HomeMy WebLinkAboutPermit 5919 - First Interstate - Interior DemolitionAPPROVED FOR
�. �� BUILDING
ISSUANCE BY: OFFICIAL
DATE: ,
2-
I hereby ce if that I have read and e ed this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this budding permit.
SIGNATURE: i - P 4 t -- 4 /
o
DATE: V - lob - 'f D
COMPANY: /3 .T ( 72L/eTiatl
PRINT NAME: ✓DF/�y R. ft /A L
PROPERTY OWNER First Interstate Bank
PHONE 292_3610
ADDRESS 999 Third Avenue, Seattle, WA
ZIP 98104
CONTRACTOR B & J Construction
PHONE 632 -7991
ADDRESS P.O. Box 31132, Seattle, WA
ZIP 98103
WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7
EXP. DATE 11 - -
ARCHITECT Architects Reed Reinvald
PHONE 572 -3993
ADDRESS 201 North I Street, Tacoma, WA
ZIP 98403
TYPE OF CONSTRUCTION: N/A UBC EDITION (year)
SETBACKS: a_ _
E -
� 7 No
W -
(. rough
• • ,
•..
FIRE PROTECTION: � S. rinklers 0 Detectors El N/A
UTILITY PERMITS REQUIRED? l
ZONING: BAR /LAND USE CONDITIONS0Yes ( X)No
PLAN CHECK FEE
BUILDING SURCHARGE
4. 50
5632
CONDITIONS (other than those noted on or attached to permit/plans):
ENERGY SURCHARGE
OTHER:
TOTAL -
212.50
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
DATE ISSUED:
DESCRIBE WORK TO BE DONE:
CERTIFICATE OF
OCCUPANCY NO.
5CU9
Q- 90
6847 S 1Rn St
BUILDING PERMIT
(POST WITH INSPE■;-LION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN CHECK #90 -048
FEES
11,280.00
PROJECT NAME/TENANT ASSESSOR ACCOUNT*
First Interstate Bank 362304 - 9079 - 04
TYPE OF U New Building Addition Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Q Other: Interior Demolition
Interior demolition of partitions, ceilings,. lighting and ductwork.
(:ODI COr.iPr IArI('r
USE -4
FLOOR 4
TOTAL
SQUARE OCC. T
FEET SHAD
SQUARE CCC. SQUARE OCC. SQUARE
FEET LOAD FEET LOAD FEET
OCC. " SQUARE
LOAD FEET
i
OCC.
LOAD 4
TOTAL TOTAL
SQUARE FEET , OCC. LOAD
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last Inspection.
7 DATE ISSUED:
C
A
C C
PHONE
,
BUILDING PERMIT FEE
126,0
82.00
563?
5632
? - 07 - 90
2 - 07 - 90
PLAN CHECK FEE
BUILDING SURCHARGE
4.50
5632
2 - 07 -90
ENERGY SURCHARGE
P.O. Box 31132, Seattle, WA
SQUARE
FEET
OCC.
LOAD
OTHER:
WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7
SQUARE
FEET
EXP. DATE 11 - 02 - 90
TOTAL -
212.50
PHONE
PROPERTY OWNER
F Interstate Bank
/
PHONE
292_3610
Z 98104
ADDRESS
999 Third Avenue, Seattle, WA
CONTRACTOR
B & J Construction
'PHONE
632 -7991
ADDRESS
P.O. Box 31132, Seattle, WA
SQUARE
FEET
OCC.
LOAD
ZIP 98103
WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7
SQUARE
FEET
EXP. DATE 11 - 02 - 90
ARCHITECT
Architects Reed Reinvald
PHONE
572 -3993
ADDRESS
201 North I Street, Tacoma, WA
ZIP 98403
JSE 4
SETBACKS N - - E - W -
/
UTILITY PERMITS REQUIRED ? Yes Q No �u sic workst
COOL COMPLIANCE
'RINT NAME: JONA/ R td /AKE °
:oNDITIONS (other than those noted on or attached to . - rm • lens •
OR
ICpR
W.
-.
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
,
,
f
T OTA L
TYPE OF CONSTRUCTION: N/A UBC EDITION (year
SETBACKS N - - E - W -
FIRE PROTECTIO (S p rinklers Q Detectors ® N /q
UTILITY PERMITS REQUIRED ? Yes Q No �u sic workst
ZONING: BAR /LAND USE CONDITIONSDYes 1i No
'RINT NAME: JONA/ R td /AKE °
:oNDITIONS (other than those noted on or attached to . - rm • lens •
;PNHOVED FOR J BUILDING
SSUANCE BY: . /-e c'( Yi. ) OFFICIAL
DATE:
.2 / % 0
I hereby cattily that I have read and e d this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this perms does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: / A. Arligr:
DATE:
DATE: 2 - 42 - ` D
'RINT NAME: JONA/ R td /AKE °
COMPANY: /3i J' (
i
- CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
5919
DATE ISSUED:
&- IQ- 90
PROJECT INFORMATION
S
6847 S IPA St
PROJECTNAME/TENANT F Interstate Bank
ASSESSOR ACCOUNT N
362304
TYPE OF U New Building Addition Tenant Improvement (commercial) Li Demolition (building) U Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Q Other: Interior Demolition
DESCRIBE WORK TO BE DONE:
Interior demolition of partitions, ceilings, lighting and ductwork.
:ERTIFICATE OF
)CCUPANCY NO.
BUILDING PERMIT
(POST WITH INSPE., (ION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
N CHECK #90 -048
SUI
V
DATE ISSUED:
FEES
11,280.00
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period 01 180 days from the last inspection.
Type of Inspection Demo 1 on
LAO 1qCY1t)
Requestor 1301
Site Address
CITY OF TUKWILA
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433-1849
Special Instructions
Inspection Results/Comments
Inspector
Date
PERMIT #5
..••••••••••••■••■•■■•••••••••••••••••■••••• ••1 41•Mitit.I•••,•/,•111••
INSPECTION RECORD
3 - I 'Fr ci 0
Date Wanted 5 C)
Projec0Fif(-A IA/A.7er stoe,tia_.
Phone # 1 9CI
• iI
,77 /4 , 1-4e r ,oe / --
cc-ce
■,"
Date 3
'X'
REQUIRED INSPECTIONS
PHONE
AP DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
433 -1849
2 Foundation
433 -1849
3 Slab and/or Slab Insulation
433 -1849
4 Shear Wall Nailing
433 -1849
5 Root Sheathing Nailing
433 -1849
6 Masonry Chimney
433 -1849
7 Framing
433-1849
8 Insulation
433-1849
9 Suspended Ceiling
433 -1849
10 Wall Board Fastening
433 -1849
11
12
13
14 FIRE FINAL Insp:
575-4404
15 PLANNING FINAL
433-1849
16 PUBLIC WORKS FINAL
433 -0179
X
17 BUILDING FINAL
433 -1849
BUILDJG PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place)
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
SITE ADDRESS:
6847 S 180 St
SUITE NO.:
BUILDING
PERMIT NO. 59i
DATE ISSUED:
Q- cr0
PROJECT:
First Interstate Bank
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REVE
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied In place.
2. FOUNDATION • When forms and rebar are in place.
3. SLAB - If structural slab or if undersiab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION • After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296.4732
Electrical — Washington State Department of Labor and Industries — 872 -6363
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 433 -1849. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
ou2e/110
VICINITY MAP
RECEIVED
CITY OF TUKWILA
FEB 0 7 1990
PERMIT CENTER
•
= - csvejLet, •W$44ty
Ted+fidi fi
180 th STREET
J TITI I ITI- Tnk+- 4T-ITI I I I I i 1T1
c•oVbjz t4t.KI4
SITE PLAN
1" : 40.0'
F
14_
PARCEL A:
'__._ �._ LEGAL DESCRIPTION
l'he land referred .to in this commitment is located in the county of King,
State of Washington, and. described as follows:
THAT PORTION OF GOVERNMENT LOT 4, SECTION 36, TOWNSHIP 23 NORTH, RANGE 4
EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION 36; THENCE SOUTH 0i
WEST ALONG THE WEST LINE OF SAID SECTION 36 A DISTANCE OF 1,320.01 FEET. TO
THE NORTHWEST CORNER OF SAID GOVERNMENT LOT 4; THENCE SOUTH 88 °04'53" EAST
ALONG THE CENTERLINE OF SOUTH 180TH STREET A DISTANCE OF 431.81 FEET; THENCE
SOUTH O1° 55'07" WEST A DISTANCE OF 36.00 FEET TO THE SOUTHERLY MARGIN OF
SAID SOUTH 180TH STREET AND THE TRUE POINT OF BEGINNING; THENCE SOUTH 88°
04'53" EAST ALONG SAID SOUTHERLY MARGIN A DISTANCE OF 257.94 FEET; THENCE
SOUTH 12 EAST A DISTANCE OF 70.94 FEET; THENCE SOUTH 07 EAST A
DISTANCE OF 50.09 FEET; THENCE SOUTH 09D22'49" EAST A DISTANCE OF 50.02 FEET;
THENCE SOUTH 15 EAST A DISTANCE OF 39.16 FEET; THENCE NORTH 88 °04'53"
WEST A DISTANCE OF 353.52 FEET; THENCE NORTH O1 55'07" EAST A DISTANCE OF
155.00 FEET; THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 50.00
FEET, AN ARC DISTANCE OF 78.54 FEET THROUGH A CENTRAL ANGLE OF 90' TO
THE TRUE POINT OF BEGINNING.
PART 1 - GENERAL
B. Remove protections at completion of work.
SELECTIVE DEMOLITION - SECTION 02070
1.01 Extent of selective demolition work is indicated on drawings.
1.02 Types of Selective Demolition Work: Demolition requires the selective
removal and subsequent offsite disposal of the following:
A. Portions of building structure indicated on drawings and as required
to accommodate new construction.
B. Removal of interior partitions as indicated on drawings.
C. Removal of doors and frames indicated "remove ".
D. Removal of built -in casework indicated "remove ".
E. Removal of existing storefront.
F. Removal of existing suspended acoustical ceiling.
G. Removal of existing mechanical ductwork and lights.
1.03 Schedule: Submit schedule indicating proposed sequence of operations for
selective demolition work to Owner's Representative for review prior to
commencement of work. Include coordination for shut -off, capping, and
continuation of utility services as required.
1.04 Condition of Structures: Owner assumes no responsibility for actual
condition of items or structures to be demolished.
1.05 Protections: Provide temporary exterior wall where main entry storefront
is removed. Provide a secured temporary enclosure.
A. Provide temporary weather and security protection during interval
between demolition and removal of existing construction on exterior
surfaces, and installation of new construction to insure that no
water leakage or damage occurs to structure or interior areas of
existing building.
1.06 Damages: Promptly repair damaged caused to adjacent facilities by
demolition work at no cost to Owner.
1.07 Traffic: Conduct selective demolition operations and debris removal in a
manner to ensure minimum interference with roads, streets, walks, and
other adjacent occupied or used facilities.
1.08 Utility Services: Maintain existing utilities indicated to remain, keep
in service, and protect against damage during demolition operations.
c
SELECTIVE DEMOLITION - SECTION 02070
1.09 Demolition: Perform selective demolition work in a systematic manner.
1.10 If unanticipated mechanical, electrical or structural elements which
conflict with intended function or design are encountered, investigate
and measure both nature and extent of conflict. Submit report to Owner's
Representative in written, accurate detail. Pending receipt of directive
from Owner's Representative rearrange selective demolition schedule as
necessary to continue overall job progress without delay.
1.11 Disposal of Demolished Materials: Remove debris, rubbish and other
materials resulting from demolition operations from building site.
Transport and legally dispose of materials off site.
A. If hazardous materials are encountered during demolition operations,
comply with applicable regulations, laws, and ordinances concerning
removal, handling and protection against exposure or environmental
pollution.
B. Burning of removed materials is not permitted on project site.
1.12 Clean-Up and Repair: Upon completion of demolition work, remove tools,
equipment and demolished materials from site. Remove protections and
leave interior areas broom clean.
1.13 Repair demolition performed in excess of that required. Return
structures and surfaces to remain to condition existing prior to
commencement of selective demolition work. Repair adjacent construction
or surfaces soiled or damaged by selective demolition work.
END OF SECTION 02070
PERMIT NO.
•
CONTACTED
,IZ n; t
o U,) n
DATE READY
DATE NOTIFIED
c- I,D -q O
(init.),.®
PERMIT EXPIRES
2nd NOTIFICATION
BY:
AMOUNT OWING
0
3RD NOTIFICATION
(i it )
n -.u..e
PLAN CHECK
NUMBER
OLg
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
REVIEW COMPLETED
e
BUILDING PERMIT APPLICATION TRACKING
PROJECT NAME
rSt 1:11r*(*.e--- SITE ADDRESS SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
RI BUILDING -
initial review
O FIRE
0 PLANNING
O PUBLIC
WORKS
0 OTHER
(ROUTED)
INIT:
INIT:
INIT:
INIT:
BUILDING - a x O a�
final review INIT:
.UIRE
UTILITY PERMITS REQUIRED? ( ] Yes M No
PUBLIC WORKS LETTER DATED:
CONSULTANT: Date Sent - Date Approved -
FIRE PROTECTION: ( ] Sprinklers ( ) Detectors k) N/A
INSPECTOR:
FIRE DEPT. LETTER DATED:
ZONING:
(BAR/LAND USE CONDITIONS? FlYes . ¢<1 No
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N- S- E- W-
1
O
S ' UC
(year):
9ullat u ivision s
r • .� 6200 Sa ng , Washing on 98t88 r Control # D- (�
etas
,'' sy ( 2 0 X433 1849
Site Address 6847 S. 180th, Tukwila, WA Suite# - -- Floor# _ - --
Project Name /Tenant Remodel to Consumer Credit for First Interstate Bank, Tukwila, WA
Valuation of Construction $11,280 Assessors Account# 362304 - 9079 -04
Property Owner First Interstate Bank Phone 206- 292 -3610
Address 999 Third Ave., Seattle, WA Zi 98104
Applicant Architects Reed Reinvald Phone 206- 572 -3993
Address 201 North I Street, Tacoma, WA Zip 98403
Architect /Engineer Architects Reed Reinvald Phone 206- 572 -3993
Address 201 North I Street, Tacoma, WA Zip 98403
Contractor B & J Construction License# BJCON * *215D7 I ° " Phone 206- 632 -7991
Address P.O. Box 31132, Seattle, WA Zip 98103
Class of Work: O New O Addition
Demolition x
[] Tenant Improvement fl Remodel (residential) [] Reroof
Interior Demolition Other
Describe work to be done Interior demolition of partitions, ceilings, lighting and
ductwork.
Type of Const. (UBC) 5N Occ. Group (UBC) B -2
Square footage of entire building 15,620 gsf exis6quare footage of tenant space 15,620 g.sf
Building Use Vacant (Former office /research) Will there be a change of use? [] Yes
x No
If yes, describe change of use, including square footages of changed areas
Will there be storage or use of flammable, combustible or hazardous materials on the premise or
area of construction? Yes 0 No If yes, explain
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND
CORRECT AND THAT I HAVE THE PROPERTY OWN R'S AUTHORIZATION TO DO THIS WORK.
Applicant /Authorized Agent (signature) C ( 1 pm f Date 2 -7 -90
(print name) Venita VanHamme Brown
Contact Person (please print) Venita VanHamme Brown Phone 206- 572 -3993
OFFICE USE ONLY
FEES: Building Permit Fee (000/322.100) $ I. .00 Receipt# 5 30 Date Paid 2
Plan Check Fee (000/345.830) '.... Receipt Date Paid
Bldg Code Sur Charge (000/386.904) 50 Receipt# Date Paid
Energy Sur Charge* (000/386.907) Receipt# Date Paid
Other ( ) Receipt# Date Paid /
*New construction only TOTAL a l a.a) (OWES: $ )
SQUARE FOOTAGE /BUILDING USE INFORMATION Square Footage of Entir-
Building: a
FLOOR
USE Occ T •E
S..FT.
0CC
SAD
USE Occ T I
SS.FT.
OCC
LOAD.
USE 0 c T e:
SI FT
OCC
s •
TOTAL
SI FT.
TOTAL
OCC.
TRACKING
DEPT.] DATE IN
DATE OUT
COMMENTS
BLDG
Approved for Issuance Type of Const.
To Mahan: Date A.'roved:
Approved (Initials) Per letter dates
FIRE
Fire Protection:
Approved
• Sprinklers O Detectors
O BAR O LAND USE /SEPA CONDITIONS
PLNG
Zoning Setbacks: N S E W
Parking stalls required for: Site Tenant Space
Parking stalls provided: Site Tenant Space
ADDITIONAL PARKING STALLS REQUIRED:
PWD
Approved (Initials) Per letter /plans dated
Li
0
6X1 eoTir 4A iA:, 1O 12E,HA.11.1
)(I`vM :1∎1& H,AL -v To i r2rrMov�r
X! TI WC", ag. Got -lc,,
To 12 HAIN, +�X►S�IN� pop.p-iN (.. Q
rINI� >�-i ;li)4.t, ;o 1 12b &G.
DPP tt
SI; C s�l6( Nor -S 69g R1'f p i .L 9 r4 c> 1, ! n e›
I? 6f✓itNc exIS`j;tic,p c'VF ( .a ► '
„"fi°'
L
( lam Relrlo' 6)(1,;1 4C Ai.UMirl► -'r1 c l(ol 2 er(ZotJ1 1/ .
Ki' cN t 'hv,1 tN(o I7o�Ytd��o�1�> ave,t2pt.>t,4
'7 p_Uo / e2 i Tg, f';.4 X 0 2 hoar 4 P61- l o t,. i f L o i, Fo r?T N641 ,47,
MI C.1-1A tGA1, E E5i, l.,:T(zIc:+h.1. fUtz .spec
6 Po 1 At< 4 ►eM oL i -ri 014, rv94F460 Mit.k,
3, F...sMoVE ALL ,
'.49.01 &Noof i �alJll,Di�i�
� GMl7VE AI., , �:,�,( }��I ;orl �� e- J , JEIU
L •I &H Trace r IX1R) 'rlpooCorioLT
pi.A(, !AO r Vs) I+ 4 IC7 (-op_ e. :ot -JS,
Gj. GONii�A(i U {�. '10 ,,>c'1"1 --11 op JG'Fif •iop.."jION or
ex•r 2-108. mtei'‘fa ik.th. C•01-41 IF cuff D i110 )
VAR-j' rI2G•NI j(�U�f1 l"AfiUt- 4Et- .di1.t�.
m. ALL i'2i ow 40p i T e11 ? lc RA, Dic,QG;;,G
7. R6Mo"E ALA_ ca.Ai 4OPic. a% tt.4016,k1; 6v,
e, 12.6H0V6 OIk'1Not ¶0 1MGE; IpE e' 2r- ; U4-6- Priot4
tzooH u' 1 F-
L I ,
t
— r- Nc-(it14 41c4., op rh-+N 0S
4. M Ii> -'rN6v Rat-44 6y°(ENhi cb4' 6ur TN !zoo
- cif i- {,ar{Cs, 1`(olGa.►. cvursY -yix.p.-c ON::r
n or {bV6 UI f Ncv rioc12 4 . rr i!✓
Reylove. 6) i Peal:- tor i pt.1 i5 e, op 'L&»- `i
Ati
126.4 PD.
� ' I CIACv 4 11i1( WOOD 112tl.1 A'( 2tr O Wi'U.' -o
pHcY6 6)(1 11 NooP 112iH ,o..T Top or- +,aia, TO C Te -r-l/ �if�nWN
getloVE I:Xt'2111 I Ut./t- 6-(It.4 4 riff F.1cri:460014,He,12. app.$
i2ePiov' 6i1 FL IN PANzlepoovi
•
,a
• -k
,':4s. ...'?....: , fY... . <_.. .i r.•.....�iC.. ;;9._. r- a.S.wy .� r .L -: € ..^i..- ,- a+..':.c.s .�.,: -1 •
It
'n1 1rIL 1E
TT
O
2, f. _ i i
1 �
11
4 r
ct )P Rao$ •ro RelAm4 aT c I2TY VON
t 4 R- .Move &.W . e , ny L*( AT Ex.15'1iM 6, 6t- i RI CSu pArl 6L
i,oiuA'rIc .l' - ri2AHINi&& To 26Mp.11.4,
6,611.1NC9 lilt. , 11-I1 AI2ewA io pe (7 H Veil pi/
' I a' 5
4 s L I A-11 - ii4LP rnlvi O1, i 7''bON , j4�I4 A(ZeA , ra'f ie- 1It4Cn ,
O fu nc. iric„ i
NOT'?: If the microfilmed docutncnt is less deer then this
notice, It is t ue to the quality Cr the oripinel c'ocument,
fie ez Ze l (, G E,l i3i ti 9L . .3I bL Cl ZL U. di, 6 9
iii!l III iIIiIIIi1liilii► IIiIIII111IIiIIIIiIiIIIIIiI IIiIIIIIIfIIIIIIIII MiltII IIIiIIIIIIIIIIIiIIIIIIiilliiIIIIIIIIIIII IIII IIIIIIIiIIIIIIIiIIIIIIIiIIIIIIIIIIIII IIIIIIIIIIfIIIIIIIII
II Ili 1 1 1 IIIIIIIIIIiiilIIfI IjIII III IIIf 111 I l I l f' Iiil l l f IIIiliIf 1 1 1 f IIIJII1f IIIf IIIf IIItl1iilIIJIIIf IIIJII IIt 1IIf IiIf II !111'f II I IIf IIIf IIIli{IilII iIiiIII I If IIIf III IIIf IlIIIIIf IIIiIiil
9 S fl i; L ww
II! Iiiillllillllllllillllilliln' IIiIIIIII lIIIIIIIIIIIIifIIIII!III!Illf
j.- -• = = _— —
r
•
•
ffal
tt-
s<
44
__ 1
E OL.- 111 ON 1
I / Q Ii It
Ir
urxlerstand that the Plan Check approvals are
t to errors and omissions and approval Of
does not authorize the violation of any
ptedcode or ordinance. Receipt of contractor',
y of a Jed plans acknowledged.
o uw g �{ ,
By
Date a " 9D
- - Permit No
n LI
FILE COPY
CITY OF TI)KWILA
APPROVED
FEB % 9g;
RECEIVED
CITY OF TUKWILA
FEB 0 7 1990
PERMIT CENTER
AMERICAN LNST MUTE CM ARCHITECTS
........._...mss..
3.
2/7/90
°` inciti *x.4 ' ASH
`''.��,f4kA`�'A''ft;:'�'+�y? -`+'mil • �i �3^v"� r 4
A RC�r�ers
RE1NVALD
01 NORTH J STREET
COMA, WA 98403
206 572-3993
EOL "O
ONSUMER ettEDIT,
VM L D µ tl O
ATE
BU1 DIN DIVISION , Y,