Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 5889 - Morgan Design - Offices
APPROVED FOR j 2 , ISSUANCE BY: t A `41011-....• BUILDING OFFICIAL know the same whether specified the provisions to sign DATE: - 9- ?0 I hereby certify that I have read a • exa ned this permit and of law and ordinances governing this work will be complied with, this permit does not presume to • ' : autho ity to violate or cancel regulating con ion or t • : • rman or work. I am authorized to be true and correct. Ail provisions herein or not. The granting of of any other state or local laws for and obtain this building permit. SIGNATURE: Gam_ DATE: / -- // — 90 PRINT NAME. —J1 ( f,�rt�v S J � :zi COMPANY: P/, d Jtirc . PROPERTY OWNER Knl l Co. PHONE 57_0765 ZIP 9RIRR 21 90 5/90 ADDRESS 601 Strander Blevard, Tukwila. WA ou CONTRACTOR PH Boden Inc. PHONE 5E1.-4515 EXP DATE PHONE ADDRESS 12507 Bel Red Road 0102. Bellevue. WA WA. ST. CONTRACTOR'S LICENSE # PATRII213DM ARCHITECT Owner Representative ADDRESS ZIP TYPE OF CONSTRUCTION: V -N UBC EDITION (year) SETBACKS: N _ S - E - W - FIRE PROTECTION: ®Sprinklers ❑Detectors [] NIA UTILITY PERMITS REQUIRED ?❑ Yes © o ( throufl h Public works) ZONING: C-M BAR /LAND USE CONDITIONSOYes t7 No CONDITIONS (other than those noted on or attached to permit/plans): CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: 1- (-10 11, Pno JFC r INF ORMA TIOr UI M _ 1044 Indu.stry Dr PROJECT NAME/TENANT Mo r a n TYPE OF Li New Building Addition WORK: ❑ Rack Storage ❑ Reroof ❑ DESCRIBE WORK TO BE DONE: Divide large room PL BUILDIbG PERMIT (POST WITH INSP'0%.:TION CARD AND PLANS IN A CONSPICUOUS LOCATION) DATE ISSUED: FEES DESCRIPTION BUILDING PERMIT FEE AMOUNT 53.00 4.50 PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - 81.00 138.50 RCPT • DATE 1 L l 1 -10 4388 12 -20 -R9 L-N91. I Ms) 5.720,00 ASSESSOR ACCOUNT e 252304- 9471 -Q5 Tenant Improvement (commercial) Li Demolition (building) U Grading/Fill Remodel (residential) ❑ Other into two offices, add door and relite to open work area. CODE COMPLIANCE USE 4 FL0i0R W FEET LOAD TOTAL SQUARE OCC. SQUARE FEET LOAD FEET CCC, LOAD SQUARE FEET CCC. - SQUARE CCC. LOAD FEET LOAD TOTAL TOTAL SQUARE FEET OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. ONTO ■V PROPERTY OWNER ol l K l n. PHONE 575 -016.5 ZIP 9ft1 S8 ADDRESS 601 Strander rd_ Bouleva, Tukwila. WA CONTRACTOR PH Boden Inc. PHONE 455 15 ADDRESS 12507 Bel Red Road #102, Be1leYue, W11 I I ZIP 98005 EXP. DAT 5/90 PHONE WA. ST. CONTRACTOR'S LICENSE # PATRII213DM ARCHITECT Owner Representative ADDRESS OCC. LOAD • ZIP DESCRIP ON A RCPT M DATE BUILDING PERMIT FEE _8L (10 ) 01 4.50 b E i : (b9 _ I- 11 • Q_ PLAN CHECK FEE . _ s _: • I -1110 BUILDING SURCHARGE ENERGY SURCHARGE CCC. LOAD SQUARE FEET OTHER: SQUARE FEET OCC. LOAD • SQUARE FEET TOTAL • 138.50 TOTAL OCC LOAD _ USE - ) / ,,. / CODE COMPLIA / / l , ?,.t., to sign for and obtain this building permit. n.coR 4 SQUARE FEET OCC. LOAQ SQUARE FEET CCC. LOAD SQUARE FEET OCC. LOAD i SQUARE FEET OCC. LOAD • SQUARE FEET OCC. LOAD , TOTAL ARE FEET TOTAL OCC LOAD TOTAL ' TYPE OF CONSTRUCTION: V - UBC EDITION (year) SETBACKS: N _ S _ E - W - FIRE PROTECTION: ®Sprinklers 0 Detectors 0 N/A UTILITY PERMITS REOUIRED?U Yes n N o I Public W ric. i Public os ZONING: C - M BAR /LAND USE CONDITIONSO ri No this permit does not presume to • : autho ity to violate or cancel the provisions of any other state or local laws CONDITIONS (other than those noted on or attached to permit/plans): to sign for and obtain this building permit. SIGNATURE: _ , u' � jr,� APPROVED FOR i ;T7 ISSUANCE BY: . . 1 /' . %tti BUILDING OFFICIAL know the same DATE: / •- 9 - ''Q to be true and correct. All provisions I hereby certify that I have read a • exg nod this permit and of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to • : autho ity to violate or cancel the provisions of any other state or local laws regulating conAp ion or t...or1 rman or work. I am authorized to sign for and obtain this building permit. SIGNATURE: _ , u' � jr,� DATE: / -- // ` ?6.7 PRINT NAME. ,.a �,c; � __ r • yt COMPANY: eH anc41 ._ CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. '5 < DATE ISSUED: -6 1 0 SITE ADDRESS S •UC ON 5,720,00 PROJECT NAME/TENANT ASSESSOR ACCOUNT # Mor an Desi n 252304-9071-05 TYPE OF Li New Building Addition [ Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: ....._ + _ DESCRIBE WORK TO BE DONE: � Divide large room into two offices, add door and relite to open work area. 1044 Tndus _ry ..D.r CERTIFICATE OF OCCUPANCY NO. BUILDING; PERMIT \/ (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES LA CAE , :• PROJECT INFORMATION', SUI VALU O This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. waft *Kg CITY OF TUKWILA But)ding otn'ision Tukwila,�tWashington Boulevard 98188 (206) 433 -1849 • Site Address /(9 _ �,• —� �� ' s 4t 4/ Requestor CA."? Special Instructions Type of Inspection Inspection Results /Comments: Inspector ..� r v V 1"1 Cierrieci 1r 13 — -- PERMIT #- Date Date Wanted 3--5 ?O Date < �1.�1� p.m. s a y Project /plc Phone # g �sl y CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 Type of Inspection Site Address Requestor Inspection Results /Comments: 71- rtCL1 Date Wanted 73-1-' I oafLj TThd u4ry �r BO) 4-1 Project'Yf Or'� OIYI 302_513n m Ordn o- Phone # 5S Special Instructions Inspector INSPECTION RECORD PERMIT Date Date 3 ( '' .IT > ( Date ) "/ _ Permit No. CITY OF TUKWILA Building Division 6200 Southcenter Blvd. Tukwila, WA 98188 433 -1845 f r , Signed i ` � Building Official /Inspector Job Address CORRECTION NOTICE 14 - The following items are found to be in violation of.Ordinanee /> )J /=` and shall be corrected. _.. .. vwear�Wa' ^1:iNi'a5011..111ta'fI: 1 :111 S':+S t1GYtarnt'+a<a.� Inspector CITY OF TUKWILA Building Division Tukwila, Washingtonul98188 (206) 433 -1849 Type of Inspection `/1Cc.) Requestor ' ( n•l Special Instructions C j d �`r r 5�r y (fir ire Siu{V- Project / 74'p Q /? 9/ Site Address Inspection Results /Comments: /' ' j INSPECTION RECORD PERMIT #�j Date aZ — 90 Date Wanted . -70 a.m. Phone # Date 2' � � 7/990 CITY OF TUIWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 Inspection Results/Comments: ) Inspector INSPECTION RECORD PERMIT # Date Tyke of Inspection Date Wanted p.m <1 6 Site Address /Oil Project Requestor %.„--;/5-eltl dari Phone # Special Instructions Date 2/20/F c.3 r+iwf� � 4Ly. t'VSaill l °'stil ttt >`k �:. " o ii4:; rsvK :tv3 x,r, �asa.aukxr.�nY.,»w CITY OF TUKWILA Building Division 6200 Sou Tukwila, thcenter (206) 433 -1849 Date Type of Inspection �'a nt n OR J Site Address 10 L-( L! "v�d u r �r Requestor 1 rr ` Special Instructions Inspection Results /Comments: • L. .1 INSPECTION RECORD PERMIT # ,_)' '' ll Date Wanted Q -15-90 a . m Project l JOQ4 �Q�15 V1 Phone # 55-- Li 3 S Date P r. f 4) .�ntrol No. 59— CITY CITY OF TUKV�irLA ; �.��? � �� ,.� Central Permit System �� _.. 1990 Permit No. S�. >c 5 TO: ❑ Building ❑ Planning A uthorized Signature Authorized Signature This project is approy, by this department: FINAL APPROVAL FORM ❑ Public Works Fire Dept. Project Name /} ! ; . 9 / A / 1.-& :,/c7 Al Address / r �� c.r ;it 7 le f' l..) /e Type of Permit(s)- This project is nearing completion. Please investigate your area of responsibility and indicate below either your final approval or necessary corrections. if no response is received within one week, it will be assumed that the project is of no concern to your department and a certificate of occupancy may be issued. This project is NOT approved by this department; the ` following corrections are necessary: �4 c % A 1.4 rt) % ii A( / ) 1 `) •� c %/ % / - Cic ("ill %!7(' Y ^C-4- IC ,) &'k i % _5/7,9 // 1.�e / o E /t-6 t r ) qp f po 5r2r ) ) � ) ( ) E ) U C/2_ • ❑ Police ❑ Parks/Recreation 4 96 f Date t t /2 l Date f CPS Form 3 SEPARATE 1 JET PERMIT AND E ��, A � APPROVAL REQUIRED w�� FILE COPY I understand that the Plan Check approvals are subject to errors and omissions and approval Of plans does not authorize the violation of any adopted cod • • rdinance. - of c • • actor's copy of a • • rov -. plans c • • • ed. Permit No 0 RECEIVED oITY OF TUKWILA DEC 2 0 1999 PERMIT CENTER Strander Blvd. J Minkle Blvd. Koll Commerce Center Tract II 11„1111117 0 D 2e 32 Phase IV Duipt CITY OF TUKWILA APPROVED .J/� 19' G DIVISION Lint f3 Of (^)0•4"" Phase V KOLL BUILDING 34 1036 -1052 Industry Drive Tukwila, Washington Total Area 18,300 S.F. t oll Business Center Tukwila -Phase V I. CITY OF TUKWILA APPROVED JA 19 B LDI DIVISION Afro.- 1% . TENANT IMPROVEMENTS: MO r an ! ti, /6 (7 Des . Citr. /0 / V I,1lvs 1 Drive, eat 3 Scale" ' v sp'0os EKisf'�y w h Pero,% Akio 6 510414 wtU per WIN-14 d eta ∎ 7 New ill? f tovi•A.l 3 °x r ° S°rd es c- bi •cl- hoe AVew I/4 J4Ia.4 ,life A!•x6 °aifk � a leav *form( 1 &•is .r. CITY OF TUKWILA APPROVED • PATRICK H. BODEN INC, 12507 B41-Red Rd, 0102 Bevuu, WA 96005 • (206) 4554515 • " eei t 47` 4 PATRICK H. BODEN W. 12507 Bel-Red Rd. 0102 Bellevue, WA 09005 (206) 455.0515 AIM. f 4Cfl4G Top � i v0 °` 8��, • Depa��, oV wau. 1so / . 45 6GfZcaf 4- �r• MaX �pactKA EX/lrn� (flirt? Iv 1 wr`re f /oo.- etkve X1f /ay Gacouifrca/ drl// ' lye fa l e tnn e/ •frrAd a f deg /' 7 6ro� Abfe: A/a./ls dh"dii► Wa .e,<Duse etMe( d s'i// � k t[rd b e yard stu a of //i�iy b ai/d J al/ad /Ault of w'J(a lc- 4,11 will le ir�ted fv sfrac fare abo& g'- o "o.G. 7 IC , w s 4 e� . ,,e . - screws etaces( S"O.G. On e /L "D, G. ii fit /G( AI' rile ma", situ( 3 yb ' 'wic>/e , Z Y`'0, C .2— 2S r'4r ine fat ei4nAa /YYak Ext:W7 f /.a-• S/4 � �1" ninuef v Weedc dka yin ( y8 "D, L. „et✓7c /On Wind wait. eon r 7 icai CITY OF TUKWILA APPROVED JA 9 B ILDI G DI ISION Plan Check #89 -441: Morgan Design 1044 Industry Dr #E THE FOLLOWING COMMENTS APPLY TO AAN�NDD� ECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER _EXIS1____• 1. No changes will be made to the plans unless approved by the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 9. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE AP PROVED INITIALS CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 X 7 Framing 433 -1849 8 Insulation 433 -1849 9 Suspended Ceiling 433 -1849 X 10 Wall Board Fastening 433 -1849 11 12 13 x 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 x 17 BUILDING FINAL 433 -1849 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 S ITE ADDRESS: 9. 10. 11. 12. 13. 14. 15. 16. 17. OTHER AGENCIES: BUILDr,1G PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: 1044 Industr Dr E Morgan Design CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE 5%%q I - ti-T) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied In place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is In place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). FINAL FIRE INSPECTION - Contact Fire Department for their requirements. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. a,Z�ec "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 8 Masonry Chimney X 7 Framing 8 Insulation 9 Suspended Ceiling X 10 Wall Board Fastening 11 12 13 X14 FIRE FINAL Insp: 15 PLANNING FINAL 18 PUBLIC WORKS FINAL ><17 BUILDING FINAL PLAN CHECK NUMBER ( PROJECT: MCZoA“ L)% N THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER _ (,.t') No changes be made to the plans unless approved by 4Ar■ w '--' - - ' the Tukwila Building Division. O Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). O O 7 All structural concrete to be special inspected (Sec. 306, UBC). O special inspected (Sec. 306, UBC). O All high- strength bolting to be special inspected (Sec. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. All mechanical work shall be under separate permit through the {{{{{{//////���//��� City of Tukwila, }All permits, inspection records, and approved plans shall be t/�' posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. All structural welding to be done by W.A.B.O. certified welder and jiPartition walls attached to ceiling grid must be laterally braced w if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. IS Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. t Any exposed insulations backing material to have Flame Spread 1. 51?.----' �j Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15 Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.), 16 A statement from the roofing contractor verifying fire retardancy of rook will be required prior to final inspection (see attached p cedure). ifi 31--"- All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Nashignton State Energy Code (1989 Edition), and Washington Stae Regulations for Barrier Free Facility (1989 Edition). 11 All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the Job site. l9 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20 Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.B.C. Standard No. 43-1, shall be special inspected. 22 All wood to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.1.C. Section 306 (a) 7. Ifi l)alidity of Psrelt. The issuance of a permit or approval of (/`� plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Dear Sir 1 City o Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Fire Department Review (512) Control 4189-441 Ro: Morgan Design - 1044 Industry Drive, Suite 41E, Tukwila, Wa. 98188 January 8, 1990 Gary L. VanDusen, Mayor The attached at of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for yeul ,*stablishment. is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher( s) should bv. of the "All Purpose" (2A, 10 8:C) dry chemical type, Yr. distance to any fire extinguisher must be 75" or less. (NFPI 10, 3-1.1) (UFC 10-1 (3-1)) Extinguishers shall be located so as to be in plain view (if at all possible), or if riot in plain view, they shall be identified with a sign stating, "Fire Extinguisher," with an arrow pointing to the unit. (NEPA 10, 1-6.3) (UFC 10.301) 2. All modifications to sprinkler systems shall have the written approval of the Washington Surveying & Rating Bureau, Factory Mutual Engineering or Industr ial Risk Insurers, then by the Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance 111141) (NFPA 13, 1-9.1) (UFC 10.307) Contact the Tukwila Fire Depaltment., Fire Prevention Bureau to witness all required inspections and te-, (NFPA 13, 1-10.2) (UFC 10.307) 3. Ali electrical wiring is to be inspected by the State Eltutrical Inspector , Washington State Department of Labor & industries. (UGC 10.104) Yours truly, cc: T.F.D. File mmd City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Page nunibe 2 The Tukwi a Fire Prevention Bureau Gary L. VanDusen, Mayor All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPf 70) (UFC 10.104) 4. All required occupancy separations, area separation wails, and draft-stop. partitions shall be maintained and shll be properly repaired, restored or replaced when damaed, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) In order Lo provide you with the Castest police and File protection under emergency conditions, please post your suite, room or apartment number in a conspicuou,o place near the main entry door. Numbers shall contrast with their background. (UFC 10.201:i) Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of ouch condition or violation. PROJECT movek,ozma49.0 T X • _ ADDRESS 1044 �'4loca5A ORDINANCE COMPLIANCE CHECKLIST Uniform Buildinc J CITY OF TUKV L.A DEPARTMENT OF COMMUNITY DEVELOPMENT nrct1PANCY nROUP IS-2y ... OM/Of-6M VN [ TYPE OF CONSTRUCTION LOCATION ON PROPERTY 1 RI I T I fl l NG H I FGHT /Nn of STORIES.._.___ r FLOOR AREA zsortGsf (. OCCUPANT LOAD ,Z 04/LpD . Z3 �!!J EXITING REQUIRFMENTS e5C.Ce = Z3 < . 30 ••• r--11342Q10-ED-y_ 2_ 6CSAPag..1.f.6.4aS/ . _ 41c0 E4¢CES6 . �SF,v�,_....�x�Tti�c_ o.1r�� ✓ r 'I] ` _] DETAILED REQUIREMENTS: OCCIIPAN.CY ` SYPF OF .CO tSSRUCIION !ENGRG. REGS & REQMT_S, WA �'1�CNAPIER_5L -. LAC- .. I 1 , NOTES: � g <tb 4 irPOAC.P ... ± r11.c..ePArxITtOK_ sTA440... .tasg : ..... Code, 19 $$ Edition. PLAN CHECK NUMBER al - FACIE NO PERMIT NO. • CONTACTED DATE READY DATE NOTIFIED 1 � n � "l "t BY: ini _ p ,W PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING 5o 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER Li Lt l BUILDING PERMIT APPLICATION TRACKING PROJECT NAME SITE ADDRESS org 5 n 10�►�I 'End c r SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. ) • BUILDING - initial review CA FIRE O PLANNING O PUBLIC WORKS O OTHER tt BUILDING - j_q_90 final review INIT• 1 -2 -h0 (ROUTED) FIRE PROTECTION: (Xj Sprinklers ( ) Detectors ( N/A INIT: INIT: INIT: INIT: CONSULTANT: Date Sent - Date Approved - FIRE DEPT. LETTER DATED: / - ?'"fo INSPECTOR: 4 31 2_ ZONING: C— (Y7 IBAR/LAND USE CONDITIONS? (lYes _SK No REFERENCE FILE NOS.: MINIMUM SETBACKS: N- 5- E- UTILITY PERMITS REQUIRED? Yes ),Q No PUBLIC WORKS LETTER DATED: S - C C I I 0 (year): REVIEW COMPLETED (206) 433 -1849 DESCRIPTION :;: AMOUNT RCPT; # — Mr - BUILDING PERMIT FEE `I4.�7 PLAN CHECK Q - [ NUMBER t l I AITLICA TION MUST BE FILLED OUT COMPLE TEL Y PLAN CHECK FEE _.. C � . a-a• BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - I j` s:S') SITE ADDRESS SUITE # 10 y y .znhU ivy A-/V e, E VALUE OF CONSTRUCTION - $ IS 7,20 PROJECT NAME/TENANT tfir ��ri /� A ACCOUNT # 2Sx3oy s - 907 / - TYP OF U New +Building U Addition Tenant Improvement (commercial) U Demolition (building) WORK: O Rack Storage 0 Reroof ❑ Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: /- L t /i/I e . 4/Ale rpor -- info tWO a fi / (Cl ail aovr Qs-1 r e 7O ole ... Wuv-A c.frca.. BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: .7A7 /'041% WILL THERE BE A CHANGE IN USE? l�J"No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: /g 300 Tenant Space: A1D0 Area of Construction: 30g WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? Q'No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER l 4 // Co PHONE s 7f- D76 ADDRESS 60/ .S 4/vI ZIP W.611 'CONTRACTOR Pk /� oden j3 PHONE y vro ADDRESS /1 -.I'0 7 6d /4). a . /0,_ 4 Gv ✓e: ZI P i j_ WA. ST. CONTRACTOR'S LICENSE # # 04 T2 Z / 3 of EXP. DATE s-- 90 ARCHITECT f o am er . Tr car feuinee, PHONE ADDRESS ZIP 1 H EREBY CERTIFY THAT I: HAVE READ AND: EXAMINED T HIS APPLICATION ANA RUE:�AND CORRECT, AND L AM.AUTHOI IZED TES APPLY : >F OR> IVQW :TH SAME TO SE BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE - `\1/1,/44m1., DATE /2- 21J/6" PRINT NAME . ci/ i �" vvrr PHONE yj - f -_ yr - /( - ADDRESS /Lfo7 /de( a a /02 / CITY /ZIP A_ iL veuevve. 94'0ur- CONTACT PERSON (� / h T vvrr c.. PHONE y -r ynr CITY OF TUKWILA Department of Community Development - Building Division FEES (for staff use only) 6200 Southcenter Boulevard Tukwila WA 98188 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prier to application submittal. Contact the Permit Coordinator at 133 - 1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION ACCEPTED B PERMIT APPLICATION DATE APPLICATION EXPIRES COMMERCIAL • " ' • ''''' ' • ' ' • ' • ' ' ' N E W C BU . Completed bthlng permit application (one for each structure) Assessor A000unt Number . : „, . . :,..,-.••.•".„..,,...••• Two sets (2) of he following • El Structural calculations stamped by a 1 tingttin.:Stat*Ilbersed .:••••• engineer ................ report stamped,by..a:WashingtOn State liCenCetidngineer::::.. ........ ....... ....... Topographical, survey '''' „:.••• Energy calculations Stamped by :aWaihingteirt State licensed . „. ..• •., • , •••-•••: engineer. or 'architect • • • •• ••• • li censed ••• • Structural drawings Mectianical drawings • Elevations • CM drawings • '' . ... Completed utility permit application (one for entire . ; . . ; . • . • Siti16)Sets of own drowing!t::::. NOTE See •titilitYPeritilt:i1PpliCatinn and checkhst for „ .... .. ... . ..:.„,:.,: • NOTE lncluc$ dimensions of racks (ftelgit(#iddiartdlang .alaleS:::::::::..:::: and :MO: snlya on plart,',” • fl Structural calculations stamped by a Washington State licensed RESIDENTIAL • : • . .. NEW SINGLE-FAI4ILY fl :. • . . . . Completed building • permit applicalionlonefor each structure) , , • ••:::: • . .....,..... .. .. .1:11 Legai description E Assessor Account Number': • ...;:..;.,„ . . ••••• C Two sets (2) of working drawing ii;whiCh • ••••• :: • • • . .": . • • • • Site plan • , "• • :":" • Foundation plan • Roor plan Root plan .;.• Building .elevations (all , ......Bulking cross section Structural framing , .E Washington State Energy Code data Completed utility permit application ••••••* Six (6) sets of site plans showing utilities: : • „ .„. • ::: . . • NOTE Building site plan and utility site plan may be combined See utility permit application and checklist for specific submittaiectifirentants.: : • • • Ad* banal topographical and soils information may be required t.unique", site C0110VOOnit. • " • • • SlCaMITTAL CHECIWST . [] Completed building permit appllcaon (one for each structure) fl Assessor Account Number Two (2) sets of working drawings, which Include . . . „ "" ": ••••:: •:: Site plan • • Foundation plan Roof plan • Building elevations (ail: views) • •••• • , ":" : • ., wide urn/ry • •-• .a an y .:: • tildk...viork • submitte ,,• NOTEIf. • ...... ..••• • • • and plans must be • . ...,,,., . . ... . . .. . „,.:„.„.. •• .„.;•.„„ E building PorMitapplicaticid(One"fOr •pach•strticttire) '•"' • . .....:. .:.„.:„ . ....... . E Atsesstir:AccOtint Number ..:" E NarratiVddisCribing:eitilting re being removed and • ••••: .•• • material being • •••• '.."' ••••• • ,••••,... ...... • ........... • : • : • •:::: •••••• •••••••••••••••• '• • : ::••• ••••••• ':" ••• ••• ::••••••• •• • • , • • -, • -- • ....... . NOTE: A certification letter Is requira 'Prioe to final Inspectionandsignr.,.... off of the permit