Loading...
HomeMy WebLinkAboutPermit 5987 - Cooke Sales - Storage RacksC.00 IcE SALES BP1tP59n APNR4OVED FOR ISSUANCE BY: / ` 1 BUILDING / � 51 , OFFICIAL . DATE: 0 Z I hereby certify that I have read a . ex «l this permit and know the same to be t ue a correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATU - . _ A -4L -ei \ ` / DATE: -I ` -e '� b PRINT NA -b /4-- `-'',--e^ T� COMPANY: /-, Lam. $ go L(kt -t..j PROPERTY OWNER William Boeing Jr. PHONE 624-4494 ZIP 98101 ADDRESS 1325 Fourth Avenue, Suite 1940, Seattle, WA CONTRACTOR Northwest Handling Systems PHONE 255 -0500 ADDRESS 838 Seneca Avenue S.W., Renton, WA ZIP 98055 WA. ST. CONTRACTOR'S LICENSE # NORTHWH275JF EXP. DATE I o_. 1.. 90 PHONE ARCHITECT N/A ADDRESS ZIP TYPE OF CONSTRUCTION: UBC EDITION (year) . SETBACKS: N - S - E - W- FIRE PROTECTION: O Sprinklers 0 Detectors ®N /A UTILITY PERMITS REQUIRED. Yes ®N o (through Public Works) ZONING: C_M BAR /LAND USE CONDITIONS DYes ®No BUILDING SURCHARGE 4 4.50 E CONDITIONS (other than those noted on or attached to permit/plans): ENERGY SURCHARGE OTHER: DESCRIPTION A AMOUNT R RCPT N D DATE BUILDING PERMIT FEE 8 8.20 l lla 3 3 :3O-9D PLAN CHECK FEE BUILDING SURCHARGE 4 4.50 E ENERGY SURCHARGE OTHER: TOTAL - 1 12.70 ■ ■ \ \l/ CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: PROJECT NAME/TENANT Cooke Sales USE S 220 Andov Pk F Rack installation. BUILDI!/3 PERMIT (POST WITH INSPE%'s ION CARD AND PLANS IN A CONSPICUOUS LOCATION) FEES PLAN CH PROJECT INFORMATION SUI VALU ON• $ 150.00 ASSESSOR ACCOUNT# 022310 -0099 TYPE OF U New Building Addition Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: ® Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: CODE COMPLIANCE_ —3' FLOOR SQUARE FEET / SQUARE FEET SQUARE FEET SQUARE FEET TOTAL OCC. LOAD OCC. LOAD occ. LOAD OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF DATE ISSUED: OCCUPANCY NO. PERMIT NO. • CONTACTED � oanr \Q DATE READY DATE NOTIFIED .- - 5c)-- 90 d i nt ) ,1 3 PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING -�7 1D , / o 3RD NOTIFICAT BY: (init.) PLAN CHECK NUMBER °10' 090 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) TOTAL SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. DEP INIT. • INIT: BUILDING - () z� cru initial review �^ 1 _ ( '] (ROUTED) tRi FIRE 3/2-ch° O PLANNING O PUBLIC WORKS O OTHER BUILDING PERMIT APPLICATION TRACKING PROJECT NAME COKE 5C4Q3 SITE ADDRESS odao Ptnd 0\R r Pk € SUITE NO. iNi T : INIT: t BUILDING - /2? final review d INIT: C REVIEW COMPLETED CONSULTANT: Date Sant - REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- UIREME ME Date Approved - UTILITY PERMITS REQUIRED? ( ) Yes 1)(1No PUBLIC WORKS LETTER DATED: FIRE PROTECTION: (1 Sprinklers [J Detectors ( N/A FIRE DEPT. LETTER DATED: /�( / e - INSPECTOR: 577-- — ZONING: [BAR/LAND USE CONDITIONS? f Yes UBC EDITION (year): No SITE ADDRESS SUITE # VALUE OF CONSTRUCTION - $ PROJECT NAME/TENANT C it C c.e 1 .. Q . ��.- - c_ ASSESSOR ACCOUNT # O ) CY CX). 9 BUILDING PERMIT FEE TYPE OF 0 New Building Li Addition U Tenant Improvement (commercial) U Demolition (building) WORK: Rack Storage 0 Reroof ❑ Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: BUILDING USE (office, warehouse, etc.) tt'/\ b' `•' 1 !(1`0 C ? 1 t_: S. / . (, ( b 17 F I CE NATURE OF BUSINESS: rbki-w!`. I = /ii TL I ' I,GpI_sz 1- /01N1 Ir' it WILL THERE BE A CHANGE IN USE? -No U Yes IF YES, EXPLAIN: • SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? 0 No t1 Yes IF YES, EXPLAIN: t:-%' A i /kC r-t_ -- j — /'i =QCic_ P i o0�,_. g7 -L\ 7 BUILDING SURCHARGE PROPERTY OWNER Lk ,, 4L, B C i,..r ,T-IL PHONE LI - 1f (J ci i ADDRESS i 2 • Film ; 11 Ave jU i IT lc yo -- ') /\ rtu; l.C.) a ZIP 970I 'CONTRACTOR lippi otL) (2 '-,•-; Fjkk) ) L ; Vii, - 1 - f _.D� j PHONE l ,;� _6S )O ADDRESS f7 - -� 5 ;0; -,4 gi,'c' 3. C•k} f�GllJfc°.` ri Z IP (2'eC -- WA. ST. CONTRACTOR'S LICENSE # A('- t , H 2 7$ FL EXP. DATE ARCHITECT PHONE ADDRESS ZIP DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE , r'!,'> PLAN CHECK FEE BUILDING SURCHARGE Li, ENERGY SURCHARGE OTHER: TOTAL - }c'?:AD CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 APPLICATION MUST BE FILLED OUT COMPLETELY BUILDIFJ a PERMIT APPLICATION FEES (for staff use only) HEREBY ::CERTIFY ;THA R UE' AND CORRECT, AI BUILDING OWNER SIGNATURE OR B RE AD AND EXAMINED THIS APPLICATIQN AND I A UTHORIZE D TO APPLY. FORTNIS..PERMIT KNOW:; THE „SAM E T: DATE J 0 AUTHORIZED AGENT CONTACT PERSON PRINT NAME 605 /26 ( - U . ADDRESS 1 /ice h6 j)z ,V)2.- 1 PHONE • CITY /ZIP ipirr : (76761/ C-�1.e, .e -. C ook.C_ ( 151 LI) PHONE o�� I J �—)c.5:-2.? APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. . VALUATION OF _CONSTRUUCTION Valuation for new construction and additions are calculated by the Department of nomminity fevelopmant prior to application submittal. Contact the Permit Coordinator at 433 - 1851 prior to submitting application. In all cases, a valuation amount should be entered.by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION ACCEPTED 3- t -90 DATE APPLICATION EXPIRES cA - 9 o COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITiONS Completed building permit application (one for each structure) Assessor A000unt Number Two sets (2) of the following: Specifications Structural calculations stamped by a Washington State Iicensed . engineer E] Soh report stamped by a Washington State licensed engineer n TopographiI survey .. Energy calculations stamped by a Washington State licensed engineer or architect Legal description SL3MITTAL CHECKLIST - Working drawings, stamped by a Washington State licensed architect, which Include: • Site plan • Architectural drawings .. • Structural drawings • Mechanical drawings • Elevations •. Civil drawings • I:eu►decape plan n Completed utility permit application (one :for entire • C Six (6) sets of civil drawings MOLE : See tail* Pent* application and checklist for spedbiC submittal requirements RACK STORAGE Completed building permit application;: Assessor :Account Number • Two (2) sets of plans, which include 2 ,,Btdiding floor plan showing • Entire space where racks will be loos • Dimensions of er srslss.> 4Tena space floor plan' showing rack storage layout, aisles and nt exits: NOTE: Include dimensions of racks (height, .eridth and length), aisles and exit yaws on plan. Structural ccdculations stamped by a VVashington State licensed \ engineer (rack storege 8' and over), RESIDENTIAL NEW SINGLE-FAMILY DWELLINGS/ADDITIONS Completed building Permit application (one for each structure Legal description E Assessor Account Number E Two sots (2) of working drawings, which include Silo plan Foundation plan :::.. • Floor plan . . • Roof plan • Building elevations (all views) • Building cross- section • Structural framing plans Washington State Energy Code data L__.I Completed utility permit application C Six (6) sets of site plans showing utilities • NOTE: Bulling site plan and utility site plan may . be combined Sew.: utility permit application and checklist for specific submittaal tequlrements. : Addpon& topographical and soils information may be requkedd unique she conditions: COMMERCIAL TENANT IMPROVEMENTS Completed building permit application (one for each stricture or tenant) E: Assessor Account Number Two (2) sett of construction plans, which includ Site plan Location of tenant space Existing and proposed perking C Overall building plan • • Tenant location Dire of adjacent,(common wall) tenant • Overall dimensions of building or square footage Floor pien•of.proposed tenant space Tenant space plan with use of each. room labelled. Exit doors, egress patterns. New walls; existing wall,. and walls. to be demollshed.•; Construction details :•..C sections showing.waall:construction and method of.;• attachment for floor and ceiling: Structural calculations stamped by 'a Washington State ioensed engineer may be required if structural work is to be'done (2 sets) NOTE:.: if any ubhty work' is to be cbne,:submit separate utility permit:- ...REROOF Completed building permit appicadon (one, for each structure Assessor Account Number Narrative describing existing roof; material being removed, and material being installed NOTE: A oerdficallon letter Is required prior to final inspection and sign= oil of the perm . • ANTENNA/SAT n ,: n Cotnpletaii buiiding p ermit epplicadon • r Assesso Accoun Number Two (2) se ts of p lans , which include • Site /art (show building and.locatio of dish) rd of,attachment, s ishington 8tate. • RESIDENTIAL REMODELS n Completed buildup permit application (one forr each structure) Assessor Account Number n Two (2) sets of working drawings, which include • Site plan Foundation plan Ffror pIAn Roof plan ': Buiiding.elevations (all. views • Building cross section :.: Structural framing piano: >: NOTE:. II any utilitty work la: to be done provide utluy permit application and plarrs'must. be submitted REROOFS : ::: •Completed building permit appication (one for each structure) E Assessor Account Number Narrative descnbing.existing roof, material being removed, and material being insmlled NOTE: A ardficafion letter is required prior final inspection and sign off of the permit TO: FROM: DATE: SUUJECT: (10 /T2.MEM0) City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433-1800 Gary 1. Vanousen, Mayor MEMORANDUM CooKQ- 3h.01;e rroocJ a, MO oro3o_ Lei ht '6Q` x ID' J @O `6a0 o - - - - - 100 gU ttd fl rrnik c;.ao SU ( c ho\rCQ-- I', So )o.lo CITY OF TUKWILA Buildit'epartment (206) 431-3670 6300 S .acenter Boulev r• Tukwila, WA 98188 4 4 VP1 Type of Inspection // Date Wanted /2 --2ei- 41:ii) p.m. Site Address Project . ',..,,, 7 4- e c..4 4 . 5 Requestor Phone # •2-4,-/ - -0;3?573 Special Instructions 1 Inspection Results/Comments INSPECTION RECORD PERMIT # D e 4 CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 Type of Inspection ra2._k Site Address Requestor Inspection Results/Comments: Inspector INSPECTION RECORD PERMIT # - 57F 7 Date 1 4 2c) Date Wanted Project Phone # Special Instructions z Date RUPERT ENGINEEt IG, INC. 1501 W. Valley Highway N. Ste. 101 P.O. Box 836 AUBURN, WASHINGTON 98071 (206) 833-7776 FAX (206) 939-2168 PRoDuct az.ificeiiii)k. cook mai 01411 1g w44 IOU flt1140Z1430 JOB 9e) a - o.73 SHEET NO —7 '1'4-- OF 90 CALCULATED BY CHECKED BY SCALE DATE DATE ; • ' I „,1 , _ i i Ifirtx 4,44,)Al..e..4/..› I A '1 Z■44 . ;.A..0 ,eGsto ! = ! 1 ,.../...s-ap...e,= I • • • ! ! Z.. i..4 . 9. i .... .-.. I i ' ■ •Pe- " = , zo .9 rt: i I ; ; i--- _ _ !:.,1 1 - 1 •' ,7 /02..r.Ai , .v.,_ ' • 1.- ( I. r i , , 1 ,i..;, Il , i , , 3 0 v t i 2, 2 rfT, 2 rzZ Ci Ce(. S/ ,4/.'6..#'.r . : 4..; .choef'colt.7 i . i 1 . .... . I I . 4."; exr .644.4.,77 C4.3o 7 ) 3", It 1 .S 1 .. .1 4• f • , . . t"1.: • i • •.,. •,-;1 f " • . •••:: • :11 • ? Wi,• , ;...A ' - fT • 4 ,. • 1 • • • 1.41 • - 4 . SZ 1.; 1 ■■••■•11 1 ti 1 • • . . i i :: :.c. ,. 0-,.. •s 1, ... 1 • • .410 • If t •111;t: .C.•.‘•••••• • .;.• • •••• 4f1, .q • $1 :.:4444; • •P, . „ ';•;)vt ,4,14 1.• , t :.; • •. WAI EHO SE - SPACE ••• : •y•• J 'II nel • .. ,,,,„,•aettzrAF,r/ASV j,,,t4S, ..ZIN,::.7:' :.".1'..I' !I s 0 .., , • " - ::: , - -. . • - — - - • • • .• • • • .` • ',Z.1■4 4 t. EXISfltp exe BEAMS no sr LOW! OlAttiC-5 mum 3c6-L9 • • • ^ - • - • • - approva!s are )nci approval of 3f 4 y lot of contr t.vc.narce. R•qc I- • . -ovoid plans acknowl W;if • ••" 7 " . 1 1' .• • 4 •'• SI .J... c'! •-•-• _ bfr t -t- •••'- ".•••-• J ,4%;• o .T g • E. !,. • -- Si . ..•,‘,..:; . - ' • • - • • , ••• I - • • • I.4:v.:-.*•• .• V tOVS 04. ..1 EXI5f1t6 ROCe BEAMS NO 5f • •••<..75.T. , ,; -a •-• .- , vr..■44. L'" I 7 i . • -•• 110 ,V• •.. • • . • .• •/•••••• .1.44.44.“.424.-••• • • - "t■ • - • 4 ', • - • • • • ';....,-.4.;,‘.•..4±4:5+:4>*1 - - • WAllEHOUSE - SPACE • 4 — . f4.••• • • 4I• 41 • ' • , i•■•-4,4,7":4,1/X, t ,•4 • .; .444 t • • ••• " ' • , . .' •••, • • • • ■ - • - ■ • • - 4.4 titti:1;:. • • • Ct1Ais6C-5 RECUIR60 1 .11A, • 17 • .-). 4 ? I " • ;4044:•P 41' IL' t) pd c copy of ap "7. i ■■•?! 11:4 .•••;:rS 1 1 by Date Perm V4 IA55•OftU 0 \--N \I" c‘ • ; cl,(3 \C3(3 , '• I 1 G EX/5110 PA55•111IO •••••••••-• Plan Check 090 -090; Cooke Sales 220 Andover Pk E THE FOLLOWING COMMENTS APPLY TO la,C TUKWILA BUILDING PERMIT NUMBER_ _ _ _ ME PART OF THE APPROVED PLANS UNDER 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 3. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy. Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition).. 4. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433-1849 7 Framing 433 -1849 8 Insulation 433 -1849 9 Suspended Ceiling 433 -1849 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: BUILDd1G PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: 220 Andover Pk E Cooke Sales BUILDING PERMIT NO. 59M DATE ISSUED: 3_ 50-Gb PROJECT: CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If stnictural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 04,211,110 •X• REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Stab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Watt Board Fastening 11 i 12 13 14 FIRE FINAL Insp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL >' 17 BUILDING FINAL PLAN CHECK NUMBER go - ono PROJECT: CockF? e5 d0 No changes will be midi to the plans unless approved by the 'V Architect and the Tukwila Building Division. �2 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296. 4732). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (072- 63631, O All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. (6 When special inspection is required either the owner, architect or JJJ/ engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O All structural concrete to be special inspected (Sec. 306, UBC). O All structural welding to be done by W.A.8.O. certified welder and special inspected (Sec. 306, UBC). :/ All high - strength bolting to be special inspected (Sec. 306, UDC). !0 Any new ceiling grid and light fixture installation is required to emit lateral bracing requirements for Seismic Zone 3. !1 Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. 13 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. O Any exposed insulations backing eaterlal to have Flame Spread Rating of 23 or less, and aaterial shall bear identification showing the fire perforsance rating thereof. 13 Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). A statesent from the roofing contractor verifying fire retardancy of rook wfll be required prior to final inspection (see attached procedure). kidir 41) construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1908 Edition), Uniform Mechanical Code (1988 Edition), Washiggton State Energy Code (1989 Edition), and Washington Ste. Regulations for Barrier Free Facility (1909 Edition). !B All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be wade by calling King County Health Department, 296 -4707, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. l9 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20 Notify the City of Tukwila Building Division prior t0 placing any concrete. This procedure is in addition to any requirements for special inspection. All spray applied fireproofing as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22 All wood to remain in placed concrete shall bs treated wood. 8 All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. V alidity of Permit. The issuance of a permit or approval of . plans, specifications and computations shall not be construed to be a perait for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER Plan Review PROJECT C 1 e S ADDRESS 2 (') n hc- v o e r- Pk E DATE .5 201 v CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION PLAN CHECK NUMBER d`r 0W7/UO C_ C. (Dr,,,, -a L 0 CA, t . emu 'Cr. ( 271 C z ? Off:. r ,- ( >r , 5„6 L X 1 + rG Ca. u l r-p m P v- l /��. E)C I r G i .. ; L rk V \ l J 4 IQ o I E , ` ` E r TC Y v 1 ' ∎ -`-- . a p p( L _ c t- i r l r1 ci. 1 c r 5 S Yr---1,. n, 1 --- USA e\ �( i 9 A --1 11 C()w1b :4, L 1P l`>ir N, Ctr r, %s 2`? -14 in ba.1e v1n r nP s; \ vv.f`v'r ri II T ()1^ 1 vl by 1 (rt 't ✓1 j OCG cje- -- y4-.hrO G1 ry ,— e erAi c I) r. c. 6 e. pckf A- M Ez l/\A- or '1 ��, 1c� 5 f�S - s 4 (J 1c 'GS� mac" ■1 (E'�..> (1,‘A c- CC)Vv.tM -EV \i. Plan Review PROJECT C 1 e S ADDRESS 2 (') n hc- v o e r- Pk E DATE .5 201 v CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION PLAN CHECK NUMBER d`r 0W7/UO CONSULTING ENGINEERS /CIVIL AND STRUCTURAL February 28, 1990 Cooke Sales Company 220 Andover Park East Tukwila, WA 98188 ATTN: Mr. Bill Cooke RE: Seismic Anchoring for Storage Racking forCooke Sales, Tukwila, WA (R.E. Job No. 9002 -033) Dear Mr. Cooke: Inspection of the storage racks at the above location revealed one basic geometry and loading condition. This situation is illustrated on sheet' one of three of the seismic analysis. Calculations to determine adequate anchorage and the required base plate size were performed based on the site information that you provided and this loading condition. Under the various load cases, it has been found that this racking requires attachment per sheet three of three to resist overturning forces due to seismic loadings per the 1988 UBC Standards. Please contact me if you have any questions. Sincerely, RUPERT ENGINEERING, INC. Jay Bonnett, EIT JRB /mh Attachment 1501 West Valley Highway North /Suite 101 Post Office Box 836 /Auburn, WA 98071 206.833.7776 Fax 206.939.2168 Mi\R 0 1 1990 PERMIT CENTER 1 RUPERT ENGINEELG, INC. 1501 W. Valley Highway N. Ste. 101 P.O. Box 836 AUBURN, WASHINGTON 98071 (206) 833-7776 FAX (206) 939-2168 4'0 .. - sue - .ss... l 4a .. IL: , I 1 i . L S ... I I 1 1 i . Gr*P g' �c�e1 -• ! C arra- t M al. 1 .1 r't= r :Ary.... 1 o'o.i-- ..77 / /II.Li itA 1 oF..' ST4eAGE.......... i../•• �cc = .6_.i f, !=conJ. ... : i ! 1 1 .. v.�.± ; ! G.�'�:......7?-1-4.5 ' / ' r l. ✓ . V.I..+ ^^( , 4•! 2 / 5....w , t 1 762-; vvIC COAX eark "' ... St..A B 7 -7'1') •C /<.v. tlr-0.f c. G. � 1.'4 .8I .G. r-:2 SS() e. k 1 5 4,. - Soo " ,`' ! (..^i -s'SN .P) I { 5E-I t -s.1c.r : V ... = ....... ( I I<. c 5) G✓ 'ca Types ' re,GkKe ` � I /Lau CP' ) t` ..... ox os • 1.- E.✓C.i... 5 Z G CASE r Ac i _ L E-L LS Lai, t tom. JOB SHEET NO / tt ^ OF CALCULATED BY V R DATE 2/2 6/ y0 CHECKED BY DATE SCALE , i i W10 r' - /, />r- ( F k,)i, ).. _ . j /r(A rd ") Ma_ . r t - '`)( z . 3' 7 /.) /, 71 MA - /.4..5. (/' - (,� PI r 'o02 -033 I � 7 I 1 000 CA ... . ' 76;a •� .... LE_V &L; • D'"-j/ LOA i AA : , ` K t. 37 >4 i J.� IV\A.. = . . / ( / d 6 ) - .... /., ..t...�....... .. 2- •� /Y.I...X._..a irT � .1 ; ` Z/0 GCSE. • . r2 mac? 3oLT C "4.0 7 C/ / 7..S� we.)Le. gi p....... a....... /.J9 L / ....=.......7. (2-37 ). '..7 t.....)..; = 9/ ;.. t F,' (x.3. ,'(.) i <s.' 4 ', Sc RUPERT ENGINE NG, INC. 1501 W. Valley Highway N. Ste. 101 P.O. Box 836 AUBURN, WASHINGTON 98071 (206) 833-7776 FAX (206) 939.2168 tr PRODUCT alficalliPloo. Ont.%IWt 07477. To 0100 PHONE TOLL PNEI 14042$4.1b) r M JOB X 00 2 — v3 SHEET NO � ��ii OF CALCULATED BY •S DATE 2/2 % c 0 CHECKED BY DATE SCALE Q k_ 0 32 0 ) r grl:h1 CONSULTING ENGINEERS /CIVIL AND STRUCTURAL • February 28, 1990 Cooke Sales Company 220 Andover Park East Tukwila, WA 98188 ATTN: Mr. Bill Cooke RE: Seismic Anchoring for Storage Racking forCooke Sales, Tukwila, WA (R.E. Job No. 9002 -033) Dear Mr. Cooke: Inspection of the storage racks at the above location revealed one basic geometry and loading condition. This situation is illustrated on sheet' one of three of the seismic analysis. Calculations to determine adequate anchorage and the required base plate size were performed based on the site information that you provided and this loading condition. Under the various load cases, it has been found that this racking requires attachment per sheet three of three to resist overturning forces due to seismic loadings per the 1988 UBC Standards. Please contact me if you have any questions. Sincerely, RUPERT ENGINEERING, INC. Jay Bonnett, EIT JRB /mh Attachment 1501 West Valley Highway North /Suite 101 Post Office Box 836 /Auburn, WA 98071 206.833.7776 Fax 206.939 -2168 11 (n CITY 6•1 TU':d: '.A MAR 0 1 1990 PERMIT CENTER RUPERT ENGINEEI4G, INC. 1501 W. Valley Highway N. Ste. 101 P.O. Box 836 AUBURN, WASHINGTON 98071 (206) 833-7776 FAX (206) 939-2168 jO8 ! 4 I e r , 1 I . 00.E E.., : Sp LLJ I 4AC/KS ? ZE ' i I i i I I • j! i I T I ! ii- •' i i • i I i r 1 I ....0 , . 20 l .Jr� � K ' ' C�. 4,744 f N 4,• ..f"_ao r,`t., : AN,o. , dot -p./1 ra. i T 1 , , 1 t..........., 4 i I 1 I OA./c let7.'t I. S�..a 7-1-1- - Ski I � 1 1 t 1 4t.,„•o )A'3 c Se . .8....C� r2.4-�- ' e. � / 5% . / ao. F 'r' ' ( ss'K r. � ''�. 7"L'.,b5wJJC,• V = 'Cal • ' s) L✓ •.... (, 7s)(.I ac , g o,A. ,./ q) (A/ I I 24.d. K. Ty PG' !� I ...AireezAKe. • JOB a X L.o (� L- .1�Et�.. � '4-D,1 "n ' - 40k idea. L;t vE` I SHEET NO / _ OF S CALCULATED BY �O _R DATE 2/L 6 / 10 CHECKED BY DATE SCALE I , I ....... ' ... ...... :.......,.............. • `'1or , - i,... /.r....(.. Fx..{•x. %. /J"( / S'? ' ..VIft.a... ''''., (../.. ±...C z -, 'e ' 9 '' i i r 00 2 — 03y � r I ,- 1 MOO i I I I RUPERT ENGINE( NG, INC. 1501 W. Valley Highway N. Ste. 101 P.O. Box 836 AUBURN, WASHINGTON 98071 (206) 833.7776 FAX (206) 939 -2168 ./H4x at T b=ill tTlejYi, aarYwMI. toOWMOdIOU, MU110 154510 . e!) Lv. ... 40A p e l . .. . ! i 1 i F 2q- k ; It_ K 1 4./7 /L 489 4 t $J - 2. /0 ... age 11? ,err, 7 1 ., SC. R-4+-r. e . ►ee at Llt a w►, eN rs 1 .,... , ...... ...... C/. . K . i. i / 74"; rc • '' 4.79 4 -Ire - _?9,,(*- 7J X s) - .2 (0( r?c l r - •pS £ � z .7r zr —. ;.,..9p Z 7 tr% ' ,.. .....r ....= ....... /. Cz37.. k.(.7r. t )' ■ 1 .9, ` ' � .. � i � I 3l . r • S A .6 L .... .. } I FI, C/..ssX' '3..Gi�sf i ■ ■ r a 1 (SSE. rL..... s, ,, aC..3 �.' ?C �8 . �........Trf.1C...; J013 SHEET NO CALCULATED BY It i I 1 90o z - v33 1 OF / DATE 2/2 et/ 1 CHECKED BY DATE SCALE 3" ..........................1 st ■ PROPERTY OWNER W • 11 . u i PHONE 524 -4494 ADDRESS 1325 Fourth Avenue, Suite 1940. Seattle. WA ZIP 98101 CONTRACTOR Northwest Handling Systems PHONE 255_0500 ADDRESS 838 Seneca Avenue S.W. , Renton, WA ZIP 98055 WA. ST. CONTRACTOR'S LICENSE # NORTHWH275J F _ EXP. DATE i Q.. I _ 90 PHONE ARCHITECT NS ADDRESS ZIP TYPE OF CONSTRUCTION: UBC EDITION (year) SETBACKS: N - S - E - W - FIRE PROTECTION: L] Sprinklers Q Detectors ® N/A UTILITY PERMITS REQUIRED . Yes Q N o (through Public Worksl ZONING: C_MBAFULAND USE CONDITIONSOYes (i3 No COMPANY: / 61 . 41 & 0-d1-1 . J (10 LQ-t ' _ CONDITION (other than those noted on or attached topermit/plans): APPHOVED FOR BUILDING ISSUANCE BY: it &A 1 // � ,�, ' OFFICIAL DATE: I hereby certify that I have read a • ex . ned this permit and know the same to be t e a correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance or work. I am authorized to sign for and obtain this building permit. SIGNATU 4iA DATE: a ' O 'Li 6 PRINT NA Ube- it-A-t- . 0 ` 'e COMPANY: / 61 . 41 & 0-d1-1 . J (10 LQ-t ' CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: USE -) FLOC _T FEET TOTAL SS CERTIFICATE OF OCCUPANCY NO. OW. LOAD 59'1Sel 3--50 -90 SQUARE OCC. FEET LOAD SQUARE FEET PLAN CHECK #90 -090 CfUILulr ir,,a rtrtivll (POST WITH INSPE4,.. ION CARD AND PLANS IN A CONSPICUOUS LOCATION) OCC. LOAD S SQUARE J. U DATE ISSUED: FEES DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - AMOUNT RCPT N DATE 1&5 3 8.20 4.50 12.70 PROJECT INFORMATION ee 220Jandover Pk F e 150.00 PROJECT NAME /TENANT Cooke Sales ASSESSOR ACCOUNT N 022310 -0099 TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) 0 Grading/Fill WORK: ® Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Rack installation. CODE. COMPLIANCE OCC SQUARE OCC. LOAD k FEET LOAD TOTAL SQUARE FEET TOTAL OCC LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.