Loading...
HomeMy WebLinkAboutPark 2013-10-16 Item 4A - Project UpdateTUKWILA PARKS . RECREATION PARKS COMMISSION PROJECT UPDATE CURRENT PROJECTS 1 4 5 % // k ila y of Ca It I P �6 / / /,/ / // / � /, Continued smaller warranty work items are being coordinated with staff and happens at the pool. Target Completion Date: Project Closed Out Project Stage: Closeout Project Budget: $1.7M �.�����,� � � � ��, � < err r ��, � � � �, �, ra /iii , ,, r r, rr � rrriiiiiiii�r ,i o ii � i i i i � it i i i !# stroorrilcoun a a Pemen �a uC bhouse% /// / / / / % , // / /I / // / / % / / //� //, G Staff are conducting research on the best long -term fix for this. Target Completion Date: Fall 2013 Project Stage: Researching Products Project Budget: $10,000 .r, r, rii.rirri, pi ,a o, 0:71, r / r� l: dr>trFoairittf m et, trffi Cl b o�fse� O / //////, / %/, M&A Three new LED light fixtures have been installed around the front fountain and look great. Already getting positive feedback on them. The other 7 fixtures were removed and capped off. Four new wallpack flood lights were also added to the east wall of the Pro Shop shining over the practice putting green. Again, positive feedback has already been heard on this. Target Completion Date: Fall 2013 Project Stage: Research and Planning Project Budget: $5,700 approx for both Nat %/// / / // ///// / /// /,/ A second kiosk development meeting happened on Oct. 1 with Miller Hull, SvR Design, Forterra, City Staff, and Friends of the Hill where Miller Hull proposed a kiosk design and the team reviewed it, Phase 2 topo survey is getting coordinated by staff. Target Completion Date: On -going Project Stage: Testing for Phase 2 /Restoration /Maintenance Project Budget: Multiple grants for this project sic i of // / 1/.4 / i r No new info to report this month. Target Completion Date: Unknown Project Stage: Public Input Gathering Project Budget: N/A right now 5 6 7 8 PARKS & RFCRE Ti<•- N PARKS COMMISSION PROJECT UPDATE Iw r, .o0 *Wor / /// / / / / //, / The parking lot was striped last week and looks great. Coordination with PW for the overlay and drainage issues for 2014 Target Completion Date: 2013 Weather Dependent Project Stage: Scope Planning /Design Project Budget: $TBD 3 a tfla AY #O1Na No new update. ✓G // r ,� i // ,r i/ /r�i ri /i r gr/P /lr % r „r 9/, / / / ig / i rriir /r Target Completion Date: 2013 Project Stage: Design Project Budget: $30,000 uir�wa„cm� , Ga �� c i r , �re rc , �r9ro i P r i �o r c .yrrrr c.oi r 1 / � r r r , / Y r r ri 50% design stage with final review plans expected in Feb. 2014 followed by permitting, bidding, and construction. Granting appears to be on track to provide full construction funding. Target Completion Date: Fall 2015 Project Stage: Design Project Budget: 6