City of Tukwila
Jim Haggerton, Mayor
Parks & Recreation Department Rick Still, Director
MEMORANDUM
TO: Tukwila Parks Commission
FROM: Dave Johnson, Recreation Superintendent
DATE: October 12, 2012
SUBJECT: PROJECT UPDATE
Included in the agenda for the October Parks Commission Meeting is a report from the
Department that provides you with an update on various projects. I encourage you to review
this report in advance of the October 17th meeting.
If you have any questions or would like additional information on a project, I also encourage
you to let me know in advance of the meeting in order to allow enough time to research the
information (if necessary).
This report will be a standing agenda item under `Business" for future agendas.
12424 42nd Ave. S. • Tukwila, Washington 98168 • Phone: 206 - 768 -2822 • Fax: 206 - 768 -0524
10h 1,10
21
1
2
3
4
5
TU KWI LA
PARKS IRECRE.ATI N
PARKS COMMISSION
PROJECT UPDATE
October 2012
Tukwila Pool Capital Project
Working with McKinstry, an Energy Savings Company (ESCO), on the Energy Savings Performance Contracting (ESPC)
Capital Project at the Tukwila Pool. A summary of the project can be seen in the attached spreadsheet. A grant was
award by the Department of Commerce for $416,666 for this project! Requests for Proposals (RFPs) were sent out
this week and are due on Wed the 17th. The facility will close on Monday, November 5, 2012 for three months to
complete the work and re -open on Monday, February 4, 2013.
Target Completion Date: Early February 2013
Project Stage: Design, RFP's, and Submittals - Pre - Construction
Project Budget: $1.66M
Tukwila Pool Exterior Access Improvements
In conjunction with the above mentioned project, it will provide new ramps and better /easier access to the facility
from the parking lot to aid the disabled and elderly patrons.
Target Completion Date: Weather Dependent (hoping for Fall 2012, but could be Spring 2013).
Project Stage: Design
Project Budget: $60,000
Tukwila Pool Re -Roof
In conjunction with the two above mentioned projects - Re -roof the pool with a new solid membrane roofing product
that will adhere right over the top of the existing tourch down roof. A thermal scan will be conducted checking for any
leaks, none anticipated at this time.
Target Completion Date: Weather Dependent (hoping for Fall 2012, but could be Spring 2013).
Project Stage: Design
Project Budget: $85,000
Restroom Counters Replacement at Foster Golf Links Clubhouse
Replace existing (water damaged and failing) restroom counters with new solid surface product that cannot be water
damaged. New fixtures will be included depending upon budget.
Target Completion Date: End of year 2012
Project Stage: Researching Products
Project Budget: $10,000
Energy Efficiency Improvements at Foster Golf Links Clubhouse
A preliminary Energy Audit has been completed at the Clubouse listing potential areas that energy efficiencies can be
obtained. We are working with an ESCO on this and will be applying for grant funding for this project through the
Department of Commerce (same as the pool, different ESCO). If we move forward with this project it would mostly
focus on occupancy sensors, lighting fixture replacements and a couple other similar things all electrical related in
savings potential.
Target Completion Date: June 2013
Project Stage: Preliminary Investigation of Feasibility
Project Budget: Unknown but will be grant funded
22
6
7
8
9
TUKWILA
PA CS . REC . ATIION
PARKS COMMISSION
PROJECT UPDATE
October 2012
Front Fountain Lighting Retrofit at Foster Golf Links Clubhouse
This will hopefully be included in the above project but if not then it will be conducted by staff. The Scope includes
renovating the existing ten light fixtures around the fountain in the parking lot to three more efficient fixtures that will
provide safe lighting, less energy use, and less maintenance costs in both labor and supplies.
Target Completion Date: June 2013
Project Stage: Design
Project Budget: $2,000 - $5,000
Duwamish Hill Preserve (DHP)
This project /preserve entails it all, maintenance, restoration, testing, design, development, partnerships, volunteers,
planning. DHP is currently in a mode of maintenanc of existing site improvements (Phase 1 construction and on -going
restoration) and planning for Phase 2. Phase 2 is in the process of conducting tests to guide design of the site. Staff is
meeting with Seattle City Light (SCL) next week to discuss the possiblity of them using DHP for some of their off -site
mitigation (great benefit and fits right in for Phase 2). Once testing is completed then design will start and eventually
construction projected for 2014 most likely. We've been working with EarthCorps to aid in the restoration and
maintenance of the site too. Lots more details on this project...
Target Completion Date: On -going
Project Stage: Testing for Phase 2 /Restoration /Maintenance
Project Budget: Unknown but lots grants for this project
Ft Dent Parking Lot Repair Work
The parking lot is in need of re- striping, some curb repair work, and an area of ashpalt patch repair by a storm drain.
This is kind of a on -going maintenance project with the heavy use at this site.
Target Completion Date: Fall 2012 - Spring 2013 (weather dependent)
Project Stage: Scope Planning /Design
Project Budget: $15,000 - $20,000
Pedestrian Pathway Bridge Repair @ Ft Dent
P &R staff are working with PW to make necessary concrete and asphalt repairs to the bridge over the river into Ft
Dent Park. The pedestrian pathway needs attention and so does the roadway part so the depertments are working
together to get this done as one project to save funds.
Target Completion Date: Fall 2012 - Spring 2013 (weather dependent)
Project Stage: Design
Project Budget: $30,000
23
CIP List - Attachment 1
Table 4.2 - Facility Improvement Measure (FIM) Summary - Preliminary
Project
Date:
Tukwila Pool
6/13/2012
11111.11 ILIA
01 11,1111h1
1110,j10 e6t 411111111
Pool Liner Water Edge Tile, and Main Drains
Draft ESP Cost Estimate
1Ii, 4' iiV,l,J "�pf)
$ 283,203
2
Pool Circulation Pump VFD
Pool Water Plumbing / Valve Replacement
Pool Heating Water Pump Replacement
ADA Pool Chair Lifts
$ 119,546
$ 22,635
2,586
Chemtrol Replacement
22,624
5
6
Nat. HVAC Digital Controls / Dampers
Lobby HVAC Digital Controls / Dampers
Nat. Fan & Motor Replacement
Building Heating Pump & Motor Replacement, Lobby
Exhaust and Supply Motors Replacement
366,972
4,507
8,551
12,047
302 $ 780
7
Boiler Burner and Controls Replacement
Condensing Domestic Water Heater
8
9
10
Lighting Conversion
Remove Natatorium Ceiling Tiles
Locker Room Tile (Showers & Walls)
$ 161,768 $ 259 $
$ 107,049 $ 4,298 $ 10,777
$ 51,186 $ - $
$ 20,364
11
HVAC Lobby Supply Motor Replacement
1,101
302
12
HVAC Lobby Exhaust Motor Replacement
1,101
302
13 20
14
Locker Room Plumbing (Showers & Fixtures - (could be
modified to $52,000 no china)
Pool Cover / Blanket
$ 36,098
37,383
1,822
$ 8,570
15
Sewer Deduct Meter
7,554
1,163
16
Bulkhead Renovation
4,500
17
DE Filter System - Vacuum DE Remodel
$ 15,000
18
Gutter /Deck Tile
64,172
19
ADA Improvements (Parking Lot)
$ 90,000
20
Locker Room China
$ 47,152
21 New Roof
22 Privacy changing areas (modified - 1 dresing room)
$ 85,449
$ 7,187
23 Locker Room Floor Resurfacing
$ 85,000
24
New Lockers MODIFIED #24 for Grant
$ 24,449
�U��11 �d�rl( �lrgia111 (�U»u)��11'rr111NF��ffJ, l
��.w,�:m.,�:�,miw,.iw�,am�.a ��o- wsim.n.m.,ymu«.Nw.6.R.��! r „m.� w�,um�a wA �a n,M.��m,.■ .
$ 1,666,000 $
780
$ 780
31,651 $ 21,668
ri'aarrwd.a
24