HomeMy WebLinkAboutPermit 5916 - Pearl Northwest - Storage RacksIS APPROVED SUANCEB / (4(4.( Q ► f . � /� � -�
OFFICIAL
know the same
whether specified
the provisions
to sign
DATE: ,2-6 - YO
to be true and correct. All provisions
herein or not. The granting of
of any other state or local laws
for and obtain this building permit.
I hereby certify that I have read and exan4i ed this permit and
of law and ordinances governing this work will be complied with,
this permit does not presume to give authority to violate or cancel
regulating construction or the performance or work. I am authorized
CONTRACTOR N/A
DATE: .:,
COMPANY:
— � 1 -- c ,
SIGNATURE: 4- ,/ - .e...e-
PRINT NAME: /`-7 Pe-
..4 v PE✓
rT i #+N d Fj.tu vn L►L 177 7 79 - 4 - r'
PROPERTY OWNER Alvin S. Pearl IPHONE
244 -2600
ADDRESS 401 Baker Boulevard, Tukwila, WA
ZIP 98188
CONTRACTOR N/A
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT N/A
PHONE
ADDRESS
ZIP
TYPE OF CONSTRUCTION: N/A UBC EDITION (year3
SETBACKS: N — S — E —
W —
FIRE PROTECTION: O S • rinklers (] Detectors ®N /A
UTILITY PERMITS REQUIRED? O Yes ®N o
(th rough
- • .
•
ZONING: C _ M BAR /LAND USE CONDITIONSOyes Z3 No
CONDITIONS (other than those noted on or attached to permit/plans):
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING (/)
PERMIT NO. , ) L
DATE ISSUED: r
qo
DESCRIBE WORK TO BE DONE:
401 Baker B1
Install racks.
BUILDING PERMIT
(POST WITH INSPE,TION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN CHECK #90 -026
DATE ISSUED:
FEES
DESCRIPTION
BUILDING PERMIT FEE
AMOUNT
5
PLAN CHECK FEE
BUILDING SURCHARGE
ENERGY SURCHARGE
OTHER:
TOTAL -
RCPT I
DATE
51.2 51.0g7 Q
4.50
56.02
P F30.I1 C I IN( 0 NIA I IONJ
t I -
1,000.00
PROJECT NAME/TENANT Pearl Northwest Inc. ASSESSOR ACCOUNT N 022310 - 0085 -
TYPE OF 0 New Building Addition ❑ Tenant Improvement (commercial) U Demolition (building) Li Grading/Fill
WORK: ® Rack Storage O Reroof O Remodel (residential) 0 Other
c'c)t>t COr.iPt Inrl�'F
USE .4
FLOOR
TOTAL
SQUARE
FEET
i
i
OCC. ' SQUARE OCC. SQUARE OCC.
LOAD FEET LOAD FEET LOAD
SQUARE
FEET
r
OCC. SQUARE OCC.
LOAD FEET LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF
OCCUPANCY NO.
PROPERTY OWNER Alvin S. Pearl
AMOUNT
]PHON 244 - 2600
ADDRESS 401 Baker Boulevard, Tu kwila, WA
BUILDING PERMIT FEE
ZIP
98188
CONTRACTOR N/A
PLAN CHECK FEE
PHONE
J.5Q
ADDRESS
OCC.
LOAD
ZIP
OCC. �"
LOAD
WA. ST. CONTRACTOR'S LICENSE #
'OCC.
LOAD
EXP. DATE
OCC.
J,GAD
ARCHITECT
TOTAL
OCC. LOAD
PHONE
56.02
ADDRESS
ZIP
,
DESCRIPTION
AMOUNT
RCPT I
DATE
BUILDING PERMIT FEE
— _ 5 L52 _
5l
PLAN CHECK FEE
BUILDING SURCHARGE
J.5Q
SQUARE
FEET
OCC.
LOAD
ENERGY SURCHARGE
OCC. �"
LOAD
�4UARE
'OCC.
LOAD
OTHER:
OCC.
J,GAD
TOTAL
SQUARE FEET .
TOTAL
OCC. LOAD
TOTAL -
56.02
LrSE
/
:ONDITIONS other than those noted on or attached to • rmit/ • lens :
COOL Cor.1PLIANCI
IGNATURE: i �. -, _./ I.- w .)
DATE: --
'RINT NAME: 4..i'i1 5, /e .[...
COMPANY: ))�- icrr/6 4-- f31.U hIEtv7/ 74
=poi
SCONE
FEET
OCC.
LOAIZ
SQUARE
FEET
OCC.
LOAD
'SQUAW
FEET
OCC. �"
LOAD
�4UARE
'OCC.
LOAD
'SQUARE
-FEET
OCC.
J,GAD
TOTAL
SQUARE FEET .
TOTAL
OCC. LOAD
,
1
,
TOTAL
TYPE OF CONSTRUCTION: UBC EDITION (year -
FIRE PROTECTION
'OS Q Detectors � N/A
ZONING: C _ H BAR/LAND USE CONDITIONSOY Q No
SETBACKS: _ _ _
UTILITY PERMITS REQUIRED ? es ( oug
Yes No Pu blic Worts.l
:ONDITIONS other than those noted on or attached to • rmit/ • lens :
_1
I hereby certify that I have read and exa ed this permit and
of law and ordinances governing this work will be complied with,
this permit does not presume to give authority to violate or cancel
regulating construction or the performance or work. I am authorized
IGNATURE: i �. -, _./ I.- w .)
fHFOVED FOR I
3SUANCE 8Y: L( 4.. J ` ( x� � "" . • -�_.
BUILDING
OFFICIAL
know the same
whether specified
the provisions
to sign
DATE: /
- - �
to be true and correct. All provisions
herein or not. The granting of
of any other state or local laws
for and obtain this building permit.
_1
I hereby certify that I have read and exa ed this permit and
of law and ordinances governing this work will be complied with,
this permit does not presume to give authority to violate or cancel
regulating construction or the performance or work. I am authorized
IGNATURE: i �. -, _./ I.- w .)
DATE: --
'RINT NAME: 4..i'i1 5, /e .[...
COMPANY: ))�- icrr/6 4-- f31.U hIEtv7/ 74
• CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
DATE ISSUED:
ERTIFICATE OF
rCCUPANcv NO.
401 Baker B1
PROJECT NAME/TENANT
Pearl Northwest Inc.
NIA
BUILDING PERMIT V
(POST WITH INSPL :_ (ION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN
PFIO.IFCT INFonmArlorl
UI
FEES
1,000.00
ASSESSOR ACCOUNT a 022310 - 0085 -07
TYPE OF • New Building ■ Addition ■ Tenant Improvement (commercial) • Demolition (building) ■ Grading/Fill
WORK: ® Rack Storage 0 Retool 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Install racks.
This permit shall become null and void if the work Is not commenced within 180 days from the date of
issuance, or If the work is suspended or abandoned for a period 01180 days from the last Inspection.
DATE ISSUED:
CITY OF TUKWILA
8u Division
Tukwila,,tWashington Boulevard
8188
(206) 433 -1849
Type of Inspec
Site Address
Requestor
Special Instructions
__ . _ . . .. : •u..+..r:.w�e eon., n- „,<�w.r�wawr:M:ve :s.ra.vnr+ saki+. ux• �xntww:,+..: x�J, aev.< : <mnrirw: +. +rwy1^�Y�na1:'d:N.w.
0 1r
P\1 v i Qr
4645 /msss
Inspection Results /Comments: ---__
7D
INSPECTION RECORD
PERMIT # i 1 CO
Date (g-1S 9 D
q'
P.m•
Date Wanted a ” di b
Project RYf \ MOr ti.)Q
Phone # Q 4) Ob
e'"!aon g' 11,94
Pearl Northwest Inc.
401 Baker Blvd.
Tukwila, Washington 98188
244 -2600
Rack length 3 44 Feet
e 56 Feet
1 . 64 Feet
Rack width 44 Inches
RACK STORAGE
Height 7 Feet 10 inches
RECEIVED
CITY OF TUKWILA
JAN 2 3 1990
PERMIT CENTER
Plan Check #90 -026: Pearl Northwest' Inc.
401 Baker 81
THE FOLLOWING COMMENTS APPLY TUNA BECOME PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER__ __..
1. No changes will be made to the plans unless approved by the
Architect and the Tukwila Building Division.
2. All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
3. All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington State Regulations for Barrier Free
Facility (1989 Edition).
4. Validity of Permit. The issuance of • a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any .violation`of any of the
provisions of this code or of any other 'ordinance of the
jurisdiction. No'permit presuming to,give authority or violate or
cancel the provisions of this code shall be valid..
"X"
REQUIRED INSPECTIONS
PHONE
AP DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
433 -1849
2 Foundation
433 -1849
3 Slab and/or Slab Insulation
433 -1849
4 Shear Wall Nailing
433 -1849
5 Roof Sheathing Nailing
433 -1849
6 Masonry Chimney
433 -1849
7 Framing
433 -1849
8 Insulation
433 -1849
9 Suspended Ceiling
433 -1849
10 Wall Board Fastening
433 -1849
11
12
13
14 FIRE FINAL Insp:
575 -4404
iL
15 PLANNING FINAL
433 -1849
16 PUBLIC WORKS FINAL
433 -0179
X 17
BUILDING FINAL
433 -1849
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
SITE ADDRESS:
OTHER AGENCIES:
� BUILDI'1G PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT:
401 Baker B1 Pearl Northwest Inc.
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - if structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Battles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department tor their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 872 -6363
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 433 -1849. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 01,21/60
"X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11
12
13
14 FIRE FINAL Insp:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
< BUILDING FINAL
PLAN CHECK
NUMBER
9D -o06
I PROJECT:
THE FOLLONINO COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER
,( �' No changes will be made to the plans unless approved by the
((���� Architect and the Tukwila Building Division.
O 2 Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency,
including all gas piping (296 - 4732).
u Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will be
inspected by that agency (872 - 6363),
O All mechanical work shall be under separate permit through the
ty of Tukwila.
All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
O When special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O All structural concrete to be special inspected (Sec. 306, UBC),
O All structural welding to be done by W,A.B.O, certified welder and
special inspected (Sec. 306, USC).
U 9 All high - strength bolting to be special inspected (Sec. 306, UBC).
O Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
(::) Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
12 Readily accessible access to roof mounted equipment is required.
l3 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread
Rating of 25 or less, and material shall bear identification
showing the fire performance rating thereof.
1S Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
O A statement from the roofing contractor verifying fire retardancy
of rook wfll be required prior to final inspection (see attached
procedure).
1../e All construction to be done in conformance with approved plans and
11IIV//VNN�v� requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington Stag Regulations for Barrier Free
Facility (1989 Edition).
le All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296 -4787, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
l9 Fire retardant treated wood shall have a flame spread of not over
23. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
O Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
21 All spray applied fireproofing as required by U.B.C. Standard No.
43 -8, shall be special inspected.
22 All wood to remain in placed concrete shall be treated wood.
23 All structural masonry shall be special inspected per U.B.C.
Section 306 (a) 7.
Validity of Permit. The issuance of a permit or approval of
plane, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or
cancel the provisions of this code shall be valid.
Plan Review
PROJECT���AL 1,10
ADDRESS 401 r R -Es
DATE I
OCCUPANCY GROUP
TYPE OF CONSTRUCTION
LOCATION ON PROPERTY
BUILDING HT. / NO. STORIES
FLOOR AREA
OCCUPANT LOAD
EXITING REQUIREMENTS
DETAILED REQUIREMENTS
OCCUPANCY
TYPE OF CONSTRUCTION
PART V, CHAPTER 23, U.B.C.��� 6TOR < � / -��` ,� -I�IC1 RMTS E�L�
AllA
W.S.E.C.
CHAPTER 51 -10, W.A.0
NOTES:
E25 MAI NTAk L D -1- TANcie
B -Z
t\l/A gAGK STORgeE
til�A
141/4
PLAN CHECK
NUMBER
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: ,
PLANNING DIVISION
TO:
PROM:
DATE:
SUBJECT:
(10 / T2.M E MO)
Ott of Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
(2081433.1800
Gary L. VanOusen, Mayor
MEMORANDUM
Rao ar 1t t #qo-- 02��
Sh.et\'k.e_ T? th
cranuarc �� (qq
Rack +c rap_ F€s
X L1 x = bsto
V, 5( o I ""Y Sr
4.50
PROJECT NAME
alk 1 I o r the -(2.5
SITE ADDRESS
4 01 ( r 61
SUITE NO.
_--'
PERMIT NO.
CONTACTED
L-ef-t ,
o.
DATE READY
DATE NOTIFIED
b�'.1 -.6 10
BY.
(init.) ..,...
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
` �• n
r
3RD NOTIFICATION
BY:
nit.)
PLAN CHECK
NUMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" in box Indicates which departments need to review the project.
;...;......:.
BUILDING -
initial review
FIRE
O PLANNING
O PUBLIC
WORKS
O OTHER
BUILDING -
final review
tgi
BUILDING PERMIT APPLICATION TRACKING
t
- a3-90
2.3 0
REVIEW COMPLETED
I — Z3-CGO
(ROUTED)
INIT:
INIT:
INIT:
INIT:
- uj - fo
CONSULTANT: Date Sent -
FIRE PROTECTION:
FIRE DEPT. LETTER DATED:
ZONING:
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
PUBLIC WORKS LETTER DATED:
TYPE OF CONSTRUCTION:
........ ...............................
FIE
S • rinkiers
S.
Yes
Date Approved -
Detectors
N/A
INSPECTOR: A/ /i1
0 &X e4 4-/
BAR/LAND USE CONDITIONS? Yes
UBC EDITION (year):
W-
(206) 433 -1849
DESCRIPTION ..
AMOUNT
RCPT #
DATE
BUILDING PERMIT FEES
:<
PLAN CHECK C
NUMBER O ^ r► /
APPLICATION MUST E3E
FILLED OUT COMPLETELY
PLAN CHECK FEE
BUILDING: SURCHARGE
4.50
ENERGY? SURCHARGE
OTHER:
TOTAL
,
SITE ADDRESS SUITE #
401 Baker Blvd.
VALUE OF CONSTRUCTION - $
1 0270.00
PROJECT NAME/TENANT
f
ASSESSOR ACCOUNT #
H 022310 0085 - 07
TYPE OF • New Building • Addition Tenant Improvement (commercial) • Demolition (building)
WORK: El] Rack Storage O Reroof O Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
rack storage
BUILDING USE (office, warehouse, etc.)
warehouse ,, office
NATURE OF BUSINESS:' clothing Distribution
WILL THERE BE A CHANGE IN USE? id No Li Yes IF YES, EXPLAIN:
4500 S.F. office , 12800 S.F. warehouse
SQUARE FOOTAGE - Buildin 17,300 S.F Tenant S total Area of Construction: 0.00
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE'
BUILDING? a No O Yes IF YES, EXPLAIN:
PROPERTY OWNER
Alvin S. Pearl
PHONE 244 - 2600
ADDRESS 401 Baker Blvd. Tukwila, Wa.
ZIl i38188
CONTRACTOR none
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
none
PHONE
ADDRESS
ZIP
1 >.H I~REB CEI ry:)•IAT f HIkV E1► IVR EJKAM ED. THI$ APPI.ICATI KN $
QN' AND t W >Tf E; AfxII TO BE
'R � .: T :: , . , ;
U�
'CORRECT; � U 7. OF#1�ED:T ;: APP Y � t EIMIT:::'<::
C. > AND l A[ii1 A M C ....I., O�i.�'H S ..p
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE j . ��
DATE
PRINT NAME Alvin S. Pearl
PHONE - 2600
ADDRESS 401 Baker Blvd. Tukwila, Wa.
CITY /ZIP 98188
CONTACT PERSON Alvin S. Pearl
PHONE 244 -2600
CITY OF TUKWILA
Department of Community Development - Building Division
DATE APPLICATION ACCEPTED
BUILDING PERMIT
APPLICATION
FEES (for staff use only)
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
(:ommunity Development prior to application submittal. Contact the Permit Coordinator at 433 - 1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION EXPIRES
COMMERCIAL
• NEW;.COMMERONIL . BuikjmNowApornoNti . : COMMERCIAL TENANT IMPROVEMENTS •
E completed botrAlto pc _ p,r41 $1 :o building permit application (One for each structure or
Assessor Account Number ; E Assessor Account Number . . • • ; •
": "" 1, : • , • : • ... .
Two sets (2) of the following s ; . Two (2) sets of construction plans, which Include
:.: • ;":
• • , . ; •
•
. :.•.: „ . . . . E
F .-- 1..sokific o tions' : ::::.:.• , ....,... : ..,-.:•... , .•.::: • ,......,...... •
............ ..... ....... ........ .:....... ............,............................„..........,.............„........:....,.:....,.. . ... ...... „...............................„.:„...........................::•:• :::::,•.,•• .....
E Structural calculations stamped by a Washington State licensed ....-. .....".........:.:-.:.:•:".....• e Location of tenant space ' • •••••• • . ••• ••• '.• '.." • •
••••,...,. ;.; ....■. Existing and propOsed:parking .:.:::::::•:,.....•::....,...
...,. -,.,.,, engineer ............-......„....:.. . • :....::....; . • • - . ....,: ... ..„.: ...... ,.,....... ... .......„ ...,..... ...,:„....,:........:.......,,,::: ,..........................:............:::....................„.::„...„. „...„......: .,.,. ,....::::::::..„.........;............. ' ..,....,.. ' ::.........,..
[1] Soils report !tamped by •a .Washington State lioensedengineer . Ove ...........:...„.. ...... ., .. . . ...... .. ... .., ..,
ibeiliditig'Plan ..:;•"••'..•.•.:..• •• ..„. • .....,..,....:::......:::-.....:.."::::::::....-::...,.......:.:,....-•
• .• ....• . .... • ' .•-• • :::".•••••••• :••••...".•••.', ....:;:":..:::: :.-1" •-• ::'. • '' ••• .-: .• • • .•••••'••••••".....:''....; ' ' •
Topo survey Tenant
:....."...";....:":;•":„::, .,......,,,:i
. .... .. ........... . ... ....... . . ..... . . . .. .......„.....„. .....„..... .......... .
....•„ . . .... .. ...•:„.„..- ..: ........ .....„:„::::...•......... „:::,:::„.„:.: „:„......„,...:::.:::::::„:„,.,..,..:::::•:.:..:::::...„...,....,„.:-........,............ (common wall) 'adjacent '(
"...".........Use, of cOm: tenant
...:".....•••.:"•::::::•,'".::::;',.....' .', ...
.::..„............ .:....„. ............ ..... ''' . ' ,.. „ :, ........ ....... ..,.. .: ::..........:....„ .. ., ..„...„ .. . . .... . .. .....„.„......... ,........,...,...,.:....
footage
: •••".. : i,foro!l 'cilOensiorlo of building . or•squarst..::'.":•••'•••••"
] Energy calculations stamped by,.1•WashinatOri:State...liCeniad • o
;'::::::"":......: . .......:„.....:„..............,...:.::::..,....„.::::....:„.::::.::,„..,...„...... :.. ... „.. ....„ . ......................„.....„......:.: ;,:-...,•,,,...... .:.,....,.
engineer or architect .....„...•:"........".::::::::•••:::::::„.•"•::::::::•::::...:::,..."....:,:.:::::::::::...„.:;::::::::::::::::::::::::::::::::::::::::::::::.:::::••".•:.::,..:::.;:•••. : Floor plan of proposed tenant space....:..:'",: ' .•::, :.:::"...........:."..,.:.••..........••,.......... . ....:::::
."..............."... . "•".......::,........,......,...:.....,,,.::.......::,;:...::".:.....:::::,...-, ' .......::::::,:,::::::,....„........:::::.::::.....:.,:•••.•:::....;:::....:•:„...,:::": • .
„..,
• Woildng drawings ,. staMPed by a Washington State licensed
' "....
• . •
Architectural drawings
• StrUctural drawings
'drawings:
•:. Eiei�ns • • •
• CIVII. drawings
plan
Completed permit application (one for entire
sets of civil drawings •:'
permilaPplicatiert and .CheCl
'..sittstritta
• RACK STORAGE ..:„.
building permit applicat ‘ :‘..
C°mpeeted Account Number::
bu
i(2) sets of pl*ns, which in dude
j ale!! T
Buil ding floo
•
Tenant spa ce Dime located
Exit1150 .. reck‘ storage lsyouI aisles and
Entire tfre •• • •: : • • • •• : ' W1 :.: . .. 1 . (11
showing
RESIDENTIAL
Foundation plan • •• • •
:..." • Floor plan ••.:- •
• Roof plan . • •
• BUNn� elevations (all views).
Building crass-section •
.......ISttuctural treating plans • .
Washington State Energy Code data
• •• •
Coinpieied utility permit application
NOTE ft1ckb • • '' '''' •.••.". • .::•
dimensiOne"Of racks' aisle
and ex Y5. °'!
•
fl • Structural tal;calculations stOmried by a W41!„.0.r1-00,...:100::)lco,.....
(t.14skmegii:
Two sets .(2) of v■orking drawings'," which include
••••••••••:. • ' ; • • ..:
" ••...... •„.... . :."..
• •
.••.• • • :. •
. „ .
' •• •••.' . •
•
C
• Ej Six (6) sets of site plans showing utilities
NOTE: Building site plan and utility site plan may be combined. See
utility pent* application and checklist for specific submittal requirements.
Addliottal topographical and soils lnformabon,may be required!! unique
silt conditions.
SBMITTAL CHECkIIST
: ..:.• spe;eplsons patterns
of each
eec
doo rs, r°°
New Walls;'; existing wall, and walls to b demolished
E Construction details -• ,
••• ‘ Cross sections showing wall construction and method of
• ..•••:. ....""' attachment for floor and ceiling ' • . . . .
•.: :"
Structural calculations stamped by a Washington State licensed
engineer may be required if structural work is to be done (2
••• • .
NOTE .11 any utility v. is to be done, submit separate utility permit
• •
• 'ape/kite/tin iind • „..... • . • : •:: „ • • •
. . :
•■••••■•■•
"Assester:ACciiunt Number
:" •.:: : • : . :: • ::, :•::
Narrative describing existing roof, material being removed and
inaterial being ::::„
:: •
NOTE A cellificatio# letter required 0110f to fltiatinipecti9000O/00..‘:.::
oft of the •
...I••■•■■••
coloom0000ltoroti.00rroit
application (one for each Structure)
• ■•■•••••
:: RESIDENTIAL RBAODELS' :•:.
:. • .
: Completed Wilding pwrnit applicetion.(orie for e hstructure)
. .
Two (2) sets of working drawings, which include
Site
*.. Foundation plan
• Roof plan
• Builng elevations (all views)
'Building cross-section
. . .„ ..
NOTE:11.anY'Utllity.:#0ik'1001"OkdOrteproVidep(iiiv.permIt. app
3 I I i 7 0 1
BU D 11 'Sl( l %
BAKER BOULEVARD
EXISTING SITE and LAND -SCAR'
I understand that the Plan Check approvals are
wab;ecf to errors and omissions and approval of
pit::/l3 does not authorize the vioiail in of any
CITY OF TUKWILA adopted code or ordinance. Re- of contractor's
APPRO STING PLANT! NiGPL .
FEB 19'O
CITY I F TUKWIIA
(_ Jt$231990
f %C (� �� 1,U! i ( m�1t t4'I -�� 5 . D PER& IT CENTER
PK�r�I� "✓ G'�.f��.; i"rl1 (THUNL7EFt-IJ > rLL M)
1111 111 iii i111111111111I11111 1111111 111111111111111 1111111 1111111 1111111 1111111 iiili11 X111111 1111111 11i iii 1111111 X111111 1j11111 11111 11111111111111111 W _ 11111lilili{ii111111
� I I � I I � I I I I I I{ I � I l
I I{ � !
2 3 4 5 6 7 8 9 1n 11 MADE GFPMarry 12
`
---
risi
/////////|///////1//||///
('/ /'/'/'/'/ /'/ / / /'|
__'
Pearl Northwest Inc.
401 Baker Blvd.
Tukwila, Washington 98188
VICINITY MAP
16,
RECEIVED
CITY OF TUKWILA
JAN 2 3 1�¢M
~"., ` " .~~~
PERMIT CENTER
- --- - -- - --
~� �.^.'.
-' -- ' -
- —''- - -
� � A 7 P 0 1n 11 kurIF ===. 10