: 10-.Di am, p.rr . Requester: E5r m Phone No,: ..y. •t- i. ; ..... INSPECTION RECORD 0 Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. (0-7q PERMIT NO. (206) 431 -3670 ❑ Corrections required prior to approval. COMMENTS: ?)\44.sL 3 r • O $30.00:REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PROJECT: I ( � ,r y I? • SITE ADDRESS: i � � ,,�,, • CALLED: DATE WANTED: b - D " a m' �1 TYPE OF INSPECTION: 1 AMPr ' T � SPECIAL INSTRUCTIONS: I .- REQUESTER: 4 ,, - PHONE NO.: `76 D -- INSPECTION RESULTS/COMMENTS: � Y V tJ v 6 - 9 - /� -7�.. / - - 8 -......1,.. zr... fil.0►_ 0 INSPECTOR: DATE: /0 - 0 - 't I CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 1909 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Project Name Address Suite .,/ current inspection schedule Needs shift inspection ___ZApproved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: /9 Hood & Duct: Halon: Monitor: Pre-Fire: Permits: 0/44/ AA!o/ /'„ Authorized Signature TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Control No. 91 3 < Permit No Gary L. VanDusen, Mayor 5 ) Date FINALAPP.FRM T.F.D. Form F.P. 85 'DATE /'44/ PROJECT NAME CONTACT PERSON ADDRESS - t73 E. /1i, i ARCHITECT OR ENGINEER CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 (206) 433 -1851 * *REVISION SUBMITTAL ** PHONE 6 PERMIT NUMBER 9/'3S3 (If previously issued) PLAN CHECK NUMBER __ ___ ________ TYPE OF REVISION: SHEET NUMBE %13 39 CITY OF TI)KWILA APPROVED OCT111 BUI DINU UrVISR.314 RECEIVED C)TY OF TUKWILA OCT 1 0 1991 PERMIT CENTER t "Cloud" or highlig' -as.,.er � aio s and data revisions. SUBMITTED TO: � � CITY OF TUKWILA 6200 SOUT/ICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 PHONEY (206) 433.1800 Cary L. VanDascn, Mayor Plan Check #91 -353: Boeing #9 -08.3 (Phase 3) E Marginal Wy S q THE FOLLOWING COMMENTS APPLY TO AND BECOME VRT, OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER i 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1991 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 9. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE APPROVED INITIALS CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 • 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 X 9 Suspended Ceiling 431 -3670 X 10 Wall Board Fastening 431 -3670 11 12 13 X 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 97-25 E Marginal Wy S BUILD1r3 PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: Boeing #9 -08.3 (Phase 3) CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE NSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS 5- 9 \ All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied In place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. OW 14190 ( Plan Check No.:q I 3S"'k Protect: •'3 REQUIRED INSPECTIONS PLAN REVIEW COMMENT • No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4722). (D Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. • All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. r ) Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. G ) Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). n All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the Job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43-8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. 12. 13. y 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final ( Plan Check No.:q I 3S"'k Protect: •'3 REQUIRED INSPECTIONS PLAN REVIEW COMMENT • No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4722). (D Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. • All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. r ) Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. G ) Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). n All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the Job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43-8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. Fire Department Review Control #91 -353 (513) C 13°3 Re: Boeing Company Building #9 -08.3 (Phase III) - East Marginal Way South Dear Sir: City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Gary L. VanDusen, Mayor September 18, 1991 The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1)) Extinguishers shall be installed on the hangers or in the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.6), and shall be installed so that the top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1 -6.6) (UFC 10.301) Extinguishers shall be located so as to be in plain view (if at all possible), or if not in plain view, they shall be identified with a sign stating, "Fire Extinguisher," with an arrow pointing to the unit. (NFPA 10, 1 -6.3) (UFC 10.301) 2. Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit signs shall be installed at required exit Page number 2 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 Gary L. VanDusen, Mayor doorways and where otherwise necessary to clearly indicate the direction of egress. Signs shall be of a contrasting color with the surrounding area and shall have letters not less than six inches high with a minimum letter width of 3/4 ". (UBC 3314) (UFC 12.108) Exits serving more than 50 occupants shall be provided with illuminated exit signs. (UFC 12.108(d)) Exit doors shall swing in the direction of exit travel when serving an occupant load of 50 or more. (UBC 3304(b)) Exits shall be illuminated at any time the building is occupied. An emergency system shall automatically provide exit illumination upon failure of the main power supply. (UFC 12.107(a)(b)) Any room having an occupant load of more than 50 where fixed seats are not installed, and which is used for classroom, assembly or similar purpose, shall have the capacity of the room posted in a conspicuous place on an approved sign near the main exit from the room. (UFC 25.114a) 3. Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) Ignition sources (such as roll -up door motors) and combustible material located above the ceiling must be —J City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Page number Gary L. VanDusen, Mayor Enclosed under floor areas must contain no combustible material other than plenum rated signal wire or be protected in a manner acceptable to the Fire Marshal. 4. All required occupancy separations, area separation walls, and draft -stop partitions shall be maintained and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) Walls and ceilings of corridors serving an occupant load of 30 or more shall be not less than one -hour fire resistive construction. (UBC.3305(g)) (UFC 12.105(a)) All interior wall covering materials shall be fire - resistive or shall be treated to be . fire - resistive, so as to result in a flame- spread rating as required by UFC Appendix VI -C tables 42A and 42B. A certificate of the flame spread rating is required to be delivered to the Tukwila Fire Department. (UBC 4204) (UFC 10.401) Yours truly, The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd MEMO TO: FIRE PREVENTION BUREAU FROM: R.S.B. DATE: September 16, 1991 SUBJECT: PLAN REVIEW 91 -353 ROUTE TO F.P.B. FOR REVIEW, THIS DATE. APPLICANT HAS SUBMITTED REVISED PLANS AND AN ITEMIZED LETTER SHOWING THIER RESPONSE TO ALL COMMENTS OF LETTER DATED 29AUG91. NOTE THAT THEY HAVE INDICATED THAT THE SMOKE REMOVAL SYSTEM IS NOT AN ISSUE, SINCE IT WAS RENDERED INOPERATIVE UNDER THE SHELL PERMIT APPROVAL. A COPY OF LETTER FROM TUKWILA FIRE DEPARTMENT WAS INCLUDED AND IS INCLUDED IN THIS FILE. 7 SEPTEMBER 1991 ROBERT BENEDICTO, PLANS EXAMINER CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD TUKWILA, WASHINGTON 98188 RE: BLDG. #9 -08.3 PHASE 3 PLAN CHECK NUMBER 91 -353 SUBJ: YOUR LETTER DATED 29 AUGUST 1991 CLARIFICATION' OF PLAN REVIEW ITEMS DEAR MR. BENEDICTO, THE FOLLOWING ARE OUR RESPONSES TO YOUR LISTED COMMENTS: 1. ROOM 302 IS ELEVATOR LOBBY . ROOM NAME HAS BEEN REVISED. SEE ENCLOSED CORRECTED SHEETS A -12 & A -12A. 2. WE HAVE ENCLOSED COPIES OF SHEETS A -27B & A -38B WHICH REFERENCE DETAILS FOR CORRIDOR WALL CONSTRUCTION. ALL CORRIDOR WALLS ARE TRUE FLOOR TO TRUE CEILING, WHICH MEANS THEY START AT CONCRETE FLOOR SLAB AND RUN TO UNDERSIDE OF FLOOR ABOVE, PASSING THROUGH RAISED FLOOR AND SUSPENDED ACOUSTICAL CEILING SYSTEM. ALL CONSTRUCTION IS SIMILAR TO THE ORIGINAL SHELL & TENANT IMPROVEMENTS. 3. SAME COMMENT AS ITEM 2 ABOVE. PER OUR SPECIFICATIONS, ALL CEILING PANELS IN CORRIDORS WILL HAVE A RATING FOR 1 -HOUR FLOOR/ CEILING ASSEMBLY, AS PROVIDED FOR IN ORIGINAL CONSTRUCTION. 4. DOORS ARE REVISED TO SWING IN DIRECTION OF EXIT. SEE SHEET A -12 ENCLOSED. 5. DOOR 352A -3 ON SHEET A -13 ENCLOSED HAS BEEN RELOCATED SOUTH BETWEEN GRID LINES 9 & 10 IN ORDER NOT TO CREATE A DEAD END CORRIDOR PAST ENTRANCE EXIT TO STAIR #3. ALL OCCUPANTS EXITING INTO CORRIDOR 352B NORTH OF GRID LINE 10 HAVE ACCESS TO TWO EXIT STAIRS #3 & 5. ALL OCCUPANTS SOUTH OF GRID LINE 10 HAVE ACCESS TO TWO EXIT STAIRS #3 & 4. DOOR WILL COMPLY WITH ALL CONSTRUCTION & HARDWARE REQUIREMENTS OF SECTION 3304(B). 6. DETAILS FOR EXIT ILLUMINATION ARE PROVIDED IN OUR ELECTRICAL DRAWINGS WHICH WILL BE UNDER SEPARATE ELECTRICAL PERMIT. ALL EXIT SIGNS WILL BE ILLUMINATED AND BE SUPPLIED BY POWER FROM THE BUILDINGS EMERGENCY SYSTEM, WHICH CONSISTS OF ON SITE GENERATOR SYSTEM. 7. AS DISCUSSED WITH STAN CRUSE OF BE &C ENGINEERS, AND PER COPY OF LETTER FROM YOUR FIRE DEPARTMENT DATED 31 MAY 1991, WE HAVE NO SMOKE EVACUATION SYSTEM TO MAINTAIN FOR THIS BUILDING. PLEASE CALL IF YOU HAVE ANY FURTHER QUESTIONS. SINCERELY, TERRY BENNETT P.O. BOX 3707, M/S 46 -87 SEATTLE, WA. 98124 -2207 ENCLOSED: REVISED AND NEW SHEETS A- 03, 12, 12A, 13, 13A, 14, 14A ,26B,27B,34E,35C,38B,46,47, &48. RECEIVED CITY n'.- T1 IK \AflL ' SEP PERMIT CENTER 31 :0 11 c:ti 1UKWILf F 1r.1 May 31, 1990 Dear Milt: Sincerely, NJO:ncd City of Tukwila FIRE IMPARTMENT G, uitwila, vv *snington V6168 (206) 575 -4404 Mr. Milt Lechelt King County Building & Land Development 3600-136th Place S.E. Bellevue, Washington 98006 Re: Boeing 9 -08 Building Smoke Removal System Nick Olivas Assistant Chief /Fire Marshal cc: Nick Konwent The Boeing Company copolv to B. A4,,c u4 �• SOP7L /<.A 4, &Q t-.9'V ,t Gary L. VanDusen, Mayor As we have discussed, the disposition of the smoke removal system at the 9 -08 building remains in question. At this time, the City has not made a decision to allow utilization of the system. Until the final status of the system is determined, we are willing to allow Boeing to render the'system inoperable by disconnecting the controls at the control panel. I n addition, a sign needs to be posted on or near the control panel indicating the smoke removal system is not operable and not to tamper with the system. I f you have any questions pertaining to this matter, please contact me. PROJECT NAME PERMIT NUMBER CITY OF TUKWILA. 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * * REVISION SUBMITTAL * * DATE ! — r--- ,O RECEIVED CITY Oi TI il�WILA SEP111i PERMIT CENTER ADDRESS 9 3e2 5 Fr if CONTACT PERSON -ems t fi1 PHONE "/ 2 9 7 5` ARCHITECT OR ENGINEER PLAN CHECK NUMBER 9/ — 55: 3 (If previously issued) TYPE OF REVISION: ( t44-e• SHEET NUMBER(S) .5 A / a A /a4f I-/ 3 X113,4 ,i, ' , a cis A?76 q 3 ye "Cloud" or highlight all areas of revisions and date revisions. Lze) 4-35C 4 3 4- y4 SUBMIrI'ED TO: / -'/8 175-, PLAN REVIEW NO. 91 -353 PROJECT : ADDRESS: August 29 CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION CONTACT: TERRY BENNETT Boeing Bldg 9 -08, F- 22 Avionics Remodel, phase 3 E Marginal Way S. , 1991 The following corrections and/or clarifications are required to complete the plan review. Please respond to the listed comments in itemized letter form, and submit two copies of corrections or additional information developed. 1. Room 302 is a portion of an elevator lobby that is labeled as a storage room, please clarify intent. 2. Two detail keys are cut at new portion of fire rated corridor 352A, however, the referenced sheets are not included in the set. Provide this detail to qualify new corridor construction. 3. Corridor 336N serves as a required exit for > 30 occupants. Provide detail to show how the requirement for 1 -hr construction will be accomplished. 4. Conference room 338B will serve an occupant load > 50 when accordian partition is in the open position. Exit doors must swing in the direction of exit travel. 5. Re: sheet A -13, Corridor 352A, Door 352A -3 is shown installed accross this corridor. How will this meet the requirement of U.B.C. Sec.3304(b) ? 6. Provide details to show how exit illumination will be provided per U.H.C. Sec. 3313 (b). Locate on lighting plans. 7. Provide a narrative, or details as required to show how the smoke evacuation system will be maintained and will function with the new proposed ull height walls at new corridors. lO PREPARED BY: w � � /L�1 i Robert Rene':' cto +e-gigt1 ZP1 R I 3 , d -tr? ; REVISION BY APPROVED DATE 10 : 01.90 REVISION BY DME APPROVED RECORD DRAWINGS SCC GC DS PHASE I F -22 AVIONICS REMODEL SCC GC DS 7.1 .91 PHASE 2 F -.22 A V I O N I C S REMODEL SCC GC DS 8.16.91 D PHASE 3 F -22 AVIONICS REMODEL . ' ' GC DS 8.15.91 RENTON PROJECT SITE FROM DOWNTOWN SEATTLE NO SCALE TERMINAL i28 �� �� � � sir PUGET SOUND REGION I OEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH SEATTLE, WASHINGTON 9810$ 457411ZEZAkig FACILITIES DEPARTMENT I I � � � i I I I I � I I I 1 I 1 � - � � � � � ��� � � � � r � i � I r II1I1I1 �I1 ,il il1lilt 1 111 ` I 1 I 1 I II �� 1 1 2 3 4L I 51 I 6 I No.18 .— ... L ilii iigigidir►i iiigaaah i 0 AUBURN, WA . 98002 O BELLEVUE , WA 98007 O EVERETT , 7 [� NT , WA 9820 1 KENT ii , WA , 9803 1 O PORTLAND OR . 97220. 0.RENTON, WA. 98055 II SEATTLE, WA. 98124 C Z f liy 11116171 I�I 1 /A\ i .'.. r;,- , TI. 1073 REGISTERED ECT S1A1E CF WASMN ,w u D ACCEPTABILITY TFI15 DESIGN AND/OR SPECIFICATION I S APPROVED APPROVED BY DEPT DATE PARKING KA If0.oi.9D BLDG 9-08 LAND USE CODE BUILDING CODE. OCCUPANCY GROUP CONSTRUCTION TYPE LOCATION ON PROPERTY FLOOR AREA (ACTUAL) BUILDING HEIGHT: STORIES: OCCUPANT LOAD: OFFICES I /IOO SF MECH /STOR I/300 SF OTHER 1 /100 SF imp _.. R.IMMERMAN CHECKED T T i a GROSS AREA SHAFTS AREA NET AREA FOR PARKING 242,382 S,F./ 200 S.F. PER HANDICAPPED REQUIREMENTS FIRE PROTECTIONS S :PARAT °ION EXTERIOR WALL (NON—BEARING) INTERIOR WALLS (NON— BEARING) INTERIOR WALLS (BEARING) STRUCTURAL FRAME FLOORS STAIRS ENCLOSURES SHAFT ENCLOSURES ELEVATOR SHAFT CORRIDORS ROOF ROOFING CONSTRUCTION CODE SUMMARY SEPARAI p,ND PERMIT aPPRa\1 _ REQUIRED M -2 (HEAVY INDUSTRY) 1988 UBC B -2 OFFICE /FACTORY II -F.R. FILE' COPY I understand that the Plan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. Receipt of ontrector' copy of approved ack CITY OF TUKWILA. "CITY OF TUKWILA OFFICES SEPARATION 60 FEET (MINIMUM ALL SIDES) BUILDING FOOTPRINT 50',207 SF BUILDING GROSS 253,832 SF FIRST FLOOR 50 ;012 $F SECOND FLOOR 50,207 SF. 'THIRD FLOOR 50,207' SF FOURTH FLOOR 50,207 SF FIFTH FLOOR 50,207 SF PENTHOUSE 2',992 SF 93FT 5 FIRST `FLOOR 340 SECOND FLOOR 419 THIRD FLOOR 419 FOURTH'FLOOR 419 FIFTH FLOOR 419 BUILDING TOTAL REQUIREMENTS = GROSS BUILDING AREA MINUS MECHANICAL, STAIR, AND ELEVATOR SHAFTS 11,450 S F. 2.42,382 S.F. CAR = 1212 CARS REQUIRED HANDICAP STALLS REQUIRED IN TOTAL =_I4 (4 FIRST 200, I PER 100 AFTER), STALLS PROVIDED 9 -=08 OFFICE BUILDING (NEW) = 1212 (14 HANDICAP) 9 -77 RANGE BUILDING (EXISTING) = 120 CARS - (4 HANDICAP) SEISMIC ZONE 3 DESIGN LOADS: 'ROOF SNOW "____ 25 PSF WHICHEVER I S GREATER - LIVE 20 PSF FLOOR — OFFICE (LIVE) X00 PSF DEAD 20 PSF (PARTITION) MECH & STOR 125 PSF - STAIRS & ` CORRIDOR 100 PSF WIND -. 80 MPH EXPOSURE C AUG 2 1 1931 PERMIT C ' ' ER BARRIER FREE FULLY AUTOMATIC I HR. UNPROTECTED HOUR 2 HOUR 2 HOUR 2 HOUR 2 HOUR 2 HOUR 2 HOUR i `HOUR I " HOUR FIRE RETARDANT: COVER SHEET 253,832 S.F. RUC ENGINEERS ARCHITECTURAL MASTER Col THROUGH —OUT F/S CLASS - I CLASS A -(FM CLASS 2016 C IY OF IUKWILA APPROVED yEP 2 5 19,91 r ivy -C D.C. 623001 RECORD DRAWINGS LAST REVISION SHEET G 01 JOB NO. - 91156/86062 ` Np. 9.08 - -GO1 SYMBOL 8.15 91 DATE DRS/08. 15 91/09:5; 9.08 -S24 S -24 FRAMING ELEVATIONS. VAT - 9.088-S25 S -25 FRAM ING ELEVATIONS 9.08 -S26 S -26 FRAMING ELEVATIONS 9.08 - S27 S -27 GIRT ELEVATIONS 9.08 -S28 S -28 GIRT ELEVATIONS 9 08-S29 S -29 BASE°PLATE AND ANCHOR BOLT DETAILS 9.08 -S30 S -30 BASE PLATE AND ANCHOR BOLT DETAILS 9 ,08 -S3 I S FLOOR FRAMING DETAILS 9.08 -S32 5 -32 FLOOR FRAMING DETAILS 9.08 -533 S-33 ROOF FRAMING DETAILS 9 08-S34 S -34 ROOF FRAMING DETAILS 9.08 -S35 ` S -35 BRACING DETAILS 9.08 -S36 5 -36 BRACING DETAILS 9 08-S37 5 =37 GIRT DETAILS 9.08 --S38 S -3$ GIRT DETAILS 9.08 S39 S -39 GIRT DETAILS 9.08 -S40 S740 ELEVATOR RAIL SUPPORT DETAILS 9.08 -S41 5 -41 EQUIPMENT SUPPORT DETAILS 9,08 -S42 S--42 EQUIPMENT SUPPORT DETAILS 9.08 -543 S - 43 STAIR PLANS 9 , 08-S44 S -44 STAIR ` DETAIL S 9,08 -S45 S-45 MISCELLANEOUS DETAILS 9.08 -S46 S -46 MISCELLANEOUS DETAILS a.p F ALP - 25 191 INCLUDED DRAWING NO SHEET NO DRAWING TITLE y -_. IN SET GENERAL _r _ 9.08 - - -G01 '- - _G-01 � _ COVER SHEET -_ 9 , 9,08-G02 G -02 INDEX OF DRAWINGS O8 G0 -3 G ---0,3 INDEX OF DRAWINGS 9.08 'G04 _ G- -04 INDEX OF DRAWING I C VIL _�- 109-008-1000-COI C-6 -0 I OVERALL SITE PLAN 109_- w008 -1000 -0O2 C�-02 SITE PLAN (SOUTH HALF) 109-008-1000-0O3 ao� aaa - -co3 c 03 ._ � _. - ___._-___.______.__ SITE PLAN (NORTH HALF) ^` 109 -- 008- - 1 -004 C - -04 UTILITIES PLAN _.._.___.________ -_ -_ -_ _. - LITIE --- _ -__ ' � (SOUTH I11 HALF ) 16 5 C ---O _ ______ ._____- _ _ 5 UTILITIES PLAN (NORTH HALF _ 109 -008 -- 1 000 C0_ 6 C -06 SITE SECTIONS AND DETA fTS 1097008-V000-007 C NS 07 C - -07 SITE SECTIO AN DETAILS - - -__ 109 - 008 - 1000 -008 C 708 SITE SECTIONS AND DETAILS I09 -- 008 - 1000 -CO9 C -09 OFFSITE SANITARY SEWER PLAN ___ 109 -008 -- 1 000 -CI o _ C- I 0 GENERATOR AND FUEL. TANK PADS -. 109- 00I 008 -0 -C I f C- I I TRUCK WELL AND COMPACTOR PAD I09-005--l000--C12 C- 12 DUCTBANK PROFILES - 109 -008 --1 000 -C 13 C- 13 DUCTBANK PROFILES __________ ,.__ _____ 109 -008 - -I 000- -C 14 C-14 SEATTLECITY LIGHT VAULTS - _ - 109- 008 - 1 0_00 -C15 C--15 SEATTLE CITY LIGHT STANDARD ...__ - - __ _ DETAILS I L S 109-- 008 - 000 -C16 C -1_6 PAVEMENT MARKING PLA N ---- ------ _.___ 109 -008 - 1000 -DOI D -01 DEMOLITION PLAN (SOUTH HALF) 109 D -.02 DEMOLITION I (NORTH ON PLAN _ .�_____ `HALF) __ ..___ 109 -008 - 1 000 -D03 D -03 OFFS I T -.- T E STOr�M SEWER PLAN 8� SECTIONS _ LANDSCAPE 109 -- 008 - 1 000 _ -L I L-I GRADING , PAVING 8, LAYOUT AT ENTRANCE: COURT 109 -008 - 1000 -L2 L -2 DETAILS I09- 008 - 1000 -L3 L -3 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -L4 L -4 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -MI M -I IRRIGATION PLAN I09- 008-- I000 -M2 M -2 . iRRIGATTON PLAN ARCHITECTURAL 9.08 -A01 A -01 BUILDING FIRST FLOOR PLAN 9.08 -A02 A-02 BUILDING SECOND FLOOR PLAN +� 9.08 -A03 A -03 BUILDING THIRD FLOOR PLAN 9.08 -A04 A -04 BUILDING FOURTH FLOOR ULAN 9.08 -A05 A -05 BUILDING FIFTH FLOOR PLAN 9.O8 -A06 A -06 FIRST FLOOR - PLAN A 9.08 -A06A A -06A DOOR AND ROOM FINISH SCHEDULES 9,08-A07 A -07 FIRST FLOOR -. PLAN B 9.08- A07A A -07A DOOR AND ROOM FINISH SCHEDULES 9 08-A08 A -08 FIRST FLOOR - PLAN C 9.08 -A08A A -08A DOOR AND ROOM FINISH SCHEDULES 9.08-A09 A-09 SECOND FLOOR -- PLAN A 9.08 -A09A A -09A DOOR AND ROOM FINISH SCHEDULES 9.08 - -A10 A -I0 SECOND FLOOR - PLAN B 9.08 --AIOA A -IGA DOOR AND ROOM FINISH SCHEDULES 9 .08 - -A I I A- I I SECOND FLOOR - PLAN C 9.08 -AI IA A- -I IA DOOR AND ROOM FINISH SCHEDULES 4 9 08-A 12 A -- 12 THIRD FLOOR - PLAN A 4 9.08 -AI2A A-I2A DOOR AND ROOM FINISH SCHEDULES 4 9,08 -AI3 A - -I3 THIRD FLOOR - PLAN B O 9.08 -A13A A - -13A DOOR AND ROOM FINISH SCHEDULES _9 9.08 -AI4 I A -I4 THIRD FLOOR - PLAN C 4 9 .'08 -A 14A A -- 14A DOOR AND ROOM FINISH SCHEDULES 9.08415 _ A- 15 FOURTH FLOOR - PLAN A - - -- 9.08 -A15A A -15A DOOR AND ROOM FINISH SCHEDULES _9 -AI6 A -I6 FOURTH FLOOR -- PLAN B 9 :O8 -AI6A V A -I6A DOOR AND ROOM FINISH SCHEDULES ___ -_- 9.08 -A17 A -17 FOURTH FLOOR - PLAN C 9.08 -A 17A A - -17A DOOR AND ROOM FINISH SCHEDULES _ - - 9.08-A18 A-18 FIFTH FLOOR - PL: AN ! q _- _ 9.08 -A 18A A -18A DOOR AND ROOM FINISH SCHEDUI_ E:S 9.08 -A19 A -I9 FIFTH FLOOR -- PLAN B A -I9A DOOR AND ROOM FINISH SCHEDULES 9.08- --A20 A -20 FIFTH FLOOR - PLAN C 9 , 08 --A20A A -. -20A DOOR AND ROOM FINISH SCHEDULES INCLUDE DRAWING NO. ( R SHEET NO. _.__ IN SET D AWING °TITLE _ I TECTURAL L - 9. 08 -A598 A -59_ ARCH B VTC ROOM WALL SECTIONS 9.08 -A60 A -60 ELEVATOR DETAILS - _ - _ ___.____ 9.08 - -A6OB A -60B VTC DETAILS --- _ _____._____ 9 - -A61 A - -61 STAIR l AND- 2 PLANS 9._08:461a______ _ ^A-618 VTC ROOM FLOOR FRAMING PLAN 9 08 -A62 A -62 STAIR I AND 2SECTIONS AND DETAILS - -`� 9 08 - -A62B A -62B VTC ' DETA I LS - _ 9.08 - -A63 ' A -63 STAIR 3.-FLANS 0 A6 4 A- 64 STAIR 8 3SECTION AN _._.._ D DETAILS __ 9._087A __ - A -65 STAIR 4 AND 5 PLANS 9.08 -A66 A-66 STAIR 4 AND 5 SECTIONS _ 9 -A68 A - -_68 -- LOADING DOCK PLAN _ 9.08 -A70 _ A. -70 TOILET ROOM PLANS, ELEVATIONS A ND DETA _ D[1 A IL, S _ 9.08-A 70B _ A -708 MISCELLANEOUS DETAIL S --- ___. 9,08-A72 - A -72 Ml SCELLANEOUS DETA I LS - - r RF SHIELDiNG 9.08 -RFI RF -i FIRST FLOOR PENETRATION PLAN AND SCHEDULE. 9.08-- RF2 'RF -2 FIRST FLOOR DETAILS 9.08 -RF3 RF - -3 FIRST' FLOOR DETAILS 9.08 -RF4 RF -4 TiFiRST FLOOR AND MISCELLANEOUS DETAILS 9.08 -RF5 RF -S SIDING DETAILS 9.08 - - -- RF -'9 DOOR DETAILS 9.08 -RFII RF - -Ii ROOF PENETRATION PLAN AND SCHEDULES 9.08-RFI2 RE- 12 ROOF 'DETA I LS SIGNAGE 9.08 -ASOI AS -01 SIGNAGE FIRST FLOOR `9.08 -ASO2 AS -02 SIGNAGE SECOND FLOOR PLAN 9.08 -AS03 AS -03 SIGNAGE THIRD FLOOR PLAN 9.08 -ASO4 . AS -04 S'IGNAGEFOURTH FLOOR PLAN 9.0 -q 8 S05 AS -05 SIGNAGE FIFTH FLOOR PLAN 9.08 -AS2I AS -2I INTERIOR SIGNAGE DETAILS w. > T TT i g 8 L 9 9 C g If' t I 1111 1111 II11�I1111111�IIIl Illl�l111111 ' � 11I11111111�11111[11III11 II11 I111'1111111111ili 1111111111111 I, 11 111111 11111 1(1 111111 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 I NCL LID . - 9 AWING NO S SHEET NO. D ., __ 9.08 -A40 FOUNDATIO PLAN A -40 REFLECTED CEILING PLAN - FIRST FLOOR A FOUNDATION DETAILS 9.O8 -S4 S 9. 08 -- A4 I • _ _ _ A -4 I REFLECTED CEILING PLAN - FIRST FLOOR B S-5 F FIRST FLOOR PLAN 9,08-A42 A - -42 REFLECTFO CEILING PLAN - FIRST FLOOR C 9.08 -A43 9.08-S8 A -43 __ - - -____ - ' REFLECTED CEILING PLAN - SECOND FLOOR A 9.08 -A44 BASEPLATE AND ANCHOR BOLT PLAN A-44 REFLECTED CEILING PLAN - SECOND FLOOR B -1 i 9.08 -A45 9.08 -S 13 S A -45 REFLECTED CEILING PLAN - SECOND FLOOR C 9,08-$14 5 9.08 -A46 A -46 REFLECTED CEILING PLAN - THIRD FLOOR A S -15 T 9.08 -A47 THIRD FLOOR SLAB`PLAN A -47 REFLECTED CEILING PLAN - THIRD FLOOR B 9.08 -A48 A -48 REFLECTED CEILING PLAN --- THIRD FLOOR C S -19 F 9.08 -A49 9.08 -S20 S A -49 REFLECTED CEILING PLAN -- FOURTH FLOOR A 9.08 - 521 S 9.08-A50 A -50 REFLECTED CEILING PLAN - FOURTH FLOOR B S -22 P PENTHOUSE FLOOR AND PARTIAL - 9.08 --A51 S - 2 B A -5i REFLECTED CEILING PLAN - FOURTH FLOOR C 9 08-A52 A -52 CEILING REFLECTED CEILING PLAN - FIFTH FLOOR A 9 08-A53 A -53 . . REFLECTED CEILING PLAN - FIFTH FLOOR B 9.08-A54 A -54 REFLECTED CEILING PLAN -- FIFTH TI-I FLOOR C 9.08 -A55 A -55 SOUTH LOBBY PLAN 9.08- -A55B A - 55B VTC ROOM FLOOR PLAN 9.08 -A56 ' A -56_ LOBBY SECTIONS 9 08-A56B A -56B VTC ROOM SECTIONS 9.08 -A57 A - -57 SOUTH LOBBY PLAN 9 08-A57B A -576 VTC ROOM REFLECTED CEILING PLAN 9.08 -A58A A -58A LOBBY DETAILS 9.08 -A58B A -50B LOBBY DETAILS 9,08 -A58C A -5 „8C ,. LOBBY T DE AILS 9 08-A58D A -58D VTC ROOM ELEVATIONS 9.08 -A58E A -58E LOBBY DETAILS 9.08 -S24 S -24 FRAMING ELEVATIONS. VAT - 9.088-S25 S -25 FRAM ING ELEVATIONS 9.08 -S26 S -26 FRAMING ELEVATIONS 9.08 - S27 S -27 GIRT ELEVATIONS 9.08 -S28 S -28 GIRT ELEVATIONS 9 08-S29 S -29 BASE°PLATE AND ANCHOR BOLT DETAILS 9.08 -S30 S -30 BASE PLATE AND ANCHOR BOLT DETAILS 9 ,08 -S3 I S FLOOR FRAMING DETAILS 9.08 -S32 5 -32 FLOOR FRAMING DETAILS 9.08 -533 S-33 ROOF FRAMING DETAILS 9 08-S34 S -34 ROOF FRAMING DETAILS 9.08 -S35 ` S -35 BRACING DETAILS 9.08 -S36 5 -36 BRACING DETAILS 9 08-S37 5 =37 GIRT DETAILS 9.08 --S38 S -3$ GIRT DETAILS 9.08 S39 S -39 GIRT DETAILS 9.08 -S40 S740 ELEVATOR RAIL SUPPORT DETAILS 9.08 -S41 5 -41 EQUIPMENT SUPPORT DETAILS 9,08 -S42 S--42 EQUIPMENT SUPPORT DETAILS 9.08 -543 S - 43 STAIR PLANS 9 , 08-S44 S -44 STAIR ` DETAIL S 9,08 -S45 S-45 MISCELLANEOUS DETAILS 9.08 -S46 S -46 MISCELLANEOUS DETAILS a.p F ALP - 25 191 INCLUDED DRAWING NO SHEET NO DRAWING TITLE y -_. IN SET GENERAL _r _ 9.08 - - -G01 '- - _G-01 � _ COVER SHEET -_ 9 , 9,08-G02 G -02 INDEX OF DRAWINGS O8 G0 -3 G ---0,3 INDEX OF DRAWINGS 9.08 'G04 _ G- -04 INDEX OF DRAWING I C VIL _�- 109-008-1000-COI C-6 -0 I OVERALL SITE PLAN 109_- w008 -1000 -0O2 C�-02 SITE PLAN (SOUTH HALF) 109-008-1000-0O3 ao� aaa - -co3 c 03 ._ � _. - ___._-___.______.__ SITE PLAN (NORTH HALF) ^` 109 -- 008- - 1 -004 C - -04 UTILITIES PLAN _.._.___.________ -_ -_ -_ _. - LITIE --- _ -__ ' � (SOUTH I11 HALF ) 16 5 C ---O _ ______ ._____- _ _ 5 UTILITIES PLAN (NORTH HALF _ 109 -008 -- 1 000 C0_ 6 C -06 SITE SECTIONS AND DETA fTS 1097008-V000-007 C NS 07 C - -07 SITE SECTIO AN DETAILS - - -__ 109 - 008 - 1000 -008 C 708 SITE SECTIONS AND DETAILS I09 -- 008 - 1000 -CO9 C -09 OFFSITE SANITARY SEWER PLAN ___ 109 -008 -- 1 000 -CI o _ C- I 0 GENERATOR AND FUEL. TANK PADS -. 109- 00I 008 -0 -C I f C- I I TRUCK WELL AND COMPACTOR PAD I09-005--l000--C12 C- 12 DUCTBANK PROFILES - 109 -008 --1 000 -C 13 C- 13 DUCTBANK PROFILES __________ ,.__ _____ 109 -008 - -I 000- -C 14 C-14 SEATTLECITY LIGHT VAULTS - _ - 109- 008 - 1 0_00 -C15 C--15 SEATTLE CITY LIGHT STANDARD ...__ - - __ _ DETAILS I L S 109-- 008 - 000 -C16 C -1_6 PAVEMENT MARKING PLA N ---- ------ _.___ 109 -008 - 1000 -DOI D -01 DEMOLITION PLAN (SOUTH HALF) 109 D -.02 DEMOLITION I (NORTH ON PLAN _ .�_____ `HALF) __ ..___ 109 -008 - 1 000 -D03 D -03 OFFS I T -.- T E STOr�M SEWER PLAN 8� SECTIONS _ LANDSCAPE 109 -- 008 - 1 000 _ -L I L-I GRADING , PAVING 8, LAYOUT AT ENTRANCE: COURT 109 -008 - 1000 -L2 L -2 DETAILS I09- 008 - 1000 -L3 L -3 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -L4 L -4 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -MI M -I IRRIGATION PLAN I09- 008-- I000 -M2 M -2 . iRRIGATTON PLAN ARCHITECTURAL 9.08 -A01 A -01 BUILDING FIRST FLOOR PLAN 9.08 -A02 A-02 BUILDING SECOND FLOOR PLAN +� 9.08 -A03 A -03 BUILDING THIRD FLOOR PLAN 9.08 -A04 A -04 BUILDING FOURTH FLOOR ULAN 9.08 -A05 A -05 BUILDING FIFTH FLOOR PLAN 9.O8 -A06 A -06 FIRST FLOOR - PLAN A 9.08 -A06A A -06A DOOR AND ROOM FINISH SCHEDULES 9,08-A07 A -07 FIRST FLOOR -. PLAN B 9.08- A07A A -07A DOOR AND ROOM FINISH SCHEDULES 9 08-A08 A -08 FIRST FLOOR - PLAN C 9.08 -A08A A -08A DOOR AND ROOM FINISH SCHEDULES 9.08-A09 A-09 SECOND FLOOR -- PLAN A 9.08 -A09A A -09A DOOR AND ROOM FINISH SCHEDULES 9.08 - -A10 A -I0 SECOND FLOOR - PLAN B 9.08 --AIOA A -IGA DOOR AND ROOM FINISH SCHEDULES 9 .08 - -A I I A- I I SECOND FLOOR - PLAN C 9.08 -AI IA A- -I IA DOOR AND ROOM FINISH SCHEDULES 4 9 08-A 12 A -- 12 THIRD FLOOR - PLAN A 4 9.08 -AI2A A-I2A DOOR AND ROOM FINISH SCHEDULES 4 9,08 -AI3 A - -I3 THIRD FLOOR - PLAN B O 9.08 -A13A A - -13A DOOR AND ROOM FINISH SCHEDULES _9 9.08 -AI4 I A -I4 THIRD FLOOR - PLAN C 4 9 .'08 -A 14A A -- 14A DOOR AND ROOM FINISH SCHEDULES 9.08415 _ A- 15 FOURTH FLOOR - PLAN A - - -- 9.08 -A15A A -15A DOOR AND ROOM FINISH SCHEDULES _9 -AI6 A -I6 FOURTH FLOOR -- PLAN B 9 :O8 -AI6A V A -I6A DOOR AND ROOM FINISH SCHEDULES ___ -_- 9.08 -A17 A -17 FOURTH FLOOR - PLAN C 9.08 -A 17A A - -17A DOOR AND ROOM FINISH SCHEDULES _ - - 9.08-A18 A-18 FIFTH FLOOR - PL: AN ! q _- _ 9.08 -A 18A A -18A DOOR AND ROOM FINISH SCHEDUI_ E:S 9.08 -A19 A -I9 FIFTH FLOOR -- PLAN B A -I9A DOOR AND ROOM FINISH SCHEDULES 9.08- --A20 A -20 FIFTH FLOOR - PLAN C 9 , 08 --A20A A -. -20A DOOR AND ROOM FINISH SCHEDULES INCLUDE DRAWING NO. ( R SHEET NO. _.__ IN SET D AWING °TITLE _ I TECTURAL L - 9. 08 -A598 A -59_ ARCH B VTC ROOM WALL SECTIONS 9.08 -A60 A -60 ELEVATOR DETAILS - _ - _ ___.____ 9.08 - -A6OB A -60B VTC DETAILS --- _ _____._____ 9 - -A61 A - -61 STAIR l AND- 2 PLANS 9._08:461a______ _ ^A-618 VTC ROOM FLOOR FRAMING PLAN 9 08 -A62 A -62 STAIR I AND 2SECTIONS AND DETAILS - -`� 9 08 - -A62B A -62B VTC ' DETA I LS - _ 9.08 - -A63 ' A -63 STAIR 3.-FLANS 0 A6 4 A- 64 STAIR 8 3SECTION AN _._.._ D DETAILS __ 9._087A __ - A -65 STAIR 4 AND 5 PLANS 9.08 -A66 A-66 STAIR 4 AND 5 SECTIONS _ 9 -A68 A - -_68 -- LOADING DOCK PLAN _ 9.08 -A70 _ A. -70 TOILET ROOM PLANS, ELEVATIONS A ND DETA _ D[1 A IL, S _ 9.08-A 70B _ A -708 MISCELLANEOUS DETAIL S --- ___. 9,08-A72 - A -72 Ml SCELLANEOUS DETA I LS - - r RF SHIELDiNG 9.08 -RFI RF -i FIRST FLOOR PENETRATION PLAN AND SCHEDULE. 9.08-- RF2 'RF -2 FIRST FLOOR DETAILS 9.08 -RF3 RF - -3 FIRST' FLOOR DETAILS 9.08 -RF4 RF -4 TiFiRST FLOOR AND MISCELLANEOUS DETAILS 9.08 -RF5 RF -S SIDING DETAILS 9.08 - - -- RF -'9 DOOR DETAILS 9.08 -RFII RF - -Ii ROOF PENETRATION PLAN AND SCHEDULES 9.08-RFI2 RE- 12 ROOF 'DETA I LS SIGNAGE 9.08 -ASOI AS -01 SIGNAGE FIRST FLOOR `9.08 -ASO2 AS -02 SIGNAGE SECOND FLOOR PLAN 9.08 -AS03 AS -03 SIGNAGE THIRD FLOOR PLAN 9.08 -ASO4 . AS -04 S'IGNAGEFOURTH FLOOR PLAN 9.0 -q 8 S05 AS -05 SIGNAGE FIFTH FLOOR PLAN 9.08 -AS2I AS -2I INTERIOR SIGNAGE DETAILS w. > T TT i g 8 L 9 9 C g If' t I 1111 1111 II11�I1111111�IIIl Illl�l111111 ' � 11I11111111�11111[11III11 II11 I111'1111111111ili 1111111111111 I, 11 111111 11111 1(1 111111 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 I NCL LID . - 9 AWING NO S SHEET NO. D ., __ T S RUCT URA L FOUNDATIO PLAN 9 -S3 S S -3 F FOUNDATION DETAILS 9.O8 -S4 S S -4 F • _ _ _ FOUNDATION D E T A I L S • 9_08 -55 S-5 F FIRST FLOOR PLAN 9.08 -S6 S •-- 9,08 -S7 S S-7 F FIRST FLOOR DETAILS 9.08-S8 MISCELLANEOUS N EOUS CONCRETE DETAILS __ - - -____ - ' ' S -9 MISCELLANEOUS CONCRETE I BASEPLATE AND ANCHOR BOLT PLAN 9.08 -S I I S SL II L SCHEDULE SECOND 9.08 -S 13 S S- f 3 P PARTIAL FLOOR FRAMING - 9,08-$14 5 5714 S SECOND FLOOR SLAB PLAN 9.08 -S15 S S -15 T THIRD FLOOR FRAMING PLAN _ _�- THIRD FLOOR SLAB`PLAN 9708 -517 5 5 -17 F FOURTH FLOOR FRAMING PLAN FOURTH FLOOR SLAB PLAN _- 9 '08 -S 19 S S -19 F FIFTH FLOOR FRAMING `PLAN 9.08 -S20 S S -20 F FIFTH FLOOR SLAB PLAN 9.08 - 521 S S -21 R ROOF FRAMING PLAN 9.08 -522 S S -22 P PENTHOUSE FLOOR AND PARTIAL - 9.08 -523 S S - 2 B INCLUDED DRAWING NO SHEET NO DRAWING TITLE y -_. IN SET GENERAL _r _ 9.08 - - -G01 '- - _G-01 � _ COVER SHEET -_ 9 , 9,08-G02 G -02 INDEX OF DRAWINGS O8 G0 -3 G ---0,3 INDEX OF DRAWINGS 9.08 'G04 _ G- -04 INDEX OF DRAWING I C VIL _�- 109-008-1000-COI C-6 -0 I OVERALL SITE PLAN 109_- w008 -1000 -0O2 C�-02 SITE PLAN (SOUTH HALF) 109-008-1000-0O3 ao� aaa - -co3 c 03 ._ � _. - ___._-___.______.__ SITE PLAN (NORTH HALF) ^` 109 -- 008- - 1 -004 C - -04 UTILITIES PLAN _.._.___.________ -_ -_ -_ _. - LITIE --- _ -__ ' � (SOUTH I11 HALF ) 16 5 C ---O _ ______ ._____- _ _ 5 UTILITIES PLAN (NORTH HALF _ 109 -008 -- 1 000 C0_ 6 C -06 SITE SECTIONS AND DETA fTS 1097008-V000-007 C NS 07 C - -07 SITE SECTIO AN DETAILS - - -__ 109 - 008 - 1000 -008 C 708 SITE SECTIONS AND DETAILS I09 -- 008 - 1000 -CO9 C -09 OFFSITE SANITARY SEWER PLAN ___ 109 -008 -- 1 000 -CI o _ C- I 0 GENERATOR AND FUEL. TANK PADS -. 109- 00I 008 -0 -C I f C- I I TRUCK WELL AND COMPACTOR PAD I09-005--l000--C12 C- 12 DUCTBANK PROFILES - 109 -008 --1 000 -C 13 C- 13 DUCTBANK PROFILES __________ ,.__ _____ 109 -008 - -I 000- -C 14 C-14 SEATTLECITY LIGHT VAULTS - _ - 109- 008 - 1 0_00 -C15 C--15 SEATTLE CITY LIGHT STANDARD ...__ - - __ _ DETAILS I L S 109-- 008 - 000 -C16 C -1_6 PAVEMENT MARKING PLA N ---- ------ _.___ 109 -008 - 1000 -DOI D -01 DEMOLITION PLAN (SOUTH HALF) 109 D -.02 DEMOLITION I (NORTH ON PLAN _ .�_____ `HALF) __ ..___ 109 -008 - 1 000 -D03 D -03 OFFS I T -.- T E STOr�M SEWER PLAN 8� SECTIONS _ LANDSCAPE 109 -- 008 - 1 000 _ -L I L-I GRADING , PAVING 8, LAYOUT AT ENTRANCE: COURT 109 -008 - 1000 -L2 L -2 DETAILS I09- 008 - 1000 -L3 L -3 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -L4 L -4 LANDSCAPE IMPROVEMENTS 109- 008 - 1000 -MI M -I IRRIGATION PLAN I09- 008-- I000 -M2 M -2 . iRRIGATTON PLAN ARCHITECTURAL 9.08 -A01 A -01 BUILDING FIRST FLOOR PLAN 9.08 -A02 A-02 BUILDING SECOND FLOOR PLAN +� 9.08 -A03 A -03 BUILDING THIRD FLOOR PLAN 9.08 -A04 A -04 BUILDING FOURTH FLOOR ULAN 9.08 -A05 A -05 BUILDING FIFTH FLOOR PLAN 9.O8 -A06 A -06 FIRST FLOOR - PLAN A 9.08 -A06A A -06A DOOR AND ROOM FINISH SCHEDULES 9,08-A07 A -07 FIRST FLOOR -. PLAN B 9.08- A07A A -07A DOOR AND ROOM FINISH SCHEDULES 9 08-A08 A -08 FIRST FLOOR - PLAN C 9.08 -A08A A -08A DOOR AND ROOM FINISH SCHEDULES 9.08-A09 A-09 SECOND FLOOR -- PLAN A 9.08 -A09A A -09A DOOR AND ROOM FINISH SCHEDULES 9.08 - -A10 A -I0 SECOND FLOOR - PLAN B 9.08 --AIOA A -IGA DOOR AND ROOM FINISH SCHEDULES 9 .08 - -A I I A- I I SECOND FLOOR - PLAN C 9.08 -AI IA A- -I IA DOOR AND ROOM FINISH SCHEDULES 4 9 08-A 12 A -- 12 THIRD FLOOR - PLAN A 4 9.08 -AI2A A-I2A DOOR AND ROOM FINISH SCHEDULES 4 9,08 -AI3 A - -I3 THIRD FLOOR - PLAN B O 9.08 -A13A A - -13A DOOR AND ROOM FINISH SCHEDULES _9 9.08 -AI4 I A -I4 THIRD FLOOR - PLAN C 4 9 .'08 -A 14A A -- 14A DOOR AND ROOM FINISH SCHEDULES 9.08415 _ A- 15 FOURTH FLOOR - PLAN A - - -- 9.08 -A15A A -15A DOOR AND ROOM FINISH SCHEDULES _9 -AI6 A -I6 FOURTH FLOOR -- PLAN B 9 :O8 -AI6A V A -I6A DOOR AND ROOM FINISH SCHEDULES ___ -_- 9.08 -A17 A -17 FOURTH FLOOR - PLAN C 9.08 -A 17A A - -17A DOOR AND ROOM FINISH SCHEDULES _ - - 9.08-A18 A-18 FIFTH FLOOR - PL: AN ! q _- _ 9.08 -A 18A A -18A DOOR AND ROOM FINISH SCHEDUI_ E:S 9.08 -A19 A -I9 FIFTH FLOOR -- PLAN B A -I9A DOOR AND ROOM FINISH SCHEDULES 9.08- --A20 A -20 FIFTH FLOOR - PLAN C 9 , 08 --A20A A -. -20A DOOR AND ROOM FINISH SCHEDULES INCLUDE DRAWING NO. ( R SHEET NO. _.__ IN SET D AWING °TITLE _ I TECTURAL L - 9. 08 -A598 A -59_ ARCH B VTC ROOM WALL SECTIONS 9.08 -A60 A -60 ELEVATOR DETAILS - _ - _ ___.____ 9.08 - -A6OB A -60B VTC DETAILS --- _ _____._____ 9 - -A61 A - -61 STAIR l AND- 2 PLANS 9._08:461a______ _ ^A-618 VTC ROOM FLOOR FRAMING PLAN 9 08 -A62 A -62 STAIR I AND 2SECTIONS AND DETAILS - -`� 9 08 - -A62B A -62B VTC ' DETA I LS - _ 9.08 - -A63 ' A -63 STAIR 3.-FLANS 0 A6 4 A- 64 STAIR 8 3SECTION AN _._.._ D DETAILS __ 9._087A __ - A -65 STAIR 4 AND 5 PLANS 9.08 -A66 A-66 STAIR 4 AND 5 SECTIONS _ 9 -A68 A - -_68 -- LOADING DOCK PLAN _ 9.08 -A70 _ A. -70 TOILET ROOM PLANS, ELEVATIONS A ND DETA _ D[1 A IL, S _ 9.08-A 70B _ A -708 MISCELLANEOUS DETAIL S --- ___. 9,08-A72 - A -72 Ml SCELLANEOUS DETA I LS - - r RF SHIELDiNG 9.08 -RFI RF -i FIRST FLOOR PENETRATION PLAN AND SCHEDULE. 9.08-- RF2 'RF -2 FIRST FLOOR DETAILS 9.08 -RF3 RF - -3 FIRST' FLOOR DETAILS 9.08 -RF4 RF -4 TiFiRST FLOOR AND MISCELLANEOUS DETAILS 9.08 -RF5 RF -S SIDING DETAILS 9.08 - - -- RF -'9 DOOR DETAILS 9.08 -RFII RF - -Ii ROOF PENETRATION PLAN AND SCHEDULES 9.08-RFI2 RE- 12 ROOF 'DETA I LS SIGNAGE 9.08 -ASOI AS -01 SIGNAGE FIRST FLOOR `9.08 -ASO2 AS -02 SIGNAGE SECOND FLOOR PLAN 9.08 -AS03 AS -03 SIGNAGE THIRD FLOOR PLAN 9.08 -ASO4 . AS -04 S'IGNAGEFOURTH FLOOR PLAN 9.0 -q 8 S05 AS -05 SIGNAGE FIFTH FLOOR PLAN 9.08 -AS2I AS -2I INTERIOR SIGNAGE DETAILS w. > T TT i g 8 L 9 9 C g If' t I 1111 1111 II11�I1111111�IIIl Illl�l111111 ' � 11I11111111�11111[11III11 II11 I111'1111111111ili 1111111111111 I, 11 111111 11111 1(1 111111 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 INCLUDE DRAWING NO. ( R SHEET NO. _.__ IN SET D AWING °TITLE _ I TECTURAL L - 9. 08 -A598 A -59_ ARCH B VTC ROOM WALL SECTIONS 9.08 -A60 A -60 ELEVATOR DETAILS - _ - _ ___.____ 9.08 - -A6OB A -60B VTC DETAILS --- _ _____._____ 9 - -A61 A - -61 STAIR l AND- 2 PLANS 9._08:461a______ _ ^A-618 VTC ROOM FLOOR FRAMING PLAN 9 08 -A62 A -62 STAIR I AND 2SECTIONS AND DETAILS - -`� 9 08 - -A62B A -62B VTC ' DETA I LS - _ 9.08 - -A63 ' A -63 STAIR 3.-FLANS 0 A6 4 A- 64 STAIR 8 3SECTION AN _._.._ D DETAILS __ 9._087A __ - A -65 STAIR 4 AND 5 PLANS 9.08 -A66 A-66 STAIR 4 AND 5 SECTIONS _ 9 -A68 A - -_68 -- LOADING DOCK PLAN _ 9.08 -A70 _ A. -70 TOILET ROOM PLANS, ELEVATIONS A ND DETA _ D[1 A IL, S _ 9.08-A 70B _ A -708 MISCELLANEOUS DETAIL S --- ___. 9,08-A72 - A -72 Ml SCELLANEOUS DETA I LS - - r RF SHIELDiNG 9.08 -RFI RF -i FIRST FLOOR PENETRATION PLAN AND SCHEDULE. 9.08-- RF2 'RF -2 FIRST FLOOR DETAILS 9.08 -RF3 RF - -3 FIRST' FLOOR DETAILS 9.08 -RF4 RF -4 TiFiRST FLOOR AND MISCELLANEOUS DETAILS 9.08 -RF5 RF -S SIDING DETAILS 9.08 - - -- RF -'9 DOOR DETAILS 9.08 -RFII RF - -Ii ROOF PENETRATION PLAN AND SCHEDULES 9.08-RFI2 RE- 12 ROOF 'DETA I LS SIGNAGE 9.08 -ASOI AS -01 SIGNAGE FIRST FLOOR `9.08 -ASO2 AS -02 SIGNAGE SECOND FLOOR PLAN 9.08 -AS03 AS -03 SIGNAGE THIRD FLOOR PLAN 9.08 -ASO4 . AS -04 S'IGNAGEFOURTH FLOOR PLAN 9.0 -q 8 S05 AS -05 SIGNAGE FIFTH FLOOR PLAN 9.08 -AS2I AS -2I INTERIOR SIGNAGE DETAILS w. > T TT i g 8 L 9 9 C g If' t I 1111 1111 II11�I1111111�IIIl Illl�l111111 ' � 11I11111111�11111[11III11 II11 I111'1111111111ili 1111111111111 I, 11 111111 11111 1(1 111111 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 w. > T TT i g 8 L 9 9 C g If' t I 1111 1111 II11�I1111111�IIIl Illl�l111111 ' � 11I11111111�11111[11III11 II11 I111'1111111111ili 1111111111111 I, 11 111111 11111 1(1 111111 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 SYM REVISION PF.CORD DRAWINGS PHASE I F -22 AVIONICS REMODEL PHASE 2 F-22 AVIONICS REMODEL ► PHASE 3 F -22 AVIONICS REMODEL DATE SY11 REVISION TL 107: APPROVED BY DEPT. RECORD DRAWINGS 9Y APPROVED SCC GC DS 10.01.90 SCC GC DS 7.15.91 SCC GC DS 8.1591 _Art GCDS 8.15 .91 INCLUDE IN SET 9.08-A23 _9,08-A2313 9.08- A23C_ -- 9�, 08 -A23D 9.08 -A26 ` -- 9.08-A26B 9.08-A27 4 9.08 -A27B 9,08-A28_ 9.09-A29 9.08 -A30 _. 9.08 -A30B 9.08-A3 I 9.08 -A3IB 9.08 -A32 9,08 -A32B 9.08-A32C 9.08 -A33 DRAWING NO. 9.08 - -A ?I X 9.08 -A22 9.08 -A2?_B 9.08 - -A22C 9.08 -A24 9.08 - -A24B 9:08- -A25 9.08 -A34A 9,08 -A34B 9,08 -A34C 9.08 -A34D 9.08 - -A34E 9.08 -A35A 9.08 - -A35B 9 08 -A35C 9.08 -A35D 9.08 -A36 9.08 -A36B 9.08-A36C 9.08 -A37 9.08 -A37C 9.08 -A38 9.08 -A38B 9 08- A38C 9.08-A39 SHEET NO. A-23 A - -23B A -34D A-34E A -35A A -35B A -35C A -35D A -36 A -36B A -36C A -37 A -37C A -38 A -38B A -38C PPROVED1 DATE INDEX DRAWING TITLE ARCH I TECTURAL FXTFR I t?R WAI ' 1 ' I .,. i .,' 1 ' ,' iI OF FINISH MATERIAL SCHEDULE, DOOR TYPES AND DETAILS _�_ - - - -- -- - -_�! - A-22 A -22 DOOR DETAILS A_22B ACCORDIAN FOLDING FIRE DOOR AND POCKET DETAILS A-22C PARTIAL ENLARGED PLANS AND ENLARGED CLG. PLANS - FIFTH _FLOOR ROOF PLAN P:NTH S� PLANS -.__.. OU� A k (_ NS AN ETA A -23C PENTHOUSE PLANS I AND DETAILS D PARTIAL ENLARGED - PI PLANS ENLARGED _ __ SAND ENLARGED Cl_G _ _.----- _ - - -- PLANS - FIFTH FLOOR - -- - A -24 ROOF DETAILS A -24B PARTIAL ENLARGED PLAN AND ENLARGED CEILING PLAN A - NORTH ELEVATION__ A -26 EAST ELEVATI N ON A -26B DOOR DETAILS A-27 SOUTH ELEVATION A - - -278 DOOR DETAILS LS A --28 WEST ELEVATION A-29 BUILDING SECTION A A -30 BUILDING SECTIONS B AND C A -30B CABINET ELEV. AND WALL DETAILS A -3I EXTERIOR WAIL SECTIONS A -3IB INTERIOR ELEVATIONS A -32 EXTERIOR WALL SECTIONS A -32B WALL DETAILS A -32C WALL DETAILS A - -33 EXTERIOR WALL SECTIONS A -34A EXTERIOR WALL DETAILS A -34B EXTERIOR WALL DETAILS A -34C EXTERIOR WALL DETAILS EXTERIOR WALL DETAILS INTERIOR WALL DETAILS WALL DETAILS WALL DETAILS CABINET SECTIONS AND DETAILS CABINET SECTIONS AND DETAILS WALL DETAILS CONFERENCE ROOM CABINET PLAN AND SECTIONS SCREEN BOARD PARTITION DETAILS CABINET AND DOOR DETAILS EXTERIOR WALL DETAILS MISC. DETAILS MISC. `DETAIL S 1 I � 5 L , 1 , 1 , lI 6j DRAWINGS AUBURN, W ,98 ❑ DELL.EVVUE, WA , 98007 •g ' rev & ❑ EVERE r T , WA . 98201 FACILITIES DEPARTMENT ❑ KENT , WA • 98031 ❑ PORTLAND , OR . 97220 RENTON, WA.98055 RI SEATTLE, WA . 98124 f?rGISTERED - Rc „TECT GOT; N A. CULTUM STATE tit' WAStr. ,rug, ACCEPTABILITY IRIS DESIGN AND /OR SPECIFICATION ;S APPROVED DATE DRAM BY MERMAN r i:i,CIVCU CITY of 7 UKW AO 2 1 bI PERNIITCENTER BE&C ENGINEERS INDEX OF DRAWINGS ARCHITECTURAL MASTER 9-08 COL D.C. LAST REVISION SHEET G 6 N0. 91186/8606? DWG No. 9.08 SYM REVISION r„ iril� � Y APPROVE', DATE ..........,..... SY 4 w..,...--- �....... �..........,.,......,._.... ...,_.,......_._.,.._......«.,. RE VISION BY APPROVED, DATE - A, RECORD DRAWINGS SCC GC DS 10.01.99 B PHASE I F - -2.2 AVIONICS REMODEL L SCC S 7 1 5.91 �..� ._.....�.. ...... _..... C CHANGED ROOM NUMBER SCC 8.12.91 D PHASE 3 F'-- ?2 AVIONICS REMODEL. SCC 8.15.91 E PHASE 3 PERMIT UPDATE SET ;, 4 9.9.9 Se FACILITIES S DEPARTMENT rN11 . .u1 I� 111,11111 IIII uI li u Ufl1if1u1II UUHUiIiJ1IikjIuIiJ �4 .11 ���� 0-2) 0 (I . 111 :%BAs ii;u TOn ACCEPTABILITY THIS DES IGN AND/OR SPEC IFI CAT ION IS APPROVED — APPROVED BY DEPT . t1A1 SHE ET' LAST' REVISION lltritttvii T ILrre t * rr : l . 0 AUBURN , WA 98002 p BELLEVUE, WA . 98007 0 EVERETT WA . 98201 0 KENT, WA.98031 0 PORTLAND, OR 97220 O PENTON, WA. 98055 N SEATTLE, WA . 98124 i I I I �� I j I I i I� I l j I I I I Note � ....• ......., BLDG 9 MINWIMTVIRIO CITY OF TUICWILA SEP11191 PERMIT CENTER. 3. BUILDING THIRD FLOOR PLAN ROOM. LEG ENTRANCE VESTIBULE ENTRANCE /CONTROL & ELEVA FOR EXIT STAIR RESTROOMS 6. PROGRAM SPACE 6. ELECTRICAL ROOM 7, TELEPHONE ROOM 8. FREIGHT ELEVATOR 9. EXIT CORRIDOR 10, STORAGE it JANITOR STORAGE 12. COFFEE AREA 13. FIBER OPTICS SWITCH ROOM 14. MECHANICAL ROOM (CO2) 16. EQUIPMENT ACCESS PANEL 18. SHAFT - FUTURE ELEVATOR 17. MECHANICAL SHAFT BE &C ENGINEERS ARCHITECTURAL MASTER NOT IN THIS PHASE(CONTRACT) CO A-F/1-2O D.C. LOBBY iril� i�d�i�ui�l�li iiirl1ai ; l�ii It hill �il�E�dn�l���l�rii{i�l►m [41111i iiii6iu iii►liiii ritiliEit�lit FACILITIES S DEPARTMENT rN11 . .u1 I� 111,11111 IIII uI li u Ufl1if1u1II UUHUiIiJ1IikjIuIiJ �4 .11 ���� 0-2) 0 (I . 111 :%BAs ii;u TOn ACCEPTABILITY THIS DES IGN AND/OR SPEC IFI CAT ION IS APPROVED — APPROVED BY DEPT . t1A1 SHE ET' LAST' REVISION lltritttvii T ILrre t * rr : l . 0 AUBURN , WA 98002 p BELLEVUE, WA . 98007 0 EVERETT WA . 98201 0 KENT, WA.98031 0 PORTLAND, OR 97220 O PENTON, WA. 98055 N SEATTLE, WA . 98124 i I I I �� I j I I i I� I l j I I I I Note � ....• ......., BLDG 9 MINWIMTVIRIO CITY OF TUICWILA SEP11191 PERMIT CENTER. 3. BUILDING THIRD FLOOR PLAN ROOM. LEG ENTRANCE VESTIBULE ENTRANCE /CONTROL & ELEVA FOR EXIT STAIR RESTROOMS 6. PROGRAM SPACE 6. ELECTRICAL ROOM 7, TELEPHONE ROOM 8. FREIGHT ELEVATOR 9. EXIT CORRIDOR 10, STORAGE it JANITOR STORAGE 12. COFFEE AREA 13. FIBER OPTICS SWITCH ROOM 14. MECHANICAL ROOM (CO2) 16. EQUIPMENT ACCESS PANEL 18. SHAFT - FUTURE ELEVATOR 17. MECHANICAL SHAFT BE &C ENGINEERS ARCHITECTURAL MASTER NOT IN THIS PHASE(CONTRACT) CO A-F/1-2O D.C. LOBBY A--121A-32B RECORD DRAWINGS NF PHASE I F-22 AV1ONITS REMODEL SCC GC DS PHASE 2 F-22 AVIONICS REMODEL SCC GC DS PHASE 3 F--22 AVIONICS REMODEL PHASE 3 PERMIT UPDATE SET Exits. PART AL THIRD FLOOR , PLAN - AREA A SEE SHEET A-06 FOR TYPICAL DETAIL CALL-OUTS APPROVED ACCEPTABILITY r MIS DESIGN AND/OR SPECIFICATION IS PROVED DATE DEMOUNTABLE PAR1ITION STC 45 STC 45 AND PROGRAM PERIMETER STC 50 AND PROGRAM PERIMETER 50 dB SHIELDING RA I SED FLOOR PERFORATED PANEL F I R E EXT I NGU I SIER ALL PARTITION WALL TYPES LOCATED BETWEEN GRIDS 'C AND 'D' (BUT 'NO1 ON GRIDS 'C' AND 'D") SHALL BE CONSTRUCTED TO ALLOW FLOOR DEFLECTION SEE DETAIL I/A-37 FOR TYPICAL CONNECTION TO STRUCTURAL FLOOR DECK. RAISED ACCESS FLOOR SEAMS ARE 12" OFF GRID LINE IN BOTH DIRECTIONS. MINIMUM WIDTH OF CUT PANEL IS 5". DIMENSIONS ARE TO FACE OF STUDS, , DEMOUNTABLE PARTITIONS TO FACE OF FINISH. M ON [ NTER 1 OR'STUDS DL THI RECEIVED CITY Oi:TINWILA NOTE: LOCATIONS TO BE PER. MECHANICAL DRAWINGS - OR AS DIPECTED BY ENGINEER. * Lc:::'. f 21 PERFORATED HIGH PRESSURE FLOOR , g ,..., PANELS PER SPECIFICATION 326-'91186 -TS -01 , , SECTION 10273,2.05, ,,,_ '1 [ PROVIDE 5 PERFORATED HIGH PRESSURE FLOOR PANELS PER SPECIFICATION 326 -9 I 1 88 L TS -01, SECTION 10273,2.05, r, * L.,12:-"›. PROVIDE '6 PERFORATED HIGH PRESSURE FLOOR PANELS PER SPECIFICATION 326 SECTION 10273,2,05, PROVIDE 2 PERFORATED HIGH PR ESSURE FLOOR PANELS PER SPECIFICATION 326-91186-7S-01, SECTION 10273,2.05. COORDINATED 'AND DIRECTED BY BCS & ENGINEER. EQUIPMENT DESIGNATED A05,A06, & A07, TO BE LOCATED )1\) WELD ALL AROUND AND SET IN MASTIC, UNDER EXISTING ACCESS FLOORING PEDESTALS IN AREAS INDICATED FOR BCS COMPUTER ENGINEERS THIRD FLOOR -' PLAN A AND SCHED - OL ROOM FINISH SCHEDULE ROOM 301 ACCESS CONTROL 301A LOBBY 336 OPEN OFFICE 336A CONFERENCE 3368 CONFERENCE 337 COMPUTER ROOM 337A COMPUTER ROOM 337B DATA ROOM 337C COMPUTER ROOM 338B CONFERENCE E 340 OPEN OFFICE 340A OFFICE 340B OFF I CE 340C WORK AREA 340D OFFICE 340E OFFICE 340E WORK AREA 352 CORRIDOR ROOM FINISH SCHEDULE OBBY ROOM NAME L TEL PM TEL RM ELECT RM ELECT PM MEN MEN JANITOR COFFEE NOOK PROGRAM SPACE DELETED -NOT USED STAIR #4 RtVISItNN RECORD DRAWINGS PHASE i F=X AVIONICS REMODEL • PHAS2 CHANGE TO D2t7R j33'7A PHASE 3-F-22- AVIONICS REMODEL PHASE 3 PERMIT UPDATE SET FLOOR FLOOR F-5 F-5 F -4 F -2 F-- F -2 F -4 F -5 F - -2 F-2 F-2 F--2 F -2 8 -1 8_1 B-1 F-- I3- B- I B -I B-1 _ B- I B -I B- I B-I 3 -1 B--I B- I B- I 8--- B- FLOOR BASE F B -- I B 1 F -5 0 -1 F -5 B-- F- B - -1 F - -5 ` B - I F -9 B -2 F -9 B -2 F -8 B-I F- I � 5 - I F F F-5 B -I NORTH NORTH BASE MALL B SC By SCC SCC SCC w. W W -I W -6 W-I W -1 W-I w- l W -1 W-1 W-6 W-6 W -6 W -6 W -6 W -6 W- WALL EAST � E . SOUTH WEST CE LING BASE WALL BASE WALL BASE' WALL MAT 'L HEIGHT B -1 W- I B -`= I W -1 C -_ 9 -0' E3- I ° W -1 ! .. B -I W -I 6- I W-I B- i W- I - W-6 .- s 1 N6 c. I 9 —o B- I W -6 B I W-I B -1 W- I C-1 B-1 B I W- I - ,_ f3 I W I B-1 'W-1 C-1 9 -p B- I W--1 B -1 W-1 B -1 W=-I C-1 " 9 --U B- I W - 1 B -1 W- i B- ' I B- I W-- I B- I W_- I B__ -I - _ W I C -I 9 ' - -0 " B -t W - 1 B -1 W -I B -1 W -1 C--I 9 -U B-1 W - I /6 B_1 W-1/6 B -1 W-.1/6 C-1 B-1 W -6 B -1 _W- I I3 -1 W-I C-1 9 g- I W -1 B -1 W^ I B._'I W-6 C -1 9 , -0 „ B- I W 1 B-I W -6 B -I W -6 C_1 , 9 -0 6-1 W-I B: I W -6 f3- i W -6 C-1 9 -0„ B W I B- I W -6 B- I W -6 C-1 9 -0" B-1 W-1 B -1 W-6 B - I W-I C -.1 9 ' O" E3 -1 W - I B - -1 VV--I B -1 W-I CEILING MAT "L HGH -1 C I - -Q C - - 1 C--1 9'--0" W- I C-3 W-1 C -3 W -- I C__3 W- I C -3 W-4 C -I 8 -- W -4 C -I 8' W -I C_ -2 8 W _C W -1 -- C -3 W- I C-3 W- I C -2 CC DS 6S 8.15.51 9,9,91' NOTES ROOM FINISH NOTES I WHERE COLUMNS OCCUR IN ROOMS, THEY SHALL BE FINISHED WITH W PAINTED' UNLESS OTHERWISE NOTED G B AND FE‘, I S ION • FINISH N1A�'ERIALS KEY 1 MATERIAL • B I B -2 NOTE HEAD I`NG RESILIENT CERAMIC TILT HEADING F-- I CARPET F- 2 RA SED ACCESS, TYPE F--3 RAISED ACCESS, `TYPE I I F -4 RA I SED /- ACCESS , TYPE I I F -5 CONCR F -6 CONCRETE F -7 RESILIENT TILE F -8 SHEE I VINYL F-9 CERAMIC TILE - FIBERGLASS RAISED FLOOR --- VVAL L --- W -I GYMSUM WALLBOARD (GWB) W-IA GYMSUM WAL LBOARD (GWB) W - GYMSUM WALLBOARD (GWB) W -3 S H I L D I N G 50DB 'W -4 - CERAMIC TI LE W-5 SHIELDING W-6 ~ `DEMOUNTABLE PART I T ION - - -CE I LING - -_- C -- I SUSPENDED °ACOUST I CAL PANEL C-2 GYPSUM CE" 1 L I NG BOARD C 3 OPEN TO STRUCTURE ABOVE C- -4 T SH I I=`LD'I NG NOTE: ALL CONCRETE AREAS I "PROGRAM AREAS TO RECE 111E SEALER TYPICALLY . APPPt VtD .; DAT iW FACILITILS DEPARTMENT FINISH FACTORY FINISH FF , FF CARPET TILES CARPET TILES HIGH PRESSURE LAM SEALER FF FF FF FF CARPET PAINT FF) EPDXY PAINT PAINT FF ANECHOI C MATERIAL FF OWNER FURNISHED ANT I --STAT I C 'NON- CONDUCT ' VE I='F PAI "'NT eYPOSED F IREPROOF ING 5008 0 AUBURN, WA 98002 0 BELLEVUE WA 9 . 98007 0 EVERETT WA .� 9�32U i D KENT, WA . 98031 0 PORTLAND, OR . 97220 0 RENTON , WA . 9805'5 M SEATTLE, WA . 98124 , pi �I �II� �, � � L I � � �� � i II � i! ��� till NO ` PA 1 N - F 1 RE "TAPE ONLY SPECIAL CONSTRUCTION VINYL' COVER ING ' I't' I I I 5 NOTES tl 1013 RE! %,%Js1I OR': A.,i1l.TU ST,1T£ C.F "1 "1117Cttyl():i ACCEPTABILITY THIS DESIGN AND /OR SPEC I I ` I CAT ION I S APPROVED -_— APPt OVED BY DOOR SCHEDULE DOOR MARK OPENING SIZE 301 3 -o» x 7' -0" 30IA -1 3' -p .:x 7 336A, x 7 - ;336A- t X 7' = 0 " 3368 3 -O " x -0" x 7 336C ' -0 3360 3 ' 0 ., x 7, 353378E; 4' p " " x - 7' - D," 3' p x 7' 340A -1 .3' -O "' 'x 7 340A - 2 3 ' _ -0 : 7 , 340A -3 3 0" x 7'- 340E -I 3' -O" x 7' - -0 340D 3 ' -0 " x 7 340E 3 x 7 ' - 352A -I 3' -O" x . • • TYPE MAT FA F A f M PA FA HM PA I NE F WOOD F F F WOOD FF F WOOD F F F WOOD FF F WOOD F F FA HM PAINT . HM PA I N WOOD F F F 'rOD F GOD; F WOOD F WOOD F WOOD F WOOD DOOR SCHEDULE DOOR DOOR SIZE TYPE MARK 302 F 304 305 3' -O x 7' -5" 306 3' -0 " x 7' -O " 307 3 - .x 7'- 308 3 0 " x 7'- 309 3' -0" )( 7' 310 3'_ -O:' x 7 '- 335 PR 3' -0" X 7' 335A PR 2' -6" X 7' p I FINISH A STARK R_H S KA F N F F 3 - O " X . 7 " -O" F . � 337D PR 3' X 7'--I„ FA 338C 3 ' --0" X 7 . -0" ' FA 3380 3 ' -0 x ''`7 ' -O" FA 340A PR 2' -6" X 7 " = "F 343 3 " "" x 7 ' -O" FA THKNS 11111 3/4 3/4" 3f4 3/4" 1 3/4 13/4 "" 13` 4 ` / I I 3/4 13/4" I 3/4 I 3/4 . r. • u FINISH F.. F F F FF FF FF FF BLDG 9.08 ... WOOD HM HM WOOD. WOODY', WOOD WOOD WOOD WOOD WOOD HM HM HM HM WOOD HM RATING 20 M IN 20 MIN iPA INT - PANT PAINT PAINT - PAINT 2D MIN PAINT PAINT PAINT 20 MIN PAINT _ PAI "NT PAINT - PA'INT 20 MIN PAINT FF PAINT PA I NT FF FF FF FF FF FF FF DOOR SCHEDULE NOTES I DOOR HAS REMOVEABLE CENTER JAMB. 2 . THRESHOLD . 2A I/A-21 L . = __ / 2E 5A21 DETAILS: 2B = 2/A -21 2F = 6/A -2.1 2C = 3 /A -2I 2G = 7/ A -21 2D = 4 /A -2I 2H = 8/'A -21 3, 3A = SEE DETAILS 2,IO /A -22B 36 = SEE 'DETAILS 1 I , 12/A -•2.2B 3C = SEE DETAILS 346,7/A--22B 3D = SEE DETAILS 8,9/A -22Q 3E = SEE DETAILS 1 ,7 /A -221-3 3F = SEE DETAILS 3/A -22 3G = SEE DETAILS 4/A -22 3H = SEE DETAILS 7'. / A-?2 4 SEE SPECIFICATION 3 ?_6- 86062 -TS -01 5 . SEE: SPECIFICATION 32_6- 86062 -TS -05 6 , FF ,I N DOOR FINISH COLUMN INDICATES FACTORY FINISH. 7. ALL DOORS ARE I 3/4" THICK UNLESS OTHERWISE NOTED. 8. RELOCATED DOOR PROVIDE NEW FRAME TO FIT PARTITION TYPE 9 . REMOTE AND STORE AS DIRECTED BY OWNER. 10 PRO'dI DE HEAVY DUTY HASP FOR S & G PADLOCK, II SEE SPEC I F I CATtON 326-91186-1S-01 12. USE STORED DOOR & FRAME, MODIFY FOR NEW HARDWARE I F REoU I RED FRAME FINISH PAINT GLASS ci c� SEE' 1 PEFii4'M' CENT ES COL DETAILS HEAD JAMB SILL LL I J 1 - - 0 4/A 268 2/A 26B 7/A -218 7 2/A -268 2/A -26B 6/A-278' 3/A- -26B " 3/A-268 I /A-26B I/A 7/A -27B 3/A -- 26B / 3 A -26B I 3/A_..26B' 3` A-268 I ': <., 3/A -26B 3.: / A -266' 2 ) 2 -A - 2_6B _ 2 A--26 7 /A - 278 4 . / / B 2 /A-268 2/A -?6B 7/A -27B 3/A -26B 3/A -26B I 3/A-26B 3,..: A - - ?6B 38 2/A -268 2/A -268 3/A-268 3/A-26B I 3/A-26B 3 /A -26[3' I 3/A-268 3/A -268 32 I/A -26B I A -26B HI�WE GROUP ' , RATING FRAME 20MIN 5/A22 - 5/A22 5/A22 20 MIN 5/A22 20 M I N 5/A22 20 MIN 5/A22 20 M I Nl 5/A22 20 MIN5 /A22 20 MIN 5 /A22 _20MIN5 A22 40 M1 1 011001 1 10111110110401i PAINT - 2 PAI NT - /A22, PAINT PAINT.` 20 MIN 2/A22 PAINT PA 1 N 20 'MIN 2/A22 PAINT FF - 20 MIN 5/A22 PA INT PAINT - 15 HR 2/A22 PA I NT .� AilLN itjJi A SEE NOTE 5 FRAME I''I H PA INT PA I'NT PA I NT PAINT PAI Ni PA I NT PAINT PAI NT PAINT PAI NT NT G UOP 28 5A 5A 5 5 7 5 13 29 29 8 ARCHITECTURAL MASTER 2H - 336A TO THIS LOC . 7/A - -27B STC 45 7/A --27B* SIM, 2A 2A 2C 2C 2A OTE N0TE° I NOTE i NOTE II SHEET NOTE 4 NOTES IBE1&C RECORD ENGINEERS DRAWINGS ALL DOORS DOOR TYPES ARE SHOWN ON SHT. A -21 2 HM = HOLLOW METAL FF = FACTORY FIN! SH 3. DOORS ARE NUMBERED WITH THE SAME NUMBER OF THE ROOM OR AREA THA`F THE DOOR SWINGS INTO. THE SECOND DOOR THAT SW 1' NGS INTO AN AREA HAS THE SAME NUMBER , BUT E T IS FOLLOWED BY THE LETTER A, (EG: 206A), THE THIRD BY LETTER B, ETC.. DOOR FRAMES HUNG WITH LABELED DOORS SHALL ALSO 'BE LABELED WITH THE SAME 'RAT ING. DOORS ARE 6" FROM CORNER UNLESS NOTED OTHERWISE NOTES c�T Y P R ��Ep SE? 2 5 °1991 --T • �3m l�l \its '- a THIRD FLOOR LAST REVr"�Iota �r L��� PLAN SYMBOL DOOR ROOM FINISH SCHEDULE No. ._.._.' 91 1 886062 OW.) NO 9.08 -AI2A STC 45 STC 4 C 5 NOTE II & *SIM, 7 [ NOTE, I 1 ` & NOTE I2 REMOVE & STORE REMOVE & STORE NOTE II NOTE 1 NOTE 12 9,9 91 DATE' or ............r...... Ilil�li� I7�fI1iCII iIIIiIl0I�1�1iCi lilillii ir,,,Iliii iiiIfllill► i1I1il,,,Ilillilll1li( I1IIIIIIIII1III( IrriIiIIIIlIIIIiIIIIlIi (,ilifll(llflllll } { ti i s :t. ROOM FINISH SCHEDULE xo amu Hac ROOM NAI € 301 ACCESS CONTROL 301A LOBBY 336 OPEN OFFICE 336A CONFERENCE 0 J C EFC E 3368 CONFERENCE 337 COMPUTER ROOM 337A COMPUTER ROOM 337B DATA ROOM 337C COMPUTER ROOM 338B CONFERENCE E 340 OPEN OFFICE 340A OFFICE 340B OFF I CE 340C WORK AREA 340D OFFICE 340E OFFICE 340E WORK AREA 352 CORRIDOR ROOM FINISH SCHEDULE OBBY ROOM NAME L TEL PM TEL RM ELECT RM ELECT PM MEN MEN JANITOR COFFEE NOOK PROGRAM SPACE DELETED -NOT USED STAIR #4 RtVISItNN RECORD DRAWINGS PHASE i F=X AVIONICS REMODEL • PHAS2 CHANGE TO D2t7R j33'7A PHASE 3-F-22- AVIONICS REMODEL PHASE 3 PERMIT UPDATE SET FLOOR FLOOR F-5 F-5 F -4 F -2 F-- F -2 F -4 F -5 F - -2 F-2 F-2 F--2 F -2 8 -1 8_1 B-1 F-- I3- B- I B -I B-1 _ B- I B -I B- I B-I 3 -1 B--I B- I B- I 8--- B- FLOOR BASE F B -- I B 1 F -5 0 -1 F -5 B-- F- B - -1 F - -5 ` B - I F -9 B -2 F -9 B -2 F -8 B-I F- I � 5 - I F F F-5 B -I NORTH NORTH BASE MALL B SC By SCC SCC SCC w. W W -I W -6 W-I W -1 W-I w- l W -1 W-1 W-6 W-6 W -6 W -6 W -6 W -6 W- WALL EAST � E . SOUTH WEST CE LING BASE WALL BASE WALL BASE' WALL MAT 'L HEIGHT B -1 W- I B -`= I W -1 C -_ 9 -0' E3- I ° W -1 ! .. B -I W -I 6- I W-I B- i W- I - W-6 .- s 1 N6 c. I 9 —o B- I W -6 B I W-I B -1 W- I C-1 B-1 B I W- I - ,_ f3 I W I B-1 'W-1 C-1 9 -p B- I W--1 B -1 W-1 B -1 W=-I C-1 " 9 --U B- I W - 1 B -1 W- i B- ' I B- I W-- I B- I W_- I B__ -I - _ W I C -I 9 ' - -0 " B -t W - 1 B -1 W -I B -1 W -1 C--I 9 -U B-1 W - I /6 B_1 W-1/6 B -1 W-.1/6 C-1 B-1 W -6 B -1 _W- I I3 -1 W-I C-1 9 g- I W -1 B -1 W^ I B._'I W-6 C -1 9 , -0 „ B- I W 1 B-I W -6 B -I W -6 C_1 , 9 -0 6-1 W-I B: I W -6 f3- i W -6 C-1 9 -0„ B W I B- I W -6 B- I W -6 C-1 9 -0" B-1 W-1 B -1 W-6 B - I W-I C -.1 9 ' O" E3 -1 W - I B - -1 VV--I B -1 W-I CEILING MAT "L HGH -1 C I - -Q C - - 1 C--1 9'--0" W- I C-3 W-1 C -3 W -- I C__3 W- I C -3 W-4 C -I 8 -- W -4 C -I 8' W -I C_ -2 8 W _C W -1 -- C -3 W- I C-3 W- I C -2 CC DS 6S 8.15.51 9,9,91' NOTES ROOM FINISH NOTES I WHERE COLUMNS OCCUR IN ROOMS, THEY SHALL BE FINISHED WITH W PAINTED' UNLESS OTHERWISE NOTED G B AND FE‘, I S ION • FINISH N1A�'ERIALS KEY 1 MATERIAL • B I B -2 NOTE HEAD I`NG RESILIENT CERAMIC TILT HEADING F-- I CARPET F- 2 RA SED ACCESS, TYPE F--3 RAISED ACCESS, `TYPE I I F -4 RA I SED /- ACCESS , TYPE I I F -5 CONCR F -6 CONCRETE F -7 RESILIENT TILE F -8 SHEE I VINYL F-9 CERAMIC TILE - FIBERGLASS RAISED FLOOR --- VVAL L --- W -I GYMSUM WALLBOARD (GWB) W-IA GYMSUM WAL LBOARD (GWB) W - GYMSUM WALLBOARD (GWB) W -3 S H I L D I N G 50DB 'W -4 - CERAMIC TI LE W-5 SHIELDING W-6 ~ `DEMOUNTABLE PART I T ION - - -CE I LING - -_- C -- I SUSPENDED °ACOUST I CAL PANEL C-2 GYPSUM CE" 1 L I NG BOARD C 3 OPEN TO STRUCTURE ABOVE C- -4 T SH I I=`LD'I NG NOTE: ALL CONCRETE AREAS I "PROGRAM AREAS TO RECE 111E SEALER TYPICALLY . APPPt VtD .; DAT iW FACILITILS DEPARTMENT FINISH FACTORY FINISH FF , FF CARPET TILES CARPET TILES HIGH PRESSURE LAM SEALER FF FF FF FF CARPET PAINT FF) EPDXY PAINT PAINT FF ANECHOI C MATERIAL FF OWNER FURNISHED ANT I --STAT I C 'NON- CONDUCT ' VE I='F PAI "'NT eYPOSED F IREPROOF ING 5008 0 AUBURN, WA 98002 0 BELLEVUE WA 9 . 98007 0 EVERETT WA .� 9�32U i D KENT, WA . 98031 0 PORTLAND, OR . 97220 0 RENTON , WA . 9805'5 M SEATTLE, WA . 98124 , pi �I �II� �, � � L I � � �� � i II � i! ��� till NO ` PA 1 N - F 1 RE "TAPE ONLY SPECIAL CONSTRUCTION VINYL' COVER ING ' I't' I I I 5 NOTES tl 1013 RE! %,%Js1I OR': A.,i1l.TU ST,1T£ C.F "1 "1117Cttyl():i ACCEPTABILITY THIS DESIGN AND /OR SPEC I I ` I CAT ION I S APPROVED -_— APPt OVED BY DOOR SCHEDULE DOOR MARK OPENING SIZE 301 3 -o» x 7' -0" 30IA -1 3' -p .:x 7 336A, x 7 - ;336A- t X 7' = 0 " 3368 3 -O " x -0" x 7 336C ' -0 3360 3 ' 0 ., x 7, 353378E; 4' p " " x - 7' - D," 3' p x 7' 340A -1 .3' -O "' 'x 7 340A - 2 3 ' _ -0 : 7 , 340A -3 3 0" x 7'- 340E -I 3' -O" x 7' - -0 340D 3 ' -0 " x 7 340E 3 x 7 ' - 352A -I 3' -O" x . • • TYPE MAT FA F A f M PA FA HM PA I NE F WOOD F F F WOOD FF F WOOD F F F WOOD FF F WOOD F F FA HM PAINT . HM PA I N WOOD F F F 'rOD F GOD; F WOOD F WOOD F WOOD F WOOD DOOR SCHEDULE DOOR DOOR SIZE TYPE MARK 302 F 304 305 3' -O x 7' -5" 306 3' -0 " x 7' -O " 307 3 - .x 7'- 308 3 0 " x 7'- 309 3' -0" )( 7' 310 3'_ -O:' x 7 '- 335 PR 3' -0" X 7' 335A PR 2' -6" X 7' p I FINISH A STARK R_H S KA F N F F 3 - O " X . 7 " -O" F . � 337D PR 3' X 7'--I„ FA 338C 3 ' --0" X 7 . -0" ' FA 3380 3 ' -0 x ''`7 ' -O" FA 340A PR 2' -6" X 7 " = "F 343 3 " "" x 7 ' -O" FA THKNS 11111 3/4 3/4" 3f4 3/4" 1 3/4 13/4 "" 13` 4 ` / I I 3/4 13/4" I 3/4 I 3/4 . r. • u FINISH F.. F F F FF FF FF FF BLDG 9.08 ... WOOD HM HM WOOD. WOODY', WOOD WOOD WOOD WOOD WOOD HM HM HM HM WOOD HM RATING 20 M IN 20 MIN iPA INT - PANT PAINT PAINT - PAINT 2D MIN PAINT PAINT PAINT 20 MIN PAINT _ PAI "NT PAINT - PA'INT 20 MIN PAINT FF PAINT PA I NT FF FF FF FF FF FF FF DOOR SCHEDULE NOTES I DOOR HAS REMOVEABLE CENTER JAMB. 2 . THRESHOLD . 2A I/A-21 L . = __ / 2E 5A21 DETAILS: 2B = 2/A -21 2F = 6/A -2.1 2C = 3 /A -2I 2G = 7/ A -21 2D = 4 /A -2I 2H = 8/'A -21 3, 3A = SEE DETAILS 2,IO /A -22B 36 = SEE 'DETAILS 1 I , 12/A -•2.2B 3C = SEE DETAILS 346,7/A--22B 3D = SEE DETAILS 8,9/A -22Q 3E = SEE DETAILS 1 ,7 /A -221-3 3F = SEE DETAILS 3/A -22 3G = SEE DETAILS 4/A -22 3H = SEE DETAILS 7'. / A-?2 4 SEE SPECIFICATION 3 ?_6- 86062 -TS -01 5 . SEE: SPECIFICATION 32_6- 86062 -TS -05 6 , FF ,I N DOOR FINISH COLUMN INDICATES FACTORY FINISH. 7. ALL DOORS ARE I 3/4" THICK UNLESS OTHERWISE NOTED. 8. RELOCATED DOOR PROVIDE NEW FRAME TO FIT PARTITION TYPE 9 . REMOTE AND STORE AS DIRECTED BY OWNER. 10 PRO'dI DE HEAVY DUTY HASP FOR S & G PADLOCK, II SEE SPEC I F I CATtON 326-91186-1S-01 12. USE STORED DOOR & FRAME, MODIFY FOR NEW HARDWARE I F REoU I RED FRAME FINISH PAINT GLASS ci c� SEE' 1 PEFii4'M' CENT ES COL DETAILS HEAD JAMB SILL LL I J 1 - - 0 4/A 268 2/A 26B 7/A -218 7 2/A -268 2/A -26B 6/A-278' 3/A- -26B " 3/A-268 I /A-26B I/A 7/A -27B 3/A -- 26B / 3 A -26B I 3/A_..26B' 3` A-268 I ': <., 3/A -26B 3.: / A -266' 2 ) 2 -A - 2_6B _ 2 A--26 7 /A - 278 4 . / / B 2 /A-268 2/A -?6B 7/A -27B 3/A -26B 3/A -26B I 3/A-26B 3,..: A - - ?6B 38 2/A -268 2/A -268 3/A-268 3/A-26B I 3/A-26B 3 /A -26[3' I 3/A-268 3/A -268 32 I/A -26B I A -26B HI�WE GROUP ' , RATING FRAME 20MIN 5/A22 - 5/A22 5/A22 20 MIN 5/A22 20 M I N 5/A22 20 MIN 5/A22 20 M I Nl 5/A22 20 MIN5 /A22 20 MIN 5 /A22 _20MIN5 A22 40 M1 1 011001 1 10111110110401i PAINT - 2 PAI NT - /A22, PAINT PAINT.` 20 MIN 2/A22 PAINT PA 1 N 20 'MIN 2/A22 PAINT FF - 20 MIN 5/A22 PA INT PAINT - 15 HR 2/A22 PA I NT .� AilLN itjJi A SEE NOTE 5 FRAME I''I H PA INT PA I'NT PA I NT PAINT PAI Ni PA I NT PAINT PAI NT PAINT PAI NT NT G UOP 28 5A 5A 5 5 7 5 13 29 29 8 ARCHITECTURAL MASTER 2H - 336A TO THIS LOC . 7/A - -27B STC 45 7/A --27B* SIM, 2A 2A 2C 2C 2A OTE N0TE° I NOTE i NOTE II SHEET NOTE 4 NOTES IBE1&C RECORD ENGINEERS DRAWINGS ALL DOORS DOOR TYPES ARE SHOWN ON SHT. A -21 2 HM = HOLLOW METAL FF = FACTORY FIN! SH 3. DOORS ARE NUMBERED WITH THE SAME NUMBER OF THE ROOM OR AREA THA`F THE DOOR SWINGS INTO. THE SECOND DOOR THAT SW 1' NGS INTO AN AREA HAS THE SAME NUMBER , BUT E T IS FOLLOWED BY THE LETTER A, (EG: 206A), THE THIRD BY LETTER B, ETC.. DOOR FRAMES HUNG WITH LABELED DOORS SHALL ALSO 'BE LABELED WITH THE SAME 'RAT ING. DOORS ARE 6" FROM CORNER UNLESS NOTED OTHERWISE NOTES c�T Y P R ��Ep SE? 2 5 °1991 --T • �3m l�l \its '- a THIRD FLOOR LAST REVr"�Iota �r L��� PLAN SYMBOL DOOR ROOM FINISH SCHEDULE No. ._.._.' 91 1 886062 OW.) NO 9.08 -AI2A STC 45 STC 4 C 5 NOTE II & *SIM, 7 [ NOTE, I 1 ` & NOTE I2 REMOVE & STORE REMOVE & STORE NOTE II NOTE 1 NOTE 12 9,9 91 DATE' or kNOcK OUT OPG. FRAMED ISNTO GYPSUM WALLBOARD 'PARTITION PHASE 3 Fy22 AVIONICS REMdDE PHASE 3 PERMIT UPDATE SET APPPOVED STATE Of WASHINGTON GYPSUM 0 WALLBOARD PARTITION TYPE. SEE SHT A-37, DEMOUNTABLE PARTITION STC 45 STC 45 AND PROGRAM PERIMET STC 50 AND PROGRAM PERIMETER dB SHIELDING ALL PART IT I ON WALL TYPES LOCATED BET WEE N GRIDS 'C AND ' D (BUT NOT ON GRIDS 'C' AND 'D'), SHALL BE TO ALLOW FLOOR `DEFLECTION.- SEE DETAIL I%A - 37 FOR TYPICAL CONNECTION T'O STRUCTURAL FLOOR DECK-. RAISED A SEAMS'.ARE..,12" tOFF ONIIY' l [ NE ` BOTH D I RECT I O MINIMUM WIDTH °OF ` CUT P ANEL " IS 5 DIMENSIONS ARE PTO FACE 1 `OF STUDS, DEMOUNTABLE PARTITIONS TO-FACE F"I "N I SH EX I ST I FURN I TURE SYSTEMS TO REMAIN, PROTECT /COVER DURING CONSTRUCTION.. EX`I`ST I' F URN I TURE SYSTEMS REL "OCATED BY OTHERS, COORD "I`NAT I ON `REQU'I RED BETWEEN OWNER AND CONTRACTOR . FACE OF S GRI PROVIDE WALL INF I LL AT ELEVATOR OPENS "NG, USE WALL TYPE IC WITH ONLY I LAYER OF GWB ON CORRIDOR SIDE. DISABLE ACCORDION FOLDING FIRE DOOR, LEAVE IN' PLA6E FOR FUTURE USE. REMOVE EXISTING FUTURE OPENING PLUG AND INSTALL NEW ELEVATOR DOO AND FRAME.'REPROGRAM ELEVATOR FOR 'OPENING AT LOBBY ONLY. LINE OF S I OI•IT DRAPER'I ES AND "HARDWARE TYP I,CAL . DRAPERIES TO MEET CLASS I FLAME SPREAD R G REUSE AND RECONF`I Gtr "RE EX I ST I IJG GAB I NE N REPLACE TRY. REPAIR R & REPA "I NT WALLS AS `REQU REMOVE A C ARPET TILES AS K EQCI RED . REMOVE A &N D ° REINSTALL RUBBER BASE AS RE Q (�`IRED. ALL FINISHESM a COLO TO MATCH EXISTING. CORRIDOR R 3!4 SW 1 TCH ROOM 314A JANITOR STORAGE- 13148 REPRODUCTION 1 321 CONFERENCE 336 OPEN OFFICE 336C DOCUMENT CONTROL 340P OFF 1 CE 352A , CORRIDOR 315 FRT EL EV VEST I E3ULE F-5 B W-- I C-2 316 FRT ELEV VESTIBULE , F-5 B-I W I C 317 E X I T ' CORRIDOR F-5 B I C-2 318 'TELEPHONE F-5 B-1 'W-1 C-3 319 STAIR #3 F-5 B-1 W-I C-2 320 ELECTRICAL RM ': F-5 B-1 W- I C-3 322 WOMEN F--9 B-2 1 W-4 C-I 323 WOMEN F-9 F3-2 W--4 C-I 1 vrrik,c. AVIONICS LAB AV I ON CS LAB AV ON I CS LAB A V I O N I C S LAB - AV ON I CS LAB MECH RM , VESTI BULE syu ar_vi s tem A RECORD DRAWINGS B PHASE 1 F-22 AVIONICS REMObEl- REMOVED ROOM 48/HARDWARE CHANCE D PHASE 3 F AV I ON 1 CS REMODEL E PHASE 3 PERMIT UPDATE SET WHERE COLUMNS OCCUR N ROOMS, THEY SHALL BE F INI WITH GWB AND PA 1 NTED UNLESS OTHERWISE NOTED HEAD NG F-1 CARPET F-2 RAISED ACCESS, TYPE 1 F-3 RA I SED ACCESS, TYPE 1 I F-4 RAISED ACCESS, 'TYPE 11 F-5 coNcRcrE F-6 ' CONCRETE . F-7 RESILIENT TILE , F-8 SHEET VINYL DATE GYMSUM WAL LBOARD (GWB) W — 1 A GYMSUM WALLBOARD (GwB) W-.2 GYMSUM WAL LBOAR1) (OW13) W-3 SHIELDING G 50DB W-4 CERAMIC TILE SHIELDING G 1DEMOUITABLE PARTITION --CE 1LYNG- C - I SUSPENDED ACOUSTICAL PANEL C-2 ' GYPSUMTZEILING BOARD C-3 OPEN TO STRUfORE BOVE SHIELDING -- - NOTE : ALL CONCRETE AREAS IN PROGRAM AREAS TO RECEIVE SEALER TYPICALLY EF CARPET TILES CARPET 'TILES H I G H PRESSURE LAM I NATE, SEAL ANECHO1C MATER I AL SPECIAL CONSTRUCTION Pr VI NYL COVER I NG AUBURN WA . 98002 0 BELLEVUE , WA . 98007 EVER , WA. 98201 0 KENT VVA 98031 0 PORTLAND OR 97220 0 RENTON , WA 98055 SEATTLE, WA. 98124 OVVNER FURN I SHED , OWNER '1 NSTAL LED (0 F ANTI-STATIC WON-CONDUCTIVE APPROVED BY ACCEPTABILITY TH I S DESICN AND/OR SPEdIPICATION IS APPROVED DATE OPENING SIZE ' 336M ' 3 ' -0" x 7 ' -0" 336N 4 -0" x 340G 3 ' -0" x 7 DOOR SCHEDULE HM PAINT 20 MI HM PAINT 20 MIN FA HM PAINT 20 MIN F w00D FF N WOOD FF 20 MIN DOOR SIZE . rypE DOOR SCHEDULE NOTES 1 , ' DOOR HAS REMOVEABL E CENTER JAMB 3. 3A = SEE DETAILS S 2 ,'"'IO/A-22B 313 SEE DETAILS "El ; 12/A-22B 3C -."4": SEE DETA I LS 3, 4 ; 6 , 7/A-2213 3D. SEE DETAILS 8 ;9/A--2B 3E ---- SEE ' DETAILS I , 7/A-22B 3F = SEE LS 3/A-22 3G = SF_E 'DETAILS 4/A-22 3H = SEE 'DETAILS 7/A 4. SEE SPEC I F I Ci\T ION 326786062--TS-=-0 I . 5 SEE SPECIFICATION '326-86062--TS--'05 6. FE IN DOOR FINISH COLtIMI'l INDICATES FACTORY FINISH. 7. ALL DOORS ARE 1 3/4" THICK UNLESS OTHERWISE NOTED. 8 RELOCATED DOOR PROVIDE NEW FRAME TO FIT P A R T I T I O N -TYPE 9 REMOVE AND STORE AS DIRECTED BY OWNER . Ub_SP FS)11_4,1 G PAC)LOCK 131.DG 9.08 COL FAAMt HOW' F INI SH GROUP PAINT PAINT PA I NT PAINT PAINT PA 1 NT PAINT PAINT PAINT 2 PAINT 2 PAINT '2 PAINT PAINT 4 8 PAINT PAINT I PAINT T PAINT I PAINT I PAINT 1 PAINT 1 PAINT I PAINT 1 PAINT 6 PAINT 3/A-26B 3/A-26B 3/A--2613 3/A-- 2613 3/A-26B 3/A-266 L......... 2,A..-26B . 2/A-26B 5/A-27B I I 3/A-26B 3/A-26B - PA ■ - I /A-2613 I /A-26B „ 1 /A-2713 , , PROV I 0 I.IN I $ N MECHA I CAL LOC ' 'WITH LE ER HANDLE , TILT DIOR STOP, ALL STO ,'AND AU OMATIC DOOR CLOSER. /--- E 4 NOT 4 1 CL:f01 8:r1 HEAD 1 JAMB SILL I/A -26B 1/A -26B I/A -278 8 I/A-26B I/A-26B 1/A-27B 10 2/A-26B 2/A-26B 5/A-278 10 2/A: • ; B 5/A-27E3 I I ut■---26B I A-268 I 1 & 12 2/A - 2 - 673 2/A 5/A-27B 1 1 I 2/A-26B 2/A-2613 5/A--276 2/A-2613 2/A-26B 5/A-278 „ 1 I 2/A26B 2/A-2613 5/A-27E3 I I 2/A-26t3 2/A-26B 5/A-27B I 1 2/A-26B 2/A-26B 5/A-27B I 1 2/A-26B 2/A-26B 5/A-2713 1 I -' 2/A-26B 2/A-266 5/A-27B I I 2/A-26B 2/A-2613 5/A-2713 11 3/A-2613 3/A-26B -- , 5 3/A-26B 3/A-26B - 5 smote ENGINEERS SUBTITLE THIRD FLO B DOOR AND ROOM FINISH SCHEDULES 20 'PIN 2C - 59/22 PAINT 5B , 20 MIN 5/A22 PAINT 7 2C 20 MIN.2/A22 PAINT 25 2 B 20 MIN 2/A22 PAINT 9 I 2G 20 MIN,5/A22 PAINT 12 20 MIN 6 /A 22 PAINT , 9 1,2G,3F 1.5 hr 2/A22 PAINT 10 2B . HR 6/A22 PAINT , 10 20 MIN 2/A22 PAINT 12 2B 20 MIN. PAINT 12' 20 MIN 5/A22 PAINT 7 '2C ' MIN 5/A22 PAINT 7 , 2C 1.5 HR 8/A22 PAINT - CYLINDER LOCK 20 'MIN PAINT 10 2G 20 MIN I/A26B PAINT ALL 00OR$ 1. DOOR 21.TYPES ARE -SHOWN ON SHT 2 . HOLLOW METAL FF FACTORY'-'2 3. DOORS , ARE - NUMBERED WITH 'THE SAME 'NuMtIER OF THE ROOM OR AREA THAT THE . DOOR SWINGS INTO. THE SECOND 'DOOR THAT SWI NGS INTO AN AREA HAS TI-1E' SAME NUMBER, BUT IT . 15 FOLLOWED BY Ti.IE LETTER A, 206A), THE THIRD BY LETTER B, ETC. . 4, - 'DOOR FRAMES - HUNG WITH LABELED DOORS SHALL ALSO BE LABELED WITH THE SAME RATING 5. DOORS ARE 6" FROM C ORNER UNL ESS NOTED '0'1 SE . SHEET SYMBOL DATE ttIT afX•ii!71 RECOM DRAW! NGS F PHASE I --22 AV 1 ON CS PE1sAODEL PHASE 3 F-22 AV I ON 1 CS REMODEL PHASE PERMIT UPDATE SET I ikt_ THIRD 11-.) F LOOR i\IRE:/k C ACCEPTABILITY DEMOUNTABLE PARTITION STC 45 STC 45 AND PROGRAM PER I METER STC 50 AND PROGRAM PER 50 dB SHI ELD ING es le UP le IMEMPICIII OM II GENERAL NOTES ALL PART 1 I ION WALL TYPES LOCATED BETWEEN GRIDS ' C' AND 'D (BUT NOT ON GRIDS AND 'D') SHALL BE CONSTRUCTED TO ALLOW FLOOR DEFLECT I ON SEE DETAIL 1 /A—:37 FOR TYPICAL CONNECTION TO STRUCTURAL FLOOR DECK. RAISED ACCESS FLOOR SEAMS ARE 12 OFF GRID LINE IN BOTH DIRECT IONS. MINIMUM WIDTH OF CUT PANEL IS 5'. DIMENSIONS ARE TO FACE OF STUDS, DEMOUNT/ABLE P A R T I T I O N S TO FACE OF CONSTRUCTION NOTES E X I S T I N G FURNITURE SYSTEMS TO REMAIN, PROTECT/COVER DURING CONSTRUCTION. E X I S T I N G FURNITURE SYSTEMS RELOCATED BY OTHERS, COORDINATION REQUIRED BETWEEN OWNER AND CONTRACTOR. FACE OF STUD GRID 7 j>. PROVIDE WALL INF ILL AT ELEVATOR OPENING, USE WALL TYPE IC WITH ONLY 1 LAYER OF GWB ON CORRIDOR S I DE DISABLE ACCORD I ON FOLDING F I R E DOOR, LEAVE IN PLACE FOR FUTURE USE. REMOVE E X I S T I N G FUTURE OPENING PLUG AND INSTALL NEW ELEVATOR DOORS AND FRAME . REPROGRAM ELEVATOR FOR OPEN I NG AT LOBBY ON1...Y L I N E OF SIGHT DRAPERIES S AND HARDWARE TYPICAL DRAPER I ES TO MEET CLASS 1 FLAME SPREAD RATING ( suoT ifte nrcrwrp '61V oruivvii SEP 1.1 14j1 peRriArt CENT Efl NSW ENGINEERS ri Of TOK\NO APPROVE SEP 2 5 1991 mitslot1/41 J• MMEMN1 OPEN OFF I CE WORK AREA CONFERENCE c.,,QNFERENCE ' COFFEE NOOK JANITOR TEL RM ELEVATOR LOBBY STORAGE mv otv s 1 oN A RECORD DR4INGS B PHASE I F AV I ON I CS REmoVEL F-22 AVION REMODEL PHASE 3 PERM I T , UPDATE SET FLOOR I BASE I WAL L C-2 9 ,—o" B*I W—I ROOM FIN' SHNOTES : . WHERE COLUMNS OCCUR IN ROOMS, THEY SHALL BE FINISHED WITH GVVB AND PA I NTED "UNLESS OTHERWISE NOTED. REVISION C '9' C 1 l 9 —On C-1 F RAISED ACCESS , TYPE I F-3 RAISED ACCESS, TYPE , 1 F-4 RAISED ACCESS, TYPE 11 F-5 CONCRETE F CONCRETE F R E S I L I E N T T I L E F SHEET VINYL F CERAMIC TILE F-10 FIBERGLASS RA I SED FLOOR W— I GYMSUM WALLBOARD D (GWB) W I A GYMSUM WALL BOARD (GW'B) W GYMSUM WALLBOARD (GVVB ) W-4 CERAMIC TILE S H I E L D I N G — 5ODB DEMOUNTABLE PAi" I T I ON W-5 SHIELDING ---CEILING- C — I SUSPENDED ACOUST I CAL PANEL C-2 GYPSUM C E I L I NG BOARD C OPEN TO STRUCTURE ABOVE C SHIELDING NOTE ALL CONCRETE AREAS I N PROGRAM AREAS TO RECE I VE SEALER TYP I CAL LY . FACTORY FINISH H (Fr) FF FF CARPET TILES ' OWNER FURNISHED, OWNER INSTALLED (0 F 0 . I CARPET TILES ANTI — STAT IC, 0.F .0. I . HIGH PRESSURE LAMINATE NON I VE 0 F 0 . SEALER 0 AUBURN, WA. 98002 L "0 8007 98201 0 PORT LAW. ,;f0R..: 97220 WA. 98055 0 Pr' 98124 111 .•,•••eaamrrrosrwwoosrv.e.o/...A........*Iftwlriro.m.••••••*oiwwwamal•orr.s.■•■•■w now.immallhooliholtmkoromowni.. I SPECIFICATION IS APPROVED T1 1073 THIS ogsiGN AND/DR IA} APPROVED BY 17T ACCEPTABILITY GORMN A. dtiLtUICI STATE OF WAsi11:1, 336J 336J-1 336K 340S 340T 340U 340V 340W SCHEDULE LOCATION & SWING CHANGES DOOR SCHEDULE NOTES I. DOOR HAS REMOVEABLE CENTER ' F WOOD F F F WOOD: FE F WOOD FF F WOOD FF F WOOD FF F WOOD FF F WOOD F F F WOOD FF FOR D TAILS —SHEET DOOR S I Z E TYPE THKNS MAT FINISH PR 4 ' —0" )( 7' " F I 3/4" WOOD F F 3 ' —0" )( 7 ' —0" F 1 3/4'' AM PAINT 3 ' —0" X 7 ' —0" N I 3 /4 " WOOD FF 3 ' —0" x 7 ' —0" F I 3 4" WOOD F F 3 ' —0 " x 7 ' —0" F I 3/4' WOOD FF 31_0" )( 7 ' F 1 3/4 ' HM PA I NT 3 —0" x 7 N 1 3/4" WOOD F F 3 )( 7 ' F I 3 4 WOOD FF 3 ' — 0 " )( 7 ' —0" F 1 3/4 h WOOD F F 3 )( 7 ' —0" F I 3 4" WOOD FF WOOD." WOOD FF FF PA I NT 3. 3A = SEE DETAILS 2 10/A-22B 3B = SEE DE TA I LS 11,1 2/A-228 . 3C = SEE DETAILS 3 , 4 , 6 , 7/A-22B 3D = SEE DETAILS 8 , ''/A 3E = SEE DE TA ILS I 7/A-22B 3F = SEE DETAILS •/A-22 5C = SEE DETAILS 4/A-22 3H = SEE DE TA I LS 7/A-22 4 SEE S P E C I F I C A T I O N 326-86062— T S-01 . 5. SEE SPECIFICATION 326-86062—TS-05 ' 5 6. FF I N DOOR FINISH COLUMN INDICATES FACTORY FINISH. 7. ALL DOORS APE I 3/4" THICK UNLESS OTHERWISE NOTED. 8. RELOCATED DOOR PROVIDE NEW FRAME TO F IT PART I T I ON TYPE 9. REMOVE AND STORE AS DIRECTED BY OWNER. 11 i 4 ' ‘1,.-GNPAD LOCX PA I NT PAINT PA I NT PAINT PAINT PA I NT GLASS /A -2B .2'7A-260 8/A II 2 2/A-26B 2/A-26B 6/A-27B ' I I 2 2 A 2 /A - 28B' 8/A I 1 2 2/A-266 2/A-268 6/A-27B 1 I ' 2 A-26: 2/ —268 6/A— 78 II I ' . . /A ; -- I 3/A-26B 3/1k-268 — I 3/A-2 1 88 3 A-26B — I ' 3/A-26B 3/A-26B I — 3/A-268 3/A-26B — , J ----- 1 1 3/A-26B 3/A — 3/A-26B . 37A-268 — 3/,A-268 3/A-268 — 3/A-26B 3 /A -2 6B — NOTE 4 RAT ING FRAME FR A M E 11°111 NOTES FINI H GROUP 20 MI 5 /A 2 2 PAINT 5 2A 20 MIN 5/A22 PA I 197 7 2C — 5/A22 PAINT 5B 20 M 1 N 5/A22 PAINT 7 2C 20 MIN 5/A22 PAINT 5 2A 20 MIN 5/A22 PAINT 5 2A — 5/A22 PAINT 5A — 5/A22 PAINT 5A 20 MIN 5/A-22 PAINT 28 20 M I N 5L,A22 PAINT • 5 .,„.••••'•ic-rdv;i1..• • tayoTtwAILA • • S PERIVIIT .STARK PA I NT PAINT PAINT SE&C ENGINEERS THIRD FLOOR *. PLAN C DOOR AND ROOM FINISH SCHEDULES ARCHITECTURAL MASTER I. DOOR TYPES ARE SHOWN ON SHT. A HM = HOLLOW METAL FF . FACTORY FINISH DOORS ARE *NUMBERED WI., I., 0 THE NUMBER OF THE ROOM OR AREA THAT THE fi)(1—).1',As7 SWINGS INTO, THE SECOND DOOR NUMBER, BUT IT IS FOLLOWED BY THE LETTER A, (EC: 2 06A), THE THIRD BY LETTER 13, ETC,. DOOR FRAMES HUNG WITH LABELED DOORS SHALL ALSO BE LAB WITH THE SAME RAT INC. DOORS ARE 6" FROM CORNER UNLESS NOTED OTHERWISE. nn /ol Poo POOR AND FRAME BEYOND. SEE JAMB DETAIL FOR FRAME SIZE ALUM. SADDLE THRESHOLD DOOR AND FRAME BEYOND;, SEE JAMB DETAIL FOR FRAME SIZE RECORD DRAWINGS PHASE: I F-22 AVIONICS REI4►DEL PHASE ACOUST I CAL DOOR AND FRAME BEYOND DOORWAND FRAME BEYOND • ALUM. CARPET THRESHOLD "FINISH FLOOR • AS SCHEDULED DOOR AND FRAME. BEYOND. SEE JAMB DETAIL FOR FRAME SIZE ALUM. CARPET THRESHOLD 'SET "N J SEALANT GROUT CERAMIC ' FLOOR SYSTEM TILE CARPET TILE (OFOI ")- ALIGN OF THRE ''PR I LE w% 7 FRAME 00R AND FRAME • B EYOND. SEE JAMB DETAIL FOR FRAME SIZE AL I GN BREAK — ALUM, "BU I LT—UP THRESHOLD PRO I LE THRESHOLD SET w %FRAME I SEALANT. :. SEALANT, TYP ' Irlrltl : II II . 2 IIt � i � ` ' rl '� r » L_ ' r ulita �iril�� i�ln� �i�l44 ...mss' Ca AU U N, WA . . .0 2 0 BE L E VUE , WA . 9'8007 O VE ETT, CIA . 98201 C KENT , 1+' A . 98031 0 POR ,AND , oR . 97220 O REN ON WA 918055 It SEATTLE „ W , 98124 DOOR SAND FRAME BEYOND SEE JAMB .DETA`I L F'OR'` "FRAME SIZE . ALUM. ,BUI -UP THRESHOLD.•SET IN`SEALANT. SEALANT, TYP. CERAMIC TILE •F LrCOR "SYSTEM No.18 1iihIfill111 liiii iiIiiiiii 1C1'111110 ., . , r �i1l1111 10i111i1 REGI STEREO TECT /7 aoi'ors A. oJLTU { sT of wn �rurittor + ACCEOTABI L ITY 1111 S CC S 411 SoECIrICAt1ON `IS A -I 2A STEEL CHANNEL HEADER SECURE TO STR STEEL 0 TOP OF ROLL—UP DOOR 2 COMPOS I TE METAL BU I LD I PIG PANEL STR STEEL OUTE. I NE OF DOCK SEAL HEAD EXTRUSION BY PANEL MFGR -- REMOVABLE MULLION, PROFILE TO MATCH ADJACENT FRAME . . FLUSH MOUNTED CEI • . METAL STUDS W/5/8" GYPSUM WALLBOARD CEILING A-07j A-22 (2) I 6GA MT L STUDS • AT JAMB OPNG \ SEE PLAN FOR PARTITION T ERMIC TILE Vil-IEIRE. SCHEDriLED . SEE PLAN SEALANT @ CERAMIC TI LE F1 I . 2" COMf'OS I 1E METAL_ 80 I LYING PANEL. TRIM E ION BY PANEL MFOR . HEAD EXTRUSION S I M JAMB DE TA I L ACCEPTAB L TY SPEC ApoRovto BY OUTLINE OF ROLL—UP DOOR I N WEATHERIZE HOOD 8. MOTOR AtVI S Pat RECORD DRAWINGS PHASE 2 IS I ONS—NISC . ACOUSTICAL SEALANT, APPLY— „ BETWEEN FRAME & DRYWALL TYP D IM PER MFGR f2ECOMMENDAT1 ON s s „ GALV. STEEL DOOR GUIDE SECURE TO STEEL CHAfkINEL STEEL CHANNEL JAMB FRAMING SEE STR . DWGS JAMB EXTRUSION, BY PANEL MFGR. SET — I N SEALANT AT STEEL 'CHANNEL 0 AUE)URN, WA . 580()2 0 BELLE\itiE WA . 98007 0 EVERETT, WA. 98201 0 KENT, WA . 98031 0 PORTLAND, OR . 97220 1".:IRENTON, WA . 98()55 MI SEATTLE WA. 98124 2 COMPOSITE METAL BUILDING PANEL ' N.18 rACOU8T I CA SEAL/STOP Y DOOR isAr6 ACOUS I CAL DOOR TL 1073 REGISTEAD AaCHITECT ACOUST I CAL P A R T I T I O N T S y E p E E P LAN FOR PART I T1 ON ACOUSTICAL SEALANT , APPLY BETWEEN FRAME & DRYWALL TYP EXISTING ELEVATOR SHAF1 ....• . . WALL • . MODIFY FOR INSTALLATION OF ACOUSTICAL BATT INSULATION INSTALL 'J' RUNNER •• •• • ••. • .....,•••• • •••:• • • . •••••• . .••• ,.,•• • .• PERI METER••••,.• —OF KNOCK—OOT OPG. OR FUTURE ELEVATOR DOOR INSTALLATION ,vhs— CENTER OF I ELEVATOR CAB NEW ACOUSTICAL SHAFT WALL ' . SEE PLAN FOR AkilTI ON TYPE . TAPE AND FINISH TO EXISTING WALL. PA I NT TO MATCH PART ltl'"(iN BEYOND CAULK 'BETWEEN GYPSUM WALLBOARD AND 'DOOR.' FRAME --=-\ ALIGN SOFFI W/E)OOR '\ FRAME HM. DOOR FRAME 01554(4 !082x ,1 yEG: B mAc c NAN GAL Lx °E w , b N STUDS, TYP PROVI E 9 fHRU A 714 fr sYSTEM DOOR -- JAMB ANCHOR 4" X 209A' METAL STUD DROP WALL . STUDS @ 2 ,. DIAGONAL SE t0ET0BRsATtRE t . EACH WAY METAL STUDS SHIM M As REQUIRED --- ' - ExtRUDLD ALUMINUM RECEsSrD CEILII‘IG TRACK FOR ACCO PART IT I oN. SECURE To METAL STUD PAINT T TO MATCH CE I LINC SUSPENSION N SYSTEM AcCOFD'ION P A R T I T I O N SWEEPS ' PARTITION C OORDINATE ACTUAL Dim. w/MANUFACTUkE EXISTING GYPS PARTITI REMOVE AND 2: it Vi,A 1. L E A i AS' I NS T AI,J. ' A 019 pkiteiro 4 Tc ACOUSTICAL SEALANT APPLY BETWEEN FRAME & DRVNAI. L TYP - T ACOUSICAL SEAL/STOP 'DOOR MANUFACTURER - ACOUSTI CAL :DOOR CON'T . 16 GA CHANNEL JAMB BY DOOR MFGR. GROUT, BY DOOR = INSTALLER • • FRAME AND TRIM BY DEMOUNTABLE PARTITION MFGR M WALLBOARD INVA1:7 - .L.-i..40000)4WPAR171Tt014&., , AN0HDR.,•.: • . . . • • • ' • • • . . . • ,.. • . „ . • , . • • .,. . . • • ., OE: ME1AL BACKING tETWEEN STUDS ANCHOR 'OST •••• 2 0 I WA . 98007 0 EVERETT, WA. 9820.1 • •••••''••••• ••••• • • ••• •'•'•• 97220 111 SEATTLE A- 26B f SECURE SHELF WITH FLAT HEAD WD SCREWS COUNTERSINK AND PLUG 0 EXPOSED LOCATIONS --- O AK DIAGO ) I V4 FINI SH TO MATCH DOOR — SO BRACKET ACCtTABILITy tFijs DESIGN AND/011 sPECiricA/I6N is ApPRovED \ Ti.ioy ,.. RLOISTERED Al'Cli_iTECT GOTIDetrif:CUIRMT, STATE OE wAstImbion; DttsT -SHELF WITH P LAM EA FACE ON (2) LAYERS HI GH DENSITY PART CL E BOARD — 1r - OAK EDGE T R I M TYP FINISH TO MATCH r - /8 - CHAMFER OUTSI RM Recgiveb CITY OF TUKwILA OCT 1 0 1991 BEsetworCENTEFt ENGINEERS t ," LAr. R0 „ T HOLD BREAK AL I GNS/W FRAME PROFILE RAISED ACCESS FLOORING CUT PANE!. AS REQUIRED EX I ST ! NG ACOUSTICAL DOOR AND FRAME 'BEYOND THRESHOLD PgQ1,1,12L 01' DOOR MF GR '1 - EXISTING DOOR AND FRAME BEYOND EXISTING. ALUM. SADDLE THRESHOLD ACOUSTICAL - DOOR ACOUSTICAL F"ikRT I T I ONI , SEE PLAN FOR P A R T I T I O N TYPE. 'tJSE I 6GA METAL STUDS @ DOOR SILL BY DOOR NIFGR , SET THRESHOLD PROVI DED IN ACOUSTICAL EALANT REV! t I ON EXISTING DOOR AND FRAME BEYOND ALUM . CARPET THRESHOLD XISTING FINISH FLOOR AS SCHEDULED =z 1 E - r==d5MHtai=nn A=6A TO A-2'0A A' 0 OR 3070M • .• RA I SO ACCESS FLOOR, CUT - PANEL AS REQUIRED - CARPET T I L E E Rik' SEE) ACCESS •FLOOR INC. CUT PANEL AS , rEc.)) RED . • 0 AUBURN WA . 980#02 0 BE a LLEVUE WA . 98007 4iiirdd!ir.4;i,F, 0 E VE RE T T , . 082,0 1 rAt11 r' pife A r4 A 0 KENT , WA . 98C131 0 PORTLAND, OR 97220 1:.1 RENTON , WA 98055 al SEATTLE , WA. 98124 1 No.I8 toom STATE OE WASHINGTON CONT . 1 6 GA CHANNEL „r JAMB BY 't)00R MFGR r GROUT , '13Y DOOR INSTALLER bE0X0IASTAI NNiic A FRAAE6E , _---", )(1ST 1 i Nqb PROVIDED mFGR g,,,,,..resi4OL , . b(joi? '', T HRESHOL D f !CAL E cuu ACCESS P ' - FRAISED L 0 - : - S RE DI A S ' -RCEQU T D . cirtil ) CARPET '-- TI LE c\I cs.. PANEL = . AccoymILITy I 4 spEPLIP" 140v 014 S A "I , , . .., . „. . . , ,. •i• ut...ilregl ... . I:, RE T HOLD BREAK 1:1 S AL I GNS/W FRAME PROFILE RAISED ACCESS FLOORING „ 1 ,, CUT PANE!. AS REQUIRED EX I ST ! NG ACOUSTICAL DOOR AND FRAME 'BEYOND rvIn n 4,, I B THRESHOLD PgQ1,1,12L 01' DOOR MF GR '1 - EXISTING DOOR AND FRAME BEYOND EXISTING. ALUM. SADDLE THRESHOLD ACOUSTICAL - DOOR ", 1 -;ND F RAME , ACOUSTICAL F"ikRT I T I ONI , SEE PLAN FOR P A R T I T I O N TYPE. 'tJSE I 6GA METAL STUDS @ DOOR SILL BY DOOR NIFGR , SET THRESHOLD PROVI DED IN ACOUSTICAL EALANT REV! t I ON EXISTING DOOR AND FRAME BEYOND ALUM . CARPET THRESHOLD XISTING FINISH FLOOR AS SCHEDULED =z 1 E - r==d5MHtai=nn A=6A TO A-2'0A A' 0 OR 3070M • .• RA I SO ACCESS FLOOR, CUT - PANEL AS REQUIRED - CARPET T I L E E Rik' SEE) ACCESS •FLOOR INC. CUT PANEL AS , rEc.)) RED . • 0 AUBURN WA . 980#02 0 BE a LLEVUE WA . 98007 4iiirdd!ir.4;i,F, 0 E VE RE T T , . 082,0 1 rAt11 r' pife A r4 A 0 KENT , WA . 98C131 0 PORTLAND, OR 97220 1:.1 RENTON , WA 98055 al SEATTLE , WA. 98124 1 No.I8 toom STATE OE WASHINGTON CONT . 1 6 GA CHANNEL „r JAMB BY 't)00R MFGR r GROUT , '13Y DOOR INSTALLER bE0X0IASTAI NNiic A FRAAE6E , _---", )(1ST 1 i Nqb PROVIDED mFGR g,,,,,..resi4OL , . b(joi? '', T HRESHOL D f !CAL E cuu ACCESS P ' - FRAISED L 0 - : - S RE DI A S ' -RCEQU T D . cirtil ) CARPET '-- TI LE c\I cs.. PANEL = . AccoymILITy I 4 spEPLIP" 140v 014 S A "I MIL. CH STUDS WITH " CORE BD., 5/8" GYVB AND SOUND ATTEN, 'BI_KT. A-661 A-328 EXISTING ACOUST I CAL CABINET ABOVE. NO PENETRATION 0Q,Fftitspu,%riBtl.LbE,AiLDAYAERL.t:owEoF ALLOWE AT WALL. 47)( 20A. METAL STUDS W/ LAYERS GYPSUM WALLBOARD, TYP. CONT. q„YPSUM WALLBOARD F.E. CABINET OPC TYP, A42B E X I S T I N G ACOUSTICAL PARTITION WALL, MODIFY AS SHOWN FOR rNSTALLAT ION OF FE. CABINET SPRAY PROOF I NG C4OLNIXRE-i32°6AG A C -2H t1 Wr'' —5/..a:-GYEtik-WALI-BOAO 3 1 /2 ACOUSTICAL BATT INSULATI FOR FURRING 9GA FLATTENED : • 4AB°C"61.'SUHTS:USI.b11 ANCHORE ribkcjnR l3f AND 0AT ION AL Lo 'vvE NO P LAYER OF AT yukiut:0,-Ii10.-C,.AIR(j-bREATr‘u‘'' EXTER iro,R WALL. D i AN DETAIL X1.0.0 WANN NEW ACOUSTtCAL WALL FEATHER FINISHES WITH EXISTING EXISTING ANCHOPEOAItte■Ok. AND SThUcThRE ABOVE. WO PENETRATWN ALLOWED APPROVE ref DEEP) BRB, AER ssAEci L ANGLE MANUFACTURED CUSTOM CASEWORK (PART I T I ON) PHASE 3MITUPfMTE sr CABINETS 30" DEEP W7LOCKTNG DOOR AND 2 DRAWERS FACILITIES DEPARTMENT EVKENT 'vvA . 98031 EVERETT, . 48201 • PORTLAND OR . 97220 0 PENTON WA .98055 II SEATTLE WA. 98124 A g. ANDERSON WEST ELEVAT I ON LOCK I NG 'DOORS AND DRAWERS TYPfCAL BE&C ENGINEERS RCEIVED ON OF TUKWII A 'OCT PERMIT CENTER PEDESTAL w/ DOOR AND (2)DRAWERS LOCK r ii A-34E DRS/10.02,91/11:5( 1 NOTE: AT SIM. ' CONDITION (5) AINUST IBLE SHELVES TYP . AND 16" DEEP @ SIM. CONDITION BAGKSPLASH: 1" SUBSTRATE w/ P LAM COVERED FACE AND VISIBLE EDGES. RETURN SIDE WALLS AS SHOWN ON sHELVEs W/POLYESTER o LAMINATE B OTH FACES o PVc EDGE AND TYP 2 X SUPPORT 'PAINT TO MATCH INTERIOR P LAM CUSTOMER S I D E (3) ADJUST SHELVES 3/4" SUBSTRATE WITH P LAM COVERED FACES AND EDGES TYP , C OVERED w/ P LAM @ kr SUBSTRATE : ALL FACES, SIDES, EDGES AND 'VISI INTER I OR SURFACES 1RES L I ENT BASE FINISH FLOOR BAND DRAWER FRONTS AND DOORS -ALL FACES, SIDES, DOS, iDRAWER DRAWER FRONTS AND VISIBLE INTERIOR SURFACES: 3/4" SUBSTRATE COVERED W/ PLAM 2X4 TYP ALL FACES, SIDES, DOORS DRAWER FRONTS & VISIBLE SURFACES: 3/4 SUBST RATE COVERED P LAM TOP: I SUBSTATE COVERED w/ PLASTIC 3/8 FIELD APPLIED STEEL ANGLE BRACKET PLASTIC LAMINATE COVERED 3' 4 SUBSTRATE PLASTIC LAMINATE (P LAM) TRIM SEE 41011 SUFPORT PAINT TO MATCH INTERIOR P LAM 0 EVERETT, WA. 98201 ALL FACES, SIDES, DOORS, 'DRAWER FRO & VISI SURFACES: 3/4" SUBSTRATE COVERED "W/ ID LAM RESI L I ENT BASE FINISH REGISTIRE:D ACCEPTAI:411 DESIGN ANCOovED -GATE: I 3/4 SUBSTRATE COVERED (2 ) ADJUST 814EtV t 3 / 4 al SU BSI RAt E W ITW P LAM COVERED FACES' AND EDGES TYP EACH SIDE - 3/47 SUBSTRATE COVERED Wi P LAM ALL FACES, SrDES, EDGES AND Vls'IeLE INTERIOR SURFACES. - RESILIENT BASE TOP & BOTTOM RESILIENT CARPET . MOUL D I NG (SNAP- DOWN DIVIDER 'T' ACCESS FLOOR _ c MFGR. TO T Q 8 SUPPLY CLOSURE SKIRTING TO MATCH F -4 FINISH. EXISf1 FLOOR NG STR. SLAB DATE EXISTING PARTITION WALL RESILIENT BASE, TYP RAISED ACCESS FLOOR CUT PANEL AS REQ'D CARPET TILE (O.F.O. I . ) FIN FLR d AUBURN, WA. 98002 0 BELLEVUE , WA . 98007 a in WI *' 1 EVERETT , WA 98201 0 KENT, WA. 98031 0 PORTLAND, OR . 97220 0 RENTON , WA . 9055 U SEATTLE, WA . 98124 A_ CCEPTAB I L" I'C'Y `THIS`OCSiGN AND OR SPECIE I CAT 1 0 N I S RPPRO A -06 THRU PARTITION, SEE PLAN FOR PART. TYPE - RESILIENT BASE RAISED ACCESS FLOOR, CUT PANEL AS REQ'D. CARPET TILE (F010) MC DETAILS CITY RECEIVED TUKWILA OCT 1 0 1991 PERMIT CENrER Seam ENGINEERS LAST REVIS REVISION BY APPRo VED DATE $Y1,i RECORD DRAWINGS . ..r SCC__ GC DS I O , U I , 90 PHASE I F-22 AVIONICS REMODEL SCC . .GC DS TI5,91 PHASE 3 F -22 . AV I ON I CS REMODEL SCC GC DS 8. 15.91 PHASE 3 PERMIT UPDATE SET I2/12 CLG. Q AUBURN, WA . 98002 ELLEVUE , WA . 98007 C1 EVERET . , WA'. 9820 I 'KENT , WA , 9803 I 0 PORTLAND , OR . 97220 D RENTON, WA , 98055 MI SEATTLE WA 98124 ACCEP7Af3 THIS DESIGN SPECIFICATION I APPROVED BY I ILITY R.NAUZAY AND /OR S APPROVED R R DEPt.. DATE CRt . T BLDG 9-08.3A 2x2 RECESSED FLUORESCENT FIXTURE Ix4 SURFACE, PENDANT OR WALL. MTD FLUORESCENT FIXTURE C) -- -- SPRINKLER R HEAD BE&C ENGINEERS REFLECTED CEILING PLAN - THIRD FLOOR A --- ARCHITECTURAL MASTER <O9O9 9 MECHANICAL EQUIPMENT ACCESS DOOR: COORDINATE LOCATIONS W /MECH DUCTWORK, FIRE DAMPERS, ' AND ACCESS HATCHES, SEE DETAILS 8 & 9/A -22A FOR HATCH FRAMING IN WALL TYPES AS SHOWN ON FLOOR PLANS. 62CA46 RECORD DRAWINGS SHEET BK NAME , 623A 12BK 4'-O " X2 ' -0" SUSPENDED CEILING GRID rl . RECESSED OR WALL MTD INCANDESCENT FIXTURE —SUPPLY AIR DIFFUSER RETURN OR EXHAUST AIR BY APPRo VED DATE $Y1,i RECORD DRAWINGS . ..r SCC__ GC DS I O , U I , 90 PHASE I F-22 AVIONICS REMODEL SCC . .GC DS TI5,91 PHASE 3 F -22 . AV I ON I CS REMODEL SCC GC DS 8. 15.91 PHASE 3 PERMIT UPDATE SET I2/12 CLG. Q AUBURN, WA . 98002 ELLEVUE , WA . 98007 C1 EVERET . , WA'. 9820 I 'KENT , WA , 9803 I 0 PORTLAND , OR . 97220 D RENTON, WA , 98055 MI SEATTLE WA 98124 ACCEP7Af3 THIS DESIGN SPECIFICATION I APPROVED BY I ILITY R.NAUZAY AND /OR S APPROVED R R DEPt.. DATE CRt . T BLDG 9-08.3A 2x2 RECESSED FLUORESCENT FIXTURE Ix4 SURFACE, PENDANT OR WALL. MTD FLUORESCENT FIXTURE C) -- -- SPRINKLER R HEAD BE&C ENGINEERS REFLECTED CEILING PLAN - THIRD FLOOR A --- ARCHITECTURAL MASTER <O9O9 9 MECHANICAL EQUIPMENT ACCESS DOOR: COORDINATE LOCATIONS W /MECH DUCTWORK, FIRE DAMPERS, ' AND ACCESS HATCHES, SEE DETAILS 8 & 9/A -22A FOR HATCH FRAMING IN WALL TYPES AS SHOWN ON FLOOR PLANS. 62CA46 RECORD DRAWINGS LEGEND BK NAME , 623A 12BK 4'-O " X2 ' -0" SUSPENDED CEILING GRID rl . RECESSED OR WALL MTD INCANDESCENT FIXTURE 4 —SUPPLY AIR DIFFUSER RETURN OR EXHAUST AIR REC DRAWINGS PHASE I F-22 AV I ON I C S D FFUSER MOVEMENT APPROVED 1 DATE 1 SYM 0 AUBURN . WA 98002 0 BELLEVUE , WA 98007 0 EVERETT , WA . 98201 El KENT , VVA 98031 0 PORTLAND , OR . 97220 13 RENTON , VVA . 98055 II SEATTLE, VVA. 98124 tveAR 010.."1-11ts*.i it 107.3 STME - VV A A : Sti t7 t4 5 :; 71 1014, 41 APPROVED BY ACCEPTAB I L 1 TY MIS DESIGN AND/OR SPECIOCATION IS APPROVED DEPT 2x4 RECESSED LL --)1 FLUORESCENT FIXTURE 11:] RECESSED FLUORESCENT FIXTURE 1x4 SURFACE, PENDANT E2 MTD FLUORESCENT FIXTURE NEW ACCORDIAN PARTITrON CEILING TRACK ). Ty LINE OF SIGHT DRAPERY TRACK AT CEILING TYP. CtTY SEP 1 1 LOi Pcl-D1111` CEN*1 MECHANICAL EQUIPMENT ACCESS DOOR COORDINATE LOCATIONS W/MECH DUCTWORK, FIRE DAMPERS, AND ACCESS HATCHES, SEE DETAILS 8 & 9/A-22A FOR HATCH FRAMING IN WALL TYPES AS SHOWN ON FLOOR 'PLANS WALL OR CEILING MOUNTED I LLUM I NATED E X I T LIGHT DAT E 624447 PPr /09. I r 11/09;3k, APPROvt 0 DATE S' REVISION APPROVED DATE A RECORD DRAWINGS SCC GC DS 10.01.90 B PHASE 1 F-22 AVIONICS REMODEL SCC GC DS 7.6.91 DIFEUSER MOVEMENT D 0 AUBURN , WA 98002 O BELLEVUE , WA . 98007 O EVERETT , WA . 98201 O KENT , WA . 98031 O PORTLAND , OR . 97220 O RENTON , VVA . 98055 SEATTLE, WA 98124 Ti 1073 7:7 A: eflrfUT ACEPT AB 1 L 1 TY THIS DESIGN AND/OR SPrCIPICATiON IS APPROVED DEPT . GWB CEILING 2x4 RECESSED 16=1"P".24 FLUORESCENT FIXTURE ILJ 2x2 RECESSED 1.0 FLUORESCENT FIXTURE r--1 FXIT Ix4 SURFACE, PENDANT OR WALL MTD FLUORESCENT -- FIXTURE // // /// NEW ACCORDIAN PARTITION CEILING TRACK TYP. [:=> LINE OF SIGHT DRAPERY TRACK AT CEILING Typ 6 I II 12 -0 1 C}VN' • A S 1 1 1;...:' , 0 I CL: I Lt1 MECHANICAL EQUIPMENT ACCESS DOOR: COORDINATE LOCATIONS W/MECH DUCTWORK, -FIRE DAMPERS, AND ACCESS HATCHES, SEE DETAILS 8 & 9/A-22A roR HATCH FRAMING IN WALL TYPES AS SHOWN ON FLOOR PLANS. BE&C ENGINEERS REFLECTED CEILING PLAN - THIRD FLOOR C LE ARCHITECTURAL MASTER 86062 9 .08-A48 DATE ■•■ 4.4 4.4 4.4.4 4444.. .4-.4 Votlr,71444 m44 4. 4 4. .4.... 1 - , 11 I !t 1 11 1 11 l r ri r li i 1 : i f I i I 5 ' I , I 21 I 31 I 41 , . . . t07.„A,..1.47 • L T 111 11111 ? 11111 . 1111;1 . 1111101;1IlliliitlifillPilt101141;i0 ;11101 1 BK NAME 623A14BK BK 08.28.91 62CA48 DRS/09.10.917094 '17 A RECORD DRAWINGS REVISION OFFICE SIGN WALL -- CENTERED TYP WALL LEO HALL 3 4" CEILING FIRE EXTINGUISHER SIGNS 5 3/4" FLOOR ---7/8"x 7/8"x 1/16" THK. ALUM. CORNER ANGLE, SIGN ATTACHED WITH (2) 5/32" POP RIVETS, ANGLE ATTACHED TO CEILING GRID WITH (2) NO 6 ROUND OR PAN HEAD SCREWS. APPROVED DS SIGN MATERIAL IS 1/8" THK. SOLID RED COLOR PLASTIC, WITH 1" HIGH WHITE HELVETICA MEDIUM LETTERS MOUNTED ON BOTH SIDES OUTLINE OF MAGNETIC TAPE BEHIND TYP 48 PT . HELVETICA MEDIUM LETTERS TYPICAL A 12 AS--21 DATE 10.01.90 TYP REVISION A- I2IAS -2I APPROVED DATE SIGNAGE IS TO BE PROVIDED BY TRADE -MARX SI GN d DISPLAY CO., SEATTLE, /06/623- 7676. 2 SIGN MATERIAL IS TO BE "NEVAMAR" HI2 1/8" "DEEP BLUE" LAMINATE. 3. LETTERING SHALL BE DONE ON A GERBER SCIENTIFIC PRODUCTS GRAPHICS 2 OR AN UPGRADED MODEL OF THE SAME MANUFACTURER. TAPE I S TO BE WHITE MATTE #76- 2790IA -I04 APPLICATION TAPE IS #76-P265 1 7A (5/8") 4 ADHESIVE SHALL BE I" ADHESIVE BACKED MAGNETIC TAPE BY 3M OR UTLRAMAG (AVAILABLE THROUGH "MAGSLE SALES" ,'PORTLAND, OREGON ,503 /252 -96I0) A. USE TEMPLATE TO ESTABLISH THE BOTTOM OF TAPE AND THE BOTTOM OF THE SIGN. B. CUT TAPE & APPLY TO WALL. C. CUT IDENTICAL SIZE AS WALL AND APPLY TO WALL TAPE. D. PRESS SIGN TO TAPE BY ALIGNING BOTTOM EDGE OF TEMPLATE MARK. E RE E S IGN ANDK I BURNISH TAPE, FEAPPLY SIGN ALIGNING AlirearnEFJv FACILITIES I L DEPARTMENT O AUBURN, WA .` 98002 0 BE L LEVUE , WA . 98007 O EVERETT , WA 982O D KENT, WA . 98031 PORTLAND, OR . 97220 O .,. EATON, WA • 98055 II SEATTLE, WA. 98124 II CEILING TILE TYP, /r N) ELEVATION 3 " =I - - 0 O / /l/ 0Rbo E STATE OE WASHIWGYON r REG! HT o0 -- HELVETICA MEDIUM LETTERS MOUNTED BOTH SIDES TYPICAL 1/4" RADIUS TYP. AT BOTTOM TYPICAL BAY SIGN AP, 1013 :; T iT E D ,.- - - i APPROVEb BY DEPT ACCEPTABILITY This DESIGN AND/OR SPECIP1CA1 IS APPROVED SIDE VIEW NORTH /SOUTH CEILING GRID TYP. ATTACHED TO I BOTTOM FLANGE OF CEILING GRID WITH NO.6 ROUND OR PAN HEAD SHEET METAL SCREWS TYPICAL -7/8"x / /8 "x 1/16 THK. ALUM: CORNER ANGLE WITH PREDRII:LED HOLES FOR POP RIVETS AND SHEET METAL SCREWS TYPICAL - SIGN ATTACHMENT TO ANLGLE 5/32" POP RIVETS ' (2) PER SIGN TYPICAL. PREDRILL SIGN FOR RIVETS TYP. MIES_ -SIGN MATERIAL IS 1/16" THK. MIN. SOLID COLOR 'NEVMAR' H -12 DEEP BLUE PLASTIC LAMINATE, LETTERING SHALL BE DONE ON A GERBER SCIENTIFIC PRODUCTS GRAPHICS 2 OR AN UPGRADED MODEL FROM SAME MANUFACTURER. LETTERING SHALL BE WHITE. MATTE 1176-- 21901A -104. (2 A -- 121AS -2` I • ' J II • REMOVE AND REUSE EXISTING OFF SIGNS (I /AS- 2I) - AS D IRECTED [�`Y ('Wl�i[ G� RENUMBER D 'A AND RENAME AS n l hr Yrn � B L RENUMBER AND Rl. NAME AS D .REC� ED . PROVIDE NEW SIGNS I F REQUIRED. MAINTAIN EXISTING BAY SIGNS IF POSSIBLE. MOVE OR REMOVE ONLY IF IT INTERFERES WITH NEW WALL CONSTRUCTION OR IS DETERMINED BY OWNER THAT IT MUST BE MORE VISIBLE OR IS NOT REQUIRED. REPLACE ACOUSTICAL CEILING SUSPENSION SYSTEM WHERE SIGN REMOVED. REMOVE AND REUSE EXISTING FIRE EXTINGUISHER SIGNS AS DIRECTED BY OWNER . k['PL ACE ACOUSTICAL CEILING SUSPENSION SYSTEM WHERE SIG `N IS REMOVED. REINSTALL. OR PROVIDE NEW SIGNS AT FIRE E XT I NGU I SHER < LOCATIONS TO BE PROV I DET) BY BOEING FIRE PROTECT ION ENGINEERING: TTLE INTERIOR SIGNAGE DETAILS RECEIVED rI'i'N' AP TI IOWIIA UOI 1 0 1991 PERMITCENTER BEac ENGINEERS ARCHITECTURAL MASTER Kw 9-08 ca i r /i -20 D.C. • DA Yg RECOIL DRAWINGS LAST REVIS SHEtT JOB NO. 91186 $6062