Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6000 - Paco Pumps - Office and Storage Mezzanine
APPROVED FOR ISSUANCE BY: I hereby certify of law and ordinances this permit regulati cr ) ■ that I have read and governing es not presume to ction or the pe � BUILDING l OFFICIAL F amined this permit and know the same this work will be complied with, whether specified give authority to violate or cancel the provisions ance or work. I am authorized to sign DATE: L/_ /-- y' 6 to be true and correct. All provisions herein or not. The - granting of of any other state or local laws for and obtain this building permit. SIGNAT . Lz lc, ice2_6cu0 DATE: 4- 10- 90 PRINT NAME: / r drald y (,LP,/' COMPANY: I lab_‘e.... i 4-6/4 PROPERTY OWNER Bedford Properties SETBACKS — S — E — PHONE -1103 ADDRESS 12720 Gateway Drive. Tukwila, WA UTILITY PERMITS REOUIRED?O Yes ® No ZIP 98168 CONTRACTOR SSG Corporation LUQ' q0 3 -08 -90 PHONE -9393 ZIP 98133 ADDRESS P.O. Box 33970, Seattle, WA WA. ST. CONTRACTOR'S LICENSE # SSGC0* *249J8 1y(5 EXP DATE 5/91 ARCHITECT David Kehle, Archi e t PHONE -8997 ADDRESS 12878 Interurban Avenue Sou h T.. ,: � ZIP 98168 TYPE OF CONSTRUCTION: UBC EDITION (year) SETBACKS — S — E — W — FIRE PROTECTION: ®Sprinklers O Detectors O N/A UTILITY PERMITS REOUIRED?O Yes ® No p ubli c u works) ZONING: BAR /LAND USE CONDITIONSO 0 N LUQ' q0 3 -08 -90 PLAN CHECK FEE CONDITIONS (other than those noted on or attached to permitplans): BUILDING SURCHARGE 4.50 1y(5 L1 (0 - 90 ENERGY SURCHARGE DESCRIPTION AMOUNT RCPT it DATE BUILDING PERMIT FEE 451 nn 1T{I`oS 6464 LUQ' q0 3 -08 -90 PLAN CHECK FEE 293.00 BUILDING SURCHARGE 4.50 1y(5 L1 (0 - 90 ENERGY SURCHARGE OTHER: TOTAL - 748.50 &ITV OF TUKWILA . Department of Community Development - Building Division 4 200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. (Q) 000 DATE ISSUED: 1 - - ct o PROJF INFC)RMA TION PROJECT NAME/TENANT Paco Pumps TYPE OF Li New Building U Addition El Tenant Improvement WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential DESCRIBE WORK TO BE DONE: CERTIFICATE OF OCCUPANCY NO. 3215 S 116 St BUILDIt G PERMIT (POST WITH INSPEL, LION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN CH U I 0 1Q9 V DATE ISSUED: U FEES N -S 58 ASSESSOR ACCOUNT #09 ZJu4- 102304- (commercial) U Demolition (building) 0 Other: Initial office tenant improvements including storage mezzanine. ,000.00 9Ubb 9044 U Grading/Fill CODE COMP[JAr1CF USE -I FLOOR 4 TOTAL SQUARE FEET OCC. LOAD SQUARE FEET CCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. • PROPERTY OWNER Bedford Properties PHONE -1103 ADDRESS 12720 Gal w Drive Tu 1y_i 1 a , WA ZIP 98168 CONTRACTOR SSG �rpnraL PHONE - 9393 ZIP 98133 ADDRESS P.O. Box 33970, Seattle, WA WA. ST. CONTRACTOR'S LICENSE # SSGC0* *249J8 EXP. DATE 5/91 ARCHITECT David Lehle, Architect PHONE -8997 ADDRESS 12878 Interurban Avenue South, Tukwila. WA_ SQUAFE ZIP 98168 DESC - IPTION A 0 N RCPT I DATE BUILDING PERMIT FEE 451. nn 93. n0 4,5, '74 (ff, 6464 , r • 3 - 08 - 90 L O° PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: OCC. SQUAFE OCC. TOTAL - A : SQUARE CCO. ,,,, USE r FIRE PROTECTION: ®S•rinklers ❑ Detectors ❑ N/A CODE COMPLIANCE f 19 yy CONDITIONS (other than those noted on or attached to permit/plans): woR SQUARE OCC. SQUARE OCC. SQUAFE OCC. SQUARE occ. SQUARE CCO. TOTAL TOTAL TOTAL TYPE OF CONSTRUCTION: UBC EDITION (year) —___, SETBACKS: N _ $ ,- E - W - FIRE PROTECTION: ®S•rinklers ❑ Detectors ❑ N/A UTILITY PERMITS RE ❑ Yes (i0 NO I Puhl 9Worksl ZONING: BAR /LAND USE CONDITIONSDNes ©No CONDITIONS (other than those noted on or attached to permit/plans): APNHOVED FOR ISSUANCE BY: T • ' 1 I ► that I have read and governing es not presume to ction or the pe I • BUILDING OFFICIAL " 3 camined this permit and know the same this work will be complied with, whether specified give authority to violate or cancel the provisions Cmance or work. I am authorized to sign DATE: L_ /-- `i 6 to be true and correct. All provisions herein or not. The granting of of any other state or local laws for and obtain this building permit. I hereby certify of law and ordinances this permit • • regulati .• • SIGNAT• R . 3C >/'..-1c. ` / Y 1,1 -er _ DATE: 4-10.90 COMPANY: /CauaGt ?& ( >214/CACkel PRINT NAME: N &ra 1d CITY OF TUKWILA Department of Community Development - Building Division . 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. DATE ISSUED: (v000 EIIJILDIMG PERMIT V (POST WITH INSPE...ION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN CHECK #90 - 105 FEES SITE ADDRESS SUI I VALU 0 .,, , , ,..,, . , 3215 S 116 St 1Q9 58 000.00 PROJECT NAME/TENANT ASSESSOR ACCOUNT Iu9 i - ubb Paco P s 102304 - 9044 TYPE OF U New Building Addition Tenant Improvement (commercial) U Demolition (building) Li Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: Initial office tenant improvements including storage mezzanine. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF OCCUPANCY NO. DATE ISSUED: ItrA4V/VNIC` INNAr7 .iiAti• .'.GY-!7Y.~ 4434 ru:. .... ».w.u..n:. rotfa r.tvrdy69 NSCb? Nib1 tex1.lirin.44.w.10014 :COK NX.V. YY::al�.'te%7SYknr CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (2Q6) 433 -1849 1 Type of Inspection C Site Address 32(S S. �) (- Requestor Special Instructions Inspection Results /Comments: rn/ INSPECTION RECORD PERMIT # `�`�(A 0M Date 5—t —lo Date Wanted S— ((2 -- ^ 7 n Project ei}-c= v T cn I). p Phone # g-(Ko — (go 1 ( 0 Inspector • 4 S Date 5 a lggttr1 7lgattVVJI OM' j ,W.MSAVthr.t ...., em+. rt'«.. p.e. ...,..aw,awwa., w..w..,....... ktvotntotv!VSY;n.smYrnXi i. F_ G7Lklzhri ris±Yrze.,;i*ZW.hlA,tkg !rA39 4!3 Ct;'1C1S i; S^4F? CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tdkwila, Washington 98188 (206) 433 -1849 Inspection Results /Comments: cJJ■ Inspector -2_ INSPEC ON RECORD PERMIT # (MOO Q - lu-90 Date f .Type of Inspection Fkr cYrrA n9 Date Wanted 5-I D p,m, Site Address LS 11 ( 1O9 Project �0`C t'VIYI 5 Requestor K 1 m Phone # .1:i , ( ((p Special Instructions Date S / (.5 J Inspector CITY OF TUKWILA , Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 G d,5?-- :.w'a::^x.Mev'atrro,W!< :elrrt, kr..f.VVii .t .^ ?Yx1?' YU. P. 19v '2r.:!'4'.�y14)1G;fL^iX;P`;�L 1',.,.�i:fil<.afiii'; ..:. • INSPECT N RECORD PERMIT # DDC) Date Type of Inspection '7: 1 1 Lna , I Date Wanted 6 - IS Site Address �) 153 [J - 11 In S'\ -c. lO Project P(l CLO (11, Requestor t. S �-, . Phone # a- D°l ©1-1 Special Instructions r y e CcL.0 . Inspection Results /Comments: 1■17 Date � / s -- TV a.m. /p.m. CITY OF TUKWILA Building i.irtment 6300 So .•`cer Boulevard Tukwila, i 98188 (206) 433 -3670 cx<zr.e;+re tat!.avoi itAvst •Veir,i,u r+.i'011+37+t:itmc( INSPECT N RECORD PERMIT # Ile Date 3" lcl • Type of Inspection LOCI..a- 6cetcLr 3 c3�r?6ti�e brtc[ Date Wanted 5-14-1, SiteAddress 3315 S' . / /ash 5te ,O Project Az-co TZC li2/J Requestor �O�.i� " 5s Phone # / - 9 V Special InstructionsL ,60,E & ocYv`) ,01 0, cat . Inspection Results /Comments: Inspector ifSaJO Date , S� / 477iJ a .m. p.m. AAMW Contact Person (please print) CITY OF TUKWIL Building Oivisi 6200 Southcenter Boulevard Tukwila, WA 98188 (206) 433 -1849 Reinspection of (AJA g2( Original Inspection Date 5 /fir Pcs Site Address 3zl S 5 - if G2 Project JP,q -Cr, & pp, P5 Contractor S S 9 Phone 2 - 2S0((-- Address 54 -► -$16 Zip Applicant (signature) lam, (print name) Dan Lr'IN.t gr,i +IVa. !x:}i .+e Avientra;A+a! 'f lttirgiliT3f i.2IR:b. 'E, t' i ? CtA' , 1#1�s?tYaS: oCI:TSA r.L T3K.M...ZTWAt AV.1.4�. Lt ?l, OFFICIAL USE ONLY REINSPE:,ION APPLICATION PERMIT # 60 Date / ` - t - y2) Reinspection fee $ • ©C) ($30.00 minimum) Receipt # Date received Resinpection scheduled for (date) J' l J(:) £ p.m. Phone# 2 1 f 6 CI a e IW "" WW.A CIAM n3Llk:f�tprntwaafui -- ,.n..-w..... . w........,. r... ....- ..,..............�.....�., Type of Inspection Site Address Requestor Special Instructions Inspector CITY OF TUKWILA . Building Division Tutr1ls,t Boulevard (206) 433 -1849 Inspection Results /Comments: . .• ate Wanted Project Phone # +0444140 1 w0:010.vawn0.0044 4044 41 40,4 Wow,(2,4W104t. • INSPEC ON RECORD PERMIT # Date c* --(Q Date -S • ( 1 •- ail T +nv, CITY OF TUKWILA Building Division 6200 Tukwila, Boulevard (206) 433 -1849 Requestor T)OC-I'1 Inspection Results /Comments: Type of Inspection )y' Site Address 5 P---/ - /�� CO ............,.......-. 4,........._......«.,,......-. o.+ �n+ a;, at+ nvw» savrursa�n: hRnmsrsnrmxarztcr ,nKnr,u,KKaa:nr•r: u'.r - i.:. c. xrt^ na. Yr..». stiC ,.;};.SFd INSPEC ON RECORD PERMIT # &CQD Date Special Instructions I p 44 cAlr O Date Wanted — 90 a.m. Project Puyvr. Phone # .2.9ay na +o .5Ic1 / ciel Z41-ire.n!"_ Wtz ` ".1 tittek.s'r2t:,5inimib`t ps r sicvrata r CITY OF TUKWILA Building Division Boulevard (266) 433 -1849 Inspection Results /Comments: Inspector a,uw.vrv. :v,emaw. sea >:o5i :�a'uuG:�:'s+noratiav:�.na` qtr.-' t?+; t•+ t% ia. �rxmrR, �w± x: l^. mPSar�•, y;,:„. x` c; �, �pk. �t, Ns�t"!5'l'!- ,++,'?�,k�.�Ti�'::' . INSPECTION RECORD PERMIT # (3,1 Date 5---1-q0 Type of Inspection Site Address X 0 2 (E ;, //&-�`. ...Ect,Li IC7Project � (,l-` Requestor : f) / Phone # c241 �-- o � (L}4' Special Instructions Date Wanted p k! ry C—i V -i. Date S / /7 0 a .m Dili <fil'A+n.We . >•.y�Q�.� 1' Qil."EU.LllGlt }'M +mfG CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 Date Type of Inspection Site Address 3Z-i E E . I lam C39 Requestor 1 l 2J� ( Special Instructions n.wrt «�e✓ern+.a�+..aNrt. Inspection Results /Comments: /J (2"j-4-4- 6-41 L -L Tncncr +nr 0. 0. Y) INSPECON RECORD PERMIT # Date Wanted Li - 2r7 - a.m pm Project 7 - s Phone # . ( na +o d-i2 74 43I�•�Y.2',. +JS2,:47if:+1 a.._. iatucsi f � • ��4' ���1`'> ��1. �k; 1L" �/ a' �r�ul' r.!' �S G¢ k§ tdMbrGt'% kY. 7Yb• nnbr< ptavw.',.. s :•.Nne..a.sess..nw..e...•... CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 Type of Inspection f `J' Site Address 1 I l lQ ►�q Requestor J(XY\ Special Instructions ' �', '�� Inspection Results /Comments: Inspector ate"-4-7,- card.•.,arvc:c;s:.Kmamtcc::s n;.rx+ e:.�:z�s�zn.�;�:.x•.:iiar. x?vF ciS��.vrr• .G' , ,rtt,, , ir..eH'r GtiT7.4ilm%if • INSPECTION RECORD # Date Wanted Q3'9 a.m. Project Paco PUm Phone # atA 1 aq PERMIT Date Ce Date Z,3 - c� { CITY OF TUKrWILA Central Permit System TO: ❑ Building ❑ Planning C Project Name" (Lc-, Address Type of Permit(s) 7.2 Authorized Signature FINAL APPROVAL FORM / 11, -Hi- ❑ Public Works Fire Dept. "'Control No. 90 - 76 3 5 -- Permit No. /2 ❑ Police ❑ Parks/Recreation This project is nearing completion. Please investigate your area of responsibility and indicate below either your final approval or necessary corrections. If no response is received within one week, it will be assumed that the project is of no concern to your department and a certificate of occupancy may be issued. This project is NOT approved by this department; the following corrections are necessary: () O O () () ) ) ) Authorized Signature Date This project is approved'bythis department: 51/2 e; /90 Date 7 CPS Form 3 Spscimsn No. Specimen Type Test (i Days R.Oister Number Dot• Rsc'd. Dot. Tooted Tool Load Arse Unit Load_ PSI Report No. 1 A 6 x 12 cyl 7 7157 4/24 4/30 100,500 28.27 3560 5o6o 1 3 B 28 7158 5/21 143,000 c 28 7159 5/21 141,500 5000 3 D E F Carlson Associate - - - -- � \glri,II REPORT OF CONCRETE TEST SPECIMENS SAY �� 1990 Date Molded: 4 / 2 3 , 19 90 ,..__ PLtiq� J`rr�`�E 10 Client: SSG Corp. ._....,..._._._..,.,.,,� Project• Address: Contractor: Architect: Gateway N. Bldg. 3 (Paco Pumps) 3215 S. 116th SSG David Kehle Weather: Cloudy Location of Concrete Placement. 7/8 Brand: Sub-Contractor. Engineer: Concrete Supplier: Ocean Cast by. Mezzanine column footings in entirety Admix, Amount: Type: natural Richard Hudson Construction Inspection & Related Tests • P.O. BOX 3443 KIRKLAND, WASHINGTON 98083 (206) 820 -1018 Mark Jeong PERMIT NO. 6000 Temp. high: 53 Temp. low' 4" Strength Requirement: 2 �� PSI @ 2 days S I design mix Cement Type: No. of sacks: Admix, Amount: Coarse agg. size. Entrained Air Brand. Fine Agg. Size: — bldg. Remarks: FRANK W. CARLSON INSPECTOR DATE REPORT oN re ^.7s-0 ,2stT 4 o -mwv; 4i 64 icb ; 0 e 41 4 s" 7, rzz.4Ni Air ! Lei K,..J 7r-c- ____ ..•. r it 5 -41 1 L3- 7O fr arciec QT-"e ✓�!! GOr1/.,,der t. g , .s o, N _,1• / rix s --- ` p 6 4„,...., . 1 .. • • i • - -- / 6 tv,) �a'reir--p i51 , / t D c - ,-411' I .4. Arz... ! 4 iv'', S bt C c ' 7 , - -/t• 4' sz .C i /1l.I'�3A' 0 -.LAM //4-rt mot; �AJc- n •OZL_ Vi't i) cprt. .A s �re/ 6- z 3 - c r n. 2 - Garlson Associates P.O. BOX 3443 KIRKLAND, WASHINGTON 98083 (206) 820 -1018 Q INSPECTION � 1 REPORT OF CONCRETE ❑, STRUCTURAL STEEL El, , /� `/ PROJECT 6 - 1 17T-44 N . /J PG- /°"7i) JOB NO (l/t9 Y 0 /4" PERMIT NO. 000 ADDRESS , 3(R/ S 54 ARCHITECT 7)41).o li;,aC_.. Construction Inspection 9 Related Tests ❑ FABRICATOR ❑ CONTRACTOR Specimen No. Speefmon Typo Test (i Days Register Number Dote Reed. Date Tested Total Load Areo Unit Load PSI Repor► No. 1 A 6 x 12 cyl 7 7157 4/24 4/30 100,500 28.27 3560 1 B 28 7158 5/21 c 28 7159 5/21 D E . F arlson Associates REPORT OF CONCRETE TEST SPECIMENS Date Molded: 4 / 2 3 , 19 9 Client: SSG Corp. Project: Gatewa N. Bld Address. 3215 S. 116th Contractor: SSG Architect: David Kehie Concrete Supplier: Ocean Location of Concrete Placement. Cement Type: Admix, Amount: Coarse agg. size: 7/8 Brand: Type: • . II P Job. No CA 640 PERMIT NO 6000 Sub - Contractor: Engineer: Richard Hudson Cast by. Weather: Cloudy Temp. high: 5 3 Temp. low. Mezzanine column footings in entirety Strength Requirement: 2500 PSI @ 28 days No. of sacks design mix natural I „, L!, 'l I�fi f NY u 7 TSJ0 CiTY PLAN:. ; : r••.! I''' Admix, Amount: Remarks: - Inspection S Related Tests P.O. BOX 3443 RKLAND, WASHINGTON 98083 (206) 820 -1018 Mark Jeong Slump. Entrained Air Brand. Fine Agg. Size. bldg. FRANK W. CARLSON Plan Check #90 -105: Paco Pumps 3215 S 116 St #109 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER__ QQQ _. 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 4. All mechanical work shall be under separate permit through the City of Tukwila. 5. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. Any exposed insulations backing material to have Flame Spread Rating of 25 or .less, and material shall bear identification showing the fire performance rating thereof. 7, All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 8. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE APPROVED INITIALS CORRECTION NOTICE ISSUED X 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 7 Framing 433 -1849 8 Insulation 433 -1849 X 9 Suspended Ceiling 433 -1849 X 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 BUILD PERMIT INSPECTION RECORD CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: (Post with Building Permit in conspicuous place) SUITE NO.: BUILDING PERMIT NO. OOO DATE ISSUED: PROJECT: 3215 S 116 St 109 Paco Pumps CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE t o -9t (INSPECTOR INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. au2a<aa "X" REOUIRED INSPECTIONS p'A 1 Footings Foundation 3 Slab and/or Slab Insulation II 2 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 4 7 Framing lip 6 Insulation `�, r 9 Suspended Ceiling 10 Wall Board Fastening 11 i r 12 13 ,� 14 FIRE FINAL Insp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL PLAN CHECK NUMBER cO Ios iP PROJECT: j1 �- o y M S THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER V No changes will be aada to the plans unless approved by the ICJ Architect and the Tukwila Building Division. a 0 O All structural concrete to be special inspected (Sec. 306, UDC). �8 All structural welding to be dons by W.A.B.O. certified welder and special inspected (Sec. 306, UDC /. 0 All high - strength bolting to be special inspected (Sec. 306, UDC). 10 Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11 Partition walls attached to ceiling grid must be laterally braced if over eight (01 feet in length. 12 Readily accessible access to roof counted equipment is required. 13 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State redessional Engineer. 1Q )6 A statesent from the roofing contractor verifying fire retardancy of rook will be required prior to final inspection (see attached rocedurel. 18 Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296 - 4732). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (072- 6363). a All sechanical work shall be under separate permit through the City of Tukwila. N a All permits, inspection retards, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. tgr'' Any moved insulations backing material to have Flame Spread Rating of 20 or less, and material shall bear identification showing the fire performance rating thereof. Subgrede preparation including drainage, excavation, compaction, and fill requirements shall senior's strictly with recoesendations given in the soils report prior to final inspection (see attached procedure.). A ll construction to be dont in conformance with approved plans and requirements of the Uniform Building Code (1900 Edition), Uniform Mechanical Code 11909 Edition), Washinnton State Energy Cade (1909 Edition), and Washington Stae Regulations for Barrier Free Facility (1909 Edition). All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4707, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. l4 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20 Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.B.C. Standard No. 43 -0, shall be special inspected. 22 All wood to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.B.C. Section 306 (al 7. ca r Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or en approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. Ne permit presuming to give authority or violate or cancel the provisions of this code shall be valid. ADDRESS CONTACT PERSONjjtO, _ ARCHITECT OR ENGINEER' (206) 433 -1851 CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * *REVISION SUBMITTAL ** DATE 4- IQ -10 PROJECT NAME 1340 Rolf* - L I wb(I� 1\4641 tArrA g, PHONE4 -c PERMIT NUMBER (If previously issued) PLAN CHECK NUMBER C IO' 1 6 TYPE OF REVISION: VW1642 kti5P,JAWE iftwAse lauffgat2 kkLi a tial/Ar2 jwtib G6N,► . SHEET NUMBER(S) 1" -i ' �•Z // Gil 4 /71- , "Cloud" or highlight dll areas of revisions and date revisions. SUBMITTED TO: Ken t J6on REVIVED CITY OF TUKwiW APR 1 0 1990 PERMIT CENTER FROM HUDSON 206- 324 -6248 RICHARD HUDSON & ASSOCIATES, INC. CONSULTING ENGINEERS 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206.324.6160 ) 2,T ot Y►' : . i ' _ S °2-/ =� r 1444' : m12- 1 2 • 1 6..a. ti, • VI k t c 'J I � 2 Z YY ► � = " "� 40 v:12. wl. r 2.1/2_ , :. JOB Xr: e l, do elk/g, In4vt'oe c .. -L ' R- 2Y��� ♦IZ.. - 14 = 16,1 4.10.1990 8:56 P ra-c ) u ►nf SHEET NO. S . CALCULATED BY CHECKED BY SCALE k /34,0 O --)t4 = ,2 Z ,2 OF DATE DATE ' 3 +x: 33 2, i(4, Z ' 2 2 - 1 I 2 , 8 & ' = 2, c8& 3 mi +,I� V . 29 tti 2+' (p • i I i I _ if '4. aL P. 1 RECEIVED CITY OF TUKWILA i • APR '1 0 1990 PERMIT CENTER . FRn1 HUDSON 206-324-6248 RIGUARD HUDSON & ASSOCIATES, INC. CONSULTING ENGINEERS 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206-324.6160 1 , C ,tak , „w-1‘) 1 c.,, i ThJii Z2' 6,ec, y 3/ (t ,( . ,s 0 . . I , . etIveyvvd , , 1 3 , A $2,e714 4i 1‘) co L-E siir— 6 ,,. . 1 ........t_i_o‘ Li" A 's .:V, I c ! 1 :11P3 \ 1 ... 1 #3 , . L12...... m . T2(.5 ) i t 1 - 1 , I ■ i I. i I i I LOG.Y 2. .1 • , , --- II ! I i ; 1 , i • i 1 ! ! 7 1?/ 11 2 -." Ile tt 10.1 1 6 I • 1 I C I i 1 • I t I ) 4 I , • I . ! ' . 1 • , 1 • I i 1 . I ! , • 1 1 12 . 6-/, 4 ..L', r ;o 6 'ks1 '!p l 4 V:" —77: , i ; ; ; • ; , 1 , 1 , i ! • ., 1 ; I i ; 'I i. , • , ; ; 1 .. , , 1 i/u i .,, i - ■ i ! . , , i , i . i 1 ,, , . • , i ". 64, m 4 ' 41 , 1 /q,2,1 * : 14 eg'icsi 4 1., 134 . 3 17..13 - 4.61 • ', . , . 1 , •.(P7A . ". 0822. 4 ‘ tfi ( ft.,;11....; i, v co stag/14k', tp,./or s iy.e e, 4, ,i.L.: . 1 ' , ( — ::*,2,)( 28i ).. . 2 rn./; \A ; 6) JOB (tvtd.:1--tA t .11;c . • ; fp.= e• /421 14.16 ■, SHEET NO ' • _ OF 5 CALCULATED BY DATE CHECKED BY DATE SCALE 4.10.1990 8157 P Ct 6 4rit,J Loci( OM 1Y. 2.4s- I I, 0 a ; P 2 FROM HUDSON 206- 324 -6248 a RICHARD HUDSON & A OCIATES, INC. "ij'` = b� I . CONSULTING ENGINEERS 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206. 324.6160 4.10.1990 JOB fP,o P SHEET NO. S 8158 t . L e S-e c� Jlti'�i►. . OF . 3 CALCULATED BY DATE CHECKED BY DATE SCALE roM HUDSON 206- 324 -6248 /� RICHARD i7 V L JOB �1't" 80N & ASSOCIATES INC • 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206. 324.6160 po •l (. 140 , CONSULTING ENGINEERS SHEET NO. 5./ fr. 174 ' tit 2 4S ° ' r = MrK- r 4-L S 1.Z • 1 • 3z•, q Ic.. ,s i • o f Ak)I 4v ZZ Yht2 = gv "4. 5� L.k c1QQ T s! p PI r2 -19 1 i I = 50 G k/34,0 I3 +O --;G; -125 IG = i . 1 ",': 3 ?1.3'I , 2 Al - P* Z I Fv S 4w t = 2't rS "+ )2. i Z 4.10.1990 6156 i 3O • T2r )1c • I, OF CALCULATED BY DATE CHECKED BY DATE SCALE 2 -2Y i2 —?,EZ 3' LI 1t14 ° 1,0 Is i J�%.051 k.4 , d I � 2 • Coe Ib I i • P. 1 • 7.2. ..t. l- N: Z K (O 'RECEIVED CITY OF'TUKWILA APR 1 0'1990 PERMIT CENTER i , F8OM HUDSON 206- 324 -6248 RICHARD HUDSON & ASSOCIATES, INC. CONSULTING ENGINEERS 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206 - 324.6160 c,3 e4 I I i F .812 i f y,'1S f arp ( 13 ..* :(it . p a ,. ./‘,C 2 .7 ' :1+16 JOB 4.10.1990 8:57 CA. JCL SHEET NO `� ' Z.. v OF 5 CALCULATED BY DATE CHECKED BY DATE SCALE S i U :Grp '67 I o (0 • 541ftctlt.F. rwo,r 3�. -?-) 1 I •■ A S�N r 21,0' i 12. P. 2 �1. F13OM HUDSON 206 -324 -6248 RICHARD HUDSON & AtbuOCIATES, INC. CONSULTING ENGINEERS 1605 12TH AVENUE • SUITE 18 SEATTLE, WASHINGTON 98122 206.324 -6160 CALCULATED BY DATE CHECKED BY DATE SCALE 4.10.1990 8 :58 P. 3 JOB Pet‘. P, r. L N C1 4 . jata - SHEET NO. 3 OF Dear Sir: City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control Number 90 -105 Re: Paco Pumps - 3215 South 116th, #109 April 4, 1990 The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: Gary L. VanDusen, Mayor 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1)) (Extinguisher required for mezzanine level as well as main floor area) 2. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exits shall be illuminated at any time the building is occupied. An emergency system shall automatically provide exit illumination upon failure of the main power supply. (UFC 12.107(a)(b)) 3. All sprinkler drawings shall be prepared by companies licensed to perform this type of work. Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) 4. Each circuit breaker shall be legibly marked to indicate it's purpose. (NEC 110 -22) All electrical wiring is to be inspected by the State Electrical Inspector, Washington State Department of Labor & Industries. (NEC 70) 5. If the building is to be used for the storage of high -piled combustible material (as defined in UFC, Sec. 9.110); automatic fire - extinguishing systems, smoke - removal systems, fire protection and fire separations are required per Uniform Fire Code - Article 81. Yours truly, City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Page number 2 The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd Gary L. VanDusen, Mayor All interior wall covering materials shall be fire - resistive or shall be treated to be fire - resistive, so as to result in a flame - spread rating as required by UFC Appendix VI -C tables 42A and 42B. A certificate of the flame spread rating is required to be delivered to the Tukwila Fire Department. (UBC 4204) (UFC 10.401) This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. EXITING REQUIREMENTS Plan Review PROJECT ADDRESS DATE PG.co PL.(v\p5 OCCUPANCY GROUP J ' TYPE OF CONSTRUCTION ILL 1\1 ( LOCATION ON PROPERTY Eg is+5 BUILDING HT. / NO. STORIES 1 S - ri e Li6kreAthuse , 2- 5f1-. Mez zan u h c FLOOR AREA q 8 oO 5a . - J. Cross OCCUPANT LOAD 1 (D 4c, I 5 CDc-c. I - ry - 4 Ware-inn us.P (� !'c J (�)- o lG / L�� .rr.l.. 17 �e O� r- 1 c .c)I - 3 h i DETAILED REQUIREMENTS OCCUPANCY 6k< TYPE OF CONSTRUCTION SIC PART V, CHAPTER 23, U.B.C. (7)1C CHAPTER 51 -10, W.A.C. NOTES: aGCr c� v Z r lore cC pr-71V t )c - 1( - 4 (- CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING DIVISION PLAN CHECK NUMBER �t0 IOS } c prepared by: , Plan Review riD PROJECT . _ a O _ U p S ADDRESS DATE 5'; Gt�1 N fly / 2. 4 (-x ; 4-i 1m rP.cwir4,4 4.1( C CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING DIVISION n prepared by: s . V I _ PLAN CHECK NUMBER qQ -JO L., TA kehie architect March 5, 1990 City of Tukwila Building Department 6200 Southcenter Blvd. Tukwila, Washington 98188 Re: Energy Code Compliance Calculations For: Paco Pumps Gateway North - Building 3 Dear Sir, The following are energy calculations per Chapter 4, Component Performance Approach, of the Washington State Energy Code, 1986. In designing this space, the design parameters of climatic Zone 1, indoor design temperature shall be 70 deg. F. For heating and 78 deg. F. For cooling with indoor design relative humidity For heating shall not exceed 30 percent were used. Outdoor design temperatures shall be 2 deg. F. in winter and in summer, 83 deg. F. dry bulb, 67 deg. F. wet bulb. Air quantities shall be per Table 3 -1, office 15 cfm /person and conference rooms 25 cfm /person. These can be reduced by 33% For recirculating HVAC systems, all outside air. The building insulation shall maintain substantial contact to unexposed surfaces of ceilings and walls and need not have a Flame- spread rating or smoke density (pg. 21, 2, exception B). Moisture control shall apply to walls but not ceilings as per pg. 22, 1, B, ii. Assumed is the ground cover and perimeter slab insulation are in place. Section 40 was used For this space, Table 4-3. All exterior window and door Frames and wall panels have been caulked and all doors will be weatherstripped. RECEIVED CITY OF TUKWILA MAR 0 8 1890 PERMIT CENTER (206)433 -8997 ❑ 12878 INTERURBAN AVENUE SOUTH 0 SEATTLE, WASHINGTON 98168 • • City of Tukwila March 5, 1990 Page 2 Lighting power budget is 1.7 watts per square Footing with individual switching of rooms 400 s.f. or less and dual level switching For areas over 400 s.F. Building areas greater than 200 s.F. or within 12' to an outside window shall also have dual level switching. As calculations show, the building will be in compliance with the State Energy Code. Sinc= =1 • David Ke le DK /mc Enclosure: Calculations Energy Code Calculations Paco Pumps * Wall Type I (Interior & Demising Walls)- - - - 1328 s.F. * Wall Type II CConc. Tilt -up Panel) 384 s.F. * Wall Type III (Windows) 804 s.F. * Wall Type IV (Ceiling) 2792 s.F. * Wall Type V (SoFFit) _280 s_F� 5588 s.F Interior Wall (Sustem I) Inside Air Film 0.68 5/8" Gyp. Bd. 0.58 Batt Insulation 11.00 Air Vapor Barrier 0.00 5/8" Gyp. Bd. 0.58 Inside Air Film 0.68 R = 13.52 Uw1 = 0.074 Exterior Wall ( Sytem II) Outside Air Film 0.17 Conc. 6 -1/2" (0.08 /in) 0.52 1 -1/2" polystyrene 7.5 5/8" Gyp. Bd. 0.58 Inside Air Film 0.68 R = 7.20 Uw2 = 0.14 Windows (Sustem III) 1" Insulated Uwinter 0.'19 Usummer 0.58 Ceiling (Sustem IV) Inside Air Film 0.68 3 /4" Ceiling Tile 2.09 (2.78/in) Insulation 11.00 Inside Air Film 0.68 R = 14.45 Uclg = .069 SoFFit CSUstem V) Outside Air Film 0.17 1 -1/'1" Stucco (0.20 /in) 0.25 Batt Insulation 11.00 Air Vapor Barrier 0.00 5/8" Gyp. Bd. 0.58 Inside Air Film 0.6B R = 12.68 UwV = .079 • • Uo = 0.074(1328) + 0.49(804) + 0.069(2792) + 0.079(280) 5588 Uo = 98.27 + 53.76 + 393.96 + 192.65 + 22.12 5588 Uo = 760.76 5003.75 Uo - 0.136 CR = 7.35) Uallow = .25 x 2796 + .035 x 2792 5588 - 699 4- 97.72 5588 = 796.72 5588 0.143 CR = 6.99) Uo is less than Uallow and is o . : ••• • ••• PERMIT NO. - CONTACTED "Wkrxr,Sh o•-• DATE READY DATE NOTIFIED 2nd NOTIFICATION 4-10- (� '"I BY: (init.) ..�� BY: (init.) PERMIT EXPIRES AMOUNT OWING i ts 50 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER CIO - 105 BUILDING PERMIT APPLICATION TRACKING PROJECT NAME Paco Pu mp s SITE ADDRESS 5D1 S II SUITE NO. )09 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. UIREMENTS / MME >w: CONSULTANT: Date Sent - Date Approved - g BUILDING - initial review (ROUTED) FIRE PROTECTION: (' Sprinklers [) Detectors ( N/A IX FIRE `/ -3-7° FIRE DEPT. LETTER DATED: y -c/-f INSPECTOR: ZONING: BAR/LAND USE CONDITIONS? Yes O PLANNING INIT: O PUBLIC WORKS O OTHER INIT: INIT: INIT: BUILNG - l final DI review ; c 1° REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- W- UTILITY PERMITS REQUIRED? ) Yes (X1 No PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: UBC EDITION (year): (.9 88 PL SIOh) yA / i,4 REVIEW COMPLETED 0313W5 ���� �VVIIIVVIIVI wVVIV INI V I /I \II IIN III 1 VV I VV (206) 433 -1849 : DESCRIPTION: :AMOUNT RCPT # DATE: BUILDING:PERMITFEE y 1:,' PLAN CHECK 90- NUMBER ` d 5 APPLICATION MUST DE F II_ L EL) OUT COMPLETELY PLAN CHECK; FEE : Q tot) VW ;3-1 9 BUILDING' SURCHARGE 4 00 ENERGY SURCHARGE OTHER..:: ':TOTAL : '14.41 rj' SITE ADDRESS SUITE # 33. 5 3o. 11 L c 109 VALUE OF CONSTRUCTION - $ 58, 00 PROJECT NAME/TENANT Paco Co U/Yt /) ASSESSOR ACCOUNT # L ac A -(agL?C"► - �IUID(v £' - ►Dz-. aq -- 9011 - TYPE OF U New Building U Addition 61Tenant Improvement (commercial) U Demolition (building) WORK: 0 Rack Storage 0 Reroof Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: ir1 i 11 0•4c e, - 1-efari4 Lotproveryieth.5 ..1-Act ud l o) 34ora_q e_ 1,I e zza./ITn 2, BUILDING USE (office, warehouse, etc.) Of fi c. c°. `1 L.t}a,Ye_hOt kr.G NATURE OF BUSINESS: Di ' b) -)-Dr WILL THERE BE A CHANGE IN USE? (tNo U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: „VI 3C0 ..f. Tenant Space: 618(05,.(' Area of Construction: c2l - I c iZ .5.n WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? X No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER F.5eCaLrd f-- )ar e,r41.e, PHONE ,41_/ ADDRESS ' - - 1 , 9 , 0 . - C_;a .<.Jax t r G-('. ZIP 9 , 8 1e.402) CONTRACTOR 5 5L� C'..Urpora.J7 PHONE 3b - 7_ g9eL ADDRESS PO. .76DK 33970 . &aa /44 : (JA. ZIP (16) ).7) WA. ST. CONTRACTOR'S LICENSE # . � J . 9 D 4- 4( J4ci' EXP. DATE 50/ ARCHITECT ----)a v.4 A. .ei 4 , C h 1 PHONE 433../ C 7 ADDRESS ),:),` 78 I-r1 rUl%hGcr) tut : _, Cl z P WJ( 7 CITY OF TUKWILA Department of Community Development - Building Division BY CERTIFY THAT E READ AND CORRECT, AND I DATE APPLICATION ACCEPTED BUILDW PERMIT APPLICATION FEES (for staff use only) BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON PRINT NAME a ADDRESS / 0,8.7 6 kruy 1 <,h t L DATE PHONE 48 CITY /ZIP 6cillicd 9865 PHONE 7' -gqq� APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Dommunity Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES COMMERCIAL NEW i ommERdAL BUILDINO$/AD C Completed building permit appliation ( one for each s tructure) Arsessor A000unt Num Tyro. sets (2) of the followi • Spodfiwtiono Shtx:turat calculations stamped by a Washington State lloorise engineer Soh 'report stomped by .*was hington State • licensed engineer • C To pograpf>ioel survey C Eneryy calculations stamped by a Washington State licen • • engineer. or architect C 'gal description Woitiin drawings, stamped by a wasfe ngtorr state licensetl ar hliect, which include • p � ▪ Archltsctural drawings : Structural draWings • Meihanical drawi • Elevations drawing e • T location • Use of adjacent (com mon wall) tenan • Overaq dimensions o f building or square foota Floor plan of proposed tenant space • • 'Tenant space plan with use of,each room lab elled. !: Exit dcors,'egress.pattema . • New'walls, existing wall, and walla to be dem olish e Conattuctbn details Site Plan (shoWin g permit'appiica cwt location of antenna/satellite' cis ngs, which inclu one for each `structure) removed, an ed prior!o final inspection and VOTE ` Sse utplty permit : s ubmittal requ hements, :RACK STORAGE Comple building permit :ap plicatio Assessor Ao ount Two (2) sets of plans, which Ind • A u i ld i ng floor.pla sho win • Entire speoe where red s will be • Exit doors > : :<` • Dirnensione of all Tenant space floor plan showing rack storage layout exits; NOTE.: :Include di of racks and wilt viort. o►► 0911 • Strttotural calculations stamped, bya tNast!&! engineer (radi storage: 8`' and over); • Slic+ plan • Foundation plan. • Floor plan • Roof plan • Buildng elevations: (all • Building cross - section : • Structural .fran ing plant;:; Washington State Energy Code data S1i4MITTAL CHECks..IST (heluht, Wlddf :and. RESIDENTIAL NEW SINGLE - FAMILY DWELLINGS/ADDI Completed building permit application (one, for each structure D Legal description C Assessor Account Number [] Two sets (2) of working drawings, which inch Completed utility permit application Six: (6) sets of site plans showing utilities NOTE Building site plan and utility site plan may, be contbkied See uollfgr permit application and checklist for specific submittal requirements Adaoraai topographical and soils information may be requk.d d unique site conditions. • .: CtIM ERCIAL TENANT IMPROVEME Completed building permit application (one for sect attuc • rose sections showing wall oonstructkn and meth Meet tot floo;and :ceiling ;: • rt, oturai calcu stamped by a Washington State i oenc 91n.. may bo required if'structUml work is to be dome (2 sot s NOTE. 1f any ubhty work Ts t. be:done, submit separate utility per mit: applicadon RE Comp leted building permit apphicatton (one fo each structure .As sessor.AccountNumber : ;' :. : :. Narrative deacnbing existing roof, material being removed, an material being installed NOTE A certification letter Ia required prior to 'Mai inspection off of the permit: A NTENNA/8ATELLITE : DISH Completed A : Account ;Numb 2) sets of plans, which' inclu RESIDENTIAL REMODEL8 Completed building permit' application Assessor Account N Two (2) seta of won Site pUtn Foundation, plan : : Flc+or p��n Roof plan.:*; • Building elevation. (all views • :Building cross- section • Stnicturel framing plane:' NOTE; It any utility work is to 60. 4600 and plan mu be sub REROOFS Completed building permit application (one for each structure) . AssesWrAccount Number Narrative descnbing roof;: material belt) material being installed NOTE: A cettiflcation letter! off of the permit nt Nu pcowds� uthhlY permit application: tfIla flot tti we i1baV m1 • - 1•. 3404—. -- --- 1 1142.5atft. . nn 1c.rircor e 144`,c i 4- -ilxit'' 14 wow; ` [Zh ow ,- _.... -- -- file tieurt rinma2..)01/1241 Cr l {-tero � !-►" .r.. f 1Git"111v1.0 E2 11 P MP - 441160a2—irk-o- i 4,12) f'‘ pep. CIA MCIKIG 'J T tL'N �G'T �►�" _ r. b p LEGS -riroC M H 'P'P A.L.P. u",,/ 1 V,1 0 o'iruWb& (PEP &Es'►r I, O.) ..p A.& A.4 T ,IV/14E7 'few fric4 'K - UT ipAP'ri"' ur !mi 1 « . s Yr. F7. , TTAelirr O T l4P' o l s `T 1 t,.(r 1 .0u17Ki4e:. LTE r -ATE- = 4p' P CIA IL 1V, "t "'rig' v , L 1,11K� colat•l>acitr> 'To MAIM) kLIt4i -JEr? 4 "I"O " �:iJGsili 11.W'fi-. t -l- 1•. FA. T I O1.1 C F 16 IG GowrAi f NI Vr glA11 4 TH U CF-p,rr 4 OF PIPIr., F, t- T✓ RU I.! Ps Izot-i "fUF OF "TF.E - re2 e:)T ')T OF _1A-112AP w.Jr> ot= 1/OM-AL Wlrr A-PC IJr-' PIPS V41 c o 'S RUNN -- ----.-- 11.4 au 44. W IM PL1�tJE pr; i&.1i4 RUP4P € IZ' I 0.c. E: 45 . 11.1 ean 1?I1�'FG.TIOb. a 1.`4! FONT LcllT IS.I a l e otl 1%M A. WALL - a ---- -- 1-1A11 i t11-.! E-J E R 14 1. UPI~ 11J '_K,Mk: 6.4erM A5 F-- �Gi E - 2. UPI/7T1i'ING WIRI4 T O ' 6 A . O.c. 1JIJ :TEP - rG o-i'roM - lOr2 Or- . t s s".1/ 14" rye. ti Irti t:' t orr pato - b117414 Ci4±."''44QQ•r2 IK!.I • i . ; Wi Ic ) 1 1111 rA. v .t ) - 1►�/`E riarAY ,Gi1i. otn ,47r wt. - %44- /A .W1UltUhIUll 41 ui1 U H II tiffae 5/ MIN 7A 4 i./nir 4 161-ail LL-j )t J Ika = 7n N90P l flGkiNC - 3;ti u x 2 kz II e H ! !`a II x . OM< JAS fit . OAK 7Or VMc d t L- e_ogitr 1221~. 1 811-I CC' -k k)' f : rp -3'iI witte. t Lp 4:M-4 ' eti'r a ow() DEL ALAINA C4-4P C??L r`iq /c, CQ. tzti Ia l pea '�.....� z yil oc ,K M W "'> 1.1.22. 6.6.1.1101\J zz" wine+. ‘9L1hlp PAT% rA, &IP: WALL. G `>01JIJP.11,�L / i� 1 i f L,,_. I Fla- e)'nE1'!9R FL1 IL K 2.4 FZIJEW6r If7Ui ILJG 51AIJI *F7 14,4-1- srC- Io\ i.:£ sriwii�tiYv. b.. k' R` vu. f.:' elizd`% %`.vG6nL✓...�.n'3iY.S'5i°+''��' `'o'iY , t -�!- �� ±����,.:c•: e9�ti Y�iri�. 3r�a�lrtl�SS� !TFJi3�,•G�Y� - �':..... . ... _.. _ �Illf III�IIIIllliil!iI;VIII+ Illllllillllll111II II111ilJ III!IIIIIIJIIIi III lIII�IIIilIIJIIIIi�l�lll�lli; III III +III I 11 11.1111111111111111 p ,61,1' IN(.. 2 ,- 4 5 . 6 7 3 9 • ► NOT:: If the micrcfiimed document is less cieer then this notice, it is Cut:• to the quality Cr the ori'inel c'ocum Sl tie C <; ee LG pG 01. 8L Ll 9L hl Cl ZL U QI 6 0 L 9 I I i ' I ' I � II! !iI,11111 !I,l llll�! ;1 illllll i iiillil!Illi,;llllil, I Illlillllllillillll II11�!1 llllillll Iiilil,ii i�ilillll �Illill!! IIII�IIII iII111111 ill(Iilli 111111111 Illlillll Illlil Ci . - rog NW— AV' 14 4 J 11 o iu wpm Nrr J!-r Ata 11 IZ 4/ , wimp P r � 'ti" k4 EYt r•I=W 6 1 1:1-Or 1k1JP - pr Or' NAt-i- F - - TAM G 4,,o01.1b I'JAld II e;4 M rTAL. i t>~ I M . '------ 4 i'r P. 'TY P ' X A7 1F-E. Pp'i - t p 1 K G T L :641IJt7 BALL . GALA K 4Yr '1'0 n-OC,R C1 5:74u1,IP ! I 1iI; 1n 11 MGUE 114 UNMAN, 12 t, ti w � L III! 1! r F 1 `Te 41.44-11 r i IJG s "I1L E f J i-t'f t.z �O!'>v.c. 1.Jo I z. s IN6ees.14,oU Z'< 12 Oia ot. IpE i,i66s A-4.P Mlt,• 5 phi pie4k'IN6 ki:A1 -.1- �1 11 P - C'i�N ILI WALL, - I V tt1b� V9 //D r• ( i/ ± '11 4.1,0,1 'v r II' !i34 pr It- � eau ar,p4-IP- rbN9IG14 J0I1.rr i v Rot. c \&hioL, 2( *'v ;, I#t !+i)1 `Y/ ILK LGIiGI.ML I 'Nt.ttl (4) rI ;rr IOC\! TO I LLI(21 J if /7u9 'u.. - 1, 4 1 Q al Irt 6tot 46 1 . 1 v 1 I /__ 5 rAi SICC.K fi r --- 4,' kJat� I='rS %ILL rr Loki �- -- kT'1'A63N !. L AW E> C-; HA I.* fir! t CHUM h�. l� O\) - tz' ITT A1 M f 1 r. e . to Tam I;'AI1. L-.fre. + 1:4- ;f ki/ s IN - 14t, roI,°13• 10,2x 4 V 61:.1"/"./. , M s�. v.' fZ. !~G1 05 Nult.) -. z K 4 Hoge. ,,J/ lrr› Vim r7/7 s) • Y I -- veHot-A6 C�Ii1��l�il.e- r--ov Gelu4 Mot/ iI CITY OF TUK4iILM APPR0VF0 "'PR 1_0 1990 6s (A f3UIl.D!NG DIVIS'"N RECEIVED CITY OF TUKWILA APR 1 0 1990 PERMIT CENTER T S O Pi H Sl e DUWAMVEISH RIVER ONItt � ,,- •_` i✓at •e,r; • Prri6 r r /171 k'bQ i - 7, &' 6100461 Citedlos a iGiw f a -4 epoI4 114 .0 ..... L. • En IQ ti ' DOOR_SCHEDULE 1,2 3,4,5,13 7 8,9,12 11 14,15,16 AND 17 18 19 IO WINDOW S( lIMULE A 6'-0" WIDE X 5 HIGH MTD. + 3'- " A.F.F. •- INSULATED ROOM SCI IULE ¶ 9,11 7,8,10 12 20 (MEZZ ) dr-MITE 6ti \MK. EXIS'T'ING 3' -0" x 8' -6" STOREFRONT DOOR 3' -0" x 8 SOLID CORE W3OC WITH WOOD FRAME, TWO PR. BUTTS, LC.CKSET, SIL,ENCEItS 3' --0" x 8 SOLID CORE WOOD WITH WOOD FRAME, 'IV O PR, BUT`T'S, LATCHSET, SI LENCERS 3'-0" X 8 " -0" SOLID CORE WOOL) WITH WOOD FRAME 1S,TO PR, BUTTS PRIVACY LOCK, SILENCERS 3' -0" ,. 8 SOLID CORE WOOD WITH WOOD FRAME , TWO PR . T3U'i °I'S, UJCKSET, WEATH 2STRIT , CLOSER 9' - -0" x 10' -0" STEEL, OVERHEAD DOOR EXISTING 1.0' x 14 " - STEEL OVERIIF•.AD DOOR EXISTING 3 - x 7 " - HOLLOW METAL ITeR AND FRAME OPENING FULL HEIGHT X FULL WID'T'H I_ a I , •1IZ J - O' I o - d p-P LX4 kJ*, t7 Ptcsoica, WM> PlgikfrW FLOOR: PALL : CEILING: FLOOR: WALL: CEILING: FLOOR: WAIL: CEILING: FLOOR: WALL: CEILING: CARPET W /RUBBER BASE GYP. BD. PAINTED SUSPENDED ACYOUSTIC VCT W /RUBBER BASE GYP. BD. PAINTED SUSPENDED 1 COOSTIC SHEET VINYL W /5" COVED BASE PLASTIC LAMINATE WAINSCCTT+ 4'-0" GYP. BD. PAINTED - SGE SGE GYP. BD. //yyy�PyyA(�IyyN,••yyTE,D •- SEALED CONCRL" A E' EXPOSED CONCRETE OR GYP. BD. t:XP7SED STRUCTURE FLOOR : EXPOSED PLYWOOD WALL: EXPOSED CONCRETE, OR GYP. BD. CEII..I STRUCTURE Z 376 i3AL1Ic. -uiJl x. lsiaf r=' J4 ft to 16211 kJ e ►-Avi 1.41P -e �t in.g &ROY' 6o1Z AVMJ'TI PAP&L' eT r A Tltfaki - fezt.1.11 LIL p,::o O r , rllejUM - A I - I - 1 ON6 j•�1A5'(iG 1.411-4001" ■{A,rxoiaJ eqa hct - I?RRI A i..r' t-u Q sa, I° co f IIpIiS IL0II SialaggaZaialk t LEGEND NEW STUD WALL 10 UNDERSIDE OF CEILING. NEW STUD WALL W /SOUN'0 INSULATION Fowl TYPE/CAuLI: @ BASE, 2'-0" E.S. @ CEILING W /SO(JND BATS. EXISTING STUD WALLS. EXISTING STUD WALLS. ILLUMINATE© EXIT SIGN. EXISTING 3 TUBE FLUORESCENT TO BE REMOVED AND STORED (.,R RE -USED . EXISTING 3 TUBE FLUORESCENT TO R VAIN. NEW OR RELOCATED 3 TUBE FLUORESCENT . DUPLEX OUTLET 120v WALL TELEPHONE OUTLET, MOORING, ODNDUIT, & PULL STRING ONLY. FO g CU11-el 120 a em ion t * brat I t t' e.6L,L 4 7 p1-0- P7 i' rA OL1'Ci- ,7 ( 3 'r :i. F'I e) 1 111 •4 . %:.. :- �i."w'1titw— �" , ._... 1_'S.`F.••.!'�r +►+.'r�.."- .... —' yi. 4 � � ti_.,.. -- ! i ' ! • -- --�._� A" ______ _I_ __ _ Ion Waernr? t :lI'-o.' ( MI c.. II ' It•41 i ' / p t. O ® Li 64 5 'r l 0‘ Vii+ OS, " ` 1 .wK °t~raAf� w P ; Mg a1 aai / obit : V t{t% ` Pp" cc,-), CITY OF TUKWILA APPROVED PP R 101990 BUILDING ISION II •�� S. L.i . <F III I IIII IIIIIIIIIIIIIIII lipIIIIIJIIII 'IIIIIIIIIIIIII'IIIII IT! III !III IIIII'I IIIIII I IIIIIIiiiiii IIIIIIIIIIII'II IIIIIIIIIIIIIIIIIIIIIIIIlIIIIII, . j iillmiliiii / : ' � 9 1() _. 1 1 MAOE{N GFAMANY 12 r NOT 7: If the microfilmedi document is less cleer then this k.____ notice, it is Cue Y to the quslity or the orif'ine: cocument. 0E.: e,,' fit Le y <: SZ ►iZ ce . Ze to .- o - E --- 61. 91 Ll 9L • I . fit ' et r 'it - tl ~- o1 .__ 6 �. 3 L 9 ; V t z l ww U I ( I (I I f I + liin!IIIIII IPH IN IIIIIIIIIIilililllliilllif 1111lllili1111111111 I IIIil11111► 11iI11ii lii lilllli1111III11I111111iiilil illllllf lilllilli! IIIII11111Illllli liiilllllii( ILIAl lliilliiiililiiliiililillll lli�1111IIIIII1111111111111111 IIlllllll111OIR !illllllllliiii1111I1 ; :' ��•, / / :iI1�s?.! r � s. :�. -, x i�f. : : : .l :G :, , ; � - fs J'i ._, � ✓.. � >;x . ,._,. .,...,_ .� ,?.r.�_' � ' ?;� ^. r _.. ' if . i zl � , ✓•; . : \kTe ; FLooR 1\1 Au.1 t4 6 1 Bert s —I FILE Copy ! tirdt.?rstand `f, ?t i' • "on ! : U, e c 1 t• .��-.. Jr,nrovals are Vii. :ii.a}n of r` o r ` .t e �t of I t ;.Un1( "cc tOr S t'k:•d piisi1S zi:::i4io' IC g—... �h�Lc�erJ Date Permit No U6411* PA 2.uo A ,$10' 6 I10 v F4ti✓i. aTia r' CITY OF TUKvtili_A APPROVED APR 10 1990 s '' RECEIVED CITY OF TUKWILA APR I 0 1990 PERMIT CENTER UjZ Z Z w cc 3 co . I 11 Y� flaysk: 4, Awl•ri I/8 _ I ,_0o, NOT a5 t I TOP OF F LOOR ' FRA.MING ( 1-TOM C)F PL YI"1OOt) A bOm a REP ERE.NC.E ' DATUM, 2) NA O.- 4` "CLUE FLOOR tHE.AtHING tQ FRAMING, �.+." ' iw' 4 ., t y? s.:" +;i1 /...{.rr :� �'ti .t"'- '�:""[4`''... ..'s'.a ti :..ti ..+q : : .u. -„ FLOOR PLYWOOD 5HALL E 4/4" T. G, , INDE'$ 4-8 /24, UNDER LAYMENT "GRADE.. . NAIL FLOOR PLYWOOD 1/4/10J COMMON (,148 c1 PENETRATION INTO FRAMING ) 2 '(a" ,, t~DC-JE • • ItIlII'I►1►IIII1tJ I�1 1 � II 11 1111111111111111,11111111111111 ! I ( I II 1111II 11111 �1Il1 IIfItI II �! ''111 €3 ». N7T If` the`rrlicrcfilrned eoctament is less clear'thsn'this rotice, it is cue to 'the 'ousiity cr the`cririnel cocurSPent. _..... .z�il, -�,.'- 1 �.. ; ., ZL .: ._.. C: 1k L� E7- 77 1z OG' Eel fit Li �3l ()( 6 . i : � .. o- l A ;' . , . ✓gyp . ,. !�," �I�111nlIl llnn�li1 1 -fro Irp!11�I�III111n111wlii 1�in1111 �I�IIiilnlllliihll�Ii1111t ICI 1lllill�iin1111 li ill i� �i tliiii�il`i li lili litlil1l11� �� i liiil�iliil iii�111111i11Illill��`!► i - �� /'. S:a 1 .,• ,'+`/ w • a t � ESL :r �° 3 •k t''4 Tl`.. J. .!1 .a.f .II I "*r 3' •+�`.r'a' LC �i �x '.i'. n .,. '.�Cl 7;�d `ar 7 ,.rr�� *�d2 l• �' r fh' . r � • ° �!; � .,.Y " „ � , ..' •"S i{.h. y F� '�. �'�� :. :, 3";f.. J,r r - -.. •':,•!✓ '�`'. ",^'j�- `us^• :.r �.'�L + "r. F.,..} 4�.r- •E' . ,d+c• '� � :.;fir g ,�'F � � •S.e..s,.. :4 :,,r.K...e r .,... �:..-.' S...• �' fs :'�:d.�.'.;,,(>r..,•..s:.:., � _,.. ,. _� ? :. :..!�'d.'1_ se :...�_...� .;�..�.. �_.Gc.;.,.,,. .�.,f.,S..f.,.. r . .r...,�� -. _..�'......r ! _i.. :,.f,.rY.- :5,- s,,..Ct_.ac., w4.•: r. 3" x, "�'..�3':�3r�xn..r�:�1.�'3'"_" Y'�: • scA �I1 Il1111�riII'I' Ii'I II�III I I�ililili� I . ` 10 11 Wat*iGSRULHY 1 "�^. °ti <!S"' �L w':�o- �,.. s.;:,•.,..,_.+...r'.,ic:. < e.Lc i. ,'.- ..«w -a +n:� 'oa' - ..��. ^'J'-5.. - + " :.L:k%, -. :,l4.41 TEL. (2061324.6160' RICHARD M ASSOCIATES, INC. ; CONSULTING ENGINEERS 1605'127 i AVE NUE,' SUITE :18 SEATTLE, WA$ IIIN TL IS1, 98122 L. AgV t . FA, T COL, cf,t_E eV4 ,s _ 1 I -'> 3ECJT1ON 3 /4 18 GL E3 GL.e T / V1 / t N l :;l P.( [ I\1 T ' %4 ' ' W / 2 %t3'`t$) M b . 2 -2x12 H /1 -111r ti /!4 . 4 ,� r. 6 \'1I4 22 tom! i L !:) NI 2 r',T, \(i.".1EK 2 T 1[ 14/ ` e (a) C:.X f M E) L D " 4 - " 1 T.5 3 C LR � Z bl 91 Ll 41 51 EL LL s t L %l L1 OL ` ze II ff CL II11�1��I �11611111111111l 11l 1! I1�11i11If11III�I1111111 f111I1I 111111�11I111111IIlil�lllllllll 1Il104 iI111l 1l III IIIIl111i1i111111I1I111h111111 !111 ;:� a. ,, _w c ..5 �f_`.:'iskrx.... �� r !'Y -. %,nJ,_ �..�:. :r?.', .i�,t L-. ,M1, : •i il,c' i _.! 'Ir sY kr +.•� ±ii. �. s;r PIP LTT I'1 i;. '`% KID k o #= r t 7 L WW O Ii11111111Il11111i 1��II1i �f11�111 I+ 1�111�111�Ili�ll 'I�111�111�111�111�I I !1 ii [� `1 ((�` 1ilII11 11 11111111111 11 1 1 1111111 1 1 9 2 3 4 5 6 7 . 8 ..__, NOT?: If " the micrcfilmed document' is less clear thin this notice, it is cue tc the oUality cr the "ori'inel c'ocument. I IFORM BUILDING CODE, 1988 LI OADS : FLOOR 125 PSF � UUNpAC N CL son BEARING 2500 PSF PER REPORT. G E N E R A L NO T E STEEL AL N ' EI14FORCEMENT SHALL CONFORM TO ASTM A615--;82(S1) GRADE 60 FRAMING LUMBER: 2 X 12 JOISTS...D.F. #2...• fb = 1250 psi LUMBER NOT NOTED TO BED.F. #2 OR BETTER. ALL GRADES SHALL CONFORM TO WWPA GRADE RULES FOR WESTERN LUMBER SAT -- r BE PROVIDED WITH STANDARD H -1979 EDITION. ALL BOLTS HEADS AND NUTS BEARING AGAINST' CONCRETE OH MASONRY SHALL BET PRESSURE WASHERS. D. MOISTURE ^T WITH T STURE CONTENT 19% AT, INSTALLATION FOR ALL LUMBER. STEEL_ HANGERS TO 3E SIMPSON OR APPROVED EQUAL. FASTEN ALL HANGERS AS SPECIFIED BY MANUFACTURER UNLESS SHOWN. PL YWOOD: PL ALL PLYWOOD OOORTHING.........3 /4' UNDERLAYMENT GRADE ADDITION. NAI SHALL INDICATED CONFORM BE AS" PRODUCT STANDARD P.S. 1 , CURRENT ED ON PLAN. SPECIAL CONDITIONS: BRACING AND GUYING IN ACCORDANCE WITH SOUND PRACT SH D A Oh. THE CONTRACTOR SHALL PROVIDE ADEQUATE DURING CONSTRUCTION PRACTICE AND ALL NATIONAL, STATE, AND LOCAL CODES. CONTRACTOR TO COORDINATE ALL TRADES AND VERIFY DIMENSIONS IN FIELD. OBTAIN ARCHITECT'S APPROVAL PRIOR TO ALL FIELD CHANGES. SEE ARCHITECTURAL DRAWINGS FOR ALL FLOOR AND WALL ' OPENING DIMENSIONS AND LOCATIONS, FLOOR AND WALL FINIS?1ES, E'1•C. GLU LAMINATED WOOD MEMBER GLU- LAMINATED WOOD BEAMS. KILN DRIED, INDUSTRIAL APPEARANCE. STRESS SIMPLES SPAN BEAMS. STRESS < (fb 2400 Psi; fv - COMBINATION 24 -F -V4 :. -- i65 Psi), AT SS GRADE: COMBINATION 24F -V8 AT CANTILEVEP.4'D BEAMS Cfb= 24040 psi, fv = 165 psi). GLU -LAMS MUST BE OBTAINED FROM AN AITC O S UBMIT SHOP DRAWINGS TO ARCHITECT ANDS STRUCTURAL ENGINEEROPRIOR TO FABRICATION. RICHARD iIJIMON & ASSOCIATES: IBC. CONSULTING ' EN 1NEERS 105 - 1 ; 2t1-1 AVENUE, SUITE 18 SEATI'I E. WASHINGTON 98122 RECEIVED; CITY OF TUKWILA APR 1 0 1990 PERMIT CENTER :•wSy.,�a � ..�`.= u.FS� :w�' ......�.rY - rif r . ,a 1 � 'i.