Loading...
HomeMy WebLinkAboutPermit 5930 - Seattle Mailing Bureau - Tenant ImprovementSEATZ ,M1LItJG SUE U APPROVED FOR ISSUANCE BY: ,�'� , (, BUILDING A , OFFICIAL DATE: ) -c-7-(7r) I hereby certify that I have read and exam d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating n ction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATUR Vi DATE: 46 .r (g9 O ADDRESS sn+ COMPANY: e , E. SIM Ss:-44 . tN t PRINT NAME: r ii9-64a9r- S PROPERTY OWNER Robert Storseth /Robert Levinson PHONE ADDRESS 1805 136th Place, Bellevue, WA ZIP 98005 CONTRACTOR Owner PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE • EXP. DATE ARCHITECT Lance Mueller & Associates PHONE 32 -2553 ADDRESS 130 Lakeside #250, Seattle, WA ZIP 98122 TYPE OF CONSTRUCTION: UBC EDITION (year) V -N 88 SETBACKS: N- S - E - W- FIRE PROTECTION: ®Sp rinklers Detectors [] N/A UTILITY PERMITS REQUIRED (hro Yes aX] No Pub Works) ZONING: V _ N BAR /LAND USE CONDITIONSOYes 111 No CONDITIONS (other than those noted on or attached to permit/plans): CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING � 2O PERMIT NO. � � DATE ISSUED: PROJECT NAME/TENANT Seattil1a' TYPE OF 0 New Building (� Addition WORK: 0 Rack Storage 0 Reroof CERTIFICATE OF OCCUPANCY NO. 4385 S 133 BUILDING PERMIT (POST WITH INSPeeTION CARD AND PLANS IN A CONSPICUOUS LOCATION) DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: PLAN CHECK #89 -431 TOTAL - FEES AMOUNT - RCPT • )80. 11 7 ,n0 4,50 301.5n U ON- 3C)fl 4202 17,000.00 — uATF Q )- 12 -j 3 -8q (Dl -qn I •lei S PROJFCT INFORMATIOf UI tf o' .r. ASSESSOR ACCOUNT # X33 Tenant Improvement (commercial) Li Demolition (building) U Grading/Fill 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: Demo of existing wall, construction of new walls and ceiling with related electrical, mechanical and sprinklers. CODE COP.1l'LIANCE USE FLOOR 4 TOTAL SQUARE FEET OCC. SQUARE r OCC. ' LOAD FEET LOAD • SQUARE FEET OCC. LOAD SQUARE OCC. FEET LOAD SQUARE FEET / OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. DATE ISSUED: V O Y PERMIT NO. - CONTACTED 5e, DATE READY DATE NOTIFIED 1 _ CI -Q, (Init.) �( l _ I PERMIT EXPIRES 2nd NOTIFICATION BY: c0 Q SF (init.). -4� AMOUNT OWING I �j� , 3RD NOTIFICATION BY: (init.) PROJECT NAME i MckA 5 SITE ADDRESS �, SUITE NO. PLAN CHECK NUMBER • INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. (21 BUILDING - Ia - � initial review 04 FIRE O PLANNING O PUBLIC WORKS O OTHER Qg) BUILDING - final review I -2.90 REVIEW COMPLETED BUILDING PERMIT APPLICATION TRACKING I -2 -90 JROUTED) INIT: �aK INIT: INIT: INIT: FIRE PROTECTION: FIRE DEPT. LETTER DATE REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- UTILITY PERMITS REQUIRED? Yes PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: V►N UIRE E CONSULTANT: Date Sent Date Approved Sprin Iers Detectors (t8 N/A U INSPECTOR: !-.;/ 7 ZONING: IBAR/IAND USE CONDITIONS? (-)Yes UBC EDITION (year): Vi.VV VVY {IIVVI I {VI ✓VYIV IMI M IYI\Iv IIV{ WflI VV IVV (206) 433 -1849 = CP .0 .. . BUILDING. PERMIT FEE 1` ,0.0 PLAN CHECK NUMBER - 1 _ PLAN CHECK FEE I I oo -I oq ia--) 3 1 BUILDING SURCHARGE ►-I, Std n l'L'L I C A TION MUST T QE FILLED OUT COMPLETELY ENERGY SURCHARGE OTHER: TOTAL - 501.5 SITE ADDRESS SUITE # S • I rZz -e Ls , wk G6 VALUE OF CONSTRUCTION - $ l c t PROJECT NAME/TENANT • - L imAlti� AA\ ASSESSOR ACCOUNT # 2- p 132ED -ED 1 TYPE OF New Building Addition enant Improvement (commercial) U Demolition (building) WORK: O Rack Storage 0 Reroof Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: mgr it, G.)F gxi t7, j w.4-LL - cp- y1- 5.7h0-c"re-,i 6-/c. N wovt,it s g fit %/ 14 t■i to/ A'e ,.1-7 Lem-, , #-f- pxio,l.L p, BUILDING USE (office, warehouse, etc.) 67F-c_ GO NATURE OF BUSINESS: / vile - .. pis 1 � L WILL THERE BE A CHANGE IN USE? )► No • Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: c WILL THERE B TORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER m .� .s � . L iNAS.6 --Yl PHONE ADDRESS ZI CONTRACTOR --T PHONE l 0) flG r ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT 1_,A 4_166 niL1e - . 4 A3-c, PHONE 5&5 _ 0)F55 ADDRESS �•r� `�,� ZIP /. Q . - •!:) L AB /Z-Z CITY OF TUKWILA Department of Community Development - Building Division HEREBY CERT1. RUE AND CORR BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON DATE APPLICATION ACCEPTED BUILDIK a PERMIT APPLICATION tE AND EXAMINED THl ` : PPI,ICATION AND KI IT IZED - FO APPL >F ' - IS 'ERMIT. SIGNATURE PRINT NAME jg,„6. ADDRESS 1e:) L 4 /De. 10- 13 " c69 FEES (for staff use only) Z19-V1 W T H E : SAME TQ; DATE Imo i� 4 1 1 PHONE 7,-53 CITY /ZIP PHONE Z APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete In order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of (Immunity Development prior to application submittal. Contact the Permit Coordinator at 133 -1351 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES Co- I 3 9 0 COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITIONS Completed building permit application (one for each structure Ej Assessor A000unt Number Two sets (2) of the following n Specifications Structural calculations stamped by a Washington engineer n Soh report stamped by a Washington State Owned engi n Topographical survey Energy calculations stamped by a Washington State licen engineer or architect E Legal description Working: drawings, stamped by a Washington State licern architect, whkh.Indude Sits p Architectural drawings • Structural. drawings • Mechanical drawings • Elevations Civil drawings Completed utility permit application (one for entire projec Six (6) sets of civil drawings • NOTE:: See utilAy permit application and checkfst for submittal requirements RACK STORAGE Completed building permit'appiication Assessor Account Number si whist include; a. (2) sets of plans, gilding floor plan showing Entire space where racks will be • Exit doors D • imensions'of all Tenant space floor plan showing rat:* storage layout, aisles and': exits. • NOTE: Include dimensions of rocks : and exit Wage on plan,; Structural calculations stamped by a Washington State licen engineer. (rad( storage. 8' and over); . RESIDENTIAL El Two sets (2) ofworWng drawings, which incl • Situ plan Foundation plan .Root'. plan:;;'; • •.Roof plan Buildng.elevations (ail views Building cross- section • Structural framing plans. Washington State Energy Code data :: Completed ubligr permit application C Six (6) sots of site plans showing utiiibes : J St BMITTAL CHECK..1ST rate licensed specifie'udl NEW.SINGLE•FAMILY DWELUNGS/ADDITIONS Completed building permit application (one for each structure • n Legal description' C Assessor Account Number • NOTE Bulidhr9 site plan and utility site plan May be combined, utility petmit application and checklist for specie °:submittal rvg4ltaments Addtion/f: ical and soils information topographical may be regNkwc/if u aAs conditions. COMMERCIAL TENANT IMPROVEMENTS . .::; Completed building permit application (one for each structure or tenant) : Assessor Account Number Two (2) Sets of construction plans, which include, f plan Fioorpian a; proposed tenant space e of each room labelled. - .Tenant space plan with us E doors egress patterns: nd: New wall, a walls to be demolished Construction details • Glo sections showing wall constriction. and method of attachment for. floor and: ceiff Structural calculations stamped by a Washington State licensed engineer may be requinedit structural work rs to be done (2 sets) MUTE N airy work is to be dune; submit sepa rate : udlity permit appNcabor and utility plans :< REROOF Completed building' permit application Assessor Account Number Narrative describing existing root, mate ilal being :removed; and material beng.i,nstalled ;. NOTE A certification letter is required pnor tafinal inspection and sign ofl the perntii: : ANTENNA/SATELUTE DISHES Completed building permit application — Assessor Account Number • Two (2 sets of plans, which include ) de. Site Plan (showing bulling and:location of antenna7 dish Detailsante a 8/sat ellite dish and metltod:of attac • • S tructural cal culations s by a Washington S tate t engineer may be req ................. .. .... . ..... an of tenant.speoe Existing and proposed park Overall building P lan Tarrant location •. Use of 'adjacent, ( commonWall) , tenant • CNar dimensions of building or square footag : REMODELS C ompleted building permit application (one for each structure) •`Assessor Account Number Two (2) sets of worki drawing which incl ude Bite plan •;.Foundation plan Finor'pnsn' • plan Building;;elevations views) •. Building'cross sect on Structural: framirgPlans N QTE Ifmy utlkty:w rkIs to'be done;prchcle permit appl ica and plans must be irubm►tsed Date Wanted Project.. 0 ,1 ?��u�._ Requestor Phone # Type of Inspection Y. S. CITY OF TUKWILA Build" Department 6300 •hcenter Boulevard Tukwila, WA 98168 t,l� (206) 431 -3670 Site Address 4:3$ S • 13.5 Special Instructions INSPECTION RECORD PERMIT # ,f57-3 Date Inspector " 6-- Date Z1l a .m. p.m. , J r Inspection Results/ Comments: CA—v -c , /114, INVESTMENT BUILDER AND REAL ESTATE DEVELOPMENT 12061 747 -3067 I 8 0 5 136 PLACE. N.E. SUITE 206A BELLEVUE WASHINGTON 9 8 0 0 5 August 21, 1990 Mr. Gary Schenk City of Tukwila Building Department 6300 Southcenter Boulevard Tukwila, Washington 98188 Subject: Permit No. 5930 Dear Mr. Schenk: Please be advise the recipients of the above - referenced permit do not intend to take out this permit for the construction of improvements in Building F, Fostoria Park Industrial Center. Thank you for your consideration. Partner RES /kml AUG 2 21990 tee. ROBERT E. STORSETH Plan Check #89 -431: Seattle Mailing Bureau 4385 S 133 THE FOLLOWING COMMENTS APPLY T9_09 BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER_ D O__. 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363). 3. All mechanical work shall be under separate permit through the City of Tukwila. 4. All permits, inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. 5. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 9. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 X 7 Framing 433 -1849 X 8 Insulation 433 -1849 X 9 Suspended Ceiling 433 -1849 X 10 Wall Board Fastening 433 -1849 11 12 13 X 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: 4385 S 133 OTHER AGENCIES: BuILDI:]G PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: Seattle Mailin. Bureau CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS X130 a-Q1-9_0 All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or it underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. W,24/if "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 X 14 FIRE FINAL Insp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL PLAN CHECK NUMBER 89- 431 PROJECT: THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER (i!') No changes will be made to the plans unless approved by the �/� Architect and the Tukwila Building Division, O 2 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, i clueing all gas piping (296 - 4732). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872-6363), A) All mechanical work shall be under separate permit through the ��� Cit of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O All structural concrete to be special inspected (Sec. 306, UGC). :J 8l All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UGC). O A 1 high - strength bolting to be special inspected (Sec. 306, UGC). Any new ceiling grid and light fixture installation is required to meat lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. 13 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. J Any exposed Insulations backing material to have Flame Spread t/� Rating of 2S or less, and material shall bear identification showing the fire performance rating thereof. O Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). O A statement from the roofing contractor verifying fire retardancy of rook will be required prior to final inspection (see attached procedure). (yl) All construction to be done in conformance with approved plans and V� requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington Stag Regulations for Barrier Free Facility (1989 Edition). 18 All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 2 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. O Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.B.C. Standard No. 43 -8, shall be special inspected. O All wood to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.S.C. Section 306 (a) 7. V. °Validity of Permit. The issuance of a permit or approval of ��//���/// ��. plans, specifications and computations shall not be construed to • be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. City of{ukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Fire Department. Review (512) Control 4489-431 Gary L. VanDusen, Mayor January 8, 1990 Re: Seattle Mailing Bureau - 4385 S. 133rd, Tukwila, Wa. 98168 Dear Sir The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment. is calculated at one extinguisher for each 3000 sq ft. of area. The extinguishei(s) should bL of the "All Pul pose" (2(i , 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 7E,' or (NFPA 10, 3-1.1) (UFC 10-1 (3-1)) 2. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit signs shall be installed at required exit doorways and where otherwise necessary to clearly indicate the direction of egress. Signs shall be of a contrasting color with the surrounding area and shall hVU letters not loss than six inches high with a minimum letter width of 3/4". (UBC 3314) (UFC 12.108) 3. All meJirl...ations to sprinkler systems shall have the written cipploV6 of the Washington Surveying & Rating Vactery mutunl Engineering or Industrial Risk 1n,;uler-, then by the Fire Dep6rLment. No sprinkler wolk shall cornmense without approved drawings. (City Ordinance 111141) (NFPA 13, 1-9.1) (UFC 10.307) Contact the Tukwila Fire Department , Fire Prevention Uureau to witnso all required inspections and too City of iukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 Page number (NFP( 13, 1-10.2) (UFC 10.307) Yours truly, 572-- The Tukwila Fire Prevention Bureau cc: r.F.D. File mind Gary L. VanDusen, Mayor 4. All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NEPA 70) (UFC 10.104) All electrical wiring is to be inspected by the State Electrical Inspector , Washington State Department of Labor 3, Industries. (UGC 10.104) S. All required occupancy separations, area separation and draft-stop partitions shall be maintained ond shall be properly repaired, restored or replaced when damajed, altered, breached, penetrated, removed or • improperly installed. (UFC 10.401) Your street address must be conspicuously posted on the building and shall be plainly visible and legible from the street. Numbers shall contrast with their backgrou (UFC 10.208) Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does riot imply approval of such condition or violation. CITY OF TUKWIL.A DEPARTMENT OF COMMUNITY DEVELOPMENT PROJECT L .cc g'_ _ _/_ L_g/�, 4vKeACU ADDRESS 4355 I ` 13.3_AP. ORDINANCE COMPLIANCE CHECKLIST Uni form Buildinc nccuRANcx_BouP 43-21 . u.)4Se/oFF.t.c.e. t„15E. e TYPE OF CONSTRUCTION [✓] ON PROPERTY _ RIUTI PIING HTFGHT /Nn of STORIES ._.____ .. -- 114SrALA..ATIS?.N 1?ttl • _] DETAILED REQUIREMENTS: nccuRaticY ZY EE OF CONSTRU.G.T.IIIN ENGRG.. REGS. & REQMTS. THAI? IER_5 L-.1 O .W ,,A--C, - NOTES: -sr eD-t - Qo _.`r_l!fZ' ' PLAN CHECK NUMBER Et- 431 Code, 19ea Edition. - 1 FLOOR AREA 'bFG = rJ 1(o4t 1 1.0.466. l7 05'3 V _OCCUPANT LOAD _Ap '[>lplg OfG A AVA 'PAR* yeopc6Aitom . _ 4154 /Loo '7 M. Ucc.. F X T T INC; BEIIll1BEMEf1TS EXlitaT4 ._oFF.KE. AR.e.A .. 1 J 10 0 'T�7CAr� - f4 E4) . Oc.c.. `.A, 24 exc.. < 1 O .' . Tuffs LOA!. _ cAN exit - 4h*OCX,M4 "yam CORN 01 441 Iw 't'iutovGN 2:f,1tl _ ACC" .ANO.. Out . ✓ O I K • ALL 1W1 mi S .vamhu{S . _.1?NGNdlCtPJ12 _ I .o�K�. _ .. �p16Z► !pope. .T6 CoMQUT1ea. aM. RM. _iitat.pvletir � API+HOVED FOR I � I ISSUANCE BY: / ,t,Q, ,,� C a BUILDING ►i. A.-4•\ , OFFICIAL DATE: ) -"1-- (') I hereby certify that I have read and exam'fd this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatingr.n ction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATUR -. I • 'A DATE: 46 , i i D PRINT NAME: � l iW S'7 Se +?-f- COMPANY: , 14. S.iZ S -4 .kU 2 I PROPERTY OWNER Robert Storseth /Robert Levinson PHONE ADDRESS 1805 136th Place, Bellevue, WA ZIP Q$OQ5 CONTRACTOR Owner PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT Lance Mueller & Associates PHONE 32 -2553 I ZIP 98122 ADDRESS 130 Lakeside #250. Seattle. WA TYPE OF CONSTRUCTION: V -N UBC EDITION (year) SETBACKS: k FIRE PROTECTION: �Sprinkters 0 Detectors NJA UTILITY PERMITS REQUIRED? (� Yes (X No thrO-ug Public Works) (Public ZONING: y -H BAR /LAND USE CONDITIONSDYes L`i No CONDITIONS (other than those noted on or attached to permit/plans): CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433-1849 BUILDING PERMIT NO. 5 1 30 DATE ISSUED: -x1.90 - PROJECT INrORMATIOr .n S SS 4385 S 133 PROJECT NAME/TENANT S 11l TYPE OF Li New Building U Addition WORK: 0 Rack Storage 0 Reroof au1LuiRu minima a (POST WITH INS ..:TION CARD AND PLANS IN A CONSPICUOUS LOCATION) S 'IP O BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - PLAN CHECK 1189 -431 SUI IM VALU FEES 301.50 U 17,nn0 no ASSESSOR ACCOUNT a Tenant Improvement (commercial) U Demolition (build ing) U Grading/Fill 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: Demo of existing wall, construction of new walls and ceiling with related electrical, mechanical and sprinklers. CODE COMPLIANCE USE -) OCC. SQUARE OCC. SQUARE TOTAL TOTAL • C. OA a a ?a '- ?3 • • FLOOR SQUARE CCC. SQUARE OCC. ' SQUARE TOTAL I This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. DATE ISSUED: G