PARKS COMMISSION
PROJECT UPDATE
APRIL 2013
CURRENT PROJECTS
1
3
J,54 a �Oa . i/!ae f o %/ // ZR % / %o / M % /1,1(,17V,
Staff continues to work on their in -house punchlist of items to continue to improve the details around the
facility with the goal of completing all items by the Grand Re Opening on April 20, 2013. Some items from
the list include: painting, refinishing benches, installing benches, installing storage and organizational
shelving, miscellaneous maintenance items, repairing doors, cleaning out old supplies in storage, cleaning
up at the pool and in the shop area in the mechanical room, creating a system for the pool covers that
works for staff and reduces staff time, brushing and vacuuming the new liner, and many other various
items. Staff have also received several training sessions on the various new equipment systems. The Grand
Re- Opening is on April 20, 2013 in concurrence with the nation-wide aquatics event, April's Pool's Day. On
April 10th, the pool closed at 9:OOam due to an issue with the Variable Frequency Drive (VFD) on the pool
recirculation pump. It was randomly shutting itself off and turning back on. After many hours of
troubleshooting with the sub - contractor that installed it, the manufacturer's rep, and McKinstry, it has been
deemed faulty and a new one was to be installed on warranty. The replacement was overnighted from the
East Coast to be installed on April 12th however, an unfortunate turn in events happened during installation
of the new VFD. There was some confusion by the contractor on the electrical wiring of it and it was wired
incorrectly causing it to burn up when they turned the power on. No one was hurt but the VFD was fried
and rendered useless. A similar temporary unit was overnighted and installed in time on April 13th to allow
re- opening of the pool on April 14th. All this was at the contractor's cost. Revenue loss has been discussed
as well with the contractor.
The manufacturer has never seen one of their VFD's do this so they are dissecting it to figure out what
happened. There was no obvious evidence of why it was failing like that, A permanent replacement will be
re- installed at a later date when it can be scheduled to minimize impact on operations.
Target Completion Date: Grand Re- Opening April 20, 2013
Project Stage: Commissioning and Punchlist Items
Project Budget: $1.67M
is �r /irr ,,i� , , r , r�r /. ,ra r, ,,, , r rr �� rrli /iir,,,l : , ,ri,,i /// / �o r ,,,� / f li �„ i r i„ ,/ v ,..
of , r , i /, e //% / /, /j //; /i I'7Y /,/ //�J /// / /// /// /// / ,
�Tukwil�UpoolrExtenor;Acoess,lm rovementst % / /Or f , / %// / // / /�/ / / / / / / /, /fi / /// / % /// %// /! / / / ///
Description - The Parking Lot & Access Improvements Project work was finished 1/14/13 on time and under
budget. Project completion and closeout process was initiated March 4 by the City Council. This typically
takes up to 90 days for all releases.
Target Completion Date: Completed
Project Stage: Design
Project Budget: $60,000
,,, it ,,,. /i r ,/ , -,i ri /. �. ✓ -r;;r .r:q r, ! rr:,r /�y iri. c�i 'r r ,. rr;; /
// '6/1 ,
J _ o� // /" "r / /l/%/! ,% 0 / //i // /iii
waRN (P/al rll'ukwila Pool Rd Roof / / / / /// % % / /// i � / / / / / /i // r r/ / / / / / / / / //, / / / / / / /%� /� / /i/ , / /
The Roof contractor is prepped and ready to go once there are enough warm and dry days to complete the
work
Target Completion Date: Weather Dependent (Spring 2013).
Project Stage: Design
Project Budget: $85,000
9
5
6
7
8
10
PARKS e.. RECREATION
00D HEALTHY
PARKS COMMISSION
PROJECT UPDATE
APRIL 2013
Restroom#Counters Re p lacement at the Clubhouse / % % % % % %/ / f %/ / % % i.i/
.l , %// .„ , , /%/ / / % / "
//
Brief discussion about replacing the counters in the restrooms Fall 2013,
Target Completion Date: Fall 2013
Project Stage: Researching Products
Project Budget: $10,000
ner
No update
cirenl
m
rovea
nen
at% hre
u
Target Completion Date: June 2013
Project Stage: Preliminary Investigation of Feasibility
Project Budget: Unknown but will be grant funded
o ,F
etr o
E M ou Lam li i u
,
Receiving a quote for this work.
e
%a Mile% Clubhouset % /// % / % /,i / %// // j % %% //% i % % / // / /ri / %j/
11i � // � �� / / ��
Target Completion Date: June 2013
Project Stage: Research and Planning
Project Budget: $2,000 - $5,000
/// r rrr „ , � orrrr ��, , , ,rrr ,� ,,, rrr „ -;
(: , r ,iii / /// % 7% / /i / / //// rii. „ ii // /// ri 1; ii / ////. /� , % n� / l :,.1
uwamishr H�II�PreserveJ DHP l/ /ii //% /i / /,% % % /// , /; / /, „rr i /�� /� i / / / /i�/ , % / / /// rr,� /! /�/ /��/ /iii % /// //
Communication has been happening between EarthCorps, Forterra, Holly (Past Forward), Friends of the Hill,
and City Staff about the plans for 2013. Duwamish Alive! is on Saturday April 20th and once again many
volunteers are anticipated. Staff is working with Finance to nail down the CIP budget for this project for
2013. Most all City CIP funds were re- allocated by the City Council in efforts to re- evaluate where to spend
monies based upon information from the Strategic Plan.
Target Completion Date: On -going
Project Stage: Testing for Phase 2 /Restoration /Maintenance
Project Budget: Unknown but lots grants for this project
e %Golf,Course, r ,/ // /// / � /// //, /� /„ iii/ / / „i,r /// % / /, / / / ,i , / / /%,
/ /� / / / / / / / / /r / % / / / / %, / /// / %, / / / / / / /i / / / / /,, r %sir/ , / / // %.,iii/ ��
/
,,,.,, ,,,,, , / //� r ,,//„%% / / / / / % / % / / „ / / / „ /,,,, / /,, / / / /O�/ , /,,,, ,, / /,, / / /,, / / / / /,.,,,,,, / / / // /iii,, ,,,, / / /%%
Occasional emails keep coming in about this.
Target Completion Date: Unknown
Project Stage: Brainstorming /Planning
Project Budget: N/A right now
Ft o D„e n ey t / a ro o. rriK ; „;V //r 1/12: ,i Z: „ % / % /
% / / %,
Robert and Paul are working on getting the parking lot striped. We are also looking into the option of
bidding out a "maintenance contract for 3yrs” for parking lot type work. Other agencies have done this and
we are looking at doing something similar to save staff time.
Target Completion Date: Fall 2012 - Spring 2013 Weather Dependent
Project Stage: Scope Planning /Design
Project Budget: $15,000 - $20,000
an Pahway
c{$er
e % %i / / /%% ! o / //r l ri/ ! /sri % / / //i / J iii / o, //% % ,r/
e air %!i /o / / / /, / / /!i /ii // / % %/l !O /!i / „ / /i,,,/
.,,�, ,,,, .� /� / % / / /., / / / / / / / / / %ii / %�, / %/� /iii, / / % / / % / / / / / / /,% /i /l/ / / / / /,, / / /� //
No new update (fast months update was "PW is thinking of holding off till late spring 2013 for this to
happen_ maybe in conjunction with some other P &R parking lot maintenance work that needs to happen. ")
Target Completion Date: 2013
Project Stage: Design
Project Budget: $30,000
10