Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 5959 - Northwest Scale - Tenant Improvement
APPHOVED FOR s ' BUILDING ISSUANCE BY: i ' —w.; OFFICIAL DATE: 3-K-96 I hereby certify that I have read a • examined this permit and know the same to be true and correct. All provisions of taw and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATURE: q 41 ttitArvre4.— I DATE: 3 IS `Q( / PRINT NAME: :04 ~ac- .1, vh3�riUtr\ r\ COMPANY: tG{\ Ce \czuc(_ - ,n/1, - U/1' PROPERTY OWNER Thc� Knl l romp .any PHONE 575 PHONE 575 ZIP 97188 -0367 ADDRESS 601 Strander Boulevard, Tukwila, WA CONTRACTOR Zion Construction ADDRESS 992 Industry Drive, Tukwila, WA ZIP 98188 WA. ST. CONTRACTOR'S LICENSE ZIONCI * 143Mu EXP DATE 7_31_90 ARCHITECT Zion Construction Inc. PHONE 575 -0367 ADDRESS 992 Industry Drive, Tukwila, WA I ZIP 98138 TYPE OF CONSTRUCTION: UBC EDITION (year) V - N 88 SETBACKS: N— S— E — UTILITY PERMITS REQUIRED? Lj Yes Q N o W — (through Public Works) FIRE PROTECTION: OS rinklers Detectors p ® / A ZONING: r-M BAR /LAND USE CONDITIONSoyes (z)N0 126.00 32.00 5921 5921 2 - 20 - 90 2 - 20 - 90 CONDITIONS (other than those noted on or attached to • rmit/plans): BUILDING SURCHARGE 4.50 5921 2 - 20 - 90 ENERGY SURCHARGE OCC. •.• ' SQUARE OCC. •_.. DESCRIPTION AMOUNT RCPT 0 DATE BUILDING PERMIT FEE 126.00 32.00 5921 5921 2 - 20 - 90 2 - 20 - 90 PLAN CHECK FEE BUILDING SURCHARGE 4.50 5921 2 - 20 - 90 ENERGY SURCHARGE OCC. •.• ' SQUARE OCC. •_.. OTHER: OCC. • • TOTAL 7. RE TOTAL • C. L• TOTAL - 212.50 -a3 USE 4 / / COD[ COr.11'1 / I/1NCF / / wog SQUARE OCC. L• • SQUARE OCC. !..• SQUARE . a OCC. •.• ' SQUARE OCC. •_.. SQUARE OCC. • • TOTAL 7. RE TOTAL • C. L• - z3 -a3 TOTAL CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. 595 DATE ISSUED: 12 RTIFICATE OF CUPANCY NO. 842 Industry PROJECT NAME/TENANT Nor we TYPE OF - 0 New Buildin U Addition WORK: 0 Rack Storage 0 Reroof BU1LD1N'3 PERMIT (POST WITH INSPEt, i'ION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN CHECK #90 -061 PROJFCT INFOF7 NIA TION Dr 842 U 10,905.00 ASSESSOR ACCOUNT N 2523 4- 9015 -04 Tenant Improvement (commercial) Li Demolition (building) 0 Remodel (residential) 0 Other UI LU FEES ti Grading/Fill DESCRIBE WORK TO BE DONE: Add office, relocate doors, change lighting, repair ceiling, add carpet, and paint;. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period 01180 days from the last inspection. DATE ISSUED: PROPERTY OWNER �� , • _ PHONE r - -! ADDRESS Boulard, Tukwila, 6r ander ev (Z St ZIP 98188 CONTRACTOR Zion Construction PHONE 5 75 -0367 ADDRESS 992 Industry Drive, Tukwila, WA ZIP 98188 WA. ST. CONTRACTOR'S LICENSE # ZIONCI *143M0 EXP DATE 7001 -90 ARCHITECT Zion Construction Inc. PHONE 575 -0367 ADDRESS 992 Industr Drive, u Tk WA ZIP 98188 DESCRIPTION AMOUNT RCPT N DATE BUILDING PERMIT FEE 126, 00 122 5921 1 _ • 2 _ t _ • PLAN CHECK FEE 82. an BUILDING SURCHARGE 4.7S) 5921 _ #_• s ENERGY SURCHARGE OTHER: TOTAL -____W .50 TYPE OF CONSTRUCTION: v _ N UBC EDITION (year) SETBACKS: N _ S — E — W — FIRE PROTECTION: OSprinkfers ❑ Detectors Q N/A PERMITS REQUIRED? ❑ Y es Q N o (through Public Works) ZONING: BAR /LAND USE CONDITIONS ❑Yes O No COMPANY: ttiLCs .1tzc9s14c1n,, -t/l- _ CONDITIONS (other than those noted on or attached to permit/plansl: AP['HOVED FOR BUILDING ISSUANCE BY: 1.1 OFFICIAL DA TE: 3 A - 9G I hereby certify that I have read a examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this building permit. DATE: 3 0 SIGNATURE: �a 1,4 g U r-- PRINT NAME: Ic-lc -l rvutr\ COMPANY: ttiLCs .1tzc9s14c1n,, -t/l- _ CITY OF TUKWILA — Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. USE TOTAL CERTIFICATE OF OCCUPANCY NO. -J 5`15` DATE ISSUED: NIA BUILDING PERMIT (POST WITH INSPE(►• sON CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES PLAN CHECK #90 -061 842 Industry Dr - 842 -- - U T1•N-$ 114205.00 PROJECT NAMENANT ASSESSOR ACCOUNT # lTE _ -❑ Nor west Sr_ 9.015 -04 TYPE OF New Building LJ Addition Tenant Improvement (commercial) Demolition (building) i Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other: DESCRIBE WORK TO BE DONE: Add office, relocate doors, change lighting, repair ceiling, add carpet, and .aint. 7 DATE ISSUED: CODE COMPLIANCE FLOOIR4 SQUARE OCC. FEET LOAD OCC. SQUARE LOAD FEET SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET f' OCC. LOAD TOTAL TOTAL SQUARE FEET OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Building Division 4200 Southcenter Boulevard Tukwila, 'Washington 98188 (206) 433 -1849 Type of Inspectio( Site Address � S 13 /^ Requestor Special Instructions Inspection Re &.alts /Come= ts: INSPECTION RECORD PERMIT # Date y - S -9 0 Date Wanted " 1 Project Phone # Inspector ;44o Date L7 --?6) /1) x7 5 - -0gCa -7 CITY OF TUKWILA Building Division T ukwila,,tWashinoton Boulevard 8188 (206) 433 -1849 Inspection Results /Comments: - C Inspector PERMIT # 4,r 3 d --9 Date Date Wanted Project 3•,x.9 -9 Type of Inspection Site Address Requestor Special Instructions Phone # 7 Ss"' 3 Co 7 Date 3- /'-�� CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 F eta Inspection Results /Comments: 02)/3 Inspector 19/2 4.47j—r,r)/7 *44. 44 4uMa: IAG 'NF4kEy4VF1i4.'*. ".YaWWR414." M44 41M., Y. YJ: a: tiCRaf.' if i4mk .0lrLLd..4.k.Vj't'gW. INSPECTION RECORD PERMIT # S Date - - 9 0 Date j -22- - / ate Wanted 3 aom Project nOcAjkLud,d7 LAS Phone # j 75 - 0 3 CP 7 Type of Inspection Site Address Requestor Gf_ A A .�i�' Special Instructions fi `''t t�J / ,,fCh� - �� P.1 CITY OF TUKWILA Building Division 8200 Southcenter Boulevard � Tukwila, Washington 98188 tr %` PERMIT # (206) 433 -1849 Date Type of Inspection Q e-;46 Date Wanted 3 , '10 p.m Site Address i3 .( :D ,.S v 1v �'', Project k acre S -- Ca Requestor 01.-47'1C-K 1; {ALL -�.t Phone # CJl S--' 0 Special Instructions C.. Inspector 74„,p . �...v...,.,.... r�. v..... r...w. w.. �. �e....K.., rweosw ..:. <.w.x.rnaean..et.w.rr.xw c.:.,�rnn�Yw� rr�::.ewr,::k ^•.•,x.�tG� 1:�+.•=•vYiCa.".X�Ri'S� . , INSPECTION RECORD Inspection Results /Comments: c Date 3--/2-11/--% Project Name , %�� - 1 !, �r. , _? 5-er, (' Address Type of Permit(s) /.._ TO: ❑ Building ❑ Planning «: r p CITY OF TUKILA Tontrol No. g / ) - C' ) 1 Central Permit System Permit No. FINAL APPROVAL FORM ❑ Public Works Fire Dept. ❑ Police ❑ Parks/Recreation This project is nearing completion. Please investigate your area of responsibility and indicate below either your final approval or necessary corrections. If no response is received within one week, it will be assumed that the project is of no concern to your department and a certificate of occupancy may be issued. This project is NOT approved by this department; the following corrections are necessary: () () () () () () () () () () () () Authorized Signature Date This project is approved by this department: Authorized Signature Date CPS Form 3 J MARVIN F. POER & COMPANY PROPERTY INFORMATION REQUEST PROPERTY NAME: .DOVER. wP.H,ASE.IVd LRaAL.:DB$CRIFTION . All that certain real property situated in the City of Tukwila, County of King, State of Washington, and being a portion of the southwest quarter of Section 25, T.23N., R.4E., W.M., more particularly described as follows: Beginning at the east one- quarter corner of Section 26, T.23N, R.4E., W.M.; thence N88 °06'42 "W 'along the East -West centerline of said Section 26 a distance of 105.84 feet; thence S01 °47'28 "W 90.66 feet; irhence S88 °12'32 "E 233.00 feet to the TRUE POINT OF BEGINNING: thence from the TRUE POINT OF BEGINNING S88 °12'32 "E 291.50 feet to a point on the southwesterly margin of James Christensen Road No. 1479; thence along said southwesterly margin the following seven (7) courses: S32 °39'25 "W 96.43 feet, S20 °16'25 "W 114.09 feet, S03 °06'25 "W 122.73 feet, S02 °41'35 "E 98.54 feet, S19 °53'35 "E 168.86 feet, S32 °38'35 "E 158.24 feet and S44 °38'35 "E 25.37 feet; thence leaving said southwesterly margin S01 °47'28 "W 461.42 feet; thence N88 °12'32 "W 254.00 feet; thence N01 °47'28 "E 18.00 feet to a point of the northerly margin of Minkler Boulevard; thence along said margin N88 °12'32 "W 103.00 feet to a point on the centerline of a private drive; thence along said centerline N01 °47'28 "E 430.00 feet to a point of curvature; thence tangent to the preceding course along the arc of a curve to the left, a distance of 77.78 feet, having a radius of 250.00 feet and a central angle of 17 °49'33" to a point of reverse curvature; thence from a tangent which bears N16 °02'05 "W along the arc of a curve to the right, a distance of 77.78 feet, having a radius of 250.00 feet and a central angle of 17 °49'33 ", to a point of tangency; thence tangent to the preceding curve N01 °47'28 "E 577.17 feet to the TRUE POINT OF BEGINNING, containing an area of 7.783 acres, more or less. SUBJECT TO AND INCLUDING an easement for utilities over the south 15.00 feet thereof. RECEIVED CITY OF TUKWIlA FEB 201990 P RMft CENTER I understand that the Plan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. Receipt of contractor's copy of a oved plans ack ledged. BY °v `cl(C- "4 Date -`t Permit No 959 4G,E.. KOLL BUILDING 20 830 -846 Industry Drive Tukwila, Washington fetal Area 1 S.F. CITY OF TUKWILA APPROVED 1'AAR 01 1990 BUI DING DIVISION FILE COPY t Koll Business Center Tukwila -Phase IV <0> 8 m T RECEIVED CITY OF TUKWILA FEB 2 0 1990 PERMIT CENTER 3-Phase Panel CITY OF TUKWILA APPROVED MA 14 1990 BUILDING DIVISION �1C Co 111111111/11 = rsm..t A 9CAC.t YS M (' d �► RECEIVED CITY OF TUKWILA FEB 2 0 1990 PERMIT CENTER ZION CONSTRUCTION, INC. 992 INDUSTRY DRIVE TUKWILA, WA 98188 Drh∎A n 6y PAR z I c . beth 1031 3-Phase Pan 9 1 \muff . �tcL nC1 4 4° ° r • REIocR }E. Doo +LS L. E-C1 Nv, SCPr\E' . \' O" CITY OF TUKWILA APPROVED IA 4 1990 ,V Oft RECEIVED CITY OF TUKWILA FEB 2 0 1990 PERMIT CENTER Tom. = Nt"' u44%1 ■ 1 1 1 1 = QEMoitt. wAq BUILDING DIVISION ZION CONSTRUCTION, INC 992 INDUSTRY DRIVE TUKWILA, WA 98188 DrAw 3Y PJ F 2 f r t D V% 341 ' - . ti • 1 w00.r. w i . u. t l s , • _ t V cs, 4 3 ,52• 0 • • . Valli 6 . OO, k .. r ..• _ —. U..:... 1 1 • • N • �• 11.r — -- _ as r " ►bp SOSI'cM tb 0.t1(.01 MIS Pk A o«\y i • tAm4 4.44 :ttl ►w4 N4.,ys• 1' opt') wet .._.----\ ...t....... beth 1031 3-Phase Pan 9 1 \muff . �tcL nC1 4 4° ° r • REIocR }E. Doo +LS L. E-C1 Nv, SCPr\E' . \' O" CITY OF TUKWILA APPROVED IA 4 1990 ,V Oft RECEIVED CITY OF TUKWILA FEB 2 0 1990 PERMIT CENTER Tom. = Nt"' u44%1 ■ 1 1 1 1 = QEMoitt. wAq BUILDING DIVISION ZION CONSTRUCTION, INC 992 INDUSTRY DRIVE TUKWILA, WA 98188 DrAw 3Y PJ F 2 f r t D V% 341 3° b 3tj TIVIv1 G33Ved ' tip iSiHI: 11EV; •14!> X14 3cvS 6V../•02 H' Th uD ) ‘;‘,../i a« ao 1111 ne.g 1 r1-4r SJ g v-d ri J- Nr y >% JO 'iJr+l'113a7 tY (4 44 7O s0 -,;€'€ .;1.1 (1 1L-7"-r- ) r :.rz.i V raoiv 1 .o' ;13+ iNs1s ""Ti 0 CCP Plan Check #90 -061: Northwest Scale 842 Industry Dr THE FOLLOWING COMMENTS APPLY TO AND B COME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER_On l5d___. 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 4. All mechanical work shall be under separate permit through the City of Tukwila. 5. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 7. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 8. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 9. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 10. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 X 7 Framing 433 -1849 8 Insulation 433-1849 X 9 Suspended Ceiling 433 -1849 X 10 Wall Board Fastening 433 -1849 11 12 13 X 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 BUILDMG PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: 842 Industry Or SUITE NO.: 842 BUILDING PERMIT NO. 5 G J �� DATE ISSUED: 3-15-q0 PROJECT: Northwest Scale CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMEN INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are In place. 3. SLAB - If structural slab or if understab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the 04121/119 project progresses. "X' REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Root Sheathing Nailing ' 8 Masonry Chimney X 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 X14 FIRE FINAL Insp: 15 PLANNING FINAL 18 PUBLIC WORKS FINAL X 17 BUILDING FINAL PLAN CHECK NUMBER IV -"DO( • ).Q� LCAL Q. • PROJECT: (� THE FOLLOWINI COMMENT! APPLY TO AND IECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMSEA ©/ p 7 All structural concrete to be special inspected (Sec. 306, UBC). O All structural welding to be done by W.A.B.O. certified welder and spacial inspected ISsc. 306, UBC). O 9 All high - strength bolting to be special inspected (Ise. 306, UBC). Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. [ a-Partition walls attached to ceiling grid must be laterally braced if over eight (0) feet in length. 12 Readily accessible access to roof mounted equipment is required. 13 Engtneereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed Insulations backing material to have Flees Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing wait shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). '�) Electrical permit shall be obtained through the Washington State \�`-� Division 04 Labor and Industries and all electrical work will be inspected by that agency (972- 6363). 1/321 mechanical work shall be under separate peralt through the City of Tukwila. i V — " All permits, Inspection records, and approved plans shall be posted at the Job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila !wilding Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection tsee attached procedure.). A statement from the roofing contractor verifying fire retardancy of rook wfll be required prior to final inspection (see attached procedure). / • All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (19S11 Edition), Uniform Mechanical Code 11911 Edition), Washignton State Energy Code (1989 Edition), and Washington etas Regulations for carrier Free Facility 11909 Edition). 11 All food preparation establishments suet have King County Health Department sign -off prior to opening or doing any feed processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4717, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the Job site. 19 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. such identification shall be issued by an approved agency hawing a service for Inspection at the factory. 20 , Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is to addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.1.C. Standard No. 43 -0, shall be special inspected. 22 All we to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.I.C. Section 306 161 7. ) Validity of Permit. The issuance of a permit or approval of 11// . plans, specifications and cosputstions shall not be construed to be a permit for , or an approval of any vislatlon of any of the provisions of this code or of any other ordinance of the furls /lctlan. Ne permit presuming to give authority or violate er cancel the provisions of this code shall be valid. Fire Department Review Control Number 90 -061 Re: Northwest Scale - 842 Industry Drive, Tukwila, Wa. Dear Sir: City oC ukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 March 13, 1990 Gary L. VanDusen, Mayor The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Maintain fire extinguisher coverage throughout. 2. Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit signs shall be installed at required exit doorways and where otherwise necessary to clearly thdicate the direction of egress. Signs shall be of a contrasting color with the surrounding area and shall have letters not less than six inches high with a minimum letter width of 3/4 ". (UBC 3314) (UFC 12.108) 3. Your street address must be conspicuously posted on the building and shall be plainly visible and legible from the street. Numbers shall contrast with their background. (UFC 10.208) All required occupancy separations, area separation walls, and draft -stop partitions shall be maintained and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) Plan Review PROJECT .'72 �� i i !� l P ADDRESS DATE I- 4 OCCUPANCY GROUP cLJ 2 C TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HT. / NO. STORIES 697 idt FLOOR AREA CgF'r OCCUPANT LOAD EXITING REQUIREMENTS DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION �1 U PART V, CHAPTE 23, U.B.C. W.S .E.C. CHAPTER 51 - 10, W.A.C < V4141 4 14-20 /oo 2 r262, /&9 ,,) affee4 / ? CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION ID PLAN CHECK NUMBER PERMIT NO. • CONTACTED / YneS Le_ft DATE READY DATE NOTIFIED PERMIT EXPIRES 2nd NOTIFICATION BY: (Init.) AMOUNT OWING 6 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER ci o- 0(0) INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. ....................... J BUILDING - initial review FIRE O PLANNING O PUBLIC WORKS O OTHER (Z BUILDING - final review REVIEW COMPLETED 1 BUILDING PERMIT APPLICATION TRACKING PROJECT NAME N rth a_oLl SITE ADDRESS : Endv r, ;) r SUITE NO. SL , 3 -14-40 3_7vx? U CONSULTANT: Date Sent INIT: INIT: (ROUTED) INIT: INIT: INIT. REFERENCE FILE NOS.: JIREM _ FIRE PROTECTION: [ ] Sprinklers FIRE DEPT. LETTER DATED: _ iz - gyp MINIMUM SETBACKS: N- S- ZONING: C.: IBAR/LAND USE CONDITIONS? UTILITY PERMITS REQUIRED? ( ] Yes PUBLIC WORKS LETTER DATED: -3 _ 1 4- _9 TYPE OF CONSTRUCTION: Date Approved - Detectors INSPECTOR: 1988 1V /A 1 3 UBC EDITION (year): ]Yes w- O313WN SITE ADDRESS SUITE # B4? Inflosii D+=.10 E. 84z. VALUE OF CONSTRUCTION - $ *ID, cl05,ao PROJECT NAME/TENANT Nofa.TlA -� _.s r SC L E. ASSESSOR ACCOUNT # Z5 a 3oq — `1015 TYPE OF U New Building U Addition b9 Tenant Improvement,(commercial) U Demolition (building) WORK: O Rack Storage O Reroof O Remodel (residential) : , O Other DESCRIBE WORK TO BE DONE: AM Q-1-Y ()> Iz xlz° o- tce. 1Zs.1ocM -e. cA-y z dcvv-5 ca4-y . 2aL -e4 PP :,r c�.l.,r, NA caT 4- * r., -M-in BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: Cq vvk.rr\f o., �(� Se-M- WILL THERE BE A CHANGE IN USE? I&1 No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: l ci e Tenant Space: 3, 000 Area of Construction: )(° G s .0 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR kAZARDOUS MATERIALS IN THE BUILDING? ®. No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER T 1 . 1 . E_v_ , ,I\ Ce- , miA. , N ;' P M g0t7 65 ADDRESS 1301 S1 . T4\18 TlCwt4q- WA ZIP 951 8 -, 'CONTRACTOR �Z 1()r 0.ons44 -ton -DnG PiON ?5- 3 b ADDRESS 9c(? INwrs - 2'? L.201t T'QKw4�c. w 1>r � ZIP c(8lA$ WA. ST. CONTRACTOR'S LICENSE # ZZO Y1CT. )4$1,4 EXP. �TTE 19 � ARCHITECT ....10 cors.-,.2ei -.pn T_r c PHON F1).-03617 ADDRESS soli 2, z nrt,)s t-+e , Z fl et,vc Z I R. 1 S t fl b 1 HER EBY CERTIF..Y THAT 1 HA .g, f3 RU 1ED EXAMINED :THIS kPPUCATION >AN D:KNOW.THE SAME: > Tp:.Qf E::A ND RRECT CO : .:....:::: ::::::::::: ...... <:; ;::::<<::;:;» ;:..;. ANt 1 AM::AUtMO . EbTQ APPLY FtSR TMISI?ERMI`1. . ::::... „ : „. :, BUILDING OWNER OR AUTHORIZED AGENT r9rcic SIGNATURE 2 .1.r� / ��- �(wv�, ..—. DATE o? ,R0/90 PRINT NAME U J. > PHON 1 )5 -0367 ADDRESS c 1az 1 N bus.i -2Y iD 2w�. C lY / c wl/A, U04 9 8/■ CONTACT PERSON A._R.IGAc._ J . 1-,1--w..a n PHONE 5'75 --ea96 9. CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 ,1 PI'LICA TION I1IUST BE 1-ILI f-U OUT COMPLETELY BUILDI PERMIT APPLICATION FEES (for staff use only) DESCRIPTION:» BUILDING:; PERMIT FEE :` PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE AMOUNT RCPT .# ki DATE APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1951 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION ACCEPTED Dp- 90 DATE APPLICATION EXPIRES &o -90 COMMERCIAL NEW COMMERCIAL BUILDINGIVA COMPletid 0.000: 7tiose0(2) foIPon " Structural CeICUlatiOnS'SteMeed by a : WaithingtOn: State IICertited ..1•■••1.0.0.0 •■•••■••■• sink:int! Oat reportlitemped by laVashingtOn StitellOginsed.:engi: •••••••••••••• .:.Ertergy CeICUlatiorirt stamped by *Was r or arohitecti ••••••••••:••••••••••••••••••:::::•••••••••• delidnge;:Stairieed bY:ii•Waithliigterf Stittir • • • • • .• •••••• . .• :.Arettitttletral • Striidural: drawlngs • Elevations :Completed:utility. permit applicatiOri.loni kW:entire Six (6) sets ol civtl drawing / ed/hY NEW SINCILEfAMILY.,PYi .E.Wit:113,,A0D:T p 8 tture) E compl btiildiv permit application for Oectl•;;s ruc • ' • .. : • ::•••• •'•-• • • : • • •• • • cliseriPtion. ". :••••••••••••'..:: " • -"••••••:•••":•:- RAcI Ing rol STOR • • • • Ca m It! Nuniber i lch ng .11 " ow • • • E 3 • • Exit doors .• D�nsloni �f . afl Tenant Space . ..Poor ;plan tinoWing :rac*i . storage :layout:: aisles. and NO.TV./nOJuelti'dinfenitiOnSO1 (h and eI . . • . .. waya 00 Sbuotura celCulatiOnt stamped bY:eAtniningten:Stete:liContie rage 8 and over) RESIDENTIAL AesessorAccount Number... ••• • • • " • ,: • • Two sets (2) of working drawings Site elen • FOUndation plan • ; Roof • •• ••'•• •:••••:•.: • p ntrelivationti (all views) ••••••••:::•:•••,,::',-,,,--• : • .. • ..•. • •.,•• • • •:. • Building crOss-section•,:•.:::: . • .;'■ Structural framing ptans E • .. :.Washington State Energy Code • ,COMeleted utility S64MITTAL CHECKLIST OMUERCIAL TENANT IMPROVEMENTS •::.T.W*(2) 8E10..0!.*10:N90 1ct! Inclu RESIDENTIAL REMOEL8 s . : Asseuor Acc:iun . . . Two (2) sets •••.:::•:••••••••••• •-• 0::Worklog• drawnge' which • include " •