Loading...
HomeMy WebLinkAboutPermit 5916 - Pearl Northwest - Storage RacksIS APPROVED SUANCEB / (4(4.( Q ► f . � /� � -� OFFICIAL know the same whether specified the provisions to sign DATE: ,2-6 - YO to be true and correct. All provisions herein or not. The granting of of any other state or local laws for and obtain this building permit. I hereby certify that I have read and exan4i ed this permit and of law and ordinances governing this work will be complied with, this permit does not presume to give authority to violate or cancel regulating construction or the performance or work. I am authorized CONTRACTOR N/A DATE: .:, COMPANY: — � 1 -- c , SIGNATURE: 4- ,/ - .e...e- PRINT NAME: /`-7 Pe- ..4 v PE✓ rT i #+N d Fj.tu vn L►L 177 7 79 - 4 - r' PROPERTY OWNER Alvin S. Pearl IPHONE 244 -2600 ADDRESS 401 Baker Boulevard, Tukwila, WA ZIP 98188 CONTRACTOR N/A PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT N/A PHONE ADDRESS ZIP TYPE OF CONSTRUCTION: N/A UBC EDITION (year3 SETBACKS: N — S — E — W — FIRE PROTECTION: O S • rinklers (] Detectors ®N /A UTILITY PERMITS REQUIRED? O Yes ®N o (th rough - • . • ZONING: C _ M BAR /LAND USE CONDITIONSOyes Z3 No CONDITIONS (other than those noted on or attached to permit/plans): CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING (/) PERMIT NO. , ) L DATE ISSUED: r qo DESCRIBE WORK TO BE DONE: 401 Baker B1 Install racks. BUILDING PERMIT (POST WITH INSPE,TION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN CHECK #90 -026 DATE ISSUED: FEES DESCRIPTION BUILDING PERMIT FEE AMOUNT 5 PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - RCPT I DATE 51.2 51.0g7 Q 4.50 56.02 P F30.I1 C I IN( 0 NIA I IONJ t I - 1,000.00 PROJECT NAME/TENANT Pearl Northwest Inc. ASSESSOR ACCOUNT N 022310 - 0085 - TYPE OF 0 New Building Addition ❑ Tenant Improvement (commercial) U Demolition (building) Li Grading/Fill WORK: ® Rack Storage O Reroof O Remodel (residential) 0 Other c'c)t>t COr.iPt Inrl�'F USE .4 FLOOR TOTAL SQUARE FEET i i OCC. ' SQUARE OCC. SQUARE OCC. LOAD FEET LOAD FEET LOAD SQUARE FEET r OCC. SQUARE OCC. LOAD FEET LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. PROPERTY OWNER Alvin S. Pearl AMOUNT ]PHON 244 - 2600 ADDRESS 401 Baker Boulevard, Tu kwila, WA BUILDING PERMIT FEE ZIP 98188 CONTRACTOR N/A PLAN CHECK FEE PHONE J.5Q ADDRESS OCC. LOAD ZIP OCC. �" LOAD WA. ST. CONTRACTOR'S LICENSE # 'OCC. LOAD EXP. DATE OCC. J,GAD ARCHITECT TOTAL OCC. LOAD PHONE 56.02 ADDRESS ZIP , DESCRIPTION AMOUNT RCPT I DATE BUILDING PERMIT FEE — _ 5 L52 _ 5l PLAN CHECK FEE BUILDING SURCHARGE J.5Q SQUARE FEET OCC. LOAD ENERGY SURCHARGE OCC. �" LOAD �4UARE 'OCC. LOAD OTHER: OCC. J,GAD TOTAL SQUARE FEET . TOTAL OCC. LOAD TOTAL - 56.02 LrSE / :ONDITIONS other than those noted on or attached to • rmit/ • lens : COOL Cor.1PLIANCI IGNATURE: i �. -, _./ I.- w .) DATE: -- 'RINT NAME: 4..i'i1 5, /e .[... COMPANY: ))�- icrr/6 4-- f31.U hIEtv7/ 74 =poi SCONE FEET OCC. LOAIZ SQUARE FEET OCC. LOAD 'SQUAW FEET OCC. �" LOAD �4UARE 'OCC. LOAD 'SQUARE -FEET OCC. J,GAD TOTAL SQUARE FEET . TOTAL OCC. LOAD , 1 , TOTAL TYPE OF CONSTRUCTION: UBC EDITION (year - FIRE PROTECTION 'OS Q Detectors � N/A ZONING: C _ H BAR/LAND USE CONDITIONSOY Q No SETBACKS: _ _ _ UTILITY PERMITS REQUIRED ? es ( oug Yes No Pu blic Worts.l :ONDITIONS other than those noted on or attached to • rmit/ • lens : _1 I hereby certify that I have read and exa ed this permit and of law and ordinances governing this work will be complied with, this permit does not presume to give authority to violate or cancel regulating construction or the performance or work. I am authorized IGNATURE: i �. -, _./ I.- w .) fHFOVED FOR I 3SUANCE 8Y: L( 4.. J ` ( x� � "" . • -�_. BUILDING OFFICIAL know the same whether specified the provisions to sign DATE: / - - � to be true and correct. All provisions herein or not. The granting of of any other state or local laws for and obtain this building permit. _1 I hereby certify that I have read and exa ed this permit and of law and ordinances governing this work will be complied with, this permit does not presume to give authority to violate or cancel regulating construction or the performance or work. I am authorized IGNATURE: i �. -, _./ I.- w .) DATE: -- 'RINT NAME: 4..i'i1 5, /e .[... COMPANY: ))�- icrr/6 4-- f31.U hIEtv7/ 74 • CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: ERTIFICATE OF rCCUPANcv NO. 401 Baker B1 PROJECT NAME/TENANT Pearl Northwest Inc. NIA BUILDING PERMIT V (POST WITH INSPL :_ (ION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN PFIO.IFCT INFonmArlorl UI FEES 1,000.00 ASSESSOR ACCOUNT a 022310 - 0085 -07 TYPE OF • New Building ■ Addition ■ Tenant Improvement (commercial) • Demolition (building) ■ Grading/Fill WORK: ® Rack Storage 0 Retool 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Install racks. This permit shall become null and void if the work Is not commenced within 180 days from the date of issuance, or If the work is suspended or abandoned for a period 01180 days from the last Inspection. DATE ISSUED: CITY OF TUKWILA 8u Division Tukwila,,tWashington Boulevard 8188 (206) 433 -1849 Type of Inspec Site Address Requestor Special Instructions __ . _ . . .. : •u..+..r:.w�e eon., n- „,<�w.r�wawr:M:ve :s.ra.vnr+ saki+. ux• �xntww:,+..: x�J, aev.< : <mnrirw: +. +rwy1^�Y�na1:'d:N.w. 0 1r P\1 v i Qr 4645 /msss Inspection Results /Comments: ---__ 7D INSPECTION RECORD PERMIT # i 1 CO Date (g-1S 9 D q' P.m• Date Wanted a ” di b Project RYf \ MOr ti.)Q Phone # Q 4) Ob e'"!aon g' 11,94 Pearl Northwest Inc. 401 Baker Blvd. Tukwila, Washington 98188 244 -2600 Rack length 3 44 Feet e 56 Feet 1 . 64 Feet Rack width 44 Inches RACK STORAGE Height 7 Feet 10 inches RECEIVED CITY OF TUKWILA JAN 2 3 1990 PERMIT CENTER Plan Check #90 -026: Pearl Northwest' Inc. 401 Baker 81 THE FOLLOWING COMMENTS APPLY TUNA BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER__ __.. 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 3. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 4. Validity of Permit. The issuance of • a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any .violation`of any of the provisions of this code or of any other 'ordinance of the jurisdiction. No'permit presuming to,give authority or violate or cancel the provisions of this code shall be valid.. "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 7 Framing 433 -1849 8 Insulation 433 -1849 9 Suspended Ceiling 433 -1849 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575 -4404 iL 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: OTHER AGENCIES: � BUILDI'1G PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: 401 Baker B1 Pearl Northwest Inc. CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - if structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Battles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department tor their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 01,21/60 "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 14 FIRE FINAL Insp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL < BUILDING FINAL PLAN CHECK NUMBER 9D -o06 I PROJECT: THE FOLLONINO COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER ,( �' No changes will be made to the plans unless approved by the ((���� Architect and the Tukwila Building Division. O 2 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). u Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363), O All mechanical work shall be under separate permit through the ty of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. O When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O All structural concrete to be special inspected (Sec. 306, UBC), O All structural welding to be done by W,A.B.O, certified welder and special inspected (Sec. 306, USC). U 9 All high - strength bolting to be special inspected (Sec. 306, UBC). O Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. (::) Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. l3 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 14 Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 1S Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). O A statement from the roofing contractor verifying fire retardancy of rook wfll be required prior to final inspection (see attached procedure). 1../e All construction to be done in conformance with approved plans and 11IIV//VNN�v� requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington Stag Regulations for Barrier Free Facility (1989 Edition). le All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. l9 Fire retardant treated wood shall have a flame spread of not over 23. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22 All wood to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plane, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Plan Review PROJECT���AL 1,10 ADDRESS 401 r R -Es DATE I OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HT. / NO. STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C.��� 6TOR < � / -��` ,� -I�IC1 RMTS E�L� AllA W.S.E.C. CHAPTER 51 -10, W.A.0 NOTES: E25 MAI NTAk L D -1- TANcie B -Z t\l/A gAGK STORgeE til�A 141/4 PLAN CHECK NUMBER CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION TO: PROM: DATE: SUBJECT: (10 / T2.M E MO) Ott of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (2081433.1800 Gary L. VanOusen, Mayor MEMORANDUM Rao ar 1t t #qo-- 02�� Sh.et\'k.e_ T? th cranuarc �� (qq Rack +c rap_ F€s X L1 x = bsto V, 5( o I ""Y Sr 4.50 PROJECT NAME alk 1 I o r the -(2.5 SITE ADDRESS 4 01 ( r 61 SUITE NO. _--' PERMIT NO. CONTACTED L-ef-t , o. DATE READY DATE NOTIFIED b�'.1 -.6 10 BY. (init.) ..,... PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING ` �• n r 3RD NOTIFICATION BY: nit.) PLAN CHECK NUMBER INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" in box Indicates which departments need to review the project. ;...;......:. BUILDING - initial review FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review tgi BUILDING PERMIT APPLICATION TRACKING t - a3-90 2.3 0 REVIEW COMPLETED I — Z3-CGO (ROUTED) INIT: INIT: INIT: INIT: - uj - fo CONSULTANT: Date Sent - FIRE PROTECTION: FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: ........ ............................... FIE S • rinkiers S. Yes Date Approved - Detectors N/A INSPECTOR: A/ /i1 0 &X e4 4-/ BAR/LAND USE CONDITIONS? Yes UBC EDITION (year): W- (206) 433 -1849 DESCRIPTION .. AMOUNT RCPT # DATE BUILDING PERMIT FEES :< PLAN CHECK C NUMBER O ^ r► / APPLICATION MUST E3E FILLED OUT COMPLETELY PLAN CHECK FEE BUILDING: SURCHARGE 4.50 ENERGY? SURCHARGE OTHER: TOTAL , SITE ADDRESS SUITE # 401 Baker Blvd. VALUE OF CONSTRUCTION - $ 1 0270.00 PROJECT NAME/TENANT f ASSESSOR ACCOUNT # H 022310 0085 - 07 TYPE OF • New Building • Addition Tenant Improvement (commercial) • Demolition (building) WORK: El] Rack Storage O Reroof O Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: rack storage BUILDING USE (office, warehouse, etc.) warehouse ,, office NATURE OF BUSINESS:' clothing Distribution WILL THERE BE A CHANGE IN USE? id No Li Yes IF YES, EXPLAIN: 4500 S.F. office , 12800 S.F. warehouse SQUARE FOOTAGE - Buildin 17,300 S.F Tenant S total Area of Construction: 0.00 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE' BUILDING? a No O Yes IF YES, EXPLAIN: PROPERTY OWNER Alvin S. Pearl PHONE 244 - 2600 ADDRESS 401 Baker Blvd. Tukwila, Wa. ZIl i38188 CONTRACTOR none PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT none PHONE ADDRESS ZIP 1 >.H I~REB CEI ry:)•IAT f HIkV E1► IVR EJKAM ED. THI$ APPI.ICATI KN $ QN' AND t W >Tf E; AfxII TO BE 'R � .: T :: , . , ; U� 'CORRECT; � U 7. OF#1�ED:T ;: APP Y � t EIMIT:::'<:: C. > AND l A[ii1 A M C ....I., O�i.�'H S ..p BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE j . �� DATE PRINT NAME Alvin S. Pearl PHONE - 2600 ADDRESS 401 Baker Blvd. Tukwila, Wa. CITY /ZIP 98188 CONTACT PERSON Alvin S. Pearl PHONE 244 -2600 CITY OF TUKWILA Department of Community Development - Building Division DATE APPLICATION ACCEPTED BUILDING PERMIT APPLICATION FEES (for staff use only) APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of (:ommunity Development prior to application submittal. Contact the Permit Coordinator at 433 - 1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES COMMERCIAL • NEW;.COMMERONIL . BuikjmNowApornoNti . : COMMERCIAL TENANT IMPROVEMENTS • E completed botrAlto pc _ p,r41 $1 :o building permit application (One for each structure or Assessor Account Number ; E Assessor Account Number . . • • ; • ": "" 1, : • , • : • ... . Two sets (2) of the following s ; . Two (2) sets of construction plans, which Include :.: • ;": • • , . ; • • . :.•.: „ . . . . E F .-- 1..sokific o tions' : ::::.:.• , ....,... : ..,-.:•... , .•.::: • ,......,...... • ............ ..... ....... ........ .:....... ............,............................„..........,.............„........:....,.:....,.. . ... ...... „...............................„.:„...........................::•:• :::::,•.,•• ..... E Structural calculations stamped by a Washington State licensed ....-. .....".........:.:-.:.:•:".....• e Location of tenant space ' • •••••• • . ••• ••• '.• '.." • • ••••,...,. ;.; ....■. Existing and propOsed:parking .:.:::::::•:,.....•::....,... ...,. -,.,.,, engineer ............-......„....:.. . • :....::....; . • • - . ....,: ... ..„.: ...... ,.,....... ... .......„ ...,..... ...,:„....,:........:.......,,,::: ,..........................:............:::....................„.::„...„. „...„......: .,.,. ,....::::::::..„.........;............. ' ..,....,.. ' ::.........,.. [1] Soils report !tamped by •a .Washington State lioensedengineer . Ove ...........:...„.. ...... ., .. . . ...... .. ... .., .., ibeiliditig'Plan ..:;•"••'..•.•.:..• •• ..„. • .....,..,....:::......:::-.....:.."::::::::....-::...,.......:.:,....-• • .• ....• . .... • ' .•-• • :::".•••••••• :••••...".•••.', ....:;:":..:::: :.-1" •-• ::'. • '' ••• .-: .• • • .•••••'••••••".....:''....; ' ' • Topo survey Tenant :....."...";....:":;•":„::, .,......,,,:i . .... .. ........... . ... ....... . . ..... . . . .. .......„.....„. .....„..... .......... . ....•„ . . .... .. ...•:„.„..- ..: ........ .....„:„::::...•......... „:::,:::„.„:.: „:„......„,...:::.:::::::„:„,.,..,..:::::•:.:..:::::...„...,....,„.:-........,............ (common wall) 'adjacent '( "...".........Use, of cOm: tenant ...:".....•••.:"•::::::•,'".::::;',.....' .', ... .::..„............ .:....„. ............ ..... ''' . ' ,.. „ :, ........ ....... ..,.. .: ::..........:....„ .. ., ..„...„ .. . . .... . .. .....„.„......... ,........,...,...,.:.... footage : •••".. : i,foro!l 'cilOensiorlo of building . or•squarst..::'.":•••'•••••" ] Energy calculations stamped by,.1•WashinatOri:State...liCeniad • o ;'::::::"":......: . .......:„.....:„..............,...:.::::..,....„.::::....:„.::::.::,„..,...„...... :.. ... „.. ....„ . ......................„.....„......:.: ;,:-...,•,,,...... .:.,....,. engineer or architect .....„...•:"........".::::::::•••:::::::„.•"•::::::::•::::...:::,..."....:,:.:::::::::::...„.:;::::::::::::::::::::::::::::::::::::::::::::::.:::::••".•:.::,..:::.;:•••. : Floor plan of proposed tenant space....:..:'",: ' .•::, :.:::"...........:."..,.:.••..........••,.......... . ....::::: ."..............."... . "•".......::,........,......,...:.....,,,.::.......::,;:...::".:.....:::::,...-, ' .......::::::,:,::::::,....„........:::::.::::.....:.,:•••.•:::....;:::....:•:„...,:::": • . „.., • Woildng drawings ,. staMPed by a Washington State licensed ' ".... • . • Architectural drawings • StrUctural drawings 'drawings: •:. Eiei�ns • • • • CIVII. drawings plan Completed permit application (one for entire sets of civil drawings •:' permilaPplicatiert and .CheCl '..sittstritta • RACK STORAGE ..:„. building permit applicat ‘ :‘.. C°mpeeted Account Number:: bu i(2) sets of pl*ns, which in dude j ale!! T Buil ding floo • Tenant spa ce Dime located Exit1150 .. reck‘ storage lsyouI aisles and Entire tfre •• • •: : • • • •• : ' W1 :.: . .. 1 . (11 showing RESIDENTIAL Foundation plan • •• • • :..." • Floor plan ••.:- • • Roof plan . • • • BUNn� elevations (all views). Building crass-section • .......ISttuctural treating plans • . Washington State Energy Code data • •• • Coinpieied utility permit application NOTE ft1ckb • • '' '''' •.••.". • .::• dimensiOne"Of racks' aisle and ex Y5. °'! • fl • Structural tal;calculations stOmried by a W41!„.0.r1-00,...:100::)lco,..... (t.14skmegii: Two sets .(2) of v■orking drawings'," which include ••••••••••:. • ' ; • • ..: " ••...... •„.... . :.".. • • .••.• • • :. • . „ . ' •• •••.' . • • C • Ej Six (6) sets of site plans showing utilities NOTE: Building site plan and utility site plan may be combined. See utility pent* application and checklist for specific submittal requirements. Addliottal topographical and soils lnformabon,may be required!! unique silt conditions. SBMITTAL CHECkIIST : ..:.• spe;eplsons patterns of each eec doo rs, r°° New Walls;'; existing wall, and walls to b demolished E Construction details -• , ••• ‘ Cross sections showing wall construction and method of • ..•••:. ....""' attachment for floor and ceiling ' • . . . . •.: :" Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 ••• • . NOTE .11 any utility v. is to be done, submit separate utility permit • • • 'ape/kite/tin iind • „..... • . • : •:: „ • • • . . : •■••••■•■• "Assester:ACciiunt Number :" •.:: : • : . :: • ::, :•:: Narrative describing existing roof, material being removed and inaterial being ::::„ :: • NOTE A cellificatio# letter required 0110f to fltiatinipecti9000O/00..‘:.:: oft of the • ...I••■•■■•• coloom0000ltoroti.00rroit application (one for each Structure) • ■•■••••• :: RESIDENTIAL RBAODELS' :•:. :. • . : Completed Wilding pwrnit applicetion.(orie for e hstructure) . . Two (2) sets of working drawings, which include Site *.. Foundation plan • Roof plan • Builng elevations (all views) 'Building cross-section . . .„ .. NOTE:11.anY'Utllity.:#0ik'1001"OkdOrteproVidep(iiiv.permIt. app 3 I I i 7 0 1 BU D 11 'Sl( l % BAKER BOULEVARD EXISTING SITE and LAND -SCAR' I understand that the Plan Check approvals are wab;ecf to errors and omissions and approval of pit::/l3 does not authorize the vioiail in of any CITY OF TUKWILA adopted code or ordinance. Re- of contractor's APPRO STING PLANT! NiGPL . FEB 19'O CITY I F TUKWIIA (_ Jt$231990 f %C (� �� 1,U! i ( m�1t t4'I -�� 5 . D PER& IT CENTER PK�r�I� "✓ G'�.f��.; i"rl1 (THUNL7EFt-IJ > rLL M) 1111 111 iii i111111111111I11111 1111111 111111111111111 1111111 1111111 1111111 1111111 iiili11 X111111 1111111 11i iii 1111111 X111111 1j11111 11111 11111111111111111 W _ 11111lilili{ii111111 � I I � I I � I I I I I I{ I � I l I I{ � ! 2 3 4 5 6 7 8 9 1n 11 MADE GFPMarry 12 ` --- risi /////////|///////1//||/// ('/ /'/'/'/'/ /'/ / / /'| __' Pearl Northwest Inc. 401 Baker Blvd. Tukwila, Washington 98188 VICINITY MAP 16, RECEIVED CITY OF TUKWILA JAN 2 3 1�¢M ~"., ` " .~~~ PERMIT CENTER - --- - -- - -- ~� �.^.'. -' -- ' - - —''- - - � � A 7 P 0 1n 11 kurIF ===. 10