Loading...
HomeMy WebLinkAboutPermit D01-144 - FITZTHUM RESIDENCE - ADDITIONJAY FITZTHUM 14725 57TH AVE S - — 02.615 frt pil,c0-(A;tA D01-144 rgegnirMEMW . . City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tu.kwila, Washington 991 :? WARNING: IF CONSTRUCTION BEGIN BEFORE APPEAL PERIOD EXPIPE5, At F'LI.ANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 808860 -0005 Address: 14725 57 AV Suite No: Location: Category: NGAR Type: DEVPERM Zoning: LDR Coast Type: Occupancy: PRIVATE 'GARAGE Gas /Elec.: U5C: 1997 Units: 000 Fire Protection: NA Setbacks: North: .0 South: .0 East: .0 West: .0 Water: TUKWILA Sewer: TUKWILA Wetlands: Slopes: N Screams: Contractor License No: OCCUPANT FITZTHUM RESIDENCE Phone: 14725 57 AV S, TUKWILA WA 98168 OWNER HEBNER JUDITH A 14725 57TH AVE S, TUKWILA WA 98168 CONTACT JAY FITZTHUM Phone: 206 -901 - 0093 14725 57 AV 3, TUWILA WA 98168 k k* k* k k** k* k* *** k k k k k k k k A k k k ** k k** k ** k k k 4 4 A A A k A A k Permit Description: CONSTRUCTION OF AN 850 SO FT ATTACHED POLE BUILDING. * k•A k k k k k k A k k * k k k k k k A k k 4 A A A. k A 4 A *WA k i A 4 A k 4 4 k 4 A k A A A 4 A k 4 A A 4 A k k A k A 4 A k 4 4 4 4 4 A k A 4 k4 4 4 A k A Construction Valuation: $ 19,:25.00 PUBLIC WORKS PERMITS: A(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk/CSS: N Fire Loop Hydrant: N r4o: "Size( in): .00 Flood Control Zone: N Hauling: N Start Tine: End Time: Land Altering: N Cut: Fill Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: rJ Private: N Public: N Storm Drainage: N Street Use: N Water Main Extension: N Private: N Public: N k k k k k k k k * k k A k k k k A k k k k k A k k k A 4 4 A k k A * 4 k k k k 4 k 4 4 A k A k A A k A A A 4 A 4 k k k A k 4 k k A A k k k 4 A k A k k .4 AA TOTAL DEVELOPMENT PERMIT FEE`:;: •5 5 ?4.56 A A k A A k * k k k k A k k k A k k k k k k k k k k k k A A k k 4 k k k k A k k AA k 4 A 4 A A 4 A k A k A k k« A 44 A 4 k A A k A k A A k k k A A A A A k 4 4 Permit Center Authorized Signature: Date: I hereby certify that I have read and examined tnis permit and know the sane to be true and correct. All provisions of law and ordinances governing thi, work will be complied with, whether specified herein or not. Signature: Print Name:__ DEVELOPMENT PERMIT k A A A 4 4 A 4 4 A 4 4 4 4 4 4 A 4 4 4 4 4 4 4 1 4 4 , 4 4 4 4 4 4 1 4 4 4 4 4 4 4 1 4 A 4 4 .A A 4 4 4 Permit N+ :,: State Issued: D i re (206) 431 -3670 DC 1-144 ISSUED 09/05 /2001 The granting of t h i s permit does not presume to give authority to violate cn cancel the provision of any other state or local laws . construction or the performance of work. i am authorized to sign f . r and o b t a i n t h i s development pertmtt. //' / Date: This permit s h a l l become n u l l and void if trte wor'E. is not cc!n;il'en. = 4 : ti': i rt 180 days from the date of issuance, or if the worn i'_ suspended or _i :,an.ioneci for a period of 130 days from the last. irr_pection. A 4 A 4 Address: 14725 S7 AV S • Permit. I. D01-144 Suite: Tenant: Status: ISSUED Type: DEVPEPM Applied: 05/16/2001 Parcel #: 808860-0005 Issued: 09/0'..v/2001 k 11, kAS A*Ai A k 3 f l A & k & tAki.A.(At 4.4A1.1AX 1A1 Permit Conditions: I. No changes will be made to the plans unlese approved by the Engineer and the lukwila Building Division. 2. Engineered truss drawings and calculations shali be oo site and available to the building inspector for inspeetion purposes. Documents shall L>edr the seal and signature of 3 Washington State Profeesional Engineer 3. All construction to be done in conformance With apprOved plans and raquirements'i5f the Uniform Building Cud. 199 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Ldition). 4. Notify the City of Tukwila Building Oivi':ion prior to placing any concrete. Thi:: procedure is in addition to any requirements for speeial inepection. 5. Validity of Permit. The issuance of a pecolt or approval of plans, specifications, and computat,ions ehall oot be con- strued to be a permit for, or an approval of, any violation of any of the provisions of the building eode or of any other ordinance of the juriediction. Ni permit presuming to give authority to v i I o.ciee or cancel the provriione of thie code shall be valid. 6. Electrical permits shall be obtained through the Washington State Division of Labor and industries and ail electrical work will be inspected by that agency (243-6630). 7. All permits, inspection records, and approved plans ti& 1 1 be available at the job site prior to the start of any con- struction. These documents are to be maintained and avail- able until final inspection approval is granted, B. Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off- site or into existing storm drainane facilities . 9. The site shall have permanent erosion contiol meaeures in place as soon as possible efter final grading has been completed and prior to the Final Inepection. I hereby certify that 1 have read these conditions end will comply with them as outlined. All provisions of law and ordinancee governing this work will be complied with, whether specified herein or not The granting of this perffiit does not presume to give authority t violate or canoe) the provisions of any other work or local lawe regulating construction 2r the perform6nt..o of work. // Signature: Print Name: CTTY OF TUKWILA 1') a t e Project Name/Tenant: Type of work: ❑ Now Single- Family Residence ❑ Addition - Single - Family Residence ❑ Interior Remodel- Single - Family Residence ❑ Residential Accessory Structure' ❑ Remodel /Addition to Accessory Structure ❑ Deck(s) - Covered & Uncovered ❑ Residential Reroof Value of Construction: r / '7 b` Tr , `) , Tax Parcel Number: Xo 0 - cis - �'C7 Site Address: / l City State /Zip: yi //1 1y)1 gR/ L. __sq. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck Property Owner: — Proposed New Square Footage: sq. ft. Dwelling sq. ft. Covered Dock(s) Phone: Street Address: City State /Zip: / 4 /702 S c7 -112- j.ut S . Irf(5 w; / LL Fax #: Co tractor: , Gpt /M S ECL P)k r. 61/1/6 'For an Accessory dwelling, provide the following: Lot area Floor area of principal dwelling Floor area of accessory dwelling Phone: 7) 61C- b" c.2 - `7 7 4 R' Street Address: _ City State /Zip: 1 Y rg Co e G S j�`fcc:J _ j UU,v1 jl £4/ t.LA- et ica Fax #: 5 >2 ' 7 & 0 TS• 0 5= 3) F'{/ Ar itect: ) P fill- 5 i C Ge 61,c1 t. i t ∎L' r•, 'S Phone: S7l-iL-C- Street Address: 7 A c City State /Zip: Fax #: 5 ;fir i'L. F ineer: _ K f-,iNS r/ur,-.n-J r i ?/ 1 Phone: V_. 'Cv -3 y7 - `iaff Street Address: City State/Zip: Fax #: Contact Pertson: AAA.. Ci Q_ CC (- 1i -c G cc vg --' !' i 2' t/ Y M City State /Zip: r4. v, jo Gct Phone: '',2_:) 0 - 61 / -cle et Fax #: Street Address: / c17c� -5 •'7 -u /2 u 5' /t r Description of work to be done: G i l l r � - 0-c ? /9C' / /C? l 2 L L / 6, Type of work: ❑ Now Single- Family Residence ❑ Addition - Single - Family Residence ❑ Interior Remodel- Single - Family Residence ❑ Residential Accessory Structure' ❑ Remodel /Addition to Accessory Structure ❑ Deck(s) - Covered & Uncovered ❑ Residential Reroof Is this site served by: ER,sewer ❑ Septic (King County Health Dept. approval required - 296 -4722) Existing Square Footage for Structure: / 2 / S sq. ft. Dwelling sq. ft. Covered Decks) __sq. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck Proposed New Square Footage: sq. ft. Dwelling sq. ft. Covered Dock(s) 7O sq. ft. Garage /Carport sq. ft. Accessory Structure(s) sq. ft. Uncovered Deck Floor Area Ratio: (total floor area of all structures divided by the area of the lot) .. 0 - 'i 'For an Accessory dwelling, provide the following: Lot area Floor area of principal dwelling Floor area of accessory dwelling * Provide documentation that shows the principal owner lives in one of the dwellings as his or her primary residence. 1 Single- Family Residential Permit Application CITY OF TL' "'W ILA Permit Center 6300 Southcenter Blvd., Suite 100, Tukwila, WA 98188 (206) 431 -3670 Date application accepted: Date application expires: Ow /b e /1 . OP SFPERMIT.DOC 2/13/97 Project Number: Permit Number: Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. APPLIICANT`REQUESTFOR rYBLIC WORKS SITE/CIVIL'PLAM REVIEW OF THE FOLLOWING: Addlllone' reviews shall be deterhilned by the Public Works Department) ❑ Channelization/Striping ❑ Curb cut /Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Flood Control Zone ❑ Hauling ❑ Land Altering: 0 Cut cubic yds. 0 Fill cubic yds. ❑ Moving an Oversized Load: Start Time: End Time: ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension 0 Private 0 Public ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: ❑ Miscellaneous Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be re- viewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall ex- pire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. PLEASE SIGN BACK OF APPLICATION FORM • R STAFF USE ONLY Application take by: (initials) BUILDING OWNER OR AUTHORIZED AGENT: Signatur ��� ....0- -- Date: ,,,,_ Print na — ----1 . . • (:.-4 T / : /�f'' . Phone: Vii/[ -�i) j,/°'j 1 Fax #: •1 , 7 Address: el /St t /Zip: ;- +„ Y • , P • , • v . ► / I: r / II if ▪ • LOWING: DRAWINGS PREPARED BY A REGISTERED ARCHITECT OR PROFESSIONAL ENGINEER MAY BE REQUIRED BY THE BUILDING OFFICIAL ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN > Bt' .DIRc SITEILASIS AND UTILITY PLANS.ARE'TO B ;COMBINED • ` , � i N/A SUBMITTED ❑ ❑ Copy of recorded Legal Description from King County ❑ ❑ Certificate of water /fire flow availability (Form H -11 a). Contact the Public Works Department (206) 433 -0179 for servicing district. ❑ ❑ Certificate of sewer availability (Form H -11). Contact the Public Works Department (206) 433- 0179 for servicing district. ❑ ❑ Metro: Residential Sewer Certification (if Tukwila Sewer District) (Form H -12) ❑ ❑ King County Health Department approval for septic - 296 -4722 Four (4) sets of working drawings, which include: ❑ ❑ Site Plan (see example Form H -16) 1. Existing fire hydrant location(s). 2. Proposed access road. 3. Driveway location - driveway shall be 10' wide minimum and 20' wide maximum. If driveway is over 150' long, driveway shall be 20' wide and have an approved turnaround (City Ordinance 1741). 4. North arrow and scale. 5. Building setback from property lines. Any proposed or existing easements must be shown on plan. 6. Public Works review requires the following on site plan: driveway location (10' min., 20' max. width), show proposed and existing power, water and sewer lines, existing storm drainage system, downspouts and foundation drains, and where drains tie -in. 7. Parking plan. w 8. Lowest building elevation (if in Flood Control Zone). a 9. Estimated /proposed topography at 2' intervals and proposed elevation of lowest floor level. u� 10. Identify location of sensitive areas slopes 20% or greater, wetlands, watercourses and their buffers. d 0 11. Identify location and size of significant trees that are located in sensitive areas and buffers or the U? shoreline zone. Of those, identify which are to be removed (Title 18, City of Tukwila Zoning Code). j i 12. Identify location of high water mark of the Green /Duwamish River if site is located within 200' of the rn u. high water mark. ui 0 13. See Public Works Checklist for detailed site plan information required for Public Works Review (Form H -9). Foundation plan and details = 0 Floor plan H- W z � Roof plan z O Building elevations (all views) w • w Building height • 0 Building cross - section o Structural framing plans and details necessary to completely describe construction w w U Washington State Energy Code Data (Gas /Electric /011 /Propane /Heat Pump) Form H -15 available u_ g at Permit Center OR Prescriptive Heating System Sizing Chap 9 Form H -6. z Complete Land Use Applications if not previously submitted (Le., Reasonable Use Exception, �—, Variance, Shoreline or Tree Permit). z Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance and other land use or SEPA decisions. If dwelling has a septic tank, and a bedroom or bathroom are added, provide written approval from the King County Health Department or the Tukwila Public Works Department prior to submittal of permit application. ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Bulid10:pifiinerlAwhoifzed Agept If the applicant is other tharj the ownet; treglsterod architect/engineer, or contractor licensed by the State`of Washington;' a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. SFPERMIT.DOC 2/13/97 * Or tt 3- * it Ift 4 * ft.t**A**** f. 7' : A 4 • A • A el 1 1. e• 0. !, j• • f CfrY OF rUKWIL4, W1A *************14**ttA* 4*f • • i• TRANSMIr Number: R0 P).0..,:lt Amcuni7: VifvmEnt he-thod: CHECt. P t , r h i t N o : 0 0 1 - 1 4 4 : E. r E t ' E . L . ( . 1 ; ;' h 1: E;Ite Addreiis,z fiY Th)t ri(vnit,nt ::!ELel 1 i=li...1. ti::. * * * * * * * * * * * * A A 7k 74 * * t‘ 4 A * f 4 ik '7% 7'. * * * * * * 4 ir * 4' * • 7 4 '. 4 7' i . A .* 1 i .A A- 1 1 IV • i 1 7 * 4 f Account Cod Oe:-11:01oti,.)o ilMCMG 000.-"341 PLON CidECt. - PEE: . ... - ,.1. t to 1 " • 0. k*k*4*4*4 k 4 At k A k At 4 k k '4'4 4 i k k 13 4 4 4 4¼ 1 4-k‘ci-4‘41'yht4i,, (;11V Or 1UFWIL.Vt. tA-4.N4*It*A***4*A44 A5 A.*A44 FIr41,4414 44 44 fr4 4 i44 4 t4 4 4 i'4‘,4 4 i..hkA4 4 4 TRAWAT1 Oumber. itIt'ur i. r ■'C'!Tht,,j ------------- PaVMent 11 th 1 c :tt - _ PgrNit 0°1-t44 y 9 i) V P !F. 12 .1 t t 1 ! i ■ f 31tt-i? Lly Thib Vi;vmerit :c:!').7:", t (-LL vrt:. 1,itirtt . ,)•: 4 AA*01 134 *114*A**4 1 1 4 4 -A 4 A4 :14-4--?Alk.i•'—;t1\.,'1'**0...:, 44 4 i 4 * 1 •:. 7i• . • 4 T , i a 7 • i7 4 ,4A.,... A Aci:oktilt C.odt.,? Deicotpt:tc,it 000/322.100 [3j] ¼1 - VEE, 000,'386.904 3TAN: aDtLDINC :30RLH,=tRi776.: Projec • ". Type o( spec ' n. Address: «~ t Date calle a Special instructions: ((7 -: f 1 , ,' 4- •� Date want ,. r / a.m. p.m. Requester: r . -- "`, 7 - tri'Y°i/ Phone: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA OMMENTS: INSPECTION RECORD Retain a copy with permit Approved per applicable codes. P 4.W.1tTe cL' pI4 ut: # b97-Neri +Yu pitta,c(9& imAlvd PERMIT NO. 306}431 -3670 Corrections required prior to approval. $47. i 0 REINSPECTIO REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blv. , Suite 100. Call to schedule reinspection. Receipt No: Date: 48'60 1- 4 -04 -01 5cY 30 '96 07:08 FR ROcutNS ENOINERING 206 347 5929 TO T. ON oniN TYPE SPAN P1 -111 2 4.3 240000 4 1 UALStstr -- rer$toil 36.5.4 !t:''I DAM •40.56 .:.t sus LONSIA PS TOP .I$ 22 6 D7L•fl1 1495 STA .97 22 4 8P1. 2400 VL$ All 2X 4 SPr -STD 475 RZCLPTIONS t 2-5 32 4 V -12 1274 2.0 SANS AS 1.5 LAVIMA . s5*c:xc4 TOP CSOS0 • 24 12. Oc STK CXOtD - 41 Ii. Oc T8U$$ SPICZAQ - 72.0 113. LOAD CASs 01 LUAUS sTYSSa S$Cis.SS: 15.08 L4ADLS0 Lint D'). (r3r) TOP CID 32.0 5.0 STA CIO .0 1.0 TOTAL 32.0 6.0 35.0 SUPPORT C1Z ?SAIA J? *2207 Via ?t3 JT RISC? VIDT8 Loa 113 -u: Lai 113•52 A 2649 3- 5 C 2669 3- 5 L0A0 03.51 52 1UN115 12T*2$$ 1 *CisAait 25.02 LOADZ310 :an D13.D (PSP) TOP C20 .0 5.0 STA CYO 10.0 1.0 ram 10.0 1.0 16.0 SUPPORT Ci1Tta1A JT isAC? 1 4 :0Th J7 A*AC? vIOT8 195 111.11]1 128 :R -SX A 113 3- 1 c 1124 3- 8 10AD Cass 83 LunaSA 8 -82.31 Z11cxwA21: 33.0a Lo2DLD10 LLV3 0217 2737) :OP CMG .0 5.0 4111 CND TOTAL 23CSPV 1034: A t -c A 0 ho 6 -01 6 -04 -14 5 -03-04 .0 1.0 3 S.: . . t -7:C7 4:DTN :x -5A 3- t 3- a ,� .. - 11x 0 I - 43z OVSRnANGS 0 0 35707 9609 -2700 TRII (2700) 4 -07.02 141XIIR A•? • 1.0 • A -1 • 81.0 - r -t • s -0 • ;.a.;e 2/2 JGD 8. 61� 1 7 -05.05 24 -00 -00 3.07 P01011 (L13) TOP 4305.11 4220 C P•s • 5214 C 5214 c 0 -40 • 6220 c 40rr041 4305841 3901 T 1 -51 • 1040 ? 4040 T 5.4 • Wise 1337 0 11■1 • 1440 7 1440 T 0 -0 • 1337 c 50011 01.11 017E • .44' 1V 2 - 0 11 DSTL • .35 t 250 - SPAS /360 SPA # /DSu4 (DL.LL) • 412 ••513 Z V11i3 320* OF 12115 **Pau' rex 11POt?arT IOTSS Plating cantors• to Use. P1•t. •.l,.s* nos b* •trttla4 with bobbins Sagio.erlag. ine. grip Taluss are based on gross eras test. Plates ore sited based ea 1uab.r spool* s1►ow . PLUTSA - 20 CA081 LOCI 01IPPI10 341.335 PS! PS/ P IxCLuDia 14.0* meatus TZAS2011 1141- 450 PL1 Psi P 3$318 744. 455 PLI pas PAZ J? r?P* PLATS 8115 A T A 2002 0.00 X10.00 6.5 3.5 •• JOt*t a •s 1.0001133 Mot: 8 3010 4.00 a 5.00 CTS CTR C 2002 4.00 X10.00 4.5 3.5 •• J0117 C • 5xpui543 W20Cs C 1010 5.00 X 6.00 CTS cTA 1 1010 5.00 X 6.00 CT* c:8 r 1QOi 3.00 X 6.00 CPA CTn 3 1001 3.00 X 4.00 471 crR *1 1100 4.00 X 8.00 CTA .0 s• RECEIVED CITY OF TUKWILA SEP 0 9 1997 PERMIT CENTER b 0 lisalg 02 6 -04 -14 4.03 -04 :t - ue 14:06'` S9ci F.22/0 me 5 -01 301t5t 1. 1185511 M*X08AC ?0120 SY - TILT01t 711/Is 2. a1ALYS13 CO1?ORK3 TO 0l4 (Tr1.5S 1 103 -11). 3. ns1101 10CLUOSS CSICC :OR L0 131 10K•COYCU511KT LI9s :.OA. Os 30 -X'6 01C a' 4. TRUSS 7* ^21143 .1L 701 SO C$:L18' 3. tRtvcyL 1)::33 10;11:IO1 1;• ALL SSA82.9 7 1.00T:011s. 6. /18!872 TRUSS :Z SAC a 1082107 Lim or ':P::71. VSlLl P *SH:r7iNC R7 MAIL $OVVJ4Ut or v*LL OA 320. 7. 713211 71033 TO 190 C P0s2107 LOS Or UPL:r1. '/3111 P1RN17T180 so 0;1/111 , 0V 1[11 0, VL'.:. :1 sag Ti Loads CONSTRUCTION NOTES - DETAIL NO. I 1. STRUCTURAL DESIGN Code 1994 Uniform Building Code Allowable Soil Bearing 1500 psf at Grade 2. MATERIALS AND CRITERIA Roof Dead Load 5 psf Roof Snow Load 25 psf Wind Load 80 mph Exposure B Net Wind Uplift 10 psf (Does not include truss weight) Lumber Framing lumber Hem -Fir No.2 Fb = 850 psi. All lumber to be dry with a moisture content of 19 percent or less. Poles to be Hem Fir No.1 - Fb = 950 psi. Door poles to be Hem -Fir No. 2 - Fb = 850 psi. Poles and Splash Boards to be treated in accordance with AWPA Standard C2. Treatment to be with waterbome presative CCA with retention of 0.60 pounds per cubic foot. Rafters see plans for grade. Truss Design Criteria Trusses and truss bracing to be designed by a licensed structural engineer for the loads stated above. All trusses to be designed for uplift wind pressures. End wall truss when shown on plans to be designed for horizontal wind forces. Truss horizontal bracing if required is to be noted on the truss drawings. Wood Connectors Galvanized Simpson Strong -Tie Manufactured by Simpson. Bolts, Nuts, Galvanized ASTM A -307 with washers between bolt heads Lag Screws and nuts and wood. Nails GALVANIZED COMMON NAILS. Space nails 2 o/c minimum & stagger to prevent wood from splitting. 16d nails to be 3 -1/2" long - 20d nails to be 4" long Metal Roof Deck & See Detail No. 5 for fastener size, location, spacing, and Wall Siding blocking requirements. 4. CONSTRUCTION NOTES - DETAIL NO. 1 1 Concrete Backfill & Footing Pad. Concrete - Floor Slab 2500 psi minimum 28 day strength 2500 psi minimum 28 day strength. Entrained Air Content 5% to 7 %. Provide 2 Ibs per cubic yard of Microfiber Reinforcement by W.R. Grace & Co. in concrete mix. Provide 1 -1/2" deep continuous control joint strips at ridge line and at all side wall poles. Place slab on compacted subgrade with 4 inch gravel sub -base. z,' (O4 rgLe4v. wf TP Tee tf ai of Sleet. w e*," Matt! ti a to i Screw4 -- et ./c MttA! Screutos FA 446it ocr At Cad W ( C4f t er Prmide block at corner post for interior rafter to post nailing if corner post size is different from end will post sin. Nail block to post and rafter to block with nailing shown on plans. I V 1 t n Sn Mct,, l Ott Pvr Itr W /4 Tod rlthtl4 SIa1G To Inside Ro to t N3 Nutvicant siY1 a- 90( batik -r0 exteStote. Intzl reaf ter whin Sfttsw i Ian• sit eIaciC f etew w hen Edij'.I vo/ I'nd Yd t1 Eg tets S e w C ) c r T % ��Jqe Pr1sn4► to tZvI'4 Pb t E t, -t 6P w o e Na ► ��, 41 446 C A • - to r Z A - t• P r (% Mott Po s+) t '1 r l i n To 0 vt sc cote, rza f te r STRUCTURAL DESIGN CALCULATIONS 1994 UNIFORM BUILDING CODE 80 MPH WIND EXPOSURE B SEISMIC ZONE 3 SNOW LOAD 25 PSF CLIENT: DATE: PROJECT: PREPARED BY: MONDRESS STRUCTURAL CONSULTING 2725 124TH ST. NW GIG HARBOR, WA. 98332 PHONE & FAX ( 206) 851 -6874 JAY FITZHUME AUGUST 13,1997 24'- 0" X 36'- 0" X 10'- 4" EAVE HT. POLE BUILDING TUKWILA, WASHINGTON POLE BUILDING STRUCTURAL DESIGN CALCULATIONS UBC 1994 WALL DIAPHRAGM AT ONE SIDE WALL ONLY Gravity Loads PSF Roof Dead Load 5 Roof Live Load 25 Geometry Feet Bldg Length 36.00 Roof Length 40.00 Bldg Width 24.00 Eave Ht. 10.33 Bay Width/Average 12.00 Roof Slope ft/ft 0.33 Overhang 2.00 Wind Loads Wind Speed 80 mph - Exposure B Wind Pressure q psf. 16.4 q x Cq x Ce Item Cq Ce Pressure psf Windward wall 0.80 0.62 8.13 Leeward wall 0.50 0.62 5.08 WVindward roof 0.30 0.62 3.05 Leeward roof 0.70 0.62 7.12 Uplift Truss or Rafters - Interior 1.00 0.62 10.17 Uplift End Wall 1.30 0.62 13.22 Longitudinal direction end wall 1.30 0.62 13.22 TRANSVERSE DIRECTION UBC 1994 METHOD 1 Force to Roof Diaphragm Lbs per ft. 3/8 of wall wind pressure 51.20 Roof wind pressure 40.27 TOTAL 91.47 Force to End Walls Lbs. Force to Roof Diaphragm x (Roof & Building Length) / 2 = 1727 Moment to End Walls Lb-Ft Force to Roof Diap.x Building Lengrth / 2 x Equivelent Height = 19434 End Wall Chord Force Lbs _ = Fe __ ^ Effective length for Overturning 23.50 827 - 72 I End Wall Moment / Effective length - - - - - -- - - - -- Roof Diaphragm shear Lbs. per ft. Force to End Walls divided by roof width = I Wall Diaphragm Shear Lbs. per ft. Effective length of end wall Ft. ( 24.00 Force to End Wall divided by effective length = 72 End Wall Vertical Shear (From O.T. Mom.) Lbs per FL Height 10.33 Chord force divided by height 80 Roof Diaphragm Chord Forces Moment Ft. -Lbs. Force to Roof Diaphragm x Building Length Squared divided bye 8 = 14818 Chord Force Lbs. Moment divided by Building Width minus four feet 741 --- - LONGITUDINAL DIRECTION UBC 1994 METHOD 2 1 Total Force to Roof Diaphragm Lbs. Longitudinal Wind pressure x (1/2 Wall Area p us Gabled Wall Area) = 2267 Force to Side Walls Lbs. Total force to roof diaphragm = 2267 Wall Diaphragm Shear Lbs. per ft. J 36.00 Effective Length for shear Ft. Force to Side Wail divided by effective length = 63 Roof Diaphragm Shear Lbs. per ft. = 57 Force to Side Wall divided by roof length Moment to Sidewalls Lb-Ft Equivelent Height 12.33 Force to Side Wall x Equivelent height 27948 Wall Chord Force Lbs Effective length for overtuming 35.50 Sidewall Moment divided by effective length 787 Side Waft Vertical Shear (From O.T. Mom.) Lbs per Ft. Height 10.33 Wall chord force divided by height 76 VERTICAL LOAD AT SIDE WALL POLE Gravity Lbs. Overhang) /2 = - ■ 5040 1406 (Dead Load + Live Load) x Bay Width - - Net Uplift From Wind Lbs. (Uplift Wind - .36 DL) x (Bay Width x (Building Width + - x Building — Width /2) = 2 004 VERTICAL LOAD AT CORNER END WALL POLE End Wall Pole Spacing Ft. 12.00 Gravity Ibs (Dead Load + Live Load) x Bay Width/2 x End Wall Pole Spacing/2 = 1960 WIND - Longitudinal Dir. - Ibs J 1183 Side wall chord force + End wall chord force (torsion). I Net Uplift From Wind ( Uplift minus 0.36 Dead Load ) Lbs. Uplift minus .36DL 11.42 (Uplift Wind - .36 DL) x (Bay Width/2 x End Wall Pole Spacing/2) 746 POLE DESIGN - SIDEWALL Pole Bending Moment at Base Lb.- Ft. Cq Factor =1.3 minus 0.3 J - 0.67)squared / 8 = 0.9 1281 Pole Wind Prerssure x (Eave Height 8x6 Pole Area square inches 31.70 6x6 Pole Section Modulus inches cubed 29.70 Actual Bending Stress psi. Pole Bending Moment x 12 / Section Modulus = 518 Allowable bending stress psi. - Wind 1263 Actual Compressive stress psi Pole Gravity Load / Area = 159 Allowable compressive stresspsi. Regook eipi 650 iii UBC 1994 edition FOOTING DESIGN - 1/3 increase in bearing pressure for wind Allowable Sail Pressure at Grade psf. 1500 Footing depth ft. 4.50 K = (D +S /2)/D +S 0.58 Allowable Soil Pressure at Botof Ftg psf. Allowable Soil Pressure at grade x Depth Factor per 1994 UBC = 2550 = 1 Ftg.x.785) : Ftg.x.785) 19.04 17.14 14.20 !Wind Chord Forc€ 1 Not at Corner Footing Diameter Sidewall in. Bot. Ftg.x.785) Bot. Bot. Square Root((D +S) /All. Soil Pressure Square Root ((D +S +.5W) /AII Soil Pressure Square Root ((D +.5S +W)/ All. Soil Pressure 3 Footing Diameter End Wall - Wind Long. Dir - in. Square Root((D+S) /All. Soil Pressure Bot. Ftg.x.785) = 11.87 Square Root ((D+S +.SW) /All Soil Pressure Bot. Ftg.x.785) Bot. Ftg.x.785) 11.75 11.22 Square Root ((D +.SS +W)/ AII. Soil Pressure Footing Diameter End Wall - Wind Trans. Dir - in. Square Root((D+S) /Ail. Soil Pressure Bot. Ftg.x.785) = 11.87 Square Root ((D+S +.SW) /All Soil Pressure Bot. Ftg.x.785) 11.33 Square Root ((D+.5S +W)/ All. Soil Pressure Bot. Ftg.x.785) 10.32 Truss to Pole Connection Gravity Load - Dead plus Live Lbs. 5040 See page No. 2 Net Uplift from Wind Lbs. 1406 See page No. 2 Lateral from Wind Lbs 3/8 x Total Wind Force on Pole = 425 Lateral from Wind Lbs. 50.10 x Roof Diap Shear x Bay Width) /2 = 55 Total Lateral Force Lbs. 480 Resultant from Wind Lbs. Resultant Force of (Lateral plus Net U ift from wind) = 1486 Allowable Connection Values Lbs 2 - 5/8 in dia. Bolts in Truss Block 3180 6 - 20d Each Truss 1323 TOTAL Allowable x Load duration factor for snow Lbs. 5178 TOTAL Allowable x Load duration factor for wind Lbs. 1760 Truss to Pole Connection Structurally Adequate 4 M I7 6 ta I\ ? 't'r6 t TAC'. g i ()cm z I -14F 0' t i? reiik MONDRESS STRUC RAL CONSULTING 2725 124th Street N.W. GIG HARBOR, WA 98332 Telephone & Fax (206) 851.6874 ofy SHEET NO OF • CALCULATED BY DATE CHECKED BY DATE SCALE Zdi r; 44 X441 e‘ C 7s) 45?) • - t � l VZ Cam - 0 0 Gle PM W,(11 G der • UO co D co u. wo c9. Z w U � to 0- 01- wW u. W Z U = O Z 1 v=4.11rVd3d 1666 E 6 130 vimoir i dO X1110 Q3A130311 O z 1:430113 115VIS 01 Ma01 SI1106 WOG Wile 33S H3Y3 SIM S no WY SR m o 3"D ,C+ .............et ....................... ............. . itz VZ3 Z •— Q G �` C bbWQ L.bU un BM pt ONnsaO 3SfiON 91111S1X3 OS 31V KLLS MUM LS00 .1, .......•••• .......... ................. c r -- go is = 13 A PI d PI D NOTICE: IF THE �5 SUE TO THE QUALITY OF THE DOCUMENT. THAN MENT. THIS NOTICE D m 1 ACTIVITY NUMBER D01 -144 PROJECT NAME: JAY HITZTH UM SITE ADDRESS: 14725 57 AV S Original Plan Submittal Response to Incomplete Letter it Response to Correction Letter it Revision If AFTER Permit Is Issued DEPARTMENTS: Build *ivision P bli \A/irks ' .c - ' Complete Comments: DETERMINATION OF COMPLETENESS: (Tues., Thurs.) TUES /THURS ROU ING: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: (ten days) Y'RRI UU OOC Yr, PLAN REVIEW /ROUTING SLIP Fire re ention 5'0- Structural Incomplete n Approved ri Approved with Conditions REVIEWER'S INITIALS: DATE: 05 -16 -01 SUITE NO: Planning ivision V / 5 -17-0r Permit Coordinator DUE DATE: 01 Not Applicable ri No further Review Required DUE DATE 06 -14 -01 Not Approved (attach comments) n DATE: DATE: CORRECTION DETERMINATION: DUE DATE Approved ri Approved with Conditions Not Approved (attach comments) REVIEWER'S INITIALS: DATE: PER' IT COORD COPY DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete RI Comments: TUES /THURS ROUTING: Please Route Structural Reviewflquired REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: (ten days) Approved m n REVIEWER'S INITIALS: CORRECTION DETERMINATION: Fire Prevention Structural Incomplete Approved with Conditions n n REVIEWER'S INITIALS: PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER D01 -144 PROJECT NAME: JAY FITZTHUM SITE ADDRESS: 14725 57 AV S Original Plan Submittal Response to Incomplete Letter it Response to Correction Letter # Revision # AFTER Permit Is Issued DATE: 05 -16 -01 SUITE NO: Planning Division Permit Coordinator DUE DATE: 05-16-01 Not Applicable No further Review Required n DATE: 67 7/26O t DUE DATF, 06 -14 -01 Approved Approved with Conditions P Not Approved (attac com 'ents) DATE: DUE DATE Not Approved (attach comments) n DATE: PERMIT NO.: DO I 144 BUILDING PERMITS INSPECTIONS CONDITIONS ❑ 00001 Progress Inspection Status ❑ 00002 Pre - construction ❑ 00003 Investigation ❑ 00004 OK to Occupy ❑ 00005 Remove Stop Work Order ❑ 00006 Follow -up ❑ 00007 Pre -Move Inspection ❑ 00050 WSEC Residential ❑ 00060 \VA Ventilation /Indoor AQC ❑ 00070 NI.I A Inspection /Modular Stnict ❑ 00071 Mobile !lame Tie Down Insp ❑ 00072 Marriage Lines ❑ 00090 Rcstccl ❑ 0095 Footing Drains 00100 Foundation Footings 00200 Foundation Walls ❑ 00250 Foundation Insulation ❑ 00300 Concrete Slab/Slab Insulation ❑ 00350 Crawl Space ❑ 00400 Shear Wall Nailing 00450 Plywood Wall Sheathing 00500 Roof Sheathing Nailing ❑ 00525 Plywood Deck Nailing ❑ 00550 Exterior Wall Sheathing ❑ 00600 Masonry Chimney ❑ )0610 Chimney Installation/All 'Types 00700 Framing 00750 Roof /Ceiling Insulation ❑ 00800 Floor Insulation ❑ 00801 Wall Insulation ❑ 0080 Exterior Roof Insulation ❑ 00803 Glazing Inspection ❑ 00815 Lighting and Controls * 80 9 0 0 Suspended Ceiling 01000 Interior Wallboard Fastening 01001 Exterior Wallboard Fastening ❑ 01110 Pre -Move Inspection ❑ 01115 Motor Inspection ❑ 01120 Pre-Demo ❑ 01140 Pre- retool ❑ 01400 Final -Fire 01700 Final - Building ❑ 01900 Final- Reroof ❑ 03100 Site Visit ❑ 04000 Special- Concrete ❑ 04001 Special-13°1's in Concrete ❑ 04001 Special- Mom /Resist Conc Frame ❑ 04003 Special -Rcinf Steel Prestress ❑ 04004 Special - Welding ❑ 04005 Special-I ligh-Strength I3olting ❑ 04006 Special - Structural Masonry ❑ 04007 Special -Rcinf Gypsum Concrete ❑ 04008 Special- Insulating Conc Fill ❑ 04009 Special -Spray Fireproofing ❑ 04010 Special - Piling, Piers, Caissons ❑ 04011 Special- Shotcrete ❑ 04011 Special- Grading, Excav /Fill ❑ 04013 Special- Retaining Wall ❑ 04014 Special - Panels ❑ 04015 Special -Smoke Control System TENANT NAME:, „i %A 0001 No changes to plans unless approved by Bldg 1)iv ❑ 1111111 Special inspection required, notify Bldg Div ❑ 0011 Special inspector shall submit final signed report ❑ (1012 New ceiling grid & light fixture shall meet lateral bracing ❑ 0013 Partition walls attached to ceiling grid 0014 Readily accessible access to roof mounted equipment (1015 0016 Engineered truss drawings & calcs shall he on site Exposed insulation hacking material ❑ 0(117 Suhgradc preparation including drainage. excavation ❑ O(118 Statement from rooting contractor verityin:: fire retardant class of roof 0019 All construction to be done in conformance wiapprovcd plans ❑ No work shall he done in addition to those modifications..." ❑ (101)2 t'lumhing permits shall he obtained through King Cu ❑ 0 11211 Structural observation shall he provided for this project ❑ 00 All food preparation establishments must have King Co (11)22 Fire retardant treated wood shall have (lame spread of 0023 Notify Building. Division prior to placing any concrete 0024 All spray applied fireproofing shall he special inspected El 0025 All worn( to remain in placed concrete shall be treated 0020 4 1 All structural masonry shall he special inspected 0027 Validity of Permit 0028 Rack storage requires separate permit )1)113 Electrical permits obtained through I. �� 1 )11311 No occupancy of building until final insp by 13Idg Div ❑ 111132 Remove all weeds, concrete. stone Iinu►dations, flat concrete 11(136 N1anufacturcrs installation instructions required on site "BTU n►aximurn allowed per 1997 WA State Energy ('ode" 0035 Contact I'\' Div to obtain insp flu outer /sewer runner( 0038 A C of () will he required for this permit 0039 Final approval for all 'I I w /in the limits ul'the S(' Mall 0001 All mechanical work shall he tinder separate permit ❑ 0010 All construction noise to he in compliance with 8.2 TMC OIW 1 Ventilation is required for all new 100111S IS spaces 0005 All permits. insp records K approved plans available 1)11116 All structural concrete shall he special inspected ❑ "Applicant shall obtain a separate plumbing permit from King Co" ❑ "Anchoring -- All new construct and substantial improvement shall he anchored to prevent flotation" ❑ 0007 All structural welding shall he done by \VAI3O certified inspector ❑ 11008 All high- strength bolting shall he special inspected ❑ 0009 0034 Bolts installed in concrete shall be special inspected ❑ 031 Comply with requirements of TM(' 16.0.1 ❑ 01134 Removal of septic tanks require approval and compliance with King Co I Icalth Dept. ❑ Obtain required inspections from appropriate water & sewer districts" ❑ "Furl burning appliances ❑ "Appliances. which generate.....' ❑ "Water heater shall he anchored...." ❑ "Raoul" Plan Reviewer: �� Date: Permit Tech: Date: 0 3'.c6'.`.•�es' {.'; ,,. ACTIVITY NUMBER D01 -144 DATE: 05 -16 -01 PROJECT NAME: IAY FITZTHUM SITE ADDRESS: 14725 57 AV S SUITE NO: Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # AFTER Permit Is Issued DEPARTMENTS: Building Division Public Works n Complete Comments: PLAN REVIEW /ROUTING SLIP Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete TUES /THURS ROUTING: Please Route ri Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: (ten days) Approved ri Approved with Conditions CORRECTION DETERMINATION: Approved ri Approved with Conditions S9[UI)IF 1%/C SPY. Fire Prevention C n REVIEWER'S INITIALS: DATE: Planning Division Permit Coordinator DUE DATE: 05-16-01 Not Applicable ri No further Review Required DATE: / //7/6/i DUE DATE 06-14-01 Not Approved (attach comments) REVIEWER'S INITIALS: DATE: 111111r1111111111■ DUE DATE Not Approved (attach comments) n n ACTIVITY NUMBER D01 -144 PROJECT NAME: JAY FITZTHUM SITE ADDRESS: 14725 57 AV S Original Plan Submittal DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Response to Correction Letter # Revision # AFTER Permit Is Issued PLAN REVIEW /ROUTING SLIP C Incomplete n Comments: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: �fL Structural APPROVALS OR CORRECTIONS: (ten days) Approved REVIEWER'S INITIALS: CORRECTION DETERMINATION: Approved REVIEWER'S INITIALS: 'I1R(t Tt txx: Yr1 Fire Prevention Response to Incomplete Letter # n DATE: 05 -16 -01 SUITE NO: Planning Division l l Permit Coordinator DUE DATE: 05-16-01 Not Applicable n No further Review Required DATE: F I - DUE DATE 06-14 -01 Approved with Conditions Not Approved (attach comments) Approved with Conditions DATE: DUE DATE Not Approved (attach comments) DATE: ACTIVITY NUMBER D01 -144 PROJECT NAME: JAY FITZTHUM SITE ADDRESS: 14725 57 AV S Original Plan Submittal DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete LI Comments: Response to Correction Letter # n TUES /THURS ROUTING: Please Route REVIEWER'S INITIALS: CORRECTION DETERMINATION: Approved `PRI U UII INK' VTI Structural Review Required REVIEWER'S INITIALS: Co"' APPROVALS OR CORRECTIONS: iten da) Approved n Approved with Conditions Approved with Conditions REVIEWER'S INITIALS: PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete ri cJ Response to Incomplete Letter # Revision i/ _ AFTER Permit Is Issued DATE: 05 -16 -01 SUITE NO: Planning Division Permit Coordinator DUE DATE: 05-16-01 No further Review Required DATE: 57/7/ Of DUE DATE 06 -14 -01 Not Approved (attach comments) DATE: /otJoi n Not Applicable n DUE DATE Not Approved (attach comments) n DATE: JAY FITZTHUM Staff Initials . . Balance Due: $ `3. 7 5 Need Current Contractor Registration Card: ❑ Yes 1 ❑ No Iv14 Need to Enter Contractor Information in Sierra: ❑ Yes ❑ No Z 00 NW � W � L1 z � tu O • N W W Pc: U. o .. 2 U ga 0 2' OVERHANG A.I. AROUND 4X6 DOOR - 6X6 END WALL POLES 6X6 TRUSS POLES DOUBLE PRE-MFG DOUG PRE - MfG TRC 24'0' 1,7r57 L /1 6X6 CORNER POLES E 2X6 BRACE T. 7 12'0' N DOUBLE 2X6 BRACE SEE DET. 7 &► ! Cg DETAIL 1 *au"— CONCRETE BACKFILL cONC. PAD ■■ SIDE ELEVATION 2X6 PURLINS 02' OC CROSS - SECTION --01§— 20* DIA. 1/4"=1' 10 PIA 4± A 1 24' 0* 29 GA. STEEL ROOFING .171 L,J 2' i , 4 f'N 41 ! RECEIVED CITY OF TUKWILA SEP 0 9 1997 PERMIT CENTER 6 1— w 5/6 TRUSS. DI 4,96* ROAL-BRILL HOLE 4 16D NAILS 3 EA TRUSS TO POLE 2X6 W/HANGER --. 2X6 -7 316D NAILS \ / 29 GA. STEEL SIDING SEE DET. 5 TRUSS TOP --I t iORD OR RAFTER 1,1 6X12 BLOCK ga. SIDE \ Z' 0 ® 1.3 ASHERS RU BOLTS 2 IN BLK. WALL GRTS SEE DETAIL 6 DETAIL 1 / 1 /X6 EA. SIDE , r -- 2.X6 f 29 GA. STEEL ROOFING T Il J "L' BRACE SEE DET. 7 TRUSS BOTTOM CHORDS DETAIL 8 METAL DECK &-2 RIDGE CAP / f- 16D PURUN DET. 5 / TO BLOCK / OR RIDGE POST RIDGE PURUN RIDGE POST OR 6X6 TRUSS BLOCK DETAIL AT RIDGE 3 160 TRUSS TOP CHORD TO BLOCK SEE PLANS FOR RAFTER NAJUNG 1 - DIAG. BRACE WHEN -SHOWN BIf4i A S r r ' 2 Wit pp-TO-ROSE POST 8Li<. STOP ONE BRA CE RIGHT BEFORE BLOCK 3 160 NAILS, 2X6 TO PURUN BLOCK 2X6 ROOF PURUNS 0 2' 0' OC SEE DET. 4 2X6 ROUGH CUT 8' LONG W/4 16D NAILS 0 EA. TFk /sS BOTTOM CHORD. TRUSS EA. SIDE OF POLE TRUSS WEB MEMBER NG BETWEEN PURUNS 35 TIE PLATE EA. BLOCK 29 GA. STEEL ROOFING SEE DETAIL 5 ROOF PURUNS TOE NAIL TO EA. RAFTER W/160 NAIL EA. SIDE 2X6 BLOCK POLE 29 GA. STEEL SIDING SEE DETAIL 5 EXTEND TO ROOF DETAIL 3 2X6 PURUN N BLOC W/6 16D TO PURUNS & 3 161) TO TRUSS TOP t CHORD AT EA SIDE 160 S16' O0 2X6 TO 2X6 DOOR POST TO WALL DETAIL 3' WIDEX14 CM ST STRAP W 2 160 TO TRUSS OC< & 12 16D TO D8L DIAG BRACE 2X6 W/4 160 AT AN TO DOOR POST & 3 160 AT ANGLE TO BLDG POST BEYOND USE 6 160 TO BLDG IF 2X6 IS NOT-SPUGED AT BLDG POST SEE PLANS i i PLAN VIEW DIAG BRACE TO ROOF DETAIL 9 / 2X6 W 4 16D TO DOER :, P ' , OST 2 1 ttAI> s ,_. TO BLDG POST BEYOND ... UNLESS SHOWN OTHERWISE DOOR POST W/12" DIA X 2' DEEP FTG C1W BACKFILL — CONC PAD NOT REQUIRED PURUNS W 6U y-Y NM / TO TRUSS S s DE / 4 FOR SPUCE METAL SIDING 2X8 HEADER W/6 16D NAILS TO POLE EA. END TOP OF --/ DOOR OPENING 1' j - TOP OF DOOR POST TOP OF DOOR OPENING 4X6 TRUSS BLOCK 4 16D NAILS EA. TRUSS TOP CHORD & 7 160 TO PURUN BLOCK �- TRU RAFTER TOP S CHORDS 2 2X6 DDAG BRACE W /A35 / ANCHOR EA SIDE. 6 8DX1 1/2 NAILS / TO BRACE & B 0X2` LONG THREADED ' SCREV6 FULL TO TRUSS TOP 2X4 GIRT W /160 aD12" OC TO 2X6 AND £ 160 NAILS AT ANGLE TO POLE SPACE 02' 00 POLE 2X8 W/3 16D NAILS 70 SIDE JAMBS & 16D NAILS 012" OC TO HEADER 4 _. 2X8 SIDE 1B W /16D NAILS 012` OC EAx. SIDE OF OPENING RET AIL 2 r- CUT ONE BRACE RIG L 0 RE POLE 4 160 NAILS 2X6 TO 2X6 ---- t / / 2A+ ' NAIL TO POLE W METAL SIDING DETAIL 6 f-� -- POLE f I \ / _- 4 _ NAIL TOGETHER NAILS ROWS ieD ZX6 VERTICAL, NAIL TO POLE W/4 18D NAILS TOP OF TRUSS BOTTOM CHORD BRACE W/160 NAILS 012 OC VERT. L END WALL POLE DETAIL 7 END WALL BRACING ALL END WALL POLES. 3 16D NAILS EA. RAFTER TO PURUN BLOCK DETAIL 4 '7 2X6 GIRTS 04' 00 W/3 160 TOE NAILS TO POLE #12 X. 1 1/2" HEX HEAD W EOPRENE WASHERS tTYPl USE #12 X2OON WALLS W/PLYW000 OR GYP BOARD UNDERLAYMENT. i\ RIDGE CAP ATTACH TO ROOF DECK W/#12X1/2 STITCH SCREW EA. RIB #12 X v2- SCREWS HEX HEAD WITH NEOPRENE WASHERS 06" OC STiCH FASTENERS ROOF RAFTERS OR TRUSS TOP CHORD 1 VS ROUGH CUT PURLS 00170/4 OF TRUSS TOP CHORD Mt RAFTERS Wit 16D NABS. \ ` \. ROOF PURUNS 6 160 NAILS TOTAL TWO ROWS - TYPICAL 1' EAVES & RIDGES OF ROOF, TOP ,& BOTTOM OF WALLS / L-- ALL INTERMEDIATE ROOF PURUNS AND WALL CARTS 1. ATTACH ROOF DECK TO END WALL RAFTERS VA2 X 1 1/2* SCREWS, HEX HEAD WITH NEOPRENE WA ' " OC METAL ROOF DECK AND FETAL WALL SIDING FASTENER DETAIL 2. WHERE METAL WALL SIDING ENDS AT WALL CORNERS AND DOOR OPENINGS, FASTEN STEEL TO 2X4 BLOCKING (BLOCKING TO RUN FULL HEIGHT OF POLES)) #12 X 1 1/2'' SCREWS, OR 2 X 2` SCREWS HEX HEAD WITH NEOPRENE WASHERS a18° 00. ATTACH BLOCKING TO POLES W/2 160 NAILS 0 3" 00 EA. END. RE CEIVED DETAIL 5 CITY OF TUKWILA 3 E 0 9 1997 PERMIT CENTER CITY O TUt;V1;l APPROVED JUN 14 11101 h.J ?I'_! i t U