Loading...
HomeMy WebLinkAboutPermit 5919 - First Interstate - Interior DemolitionAPPROVED FOR �. �� BUILDING ISSUANCE BY: OFFICIAL DATE: , 2- I hereby ce if that I have read and e ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this budding permit. SIGNATURE: i - P 4 t -- 4 / o DATE: V - lob - 'f D COMPANY: /3 .T ( 72L/eTiatl PRINT NAME: ✓DF/�y R. ft /A L PROPERTY OWNER First Interstate Bank PHONE 292_3610 ADDRESS 999 Third Avenue, Seattle, WA ZIP 98104 CONTRACTOR B & J Construction PHONE 632 -7991 ADDRESS P.O. Box 31132, Seattle, WA ZIP 98103 WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7 EXP. DATE 11 - - ARCHITECT Architects Reed Reinvald PHONE 572 -3993 ADDRESS 201 North I Street, Tacoma, WA ZIP 98403 TYPE OF CONSTRUCTION: N/A UBC EDITION (year) SETBACKS: a_ _ E - � 7 No W - (. rough • • , •.. FIRE PROTECTION: � S. rinklers 0 Detectors El N/A UTILITY PERMITS REQUIRED? l ZONING: BAR /LAND USE CONDITIONS0Yes ( X)No PLAN CHECK FEE BUILDING SURCHARGE 4. 50 5632 CONDITIONS (other than those noted on or attached to permit/plans): ENERGY SURCHARGE OTHER: TOTAL - 212.50 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: DESCRIBE WORK TO BE DONE: CERTIFICATE OF OCCUPANCY NO. 5CU9 Q- 90 6847 S 1Rn St BUILDING PERMIT (POST WITH INSPE■;-LION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN CHECK #90 -048 FEES 11,280.00 PROJECT NAME/TENANT ASSESSOR ACCOUNT* First Interstate Bank 362304 - 9079 - 04 TYPE OF U New Building Addition Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Q Other: Interior Demolition Interior demolition of partitions, ceilings,. lighting and ductwork. (:ODI COr.iPr IArI('r USE -4 FLOOR 4 TOTAL SQUARE OCC. T FEET SHAD SQUARE CCC. SQUARE OCC. SQUARE FEET LOAD FEET LOAD FEET OCC. " SQUARE LOAD FEET i OCC. LOAD 4 TOTAL TOTAL SQUARE FEET , OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last Inspection. 7 DATE ISSUED: C A C C PHONE , BUILDING PERMIT FEE 126,0 82.00 563? 5632 ? - 07 - 90 2 - 07 - 90 PLAN CHECK FEE BUILDING SURCHARGE 4.50 5632 2 - 07 -90 ENERGY SURCHARGE P.O. Box 31132, Seattle, WA SQUARE FEET OCC. LOAD OTHER: WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7 SQUARE FEET EXP. DATE 11 - 02 - 90 TOTAL - 212.50 PHONE PROPERTY OWNER F Interstate Bank / PHONE 292_3610 Z 98104 ADDRESS 999 Third Avenue, Seattle, WA CONTRACTOR B & J Construction 'PHONE 632 -7991 ADDRESS P.O. Box 31132, Seattle, WA SQUARE FEET OCC. LOAD ZIP 98103 WA. ST. CONTRACTOR'S LICENSE # BJCON * *215D7 SQUARE FEET EXP. DATE 11 - 02 - 90 ARCHITECT Architects Reed Reinvald PHONE 572 -3993 ADDRESS 201 North I Street, Tacoma, WA ZIP 98403 JSE 4 SETBACKS N - - E - W - / UTILITY PERMITS REQUIRED ? Yes Q No �u sic workst COOL COMPLIANCE 'RINT NAME: JONA/ R td /AKE ° :oNDITIONS (other than those noted on or attached to . - rm • lens • OR ICpR W. -. FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD , , f T OTA L TYPE OF CONSTRUCTION: N/A UBC EDITION (year SETBACKS N - - E - W - FIRE PROTECTIO (S p rinklers Q Detectors ® N /q UTILITY PERMITS REQUIRED ? Yes Q No �u sic workst ZONING: BAR /LAND USE CONDITIONSDYes 1i No 'RINT NAME: JONA/ R td /AKE ° :oNDITIONS (other than those noted on or attached to . - rm • lens • ;PNHOVED FOR J BUILDING SSUANCE BY: . /-e c'( Yi. ) OFFICIAL DATE: .2 / % 0 I hereby cattily that I have read and e d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this perms does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATURE: / A. Arligr: DATE: DATE: 2 - 42 - ` D 'RINT NAME: JONA/ R td /AKE ° COMPANY: /3i J' ( i - CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. 5919 DATE ISSUED: &- IQ- 90 PROJECT INFORMATION S 6847 S IPA St PROJECTNAME/TENANT F Interstate Bank ASSESSOR ACCOUNT N 362304 TYPE OF U New Building Addition Tenant Improvement (commercial) Li Demolition (building) U Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Q Other: Interior Demolition DESCRIBE WORK TO BE DONE: Interior demolition of partitions, ceilings, lighting and ductwork. :ERTIFICATE OF )CCUPANCY NO. BUILDING PERMIT (POST WITH INSPE., (ION CARD AND PLANS IN A CONSPICUOUS LOCATION) N CHECK #90 -048 SUI V DATE ISSUED: FEES 11,280.00 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period 01 180 days from the last inspection. Type of Inspection Demo 1 on LAO 1qCY1t) Requestor 1301 Site Address CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 Special Instructions Inspection Results/Comments Inspector Date PERMIT #5 ..••••••••••••■••■•■■•••••••••••••••••■••••• ••1 41•Mitit.I•••,•/,•111•• INSPECTION RECORD 3 - I 'Fr ci 0 Date Wanted 5 C) Projec0Fif(-A IA/A.7er stoe,tia_. Phone # 1 9CI • iI ,77 /4 , 1-4e r ,oe / -- cc-ce ■," Date 3 'X' REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Root Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 7 Framing 433-1849 8 Insulation 433-1849 9 Suspended Ceiling 433 -1849 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575-4404 15 PLANNING FINAL 433-1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 BUILDJG PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: 6847 S 180 St SUITE NO.: BUILDING PERMIT NO. 59i DATE ISSUED: Q- cr0 PROJECT: First Interstate Bank CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied In place. 2. FOUNDATION • When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION • After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296.4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. ou2e/110 VICINITY MAP RECEIVED CITY OF TUKWILA FEB 0 7 1990 PERMIT CENTER • = - csvejLet, •W$44ty Ted+fidi fi 180 th STREET J TITI I ITI- Tnk+- 4T-ITI I I I I i 1T1 c•oVbjz t4t.KI4 SITE PLAN 1" : 40.0' F 14_ PARCEL A: '__._ �._ LEGAL DESCRIPTION l'he land referred .to in this commitment is located in the county of King, State of Washington, and. described as follows: THAT PORTION OF GOVERNMENT LOT 4, SECTION 36, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION 36; THENCE SOUTH 0i WEST ALONG THE WEST LINE OF SAID SECTION 36 A DISTANCE OF 1,320.01 FEET. TO THE NORTHWEST CORNER OF SAID GOVERNMENT LOT 4; THENCE SOUTH 88 °04'53" EAST ALONG THE CENTERLINE OF SOUTH 180TH STREET A DISTANCE OF 431.81 FEET; THENCE SOUTH O1° 55'07" WEST A DISTANCE OF 36.00 FEET TO THE SOUTHERLY MARGIN OF SAID SOUTH 180TH STREET AND THE TRUE POINT OF BEGINNING; THENCE SOUTH 88° 04'53" EAST ALONG SAID SOUTHERLY MARGIN A DISTANCE OF 257.94 FEET; THENCE SOUTH 12 EAST A DISTANCE OF 70.94 FEET; THENCE SOUTH 07 EAST A DISTANCE OF 50.09 FEET; THENCE SOUTH 09D22'49" EAST A DISTANCE OF 50.02 FEET; THENCE SOUTH 15 EAST A DISTANCE OF 39.16 FEET; THENCE NORTH 88 °04'53" WEST A DISTANCE OF 353.52 FEET; THENCE NORTH O1 55'07" EAST A DISTANCE OF 155.00 FEET; THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 50.00 FEET, AN ARC DISTANCE OF 78.54 FEET THROUGH A CENTRAL ANGLE OF 90' TO THE TRUE POINT OF BEGINNING. PART 1 - GENERAL B. Remove protections at completion of work. SELECTIVE DEMOLITION - SECTION 02070 1.01 Extent of selective demolition work is indicated on drawings. 1.02 Types of Selective Demolition Work: Demolition requires the selective removal and subsequent offsite disposal of the following: A. Portions of building structure indicated on drawings and as required to accommodate new construction. B. Removal of interior partitions as indicated on drawings. C. Removal of doors and frames indicated "remove ". D. Removal of built -in casework indicated "remove ". E. Removal of existing storefront. F. Removal of existing suspended acoustical ceiling. G. Removal of existing mechanical ductwork and lights. 1.03 Schedule: Submit schedule indicating proposed sequence of operations for selective demolition work to Owner's Representative for review prior to commencement of work. Include coordination for shut -off, capping, and continuation of utility services as required. 1.04 Condition of Structures: Owner assumes no responsibility for actual condition of items or structures to be demolished. 1.05 Protections: Provide temporary exterior wall where main entry storefront is removed. Provide a secured temporary enclosure. A. Provide temporary weather and security protection during interval between demolition and removal of existing construction on exterior surfaces, and installation of new construction to insure that no water leakage or damage occurs to structure or interior areas of existing building. 1.06 Damages: Promptly repair damaged caused to adjacent facilities by demolition work at no cost to Owner. 1.07 Traffic: Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities. 1.08 Utility Services: Maintain existing utilities indicated to remain, keep in service, and protect against damage during demolition operations. c SELECTIVE DEMOLITION - SECTION 02070 1.09 Demolition: Perform selective demolition work in a systematic manner. 1.10 If unanticipated mechanical, electrical or structural elements which conflict with intended function or design are encountered, investigate and measure both nature and extent of conflict. Submit report to Owner's Representative in written, accurate detail. Pending receipt of directive from Owner's Representative rearrange selective demolition schedule as necessary to continue overall job progress without delay. 1.11 Disposal of Demolished Materials: Remove debris, rubbish and other materials resulting from demolition operations from building site. Transport and legally dispose of materials off site. A. If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure or environmental pollution. B. Burning of removed materials is not permitted on project site. 1.12 Clean-Up and Repair: Upon completion of demolition work, remove tools, equipment and demolished materials from site. Remove protections and leave interior areas broom clean. 1.13 Repair demolition performed in excess of that required. Return structures and surfaces to remain to condition existing prior to commencement of selective demolition work. Repair adjacent construction or surfaces soiled or damaged by selective demolition work. END OF SECTION 02070 PERMIT NO. • CONTACTED ,IZ n; t o U,) n DATE READY DATE NOTIFIED c- I,D -q O (init.),.® PERMIT EXPIRES 2nd NOTIFICATION BY: AMOUNT OWING 0 3RD NOTIFICATION (i it ) n -.u..e PLAN CHECK NUMBER OLg BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) REVIEW COMPLETED e BUILDING PERMIT APPLICATION TRACKING PROJECT NAME rSt 1:11r*(*.e--- SITE ADDRESS SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. RI BUILDING - initial review O FIRE 0 PLANNING O PUBLIC WORKS 0 OTHER (ROUTED) INIT: INIT: INIT: INIT: BUILDING - a x O a� final review INIT: .UIRE UTILITY PERMITS REQUIRED? ( ] Yes M No PUBLIC WORKS LETTER DATED: CONSULTANT: Date Sent - Date Approved - FIRE PROTECTION: ( ] Sprinklers ( ) Detectors k) N/A INSPECTOR: FIRE DEPT. LETTER DATED: ZONING: (BAR/LAND USE CONDITIONS? FlYes . ¢<1 No REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- W- 1 O S ' UC (year): 9ullat u ivision s r • .� 6200 Sa ng , Washing on 98t88 r Control # D- (� etas ,'' sy ( 2 0 X433 1849 Site Address 6847 S. 180th, Tukwila, WA Suite# - -- Floor# _ - -- Project Name /Tenant Remodel to Consumer Credit for First Interstate Bank, Tukwila, WA Valuation of Construction $11,280 Assessors Account# 362304 - 9079 -04 Property Owner First Interstate Bank Phone 206- 292 -3610 Address 999 Third Ave., Seattle, WA Zi 98104 Applicant Architects Reed Reinvald Phone 206- 572 -3993 Address 201 North I Street, Tacoma, WA Zip 98403 Architect /Engineer Architects Reed Reinvald Phone 206- 572 -3993 Address 201 North I Street, Tacoma, WA Zip 98403 Contractor B & J Construction License# BJCON * *215D7 I ° " Phone 206- 632 -7991 Address P.O. Box 31132, Seattle, WA Zip 98103 Class of Work: O New O Addition Demolition x [] Tenant Improvement fl Remodel (residential) [] Reroof Interior Demolition Other Describe work to be done Interior demolition of partitions, ceilings, lighting and ductwork. Type of Const. (UBC) 5N Occ. Group (UBC) B -2 Square footage of entire building 15,620 gsf exis6quare footage of tenant space 15,620 g.sf Building Use Vacant (Former office /research) Will there be a change of use? [] Yes x No If yes, describe change of use, including square footages of changed areas Will there be storage or use of flammable, combustible or hazardous materials on the premise or area of construction? Yes 0 No If yes, explain I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT AND THAT I HAVE THE PROPERTY OWN R'S AUTHORIZATION TO DO THIS WORK. Applicant /Authorized Agent (signature) C ( 1 pm f Date 2 -7 -90 (print name) Venita VanHamme Brown Contact Person (please print) Venita VanHamme Brown Phone 206- 572 -3993 OFFICE USE ONLY FEES: Building Permit Fee (000/322.100) $ I. .00 Receipt# 5 30 Date Paid 2 Plan Check Fee (000/345.830) '.... Receipt Date Paid Bldg Code Sur Charge (000/386.904) 50 Receipt# Date Paid Energy Sur Charge* (000/386.907) Receipt# Date Paid Other ( ) Receipt# Date Paid / *New construction only TOTAL a l a.a) (OWES: $ ) SQUARE FOOTAGE /BUILDING USE INFORMATION Square Footage of Entir- Building: a FLOOR USE Occ T •E S..FT. 0CC SAD USE Occ T I SS.FT. OCC LOAD. USE 0 c T e: SI FT OCC s • TOTAL SI FT. TOTAL OCC. TRACKING DEPT.] DATE IN DATE OUT COMMENTS BLDG Approved for Issuance Type of Const. To Mahan: Date A.'roved: Approved (Initials) Per letter dates FIRE Fire Protection: Approved • Sprinklers O Detectors O BAR O LAND USE /SEPA CONDITIONS PLNG Zoning Setbacks: N S E W Parking stalls required for: Site Tenant Space Parking stalls provided: Site Tenant Space ADDITIONAL PARKING STALLS REQUIRED: PWD Approved (Initials) Per letter /plans dated Li 0 6X1 eoTir 4A iA:, 1O 12E,HA.11.1 )(I`vM :1∎1& H,AL -v To i r2rrMov�r X! TI WC", ag. Got -lc,, To 12 HAIN, +�X►S�IN� pop.p-iN (.. Q rINI� >�-i ;li)4.t, ;o 1 12b &G. DPP tt SI; C s�l6( Nor -S 69g R1'f p i .L 9 r4 c> 1, ! n e› I? 6f✓itNc exIS`j;tic,p c'VF ( .a ► ' „"fi°' L ( lam Relrlo' 6)(1,;1 4C Ai.UMirl► -'r1 c l(ol 2 er(ZotJ1 1/ . Ki' cN t 'hv,1 tN(o I7o�Ytd��o�1�> ave,t2pt.>t,4 '7 p_Uo / e2 i Tg, f';.4 X 0 2 hoar 4 P61- l o t,. i f L o i, Fo r?T N641 ,47, MI C.1-1A tGA1, E E5i, l.,:T(zIc:+h.1. fUtz .spec 6 Po 1 At< 4 ►eM oL i -ri 014, rv94F460 Mit.k, 3, F...sMoVE ALL , '.49.01 &Noof i �alJll,Di�i� � GMl7VE AI., , �:,�,( }��I ;orl �� e- J , JEIU L •I &H Trace r IX1R) 'rlpooCorioLT pi.A(, !AO r Vs) I+ 4 IC7 (-op_ e. :ot -JS, Gj. GONii�A(i U {�. '10 ,,>c'1"1 --11 op JG'Fif •iop.."jION or ex•r 2-108. mtei'‘fa ik.th. C•01-41 IF cuff D i110 ) VAR-j' rI2G•NI j(�U�f1 l"AfiUt- 4Et- .di1.t�. m. ALL i'2i ow 40p i T e11 ? lc RA, Dic,QG;;,G 7. R6Mo"E ALA_ ca.Ai 4OPic. a% tt.4016,k1; 6v, e, 12.6H0V6 OIk'1Not ¶0 1MGE; IpE e' 2r- ; U4-6- Priot4 tzooH u' 1 F- L I , t — r- Nc-(it14 41c4., op rh-+N 0S 4. M Ii> -'rN6v Rat-44 6y°(ENhi cb4' 6ur TN !zoo - cif i- {,ar{Cs, 1`(olGa.►. cvursY -yix.p.-c ON::r n or {bV6 UI f Ncv rioc12 4 . rr i!✓ Reylove. 6) i Peal:- tor i pt.1 i5 e, op 'L&»- `i Ati 126.4 PD. � ' I CIACv 4 11i1( WOOD 112tl.1 A'( 2tr O Wi'U.' -o pHcY6 6)(1 11 NooP 112iH ,o..T Top or- +,aia, TO C Te -r-l/ �if�nWN getloVE I:Xt'2111 I Ut./t- 6-(It.4 4 riff F.1cri:460014,He,12. app.$ i2ePiov' 6i1 FL IN PANzlepoovi • ,a • -k ,':4s. ...'?....: , fY... . <_.. .i r.•.....�iC.. ;;9._. r- a.S.wy .� r .L -: € ..^i..- ,- a+..':.c.s .�.,: -1 • It 'n1 1rIL 1E TT O 2, f. _ i i 1 � 11 4 r ct )P Rao$ •ro RelAm4 aT c I2TY VON t 4 R- .Move &.W . e , ny L*( AT Ex.15'1iM 6, 6t- i RI CSu pArl 6L i,oiuA'rIc .l' - ri2AHINi&& To 26Mp.11.4, 6,611.1NC9 lilt. , 11-I1 AI2ewA io pe (7 H Veil pi/ ' I a' 5 4 s L I A-11 - ii4LP rnlvi O1, i 7''bON , j4�I4 A(ZeA , ra'f ie- 1It4Cn , O fu nc. iric„ i NOT'?: If the microfilmed docutncnt is less deer then this notice, It is t ue to the quality Cr the oripinel c'ocument, fie ez Ze l (, G E,l i3i ti 9L . .3I bL Cl ZL U. di, 6 9 iii!l III iIIiIIIi1liilii► IIiIIII111IIiIIIIiIiIIIIIiI IIiIIIIIIfIIIIIIIII MiltII IIIiIIIIIIIIIIIiIIIIIIiilliiIIIIIIIIIIII IIII IIIIIIIiIIIIIIIiIIIIIIIiIIIIIIIIIIIII IIIIIIIIIIfIIIIIIIII II Ili 1 1 1 IIIIIIIIIIiiilIIfI IjIII III IIIf 111 I l I l f' Iiil l l f IIIiliIf 1 1 1 f IIIJII1f IIIf IIIf IIItl1iilIIJIIIf IIIJII IIt 1IIf IiIf II !111'f II I IIf IIIf IIIli{IilII iIiiIII I If IIIf III IIIf IlIIIIIf IIIiIiil 9 S fl i; L ww II! Iiiillllillllllllillllilliln' IIiIIIIII lIIIIIIIIIIIIifIIIII!III!Illf j.- -• = = _— — r • • ffal tt- s< 44 __ 1 E OL.- 111 ON 1 I / Q Ii It Ir urxlerstand that the Plan Check approvals are t to errors and omissions and approval Of does not authorize the violation of any ptedcode or ordinance. Receipt of contractor', y of a Jed plans acknowledged. o uw g �{ , By Date a " 9D - - Permit No n LI FILE COPY CITY OF TI)KWILA APPROVED FEB % 9g; RECEIVED CITY OF TUKWILA FEB 0 7 1990 PERMIT CENTER AMERICAN LNST MUTE CM ARCHITECTS ........._...mss.. 3. 2/7/90 °` inciti *x.4 ' ASH `''.��,f4kA`�'A''ft;:'�'+�y? -`+'mil • �i �3^v"� r 4 A RC�r�ers RE1NVALD 01 NORTH J STREET COMA, WA 98403 206 572-3993 EOL "O ONSUMER ettEDIT, VM L D µ tl O ATE BU1 DIN DIVISION , Y,