Loading...
HomeMy WebLinkAboutPermit 6848 - Fatigue Technology - Offices6848 91-448 fatigue technology 100 andover park west fatigue technology 6848 'P •F • .: N/C B ED - I• (year 1988 ETBACKS: N- S - E- W- FIRE PROTECTION: Sprinklers ❑ Detectors ❑ NiA UTILITY PERMITS REQUIRED? ❑Y es QNo t publicWorksl_ ZONING: BAR /LAND USE CONDITIONS? ❑ Yes ® No CONDITIONS (other than those noted on or attached to permit/plans) EXP. DATE 12 -31 -91 ARCHITECT Robert ,Zanoni. PHONE 939 -1111 11 ' ZIP 98002 PROPERTY OWNER Industrial Wire & Metal Forming, Inc. PHONE 246 -2010 ADDRESS 100 Andover Park West, Tukwila, WA ZIP 98188 CONTRACTOR Howard Bowker, Inc. PHONE 575 -8175 ADDRESS 1520 S.W. Grady_Way, Renton, WA ZIP 98055 WA. ST. CONTRACTOR'S LICENSE # HOWARB205MT EXP. DATE 12 -31 -91 ARCHITECT Robert ,Zanoni. PHONE 939 -1111 ADDRESS 840 21st Street S.E., Auburn, WA ZIP 98002 t. r rr CITY OF TUKWILA Dept. of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. (0S DATE ISSUED: SITE ADDRESS PROJECT NAME/TENANT USE APPROVED FOR ISSUANCE BY: 100 Andover Pk W BUILDINQ PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES DESCRIPTION BUILDING.PERMIT FEE:. PLAN:ChIECK FEE:': BUILDING SURCHARGE AMOUNT 162.00 105*. '00 RCPT # 3592 :04;15494 PLAN CHECK NO.: 91 -448 PROJECT . .INFORM ' ATION SUITE # BUILDING OFFICIAL DATE ISSUED: VALUE OF CONSTRUCTION - $ 15,000.00 ASSESSOR ACCOUNT # 022300 - 0020 -0 Fatigue Technology TYPE OF rJ New Building Addition fxJ Tenant Improvement (commercial) Li Demolition (building) ❑ Grading/Fill WORK: ❑ Rack Storage ❑ Roroof ❑ Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Adding on two offices, removing two office walls and replacing with one. CODE COMPLIANCE SQUARE FEET /:• • OCC. LOAD SQUARE FEET /. OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD DATE: I hereby certify that I have read and exams -d this permit and know the same to be true and correct. All provisions of lav and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perfor - • - - of work. I am authorized to sign for and obtain this building permit. SIGNATURE: DATE: PRINT NAME: � :.: ::,:..::: , .::.:......:..:........ COMPANY: .� Fc ►2- .. w_-M -vvo L LIAQ This perm/( shall become null and word ff th ork is not commenced within ;180 days from the date o issuance, or if the work is su or abandoned :for a'period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. uirrwvu PERMIT NO. CONTACTED -&t=r;FL: t-t. Q I I DATE READY DATE NOTIFIED 2nd NOTIFICATION [ ( __ I BY: f,r� BY } (init.) PERMIT EXPIRES AMOUNT OWING I , +� � 3RD NOTIFICATION BY: (i nit.) INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized In writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. . • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. SQUARE LOAD FEET OCC. SQUARE LOAD FEET OCC. SQUARE LOAD FEET OCC. SQUARE LOAD FEET OCC. LOAD DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. >E PA`) fl ME Td BUILDING - initial review FIRE O PLANNING O PUBLIC WORKS O OTHER .K BUILDING - final review N)A REVIEW COMPLETED r PROJECT NAME UIREME (ROUTEDL_ tO -W -91 R I p+ FIRE PROTECTION: Sprinklers Detectors N/A FIRE DEPT. LETTER DATED: /073/9/ INSPECTOR: ,57Z- INIT: �►.► INIT: #/9 INIT: 10-30-q1 CONSULTANT: INIT: INIT: BUILDING` PERMIT APPLICATION TRACKING ZONING: Date Sent - REFERENCE FILE NOS.: MINIMUM SETBACKS: N- Date Approved - IBAR/LAND USE CONDITIONS? ( Yes s- TOTAL OCC LOAD n No UTILITY PERMITS REQUIRED? Yes PUBLIC WORKS LETTER DATED: r c? , TYPE OF CONSTRUCTION: UBC EDITION (year): 1945 08/I7/0 SITE ADDRESS SUITE # b ,�a, ©NI 2(k. 9 `x-'Ac ,s A b �Q VALUE OF CONSTRUCTION - $ ) S; O O C . PROJECT \ NAME/TEN' c2ANTT -3 Vim. - r s f � � \ G VA � l"\C.-.. ASSESSOR ACCOUNT # �/`� * OCZTh7 Nl./ - ( C) R V r� ! 0 TYPE OF • New Building ❑ Addition Tenant Improvement (commercial) U Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: p\.,�;\.1, t,-- -. r p-._ cam, 6..-S , N 41...1,.(,-,,:,., a_ ...sx, .\ S - q • , .\ . BUILDING USE (office, warehouse, etc.) C - 'C -:,(_9_, ZIP9'6055 WA. ST. CONTRACTOR'S LICENSE # 7 ,�- a t l� o W - R.6::_-__1_05 M.� NATURE OF BUSINESS: I ...�,,k,,,L-X-.„n , WILL THERE BE A CHANGE IN USE? c E!1`iNo ❑ Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: ca p-d c. Tenant Space: Area of Construction:' c a WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? f .No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER -T- �.S�._C .. a� \f"c �_ . s... _ \c\ -�\ c ‘.0.,, . PHONE �� - 0 ZIP l� l %s s_ r8 c7 5 ADDRESS ‘ Q c:).____. 5� �- 2 CONTRACTOR (A.0,..,..3 80 c.,Jtc.:...12 -. t.vA- c. HONE 5.-1 ADDRESS lS a o SuJ C� A- eakkm -cni.. VJA- ZIP9'6055 WA. ST. CONTRACTOR'S LICENSE # 7 ,�- a t l� o W - R.6::_-__1_05 M.� EXP. DATE ' a _ 3 t ,.., q 1 PHONE 9 3 9 _ (, t \ ARCHITECT eoev2�2.-7 2 r i a k nn -• ADDRESS c3yn r 5 7' S S �� ._._ __ . �7 l ZIP S8c ' . CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 TOTAL - (0-01-91 PLAN CHECK NUMBER DATE APPLICATION ACCEPTED ,HEREBY`.CERTIFY.THAT: f.HAVE:READ AND EX BE TRUE AND'CORRECT AND '1 AM , BUILDING OWNER SIGNAT °f I r fry BUILDIF43 PERMIT APPLICATION DESCRIPTION BUILDING PERMIT:FEE PLAN CHECK FEE BUILDING SURCHARGE AMOUNT MINED THIS; APPLICATION ANDKN TO' APPLY``F.OR THIS:PERMiT DAT DATE APPLICATION EXPIRES 2 RCPT # o h) DATE OR PRINT NAME PHONE AUTHORIZED �..v� C.�. CT S 4�.1 � 1,0._2_,z) AGENT ADDRESS 1 d � r \� \J CITY/ZIP CONTACT PERSON �� �_ ,� C ��so PHONE g q APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. o3/i6/si' COMMERCIAL Specifications: '. NEW COMMERCIAL BUILDINGS /ADDITIONS Completed building permit application (one for each structure) Assessor Account Number Two sets (2) of the following Structural calculations stamped by a Washington State licensed : engineer. Soils report stamped by a Washington State licensed engineer:. Topographical survey Energy calculations stampod by a Washington State licensed.;: engineer or architect. Li Legal description Working drawings, stamped, by a Washington State licensed •:. architoct,which include:. Site plan • Architectural drawings Structural. drawings • Mechanical drawings • Elevations • Civil drawings • Landscapeplan Completed utility permit application (one for entire project) Six (6) s ets of civil drawings NOTE: See utility permit application and checklist for specific utility submittal requirements 1 1 RACK STORAGE . Completed building ; permit application I Asiessor Account Number Two :(2) sets of pians,.which includo Building floor plan showing: •'Entira space where racks will be located • Exit doors Dimensions of all aisles Tenant space 'floor plan showing rack storage layout, aisles an exits, ' NOTE: includo dimensions of racks (height, width and length), aisles . and oxit ways on plan.... Structural calculations stamped by. a Washington State licensed engineer (rack storage 8'. and ovor):: RESIDENTIAL SUBMITTAL CHECKLIST NEW SINGLE•FAMILY DWELLINGS /ADDITIONS Completed building permit application (one for each structure Legal description;; Assessor Account Number Two sets (2) of working drawings which "include: • Site plan s - . (On plan show closest hydrant location Foundation plan includo acc. ,ss to building; showing Floor plan whirr and length of access) Roof plan :: • Building elevations (all views •. Buildirig'cross section ▪ Structural ; framing plans.;: Washington: State: Energy Code data Completed utility permit application Six (6) sots of site plans showing utilities NOTE, : 8ullding sito plan and utility site plan may bo combined ; utility permit application and checklist for specific submittal requirements.. Additional topographical and soils information may be required if unique sito conditions. COMMERCIAL TENANT IMPROVEMENT'S Completed building permlt appleach ication (one for ea' structure o. tenant) :: Site.plan Location of tenant space >: Existing and proposed parking Landscape plan (if 'applicable, 1 e :change Of Overall building plan n . ■Tenant location Use adjacent (common wall) tenant • . 0 Overall dimensions of building or square footage `Constructiondetails :. Cross sections 'showing wall construction and method o ::attachment for,floor:and ceiling . Structural calculations stamped by.a Washiington:State licensed . •• • engineer : May be required if structural. work is to be: done (2: NOTE -lf anyutihty work Is to be done, submit separate utllity er pm application, and plans` REROOF Completed building permit application n Assessor Account Number 'Narrative describing existing roof, matenal being removed, and material being installed NOTE A certification letter is required prior to final inspection and sign off of the permit ANTENNA/SATELLITE DISHES Completed building permit application :Assessor Account. Number Two (2) sets of plans, which include: dis Floor plan. ofproposed :tenant Tenant space plan .with use of, each room labelled:. Exit doors; egress patterns,, New wails;:existing wall; and walls to be demolished:,;: Assessor Account Number Two (2) sets of construction plans, which include one for each structure Site Ptan (showing building and location of antenna/satellite Details' antenna /satellite dish and method of :attachment Structural calculations stamped a Washington State licensed engineer may, be required RESIDENTIAL REMODELS C Completed building permit application one for each structure r1 Assessor Account Number n Two (2) sets of working drawings, which include Site plan plan Floor plan • Roof plan •Buiiding:'elevations (all views) Building cross= section • Structural framing plans NOTE 11 04 unhty work Is to ', be done provide : utility perm appllcatlon and plans must be. submitted. one foreach structuro REROOFS ; Complotedbuiiding pormitapplicatlon Assessor Aocount•Number Narrative. describing existing roof, material being 'removed; an Material being installed. NOTE A certification letter Is required prior to final inspection and sign- off of the permit ' roe : ype o nspecta �� toss; ililiallm Date Wanted: / £ am • Special nstruct ons: 3:15 ✓ Requester: , �.!. Phone o.: 1--: - ID 1 0. INSPECTION .RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved, ear appliCabie F. es- ---- 0 Co reettoR • - . : d . rior to approval. Date:. 1 "/ 1 O r.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite`100. CaII to schedule reinspection. I Receipt No,: 1 Uate: 6g PERMIT NO. (206) 431 -3670 COMMENTS: I) Su 5 GiElLirJEt HA e t`Eh1 cravL =Kev I.,) 1 rims U.1 I tJ S e t C.n_"W rJ . le...C� n-o vl, S!n FI i G 1 Cf.- T CS"7 %1LC$ Arv0 fit 1v. ACc„( F /,2 1rJsP�.;:-Tht.l e 067 - ■1 (FL =c'r z-1 c- F--c 14ki.., , Date Called: 3) o b`norl /4 F1 A ,D ' i . F-r ►J lit- . Date Wanted: -Pr N4TC'. : 5 H A:3 6r�7J o c cAA pil t/.11 riaoua Phone No.: 1, ,4(0 •o2.6/0 n v-iz- V►E 1 .5'sc 0 ,J `-^ems cl w' T�sE /1�a UG J `PMLrvn t 5 , t c- /-,t c-t-r yvh, t".' ,m,- -S A.S.A. f. A & ME 1)/7_01- un c . dF 0 ccv ? 1W G, 11 4-4-e— LA/ 17'Viata.T `i1 E 6" 11- D G 4 0.-p%. N At. 13 I LC,C"6/1.(... • Project: t . i i rC; u t.. "rEr (-t No i,u6 y pe of nT spe E N Address: / az) &t oa 1.t,12. `Q� 1N Date Called: Special Instrucllons: Date Wanted: Requester: G ovi c lL- cA3 pet.L°' Phone No.: 1, ,4(0 •o2.6/0 D,INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 O Approved per applicable codes. �eceipt No.: P • MIT NO (206) 431 -3670 [ Corrections required prior to approval. Date: � 30 12 I Inspector. (i1L.�t_sa- O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Dale: Project: o � c.t - Type of Inspection: 11.te .:. - , C - ` I r1 _ tiosivallarigAls ., Address :: Sp = • a Instruct ons: Date Wanted: I I la - q i am. p.m. Requester: k-Q V 1 Phone No.: (:), C � ••+:wnrm r•L.+.y-?. ": F"'rctF.^•'SgrS^'• ,,... • ; INSPECTION RECORD Retain a copy with permit CITY • OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: LA- t7 .y. 2t f41 g 4e 5 r-m 4. L..r C; ar-- ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. f Recept No Dare: Project; _ ,. -•--- �� � (-0..._ , a Type of Inspection; � // Address: � / l e -(duo r ��' Date Called; Date Wanted: / � / (/ "3-47 2-- �P , m , Special Ins ructions: ` ucti Requester: Phone No,: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. C .INSPECTION RECORD Retain a copy with permit (206) 431 -:1670 ❑ Corrections required prior to approval. COMMENTS: ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Dale: Project: ��� �C u � - 17 . 1 1 �" Type of Inspection: �� i IL6 Address :� ` t)\) 1 W, 1A ) . Date Called: Special Instructions: Date Wanti)c . r f f am. p.m. Requester: Phone No.: COMMENTS: nspector: INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Z ., Approved per applicable codes. 0 Corrections required prior to approval. Date: O . $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. 4,11Lit 1906 City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 -- Project Name tifT1 Address TUKWILA. FIRE DEPARTMENT FINAL APPROVAL FORM / / - ketain current inspection schedule Needs shift inspection Author ie Siwidture proved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: cc ik Pic ii5 - • . Gary L. VanDusen, Mayor W Control No. Permit No. Date Suite # FINALAPP.FRM T.F.D. Form P.P. 85 41111INIMONI■ CITY OF TUKWILA 6200 SOUTIICENTER (BOULEVARD, TUK{VILA, WASHINGTON 98188 Plan Check #91 -448: Fatigue Technology 100 Andover Pk W PHONEY (206) 433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART 0 THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER 1. No changes will be made to the plans unless approved by the Architect and the Tukwila. Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1991 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 9. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary 1., Vitluscu, Mayor "X" REQUIRED INSPECTIONS PHONE DATE APPROVED APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 X 7 Framing 431 -3670 8 Insulation 431 -3670 X 9 Suspended Ceiling 431 -3670 X 10 Wall Board Fastening 431 -3670 11 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 R 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 100 Andover Pk W i BUILDIttG PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING (Ds%\l--M PERMIT NO. DATE ISSUED: DATE ISSUED: PROJECT: Fatigue Technology CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab Insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping Is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 09/14/90 PtAN REVIEW COMME fS Plan Check No.: 3 Project: ►V I( U E, QT ' No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECTIONS 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection Is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and Tight fixture installation is required to meet lateral cD bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Walt Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney X 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. 12. 13. X 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final PtAN REVIEW COMME fS Plan Check No.: 3 Project: ►V I( U E, QT ' No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECTIONS 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection Is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). All high - strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and Tight fixture installation is required to meet lateral cD bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. Fire Department Review Control #91 -448 Re: Fatigue Technology - 100 Andover Park West Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. All modifications to sprinkler systems shall have the written approval of the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528) (NFPA 13, 1 -9.1) (UFC 10.307) Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) 2. This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. Yours truly, City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd Gary L. VanDusen, Mayor October 31, 1991 ONNINIMINIIMONIM OCT-30-'91 WED 16 ' D ::ANO'J I TEL NO: 2L 39 2411 «419 P.1 ZANONIk ASSOCIATES/ October 30, 1 991 ,Fatigue Technology, Inc. do Kevin Dooley Ref; Tennant Improvement drawings by Zanoni & Associates, Inc. Job #; C -91046 ® 100 Andover Park West, Tukwila, Washington In Conversation with "Howard Bowker, Inc" , contractors for this project, there appears to be an error on my part This is the solution as we see it. 1. The walls running N -S were called out to be 3 5/8" steel studs. They should be called out as 5 1/2" width to match existing and to make re use of relocated door jambs. 2, The seismic bracing is to be secured to the existing roof s stem and it is not concrete as per detail O ec. corrected attached detail. J Please correct and advise e Tukwila Building Department of these changes. Thank you; Robert A, Zanoni, F,A,I.B.D. RECEIVED CITY OF TUKWILA OCT 3 U 10 PERMIT CENTER cross bracing at wall sound insulation PLAN REVIE C J CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: "0,4' -' U F ADDRESS: DATE: OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HEIGHT /# OF STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. CHAPTER 51-10, W.A.C. NOTES PREPARED BY: fJ 01 . PLAN CHECK NUMBER 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 DATE: RECORDIN® ;CERTIFICATE Filed for record ithss,3 frfeay of_ gsze : 193Qat : :.c: .., :,;. X, : , in ;book ^77 "��. , SURVEYS at page 23 ''t at -the request of `DODDS'ENGINEERS,,:INC. DIVISION OF RECORDS 6 ELECTIONS of Records NR RO p . 90/23/9 !ij '�` . ... Supt. . °.. ,. N 89`40'24"W EXTRUDED CURB 477.91 450.00 ` , \ \ \\ \ \ \\ \ \ \ \\ \ \ .,\\' \ \ \ R (4 BANDONED CITY OF SEATTLE PIPE LIiVE'RIGHT -OF -WAY) - - - N 89'4024 "W (.) S. LINE OF SEC. 23- 23 -4. ILI■ loam. '27.0 •: c.) 1.53 (PLAT&MEASURED N 84'00'00 "E fP1.AT_1 -- i Zr 27' 133370((PLAT)" N 89'4024 "W °: (PLAT) SE CORNER SEC. 23 -23 -4, NOT RECOVERED PER THIS SURVEY. SURVEYOR'S CERTIFICATE This map correctly! represents a survey made b me or ._under , ST. PAUL MN ' by my di rect i on in conformance , f , . with the requirements of the SURVEY ,RECORDING 1 ACT at the request of 7x 3M COMPANY (206) 454 -3743 OR 665-7877 0000S 'ENGINEERS, INC: . 4205-148th AVENUE NORTHEAST BELLEVUE, WASHINGTON 98007 DW fV J. ' s.' STEADMAN svD R KBRQOKS ` DATE NOV,` a' APPD` STEVEN A.'MERRYMAN, PLS r i; SFiT 7F 2 I La:t.q.•.. •... 'EMIL .71111 r • . , • •• .. • • • 134359 LEGAL DESCRIPTION N $ 31 V aNi1333ti Parcel 1: Tract 2 of Andover Industrial Park No. 1, as per plat recorded in Volume 66 of Plats, page 36, records of King County; Parcel 2: That portion of the W. H. Gilliam Donation Claim No. 40, described as follows: Bc " + ^ ^^:-+ ^^ +k0 -^. oh line of the former City of Seattle la eta. cAL c.a ' awl s tt al" pipe!ine right-of-way, said line being common to Sections 23 and 26, and said point being 1333.7 feet, N894024W of the corner common to Sections 23, 24, 25, and 26; thence N01 2'09"W, 30.0 feet; thence S8940'24"E 480.0 feet; thence SO*12 30.0 feet to a point on said common Section line; thence N8940'24W along said common line 480.0 feet to the POINT OF BEGINNING; 1 EXCEPT the westerly 30 feet for street; Parcel 3: That portion of the northeast quarter of the northeast quarter of Section 26, Township 23 North, Range 4 East, W.M., described as follows: Beginning at the northwest corner of said northeast quarter of the northeast quarter, said corner being 1333.7 feet N8940'24"W of the Section corner common to Sections 23, 24, 25, and 26; thence S8940'24"E along the line common to Sections 23 and 26, 480.0 feet; thence S0*12'09"E 124.0 feet; thence N8940'24"W 480.0 feet; thence NO'12'09"W 124.0 feet to the POINT OF BEGINNING; EXCEPT the westerly 30 feet for street. 1 SE 1/4, SE 1/4, sEc43 , T. 23 N., R. 4 E., W.M. • r * F I ; ; 4 ; N0.18 , 1 1 1 1 1 1 1 1 1 1 1 . 1 . 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 1 j 1 1 1 1 T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I n ! 1 1 1 1 r11 r j 1 f 1 1 11111i11 f11111111 L9 8 7 1 NOTES 1. Description of property was supplied to DEI by the client and is the same as that on Warranty Deed filed under King County Auditor's File No. 5470719. 2. This survey is subject to any facts that may be disclosed by a full and accurate title ttearch. 3. AREA OF SITE = t 217,791 square feet or ± 4.9998 acres. 4. No attempt has been made per this survey to determine the existence or location of. all easements which may serve or encumber this property, only those easements shown on the Plat have been shown. 5. Building setbacks ere as shown on the plat. . 6. Building location dimensions are as measured at right angles from property line to ex4erior building corner at position indicated. 7. Utilities may exist on this site. No attempt has been made to locate any utilities per thit survey. 8. This survey represents conditions as they existed on November 1. 1990. All survey control indicated as "found" was recovered on that date unless shown othervvise. 9. All distances are in feet. 10. Control traverses have linear closures of at least 1:10,000 and , angular closures of at least 10 seconds times the square root of (where n = number of angles per traverse) or 3 seconds per angle, whichever is least. 11. Field equipment includes 1 second theodolite and electronic distance measuring equipment. I . 11.drs set Iwt ri trits survey are aeciarea to you oasea upon -- the professional skill and judgement of the surveyor. It does nct constitute a warranty or a guarantee, express or implied; nor does it relieve any other party of his responsibility to abide by contract documents, applicable codes, standards, regulations, and ordinances. SURVEYORS DECLARATION I hereby declare to 3M COMPANY that this map is based upon an actual survey of the lands herein described, conducted under my supervision, and that the information shown thereon is correct, tho improvements are shown correctly as they existed on this date, and there are no encroachments either way across the property lines except as shown. Dated this iO day of A„ 19 en .. # :2 ofessional Lan. - -yor Certificate No. 1 • State of Washington -• 0), s' w in 11- to a 0 E. w w wo 2 rf; w > w < w > I co di tn, 0 > 0, 11) 0 0 J O ! ( 4 1 t Cl u 3 !_ I iifili I ;,iCI .'i!'liI '"`; i ilffri I II fl1I11i! 11 i y 6; 11 <II1�11 B'' �11I1111 G e' IIIfIIf 111111I11111111I11.1 9 ' S i �r i t °E ,# .: 11 flil1111��> ' w r. hirri.'ff i1t L is 316" min. - jamb an^hor` wt. 6 4 c'48 36" USG type S pan head screws Flre•rated construction Detail & physical data USG type., screw 11 1 z / L STL s 3rlr. -I-1c Vi;l TT p) 20 (2-A. ° A1T H W t~1TL. %F' I t-, 'ti`s K>~Q t7 (CONK. c? c '•o "o.c. Op L L ..) (3)# to 5.1-i. 1ZE W r1s, ' c HP MIN. Jamb corner intersection 0 K, • metal trim DescrlptlGir & test no. Steel Stud—h SHEETROCK, brand gypsum panels, FIRECODE core -3 "studs 24"o.c.— single layer panels vert or horiz appl & screw aft— joints stag & tin — perimeter caulked —UL Des U485 —based on panels horiz appl—GA-WP-1200 ST20 steel studs- see good design practices BRACING AT WALL Drywall steel - framed assemblies— non -load bearing )'AGH G?�f7- j''AGIFIG _ -•o f.")(11: H IoUIN& coNG. rt.00R WI "PAHS�T =✓ i �,y�;�� (' %! 1 . �C'ti' �'.ATIc i: : "" /. e o - ;c) Y ;"a H I1TI!V� , r GT A 1 � � rte!I�•Z) / c' e 1 � . cf.-1L11-16 `TIL.. N % riff:, (?) 4 o L T e i rA. c 7 H .) t 5 TP\I-4PAI.t7 ? 11 - 110 c? 2 : - STL, - o o. c. �T UP� W `/g "11'Pf 'x'G'(r. 37 !A S PE No : AT'"!ENyJPPorrSt2'! ALL ovEP.• t3'- ,!1 LE1-161 t`PPovI2 W. 'NAIL ' >T-ACINC <0 XVST. >rt•cr F K A ' AS } q 2. To t..11111,1-AND S Lt'./ '. F. Lkr pA1- R'PcE. Acoustical performance steel studs runner screw attached to strut stud — floor anchors secured with no less than two suitable fasteners STC Description & test no. 40 USG - 860808 49 Based on 3" SAFB in cavity panels— SA- 870717 51 Based on 3" SAFB 25" wide, creased to fit cavity--TL-85-128 Elevation cross- section through frame Folder reference 1 SA -923 72 SA -100 /USG Corporation 11 cripple stud- min. clearance locate jamb anchors as required-- anchors on strike side to occur directly opposite hinge side for 3 -piece frames partition runner anchored with two suitable fasteners BRACING, SEE SOUND'`ATTEN. BATT FOR 2' — EACH' `SIDE OF PARTITION c TL.CORNER " TYP. ACOUSTIC SEALANT (TYP) # 12 SHT MTL SCREW TO CLG MAIN RUNNER,' 0 2' -0" 0.C. 4 USE 1 8" "X 1 BLACK FOAM , BETWE MAIN `CLG RUNNER AND PARTITION TRACK 2 1/2' SOUND ATTENUATION BATT EACH SIDE 2' 1/2" X 25 GA. ;'STEEL 'RUNNER ANCHOR C 2' -0" O.C. TYP, hanger wire exposed spline -- cornpressibte gasket • 111 1 11 _IPA KI I T I aN TO PXPo T IT 1't' 7- , L r .,a — sealant r -4 T 1 111111111 11111111111,1111 M.,,w;5 I Top set Ye SHEETROCK brand gypsum panels, FIRECODE core 11IERMAFIDER SAFB GENERAL PESCRIFTION OF WORK: LOCATED At 100 ANDOVER PARE; WEST, SEATTLE, WASHING' ION 9818& DEMISING M 5/8 GWB TYP. 'I'1'1' NOTE J REMOVE EX INO, DOOR AND JAM15S IN { EXIST ING OFFICE #2 AND RE- LOCATE' IN NEW OFFICE /t8. rHE INTENT or 1 HIS NON STRUCTURAL "ILNANT •IMPROVEMENT 1- TO REMODEL THE NORI HWES r 3 OFFICES INT 2 LARGER OFFICES, THEN TO ADD 2 OFFICES w SGU 1 H OF EXISTING OFFICES ON WEST WALL. OF=FICE #8 10 BE EXACT LY - FHE SAME= AS TI - IE RE !v1AINING 3 OFFICES FO NORTH ll' -I'X 1 ' =4" 1.S.Iv1. 1E;;IE NEXT OFFICE: /19 BE I4' / X 13 -'1" I.S.M. - I HIS I ENAN I IMIFROV M1LN r WILL' NOT EFFECT TF 1E;SUSt"PENDE D CEILING SYS IBM OR ! HEAD HE SPRINKLER . ,. HEADS' IN THE AUT Ole lA l [C FIRE SUPPRESSION SYSTEM' OR IF IE CEILING LIGI I1 ING LAY OUT. (1) 3068 DOOR & JAMr3 SHALL BE REMOVED FP N = S F `0 1 E_Xf � 1 ING OFFICE #2 AND BE RE- LOCATED IN NEW OFFICE #8 REMOVE EXES f ING CARPET /PAD: E3ASE AND REPLACE WI rid NEW CARPET AND PAP AND BASE. WALL WILL ESE STEEL STUDS 5PE X E A C I " 3" DS WITH /& TY r - _ " "E C 1 SIDE NIETf-I FRICTION Fir SOUND BA1 - 1 "S IN ALL WALLS. SEISMIC BRACING OFF TOP OF WALLS 10 EXISTING EUILDING ST, >;UCrURr_. _ r G � T" NO "rE l REMOVE EXISTING 'TEAK PAN, 't.LLING AND ALUMENUM DIVIDER MULLION Al EXIS1 ING OFFICES 1, 2 & 3 FOR RE- LOCATION IN OFFICES 7 & & 9 ON !TIE. EAST WALLS #16,. #2 INSTALL 5/& TYPE: "X" GYPSUM BOARD ON REMODELED WALLS, FIRE:1A1'E READY FOR NEW WALNUT PANELLING ELLIN� TO BE INSTALLED ' I i � `. LLCD ON ALL W><�, _ -�•: CLOSE' DOOR OPENING. IN EXISTING OFFICE #2 . NOTE 2 REMOVE EXIS TING STEEL STUD NON LOAD BEARING WALLS T I DIVIDES OFFICES #1, 2 & 3. ` PLACE NEW 1 HOUR RATED USG #&60&0& '3 5/8" STEEL STUDS Ca7'24" 0 /C` WITH 5/8" TYPE "X" GYPSUM BOARD EACH SIDE. PLACE 1/2" THERMAFIDER SAFE Cad CEN1 ER 01= WALL. FIRE TAPE, BETWEEN' NEW OFFICE ' #1 & 2 FRAME IN NEW 13/4" SOLID CORE WA(1NItJT 'DOOR ' AND Si EEL JAMB, PER DETAILS. corner reinforcement Partition corner rirKTITIO DeTA1 LS TIIERMAFIE3Eft SAID (optional) joint reinforcement --► • : . . any . 1 11ERMAFIBER SAFB (optional) COPES /\ND REGULATIONS 2 :, max. ``THERMAFIBER ' ', C\ j j • SAFES �� - � . J L) Sound-Isolating partition intersection SEPARAT � � ' � W¢" Ilt"h11� Jtt PERMIT AP1 `�.; Nalo` Framag•taiu. APP f i NIEGIO Rtca REQUIRO 1 CITY OF TUKWILA APPROVED NOV 19 V BUILDING DIVISION NO1 E- 4 1(. & & 9 FRAME IN NEB\' AREAS ' %�11 I`l,'l`5/ 1'' S rift, STUDS C� Q°''O)C wi rFE 5/6" TYPE "x" GYPSUM BO EACH 1 SIDE. 'ANE' 11%2 " THERMAFIBER SAFE INSULATION n CEr1T ER OF ALL WALLS, FIFE FAT "r_• EAST WALL TAPE & TEXTURE, PRIMER AND 2 C rS ACRYLIC SEMI GLOSS''PAIN I REMAINING WALLS. SECURE' "1 EXISTING FL OOR''& SU.)fENDED CEILING SYSTEM PER DETAILS ATTACHED. N'OT"L 5 PLACE ELECTRICAL DUPLEX OUTLETS IN NEW OFFICES #1, 2, &, c4� ? iN 11 SAME LOCATIONS FOUND IN OFFICES 3 T11ROU G117. PLACE NEW 1 ELE: PI IONE. ANF C0Mi IUNICAI IONS OUTLETS PER. 'FATIGUE ' 1LCI-iNOLOc2Y, INC REVUIREMENTS. PER'APPLICATIONS ENGINEER CHUCK COPPLL NOT E 6 EXISTING 0068 13/4" FEA1. POOR, r0 BE_` RE -LOCA 1 ED iN OFFICE. #9: (1) DOOR WILL BE SALVAGER PROVIDE NE\'v' DOOR JAMB. NOT - E'7 11\ 1ALL NEW PRE -BUIL FR FINIS '.. `L FINISHED BOOt.CASC Sl FORAGE UNITS PER "FAI(C JE TECHNOLOGY INC." PER APPLICATIONS ENGINEER = M, R HOC 0 S C .,[ .CE_R r 1r'. CHOCK COI I'LE. •1 HIS PRO• -!ECI .SHALL CONFORM! TO TF - I E_ CCI•Y I L OF TUKWILA' _J IrPI BIJILD•NG DCP,AR 1 AID TI�1C 11CNT : Y �, .�W CI - r1r 0� ANCC OlAMIMILNf)M1EN15 GOVERN`l!ilS PROJECT. • ROBERT T[,, 7ANONI F:A.LB.D/G:S.I. PILE COPY I understavki hat the Plan Check approvals are subtetfi to erP&'s and omissk ns a"nd approval of plans does not authorize` he V1616066 of any adopted Code or 'ordinance. Receipt of contractor's ropy of appeov . Tans a nowlectiged. 0 . # . ....am..., ......... r.) 0 r_‘ ( LU rr_ co 1- `J <L C il) w u u`) C.1 Cat '.J lit f! - <) . rr . 1J L,J r �!J ,, J l7 Lt. J i r :1_1 iJ (L JLl_ . " !l_ -i: L � r 0 w 0 ? U cc 1- iti 1i T. 0 , «o r V) e.) LU : -; f G... i t -i f ' ) s 1t1 T,, • It V 1 `S J <1 ll_ z n• O Ili 7_ 1. t u O. - 1.I .:,4 LO ,t 1 -, w ' : J • a: n r.. 6-1 4' ,J CYO '' 1-- t L 7 PERMIT CENTER kni©El 840 TWENTY FIRST STREET SOUTHEAST (206) 939-1111 -e • • ®Z7 FATIGUE TECHNOLOGY THE EMPLOYEES OF ZANONI & ASSOICATES ARE NOT ARCHITECTS AND DO NOT REPRESENT THEMSELVE=S TO BE SUCH: Q NI ER: - � T � EVERY EFFORT HAS BEEN MADE TO AVOID INACCURACY;; IN THE PP.EPARATION OF=D THESE PLANS, HOWEVER THE DESIGNER CANNOT GUARANTEE AGAINST HUMAN ERROR. SIT IS THE OBLIGATION OF THE BUILDER -OWNER TO CHECK ALL DIMEN- SIONS. , DETAILS. VERIFY SAME. AND BE RESPONSIBLE FOR SAME. THESE DRAWINGS ARE THE PROPERTY OF ZANONi & ASSOCIATES AND ARE MADE TO THE PURCHASER FOR . - ONE TIME USE FOR A SINGLE PROJECT. THESE DESIGNS, IDEAS OR LAYOUTS CANNOT BE REPRODUCED WITHOUT WRITTEN PERMISSION OF ZANONt & ASSOCIATES INC PANEL SCHEDULE On 14 C.L. LocArspH CISCLIITO W1K 4. 3110{1.014401. A 177/444■04 a...v.3u. - 11 IP 104 I 3/ 4 3044 robrreCO344 IS , t74 1713 -, .$3 - •rt -- 1.13141,40 HO: SH3 MIK 1 .. afeja 5 __ TiapaPP POOH • ___ C _ ... _„... _ 2 0aOreter1/441e14 A uson. I A PSN:r1SA - ' - ''. _ 7 Ip. Has. _ .3 SP:33A 7 1 IP-SPA - - 1 a...a 4 er- •O• 3 IS 31-11.4. _L •3 - , 7, - - 2___ - , - ,._ - = •,2 _ PANCL C __--,_ PANEL E _.'"'' C"."-'' - P - LiaprriNe - LTA. G....L....7_ _ , 0 _ E__:= 120/200V 34.er rOrrII a:a a PH. r • H, 10.44 mere _ P comng... . .,,,,,,,,70:”._ Room _ ,_ r.a.s....• fere0“. o4CCN•roCAL._ ea tr... 3 6 k.I3E ...Coe • Oe 0 rcr otr errs" is Der.7 $414440.4 . - • or KM I! ■■ HP-- -, Foaavais rep.p.,...., 001 -_ 004•443444.1 _ 4 , I•12 - .7ruya.aps.3 .., Art atm cot•ro ....--, _ sox. morn. sae. _ z er-104 7_ .00v-3. t 34.4341.4 — - ...7. _ l a* so. 13327.3.raiaraPeapcs PH I •Hav a o, :at, 44.3 _ _-L Pram recr rex 44400.0141444 era. ( SOW 4•14111 1 _ r , _ • - - 4 i•CO I r 10...7SP.— 3004 i.e. -". 1 41•14-7044 41 dee* 3, -, 41.3,3233 - --- 144.4.-4.000 • •.-..a 73 3 - - • _. IAKEI- H_ _ _ • .00444.4 0444L.L 14, • ■ T4.11144e1 - • • . A".. ' • / $ A •VP PAPS !.. -- 3.‘ 3 OrILY - 0•30044444 pow.. •171,1.11•11, 3 feu. (.3.7. 4444 17157 1 — /4/0114 OKLY / =.14:- — --• ' i 1 :7::::::::-....rAt. 1••••—, --- -- — — POWER DISTRIBUTION ONE LINE DIAGRAM. ttqlitEs.F.:477 n I T E PLAN ,• 143 Pra• 6451,11s 041141 "A•07.7. ams■/ BA SE DETAIL PARKING LOT LUMINAIRE . 4 • CUPL. mammr•cm • 03.0* 37 Pirrao 494 4 .a 'Hp srtac. 11-11,4C1.1 • " Hon. .3.11.6.7. ▪ . ; MOT. 613COPMS, SPir[1.1 • marow an•ATut ' • .,. GAMUT sTws . ,l1H:141004 Sal tr. PHOPTAcs.p. 21 W44 POLK • . CLOCK oUPLAT •. 73L. .111.67 csmaorr saucy...Au N curt m So.tmi aN•cs....ez st...ort L.A.... uP1HPOLooft La.,7 •l000 WHAM 1 MC. !. 1,16134 PA•KL, two 'own. .4,P•m!Tv .0 Norco au MAN- - • , LEEND , - ou7L. O 6731.7 LJ3447 caUrLill O fleta. 3.13■3313 LiGarr ommr ev /0406 cirdovc j FL.1.1.43.3aPPIP 7.37LPI • ti•E•T•F•' tr.:n":::„„`•`°"" "*" g 04444.4T .04 844343440 eue.v 414,‘ CONDUIT STUB, - UP DETAIL' Nor 'la sc.. .37: 1-41 .3 OCCCI COOL 'CCM S • if, 2CV. $ 4.144 6I• 7ass • turmit Mom ...mom mat TI-MST SITE ?L A3 AND DETAILS PLICAL ANC:. VARS.-IOUS& BUILO r P4 MINNESOTA MINING MANUFACTUZING CO. E-1 ANOOVECE INOLArralAA. FisJEK. TVICWILA,V4SI4ru61o71 7 7 BINDON AND WRIGHT • ARCHITECTS srca III SWITCH !GILDING • • SIATTLI, WASHINGTON 04 - _ c/ op ru OC'T I*1117- kNrk-5, 4 erereer: ,